Plans_-_MS_FLTP_FS_967(1).pdf

PDF 18 MB Posted

Attached to
Tombigbee National Forest Federal contract opportunity
Solicitation number
DTFH71-17-B-00018
Issued by
Department of Transportation Federal Highway Administration

About this file

Plans - MS FLTP FS 967(1)

View the file

Other files for this federal contract opportunity

Other files attached to Tombigbee National Forest, newest first.
File Type Posted
ROBO_-_MS_FLTP_FS_967(1).pdf PDF
Amend_0002_MS_FLTP_FS_967(1).pdf PDF
Notice_of_Amendment_0002.docx DOCX document
Amend_0001_MS_FLTP_FS_967(1).pdf PDF
VETS-4212.pdf PDF
Report_1_-_NEPA.pdf PDF
Report_2_-_Soils_and_Foundations.pdf PDF
Report_4_-_Choctaw_Lake_Bridge_Inspection_Report_2012.pdf PDF
Report_3_-_Certification_Program_for_Bridge_Temporary_Works_(FHWA-RD-93-033).pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
FP14_Eng.pdf PDF
Report_5_-_Choctaw_Lake_Pedestrian_Bridge_Design_Plans.pdf PDF
IFB_Solicitation_-_MS_FLTP_FS_967(1).pdf PDF
Synopsis_MS_FLTP_FS_967(1).pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R01

-F e b -2

:1

A M

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

NO. DATE BY REVISIONS NO. DATE BY REVISIONS

GENERAL NOTES AND INDEX

No scale

INDEX OF BRIDGE PLAN SHEETS

Reinforcement Bar List - 4

Reinforcement Bar List - 3

Reinforcement Bar List - 2

Reinforcement Bar List - 1

Spillway Details - 4

Spillway Details - 3

Spillway Details - 2

Spillway Details - 1

Rail Details - 2

Rail Details - 1

Typical Section and Slab Reinforcement

Diaphragm Details

Beam Details - 2

Beam Details - 1

Framing Plan

GRS-IBS Details - 3

GRS-IBS Details - 2

GRS-IBS Details - 1

GRS-IBS Abutment - 2

GRS-IBS Abutment - 1

Boring Logs

Plan and Elevation

Site Plan

General Notes and Index

SHEET NO. SHEET TITLE

HL-93. Maximum Dynamic Load Allowance, IM=33%

Live Loads:

th

Field verify all dimensions.

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.

Construction:

Dead Load:

Average Railing weight: 13 plf

Concrete: 150 psf

DESIGN LOADS:A

C

T U

A L F I L E R

M S F L T P F S

G E

N

N O

T E S .D

G N

StructureCL

Wingwall A

Wingwall B

Wingwall C

Wingwall D

Abutment 2Abutment 1

RoadwayCL

Reinforced Soil Foundation

Concrete masonry unit

RSF

CMU

KEY

Furnish galvanized structural steel conforming to AASHTO M 111.

Structural Steel:

Concrete:

- inch unless otherwise noted.4 3Chamfer exposed edges of all concrete

Furnish Class P(Prestressed) concrete for AASHTO Box Beam, BI-48 with f'ci = 5.5 ksi at release and f'c = 7.0 ksi at 28 days.

Furnish Class D(AE) concrete for concrete slab with f'c = 5.0 ksi at 28 days.

Furnish Class A(AE) concrete for spillway cast-in-place concrete, concrete filled in CMU and wet cast coping with f'c = 4.0 ksi at 28 days.

MATERIALS:

Furnish expanded polystyrene foam board conforming to ASTM C578 with minimum compressive strength of 10 psi.

comforming to ASTM D4595 and a tensile strength of 1370 lb/ft at 2 percent Strain.

Furnish biaxial polypropylene geotextile for geosyntheic reinforcement with a minimum ultimate tensile strength of 4800 lb/ft

Furnish concrete masonry units (CMU) conforming to ASTM C90 with f'c = 4000 psi and a water absorption limit of 5 percent.

Geosynthetic Reinforced Soil - Integrated Bridge System (GRS-IBS):

GENERAL NOTES:

Design:

Geosynthetic Reinforced Soil Integrated Bridge System Interim Implementation Guide, FHWA-HRT-11-026, June 2012.

AASHTO LRFD Bridge Design Specifications, 7 Edition, 2014 with 2015 and 2016 Interim Revisions.

SPECIFICATIONS:

-inch diameter high strength steel bar conforming to AASHTO M 275, Type II, Grade 150.4 1Furnish 1

The final estimated effective prestress force per strand is 37,800 lb based on estimated losses of 28,500 psi.

Pre-tension each strand to a total load of 43,950 lbs, at which load f'si = 0.75 f'u = 202,500 psi.

Furnish 0.6-inch diameter, seven wire, low-relaxation, prestressing strand comforming to AASHTO M 203, Grade 270.

Prestressing Steel:

Provide 2-inch cover for reinforcing steel unless otherwise noted.

Furnish epoxy coated steel reinforcing for AASHTO Box Beam, Deck and within GRS-IBS, confoming to ASTM A775.

Furnish reinforcing bar conforming to AASHTO M 31, Grade 60 defromed.

Reinforcing Steel:

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA OA DW of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BRP NO.BRIDGE PLAN SHEET

BRP-122724

TOMBIGBEE NATIONAL FOREST

CHOCTAW LAKE BRIDGE AND SPILLWAY REPLACEMENT

February 2017

R02

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

PT

+39 .1

Begin Bridge

Sta. 21+93.25

P C

.1

P T

.8

P C

.5

P T

.1

21+00

22+00 23+00 24+00

PC 2+46.76

Structure CL

Sta. 22+81.75

End Bridge

Waterline

Existing

Choctaw Lake Road

Sta. 1+57.35

(Typ.)

side wall slope

Top of proposed

End Spillway

Sta. 3+70.50 slab (Typ.)

