Report_2_Pavement_Info.pdf

PDF 582 KB Posted

Attached to
Walter F. George Lock and Dam
Solicitation number
DTFH71-16-B-00008
Issued by

About this file

Pavement Information Report

View the file

Other files

File Type Posted
ROBO_-_GA_FLTP_CE_WFG_LOCK(1).pdf PDF
IFB_Solicitation_-_GA_FLTP_CE_WFG_LOCK_(1).pdf PDF
Plans_-_GA_FLTP_CE_WFG_LOCK_(1).pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
FP14_Eng.pdf PDF
VETS-100A-Form.pdf PDF
Report_1_NEPA.pdf PDF
Synopsis_GA_FLTP_CE_WFG_LOCK(1).doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Image 1: Existing pavement condition in the Picnic Area.

Image 2: Existing pavement condition near the Resource Management Office .

Image 3: Existing pavement condition in the Day Use Area.

Image 3: Example of area requiring full-depth patching.

Project: Date:

Location: Personnel:

Weather:

Number of BlowsA

Cumulative Penetration

Penetration Between Readings

Penetration per Blow

Hammer FactorE DCP Index CBR DESIGN CBR Calculated MR

(mm)B (mm)C (mm)D mm/blowF %G %H psiI

0 0 -- -- -- -- -- 5 64 63.5 12.7 1 12.7 16.95 16.95 15632.54 10 127 63.5 6.4 1 6.4 36.84 36.84 25692.58 15 191 63.5 4.2 1 4.2 58.01 58.01 34358.16 20 241 50.8 2.5 1 2.5 102.79 102.79 49550.85 25 305 63.5 2.5 1 2.5 102.79 102.79 49550.85

5.67 34957.00 A number of hammer blows between test readings F footnote D X Footnote E.

B cumulative penetration after each set of hammer blows. G from CBR versus DCP index correlation.

C difference in cumulative penetration (Footnote B) between readings. H If CBR > 10 use equation 292/DCP1.12, If CBR < 10, use equation 1/0.002871*DCP D footnote C divided by Footnote A. I If CBR > 10, use equation 2555*CBR0.64, if CBR < 10, use equation 1500*CBR E enter 1 for 8-kg (17.6-lb) hammer; 2 for 4.6-kg (10.1-lb) hammer. Form Created 11-05

DCP Data Sheet

C-1

GA FLTP CE WFG LOCK (1)

Depth of zero point below surface (in):

7/22/2014

Bill Eshbaugh Hammer Weight (kg): 8.0

Aggregate Base Pavement Conditions: 3 inches

Average MR

82° Water Table Depth:

Average DCP Index

Material Classification:

Weather:

Number of BlowsA

Cumulative Penetration

Penetration Between Readings

Penetration per Blow

Hammer FactorE DCP Index CBR DESIGN CBR Calculated MR

(mm)B (mm)C (mm)D mm/blowF %G %H psiI

0 0 -- -- -- -- -- 5 279 279.4 55.9 1 55.9 3.22 1.11 1658.48 10 381 101.6 10.2 1 10.2 21.76 21.76 18344.02 15 --- 20 --- 25 ---

33.02 10001.25 A number of hammer blows between test readings F footnote D X Footnote E.

B cumulative penetration after each set of hammer blows. G from CBR versus DCP index correlation.

C difference in cumulative penetration (Footnote B) between readings. H If CBR > 10 use equation 292/DCP1.12, If CBR < 10, use equation 1/0.002871*DCP D footnote C divided by Footnote A. I If CBR > 10, use equation 2555*CBR0.64, if CBR < 10, use equation 1500*CBR E enter 1 for 8-kg (17.6-lb) hammer; 2 for 4.6-kg (10.1-lb) hammer. Form Created 11-05

Aggregate Base Pavement Conditions: 3 inches

Average MR

82° Water Table Depth:

Average DCP Index

Material Classification:

DCP Data Sheet

C-2

GA FLTP CE WFG LOCK (1)

Depth of zero point below surface (in):

7/22/2014

Bill Eshbaugh Hammer Weight (kg): 8.0

Weather:

Number of BlowsA

Cumulative Penetration

Penetration Between Readings

Penetration per Blow

Hammer FactorE DCP Index CBR DESIGN CBR Calculated MR

(mm)B (mm)C (mm)D mm/blowF %G %H psiI

0 0 -- -- -- -- -- 5 89 88.9 17.8 1 17.8 11.63 11.63 12282.45 10 152 63.5 6.4 1 6.4 36.84 36.84 25692.58 15 203 50.8 3.4 1 3.4 74.48 74.48 40317.63 20 279 76.2 3.8 1 3.8 65.27 65.27 37053.47 25 483 203.2 8.1 1 8.1 27.94 27.94 21525.82

7.89 27374.39 A number of hammer blows between test readings F footnote D X Footnote E.

B cumulative penetration after each set of hammer blows. G from CBR versus DCP index correlation.

C difference in cumulative penetration (Footnote B) between readings. H If CBR > 10 use equation 292/DCP1.12, If CBR < 10, use equation 1/0.002871*DCP D footnote C divided by Footnote A. I If CBR > 10, use equation 2555*CBR0.64, if CBR < 10, use equation 1500*CBR E enter 1 for 8-kg (17.6-lb) hammer; 2 for 4.6-kg (10.1-lb) hammer. Form Created 11-05

DCP Data Sheet

C-3

GA FLTP CE WFG LOCK (1)

Depth of zero point below surface (in):

7/22/2014

Bill Eshbaugh Hammer Weight (kg): 8.0

Aggregate Base Pavement Conditions: 2 inches

Average MR

82° Water Table Depth:

7.5

Weather:

Number of BlowsA

Cumulative Penetration

Penetration Between Readings

Penetration per Blow

Hammer FactorE DCP Index CBR DESIGN CBR Calculated MR

(mm)B (mm)C (mm)D mm/blowF %G %H psiI

0 0 -- -- -- -- -- 5 127 127 25.4 1 25.4 7.80 5.35 8027.05 10 178 50.8 5.1 1 5.1 47.30 47.30 30148.99 15 216 38.1 2.5 1 2.5 102.79 102.79 49550.85 20 254 38.1 1.9 1 1.9 141.87 141.87 60898.59 25 279 25.4 1.0 1 1.0 286.85 286.85 95564.04

7.19 48837.90 A number of hammer blows between test readings F footnote D X Footnote E.

B cumulative penetration after each set of hammer blows. G from CBR versus DCP index correlation.

C difference in cumulative penetration (Footnote B) between readings. H If CBR > 10 use equation 292/DCP1.12, If CBR < 10, use equation 1/0.002871*DCP D footnote C divided by Footnote A. I If CBR > 10, use equation 2555*CBR0.64, if CBR < 10, use equation 1500*CBR E enter 1 for 8-kg (17.6-lb) hammer; 2 for 4.6-kg (10.1-lb) hammer. Form Created 11-05

DCP Data Sheet

C-4

GA FLTP CE WFG LOCK (1)

Depth of zero point below surface (in):

7/22/2014

Bill Eshbaugh Hammer Weight (kg): 8.0

Aggregate Base Pavement Conditions: 2.5 inches

Average MR

82° Water Table Depth:

Weather:

Number of BlowsA

Cumulative Penetration

Penetration Between Readings

Penetration per Blow

Hammer FactorE DCP Index CBR DESIGN CBR Calculated MR

(mm)B (mm)C (mm)D mm/blowF %G %H psiI

0 0 -- -- -- -- -- 5 127 127 25.4 1 25.4 7.80 5.35 8027.05 10 203 76.2 7.6 1 7.6 30.03 30.03 22545.02 15 279 76.2 5.1 1 5.1 47.30 47.30 30148.99 20 356 76.2 3.8 1 3.8 65.27 65.27 37053.47 25 419 63.5 2.5 1 2.5 102.79 102.79 49550.85

8.89 29465.08 A number of hammer blows between test readings F footnote D X Footnote E.

B cumulative penetration after each set of hammer blows. G from CBR versus DCP index correlation.

