Bridge Inspection Report - Coles Creek
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB Solicitation - PRA-NATR 3A15 3W12.pdf | ||
| FP03 Errata.pdf | ||
| VETS-100A - 2010.pdf | ||
| Bridge Inspection Report - Bear Creek.pdf | ||
| Bidder's Qualifications Form.doc | DOC document | |
| Subcontracting plan.doc | DOC document | |
| Plans.pdf | ||
| FP03_Eng .pdf | ||
| Synopsis - PRA-NATR 3A15 3W12.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION REPORT
COLES CREEK BRIDGE
NATCHEZ TRACE PARKWAY OVER COLES CREEK
NATCHEZ TRACE PARKWAY
LS
STRUCTURE NO. 5570-184P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 11/11/08
Federal Highway Administration
Report prepared by: EU
MILE POINT:
KILOMETER POINT:
16.16 26.01
Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 http://www.efl.fhwa.dot.gov/FLHBO/BIP
STRUCTURE SUMMARY STRUCTURE NO. 5570-184P
COLES CREEK BRIDGE INSPECTION DATE: 11/11/08
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... STEEL CONTINUOUS NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... STRINGER/MULTI-BEAM or GIRDER NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 4 STRUCT. TOTAL LENGTH: .. 721.0 FT (219.8 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 60.0 FT (18.3 M) WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 29.5 FT (9.0 M) ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES CURB TO CURB WIDTH: ..... 26.0 FT (7.9 M)
PIER FOUNDATION(S): ........ SPREAD FOOTING ON PILES YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 3W3 / 20198 SKEW ANGLE: ..................... 0 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 2002-PATCHED SPALL AT PIER #9
2008-STRUCTURE AND APPROACHES REPAVED
LOCATION
NATCHEZ TRACE PARKWAY MILE POINT: ..................... 16.16 (KM PT 26.01)
STATE: ................................. MISSISSIPPI LOCATION: 3.9 MILES SOUTH OF MS ROUTE 553.
8.0 MILES NORTH OF U.S. ROUTE 61 (SOUTH FACILITY CARRIED: ............ NATCHEZ TRACE PARKWAY
INTERSECTION).
FEATURE INTERSECTED: .. COLES CREEK
STRUCTURE EVALUATION SUMMARY
This steel girder bridge is in good condition overall. The main significant change in the structural condition since the previous inspection is a deteriorating mortar pad for the bearing of Girder #2 in Span #3 at Pier #3 which, if not repaired, may result in a loss of bearing for the girder.
The bridge and approaches were repaved with asphalt in 2008. The paving operation left the bridge deck expansion joints packed with asphalt. The drainage system for the expansion joints is also clogged with asphalt and debris. The expansion joints and associated drainage system should be cleared of debris to allow for free expansion and contraction of the structure, and adequate drainage of the roadway surface.
Other main problems, which remain relatively unchanged from the previous inspection, include widespread paint failure on the structural steel with some minor rusting, erosion beneath Spans #1, #9 and #10, and heavy accumulation of flood debris in the channel at Pier #11. Repairs should be made as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: D.B. TAYLOR, L.M. MUELLER (CLARK NEXSEN)
CONDITION ASSESSMENT:
DANIEL B. TAYLOR, FIELD TEAM LEADER
REPORT REVIEW:
SAMANTHA LUBKIN, FIELD TEAM LEADER 703-404-6256
REPORT APPROVAL: DATE: 4/16/09
MARCUS MILLER, P.E., LEAD STRUCTURAL ENGINEER 703-404-6252
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-184P
226 PRIORITY OF IMPROVEMENT C
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT
COST
UNIT
ESTIMATE
COST
PRELIM.
60.17 FILL AND STABILIZE EROSION BENEATH SPANS #9 AND #10. 30 CY $1,000 $30,000
58.2,7, 60.15
CLEAN ASPHALT AND DEBRIS FROM BRIDGE DECK EXPANSION JOINTS AND
EXPANSION JOINT DRAINAGE SYSTEM. REMOVE ASPHALT AND DEBRIS BUILD-UP
FROM TOP OF PIER CAPS.
