Report_1_-_NEPA.pdf
PDF 262 KB Posted
- Attached to
- Tombigbee National Forest Federal contract opportunity
- Solicitation number
- DTFH71-17-B-00018
About this file
Report 1 - NEPA
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ROBO_-_MS_FLTP_FS_967(1).pdf | ||
| Amend_0002_MS_FLTP_FS_967(1).pdf | ||
| Notice_of_Amendment_0002.docx | DOCX document | |
| Amend_0001_MS_FLTP_FS_967(1).pdf | ||
| Plans_-_MS_FLTP_FS_967(1).pdf | ||
| VETS-4212.pdf | ||
| Report_2_-_Soils_and_Foundations.pdf | ||
| Report_4_-_Choctaw_Lake_Bridge_Inspection_Report_2012.pdf | ||
| Report_3_-_Certification_Program_for_Bridge_Temporary_Works_(FHWA-RD-93-033).pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| FP14_Eng.pdf | ||
| Report_5_-_Choctaw_Lake_Pedestrian_Bridge_Design_Plans.pdf | ||
| IFB_Solicitation_-_MS_FLTP_FS_967(1).pdf | ||
| Synopsis_MS_FLTP_FS_967(1).pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: November 10, 2015
MEMO TO FILE
To: File
From: Michael McDaniels Environmental Protection Specialist Eastern Federal Lands Highway Division
Subject: MS FLTP FS 967(1)
Choctaw Lake Bridge Replacement NEPA Compliance Activity
Project Description
The project consists of replacing the bridge and spillway at the Choctaw Lake Recreation Area in Tombigbee National Forest, Choctaw County, MS. This is a publically used portion of Choctaw Lake for access to the recreation area. The purpose and need for this project is to improve public safety, protect resources of the Choctaw Lake recreation area and to improve the transportation system.
Description of Events
Upon receipt of the Choctaw Dam and Spillway Decision Document from the Forest Service (FS) on March 19, 2014, the Federal Highway Administration (FHWA) proceeded to adopt the document for use as dictated by division policy. During adoption, it was discovered that a thoroughly vetted consultation process for Section 106 compliance had not been undertaken by the FS. This was communicated to the appropriate personnel at the Choctaw Dam, upon which they commenced to conduct Section 106 consultation with the State Historic Preservation Officer (SHPO). This process lasted until November 3, 2015 which culminated in a concurrence of no adverse effect, fulfilling the requirements for Section 106, as amended. The concurrence document has been attached to the original Categorical Exclusion.
| MS FLTP FS 967(1) Choctaw Lake Bridge and Spillway EFL CE |
| Choctaw Dam and Spillway Decision Document |
| Choctaw Lake Bridge BE 12-5-13 |
| Memo to File Choctaw Lake Bridge Replacement |
| Section 106 Compliance Letter |
File details come from the government source that posted it. Updated .