C difference in cumulative penetration (Footnote B) between readings. H If CBR > 10 use equation 292/DCP1.12, If CBR < 10, use equation 1/0.002871*DCP D footnote C divided by Footnote A. I If CBR > 10, use equation 2555*CBR0.64, if CBR < 10, use equation 1500*CBR E enter 1 for 8-kg (17.6-lb) hammer; 2 for 4.6-kg (10.1-lb) hammer. Form Created 11-05

DCP Data Sheet

C-5

GA FLTP CE WFG LOCK (1)

Depth of zero point below surface (in):

7/22/2014

Bill Eshbaugh Hammer Weight (kg): 8.0

Aggregate Base Pavement Conditions: 2.5 inches

Average MR

82° Water Table Depth:

Weather:

Number of BlowsA

Cumulative Penetration

Penetration Between Readings

Penetration per Blow

Hammer FactorE DCP Index CBR DESIGN CBR Calculated MR

(mm)B (mm)C (mm)D mm/blowF %G %H psiI

0 0 -- -- -- -- -- 5 25 25.4 5.1 1 5.1 47.30 47.30 30148.99 10 38 12.7 1.3 1 1.3 223.42 223.42 81438.44 15 64 25.4 1.7 1 1.7 161.88 161.88 66263.34 20 89 25.4 1.3 1 1.3 223.42 223.42 81438.44 25 102 12.7 0.5 1 0.5 623.47 623.47 157062.61

1.96 83270.36 A number of hammer blows between test readings F footnote D X Footnote E.

B cumulative penetration after each set of hammer blows. G from CBR versus DCP index correlation.

C difference in cumulative penetration (Footnote B) between readings. H If CBR > 10 use equation 292/DCP1.12, If CBR < 10, use equation 1/0.002871*DCP D footnote C divided by Footnote A. I If CBR > 10, use equation 2555*CBR0.64, if CBR < 10, use equation 1500*CBR E enter 1 for 8-kg (17.6-lb) hammer; 2 for 4.6-kg (10.1-lb) hammer. Form Created 11-05

DCP Data Sheet

C-6

GA FLTP CE WFG LOCK (1)

Depth of zero point below surface (in):

7/22/2014

Bill Eshbaugh Hammer Weight (kg): 8.0

Aggregate Base Pavement Conditions: 2.5 inches

Average MR

82° Water Table Depth:

Weather:

Number of BlowsA

Cumulative Penetration

Penetration Between Readings

Penetration per Blow

Hammer FactorE DCP Index CBR DESIGN CBR Calculated MR

(mm)B (mm)C (mm)D mm/blowF %G %H psiI

0 0 -- -- -- -- -- 5 76 76.2 15.2 1 15.2 13.82 13.82 13717.42 10 140 63.5 6.4 1 6.4 36.84 36.84 25692.58 15 229 88.9 5.9 1 5.9 39.80 39.80 26995.13 20 356 127 6.4 1 6.4 36.84 36.84 25692.58 25 483 127 5.1 1 5.1 47.30 47.30 30148.99

7.79 24449.34 A number of hammer blows between test readings F footnote D X Footnote E.

B cumulative penetration after each set of hammer blows. G from CBR versus DCP index correlation.

C difference in cumulative penetration (Footnote B) between readings. H If CBR > 10 use equation 292/DCP1.12, If CBR < 10, use equation 1/0.002871*DCP D footnote C divided by Footnote A. I If CBR > 10, use equation 2555*CBR0.64, if CBR < 10, use equation 1500*CBR E enter 1 for 8-kg (17.6-lb) hammer; 2 for 4.6-kg (10.1-lb) hammer. Form Created 11-05

DCP Data Sheet

C-7

GA FLTP CE WFG LOCK (1)

Depth of zero point below surface (in):

7/22/2014

Bill Eshbaugh Hammer Weight (kg): 8.0

Aggregate Base Pavement Conditions: 1.5 inches

Average MR

82° Water Table Depth:

Weather:

Number of BlowsA

Cumulative Penetration

Penetration Between Readings

Penetration per Blow

Hammer FactorE DCP Index CBR DESIGN CBR Calculated MR

(mm)B (mm)C (mm)D mm/blowF %G %H psiI

0 0 -- -- -- -- -- 5 102 101.6 20.3 1 20.3 10.01 10.01 11161.34 10 203 101.6 10.2 1 10.2 21.76 21.76 18344.02 15 330 127 8.5 1 8.5 26.69 26.69 20905.07 20 495 165.1 8.3 1 8.3 27.46 27.46 21287.92 25 ---

11.80 17924.59 A number of hammer blows between test readings F footnote D X Footnote E.

