_Combined_Technical_Specifications_Revised_2017.08.04.pdf
PDF 1 MB Posted
- Solicitation number
- DTSL5517B0500
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DTSL5517B0500A00002.pdf | ||
| DTSL5517B0500A00001.pdf | ||
| SLS_327_148_04_Rev1.pdf | ||
| Plan_Holder's_Listing.pdf | ||
| Plan_Holder's_Listing.pdf | ||
| Plan_Holder's_Listing.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OPERATION AND MAINTENANCE DATA 017823 - 1
SECTION 017823 - OPERATION AND MAINTENANCE DATA
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, including applicable Part I, Sections C through M, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for preparing an operation and maintenance manual, including the following:
1. Operation and maintenance manuals.
2. Emergency information.
3. Systems and equipment operation information.
4. Systems and equipment maintenance information.
5. Product maintenance information.
1.3 DEFINITIONS
A. System: An organized collection of parts, equipment, or subsystems united by regular interaction.
B. Subsystem: A portion of a system with characteristics similar to a system.
1.4 CLOSEOUT SUBMITTALS
A. Submit operation and maintenance manual as indicated. Provide content for each manual as specified in individual Technical Specification Sections, including applicable Part I, Sections C through M, and as reviewed and approved at the time of Section submittals. Submit reviewed manual content formatted and organized as required by this Section. Operation and maintenance manual shall include the pre-engineered metal building and its components.
1. COTR will comment on whether content of operation and maintenance submittals is acceptable.
2. Where applicable, clarify and update reviewed manual content to correspond to revisions and field conditions.
B. Format: Submit operation and maintenance manuals in the following format:
1. Submit on digital media acceptable to COTR. Enable reviewer comments on draft submittals.
OPERATION AND MAINTENANCE DATA 017823 - 2
2. Submit on digital media acceptable to COTR plus three paper copies of Final Approved Operation and Maintenance Manuals.
C. Initial Manual Submittal: Submit draft copy of manual at least 30 days before commencing demonstration and training. COTR will comment on whether general scope and content of manual are acceptable.
D. Final Manual Submittal: Submit each manual in final form prior to requesting inspection for Substantial Completion and at least 15 days before commencing demonstration and training.
1. Correct or revise manual to comply with COTR's comments. Submit copies of each corrected manual within 15 days of receipt of COTR's comments and prior to commencing demonstration and training.
1.5 FORMAT OF OPERATION AND MAINTENANCE MANUALS
A. Manuals, Electronic Files: Submit manuals in the form of a multiple file composite electronic PDF file for each manual type required.
1. Electronic Files: Use electronic files prepared by manufacturer where available. Where scanning of paper documents is required, configure scanned file for minimum readable file size.
2. File Names and Bookmarks: Bookmark individual documents based on file names. Name document files to correspond to system, subsystem, and equipment names used in manual directory and table of contents. Group documents for each system and subsystem into individual composite bookmarked files, then create composite manual, so that resulting bookmarks reflect the system, subsystem, and equipment names in a readily navigated file tree. Configure electronic manual to display bookmark panel on opening file.
B. Manuals, Paper Copy: Additionally, submit manuals in the form of hard-copy, bound and labeled volumes.
1. Binders: Heavy-duty, three-ring, vinyl-covered, loose-leaf binders, in thickness necessary to accommodate contents, sized to hold 8-1/2-by-11-inch paper; with clear plastic sleeve on spine to hold label describing contents and with pockets inside covers to hold folded oversize sheets.
a. If two or more binders are necessary to accommodate data of a system, organize data in each binder into groupings by subsystem and related components. Cross-reference other binders if necessary to provide essential information for proper operation or maintenance of equipment or system.
b. Identify each binder on front and spine, with printed title "OPERATION AND MAINTENANCE MANUAL," Project title or name, and subject matter of contents. Indicate volume number for multiple-volume sets.
2. Dividers: Heavy-paper dividers with plastic-covered tabs for each section of the manual.
Mark each tab to indicate contents. Include typed list of products and major components of equipment included in the section on each divider, cross-referenced to Specification Section number and title of Project Manual.
OPERATION AND MAINTENANCE DATA 017823 - 3
3. Protective Plastic Sleeves: Transparent plastic sleeves designed to enclose diagnostic software storage media for computerized electronic equipment. Enclose title pages and directories in clear plastic sleeves.
4. Supplementary Text: Prepared on 8-1/2-by-11-inch white bond paper.
5. Drawings: Attach reinforced, punched binder tabs on drawings and bind with text.
a. If oversize drawings are necessary, fold drawings to same size as text pages and use as foldouts.
b. If drawings are too large to be used as foldouts, fold and place drawings in labeled envelopes and bind envelopes in rear of manual. At appropriate locations in manual, insert typewritten pages indicating drawing titles, descriptions of contents, and drawing locations.
1.6 REQUIREMENTS FOR EMERGENCY, OPERATION, AND MAINTENANCE MANUALS
A. Organization of Manuals: Unless otherwise indicated, organize each manual into a separate section for each system and subsystem, and a separate section for each piece of equipment not part of a system. Each manual shall contain the following materials, in the order listed:
1. Title page.
2. Table of contents.
3. Manual contents.
B. Title Page: Include the following information:
1. Subject matter included in manual.
2. Name and address of Project.
3. Name and address of Owner.
4. Date of submittal.
5. Name and contact information for Contractor.
6. Name and contact information for Construction Manager.
C. Table of Contents: List each product included in manual, identified by product name, indexed to the content of the volume, and cross-referenced to Specification Section number in Project Manual.
