Amend_0001_MS_FLTP_FS_967(1).pdf
PDF 96 KB Posted
- Attached to
- Tombigbee National Forest Federal contract opportunity
- Solicitation number
- DTFH71-17-B-00018
About this file
Amendment 0001 NOTE: The new Bid Opening date is May 3, 2017, 2:00 PM EST.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ROBO_-_MS_FLTP_FS_967(1).pdf | ||
| Amend_0002_MS_FLTP_FS_967(1).pdf | ||
| Notice_of_Amendment_0002.docx | DOCX document | |
| Plans_-_MS_FLTP_FS_967(1).pdf | ||
| VETS-4212.pdf | ||
| Report_5_-_Choctaw_Lake_Pedestrian_Bridge_Design_Plans.pdf | ||
| IFB_Solicitation_-_MS_FLTP_FS_967(1).pdf | ||
| Report_2_-_Soils_and_Foundations.pdf | ||
| Report_4_-_Choctaw_Lake_Bridge_Inspection_Report_2012.pdf | ||
| Report_3_-_Certification_Program_for_Bridge_Temporary_Works_(FHWA-RD-93-033).pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| FP14_Eng.pdf | ||
| Report_1_-_NEPA.pdf | ||
| Synopsis_MS_FLTP_FS_967(1).pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
DTFH7117B00018
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sterling VA 20166-6511
EFLHD-CO
21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.
Federal Highway Administration
Sterling VA 20166-6511
EFLHD-AC
21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.
Federal Highway Administration
SEE BLOCK 1404/21/20170001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/23/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
MS FLTP FS 967(1)
The purpose of this Amendment is to provide a summary of responses to questions/clarifications asked by potential bidders and extend the bid opening date.
Questions can be submitted at any time, but questions submitted within 7 days of the bid opening may not be answered in time for the bidder to properly incorporate the responses into their bids.
The new Bid Opening date is May 3, 2017, 2:00 PM EST.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0001
Info Page 1 of 2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
MS FLTP FS 967(1)
Tombigbee National Forest Choctaw Lake Bridge and Spillway Solicitation: DTFH71-17-B-00018
The purpose of this Amendment is to provide a summary of responses to questions/clarifications asked by potential bidders and extend the bid opening date.
Questions can be submitted at any time, but questions submitted within 7 days of the bid opening may not be answered in time for the bidder to properly incorporate the responses into their bids.
The new Bid Opening date is May 3, 2017, 2:00 PM EST.
Questions / Clarifications
Bidders can send written questions or inquiries for clarification to: eflhd.contracts@dot.gov.
Questions can be submitted at any time, but questions submitted within 7 days of the bid opening may not be answered in time for the bidder to properly incorporate the responses into their bids.
The following questions and issues were submitted via email. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included.
The Government’s direct response to the sender may also have been updated below for better clarity.
1. The bid schedule includes 30 LNFT of 18-inch arched corrugated plastic pipe (pay item 60202-0200). My supplier of this material stated that 18-inch corrugated plastic pipe is not available in arch pipe. What kind of pipe is acceptable in lieu of corrugated plastic?
Response: Asphalt-coated pipe is an acceptable alternative if the corrugated plastic pipe cannot be found.
2. What is the pedestrian bridge weight?
Response: Information regarding the pedestrian bridge weight can be found on the “Choctaw Lake Pedestrian Bridge_Design Plans” which was included as Report #5 on the Federal Business Opportunities (FBO) website for the project.
mailto:eflhd.contracts@dot.gov
Info Page 2 of 2
3. After the main road bridge is removed, who will the slabs belong too?
Response: The main road bridge will not be salvaged after removal; it will become the property of the Contractor. Please review Section 203 of the FP (standard specifications book) and the Special Contract Requirements (pages J-8 and J-9 of the solicitation booklet) for requirements of removal and disposal of structures.