Edge of spillway

Siphon pipes retaining wall

Place gabion

POT 1+00.00

S

' 2

'' E covered riprap side slope concrete spillway and concrete

Remove and replace existing

Begin Spillway

20+00

P O

T

.0

N

Bridge length: 88'-6"

A C

T U

A L F I L E R

M S F L T P F S S I T

E .D

G N

P O

T

.6

SITE PLAN

'' = 1'-0''16 bridge with wood piles

Remove existing concrete reconstruction bridge and reset after spillway

Remove existing pedestrian to remain

Existing boardwalk

BL Spillway class 4

Place riprap, STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA OA DW of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

CHOCTAW LAKE BRIDGE AND SPILLWAY REPLACEMENT

November 2016

R03

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

Notes:

1.

PLAN AND ELEVATION

'' = 1'-0'' 8

A C

T U

A L F I L E R

M S F L T P F S P

E .D

G N

PLAN

ELEVATION

Bridge length: 88'-6"

Begin Bridge

Elev. 470.28

Sta. 21+93.25

P T

.1

22+00 23+0022+50

P T

.8

21+50 N 32° 13' 33'' E

End Bridge

Elev. 469.60

Sta. 22+81.75

S

' 2

'' E

POT 2+00 Spillway

POT 22+37.09 on

BL

Roadway

StructureCL

CL

SpillwayBL

Choctaw Lake Road

88'-6"

W-Beam Steel Guardail

TXDOT Type T631LS

Choctaw Lake Road wall (Typ.)

spillway side

Top of proposed covered riprap side slope concrete spillway and concrete

Remove and replace existing

-0.769%

@ 16' right of Rdwy.

Approx. Existing ground

BL Spillway Box Beams

Prestressed

(Typ.)

ground line

Proposed

ABUTMENT 1

GRS-IBS

ABUTMENT 2

GRS-IBS

CL Proposed spillway450

PROFILE GRADE

NO SCALE

E le v .4

V P I S ta

E le v .5

V P I S ta

E le v .3

V P

T S ta

E le v .5

V P

C S ta

-0.769%

E le v .7

V P

T S ta

5-7.925%

50' VC

K = 7

K = 14

40' VC

-3.563% Bridge information.

See ''SPILLWAY DETAILS - 1'' sheet for additional1.

N spillway reconstruction bridge and reset after

Removed existing pedestrian to remain

Existing boardwalk waterline system

Remove and install

See Detail E617-22A

Guardrail terminal section (Typ.)

(Typ.)

traveled way

Proposed edge of

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA OA DW of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

November 2016

R04

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

Ashpalt

Sand

Clay

Gravel

Fill

Clayey Silt

Sta. 21+89.17, 4.83' LT Sta. 22+84.66, 5.75' RT

PLAN

ELEVATION

" = 1'-0"8

N

Roadway

StructureCL

CL

22+00 22+50 23+00

B-1

B-2

P T

.8

P T

.1

Choctaw Lake Road Choctaw Lake Road

N 32° 13' 33'' E

Note:

1.

CL@ Rdwy.

Existing ground

Profile grade

BORING LOGS

A C

T U

A L F I L E R

M S F L T P F S

B O

R I N

G

L O

G S .D

G N

53/2.0

18/2.0

19/2.0

22/2.0

74/2.0

30/2.0

23/2.0

4/0.7

10/1.2

24/2.0

4/1.0

16/2.0

20/2.0

14/1.8

1.1

0.3

13.5

21/2.0

18.5

38.5

7/1.0

8/1.5

10/1.8

8/2.0

8/1.9

1.7

1.3

0.3

11.1

33.5

22/2.0

29/2.0

23/2.0

24/2.0

22/2.0

22/2.0

26/2.0

34/1.6

64/2.0

18/2.0

Subsurface conditions may vary between boring.

conditions encountered at the boring locations shown.

Boring logs on this sheet represent the subsurface

ANM of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

CHOCTAW LAKE BRIDGE AND SPILLWAY REPLACEMENT

November 2016

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA DW

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

LEGEND

N

Rec. Recovery (ft)

Standard Penetration Test

Resistance in Blows per Foot

N/Rec

B-2

Depth (ft)Depth (ft) N/Rec

B-1

R05

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

Notes:

KEY

Foam board

Aggregate base

Solid CMU

Hollow CMU

Hollow CMU filled with concrete and rebar

Reinforced Soil Foundation

Concrete masonry unit

RSF

CMU

" = 1'-0"8

A C

T U

A L F I L E R

M S F L T P F S

G R

S I B

S

A B

T .D

G N

EL. 459.39

EL. 456.89

"2 111'-8 "2

111'-8"2 11'-7 "2

11'-7

B

B

(Typ.)

coping

Wet cast

R S F

ELEVATION

no vertical joints greater than one CMU block height.

CMU blocks are staggered, including corners, so there are

Utilities not shown for clarity.

''GRS-IBS DETAILS-3'' sheet for SECTION B-B.

See ''GRS-IBS DETAILS-1'' sheet for SECTION A-A, and

A

A

2'-6""2 115'-7"2

115'-72'-6"

B B

Beam seat zone Begin Bridge

(T y p

Wingwall B with geotextile

Aggregate base wrapped

Structure CL CLRoadway

PLAN

GRS-IBS ABUTMENT - 1

N ground line

Proposed

Structure CL

14'-0"14'-0" with geotextile

Aggregate base wrapped

EL. 464.47 EL. 464.47

EL. 459.39

EL. 456.89

Wingwall A

W in g w a ll

T y p

Wingwall B (folded out) Wingwall A (folded out)

EL. 469.55* EL. 469.55*

EL. 469.55* EL. 469.55*

CMU's and corner CMU's and fill with concrete Class A(AE).

Insert 20-inch long #4 epoxy rebars into the top 3 rows of of abutment

Front face

* Elevation is at top of CMU block.

EL. 467.01* EL. 467.01*

1-inch thick and slope to drain.

