SWPPP_MT_DOT_543(1),_North_of_Jordan.pdf
PDF 7 MB Posted
- Attached to
- MT DOT 543(1), North of Jordan
- Solicitation number
- DTFH7017B00014
About this file
SWPPP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_North_of_Jordan.pdf | ||
| Q&A_5-17-17.pdf | ||
| Plan_Set_-_North_of_Jordan_-_Final.pdf | ||
| Plan_Request_for_Internet_Jordan.pdf | ||
| IFB_Jordan.pdf | ||
| PROJECT_DESCRIPTION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Stormwater Pollution Prevention Plan s
For:
North of Jordan, T DOT 543(1) Garfield County, Montana
Federal Highway Administration, Western Federal Lands Highway Division
Project Engineer:-----------
General Contractor: ----------
TAB 1: SWPPP/ESCP Narrative
TAB 2: NPDES Permit (Construction General Permit or Corresponding State Permit)
TAB 3: NOI, EPA/State Acknowledgement, Other Applicable EPA/State Correspondence
TAB 4: Delegation of Authority
TABS: Maps
TAB 6: Erosion/Sediment Control Plan Sheets (plan set and BMP typical details)
TAB 7: Permanent Stabilization and Revegetation Plan {plan sets and details)
TAB 8: SWPPP Amendment Log
TAB 9: Erosion/Sediment Control Inspection Reports and Requirements
TAB 10: Corrective Action Log
TAB il: Water Quality Monitoring, Reporting Requirements, and Reports
TAB 12: Training Log
TAB 13: Waste and/or Borrow Site Information
TAB 14: Grading and Stabilization _Log
TAB 15: Hazardous Spill Plan
TAB 16: Other Applicable Permits(§ 404, § 401, Oregon Remove-Fill Permit)
TAB 17: NPDES Quality Assurance Checklist
TAB 18: NPDES Notice of Termination (NOT)
CONTRACTOR:
Complete SWPPP narrative in accordance with contract 107.0lA(b).
Revise SWPPP narrative as needed throughout construction in accordance with contract 107.0lA(f)
ALASKA, IDAHO AND WASHINGTON PROJECTS ONLY:
SWPPP narrative must be signed by General Contractor's responsible corporate officer as defined in CGP I.11.2.
File approved SWPPP narrative i~ Tab 1.
\ AGENCY USE ONLY
Rec'd By: PERMIT NO.: Date Rec'd.: Amount Rec'd.: Check No.:
f Montana Department of
~ E w 110111111TAL QuAJ.m
WATER PROTECTION BUREAU
FORM
SWPPP
Storm Water Pollution Prevention Plan (SWPPP) Form
Storm Water Discharge Associated With Construction Activity MTRlOOOOO
READ THIS BEFORE COMPLETING FORM: This SWPPP Form is intended to assist operators in developing a SWPPP which complies with Part 3 of the General Permit. Before completing this form all parties need to read and be familiar with the General Permit, particularly Part 3, as this SWPPP Form is organized based on these Part 3 requirements. In the items to be completed on this form, references to the corresponding relevant "part" of the General Permit are indicated in italicized parenthesis. It is the permittee's responsibility to ensure all required items in the General Permit are adequately addressed, and that the SWPPP is developed, implemented, and maintained. Additional information will need to supplement this SWPPP Form in order to ~~eet these requirements. An up-to-date field copy of the SWPPP must be maintained at the construction
) ivity site by the SWPPP Administrator as required in Part 3 of the General Permit. Sections B and C on this -sWPPP Form must state information exactly the same as that indicated on the NOi Form. Attach additional pages as necessary with the corresponding item number on this form indicated. For coverage under the General Permit to be valid upon the submittal of a NOi Package, the NOi Package must include a complete NOi Form, SWPPP, and fee. Do not submit these items separately. The 2012 General Permit, this SWPPP Form, a Permit Fee Summary, and related forms are available from the Storm Water Program at (406) 444-3080 or ht ://de .mt. ov/w info/m des/stormwaterconstruction.mc x
Section A- SWPPP Status (Check one):
E)New No prior SWPPP submitted for this site.