1 LS $10,000 $10,000
58.2,3 REPAIR DETERIORATED MORTAR PAD BENEATH BEARING OF GIRDER #2, SPAN
#3 AT PIER #3.
1 LS $7,500 $7,500
61.4 REMOVE FLOOD DEBRIS FROM PIERS #10 & #11. 1 LS $2,000 $2,000
222.7 REPLACE MISSING TYPE 3 OBJECT MARKER AT NORTHEAST CORNER. 1 EA $300 $300
PRELIM. MAINTENANCE TOTAL : $49,800
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
59.1,2,6,7 CLEAN AND PAINT STRUCTURAL STEEL. 18,750 SF $20 $375,000 $0
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL : $375,000 $0
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL:
TOTAL ITEMIZED COSTS:
$0 $375,000 $49,800
$424,800
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
$849,600
REMARKS: Cost estimates assume that the recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5570-184P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N NOT APPLICABLE 3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
9 EXCELLENT CONDITION Fatigue cracks in steel or shear cracks in concrete may be present.
8 VERY GOOD CONDITION - no problems noted. 2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present
7 GOOD CONDITION - some minor problems. or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
6 SATISFACTORY CONDITION - structural elements show some minor deterioration. 1 “IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal 5 FAIR CONDITION - all primary structural elements are sound but may have movement affecting structure stability. Structure is closed to traffic but minor section loss, cracking, spalling, or scour. corrective action may return structure to light service.
4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour. 0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
58. DECK 7
ABUTMENTS
ITEM REFERENCE AND REMARKS
G1. DECK SLAB
F2. EXPANSION JOINTS
G3. WEARING SURFACE
G4. RIDEABILITY
G5. CURBS, SIDEWALKS, AND MEDIAN
G6. PARAPETS AND/OR RAILINGS
P7. DRAINS AND DRAINAGE
N8. UTILITIES
G9. DEFLECTION AND/OR VIBRATION
N10. OTHER
59. SUPERSTRUCTURE 6
F1. BEARING DEVICES
G2. GIRDERS OR BEAMS
N3. ARCH(ES) OR SLAB(S)
N4. FLOOR BEAMS AND STRINGERS
N5. TRUSSES
G6. DIAPHRAGMS AND BRACING
F7. PAINT
G8. FASCIA(E)
G9. DEFLECTION AND/OR VIBRATION
G10. ALIGNMENT
N11. OTHER
60. SUBSTRUCTURE 7
58.1 MINOR TRANSVERSE CRACKING OF DECK UNDERSIDE WITH
EFFLORESCENCE.
58.2 OPEN (FINGER) EXPANSION JOINTS ARE PACKED WITH ASPHALT
FROM NEW PAVEMENT OVERLAY OPERATION. EXPANSION JOINT
DRAINAGE SYSTEM CLOGGED. SEE ITEM 58.7.
58.3, 222.4 NEW ASPHALT PAVEMENT OVER BRIDGE AND APPROACHES.
58.6 MINOR CRACKING OF PARAPETS. MINOR SPALLING OF TOP RAIL
ON WEST SIDE OF SPAN #6 (VEHICLE IMPACT). MINOR VEHICLE
SCRAPES AT RANDOM LOCATIONS THROUGHOUT.
58.7 MINOR ACCUMULATION OF DEBRIS ALONG CURBLINES. DRAINAGE
SCUPPERS ALONG CURBLINES ARE CLEAR.
EXPANSION JOINT DRAIN AT PIER #3 CLOGGED WITH DEBRIS
(ASPHALT). EXPANSION JOINT DRAIN AT PIER #6 AND #9 CLOGGED
AND OUTLETS BURIED BELOW GROUND.
59, 60 GRAFFITI ON FACES OF PIERS AND AT SOME LOCATIONS ON
SUPERSTRUCTURE.