On the top row of CMU's create a mortar capping approx.

waterline pipe.

Trim or saw cut CMU blocks for a custom fit around the

(See Note 6) waterline system opening

6.

5.

4.

3.

2.

1.

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA OA DW of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

R06

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

KEY

Foam board

Aggregate base

Solid CMU

Hollow CMU

Hollow CMU filled with concrete and rebar

Reinforced Soil Foundation

Concrete masonry unit

RSF

CMU

" = 1'-0"8

A C

T U

A L F I L E R

M S F L T P F S

G R

S I B

S

A B

T .D

G N

EL. 458.80

EL. 456.30

"2 111'-8 "2

111'-8"2 11'-7 "2

11'-7

B

B

(Typ.)

coping

Wet cast

R S F

ELEVATION

A

A

2'-6""2 115'-7"2

115'-72'-6"

B B

Beam seat zone

(T y p with geotextile

Aggregate base wrapped

Structure CL CLRoadway

PLAN

GRS-IBS ABUTMENT - 2

ground line

Proposed

Structure CL

14'-0"14'-0" with geotextile

Aggregate base wrapped

N

EL. 463.89 EL. 463.89

EL. 458.80

EL. 456.30

Wingwall C Wingwall D

EL. 468.97*

EL. 468.97* EL. 468.97*

EL. 466.43* EL. 466.43*

EL. 468.97*

of abutment

Front face

End Bridge

Wingwall C (folded out) Wingwall D (folded out)

Notes:

no vertical joints greater than one CMU block height.

CMU blocks are staggered, including corners, so there are

Utilities not shown for clarity.

''GRS-IBS DETAILS-3'' sheet for SECTION B-B.

See ''GRS-IBS DETAILS-1'' sheet for SECTION A-A, and

CMU's and corner CMU's and fill with concrete Class A(AE).

Insert 20-inch long #4 epoxy rebars into the top 3 rows of

1-inch thick and slope to drain.

On the top row of CMU's create a mortar capping approx.

W in g w a ll

T y p

(See Note 6) waterline system opening waterline pipe.

Trim or saw cut CMU blocks for a custom fit around the

* Elevation is at top of CMU block.

6.

5.

4.

3.

2.

1.

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA OA DW of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

R07

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

Notes:

1.

A

C T

U A

L F I L E R

M S F L T P F S

G R

S I B

S

D T S .D

G N

GRS-IBS DETAILS - 1

KEY

Foam board

Solid CMU

Hollow CMU

Hollow CMU filled with concrete and rebar

RSF

CMU

Aggregate base

Open Graded Backfill

As shown

SECTION A-A

DETAIL A

5'-0"13'-0" reinforcement

Geosynthetic

(See Note 4) block face

GRS wall CMU

S o li d C

M U

L a y e r s

H o ll o w C

M U

L a y e r s

C M

U fi ll e d

C o n c r e te

L a y e r s

C lr s p a c e

Bridge deck

2'-6"9'-6"

12'-0"

1H backfill

GRS open-graded

(See Note 7)

Excavation limits z o n e a p p r o a c h

I te g r a te

Aggregate Base See DETAIL A

Begin/End bridge

6'-6"

G R

S z o n e z o n e s e a t

B e a m z o n e

Aggregate base

(See Note 5) reinforcement (Typ.)

Bearing bed geosynthetic a p p r o a c h

I n te g r a

B a r in g b e d top of beam geotextile and

2" Min. between Top of roadway reinforcement tail (Typ.)

Wrap 4-foot geosynthetic

Aluminum flashing

2" Clr. from top

#4 Epoxy Rebar, Vertical wall face batter = 0°.

maximum of 6-feet with a conventional 4-foot tail.

The first beam seat reinforcement layer length is a girders, slope to drain.

Strike CMU concrete fill flush with top of CMU's under bridge specified cannot be obtained.

than 30 days or if the required short term back slope ratio be required if the short term back slope will be open more

(29CFR, Part 1926, Subpart P, excavation). Shoring may

Short term back slope ratio per OSHA Safety Regulations approach is a maximum of 12 inches.

Primary wrap reinforcement vertical spacing for the intergrated

G R

S o p e n g r a d e d b a c k fi ll z o n e

R S F geotextile wrapped with

Aggregate base

Minimum of 5 layers of bearing bed reinforcement.

Top of roadway CMU's and corner CMU's and fill with concrete Class A(AE).

Insert 20-inch long #4 epoxy rebars into the top 3 rows of

EL. A

EL. B

two courses of CMU blocks to accept rebar and concrete.

Cut "X" into bottom geosynthetic reinforcement of upper foam board

4" x 12" or two layer of 2" x 12"

Reinforced Soil Foundation

Concrete masonry unit

ELEVATION TABLE

ELEVATION* Abutment 1 Abutment 2

A

B 467.01 466.43

467.27 466.68

* Elevation is at top of CMU block.

Bridge beam

1V

Scale: 12'' = 1'-0''

Scale: 34'' = 1'-0'' in unit price bid for CMU

Include the cost of aluminum flashing and foam board 9.

8.

7.

6.

5.

4.

3.

2.

1.

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA OA DW of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

R08

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

Notes:

GRS-IBS DETAILS - 2

A C

T U

A L F I L E R

M S F L T P F S

G R

S I B

S

D T S .D

G N

" = 1'-0"2

"8 55'-5 6'-3"

KEY

Foam board

Solid CMU

Hollow CMU

Hollow CMU filled with concrete and rebar

Reinforced Soil Foundation

Concrete masonry unit

RSF

CMU

Aggregate base

Open Graded Backfill

Begin/End bridge

(Typ.)

coping Wet cast Top of roadway

R S F geotextile wrapped with

Aggregate base

Solid CMU

(See Note 5) block face

GRS wall CMU fi ll e d C

M U c o n c r

L a y e r s

H o ll o w C

M U

L a y e r s

S o li d C

U

L a y e r s

(See Note 6)

Excavation limits backfill

GRS open-graded

Aggregate base no vertical joints greater than one CMU block height.

CMU blocks are staggered, including corners, so there are

Vertical wall face batter = 0°.

specified cannot be obtained.

than 30 days or if the required short term back slope ratio be required if the short term back slope will be open more

(29CFR, Part 1926, Subpart P, excavation). Shoring may

Short term back slope ratio per OSHA Safety Regulations6.

5.

4.

3.

2.

1.

WINGWALL ELEVATION

CMU's and corner CMU's and fill with concrete Class A(AE).

Insert 20-inch long #4 epoxy rebars into the top 3 rows of

12'-0"

2'-6"9'-6"

(Wingwall B shown) two courses of CMU blocks to accept rebar and concrete.

Cut "X" into bottom geosynthetic reinforcement of upper

1-inch thick and slope to drain.

On the top row of CMU's create a mortar capping approx.

StructureCL

Wingwall A

Wingwall B

Wingwall C

Wingwall D

Abutment 2Abutment 1

RoadwayCL ground line

Proposed

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA OA DW of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

R09

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

Notes:

1.

A

C T

U A

L F I L E R

M S F L T P F S

G R

S I B

S

D T S .D

G N

GRS-IBS DETAILS - 3

KEY

Foam board

Solid CMU

Hollow CMU

Hollow CMU filled with concrete and rebar

Reinforced Soil Foundation

Concrete masonry unit

RSF

CMU

Aggregate base

Open Graded Backfill

Vertical wall face batter = 0°.

" = 1'-0"2

SECTION B-B

geotextile wrapped with

Aggregate base b e d z o n e

R S

F G

R S

B e a r in g

Beam seat zone z o n e a p p r o a c h

I n te g r a

2'-9""2 11'-10

Solid CMU

Hollow CMU backfill

GRS, open-graded reinforcement

Geosynthetic

CMU with #4 rebar

Concrete filled hollow

(Typ.)

coping Wet cast

11'-0"

Structure CL CLRoadway

"2 115'-7

Aggregate base Roadway

5.

4.

3.

2.

1.

CRT post

CMU's and corner CMU's and fill with concrete Class A(AE).

Insert 20-inch long #4 epoxy rebars into the top 3 rows of two courses of CMU blocks to accept rebar and concrete.

Cut "X" into bottom geosynthetic reinforcement of upper

1-inch thick and slope to drain.

On the top row of CMU's create a mortar capping approx.

method to install CRT post.

Install CRT post in a pre-aguered hole, submit for approval

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA OA DW of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

R10

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

Notes:

1.

" = 1'-0"4

2.

1.See ''DIAPHRAGM DETAILS'' sheet for additional information.

for additional information.

See ''BEAM DETAILS-1'' and ''BEAM DETAILS-2'' sheets

FRAMING PLAN

A C

T U

A L F I L E R

M S F L T P F S F

R A

M E P

L A

N .D

G N

1Box beam

KEY

20'-9"20'-9"20'-9"20'-9"

88'-6"

2'-9"2'-9"

CL CL CL CL

A

A S

H T

O b o x b e a m

B I

Begin Bridge

CL

CL

(Typ.)

Interior beam

CL

(Typ.)

Exterior beam

End Bridge CLStructure

(Typ.) (Typ.)

'' 2 14 '' Diaphargm (Typ.)2

144'-0"

(Typ.)

FRAMING PLAN

3'' Dia. hole

(Typ.) 3'' dia. hole

Diaphragm and

3'' dia. hole

Diaphragm and

3'' dia. hole

Diaphragm and system waterline

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA OA DW of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

R11

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

Notes:

1.

BEAM DETAILS - 1

As shown

LBSReinf. Steel

Concrete

ITEM UNIT QUANTITY

PRESTRESSED BOX BEAM ESTIMATE

Note: Quantities shown are for one beam only.

KEY

Strand

LNFT

CUYD

0.6 Dia. Strands

Notes:

See ''DIAPHRAGM DETAILS'' sheet for additional information.

A

C T

U A

L F I L E R

M S F L T P F S

B E

A M

D

T S .D

G N

CLBeam

Scale: 11 2'' = 1'-0''

RECESS DETAIL

See SHEAR KEY

2'-0"2'-0"

4'-0"of void (Typ.)

corners of each end

" Dia. void drain at4

3" (Typ.)

2'-0"2'-0"

4'-0"

CLBeam

RECESS DETAIL

See SHEAR KEY

TYPICAL INTERIOR BEAM SECTION

Scale: 11 2'' = 1'-0'' of void (Typ.)

corners of each end

" Dia. void drain at4

TYPICAL EXTERIOR BOX BEAM SECTION

END BLOCK SECTION

3" 3"= 1'-6"

9 Spa. @ 2"

= 1'-6"

9 Spa. @ 2"

3"

0.6'' Dia. strand 0.6'' Dia. strand

3"

18 Strands

4 Strands

2 Strands

2 Strands

#4GE1

= 1'-4"

2 Spa. @ 8"

= 1'-4"

2 Spa. @ 8"

#4GE2

#4GE4 #4GE4

#4GE3

S p a

G E

#4GE1

4" 4"

CLBeam

(See "TYPICAL BOX BEAM SECTION" for details not shown)

Scale: 11 2'' = 1'-0''

Scale: 11 2'' = 1'-0''

1" Clr.

3" 3"= 1'-6"

9 Spa. @ 2"

= 1'-6"

9 Spa. @ 2"

3"

0.6'' Dia. strand 0.6'' Dia. strand

3"

6 Strands

2 Strands

18 Strands

M in s p li c e

T y p

1'-0" 1'-0"6" 6"

#4GE1

#4GE1

#4GE2

CLBeam

TYPICAL BOX BEAM SECTION

1" Clr.

E m b e d m e n t

2" Clr.

"8

"4

3 4

SHEAT KEY RECESS DETAIL

Scale: 3'' = 1'-0''

17.3

2.

1.

(Typ.)

Tooled edge

(Rake finish)

Top of Beam

(Typ.)

Tooled edge

(Rake finish)

Top of Beam

-inch.4 1an amplitude of

Rake finish top of all beams. Transverse roughened finish with

5"5" 5"5"

T y p

3" (Typ.)

T y p

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA OA DW of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

R12

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

Notes:

S p a

G E

Deflect 0.6 Dia. strands

25 Spa. @ 1'-6'' = 37'-6''9"

2 - #4GE1

= 3'-0''

@ 3''

4 Spa.

2 - #4GE1

= 1'-0''

9"

2-#4GE1 with #4GE2

8'-0"

BOX BEAM ELEVATION

1'-0" 3 Spa. @ 1'-0''

1'-9"

#4GE4

4 Spa. @ 1'-0" = 4'-0"

#4GE2

#4GE3

CL 2'-0"

CL

As shown

A C

T U

A L F I L E R

M S F L T P F S

B E

A M

D

T S .D

G N

BEAM DETAILS - 2

Interior girder midspan

Exterior girder midspan

C

1.71

CAMBER TABLE (in.)

A B

2.83 1.12

2.83 1.12 1.71

CL

3'-0"

2" Clr.

S p a

G E

PARTIAL BOX BEAM PLAN

G E

S p a

(End block reinforcing)

Scale: 1'' = 1'-0''

LIFTING EYE DETAIL

4"

CLLifting eye

4"

Top of girder

'' Dia. strand2

Double top

3 Cable clamps

Min. splice end of all voids (Typ.)

'' Dia. drain hole at each 4

Bearings BearingsCL

L/2

CL

L/2

C

A

Line between span ends

B

Midspan

Symmetrical about

CL

C = estimated camber at erection.

B = estimated camber due to deck, haunch, diaphragms and railings.

A = estimated camber due to prestress and self weight of girder.

3'' Dia. hole

3'' Dia. hole

2 - #4GE1

#4GE5 #4GE2

See ''BEAM DETAILS - 2'' sheet for additional information.

See ''DIAPHRAGM DETAILS'' sheet for additional information.

88'-6'' Beam length (out to out)

36'-3''

UTILITY SUPPORTS

EXTERIOR BEAM

Scale: 1'' = 1'-0''

(Interior and exterior beam)

Scale: 34'' = 1'-0''

Threaded insert

'' = 1'-0''2 1Scale: 1 strands or internal voids.

Spaced threaded insert in away that they do not interfere with

Cast threaded insert with beam, field installation is not allowed.

Include location of lifting eye in shop drawing submittal.

Midspan

Symm. about system

Waterline

Utility support

Contactor may submit alternative for the utility support.

Submit design and shop drawing of utility supports for approval.

5.

4.

3.

2.

1.

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA OA DW of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

R13

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

A C

T U

A L F I L E R

M S F L T P F S F

R A

M E P

L A

N .D

G N

Notes:

the steel bars are properly tensioned.

No traffic or heavy equipment is permitted on the beams until

DIAPHRAGM DETAILS

As shown

EXTERIOR BEAM DIAPHRAGM DETAILS

CL

(At end block)

PLAN

CL

PLAN

(At intermediate diaphragm)

4" "2

4"

" diaphragm (Typ.)2

Scale: 1'' = 1'-0'' Scale: 1'' = 1'-0''

(At end block)

PLAN

Scale: 1'' = 1'-0''

INTERIOR BEAM DIAPHRAGM DETAILS

PLAN

(At intermediate diaphragm)

Scale: 1'' = 1'-0''

CL CL

"2 14 " diaphragm (Typ.)2

3'' Dia. hole 3'' Dia. hole

3'' Dia. hole 3'' Dia. hole

(Typ.)

Box beam

(Typ.)

Backer rod

(Typ.)

Box beam

(Typ.)

(Typical between beams)

Scale: 11 2'' = 1'-0''

CL

CL

(Typical at transverse tie road locations)

Scale: 11 2'' = 1'-0''

SHEAR KEY DETAIL SHEAR KEY DETAIL

(Typ.)

Backer rod

4" 4"

CL

(At intermediate diaphragm)

'' = 1'-0'' 2 1Scale: 1

(At intermediate diaphragm)

'' = 1'-0'' 2 1Scale: 1

CL

ELEVATION

ELEVATION

A t I n t.

D ia p h r

A t I n t.

D ia p h r

A t e n d b lo c k

A t e n d b lo c k

3'' Dia. hole

3'' Dia. hole

Grade DH. Galavanize steel bar, plates, nuts and washers.

Grade 150 and heavy hex nut conforming to ASTM A563, Furnish high strength steel bar conforming to AASHTO M 275, tightening steel bars.

contractor must submit for approval proposed method of

The tension force of each steel bar after all loss is 80 kip. The until filled.

Cover and protect shear keys from weather and debris strength of 5000 psi at 24 hours.

Provide a keyway non-shrink grout with minimum compressive

(Typ.)

transverse steel bars.

the final tensioning of completed and prior to erection work has been

Grout shear key after all

AA

(Typical at transverse tie rod locations)

Scale: 3'' = 1'-0''

PARTIAL SECTION BEAM

6"

Top of beam

CL11

4" Dia. high strength steel bar bearing plate (ASTM A36)

" thick 2 16" x 7" x 1

SECTION A-A

Scale: 3'' = 1'-0'' bearing plate (ASTM A36)

" thick 2 16" x 7" x 1 grount (Typ.)

Fill recess with non-shrink

7.

6.

5.

4.

3.

2.

1.

3'' Dia. hole

3'' Dia. hole

CL11

4" Dia. high strength steel bar before placing steel bars.

After pouring keyway grout, water cure for 3 days minimum

Use a non-corrosive pipe when casting the 3-inch dia. hole.

"4

(Typ.)

"4

B

B

SECTION B-B

Scale: 3'' = 1'-0''

Grout prior to erection of beams

Backer rod to be placed

3 Dia. hole

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA OA DW of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

R14

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

Notes:

1.

SLAB REINFORCEMENT

TYPICAL SECTION AND

A C

T U

A L F I L E R

M S F L T P F S

T Y P S

E C

T .D

G N

28'-0"

1'-0" 2'-0" 11'-0" 11'-0" 1'-0"2'-0"

#5SE1 1.56% 1.56%

Shoulder Shoulder

#5SE2

88 Spa. @ 1'-0'' = 88'-0"

S p a

S

E

S p a

S

E

#5SE2

2'-6"

(Typ.)

Min. lap

#5SE2

#5SE2

#5SE1

#5SE1

SLAB REINFORCEMENT

3"

(Typ.)

Utility support

(See Note 2)

Waterline system

Right edge Left edge

StructureCL

CL

2 3 4 5 6 7 beam BI-48 (Typ.)

AASHTO box

2'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 2'-0"4'-0"

T y p

TYPICAL SECTION

(Looking ahead station)

Scale: 34'' = 1'-0''

Scale: 14'' = 1'-0''

W-Beam bridge rail (Typ.)

4" Cov.

Profile grade

Left edge

Right edge

Structure

KEY

1Box beam

DECK ELEVATIONS

Elevation (ft.)

21+93.25

22+37.50

22+81.75

Station

470.07

469.73

469.39

470.28

469.94

469.60

470.07

469.73

469.39 of Deck

Left Edge of Deck

Right Edge

Grade

Profile

LBSReinf. Steel

Concrete

ITEM UNIT QUANTITY

CUYD

SUMMARY OF QUANTITIES

See ''FRAMING PLAN'' sheet for additional information.

2.

1.

See "BEAM DETAILS - 2" sheet for utility support detail.

As shown

CL

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA OA DW of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

R15

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

Notes:

A C

T U

A L F I L E R

M S F L T P F S

R A I L

D T S .D

G N

As shown

RAIL DETAIL - 1

6'-3"

Begin bridge

"2 13'-7"2

12'-7

12 Spa. @ 6'-3" = 75'-0" 6'-3"

CL

W-Beam (Typ.)

CL

(Typ.)

over deck

S3 x 5.7 Post

End bridge

"2

4" "2

TYPICAL RAIL SECTION

Scale: 11 2'' = 1'-0''

CL

W-Beam

A

A

RAIL ELEVATION

CL

with one hex nut

" Hex head 4 1" Dia. x 12 s la b

M in

"2

Base plate

Backer plate

Post two hex nuts one lock washer placed under with one regular washer and

" Hex head bolt2 1" Dia. x 216

5 CL

VIEW A-A

S3 x 5.7 PostCL

"8

W-Beam

Backer plate

6"

'' Dia. anchor bolts8

5CL

of rail

Nominal face

1'-0" beam

Exterior box rest on top of box beam

Installed anchor bolts may

M in th r e a d l e n g th

ANCHOR BOLT

Scale: 3'' = 1'-0'' heavy hex nut one regular lock washer placed under bolt with one hardened washer and

" Dia. heavy hex head anchor 8

5 CL

revolution with wrench and secure with the second hex nut.

should be snug against the post). Then tighten hex nut one edges of the W-Beam engage the backer plate (backer plate

Tighten the first hex nut by hand until the top and bottom

S e e N o te

P r o je c ti o n

B o lt of zinc-rich paint according to ASTM A123.

inch and paint with two coats 2 1above nuts of more than

After posts set and bolts tightened, cut off bolt projection

(See Note 3)

#4GE2

conflicts with anchor bolts on exterior beams only.

Bend or cut and remove portion of bars #4GE2 where bar

See ''RAIL DETAILS - 2'' sheet for additional information.

Corrosion resistant (weathering) all steel compornents.

See "DETAIL E617-21A" sheet for CRT post detail.

'' dia. hole centered in PL.8 3with

'' Plate washer8 1'' x 4

3'' x 14

PART

Terminal section

W-Beam rail &

Base Plate according to ASTM A123.

Zinc-coat the embedded portion of weathering steel posts

7.

6.

5.

4.

3.

2.

1.

Hex head bolts

ASTM A563, Grade C3

ASTM A325, Type 3

Nuts

ASTM A242

Class B, Type IV

AASHTO M 180,

Anchor bolts ASTM A449 Type 3

Backer Plate SS Gr 33

ASTM A1011 CS or

SPECIFICATION

MATERIAL

(Looking at left interior top of deck)

Scale: 12'' = 1'-0''

Scale: 11 2'' = 1'-0''

(See "ANCHOR BOLT" Detail)

'' Dia. anchor bolts8 grade (Typ.)

CRT Post over

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA OA DW of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

R16

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

A C

T U

A L F I L E R

M S F L T P F S

R A I L

D T S .D

G N

As shown

"8

CLS3 x 5.7 Post

16'' Dia. hole front flange only

8'' Dia. hole front flange only

A A

4"4"

8"

6"1" 1"

"8

"4

"8

T y p

(Typ.)

CL

8'' Dia.

holes

2'' Radius

(Typ.)

PLAN

SECTION A-APOST ELEVATION

Scale: 3'' = 1'-0'' Scale: 5'' = 1'-0''

CLS3 x 5.7 Post

Traffic side

CL

BACKER PLATE DETAILS

ELEVATION

CL

(Typ.)

Backer plate

"2 13'-1 "2

13'-1"2 13'-1

25'-0" or 12'-6"

W-BEAM ELEVATION

Scale: 1'' = 1'-0''

CL

4 2'' x 21 '' Slotted hole (Typ.)

W-BEAM SPLICE ELEVATION

"4 14"4

"2 11'-

2" 2"

CL

CLW-beam splice splice bolts (Typ.)

'' button head4 1'' Dia. x 18

Backer plate 18'' x 8'' x 1'-3''

Scale: 4'' = 1'-0''

Scale 3'' = 1'-0''

" (Typ.)4

2" (Typ.)

CL W-beam splice

'' 8 58'' x 8'' x

Base plate

Base Plate

8'' x 8'' x 58"

8 Splice holes (Typ.)

RAIL DETAILS - 2

34'' x 1''

Slotted holes

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA OA DW of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

R17

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

Notes:

N

PLAN

A

B

B

A

PC 2+46.76

PT

+39 .1

D

D

SECTION A-A

SPILLWAY DETAILS - 1

Spillway

Spillway

SECTION B-B

E

E

(Typ.)

Spillway joint

See "SPILLWAY DETAILS - 2" sheet for additional information.

covered riprap side slope concrete spillway and concrete

Remove and replace existing

4.

3.

2.

1.

See "D sheets" for additional information.

As shown

A C

T U

A L F I L E R

M S F L T P F S S

P I L L

W A

Y

D T S .D

G N

C

C

SECTION C-C

slab

Spillway concrete slab (See Note 1)

Spillway concrete

See "SPILLWAY DETAILS - 3" sheet for additional information.

B

E

KEY

Spillway concrete slab

Roadway

StructureCL

CL

(Typ.)

side wall slope

Top of proposed slab (Typ.)

Edge of spillway

Sta. 1+57.35

Begin Spillway

SpillwayBL

(See Note 2)

Side wall slope

(See Note 2)

Side wall slope wall

Gabion retaining

End Spillway

Sta. 3+70.50 slab (See Note 1)

Spillway concrete

(See Note 3)

Gabion retaining wall

BL

BL

Scale: 116'' = 1'-0''

(Sta. 2+00 shown, looking back station)

Scale: 18'' = 1'-0''

(Sta. 3+00 shown, looking back station)

Scale: 316'' = 1'-0''

Section E-E for additional information.

See "SPILLWAY DETAILS - 4" sheet for Section D-D and

(See "SECTION D-D" for additional information, riprap not shown)

Scale: 38'' = 1'-0''

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

CHOCTAW LAKE BRIDGE AND SPILLWAY REPLACEMENT

November 2016

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA OA DW

R18

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

18Not to scale

PANEL - BEGIN

PANEL - 1

PANEL - 2

PANEL - 3

PANEL - 4

PANEL - 5

PANEL - 6

PANEL - 7

PANEL - 8

PANEL - 9

PANEL - END

BL Spillway

"4 335'-6 "8

538'-10

BL Spillway

Notes:

BL Spillway

A C

T U

A L F I L E R

M S F L T P F S S

P I L L

W A

Y

D T S .D

G N

SPILLWAY DETAILS - 2

See ''SPILLWAY DETAILS - 1'' sheet for additional information.

See ''SPILLWAY DETAILS - 4' sheet for additional information.

ANM

"4 328'-10 "8

126'-7

"2 122'-6"8

124'-3

"8

19'-4""8 320'-3

18'-8""8

18'-8

"4

18'-10 "018'-

"8

17'-4 18'-6"

"8

16'-8"4

18'-1

16'-0"18'-0"

"8 115'-418'-0"

15'-0"18'-0"

BL Spillway BL Spillway

BL Spillway

BL Spillway

BL Spillway

BL Spillway

BL Spillway

BL Spillway

3.

2.

1.

to fit field condition as approved by CO.

Dimensions are approximate, determine final dimensions of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

CHOCTAW LAKE BRIDGE AND SPILLWAY REPLACEMENT

November 2016

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA DW

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

R19

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

Notes:

W a ll H e ig h t ft

1+60 1+70 1+80 1+90 2+00 2+10 2+20 2+30 2+40 2+50 3+60 3+70

Top of wall

Edge of Bridge

Edge of Bridge

Elev. 462.63

Elev. @ Abut. 2 - 466.80 Elev. @ Abut. 1 - 467.08

Elev. 465.15

Elev. 465.83

Elev. 465.61 Sta. 1+86.00 Top of wall

PROPOSED WALL LAYOUT

ANM Not to scale

Elev. 461.42

Box beam

SPILLWAY DETAILS - 3

Wall slope constant at 5V:1H from 5V:1H to 1V:1H Transition wall slope at 1V:1H

Wall slope constant at 5V:1H

Wall slope constant

See "SPILLWAY DETAILS - 1" sheet for additional information.

2.

1.

See "SPILLWAY DETAILS - 4" sheet for additional information.

A C

T U

A L F I L E R

M S F L T P F S S

P I L L

W A

Y

D T S .D

G N

Elev. 445.07

Elev. 440.70 Sta. 3+70.5 End SpillwayElev. 461.00

Sta. 1+57.35 Begin Spillway slab of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

CHOCTAW LAKE BRIDGE AND SPILLWAY REPLACEMENT

November 2016

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA DW

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

R20

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

SECTION D-D

SECTION E-E

1'-0"10"

1'-0"1'-0"

BL

C lr

C lr

3'-0" Lap

(Typ.)

Varies

V a r ie s

Varies

See DETAIL A

Varies

DETAIL A

PARTIAL TYPICAL SECTION

joint

Optional construction1

Scale: 11 2'' = 1'-0''

Scale: 11 2'' = 1'-0''

As shown

10"2'-0"

Waterstop joint) optional construction

Waterstop (Required at

Scale: 11 2'' = 1'-0''

"2

See JOINT DETAIL

JOINT DETAIL

sealant

Silicone joint

#4 @ 1'-0''

#4 @ 1'-0"

#4 @ 1'-0"#4 @ 1'-0"#4 @ 1'-0"

#4 @ 1'-0"

#4 @ 1'-0"

#4 @ 1'-0"

#4 @ 1'-0" joint filler

Preformed expansion

A C

T U

A L F I L E R

M S F L T P F S S

P L L

W A

Y

D T S .D

G N

SPILLWAY DETAILS - 4

Spillway

Begin/End

Spillway

Symm. about

(Sta. 3+00 shown, looking back station)

Scale: 34'' = 1'-0''

Scale: 5'' = 1'-0''

V a r ie s

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA OA DW

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

R21

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

A C

T U

A L F I L E R

M S F L T P F S

R E

B A

R

B L

A N

K .D

G N

REINFORCEMENT BAR LIST - 1

No scale

TYPE 75

N = Number of Laps

B E

C

D

REINFORCING STEEL SCHEDULE DIMENSION TABLE

BAR MK SIZE TYPE PIN SZ LOCATION QTY LENGTH WEIGHT A B C D E F G H J K O R

BOX BEAM REINFORCEMENT (1 BEAM)

V or N

17 0'-3„"#4GE1 4

0'-3„"#4GE2 4

75#4GE3 4

17 0'-3„"#4GE4 4

17 0'-3„"#4GE5 4

LBSSUBTOTAL

SLAB REINFORCEMENT

V or N

STR#5SE1 5 Trans. top

75#5SE2 5 Long. top

LBSSUBTOTAL

B

STR

B

C

D

OPTIONAL LEG

TYPE 17 TYPE 730

A

B

C E

F

G I

WV

D

H

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA OA DW of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

R22

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

A C

T U

A L F I L E R

M S F L T P F S

R E

B A

R

B L

A N

K .D

G N

REINFORCEMENT BAR LIST - 2

No scale

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA OA DW of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

CHOCTAW LAKE BRIDGE AND SPILLWAY REPLACEMENT

November 2016

REINFORCING STEEL SCHEDULE DIMENSION TABLE

75 1#4P1 4 Trans. top & bot.

STR4

52 0'-3„"#4P3 4

67 0'-3„"#4P4 4

STR#4P5 4

75 14

STR#4P2 4

52 0'-3„"#4P3 4

66 0'-3„"#4P4 4

STR#4P5 4

B

STR

D

C

B

A

TYPE 52

K

C

F

H

E

B

D

TYPE 66

A

B C

D

E

TYPE 67

TYPE 75

N = Number of Laps

B E

C

D

#4P2

#4P1

Long. top & bot.

Trans. top & bot.

Long. top & bot.

STR#4P1 4 Trans. top & bot.

STR#4P2 4 Long. top & bot.

52 0'-3„"#4P3 4

66 0'-3„"#4P4 4

STR#4P5 4

STR#4P1 4 Trans. top & bot.

STR#4P2 4 Long. top & bot.

52 0'-3„"4

66 0'-3„"4

STR4

STR4 Trans. top & bot.#4P1

#4P3

#4P4

#4P5

LBSSUBTOTAL

LBSSUBTOTAL

SPILLWAY - BEGIN & SIDE WALLS

V or N

SPILLWAY - PANEL 1 & SIDE WALLS

SPILLWAY - PANEL 2 & SIDE WALLS

SPILLWAY - PANEL 3 & SIDE WALLS

SPILLWAY - PANEL 4 & SIDE WALLS

R23

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

A C

T U

A L F I L E R

M S F L T P F S

R E

B A

R

B L

A N

K .D

G N

REINFORCEMENT BAR LIST - 3

No scale

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA OA DW of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

CHOCTAW LAKE BRIDGE AND SPILLWAY REPLACEMENT

November 2016

STR4 Long. top & bot.

52 0'-3„"#4P3 4

66 0'-3„"#4P4 4

STR#4P5 4

STR4 Trans. top & bot.

STR4 Long. top & bot.

B

STR

D

C

B

A

TYPE 52

K

C

F

H

E

B

D

TYPE 66

#4P2

#4P1

#4P2

52 0'-3„"#4P3 4

66 0'-3„"#4P4 4

STR#4P5 4

STR4 Trans. top & bot.#4P1

Long. top & bot.STR4#4P2

52 0'-3„"#4P3 4

66 0'-3„"#4P4 4

STR#4P5 4

STR4 Trans. top & bot.#4P1

4 STR#4P2

52 0'-3„"#4P3 4

66 0'-3„"#4P4 4

STR#4P5 4

STR4 Trans. top & bot.#4P1

Long. top & bot.

LBSSUBTOTAL

LBSSUBTOTAL

SPILLWAY - PANEL 4 & SIDE WALLS

(CONTINUED)

SPILLWAY - PANEL 5 & SIDE WALLS

SPILLWAY - PANEL 6 & SIDE WALLS

SPILLWAY - PANEL 7 & SIDE WALLS

SPILLWAY - PANEL 8 & SIDE WALLS

R24

-N o v -2

M

P R

O J E

C T

S F

S M

S p tn r d e l\ m s f lt p f s (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

A C

T U

A L F I L E R

M S F L T P F S

R E

B A

R

B L

A N

K .D

G N

REINFORCEMENT BAR LIST - 4

No scale

STATE PROJECT

NUMBER

SHEET

MS MS FLTP FS 967(1)

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Dan WestonOA OA DW of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

TOMBIGBEE NATIONAL FOREST

CHOCTAW LAKE BRIDGE AND SPILLWAY REPLACEMENT

November 2016

STR4

STR#4P2 4

52 0'-3„"#4P3 4

66 0'-3„"#4P4 4

STR#4P5 4

STR4 Trans. top & bot.

STR4 Long. top & bot.

52 0'-3„"#4P3 4

67 0'-3„"#4P4 4

B

STR

D

C

B

A

TYPE 52

K

C

F

H

E

B

D

TYPE 66

A

B C

D

E

TYPE 67

#4P1 Trans. top & bot.

#4P1

Long. top & bot.

#4P2

STR4#4P5

STR4 Long. top & bot.

52 0'-3„"#4P3 4

66 0'-3„"#4P4 4

STR#4P5 4

#4P2

LBSSUBTOTAL

SPILLWAY - PANEL 8 & SIDE WALLS

(CONTINUED)

SPILLWAY - PANEL 9 & SIDE WALLS

SPILLWAY - END & SIDE WALLS