ROBO_-_GA_FLTP_CE_WFG_LOCK(1).pdf

PDF 29 KB Posted

Attached to
Walter F. George Lock and Dam
Solicitation number
DTFH71-16-B-00008
Issued by

View the file

Other files

File Type Posted
IFB_Solicitation_-_GA_FLTP_CE_WFG_LOCK_(1).pdf PDF
Plans_-_GA_FLTP_CE_WFG_LOCK_(1).pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
FP14_Eng.pdf PDF
VETS-100A-Form.pdf PDF
Report_1_NEPA.pdf PDF
Report_2_Pavement_Info.pdf PDF
Synopsis_GA_FLTP_CE_WFG_LOCK(1).doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Highway Administration

Eastern Federal Lands Highway Division

Bid Opening for

Walter F. George

Lock & Dam

PROJECT:

GA FLTP CE WFG LOCK(1)

SOLICITATION NO. DTFH71-16-B-00008

November 24, 2015 at 2:00 p.m.

Sterling, VA

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BID OPENING for SOLICITATION NO. DTFH71-16-B-00008

PROJECT NUMBER: GA FLTP CE WFG LOCK(1)

November 24, 2015, 2:00 p.m. local time

BIDDER BID TOTAL DAYS TOTAL PRICE

Central Southern Construction Corp

Schedule A $695,875.00

Calendar Days

Schedule A $785,875.00

Jim Boyd Construction, Inc. Schedule A $424,075.00

Calendar Days

Schedule A $484,075.00

Pavkov Contracting Schedule A $1,197,590.00

Calendar Days

Schedule A $1,287,590.00

Fuel Tank Maintenance Schedule A $724,106.14

Calendar Days

Schedule A $794,106.14

Engineer’s Estimate Schedule A $580,000.00

Calendar Days

Schedule A $670,000.00

The total calendar days bid to complete all contract work must be greater than or equal to ( > ) 40 and less than or equal to ( < ) 90