D Modification Permit Number: MTRl 0 ____ (Please specify these four numbers)
Section B - Facility or Site Information:
Site Name North of Jordan, MT DOT 543(1)
Site LocationS-543, Hell Creek Road
Nearest City or Town Jordan CountyGarfield
Section C - Applicant (Owner/Operator) Information:
0 0 t N Western Federal Lands Highway Division wneror peraor ame _____________________________ _
~failing Address _6_1o_E_._5_th_s_t_re_et ___________________________ _
)ty St t d z· C d Vancouver, WA 98661 _ ..... if , a e, an 1p o e _____________________________ _
Phone Number 360-619-7700
Version 2.0 April 2013 Storm Water Pollution Prevention Plan Page 1of20
Section D - SWPPP Administrator Primary:
Name and Title or Position Title Scott Smithline, Environmental Manager Mailing Address _6_1o_E_._s_th_S_t_re_et ____________________________ _ City, State, and Zip Code _v_an_c_o_uv_e_r,_W_A_9_8_6_61 ________________________ _
Phone 360-619-noo Alternate Phone MT Phone Other Phone ----- ----- Email scott.smithline@dot.gov
Secondary:
Name and Title or Position Title
Alternate Email---------------
Mailing Address _________________________________ _
City, State, and Zip Code------------------------------ Phone _____ Alternate Phone ------'MT Phone _____ Other Phone ____ _ Email Alternate Email --------------- The SWPPP Administrator must check all of the following boxes confirming SWPPP responsibilities and qualifications based on the General Permit in order to utilize this SWPPP Form:
[{] Yes D No Delegation of Authority Form in Attachment A completed as necessary for new or added
SWPPP Administrators which are not specified on the NOi Form (parts 3.2. and 4.15.);
[{] Yes D No SWPPP Administrator Training Form in Attachment B completed and to be kept updated
(Part 3.2.);
[{]Yes D No SWPPP Site Map(s) and/or Plan(s) is attached including all required items (Part 3.5.);
[{] Yes D No The SWPPP Administrator will ensure the following log sheet summaries and/or attachments are completed and updated/maintained at the construction site for the following attachments based on the requirements in the General Permit:
• SWPPP Revision/Update Summary Log in Attachment C (Parts 2.4. and 3.12. );
• Self-Inspection Forms in Attachment D for all self-inspections performed (Parts 2.3. and 2.4.); and
• BMP design, installation, implementation, and maintenance specifications (Part 3. 7.) (these are not required to be submitted to the Department with the SWPPP included in the original NOi Package, but these must be maintained at all times with the SWPPP Administrator's field copy of the SWPPP at the construction site).
Section E - Construction Activity and BMP Schedule and Phasing (Part 3.3)
In the space below, indicate how many phases the construction activity will consist of (i.e., one, two, etc.):_on_e _______ _ For the phases identified above, if more than one, describe the relationship between the construction phases and describe what.major activities will occur during each phase:
N/A
Version 2.0 April 2013 Storm Water Pollution Prevention Plan Page 2 of 20
For each phase, the permittee must complete the Phase Sheet(s) in Attachment E of this SWPPP Form. In order . to complete Attachment E, the permittee must have assessed and identified site characteristics, potential llutant sources, and candidate BMPs elsewhere on this SWPPP Form. Using the Phase Sheet(s) table in ... ttachment E, and for each phase, complete the table for all components stated in Parts 3.3.1., 3.3.2., 3.3.3., 3.3.4., 3.3.5., and 3.3.6. in the General Permit. Examples of typical components would be a specific type/location ofBMP (Part 3.3.1.), a specific earthwork activity (Part 3.3.2.), temporary cessation of construction activities in a particular area (Part 3.3.3), temporary stabilization BMPs (Part 3.3.4.), vertical construction of a building (Part 3.3.5. ), and construction activity site clean-up and dismantling (Part 3.3. 6. ).
All earthwork and the BMPs identified on this SWPPP Form (typically in Sections I) are candidate items to include for each row on the table in Attachment E in addition to the other criteria stated in Parts 3.3.1. through
3.3.6. of the General Permit.
On the Phase Sheet( s) in Attachment E, all components must be listed and numbered in the sequential order they will occur at the construction activity. Do not use the same "Component Number" twice in the table.
Describe the component type and location in the appropriate box. Provide the initiation date or installation date, depending on the type of component. For example, structural BMPs like a sediment basin will have an installation date, whereas for earthwork or site-clean-up it is an initiation date. For BMPs, including temporary stabilization, provide the operational date. Provide a completion or removal date, depending on the type of component. For example, a sediment control fence will have a removal date, whereas temporary stabilization will have a completion date.
Section F - Site Description (Part 3.4.)
I. Describe the nature of the construction activity and what is being constructed (Part 3.4.1.):
The project proposes to replace or line two culverts and repair a third culvert. Two culverts at approximately Road Post
0 ) 8.6 and 16.4 would be replaced or lined to prevent future failure. Additional work at these two culverts would be to ,.Jair the outlet ground level as there is significant erosion occurring. The culvert at RP 20.0 would need repair or replacement of sections of the inlet plates and stronger armoring of the face of the structure
2. Describe all support activities and associated storm water discharges dedicated to the construction activity including but not limited to: material borrow areas, material fill areas, concrete or asphalt batch plants, equipment staging areas, access roads/corridors, material storage areas, and material crushing/recycling /processing areas (Part 3.4.2. ):
BO by contractor
Version 2.0 April 2013 Storm Water Pollution Prevention Plan Page 3of20
3. Provide an estimate of the total area of the site, and an estimate of the area of the site expected to undergo construction-related disturbance (including all construction-related support activities)(Part 3.4.3.); this information must match the information provided on the NOi Form:
Total Site Area (acres): _1._1_74 ___ _
Area of Construction-Related Disturbance (acres): _1._17_4 ___ _
4. Describe the character and erodibility of soil(s) and other earth material to be disturbed at the site, including cut/fill material to be used (Part 3.4.4.):
Summary by Map Unit - Garfield County, Montana (MT033) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 311 D Busby-Blacksheep-Twilight fine sandy loams, 2 to 15 percent slopes .24 0.2 4.7% 383C Chinook-Twilight-Eapa complex, 2 to 8 percent slopes .24 2.3 68.5% 941 E Cabbart-Havre loams, Q to 35 percent slopes .37 0.9 26.8% Totals for Area of Interest 3.4 100.0%
5. For a storm water discharge associated with construction activity with construction-related disturbance of five acres or more of total land area (based on the acreage provided in item F.3. above)(Part 3.4.5.):
a. Provide an estimate of the runoff coefficient of the site, both before and after construction, and describe what supporting information this determination is based upon:
Runoff coefficient before construction: 0.45 ------ Runoff coefficient after construction: 0.45 ------ Supporting Information Source:
Designer for Western Federal Lands Highway Division Mark Martini
b. Provide an estimate of the increase in impervious area after the construction activity identified on the NOi form is completed (example, 20 acres of total ground disturbance and 10 acres of constructed impervious parking and rooftop areas on previously undisturbed ground would be a 10/20 = 50 percent increase):
o Percent.