1. If operation or maintenance documentation requires more than one volume to accommodate data, include comprehensive table of contents for all volumes in each volume of the set.
D. Manual Contents: Organize into sets of manageable size. Arrange contents alphabetically by system, subsystem, and equipment. If possible, assemble instructions for subsystems, equipment, and components of one system into a single binder.
E. Identification: In the documentation directory and in each operation and maintenance manual, identify each system, subsystem, and piece of equipment with same designation used in the Contract Documents. If no designation exists, assign a designation according to ASHRAE Guideline 4, "Preparation of Operating and Maintenance Documentation for Building Systems."
OPERATION AND MAINTENANCE DATA 017823 - 4
1.7 EMERGENCY INFORMATION
A. Emergency Information: In the Operations and Maintenance Manual assemble a complete set of emergency information indicating procedures for use by emergency personnel and by Owner's operating personnel for types of emergencies indicated.
B. Type of Emergency: Where applicable for each type of emergency indicated below, include instructions and procedures for each system, subsystem, piece of equipment, and component:
1. Fire.
2. Flood.
3. Power failure.
4. System, subsystem, or equipment failure.
5. Chemical release or spill.
C. Emergency Instructions: Describe and explain warnings, trouble indications, error messages, and similar codes and signals. Include responsibilities of Owner's operating personnel for notification of Installer, supplier, and manufacturer to maintain warranties.
D. Emergency Procedures: Include the following, as applicable:
1. Instructions on stopping.
2. Shutdown instructions for each type of emergency.
3. Operating instructions for conditions outside normal operating limits.
4. Required sequences for electric or electronic systems.
5. Special operating instructions and procedures.
1.8 SYSTEMS AND EQUIPMENT OPERATION INFORMATION
A. Systems and Equipment Operation Information: In the Operations and Maintenance Manual assemble a complete set of data indicating operation of each system, subsystem, and piece of equipment not part of a system. Include information required for daily operation and management, operating standards, and routine and special operating procedures.
B. Content: In addition to requirements in this Section, include operation data required in individual Specification Sections and the following information:
1. System, subsystem, and equipment descriptions. Use designations for systems and equipment indicated on Contract Documents.
2. Performance and design criteria if Contractor has delegated design responsibility.
3. Operating standards.
4. Operating procedures.
5. Operating logs.
6. Wiring diagrams.
7. Control diagrams.
8. Piped system diagrams.
9. Precautions against improper use.
C. Descriptions: Include the following:
OPERATION AND MAINTENANCE DATA 017823 - 5
1. Product name and model number. Use designations for products indicated on Contract Documents.
2. Manufacturer's name.
3. Equipment identification with serial number of each component.
4. Equipment function.
5. Operating characteristics.
6. Limiting conditions.
7. Performance curves.
8. Engineering data and tests.
9. Complete nomenclature and number of replacement parts.
D. Operating Procedures: Include the following, as applicable:
1. Startup procedures.
2. Equipment or system break-in procedures.
3. Routine and normal operating instructions.
4. Regulation and control procedures.
5. Instructions on stopping.
6. Normal shutdown instructions.
7. Seasonal and weekend operating instructions.
8. Required sequences for electric or electronic systems.
9. Special operating instructions and procedures.
E. Systems and Equipment Controls: Describe the sequence of operation, and diagram controls as installed.
F. Piped Systems: Diagram piping as installed, and identify color coding where required for identification.
1.9 SYSTEMS AND EQUIPMENT MAINTENANCE INFORMATION
A. Systems and Equipment Maintenance Information: In the Operations and Maintenance Manual assemble a complete set of data indicating maintenance of each system, subsystem, and piece of equipment not part of a system. Include manufacturers' maintenance documentation, preventive maintenance procedures and frequency, repair procedures, wiring and systems diagrams, lists of spare parts, and warranty information.
B. Content: For each system, subsystem, and piece of equipment not part of a system, include source information, manufacturers' maintenance documentation, maintenance procedures, maintenance and service schedules, spare parts list and source information, maintenance service contracts, and warranties and bonds as described below.
C. Source Information: List each system, subsystem, and piece of equipment included in manual, identified by product name and arranged to match manual's table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent as applicable.
D. Manufacturers' Maintenance Documentation: Include the following information for each component part or piece of equipment:
OPERATION AND MAINTENANCE DATA 017823 - 6
1. Standard maintenance instructions and bulletins; include only sheets pertinent to product or component installed. Mark each sheet to identify each product or component incorporated into the Work. If data include more than one item in a tabular format, identify each item using appropriate references from the Contract Documents. Identify data applicable to the Work and delete references to information not applicable.
a. Prepare supplementary text if manufacturers' standard printed data are not available and where the information is necessary for proper operation and maintenance of equipment or systems.
2. Drawings, diagrams, and instructions required for maintenance, including disassembly and component removal, replacement, and assembly.
3. Identification and nomenclature of parts and components.
4. List of items recommended to be stocked as spare parts.
E. Maintenance Procedures: Include the following information and items that detail essential maintenance procedures:
1. Test and inspection instructions.
2. Troubleshooting guide.
3. Precautions against improper maintenance.
4. Disassembly; component removal, repair, and replacement; and reassembly instructions.
5. Aligning, adjusting, and checking instructions.
6. Demonstration and training video recording, if available.
F. Maintenance and Service Schedules: Include service and lubrication requirements, list of required lubricants for equipment, and separate schedules for preventive and routine maintenance and service with standard time allotment.
1. Scheduled Maintenance and Service: Tabulate actions for daily, weekly, monthly, quarterly, semiannual, and annual frequencies.