B cumulative penetration after each set of hammer blows. G from CBR versus DCP index correlation.

C difference in cumulative penetration (Footnote B) between readings. H If CBR > 10 use equation 292/DCP1.12, If CBR < 10, use equation 1/0.002871*DCP D footnote C divided by Footnote A. I If CBR > 10, use equation 2555*CBR0.64, if CBR < 10, use equation 1500*CBR E enter 1 for 8-kg (17.6-lb) hammer; 2 for 4.6-kg (10.1-lb) hammer. Form Created 11-05

DCP Data Sheet

C-8

GA FLTP CE WFG LOCK (1)

Depth of zero point below surface (in):

7/22/2014

Bill Eshbaugh Hammer Weight (kg): 8.0

Aggregate Base Pavement Conditions: 2.5 inches

Average MR

82° Water Table Depth:

Weather:

Number of BlowsA

Cumulative Penetration

Penetration Between Readings

Penetration per Blow

Hammer FactorE DCP Index CBR DESIGN CBR Calculated MR

(mm)B (mm)C (mm)D mm/blowF %G %H psiI

0 0 -- -- -- -- -- 5 51 50.8 10.2 1 10.2 21.76 21.76 18344.02 10 165 114.3 11.4 1 11.4 19.07 19.07 16858.87 15 191 25.4 1.7 1 1.7 161.88 161.88 66263.34 20 292 101.6 5.1 1 5.1 47.30 47.30 30148.99 25 343 50.8 2.0 1 2.0 131.98 131.98 58145.51

6.08 37952.15 A number of hammer blows between test readings F footnote D X Footnote E.

B cumulative penetration after each set of hammer blows. G from CBR versus DCP index correlation.

C difference in cumulative penetration (Footnote B) between readings. H If CBR > 10 use equation 292/DCP1.12, If CBR < 10, use equation 1/0.002871*DCP D footnote C divided by Footnote A. I If CBR > 10, use equation 2555*CBR0.64, if CBR < 10, use equation 1500*CBR E enter 1 for 8-kg (17.6-lb) hammer; 2 for 4.6-kg (10.1-lb) hammer. Form Created 11-05

Aggregate Base Pavement Conditions: 3 inches

Average MR

82° Water Table Depth:

Average DCP Index

Material Classification:

DCP Data Sheet

C-9

GA FLTP CE WFG LOCK (1)

Depth of zero point below surface (in):

7/22/2014

Bill Eshbaugh Hammer Weight (kg): 8.0

1993 AASHTO Pavement Design

DARWin Pavement Design and Analysis System A Proprietary AASHTOWare Computer Software Product

Overlay Design Module

GA FLTP CE WFG LOCK(1)

Picnic Area

AC Overlay of AC Pavement

Structural Number for Future Traffic 1.56 in

Design Method Effective Existing

Structural Number (in) Overlay

Structural Number (in) Component Analysis 1.25 0.31

Remaining Life - - Non-Destructive Testing - -

Structural Number for Future Traffic

Future 18-kip ESALs Over Design Period 68,223 Initial Serviceability 4.2 Terminal Serviceability 2 Reliability Level 90 % Overall Standard Deviation 0.45 Subgrade Resilient Modulus 18,000 psi

Calculated Structural Number for Future Traffic 1.56 in

Effective Pavement Thickness - Component Analysis Method

Layer Material Description Structural

Coefficient Drainage

Coefficient Thickness

(in) 1 Existing HACP 0.3 1 2.5

2 GAB 0.1 1 5

Milling Thickness 0 in

Calculated Results

Calculated Pavement Structural Number Before Milling 1.25 in Calculated Effective Pavement Structural Number 1.25 in

Future Rigorous ESAL Calculation

Performance Period (years) 20 Two-Way Traffic (ADT) 420 Number of Lanes in Design Direction 1 Percent of All Trucks in Design Lane 100 %

Percent Trucks in Design Direction 100 %

Vehicle Class

Percent of

ADT

Annual

Growth

Average Initial Truck Factor

(ESALs/ Truck)

Annual % Growth in

Truck Factor

Accumulated 18-kip ESALs over Performance Period

2 98 2 0.0007 0 2,505 4 1 2 0.6 0 21,906 9 1 2 1.2 0 43,812

Total 100 - - - 68,223

Growth Simple

Total Calculated Cumulative ESALs 68,223

Specified Layer Design

Layer Material Description

Struct Coef.

(Ai)

Drain Coef.

(Mi)

Thickness (Di)(in)

Width (ft)

Calculated SN (in)

1 HACP Overlay 0.44 1 1.5 10 0.66 Total - - - 1.50 - 0.66

DARWin Pavement Design and Analysis System A Proprietary AASHTOWare Computer Software Product

Overlay Design Module

GA FLTP CE WFG LOCK(1)

RMO

AC Overlay of AC Pavement

Structural Number for Future Traffic 1.56 in

Design Method Effective Existing

Structural Number (in) Overlay

Structural Number (in) Component Analysis 1.45 0.11

Remaining Life - - Non-Destructive Testing - -

Effective Pavement Thickness - Component Analysis Method

Layer Material Description Structural

Coefficient Drainage

Coefficient Thickness

(in) 1 Existing HACP 0.3 1 2.75

2 GAB 0.1 1 6.25

Milling Thickness 0 in

Calculated Results

Calculated Pavement Structural Number Before Milling 1.45 in Calculated Effective Pavement Structural Number 1.45 in

Specified Layer Design

Layer Material Description

Struct Coef.

(Ai)

Drain Coef.

(Mi)

Thickness (Di)(in)

Width (ft)

Calculated SN (in)

DARWin Pavement Design and Analysis System A Proprietary AASHTOWare Computer Software Product

Overlay Design Module

GA FLTP CE WFG LOCK(1)

Day Use Area

AC Overlay of AC Pavement

Structural Number for Future Traffic 1.56 in

Design Method Effective Existing

Structural Number (in) Overlay

Structural Number (in) Component Analysis 1.1 0.46

Remaining Life - - Non-Destructive Testing - -

Effective Pavement Thickness - Component Analysis Method

Layer Material Description Structural

Coefficient Drainage

Coefficient Thickness

(in) 1 Existing HACP 0.3 1 2

2 GAB 0.1 1 5

Milling Thickness 0 in

Calculated Results

Calculated Pavement Structural Number Before Milling 1.10 in Calculated Effective Pavement Structural Number 1.10 in

Specified Layer Design

Layer Material Description

Struct Coef.

(Ai)

Drain Coef.

(Mi)

Thickness (Di)(in)

Width (ft)

Calculated SN (in)

DARWin Pavement Design and Analysis System A Proprietary AASHTOWare Computer Software Product

Flexible Structural Design Module

GA FLTP CE WFG LOCK(1)

Gravel Areas

Flexible Structural Design

18-kip ESALs Over Initial Performance Period 68,223 Initial Serviceability 4.2 Terminal Serviceability 2 Reliability Level 90 % Overall Standard Deviation 0.45 Roadbed Soil Resilient Modulus 18,000 psi Stage Construction 1

Calculated Design Structural Number 1.56 in

Specified Layer Design

Layer Material Description

Struct Coef.

(Ai)

Drain Coef.

(Mi)

Thickness (Di)(in)

Width (ft)

Calculated SN (in)

1 HACP Overlay 0.44 1 3.5 10 1.54 2 Existing Agg Base 0.1 1 3 10 0.30

Total - - - 6.50 - 1.84