Version 2.0 April 2013 Storm Water Pollution Prevention Plan Page 4 of 20
6. In the Outfall Sheet table below, describe the names ofreceiving state surface waters anda description of the size, type, and location of each point source discharge or outfall. Use these same outfall locations and numbers the SWPPP site map(s). Use the same respective outfall numbers as identified in Section G on the submitted ~•01 Form. If there is no distinguishable point source discharge or outfall to the receiving state surface waters, a description of storm water runoff flow and drainage patterns into the receiving state surface waters must be provided. This must specify if discharges are to unnamed drainages and provide the name of the first named drainage that will receive that discharge down gradient of the site. If the discharge is to a municipal separate storm sewer, enter the location of any storm sewer discharge into receiving state surface waters. (Part 3.4. 6.)
Outfall Sheet (detailed outfall and receivin2 surface water information) (Part 3.4.6.)
Type Discharge To
Size (open Municipal Describe Flowpath Receiving Outfall (approximate channel, Storm Sewer (from outfall to named receiving surface water if Surface Water (first pipe, inlet, (Yes/No, if yes Number acreage from sheet flow, outfall does not discharge directly into the named named drainage downgradient site drained) provide location of receiving surface water, include unnamed drainages) from site) other- discharge (latitude specify) & longitude))
001 < 1 acre open no sheet flow from highway Frazier Creek channel
002 < 1 acre open no sheet flow from highway Hell Creek channel
,04
)R ADDITIONAL OUTFALLS, ADD ADDITIONAL COPIES OF THIS OUTFALL SHEET (will need to delete or ..:number the "Outfall Number" column; on second sheet renumber next outfall as "010'', and so forth; do not use the same outfall numbers twice)
Version 2.0 April 2013 Storm Water Pollution Prevention Plan Page 5of20
7. Provide a brief description of the existing vegetation at the site and an estimate of the percent density of vegetative ground cover (Part 3.4. 7.)
Most of work will be done in the existing right-of-way. Minimal vegetation disturbance might occur at the points where culvert replacement will occur and realignment.
Specify Percent Density of Existing Vegetation: _S_O_o/c_o _____ _
Section G- Site Map (Part 3.5.)
Attach the required SWPPP site maps or plans to this SWPPP Form. The site maps or plans must clearly indicate all the required information in Part 3.5. of the General Permit. This means SWPPP site maps must be of sufficient size, scale, and legibility. This cannot be accomplished on standard USGS topographic maps like those required to be attached to the NOi Form. For most construction projects, in order to accommodate all required inclusions, a series of site maps is necessary and recommended as this information cannot be legibly and completely shown on one map. One map could show the undeveloped site and its current features. An additional map or maps can be developed to show the developed site or, for more complicated sites, show the major phases of development. All information on the attached SWPPP site maps must correlate with the information and identifying names provided on this SWPPP Form, such as identifying "Outfall 001" by that name on the site map. ·
Section H - Identification and Summary of Potential Pollutant Sources (Part 3.6.)
At a minimum, each of the following sources and activities must be evaluated for the potential to contribute pollutants to storm water discharges:
1. All disturbed and stored soils.
Clearing, excavating, and clearing. All stored soils must be covered and surrounded by silt fencing. Follow all specifications outlined in the erosion control plans.
2. Vehicle tracking of sediments.
Use of vehicle track-out pads used where applicable. Follow all specifications outlined in the erosion control plans.
3. Vehicle trucking of sediments.
Contractor to provide specifications.
4. Management of contaminated soils.
Spill prevention and response actions are outlined in the Hazardous Spill Plan or Spill Prevention, Control, and Countermeasure Plan (SPCC) whichever is applicable,
5. Loading and unloading operations.
Contractor to provide specifications.
Version 2.0 April 2013 Storm Water Pollution Prevention Plan Page 6of20
6. Outdoor storage activities (building materials, fertilizers, chemicals, etc.).
Npt Applicable
7. Significant dust or particulate generation.
Control measure: Sprinkling Implementation: Apply at a rate of 3 gallons per acre so that the soil is wet but not saturated or muddy and so that no dust is being generated.
Maintenance requirements: Dust control requires constant attention: it is not a one-time or once-in- awhile activity. Dust control sprinkling may have to be done several times a day during hot, dry weather.
8. Vehicle and equipment maintenance and fueling.
On-site fueling areas will have a spill kit present, visible, and maintained. Employees and subcontractors will receive training regarding equipment/vehicle fueling and maintenance practices, including proper fueling procedures, proper use of pumps, emergency shutoff valves.