2. Maintenance and Service Record: Include manufacturers' forms for recording maintenance.
G. Spare Parts List and Source Information: Include lists of replacement and repair parts, with parts identified and cross-referenced to manufacturers' maintenance documentation and local sources of maintenance materials and related services.
H. Maintenance Service Contracts: Include copies of maintenance agreements with name and telephone number of service agent as applicable.
I. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds.
1. Include procedures to follow and required notifications for warranty claims.
J. Drawings: Prepare drawings supplementing manufacturers' printed data to illustrate the relationship of component parts of equipment and systems and to illustrate control sequence and flow diagrams. Coordinate these drawings with information contained in record Drawings to ensure correct illustration of completed installation.
OPERATION AND MAINTENANCE DATA 017823 - 7
1. Do not use original project record documents as part of maintenance manuals.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 017823
PENETRATION FIRESTOPPING 078413 - 1
SECTION 078413 - PENETRATION FIRESTOPPING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, including applicable Part I, Sections C through M, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Penetrations in fire-resistance-rated walls.
2. Penetrations in horizontal assemblies.
3. Penetrations in smoke barriers.
1.3 ALLOWANCES
A. Penetration firestopping Work is not a part of an allowance, but shall be included in the lump sum price.
1.4 UNIT PRICES
A. Work of this Section is not affected by unit prices, but shall be included in the lump sum price.
1.5 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1.6 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Product Schedule: For each penetration firestopping system. Include location, illustration of firestopping system, and design designation of qualified testing and inspecting agency.
1. Engineering Judgments: Where Project conditions require modification to a qualified testing and inspecting agency's illustration for a particular penetration firestopping system, submit illustration, with modifications marked, approved by penetration firestopping system manufacturer's fire-protection engineer as an engineering judgment or equivalent fire-resistance-rated assembly. Obtain approval of authorities having jurisdiction prior to submittal.
PENETRATION FIRESTOPPING 078413 - 2
1.7 INFORMATIONAL SUBMITTALS
A. Qualification Data: For Installer.
B. Product Test Reports: For each penetration firestopping system, for tests performed by a qualified testing agency.
1.8 CLOSEOUT SUBMITTALS
A. Installer Certificates: From Installer indicating that penetration firestopping systems have been installed in compliance with requirements and manufacturer's written instructions.
1.9 QUALITY ASSURANCE
A. Installer Qualifications: A firm that has been approved by FM Global according to FM Global 4991, "Approval of Firestop Contractors," or been evaluated by UL and found to comply with its "Qualified Firestop Contractor Program Requirements."
1.10 PROJECT CONDITIONS
A. Environmental Limitations: Do not install penetration firestopping system when ambient or substrate temperatures are outside limits permitted by penetration firestopping system manufacturers or when substrates are wet because of rain, frost, condensation, or other causes.
B. Install and cure penetration firestopping materials per manufacturer's written instructions using natural means of ventilations or, where this is inadequate, forced-air circulation.
1.11 COORDINATION
A. Coordinate construction of openings and penetrating items to ensure that penetration firestopping systems can be installed according to specified firestopping system design.
B. Coordinate sizing of sleeves, openings, core-drilled holes, or cut openings to accommodate penetration firestopping systems.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Fire-Test-Response Characteristics:
1. Perform penetration firestopping system tests by a qualified testing agency acceptable to authorities having jurisdiction.
2. Test per testing standards referenced in "Penetration Firestopping Systems" Article.
Provide rated systems complying with the following requirements:
PENETRATION FIRESTOPPING 078413 - 3
a. Penetration firestopping systems shall bear classification marking of a qualified testing agency.
1) UL in its "Fire Resistance Directory."
2) Intertek Group in its "Directory of Listed Building Products."
3) FM Global in its "Building Materials Approval Guide."
2.2 PENETRATION FIRESTOPPING SYSTEMS
A. Penetration Firestopping Systems: Systems that resist spread of fire, passage of smoke and other gases, and maintain original fire-resistance rating of construction penetrated. Penetration firestopping systems shall be compatible with one another, with the substrates forming openings, and with penetrating items if any.
1. 3M.
2. Hilti.
3. STI Firestop.
B. Penetrations in Fire-Resistance-Rated Walls: Penetration firestopping systems with ratings determined per ASTM E 814 or UL 1479, based on testing at a positive pressure differential of 0.01-inch wg (2.49 Pa).
1. F-Rating: Not less than the fire-resistance rating of constructions penetrated, as determined to be required by code by the Contractor. Currently indicated to be 2 hours, which shall be considered a minimum.
C. Penetrations in Horizontal Assemblies: Penetration firestopping systems with ratings determined per ASTM E 814 or UL 1479, based on testing at a positive pressure differential of 0.01-inch wg (2.49 Pa).
1. F-Rating: At least two hours, but not less than the fire-resistance rating of constructions penetrated.
2. T-Rating: At least one hour, but not less than the fire-resistance rating of constructions penetrated except for floor penetrations within the cavity of a wall.
3. W-Rating: Provide penetration firestopping systems showing no evidence of water leakage when tested according to UL 1479.
D. Penetrations in Smoke Barriers: Penetration firestopping systems with ratings determined per UL 1479, based on testing at a positive pressure differential of 0.30-inch wg (74.7 Pa).
1. L-Rating: Not exceeding 5.0 cfm/sq. ft. (0.025 cu. m/s per sq. m) of penetration opening at and no more than 50-cfm (0.024-cu. m/s) cumulative total for any 100 sq. ft. (9.3
sq. m) at both ambient and elevated temperatures.
