Report_Pavement.pdf

PDF 276 KB Posted

Attached to
George Washington Memorial Parkway
Solicitation number
DTFH71-17-R-00011
Issued by

About this file

Report_Pavement

View the file

Other files

File Type Posted
Amendment_0003_-_NP-GWMP_203(2).pdf PDF
Amendment_0002_-_NP-GWMP_203(2).pdf PDF
Amendment_0001_-_NP-GWMP_203(2).pdf PDF
FP14_Eng.pdf PDF
ADV_Offeror's_Qualifications_Form.doc DOC document
RFP_Solicitation_-_NP-GWMP_203(2).pdf PDF
Synopsis_-_NP-GWMP_203(2).doc DOC document
VETS-4212.pdf PDF
Plans_-_NP-GWMP_203(2).pdf PDF
Report_NEPA.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1993 AASHTO Pavement Design

DARWin Pavement Design and Analysis System A Proprietary AASHTOWare Computer Software Product

Flexible Structural Design Module Iwo Jima Access Road

Asphalt design

Flexible Structural Design

18-kip ESALs Over Initial Performance Period 858,250 Initial Serviceability 4.2 Terminal Serviceability 2.5 Reliability Level 90 % Overall Standard Deviation 0.4 Roadbed Soil Resilient Modulus 15,000 psi Stage Construction 1

Calculated Design Structural Number 2.53 in

Rigorous ESAL Calculation

Performance Period (years) 25 Two-Way Traffic (ADT) 526 Number of Lanes in Design Direction 1 Percent of All Trucks in Design Lane 100 % Percent Trucks in Design Direction 100 %

Vehicle Class

Percent of

ADT

Annual

Growth

Average Initial Truck Factor

(ESALs/ Truck)

Annual % Growth in

Truck Factor

Accumulated 18-kip ESALs over Performance Period

1 73 2 0.0008 0 3,478 2 13 2 0.004 0 3,097 3 9 2 1.2 0 643,223 4 5 2 0.7 0 208,452

Total 100 - - - 858,250

Growth Simple

Total Calculated Cumulative ESALs 858,250

Specified Layer Design

Layer Material Description

Struct Coef.

(Ai)

Drain Coef.

(Mi)

Thickness (Di)(in)

Width (ft)

Calculated SN (in)

1 ACP 0.44 1 6 20 2.64

2 GAB 0.1 1 6 20 0.60

Total - - - 12.00 - 3.24

1993 AASHTO Pavement Design

DARWin Pavement Design and Analysis System A Proprietary AASHTOWare Computer Software Product

Rigid Structural Design Module Iwo Jima Access Road

Conccrete design

Rigid Structural Design

Pavement Type JRCP 18-kip ESALs Over Initial Performance Period 1,328,071 Initial Serviceability 4.5 Terminal Serviceability 2.5 28-day Mean PCC Modulus of Rupture 700 psi 28-day Mean Elastic Modulus of Slab 5,000,000 psi Mean Effective k-value 90 psi/in Reliability Level 90 % Overall Standard Deviation 0.39 Load Transfer Coefficient, J 3.2 Overall Drainage Coefficient, Cd 1

Calculated Design Thickness 7.34 in

Rigorous ESAL Calculation

Performance Period (years) 35 Two-Way Traffic (ADT) 538 Number of Lanes in Design Direction 1 Percent of All Trucks in Design Lane 100 % Percent Trucks in Design Direction 100 %

Vehicle Class

Percent of

ADT

Annual

Growth

Average Initial Truck Factor

(ESALs/ Truck)

Annual % Growth in

Truck Factor

Accumulated 18-kip ESALs over Performance Period

1 73 2 0.0008 0 5,382 2 13 2 0.004 0 4,792 3 9 2 1.2 0 995,335 4 5 2 0.7 0 322,562

Total 100 - - - 1,328,071

Growth Simple

Total Calculated Cumulative ESALs 1,328,071

SOIL DATA

INDEXLIMITLIMITCONTENTNO.

PLASTICITYLIQUIDPLASTICWATERDEPTHSAMPLE

NATURAL

SOURCESYMBOL

Project No.:

Project:

Client:

LIQUID AND PLASTIC LIMITS TEST REPORT

(ft.)

AASHTO

PRA GWMP 203(2)

FHWA/EFLHD

A-6(9)18382018.01-3B-4/J-1Sta. 15+00

LIQUID AND PLASTIC LIMITS TEST REPORT

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

A-4(2)6221614.03-5B-5/J-2Sta. 19+00

A-7-6(15)23472416.33-5B-6/J-2Sta. 24+00

A-2-4(0)5231814.51-3B-7/J-1Sta. 0+75

10 30 50 70 90 110

LIQUID LIMIT

P

LA

S

TI

C

IT

Y

IN

D

E X

PI

=L

L-

A-4 or A-2-4 A-5 or A-2-5

A-7-6

A-6 or A-2-6

A-7-5 or A-2-7

SOIL DATA

NO. AASHTODESCRIPTIONDEPTHSAMPLESOURCESYMBOL

Project No.:

Project:

Client:

Particle Size Distribution Report

P E

R C

E N

T

FI

N E

R

100 10 1 0.1 0.01 0.001200 GRAIN SIZE - mm

% + 3"

% GRAVEL

CRS. FINE

% SAND

CRS. MEDIUM FINE

% FINES

SILT CLAY

in in in

1- 1/ in in

3/ in

1/ in

3/ in

#4 #1

#2

#3

#4

#6

#1

#1

#2

0.0 0.0 3.2 2.3 1.1 29.7 63.7

(ft.)

PRA GWMP 203(2)

FHWA/EFLHD

Sta. 15+00 B-4/J-1 1-3 Sandy lean clay A-6(9)

Particle Size Distribution Report

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

0.0 0.0 0.9 1.0 5.3 23.9 68.9

Sta. 19+00 B-5/J-2 3-5 Sandy silty clay A-4(2)

0.0 0.0 0.2 0.9 3.6 26.6 68.7

Sta. 24+00 B-6/J-2 3-5 Sandy lean clay A-7-6(15)

0.0 0.0 15.6 8.4 10.0 34.6 31.4

Sta. 0+75 B-7/J-1 1-3 Silty, clayey sand with gravel A-2-4(0)

File details come from the government source that posted it. Updated .