9. Routine maintenance activities involving fuels, oils, solvents, pesticides, herbicides, fertilizers, detergents, etc.
Designate vehicle/equipment service will be marked and the areas will be located away from drainage facilities and watercourses to prevent stormwater run-on and runoff. Designated washout areas will be shown on the SWPPP plan sheets .
... u. On-site waste management practices (waste piles, liquid wastes. dumpsters, etc.).
• Designated trash and bulk waste-collection areas on-site (location of areas are shown and updated on plan sheets. • Litter and debris from the construction will be cleaned up on a daily basis. Waste-collection areas will be located away from streets, gutters, watercourses, and storm drains. Secondary containment around waste collection areas will be implemented if needed to further minimize the likelihood of contaminated discharges. Portable restrooms will have tie downs or stake downs in areas of high winds or susceptibility to vandalism.
11. Concrete truck and equipment washing.
Equipment/vehicle washing and allowable non-stormwater will be controlled using procedures and practices include using off-site facilities; washing in designated, contained areas only; eliminating discharges to the storm drain by infiltrating the wash water or routing to the sanitary sewer. The locations of equipment/vehicle washing areas, storm drains, tributary drainage areas, and surface waterbodies on or near the site are shown and updated on the SWPPP plan sheets
12. Dedicated asphalt and concrete batch plants.
Concrete trucks or equipment will not be washed out into storm drains, streets, gutters, uncontained areas, or any watercourses. Washout areas will be established prior to commencing the activity and their locations advertise with signs or delineators. Materials will be disposed of properly {for example, allow the water to evaporate and to recycle the hardened concrete).• Employees and subcontractors will receive training regarding designated washout areas, including proper handling and storage practices.
13. Non-industrial waste sources such as worker trash and portable toilets.
Portable restrooms will be located away from streets, gutters, watercourses, and storm drains (location of areas are shown i updated on plan sheets). Secondary containment around waste collection areas will be implemented if needed to iher minimize the likelihood of contaminated discharges.
Version 2.0 April 2013 Storm Water Pollution Prevention Plan Page 7 of 20
14. Other non-storm water discharges if present (as identified in the table below or otherwise).
Identify if any of the following allowable non-storm water discharges are to be present at your site based OP -
Part 1.1.3. of the General Permit:
Type of Allowable Non-Storm Water Discharge Likely to be Present at the Construction Site?
Uncontaminated condensate from air conditioners, coolers, and other compressors and from the outside storage of refrigerated gases or liquids Irrigation drainage
Landscape watering provided all pesticides, herbicides, and fertilizer have been applied in accordance with the approved labeling Pavement wash waters where no detergents are used and no spills or leaks of toxic or hazardous materials have occurred (unless all spilled material has been removed)
Routine external building wash down that does not use detergents Uncontaminated ground water or spring water
Water used to control dust
Discharges from emergency fire-fighting activities
· Foundation or footing drains where flows are not contaminated with process materials Incidental windblown mist from cooling towers that collects on rooftops or adjacent portions of the facility, but not intentional discharges from the cooling tower (e.g., "piped" cooling tower blowdown or drains)
15. Other areas or procedures where potential spills can occur.
None
16. Other potential pollutant sources not identified above.
None
0Yes
0Yes
0Yes
[ZJ Yes
0Yes
0Yes
[ZJ Yes
[ZJ Yes
0Yes
0Yes
Section I - Description of Best Management Practices (BMPs) (Part 3. 7.)
[ZJ No
[ZJ No
[ZJ No
0No
[ZJ No
[ZJ No
0No
0No
[ZJ No
[ZJ No
To complete this properly and adequately, you must refer to the specific BMP requirements in Part 3. 7, and the applicable and pertinent effluent limits in Part 2.1, of the General Permit. The items in Section 1.2. of this SWPPP Form are listed in the order these items appear in Part 3. 7. of the General Permit. The BMPs specified below in the SWPPP must clearly describe how compliance with these permit conditions will be achieved. The BMP descriptions below must address all of the potential pollutant sources stated in Part 3.6 of the General Permit and in Section Hof this SWPPP Form.
For structural or other BMPs where the BMP is depending on a technical reference source for BMP design, installation, implementation, and maintenance specifications, you must provide the reference source and respective BMPs in the table in Section 1.1. below. For those BMPs which are listed in the completed table below, the referenced specifications must be maintained on-site with the working up-to-date field copy of this SWPPP Form and associated SWPPP site maps. When this SWPPP Form is submitted to the Department as a part of the NOi Package, do not submit these specifications for Department records. If the technicf.
reference source does not cQmpletely address all specifications associated with the design, installation, · im lementation, and maintenance, then this must be addressed in Section 1.2. below.
Version 2.0 April 2013 Storm Water Pollution Prevention Plan Page 8of20
For BMPs where you do not specify a technical reference source below, applicable design, installation, implementation, and maintenance specifications must be described and addressed in Section I.2. below.
In the following table, provide the reference source(s) to be used for these specifications, and indicate the associated BMPs which were obtained for each.
BMP S .fi ti S /R J Sh 1pec11ca on ource e erences eet
Source BMP Specification Reference Source Specific BMPs For Which This Number (name, publisher, date, page number(s), website Reference Source Was Used address, etc.)