E. Exposed Penetration Firestopping Systems: Flame-spread and smoke-developed indexes of less than 25 and 450, respectively, per ASTM E 84.
http://www.specagent.com/LookUp/?ulid=11857&mf=04&src=wd
PENETRATION FIRESTOPPING 078413 - 4
F. Accessories: Provide components for each penetration firestopping system that are needed to install fill materials and to maintain ratings required. Use only those components specified by penetration firestopping system manufacturer and approved by qualified testing and inspecting agency for conditions indicated.
1. Permanent forming/damming/backing materials.
2. Substrate primers.
3. Collars.
4. Steel sleeves.
2.3 FILL MATERIALS
A. Cast-in-Place Firestop Devices: Factory-assembled devices for use in cast-in-place concrete floors and consisting of an outer sleeve lined with an intumescent strip, a flange attached to one end of the sleeve for fastening to concrete formwork, and a neoprene gasket.
B. Latex Sealants: Single-component latex formulations that do not re-emulsify after cure during exposure to moisture.
C. Firestop Devices: Factory-assembled collars formed from galvanized steel and lined with intumescent material sized to fit specific diameter of penetrant.
D. Intumescent Composite Sheets: Rigid panels consisting of aluminum-foil-faced intumescent elastomeric sheet bonded to galvanized-steel sheet.
E. Intumescent Putties: Nonhardening, water-resistant, intumescent putties containing no solvents or inorganic fibers.
F. Intumescent Wrap Strips: Single-component intumescent elastomeric sheets with aluminum foil on one side.
G. Mortars: Prepackaged dry mixes consisting of a blend of inorganic binders, hydraulic cement, fillers and lightweight aggregate formulated for mixing with water at Project site to form a nonshrinking, homogeneous mortar.
H. Pillows/Bags: Reusable heat-expanding pillows/bags consisting of glass-fiber cloth cases filled with a combination of mineral-fiber, water-insoluble expansion agents, and fire-retardant additives. Where exposed, cover openings with steel-reinforcing wire mesh to protect pillows/bags from being easily removed.
I. Silicone Foams: Multicomponent, silicone-based liquid elastomers that, when mixed, expand and cure in place to produce a flexible, nonshrinking foam.
J. Silicone Sealants: Single-component, silicone-based, neutral-curing elastomeric sealants.
2.4 MIXING
A. Penetration Firestopping Materials: For those products requiring mixing before application, comply with penetration firestopping system manufacturer's written instructions for accurate proportioning of materials, water (if required), type of mixing equipment, selection of mixer
PENETRATION FIRESTOPPING 078413 - 5
speeds, mixing containers, mixing time, and other items or procedures needed to produce products of uniform quality with optimum performance characteristics for application indicated.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions, with Installer present, for compliance with requirements for opening configurations, penetrating items, substrates, and other conditions affecting performance of the Work.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Surface Cleaning: Before installing penetration firestopping systems, clean out openings immediately to comply with manufacturer's written instructions and with the following requirements:
1. Remove from surfaces of opening substrates and from penetrating items foreign materials that could interfere with adhesion of penetration firestopping materials.
2. Clean opening substrates and penetrating items to produce clean, sound surfaces capable of developing optimum bond with penetration firestopping materials. Remove loose particles remaining from cleaning operation.
3. Remove laitance and form-release agents from concrete.
B. Prime substrates where recommended in writing by manufacturer using that manufacturer's recommended products and methods. Confine primers to areas of bond; do not allow spillage and migration onto exposed surfaces.
3.3 INSTALLATION
A. General: Install penetration firestopping systems to comply with manufacturer's written installation instructions and published drawings for products and applications.
B. Install forming materials and other accessories of types required to support fill materials during their application and in the position needed to produce cross-sectional shapes and depths required to achieve fire ratings.
1. After installing fill materials and allowing them to fully cure, remove combustible forming materials and other accessories not forming permanent components of firestopping.
C. Install fill materials by proven techniques to produce the following results:
1. Fill voids and cavities formed by openings, forming materials, accessories and penetrating items to achieve required fire-resistance ratings.
PENETRATION FIRESTOPPING 078413 - 6
2. Apply materials so they contact and adhere to substrates formed by openings and penetrating items.
3. For fill materials that will remain exposed after completing the Work, finish to produce smooth, uniform surfaces that are flush with adjoining finishes.
3.4 IDENTIFICATION
A. Wall Identification: Permanently label walls containing penetration firestopping systems with the words "FIRE AND/OR SMOKE BARRIER - PROTECT ALL OPENINGS," using lettering not less than 3 inches (76 mm) high and with minimum 0.375-inch (9.5-mm) strokes.
1. Locate in accessible concealed floor, floor-ceiling, or attic space at 15 feet (4.57 m) from end of wall and at intervals not exceeding 30 feet (9.14 m).
B. Penetration Identification: Identify each penetration firestopping system with legible metal or plastic labels. Attach labels permanently to surfaces adjacent to and within 6 inches (150 mm) of penetration firestopping system edge so labels are visible to anyone seeking to remove penetrating items or firestopping systems. Use mechanical fasteners or self-adhering-type labels with adhesives capable of permanently bonding labels to surfaces on which labels are placed.
Include the following information on labels:
1. The words "Warning - Penetration Firestopping - Do Not Disturb. Notify the Government’s Building Management of Any Damage."
2. Contractor's name, address, and phone number.
3. Designation of applicable testing and inspecting agency.
4. Date of installation.
5. Manufacturer's name.
6. Installer's name.
3.5 FIELD QUALITY CONTROL
A. Owner will engage a qualified testing agency to perform tests and inspections according to
ASTM E 2174.
B. Where deficiencies are found or penetration firestopping system is damaged or removed because of testing, repair or replace penetration firestopping system to comply with requirements.
C. Proceed with enclosing penetration firestopping systems with other construction only after inspection reports are issued and installations comply with requirements.
3.6 CLEANING AND PROTECTION
A. Clean off excess fill materials adjacent to openings as the Work progresses by methods and with cleaning materials that are approved in writing by penetration firestopping system manufacturers and that do not damage materials in which openings occur.
PENETRATION FIRESTOPPING 078413 - 7
B. Provide final protection and maintain conditions during and after installation that ensure that penetration firestopping systems are without damage or deterioration at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, immediately cut out and remove damaged or deteriorated penetration firestopping material and install new materials to produce systems complying with specified requirements.
3.7 PENETRATION FIRESTOPPING SYSTEM SCHEDULE
A. Where UL-classified systems are indicated, they refer to system numbers in UL's "Fire Resistance Directory" under product Category XHEZ.
B. Where Intertek Group-listed systems are indicated, they refer to design numbers in Intertek Group's "Directory of Listed Building Products" under "Firestop Systems."
C. Where FM Global-approved systems are indicated, they refer to design numbers listed in FM Global's "Building Materials Approval Guide" under "Wall and Floor Penetration Fire Stops."
D. Penetration Firestopping Systems for Metallic Pipes, Conduit, or Tubing:
1. F-Rating: 2 hours minimum.
2. T-Rating: 1 hour minimum.
3. W-Rating: No leakage of water at completion of water leakage testing.
4. Type of Fill Materials: As required to achieve rating.
E. Penetration Firestopping Systems for Nonmetallic Pipe, Conduit, or Tubing:
1. F-Rating: 2 hours minimum.
2. T-Rating: 1 hour minimum.
3. W-Rating: No leakage of water at completion of water leakage testing.
4. Type of Fill Materials: As required to achieve rating.
F. Penetration Firestopping Systems for Electrical Cables:
1. F-Rating: 2 hours minimum.
2. T-Rating: 1 hour minimum.
3. W-Rating: No leakage of water at completion of water leakage testing.
4. Type of Fill Materials: As required to achieve rating.
5. W-Rating: No leakage of water at completion of water leakage testing.
G. Penetration Firestopping Systems for Insulated Pipes:
1. F-Rating: 2 hours minimum.
2. T-Rating: 1 hour minimum.
3. W-Rating: No leakage of water at completion of water leakage testing.
4. Type of Fill Materials: As required to achieve rating.
H. Penetration Firestopping Systems for Miscellaneous Electrical Penetrants:
1. F-Rating: 2 hours minimum.
2. T-Rating: 1 hour minimum.
3. W-Rating: No leakage of water at completion of water leakage testing.
4. Type of Fill Materials: As required to achieve rating.
I. Penetration Firestopping Systems for Miscellaneous Mechanical Penetrants:
1. F-Rating: 2 hours minimum.
PENETRATION FIRESTOPPING 078413 - 8
2. T-Rating: 1 hour minimum.
3. W-Rating: No leakage of water at completion of water leakage testing.
4. Type of Fill Materials: As required to achieve rating.
J. Penetration Firestopping Systems for Miscellaneous Structural Penetrants:
1. F-Rating: 2 hours minimum.
2. T-Rating: 1 hour minimum.
3. W-Rating: No leakage of water at completion of water leakage testing.
4. Type of Fill Materials: As required to achieve rating.
K. Penetration Firestopping Systems for Groupings of Penetrants:
1. F-Rating: 2 hours minimum.
2. T-Rating: 1 hour minimum.
3. W-Rating: No leakage of water at completion of water leakage testing.
4. Type of Fill Materials: As required to achieve rating.
END OF SECTION 078413
PACKAGED TERMINAL AIR-CONDITIONERS, OUTDOOR, WALL-
MOUNTED UNITS 238113.13 - 1
SECTION 238113.13 – SPLIT SYSTEM, TERMINAL AIR-CONDITIONERS, OUTDOOR, CEILING-
MOUNTED UNITS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes split system, terminal, outdoor, ceiling-mounted air conditioners.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
B. Shop Drawings: For packaged, terminal air conditioners.
1. Include details of equipment assemblies. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.
2. Include diagrams for power, signal, and control wiring.
C. Color Samples: For unit cabinet, discharge grille, and exterior louver, and for each color and texture specified.
1.3 INFORMATIONAL SUBMITTALS
A. Field quality-control reports.
1.4 CLOSEOUT SUBMITTALS
A. Operation and maintenance data.
1.5 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace components of packaged, terminal air conditioners that fail in materials or workmanship within specified warranty period.
1. Warranty Period for Sealed Refrigeration System: Manufacturer's standard, but not less than 7 years from date of Substantial Completion, including components and labor.
2. Warranty Period for Nonsealed System Parts: Manufacturer's standard, but not less than 7 years from date of Substantial Completion, including only components and excluding labor.
MOUNTED UNITS 238113.13 - 2
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, provide products by the following:
B. Basis-of-Design Product: Subject to compliance with requirements, provide split system, terminal, outdoor, ceiling-mounted air conditioners, by Dakin Multi-Split Air conditioners, Dakin AC, Inc. or approved equal. Outdoor unit shall be one RMXS48LVJU with optional drip pan heater, or approved equal. The indoor units shall be two FFQ18LVJU and one FFQ12LVJU or approved equal.
2.2 MANUFACTURED UNITS
A. Description: Factory-assembled and -tested, self-contained, packaged, terminal air conditioner with room cassettes, electric refrigeration system, heating, and temperature controls; fully charged with refrigerant and filled with oil; with hardwired chassis and circuit breaker.
B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
C. ASHRAE Compliance: Applicable requirements in ASHRAE 62.1, Section 4 - "Outdoor Air Quality," Section 5 - "Systems and Equipment," Section 6 - "Ventilation Rate Procedures," and Section 7 - "Construction and Startup."
D. ASHRAE/IES Compliance: Applicable requirements in ASHRAE/IES 90.1.
2.3 Multi-Zone System
A. Outdoor:
1. Mounting: On exterior self-supporting structural steel frame not attached to the building with 3’-0” clear to the bottom of the unit painted with color to be selected by the COTR.
2. Unit Finish: Baked enamel
3. Options: Drip pan heater
B. Indoor Unit
1. Mounting: Ceiling cassette.
2. Accessories: Wired navigation remote controller.
C. Refrigeration System: Direct-expansion indoor coil with capillary restrictor and hermetically sealed scroll compressor with vibration isolation, and overload protection.
1. Indoor and Outdoor Coils: Seamless copper tubes mechanically expanded into aluminum fins.
2. Accumulator.
3. Constant-pressure expansion valve.
http://www.specagent.com/LookUp/?ulid=7131&mf=04&src=wd
MOUNTED UNITS 238113.13 - 3
4. Reversing valve.
5. Charge: R-410A
D. Filters: Washable polyurethane in molded plastic frame.
E. Condensate Drain: Coated galvanized-steel drain pan piping to direct condensate to building waste and vent piping or storm water piping as approved by COTR.
1. Comply with ASHRAE 62.1 for drain pan construction and connections.
F. Outdoor/Indoor Fan:
1. Indoor and Outdoor Fan Motors: Comply with NEMA designation, temperature rating, service factor, enclosure type, and efficiency requirements for motors.
a. Fan Motors: Permanently lubricated split capacitor.
b. Motor Sizes: Minimum size as indicated. If not indicated, large enough so driven load will not require motor to operate in service factor range above 1.0.
c. Controllers, Electrical Devices, and Wiring: Comply with requirements for electrical devices and connections specified in electrical Sections.
2.4 CAPACITIES AND CHARACTERISTICS
A. Capacity AC-1&2:
1. Total Cooling: 18,000 Btu/Hr.
2. Total Heating: 21,500 Btu/Hr.
3. Cooling Indoor Coil Entering-Air Dry Bulb Temperature: 80 deg. F
4. Cooling Indoor Coil Entering-Air Wet Bulb Temperature: 67 deg. F
5. Cooling Ambient Air Dry Bulb Temperature: 95deg F
6. Cooling Ambient Air Wet Bulb Temperature: 75deg F
7. Heating Indoor Coil Entering-Air Dry Bulb Temperature: 70 deg. F
8. Heating Indoor Coil Entering-Air Wet Bulb Temperature: 70 deg. F
9. Heating Ambient Air Dry Bulb Temperature: 47 deg. F
10. Heating Ambient Air Wet Bulb Temperature: 43 deg. F
11. Design Model: Dakin FFQ18LVJU
B. Capacities AC-3:
1. Total Cooling: 12,000 Btu/Hr.
2. Total Heating: 14,000 Btu/Hr.
3. Cooling Indoor Coil Entering-Air Dry Bulb Temperature: 80 deg. F
4. Cooling Indoor Coil Entering-Air Wet Bulb Temperature: 67 deg. F
5. Cooling Ambient Air Dry Bulb Temperature: 95deg F
6. Cooling Ambient Air Wet Bulb Temperature: 75deg F
7. Heating Indoor Coil Entering-Air Dry Bulb Temperature: 70 deg. F
8. Heating Indoor Coil Entering-Air Wet Bulb Temperature: 70 deg. F
9. Heating Ambient Air Dry Bulb Temperature: 47 deg. F
10. Heating Ambient Air Wet Bulb Temperature: 43 deg. F
11. Design Model: Dakin FFQ12LVJU
MOUNTED UNITS 238113.13 - 4
C. Heat-Pump Capacity (Outdoor Unit):
1. Total: 48,000 Btu/Hr.
2. Outdoor Minimum Operating Temperature: 5 deg F
3. Design Model: Dakin RMXS48LVJU
D. Electrical Characteristics ACCU-1:
1. Volts: 208.
2. Phase: Single.
3. Hertz: 60.
4. Rated-Load Amperes (RLA): 23.3
5. Minimum Circuit Ampacity m(MCA): 27.0
6. Maximum Overcurrent Protection (MOP): 30.0
2.5 SOURCE QUALITY CONTROL
A. Sound-Power Level Ratings: Factory test to comply with AHRI 300, "Sound Rating and Sound Transmission Loss of Packaged Terminal Equipment."
B. Unit Performance Ratings: Factory test to comply with AHRI 310/380/CSA C744, "Packaged Terminal Air-Conditioners and Heat Pumps."
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install units level and plumb, maintaining manufacturer's recommended clearances and tolerances.
B. Install and anchor exterior structural steel frame to withstand, without damage to equipment and structure, seismic forces required by building code.
3.2 FIELD QUALITY CONTROL
A. Tests and Inspections:
1. Inspect for and remove shipping bolts, blocks, and tie-down straps.
2. After installing packaged, terminal air conditioners and after electrical circuitry has been energized, test for compliance with requirements.
3. Operational Test: After electrical circuitry has been energized, start units to confirm proper motor rotation and unit operation.
4. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.
B. Packaged, terminal air conditioners will be considered defective if they do not pass tests and inspections.
MOUNTED UNITS 238113.13 - 5
C. Prepare test and inspection reports.
END OF SECTION 238113.13
WALL AND CEILING UNIT HEATERS 238239.19 - 1
SECTION 238239.19 - WALL AND CEILING UNIT HEATERS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes wall and ceiling heaters with propeller fans and electric-resistance heating coils.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include rated capacities, operating characteristics, furnished specialties, and accessories.
