SF-30_EA18RQ-00352_Amendment_0001.doc
DOC document 91 KB Posted
- Attached to
- BUOY HULLS
- Solicitation number
- EA18RQ-00352
About this file
Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| D030051.pdf | ||
| SF-30_EA18RQ-00352_Amendment_0001.doc | DOC document | |
| Past_Performance.docx | DOCX document | |
| DART_II_Hull_Specification.pdf | ||
| NDBC-8117.pdf | ||
| Past_Performance.docx | DOCX document | |
| DART_II_Hull_Drawings.pdf | ||
| RFQ_Combined_Synopsis_Solicitation.DOC | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SF30 Continuation of Block Narrative
| Page |
| 2 |
| of |
| 2 |
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| 1. Contract ID Code |
| Page of Pages |
| 1 |
| 2 |
| 2. Amendment/Modification No. |
| 3. Effective Date |
| 4. Requisition/Purchase Req. No. |
| 5. Project No. (if applicable) |
| 0002 |
| 02/08/2018 |
| NWWG2200-18-00352 |
| 6. Issued By |
| Code AJ930073 |
| 7. Administered By (If other than Item 6) |
| Code SEE BLOCK 6 |
| NOAA/EASTERN REGION ACQUISITION |
| 200 GRANBY STREET |
| SUITE 815 |
| NORFOLK, VA 23510 |
| 8. Name and Address of Contractor (No., Street, County, and Zip Code) |
| (X) |
| 9A. Amendment of Solicitation No. |
| X |
| EA18RQ-00352 |
9B. Date (See Item 11)
02/13/2018
10A. Modification of Contract/Order No.
10B. Date (See Item 13)
| Code |
| Facility Code |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X |
| The above numbered solicitation is restated as set forth in item 14. The hour and date specified for receipt of Offers |
| X |
| is extended |
is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as restated, by one of the following methods:
| (a) By completing items 8 and 15, and returning |
| 1 |
| copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer |
submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-
MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT
IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (x) |
| A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A. |
| B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) |
Set fourth item 14, pursuant to the authority of FAR 43.103 (b)
| C. This supplemental agreement is entered into pursuant to authority of: |
| D. Other (Specify type of modification and authority) |
| E. IMPORTANT: Contractor |
| is not, |
| is required to sign this document and return copies to the issuing office. |
14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
NOAA, National Data Buoy Center (NDBC)
Stennis Space Center, MS See the attached Continuation Sheet for a Complete Description of Changes
1) Solicitation Amendment 0002 is issued to provide answers to Questions received as a result of Request for Quotation (RFQ) EA18RQ-00352.
Vendor Question 1: The customer provided mold for the Hull Shell, Drwg D030047, is this a 2 piece female mold? If so do the mold halves include mating flanges that provide for alignment and attachment to each other for bonding the individual part halves together?
Government Answer to Vendor Question 1: The mold is a 2 piece female mold with mating flanges to assist with alignment and bonding together
Vendor Question 2: Drawing D020011 refers to Drwg #D030051 for the Upper Cylinder well which in not included in drawing packet,…will this drawing be available?
Government Answer to Vendor Question 2: Drawing is uploaded with attachments.
Vendor Question 3: Drawing D030062, can Garolite G-10 be substituted for the specified PVC for improved bonding assurance?
Government Answer to Vendor Question 3: G-10 can be substituted if the contractor can verify that the threaded inserts will not rotate under the torque of the fasteners that will be used on it
Vendor Question 4: Handles referred on Drwg D030063 are presumed to be FRP, is this correct?
Government Answer to Vendor Question 4: No. This fiberglass molded into the cylinder.
Vendor Question 5: There appears no mention of how the Top, Drwg D030048 is attached to Hull Shell, Drwg D030047, How is this to be accomplished?
Government Answer to Vendor Question 5: Using best practices for fiberglass construction. The "v" angles from the stainless steel frame should provide a shelf for the top to keep it stable as it is being glassed in
Vendor Question 6: Is the lettering shown on Hull, Drwg D030047 to be molded in?
Government Answer to Vendor Question 6: No, the lettering is painted on. NDBC paints the hulls after they are received and accepted.
Vendor Question 7: Is the rubber bumper to be installed by the vendor? If so will the customer provide material?
Government Answer to Vendor Question 7: No. NDBC takes care of the bumper and its installation. The vendor is responsible for ensuring proper spacing between fastening points.
Vendor Question 8: Does the buoy hull, with the exception of the payload compartment, get completely filled with foam?
Government Answer to Vendor Question 8: Yes...it is completely filled with foam.
2) Additionally, the offers due date has changed from 02/09/2018 to 02/13/2018.
3) Drawing #D030051 has been uploaded to the attachments.
4) Except for the changes made herein all other terms, conditions and provisions of the solicitation remain unchanged and in full force and effect.
END AMENDMENT 0002 TO EA18RQ-00352
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. Name and Title of Signer (Type or Print) |
| 16A. Name and title of Contracting Officer (Type or Print) |
| 15B. Contractor/Offeror |
| 15C. Date Signed |
| 16B. United States of America |
(Signature of Contracting Officer) 16C. Date Signed
_____________________________________________(Signature of person authorized to sign)
| NSN 7540-01-152-8070 |
| 30-105 |
STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITIONS UNUSABLE
Prescribed by GSA FAR (48 CFR) 53.243
File details come from the government source that posted it.