CSS DTMA-92-Q-2011-0036 AMEND 0002 Q A.docx
DOCX document 21 KB Posted
- Attached to
- T/S KENNEDY Asbestos Abatement
- Solicitation number
- DTMA-92-Q-2011-0036
About this file
Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CSS DTMA-92-Q-2011-0036 AMEND 0002 Q A.pdf | ||
| KDY DECK MATERIAL SCHED.pdf | ||
| KDY DECK SCHD.dwg | DWG drawing | |
| DTMA-92-Q-2011-0036 Amend 0001.pdf | ||
| DTMA-92-Q-2011-0036 KDY Asbestos Abatement Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation DTMA-92-Q-2011-0036 T.S. KENNEDY – Asbestos Abatement Amend 0002
QUESTIONS AND ANSWERS
| REFERENCE |
| QUESTION |
| ANSWER |
There are built-in closets throughout some of the cabins. Are we abating the tile & mastic inside the closet floor area as well?
No, the closets are not on the scope of work.
| Can we have access to the general arrangement plan or floor design plan across all decks to help with measurements for estimating purposes? |
| See attached drawings. |
In reading the individual scopes of work, there are five levels/decks indicated. The statement of work says the new terrazzo floors are to be installed in the Passages only. Which specific ones/areas get new terrazzo?
See attached drawings.
Is any new terrazzo being installed in the galleys? Which ones?
No. Terrazzo will be installed in the crew mess.
Is terrazzo base to be included?
Yes. The base should be field formed or precast approximately 4” similar to the base installed on the boat deck.
Is the epoxy terrazzo specified, standard 3/8” ground full system terrazzo?
Yes. Please review pages 93-98 of the solicitation.
| Is a water proof membrane to be included under the terrazzo? |
| As required by manufacturer’s installation instructions. |
Please define (on a drawing preferably), the limit of the new terrazzo, all areas.
See attached drawings.
Where are the ladder wells shown?
See attached drawings.
Would my company be qualified as a minority firm to bid on the said subject solicitation if we are certified with the SBA as a Small Disadvantaged Firm?
Yes
| If the response to the above (1) is yes, then are we permitted to subcontract with a firm that is an asbestos abatement firm? |
| Yes |
Does the abatement firm must have a licensed in the State where work is to be performed? Or just with the Federal EPA?
Contractors performing asbestos abatement work in Massachusetts are required to be licensed by the MA Department of Labor Standards (DLS) pursuant to M.G.L. Chapter 149, Section 6B and its implementing regulations, 453 CMR 6.00. The license ensures that the contractor has attended an approved asbestos abatement training course and is monitored by DLS health and safety inspectors for safe work practices. Attached, please find a list of currently licensed asbestos contractors as of 07/11/2011. For questions about an asbestos contractor’s licensing history and status, you may call DLS at (617) 626-6960.
File details come from the government source that posted it. Updated .