1 Standard Specifications for Construction of Roads and Fiber Roll and Silt Fence Bridges on Federal Highway Projects (pgs. 85-90) www.fhwa.dot.gov
' t<OR ADDITIONAL SOURCES/REFERENCES, ADD COPIES OF THIS BMP SPECIFICATION SHEET (do not use the same source number twice .
Version 2.0 April 2013 Storm Water Pollution Prevention Plan Page 9of20
2. Describe all BMPs which will be used at the construction project based on Part 3. 7, and Part 2.1, of the General Permit. This description can generally address a type ofBMP ifthat BMP is to be used more than- -once, but the specific BMP and their respective locations must still be provided on the Construction Phasi Sheets provided in Section E of this SWPPP Form, and on the SWPPP site maps and/or plans provided in Section G of this SWPPP Form. All potential pollutant sources in Section H must be addressed with corresponding BMPs in this item regardless of whether the BMP description is dependent on a reference source listed in Section 1.1.
Control measure: Silt Fence Implementation: The silt fence shall be functional before other land disturbing activities take place. Silt fence should be functional throughout the duration of construction and for a long enough duration following construction to allow disturbed areas to stabilize following revegetation and seeding.
Maintenance requirements: Silt fences should be inspected periodically for damage (such as tearing by wind, animals, or equipment) and for the amount of sediment that has accumulated. Remove the sediment when it reaches one-half the height of the silt fence. In situations where access is available, machinery can be used. Otherwise, the silt should be removed manually. The following are key elements to remember: The sediment deposits should be removed when heavy rain or high water is anticipated. The sediment deposits should be placed in an area where there is little danger of erosion.
The silt fence should not be removed until adequate vegetative growth ensures no further erosion of the slopes. Generally, the fabric is cut at ground level, the wire and posts are removed, then the sediment is spread, seeded, and protected (mulched) immediately.
Control measure: Fiber Roll Implementation: The Fiber Rolls shall be functional before other land disturbing activities take place. Fiber Rolls should be functional throughout the duration of construction and for a long enough duration following construction to allow disturbed areas to stabilize following revegetation and seeding.
Maintenance requirements: Remove sediment before it has accumulated to one-half of the above~ground height of the straw wattles. It is the Contractor's responsibility to upgrade erosion control measures as necessary if the sediment controls are ineffective and turbid water is observed discharging from the site.
FOR ADDITIONAL BMPS, ADD COPIES OF THIS SHEET
Version 2.0 April 2013 Storm Water Pollution Prevention Plan Page 10 of 20
Structural BMPs for Erosion and Sediment Control Sheet
a. Structural BMPs for Erosion and Sediment Control (Part 3. 7.1. ). Describe what BMPs are going to be utilized at the site, including the design, installation, and maintenance procedures for each if not addressed through a reference source in the table above in Section I1. Describe how each of the BMPs will address the specific criteria stated in Parts 2.1.1. and 2.1.6. of the General Permit as applicable and relevant.
ontrol measure: Silt Fence mplementation: The silt fence shall be functional before other land disturbing activities take place. Silt fence should be unctional throughout the duration of construction and for a long enough duration following construction to allow disturbed reas to stabilize following revegetation and seeding.
aintenance requirements: Silt fences should be inspected periodically for damage (such as tearing by wind, animals, or quipment) and for the amount of sediment that has accumulated. Remove the sediment when it reaches one-half the eight of the silt fence. In situations where access is available, machinery can be used. Otherwise, the silt should be emoved manually. The following are key elements to remember: The sediment deposits should be removed when heavy ain or high water is anticipated. The sediment deposits should be placed in an area where there is little danger of erosion.
he silt fence should not be removed until adequate vegetative growth ensures no further erosion of the slopes. Generally, he fabric is cut at ground level, the wire and posts are removed, then the sediment is spread, seeded, and protected mulched) immediately.
ontrol measure: Fiber Roll mplementation: The Fiber Rolls shall be functional before other land disturbing activities take place. Fiber Rolls should be unctional throughout the duration of construction and for a long enough duration following construction to allow disturbed reas to stabilize following revegetation and seeding.
aintenance requirements: Remove sediment before it has accumulated to one-half of the above-ground height of the traw wattles. It is the Contractor's responsibility to upgrade erosion control measures as necessary if the sediment controls re ineffective and turbid water is observed discharging from the site.
FOR ADDITIONAL STRUCTURAL BMPS, ADD COPIES OF THIS STRUCTURAL SHEET
Version 2.0 April 2013 Storm Water Pollution Prevention Plan Page 11of20
Non-Structural BMPs for Erosion and Sediment Control Sheet
b. Non-Structural BMPs for Erosion and Sediment Control (Part 3. 7.2.). Describe what BMPs are going to P"' -utilized at the site. Describe how each of the BMPs will address the specific criteria stated in Parts 2.1.1.
2.1.2., and 2.1.4. of the General Permit as applicable and relevant.
None
FOR ADDITIONAL NON-STRUCTURAL BMPS, ADD COPIES OF THIS NON-STRUCTURAL SHEET
Version 2.0 April 2013 Storm Water Pollution Prevention Plan Page 12 of 20
Materials Handling BMP Sheet Materials Handling (Part 3.7.3.). Describe all BMPs implemented at the site for each of the potential pollutant sources listed in Sections Hl, H4, H5, H6, H7, H8, H9, Hl3, and Hl4 of this SWPPP Form.
