AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. Contract ID Code Page of Pages 1 1

2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable)

0002 7/26/2017 NMAN7200-17-01192

6. Issued By Code AJ930073 7. Administered By (If other than Item 6) Code NOAA/Eastern Acquisition Division 200 Granby Street, Suite 815 Norfolk, VA 23510

See Block 6

8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.

X

EA-133M-17-RQ-01192

9B. Date (See Item 11) 7/26/2017 10A. Modification of Contract/Order No.

10B. Date (See Item 13)

Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers X is extended is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

1. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

1. This solicitation is extended through 4:00 PM ET on July 27, 2017.

2. Addenda to sections of the Statement of Work are posted below.

3. A request for pricing breakdown is posted below.

SOW/Work Items Addenda

SOW 3. Where a functioning LONworks piece of equipment exists and is compatible with a new controller, leave in place. Where equipment is broken or non functional, remove and replace with BACnet.

SOW 4. & Work Item 1.c.

- The system will be designed such that the office space radiators on the second floor of building 1 will be independent from the BAS. It will be designed with an emphasis on energy reduction.

The existing wall analog thermostats and or expansion 120V AC expansion valves do not currently function properly. The vendor should bid to install a programmable thermostat and replace or upgrade the existing expansion valves for each radiator.

Work Items 1.d. - Remove ceiling hung radiators from the scope of this requirement.

Price Breakdown

-Building 1 (without consideration of radiators listed below)

- Office Space Radiators using stand alone Digital Programmable Thermostats and expansion valves as needed.

-Warehouse Radiators

-Building 2