Amendment_0001.pdf

PDF 359 KB Posted

Attached to
OZARK NATIONAL SCENIC RIVERWAYS
Solicitation number
DTFH71-16-B-00035
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
ROBO_MO_NP_OZAR_2013-1(1).pdf PDF
IFB_Solicitation_-_MO_NP_OZAR_2013-1(1).pdf PDF
Report_1_NEPA_CE.pdf PDF
VETS-4212_-_Form.pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
Plans_-_MO_NP_OZAR_2013-1(1).pdf PDF
Synopsis_-_MO_NP_OZAR_2013-1(1).doc DOC document
Report_2_SWPPP.pdf PDF
FP14_Eng.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

DTFH7116B00035

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sterling VA 20166-6511

EFLHD-CO

21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.

Federal Highway Administration

Sterling VA 20166-6511

EFLHD-AC

21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.

Federal Highway Administration

SEE BLOCK 1407/05/20160001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/23/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project: MO NP OZAR 2013-1(1)

The purpose of this Amendment is to:

1) Revise the Plans to delete work requirements at Waymeyer River Access Road.

2) Replace the Bid Pages’ Bid Schedule and Bid Summary page to remove pay item quantities associated with the work at Waymeyer River Access Road.

The Bid Opening date remains July 26, 2016, at 2:00 p.m. EST

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment No. 0001

Amendment Info

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Amendment No. 0001 Project MO NP OZAR 2013-1(1) Ozark National Scenic Riverways Solicitation: DTFH71-16-B-00035

The purpose of this Amendment is to:

1) Revise the Plans to delete work requirements at Waymeyer River Access Road.

2) Replace the Bid Pages’ Bid Schedule and Bid Summary page to remove pay item quantities associated with the work at Waymeyer River Access Road.

The Bid Opening date remains July 26, 2016, at 2:00 p.m. EST

Plans changes

1. Delete Plan Sheets A06, A09, B04, D06, D07, M04, T11, T12, T13, and T14.

Work requirements at Waymeyer River Access Road (NPS Rte. 0215) were deleted.

2. Delete Plan Sheet C01 and substitute the amended Plan Sheet C01.

Quantities for work at Waymeyer River Access Road (NPS Rte. 0215) were removed.

B Pages changes

1. Delete the Bid Schedule and Bid Summary page (pages B-1 thru B-3 of the Solicitation Booklet), and substitute the amended Bid Schedule and Bid Summary (pages B-1 thru B-3).

Quantities for work at Waymeyer River Access Road (NPS Rte. 0215) were removed.

B I D S C H E D U L E Schedule A

Amendment No. 0001

Project No: MO NP OZAR 2013-1(1)

Name: RELOCATION OF BAPTIST ACCESS PARKING ROAD, ALLEY SPRING CAMPGROUND LOOP C

Item No. Quantity Unit Unit Price Amount

15101-0000

Line A0020 ALL LPSM $

15201-0000

Line A0040 ALL LPSM $

15401-0000

Line A0060 ALL LPSM $

15705-0100

Line A0080 800 LNFT $ $

15705-2000

Line A0100 400 LNFT $ $

15720-0000

Line A0120 ALL LPSM $

20103-0000

Line A0140 8,900 SQYD $ $

20301-3400

Line A0160 24 EACH $ $

20303-3300

Line A0180 410 SQYD $ $

20304-1000

Line A0200 ALL LPSM $

20401-0000

Line A0220 550 CUYD $ $

20444-0000

Line A0240 400 SQYD $ $

20701-1000

Line A0260 2,500 SQYD $ $

21101-1000

Line A0280 1,300 SQYD $ $

30202-2000

Line A0300 700 TON $ $

31303-0000

Line A0320 80 CUYD Amend 1 $ $

40301-0100

Line A0340 450 TON $ $

60915-1000

Line A0360 14 EACH $ $

61501-0100

Line A0380 650 SQYD $ $

62502-0000

Line A0400 6,400 SQYD $ $

63303-0900

Line A0420 2 EACH $ $

MOBILIZATION

CONSTRUCTION SURVEY AND STAKING

CONTRACTOR TESTING

SOIL EROSION CONTROL, SILT FENCE

SOIL EROSION CONTROL, FLOATING TURBIDITY CURTAIN

STORM WATER POLLUTION PREVENTION PLAN

SIDEWALK, CONCRETE

TURF ESTABLISHMENT

SIGN, ALUMINUM PANEL, TYPE 3 SHEETING

SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E

ROADWAY OBLITERATION, METHOD 1

ROADWAY AGGREGATE, METHOD 2

CLEARING AND GRUBBING

REMOVAL OF WHEELSTOP

REMOVAL OF SIDEWALK, STONE

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

ROADWAY EXCAVATION

SLOPE GRADING

AGGREGATE-TOPSOIL COURSE

ASPHALT CONCRETE PAVEMENT, TYPE 1

WHEELSTOP, CONCRETE

B-1

Amend 1

Amend 1

Amend 1

Amend 1

Amend 1

Amend 1

Amend 1

B I D S C H E D U L E Schedule A

Amendment No. 0001

Project No: MO NP OZAR 2013-1(1)

Name: RELOCATION OF BAPTIST ACCESS PARKING ROAD, ALLEY SPRING CAMPGROUND LOOP C

Item No. Quantity Unit Unit Price Amount

63401-0500

Line A0440 500 LNFT $ $

63405-1650

Line A0460 1 EACH $ $

63503-0300

Line A0480 100 LNFT $ $

63504-1000

Line A0500 20 SQFT $ $

63701-0000

Line A0520 1 EACH $ $

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

FIELD OFFICE

PAVEMENT MARKINGS, TYPE C, SOLID

PAVEMENT MARKINGS, TYPE D, ACCESSIBILITY SYMBOL

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

Schedule A Bid Total:

Submitted by:

B-2

B - 3

BID SUMMARY

Project MO NP OZAR 2013-1(1)

(1) Schedule A Bid Total (from Page B-2) = (1) $____________________

Schedule A Contract Administrative Cost Input the number of calendar days necessary to complete all Schedule A work from Notice to Proceed (or date specified in the Notice to Proceed) to the completion of Schedule A.

The total calendar days bid to complete all contract work must be greater than or equal to ( > ) 35 and less than or equal to ( < ) 60.

(2) calendar days x $1,000 per calendar day = (2) $____________________

Total Price of Project (for evaluation purposes only)

EVALUATION TOTAL PRICE OF PROJECT = (1) + (2) $____________________

DO NOT INCLUDE ANY CONTRACT ADMINISTRATION COSTS IN BLOCK 17 OF THE SF-1442

Amendment No. 0001