59.1,2,6,7 MODERATE PEELING OF PAINT OF ALL STRUCTURAL STEEL.
RANDOM AREAS OF MINOR SURFACE RUSTING WITH NO LOSS OF
SECTION.
59.1, 60.3,15 MORTAR PAD BENEATH BEARING OF GIRDER #2 (FROM WEST) IN
SPAN #3 AT PIER #3 BREAKING UP, EXTENDING 5" BACK UNDER
BEARING PLATE. MORTAR IS CURRENTLY STILL IN PLACE,
HOWEVER A 50% LOSS OF BEARING WILL RESULT IF IT BREAKS
FREE. MINOR CRACKING OF MORTAR PADS AT SEVERAL OTHER
BEARING SEAT LOCATIONS.
MINOR DEBRIS BUILD-UP ON CAP OF SOUTH ABUTMENT. HEAVY
DEBRIS BUILD-UP (UP TO 12" HIGH) ON CAPS OF PIERS #3, #6 AND
#9 BELOW OPEN JOINTS.
1. BREASTWALLS OR COLUMNS G
2. PILE BENTS N
3. CAPS AND/OR BEARING SEATS G
4. BACKWALLS AND/OR BULKHEADS G
5. FOUNDATIONS N
6. WINGWALLS G
7. WEEP HOLES G
8. EXPANSION JOINTS N
9. EROSION AND/OR SCOUR F
10. SETTLEMENT OR DEFLECTION G
11. SLOPE PROTECTION F
12. OTHER N
PIER(S)
WALLS AND/OR COLUMNS 13. G
PILE BENTS14. N
CAPS AND/OR BEARING SEATS15. G
FOUNDATIONS16. N
EROSION AND/OR SCOUR17. F
SETTLEMENT OR DEFLECTION18. G
OTHER 19. N
FIELD INSPECTION REPORT STRUCTURE NO. 5570-184P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION3.
EROSION AND/OR SCOUR2.
ALIGNMENT1.
61. CHANNEL 6
G G N F N
MED
SUFF
10 FT.
SAND, SILT
222. APPROACHES 7
OTHER 9.
ALIGNMENT 8.
SIGNS7.
SETTLEMENT 6.
EROSION5.
SURFACING4.
APPROACH GUARDRAIL 3.
2. RELIEF JOINTS
APPROACH SLABS1. N
N N G G G F G N
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR4.
FOUNDATION3.
WEEP HOLES2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDSD.
APPROACH GUARDRAILSC.
TRANSITIONSB.
BRIDGE RAILINGSA. 1
N N N
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
59.8 MINOR CRACKING OF CONCRETE FASCIAE WITH EFFLORESCENCE
MIDWAY BETWEEN DECK DRAINS; MOSS ON FASCIAE UNDER DECK
DRAINS. MODERATE STAINING THROUGHOUT.
60.1 MINOR VERTICAL CRACKING OF ABUTMENT BREASTWALLS.
60.6 MINOR VERTICAL CRACKING OF NORTH ABUTMENT WINGWALLS
WITH EFFLORESCENCE.
60.9 MINOR EROSION IN FRONT OF SOUTH ABUTMENT AT WEEP HOLES
AND EXPANSION JOINT DRAINAGE SYSTEM OUTLET; SOME RIPRAP
IN PLACE. MINOR EROSION OF SLOPE AT NORTH ABUTMENT.
60.11 MODERATE CRACKING AND SETTLEMENT OF NORTH ABUTMENT
SLOPE PROTECTION. EROSION OF CHANNEL BANK AT DRAINAGE
OUTFALL ON WEST SIDE OF NORTH ABUTMENT.
60.13 APPROXIMATELY 6' X 3' PATCHED AREA ON NORTH SIDE OF PIER
#9; TOP SECTION OF PATCH SPALLED OFF (7" HIGH X 20" WIDE X 7"
DEEP) WITH EXPOSED REBAR.