Describe how each of the BMPs will address the specific criteria stated in Parts 2.1.1., 2.1.2., 2.1.4., and
2.1.5. of the General Permit as applicable and relevant. In the description ofBMPs below, reference the specific aforementioned Section H number where the potential pollutant source was identified, and list each specific BMP so that there is adequate correlation. Be specific and not general, and be sure to address any design, installation, and maintenance protocol as applicable and pertinent to the particular BMP.
None
FOR ADDITIONAL MATERIALS HANDLING BMPS, ADD COPIES OF THIS MATERIALS HANDLING SHEET
Version 2.0 April 2013 Storm Water Pollution Prevention Plan Page 13 of 20
d. Dedicated Concrete or Asphalt Batch Plants (Part 3. 7.4.). Describe all BMPs implemented at the site for each of the potential pollutant sources listed in Section H12 of this SWPPP Form. Describe how each of tr." , BMPs will address the specific criteria stated in Parts 2.1.1., 2.1.4., and 2.1.5. of the General Permit as applicable and relevant. Be specific and not general, and be sure to address any design, installation, and maintenance protocol as applicable and pertinent to all BMP associated with the batch plant(s).
• Concrete trucks or equipment will not be washed out into storm drains, streets, gutters, uncontained areas, or any atercourses.
• Washout areas will be established prior to commencing the activity and their locations advertise with signs or delineators.
•Adequate containment for the amount of wash water that will be used will be provided.
• Washout structures will be routinely inspected to detect leaks or tears and to identify when materials need to be removed.
•Materials will be disposed of properly (for example, allow the water to evaporate and to recycle the hardened concrete).
1 • Inspections will include looking for evidence that contractors are using the washout areas and not dumping materials onto he ground or into drainage facilities. If the washout areas are not being used regularly, additional signage will be posted or he facility will be relocated to a more convenient location.
• Employees and subcontractors will receive training regarding designated washout areas, including proper handling and storage practices (training efforts documented in.
e. Vehicle Tracking Control (Part 3.7.5.). Describe all BMPs implemented at the site for each of the potential pollutant sources listed in Section H2 of this SWPPP Form. Be specific and not general, and be sure to address any design, installation, and maintenance protocol as applicable and pertinent to the BMPs.
Contractor to provide specifications.
f. Waste Management and Disposal, Including Concrete Washout (Part 3.7.6.). Describe all BMPs implemented at the site for each of the potential pollutant sources listed in Section H4, H5, HlO, Hl 1, Hl3, and H15 of this SWPPP Form. Describe how each of the BMPs will address the specific criteria stated in Parts 2.1.4. and 2.1.5. of the General Permit as applicable and relevant. Be specific and not general, and be sure to address any design, installation, and maintenance protocol as applicable and pertinent to the BMPs.
• Concrete trucks or equipment will not be washed out into storm drains, streets, gutters, uncontained areas, or any watercourses.
• Washout areas will be established prior to commencing the activity and their locations advertise with signs or delineators:
• Adequate containment for the amount of wash water that will be used will be provided.
•Washout structures will be routinely inspected to detect leaks or tears and to identify when materials need to be removed.
•Materials will be disposed of properly (for example, allow the water to evaporate and to recycle the hardened concrete).
• Inspections will include looking for evidence that contractors are using the washout areas and not dumping materials onto the ground or into drainage facilities. If the washout areas are not being used regularly, additional signage will be posted or the facility will be relocated to a more convenient location.
• Employees and subcontractors will receive training regarding designated washout areas, including proper handling and storage practices (training efforts documented in
Version 2.0 April 2013 Storm Water Pollution Prevention Plan Page 14of20
g. Stabilization Measures (Part 3. 7. 7. ). Describe specific vegetative and/or non-vegetative practices that will be used to achieve temporary and final stabilization on the exposed portions of the site. Describe how each of the BMPs will address the specific criteria stated in Parts 2.1.1. and 2.1.2. of the General Permit as applicable and relevant. Be specific and not general, and be sure to address any design, installation, and maintenance protocol as applicable and pertinent to the BMPs.
BMPs are no longer needed when the site that the BMP is protecting has reached final stabilization as defined in the applicable NPDES Stormwater Permit.
Final stabilization means:
•All ground disturbing activities at the site have been completed, AND
• Vegetation has been established that provides a uniform perennial vegetative cover with a density of 70% of the natural vegetative cover prior to construction.
•In arid (0-10" annual precipitation) or semiarid (10-20" annual precipitation) areas, final stabilization is considered to be achieved when the area is seeded or planted and vegetation is expected to provide 70% cover within 3 years; AND, erosion controls are in place that provide soil protection for at least 3 years without active maintenance. Document arid/ semi-arid conditions in SWPPP
• Effective non-vegetative stabilization is in-place such as rip rap, gabions, geotextiles, rock, aggregate etc.
li. Minimize Ground Disturbance (Part 3.7.8.). Describe measures to be taken to minimize ground disturbance and preserve pre-existing stabilization measures of earth material as much as possible. Describe how these BMPs will address the specific criteria stated in Part 2.1.1. of the General Permit as applicable and relevant.
Control measure: heavy equipment and small repeated forces Implementation: During construction, soil compaction should be minimized. This includes compaction by heavy equipment and small repeated forces such as persistent foot traffic. Limiting on-site stockpiling of materials and parking also reduces soil compaction. Staging areas should be chosen carefully, located preferably in an area that is already designed to be a hard surface such as a driveway, patio, or plaza, and well away from important trees or sensitive areas. In some cases, it is possible to use existing roads or parking areas adjacent to the site for materials storage.
i. Ground Water Dewatering (Part 3. 7.9.). Describe BMPs and locations used for ground water dewatering at the site. Describe how these BMPs will address the specific criteria stated in Part 2.1.3. of the General Permit as applicable and relevant. For discharges of ground water due to dewatering practices which will not discharge to state surface waters, be sure to address any design, installation, and maintenance protocol as applicable and pertinent to the BMPs.
None
Version 2.0 April 2013 Storm Water Pollution Prevention Plan Page 15of20
J. Operational Controls (Part 3. 7.10.). If not addressed elsewhere, address BMPs which will be used on a day to-day basis on the site to reduce or eliminate the contribution of potential pollutants in storm water runoff such as good housekeeping activities to maintain a clean and orderly site, and removal of accumulated sediment on or off the site as much as practicable. This is the section to specifically describe and locate ah BMPs implemented at the site for the potential pollutant sources listed in Sections H7, H8, H9, and H15 of this SWPPP Form. Describe how these BMPs will address the specific criteria stated in Parts 2.1.4. and
2.1.5. of the General Permit as applicable and relevant. Be sure to address any design, installation, and maintenance protocol as applicable and pertinent to the BMPs.
Corrective actions will be taken to:
• Repair, modify, or replace any stormwater control BMP used at the site;
•Replace/modify BMPs that were initially installed incorrectly or never installed;
• Replace BMPs that are ineffective in preventing/minimizing sediment discharges in accordance with applicable water quality standards;
• Clean up and properly dispose of spills, releases, or other deposits, or
• Remedy a permit violation
k. Spill Prevention and Response Procedures (Part 3. 7.11. ). Describe what procedures will be used to prevent and respond to spills, leaks, and other releases. This is the section to specifically describe all BMPs implemented at the site for the potential pollutant sources listed in Sections H15 of this SWPPP Form.
Describe how these BMPs will address the specific criteria stated in Parts 2.1.4. and 2.1. 5. of the General Permit as applicable and relevant.
Prior to earth-disturbing activities or pollutant-generating activities, the following construction personnel will receive trair to understand the requirements of the EPA/State NPDES stormwater permit and their specific responsibilities:
• Personnel responsible for installation, maintenance, or repair of stormwater control BMPs;
• Personnel responsible for the application and storage of treatment chemicals (if applicable);
• Personnel responsible for conducting inspections;
• Personnel responsible for taking corrective actions
1. Off-Site Vehicle Trucking of Sediment (Part 3. 7.12. ). Describe BMPs used to address off-site vehicle trucking of sediment at the site for the potential pollutant sources listed in Section H3 of this SWPPP Form
Not Applicable
Version 2.0 April 2013 Storm Water Pollution Prevention Plan Page 16 of 20
I m. Local Sediment and Erosion Control Requirements (Part 3. 7.13. ). Describe any and all applicable local / erosion and sediment control requirements.
ie
Section J -Final Stabilization (Part 3.8.)
Describe all procedures and BMPs (if not stated in Section I.2.g. on this Form) to achieve "final stabilization" ''ld ensure the specific requirements of Part 3.8. in the General Permit are achieved for all areas with nstruction-related ground disturbance at the construction activity .
.... one
'I
Version 2.0 April 2013 Storm Water Pollution Prevention Plan Page 17of20
Section K- Post-Construction Storm Water Management (Part 3.9.)
Describe any BMPs which are to be. used to control storm water and potential pollutants in storm water discharges that will occur after construction operations have been completed at the site, including any applicable local requirements.
Silt Fence
Section L-Inspection and BMP Maintenance Procedures (Part 3.10.)
Identify and clearly describe the inspection and maintenance procedures implemented at the site to maintain all erosion and sediment control and other BMPs identified in the SWPPP, in good and effective operating condition. These documented procedures must comply with the inspection requirements in Part 2.3. of this permit (also refer to Parts 2.3.5., 2.4., 3.3., and 3. 7. of the permit for related BMP maintenance requirements).
Inspections will be conducted at least once every 7 calendar days.
Other schedule as allowed by State NPDES Permit.
Inspection frequency may be reduced to at least once every month if:
• The entire site is temporarily stabilized, •Runoff is unlikely due to winter conditions (e.g., site is covered with snow, ice, or the ground is frozen), or
• Construction is occurring during seasonal arid periods in arid areas and semi-arid areas
Version 2.0 April 2013 Storm Water Pollution Prevention Plan
I
I .Section M- Water Quality Controls for Discharges to Impaired Water bodies (Part 3.11.)
I Specify the information required in Part 3.11. of the General Permit.
'Applicable
Section N - Miscellaneous Information Use this space to identify miscellaneous information which must be included in the SWPPP.
"'0ne
Section 0 - CERTIFICATION
Permittee Information: This SWPPP must be completed, signed, and certified as follows:
• For a corporation, by a principal officer of at least the level of vice president;
• For a partnership or sole proprietorship, by a general partner or the proprietor, respectively; or
• For a municipality, state, federal, or other public facility, by either a principal executive officer or ranking elected official.
Alternatively, this SWPPP may be signed by a duly authorized representative of the person above. A person is a duly authorized representative only if:
• The authorization is made in writing by a person described above (see Attachment A);
• The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company (a duly authorized representative may thus be either a named individual or any individual occupying a named position);
• The written authorization is submitted to the department.
Version 2.0 April 2013 Storm Water Pollution Prevention Plan Page 19of20
All Permittees Must Complete the Following Certification:
I certify under penalty of law that this document and all attachments were prepared under my direction supervision in accordance with a system designed to assure that qualified personnel properly gather ~ evaluate the information submitted. Based on my inquiry of the persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information; including the possibility of fine and imprisonment for knowing violations. [75-5-
633, MCA]
A. Name (Type or Print) Scott Smithline
B. Title (Type or Print) Environmental Manager
D. Signature
C. Phone No.
360-619-7700
The Department will not process this form until all of the requested information is supplied, and the appropriate fees are paid. Return this form and the applicable fee to:
Version 2.0 April 2013
Department of Environmental Quality Water Protection Bureau
PO Box 200901 Helena, MT 59620-0901
( 406) 444-3080
Storm Water Pollution Prevention Plan Page 20 of 20
In compliance with Section 75-5-101 et seq., Montana Annotated (MCA), Administrative Rules of Montana (ARM) 17.30.1301 et seq., a·nd ARM 17.30.1101 et seq., owners and operators (permittees) with authorization under this "General Permit for Storm Water Discharges Associated with Construction Activity" (permit) are authorized to discharge storm water in accordance with the conditions set forth in Parts 1, 2, 3, 4, and 5 of this permit.
This permit shaH become effective January 1, 2013.
This permit and the authorization to discharge shall expire at midnight, December 31, 2017.
FOR THE MONTANA DEPARTMENT OF
~MENTA U=A=L=ITY~~-=--. ._~.
Paul Skubinna, Program Manager Water Quality Discharge Permit Section Water Protection Bureau Permitting & Compliance Division
I
Permit No. MTRi 00000
PREAMBLE ................................................................... :
1. COVERAGE UNDER THIS PERl\i!IT
1.1. Eligibility
1.1.1. Construction Activities Covered
1.1.2. Allowable Storm Water Discharges
1.1.3. Allowable Non-Storm Water Discharges
1.1.4. Limitations on Coverage
1.2. Authorization under this Permit ...................................................................... .,
1.2.1. New Authorizations (Not Previously Authorized)
1.2.2. Continuing Authorizations Issued Before This Permit's 2013 Effective Date
1.2.3. Continuation of this 2013-2017 Permit Beyond the 2017 Expiration Date
1.2.4. Modification to NO!s
1.3. Termination of Coverage under This Permit
1.4. Transfer of Coverage under this Permit
1.5. Storm Water Rainfall Erosivity Waiver Form
2. EFFLUENT LIMITATIONS AND MONITORING AND REPORTING REQUIREMENTS
2.1. Non-Numeric Technology-Based Effluent Limits
2.1.1. Erosion and Sediment Controls
2.1.2. Soil Stabilization
2.1.3. Dewatering
2.1.4. Pollution Prevention Measures
2.1.5. Prohibited Discharges
2.1.6. Surface Outlets
2.2. Water Quality-Based Effluent Umitations
2.2.1. Water Quality Standards
2.2.2. Discharges to Water Quality Impaired Waters
2.2.3. Consistency with Total Maximum Daily Load-Based Waste Load Allocations
2.3. Inspections
2.3.1. Weekly Routine Inspections
2.3.2. Biweekly Routine and Post-Storm Event Inspections
2.3.3. Reductions In Inspection Frequency
2.3.4. Inspection Requirements
2.3.5. BMP Maintenance, Replacement, and Failures
2.4. Corrective Actions
2.5. Recordkeeping
2.6. Reporting
2.6.1. Notification of Primary SWPPP Administrator Changes
2.6.2. Noncompliance Reporting
3. SPECIAL CONDITIONS - Storm Water Pollution Prevention Pian (SWPPP)
3.1. SWPPP- General Requirements ............................................. :
3.2. SWPPP Administrator
3.2.1. SWPPP Administrator- General Requirements
3.2.2. SWPPPAdministrator-Trainlng
3.3. Construction Activity and BMP Schedule and Phasing
Permit No. MTRIOOOOO
3.4. Site Description ........................................................................................................................... 19 ·
3.5. Site Map
3.6. Identification and Summary of Potential Pollutant Sources
3.7. Description of Best Management Practices (BMPs)
3.7.1. Structural BMPs for Erosion and Sediment Control. ......................................................... :.22
3.7 .2. Non-Structural BMPs for Erosion and Sediment Control
3.7.3. Materials Handling
3.7.4. Dedicated Concrete or Asphalt Batch Pla.nts
3.7.5. Vehicle Tracking Control
3.7.6. Waste Management and Disposal, Including Concrete Washout
3.7.7. Stabilization Measures
3.7.8. Minimize Ground Disturbance
3.7.9. Ground Water Dewatering
3.7.10. Operational Controls
3.7.11. