16Q80036A0001.docx

DOCX document 17 KB Posted

Attached to
Geosynthetic Reinforced Soil Integrated Bridge System (GRS-IBS) Cost Study
Solicitation number
DTRT5716Q80036
Issued by

About this file

Questions and Answers

View the file

Other files

File Type Posted
16Q80036_Evaluation_Criteria.docx DOCX document
16Q80036_GFI.docx DOCX document
16Q80036_SOW.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Quotation (RFQ) No. DTRT5716Q80036 Amendment No. 0001

This RFQ is amended to provide the following questions/clarifications and the corresponding answers.

1. Task 2 and 3.1 are shown to be due at the same time; however, Task 3.1 can’t be done until Task 2 is finished. We cannot be sure how long it will take to accomplish Task 2. We are collecting important information from a lot of other people, and have no control over how long it takes to find the right person in each agency and get a response from them. We believe we should have something like 3 months for this, just because of the uncertainty of what it will take to accomplish. If we have a short fixed time, we will just have to do the best we can with what we have. Based on prior experience it could take as much as 2 months to collect the information, then we need time to process it.

ANSWER:

1. some interim deliverable target dates have been adjusted in response. However, the final completion date of 8/3 is firm and cannot be moved.

1. Task 2 requires data review rather than data collection. It is the time to identify any additional data necessary to collect for Task 3.

1. The Draft Cost Breakdown need only cover a single project of the contractor’s choosing

1. A large quantity of necessary data has already been collected and Volpe has already organized much of it as needed for Task 3.1

A revised schedule is provided with the amendment as Attachment No. 1.

2. Task 3.1 – analyze a subset of 13 of the projects: Do you tell us which 13 or do we select?

ANSWER:

It will be decided collaboratively based on the available data and ease of analysis.

Request for Quotation (RFQ) No. DTRT5716Q80036 Amendment No. 1 Attachment No. 1

DESCRIPTION
DELIVERABLE*
FORMAT
Target Date
1
Kickoff Meeting
Attendance
Teleconference
3/4/2016
1
Work Plan
Work Plan
MS Word
3/11/2016
2
Data Review
Draft Data Summary
MS Excel
4/15/2016
2
Data Review
Final Data Summary
MS Excel
4/29/2016
3.1
Cost Breakdown
Draft Sample Cost Breakdown
MS Excel
4/15/2016
3.1
Cost Breakdown
Revised Sample Cost Breakdown
MS Excel
4/29/2016
3.1
Cost Breakdown
Draft Cost Breakdown
MS Excel
5/20/2016
3.1
Cost Breakdown
Final Cost Breakdown
MS Excel
6/3/2016
3.2
Analysis
Memo on Analysis Topics
MS Word
6/24/2016
3.2
Analysis
Draft Analysis Meeting
MS Word
6/24/2016
3.2
Analysis
Final Analysis Meeting
MS Word
7/1/2016
3.2
Analysis
Revised Analysis Memo
MS Word
7/15/2016
4
Recommendations
Memo on Recommendations
MS Word
7/8/2016
4
Recommendations
Draft Recommendations Meeting
MS Word
7/15/2016
4
Recommendations
Final Recommendations Meeting
MS Word
7/22/2016
4
Recommendations
Final Recommendations Memo
MS Word
8/3/2016