60.17 MODERATE TO HEAVY EROSION UNDER SPANS #9 AND #10. MINOR
SCOUR AT PIER #10. <<MODERATE PONDING ON SOUTH SIDE OF
PIERS #2 AND #4>> (UNABLE TO VERIFY DURING THIS INSPECTION).
61.4 HEAVY ACCUMULATION OF DRIFT AT UPSTREAM SIDE OF PIER #11;
MINOR AT UPSTREAM SIDE OF PIER #10. MODERATE
ACCUMULATION OF SILT ON NORTH SIDE OF PIER #10.
222.7 TYPE 3 OBJECT MARKER TAPE MISSING AT NORTHEAST CORNER.
STRUCTURE LOAD RATING STRUCTURE NO. 5570-184P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 25 23
HS 19 17 31 28
TYPE 3 17 16 29 26
TYPE 3S2 25 22 41 37
TYPE 3-3 30 27 50 45
DESIGN LOADING: H15 (M13.5)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-184P
STRUCTURE IDENTIFICATION
(201) PARK: NATCHEZ TRACE PARKWAY (1) STATE: ....................................... 284 - MISSISSIPPI (MS)
(202) STRUCTURE NAME: .......... COLES CREEK BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 063 - JEFFERSON
(204) STRUCTURE NUMBER: ..... 5570-184P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... COLES CREEK
(207) ROAD SECTION NO: ..........184P (7) FACILITY CARRIED: .................. NATCHEZ TRACE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5570184P0000000
(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 3.9 MILES SOUTH OF MS RO
(210) OPERATING UNIT: .............NATCHEZ (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................3W3 (11) MILE POINT: ............................. 16.16 (KM PT 26.01)
(212) DRAWING NUMBERS: ....... 20198 (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
4 - STEEL CONTINUOUS
02 - STRINGER/MULTI-BEAM or GIRDER
60.0 FT (18.3 M)
721.0 FT (219.8 M)
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... R - POSTED (OTHER)
(66) INVENTORY RATING: ...... 18.7 TONS (17.0 METRIC TONS) (70) BRIDGE POSTING: .............. 3 - POSTING REQUIRED
(64) OPERATING RATING: ...... 30.9 TONS (28.0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 11/08 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-184P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 31°41'36.66" (51) CURB TO CURB WIDTH: ........... 26.0 FT (7.9 M)
(17) LONGITUDE: ......................... 91°10'51.96" (52) DECK WIDTH: ............................ 29.5 FT (9.0 M)
(19) DETOUR LENGTH: ............... 37 MI (60 KM) (32) APPR. ROADWAY WIDTH: ........ 34.0 FT (10.4 M)
(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 22.0 FT (6.7 M)
(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 6.0 FT (1.8 M)
(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 6.0 FT (1.8 M)
(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN
(29) AVG. DAILY TRAFFIC: .......... 410 (34) SKEW ANGLE: ............................ 0 °
(30) YEAR OF ADT: ...................... 2008 (35) DECK FLARE?: ........................... NO
(114) FUTURE ADT: ..................... 451 (47) TOTAL HORIZ. CLEARANCE: .... 26.0 FT (7.9 M)
(115) YEAR OF FUTURE ADT: ..... 2028 (50) SIDEWALKS:
(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)
(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE
(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 1 - CONCRETE
DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 2.58 FT (0.79 M)
(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)
(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ...........N
(224) EST. REMAINING LIFE: ....25 YEARS
(36) TRAFFIC SAFETY FEAT: ... 1NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
6 - Not yet evaluated for scour p
2 - REHAB/RECONSTRUCTION
C - MODERATE
$49,800
$375,000
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2002-PATCHED SPALL AT PIER #9
2008-STRUCTURE AND APPROACHES REPAVED
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 5570-184P
PHOTOGRAPHS STRUCTURE NO. 5570-184P
PHOTO #1 - LOOKING NORTHBOUND TOWARD JACKSON
FLOW
PHOTO #2 - WEST (DOWNSTREAM) SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW
LOOKING NORTH
PHOTO #4 - TYPICAL ACCUMULATION OF
DEBRIS ALONG CURBLINE; EAST CURBLINE IN
SOUTH SPAN SHOWN
PHOTO #5 - TYPICAL ACCUMULATION OF
DEBRIS (ASPHALT) IN OPEN (FINGER)
EXPANSION JOINTS; JOINT OVER SOUTH
ABUTMENT SHOWN
PHOTO #6 - OPEN (FINGER) EXPANSION JOINT
OVER NORTH ABUTMENT
PHOTO #7 - TYPICAL CRACKING OF RAILING; WEST SIDE OF SPAN #4
SHOWN
PHOTO #8 - SPALLING OF TOP RAIL ON WEST SIDE IN SPAN #6
PHOTO #9 - GENERAL UNDERSIDE VIEW
LOOKING NORTH, SOUTH SPAN
PHOTO #10 - TYPICAL CRACKING OF DECK
UNDERSIDE WITH EFFLORESCENCE; BAY #1
IN SPAN #4 SHOWN
PHOTO #11 - TYPICAL BEARING ASSEMBLY AT EXPANSION JOINTS;
BEARING FOR GIRDER #4 AT SOUTH ABUTMENT SHOWN
PHOTO #12 - TYPICAL CONTINUOUS BEARING ASSEMBLY; BEARING
FOR GIRDER #2 AT PIER #4 SHOWN
PHOTO #13 - DETERIORATION OF MORTAR PAD FOR BEARING OF
GIRDER #2, SPAN #3 AT PIER #3
PHOTO #14 - CLOSE-UP OF PREVIOUS PHOTO
PHOTO #15 - TYPICAL PEELING OF PAINT ON
GIRDERS; INTERIOR SIDE OF GIRDER #1 IN
SOUTH SPAN SHOWN
PHOTO #16 - TYPICAL PEELING OF PAINT AND
RUSTING OF DIAPHRAGMS; BAY #1 AT PIER #2
SHOWN
PHOTO #17 - MOSS GROWTH ON FASCIA
UNDER DECK DRAINS; SPAN #2 ON EAST SIDE
SHOWN
PHOTO #18 - GENERAL VIEW OF SOUTH
ABUTMENT
PHOTO #19 - EROSION OF SOUTH ABUTMENT SLOPE CAUSED BY
BRIDGE DRAINAGE
PHOTO #20 - GENERAL VIEW OF PIER #1, SOUTH FACE
PHOTO #21 - PATCH ON NORTH FACE OF PIER #9; TOP OF PATCH
SPALLED OFF WITH EXPOSED REBAR.
PHOTO #22 - TYPICAL GRAFFITI ON PIER WALL; SOUTH SIDE OF PIER
#10 SH0WN
PHOTO #23 - ACCUMULATION OF DEBRIS (ASPHALT) ON PIER #3 CAP
PHOTO #24 - CLOGGED (ASPHALT) BRIDGE DECK EXPANSION JOINT
DRAIN OUTLET, BASE OF NORTH SIDE OF PIER #3
PHOTO #25 - EROSION UNDER SPAN #9
PHOTO #26 - EROSION OF SLOPE UNDER
SPAN #10, EAST SIDE
PHOTO #27 - MINOR SCOUR AT DOWNSTREAM END OF PIER #10; NOTE
BUILD-UP OF SILT IN CHANNEL ALONG NORTH SIDE OF PIER
PHOTO #28 - EROSION OF CHANNEL BANK AT DRAINAGE OUTFALL ON
WEST SIDE OF NORTH ABUTMENT
PHOTO #29 - CLOSE-UP OF PREVIOUS PHOTO
PHOTO #30 - ACCUMULATION OF DRIFT ON UPSTREAM END OF PIER
#11
PHOTO #31 - UPSTREAM CHANNEL
PHOTO #32 - LOOKING UPSTREAM THROUGH STRUCTURE
PHOTO #33 - DOWNSTREAM CHANNEL
PHOTO #34 - LOOKING DOWNSTREAM THROUGH STRUCTURE