B. Shop Drawings:
1. Include plans, elevations, sections, and details.
2. Include details of equipment assemblies. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.
3. Include details of anchorages and attachments to structure and to supported equipment.
4. Include equipment schedules to indicate rated capacities, operating characteristics, furnished specialties, and accessories.
5. Wiring Diagrams: Power, signal, and control wiring.
C. Samples: For each exposed product and for each color and texture specified.
1.3 CLOSEOUT SUBMITTALS
A. Operation and maintenance data.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, provide products by the following:
B. Basis-of-Design Product: Subject to compliance with requirements, provide electric unit heaters UH 1 & 2 by Modine model VE100 and electric unit heaters UH 3 & 4 by Qmark model MUH072 or approved equal.
http://www.specagent.com/LookUp/?ulid=7131&mf=04&src=wd
WALL AND CEILING UNIT HEATERS 238239.19 - 2
2.2 DESCRIPTION
A. Assembly including chassis, electric heating coil, fan, motor, and controls. Comply with
UL 2021.
B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
2.3 CABINET
A. Construction: Heavy gauge die-formed steel housing.
B. Finish: Baked enamel over baked-on primer with manufacturer's standard color selected by COTR, applied to factory-assembled and -tested wall and ceiling heaters before shipping.
2.4 COIL
A. Electric-Resistance Heating Coil: Aluminum-finned, copper clad heating element, free from expansion noise and 60-Hz hum and limit controls for high-temperature protection. Provide integral circuit breaker for overcurrent protection.
2.5 FAN AND MOTOR
A. Fan: Aluminum propeller directly connected to motor.
B. Motor: Permanently lubricated.
2.6 CONTROLS
A. Controls: Unit-mounted thermostat. Low-voltage relay with transformer kit, and as scheduled on the drawings.
B. Electrical Connection: Factory wire motors and controls for a single field connection with disconnect switch.
2.7 CAPACITIES AND CHARACTERISTICS
A. UH-1 & 2
1. Make / model: Modine / VE100
2. Airflow: 650 cfm.
3. Heating Coil: 10 kw.
4. Electrical Characteristics for Single-Point Connection:
a. Volts: 480 v
b. Phase: 3 ph.
c. Hertz: 60 Hz.
d. Full-Load Amperes: 13.3 A.
WALL AND CEILING UNIT HEATERS 238239.19 - 3
B. UH-3 & 4
1. Make / model: Qmark MUH 072
2. Airflow: 650 cfm.
3. Heating Coil: 10 kw.
4. Electrical Characteristics for Single-Point Connection:
a. Volts: 208 v
b. Phase: 3 ph.
c. Hertz: 60 Hz
d. Full-Load Amperes: 27 A.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install unit heaters to comply with NFPA 90A.
B. Install unit heaters level and plumb.
C. Install wall-mounted thermostats and switch controls in electrical outlet boxes at heights to match lighting controls. Verify location of thermostats and other exposed control sensors with Drawings and room details before installation.
D. Ground equipment according to Section 260526 "Grounding and Bonding for Electrical Systems."
E. Connect wiring according to Section 260519 "Low-Voltage Electrical Power Conductors and Cables."
END OF SECTION 238239.19
COMMON WORK RESULTS FOR ELECTRICAL 260500-1
SECTION 260500 – COMMON WORK RESULTS FOR ELECTRICAL
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of Contract, including General and Supplementary Conditions and
Division 1 Specification Sections, apply to this and the other sections of Division 26.
1.2 SUMMARY
A. This Section includes general administrative and procedural requirements for electrical installations. The following administrative and procedural requirements are included in this Section to expand the requirements specified in Division 1, and the Contract:
1. Submittals.
2. Record documents.
3. Maintenance manuals.
4. Rough-ins.
5. Electrical installations.
6. Cutting and patching.
7. Codes, Permits and Inspections.
8. Selective Demolition.
9. Fire Stopping
10. Sleeves for raceways and cables.
11. Sleeve seals.
B. Related Sections: The following sections contain requirements that relate to this section:
1. Division 26 Section "ELECTRICAL RELATED WORK," for related specifications including:
a. Excavation for electrical installations.
b. Concrete for Electrical Work.
c. Foundations for Electrical Equipment.
d. Manholes and pull boxes.
e. Painting of electrical work.
1.3 SUBMITTALS
A. General: Follow the procedures specified in SUBMITTAL PROCEDURES.
B. It is the responsibility of the contractor to assure that all submittals meet or exceed the written specification for that item. The submittal shall be complete and provide comprehensive information so that there is no question or doubt concerning the size, model, color, etc. of the equipment to be provided. The Contractor shall bear the cost associated with subsequent reviews if more than one re-submittal is required due to a defective Contractor submittal.
1.4 RECORD DOCUMENTS
A. Prepare record documents in accordance with the requirements in CLOSEOUT PROCEDURES. In addition to the requirements specified in Division 1, indicate installed conditions for:
1. Major raceway systems, size and location, for both exterior and interior; locations of control
COMMON WORK RESULTS FOR ELECTRICAL 260500-2
devices; distribution and branch electrical circuitry; and fuse and circuit breaker size and arrangements.
2. Equipment locations dimensioned from prominent building lines.
3. Approved substitutions, Contract Modifications, and actual equipment and materials installed.
1.5 MAINTENANCE MANUALS
A. Prepare maintenance manuals in accordance with CLOSEOUT PROCEDURES. In addition to the requirements specified in Division 1, and the Contract include the following information for equipment items:
1. Description of function, normal operating characteristics and limitations, performance curves, engineering data and tests, and complete nomenclature and commercial numbers of replacement parts.
2. Manufacturer's printed operating procedures to include start-up, break-in, and routine and normal operating instructions; regulation, control, stopping, shutdown, and emergency instructions.
3. Maintenance procedures for routine preventative maintenance and troubleshooting;
disassembly, repair, and re-assembly; aligning and adjusting instructions.
4. Servicing instructions and lubrication charts and schedules.
1.6 STORAGE, AND HANDLING
A. Deliver products to the project properly identified with names, model numbers, types, grades, compliance labels, and other information needed for identification.
PART 2 - PRODUCTS
2.1 FIRESTOPPING MATERIALS
A. Compatibility: Provide through-penetration firestop systems that are compatible with one another, with the substrates forming openings, and with the items, if any, penetrating through-penetration firestop systems, under conditions of service and application, as demonstrated by through-penetration firestop system manufacturer based on testing and field experience.
B. Accessories: Provide components for each through-penetration firestop system that are needed to install fill materials. Use only components specified by through-penetration firestop system manufacturer and approved by the qualified testing and inspecting agency for firestop systems indicated. Accessories include, but are not limited to, the following items:
1. Permanent forming/damming/backing materials, including the following:
a. Slag-/rock-wool-fiber insulation.
b. Sealants used in combination with other forming/damming/backing materials to prevent leakage of fill materials in liquid state.
c. Fire-rated form board.
d. Fillers for sealants.
2. Temporary forming materials.
3. Substrate primers.
4. Collars.
COMMON WORK RESULTS FOR ELECTRICAL 260500-3
5. Steel sleeves.
C. Comply with firestopping requirements as specified in Division 7, if included.
2.2 SLEEVES FOR RACEWAYS AND CABLES
A. Steel Pipe Sleeves: ASTM A 53/A 53M, Type E, Grade B, Schedule 40, galvanized steel, plain ends.
B. Cast-Iron Pipe Sleeves: Cast or fabricated "wall pipe," equivalent to ductile-iron pressure pipe, with plain ends and integral waterstop, unless otherwise indicated.
C. Sleeves for Rectangular Openings: Galvanized sheet steel.
1. Minimum Metal Thickness:
a. For sleeve cross-section rectangle perimeter, less than 50 inches and no side more than 16 inches, thickness shall be 0.052 inch .
b. For sleeve cross-section rectangle perimeter equal to, or more than, 50 inches (and 1 or more sides equal to, or more than, 16 inches, thickness shall be 0.138 inch.
2.3 SLEEVE SEALS
A. Description: Modular sealing device, designed for field assembly, to fill annular space between sleeve and raceway or cable.
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
a. Advance Products & Systems, Inc.
b. Calpico, Inc.
c. Metraflex Co.
d. Pipeline Seal and Insulator, Inc.
2. Sealing Elements: EPDM interlocking links shaped to fit surface of cable or conduit.
Include type and number required for material and size of raceway or cable.
3. Pressure Plates: Stainless steel. Include two for each sealing element.
4. Connecting Bolts and Nuts: Stainless steel of length required to secure pressure plates to sealing elements. Include one for each sealing element.
PART 3 - EXECUTION
3.1 ROUGH-IN:
A. Verify final locations for rough-ins with field measurements and with the requirements of the actual equipment to be connected.
B. Refer to equipment specifications in Divisions 2 through 33 for rough-in requirements.
3.2 ELECTRICAL INSTALLATIONS
COMMON WORK RESULTS FOR ELECTRICAL 260500-4
A. General: Sequence, coordinate, and integrate the various elements of electrical systems, materials, and equipment. Comply with the following requirements:
1. Coordinate electrical systems, equipment, and materials installation with other building components.
2. Verify all dimensions by field measurements.
3. Arrange for chases, slots, and openings in other building components during progress of construction, to allow for electrical installations.
4. Coordinate the installation of required supporting devices and sleeves to be set in poured-in-place concrete and other structural components, as they are constructed.
5. Sequence, coordinate, and integrate installations of electrical materials and equipment for efficient flow of the Work.
6. Where mounting heights are not detailed or dimensioned, install systems, materials, and equipment to provide the maximum headroom possible.
7. Coordinate connection of electrical systems with exterior underground utilities and services.
Comply with requirements of governing regulations, franchised service companies, and controlling agencies. Provide required connection for each service.
8. Install systems, materials, and equipment to conform with approved submittal data to greatest extent possible. Conform to arrangements indicated by the Contract Documents, recognizing that portions of the Work are shown only in diagrammatic form. Where coordination requirements conflict with individual system requirements, refer conflict to the Engineer.
9. Install systems, materials, and equipment level and plumb, parallel and perpendicular to other building systems and components, where installed exposed in finished spaces.
10. Install electrical equipment to facilitate servicing, maintenance, and repair or replacement of equipment components. As much as practical, connect equipment for ease of disconnecting, with minimum of interference with other installations.
11. Install systems, materials, and equipment giving right-of-way priority to systems required to be installed at a specified slope.
3.3 CODES, PERMITS AND INSPECTIONS
A. Make installation in accordance with the latest revision of the National Electric Code and codes of any governing body having jurisdiction over the construction.
B. All tests, inspections, permits and fees required for the electrical portion of the Contract, and as outlined under this Section, shall be obtained and paid for under this Section.
C. After completion of the work, furnish the Owner with a Certificate of Final Inspection from the
Underwriter Inspection…
This is the start of the file's text. The full file is on GovTribe.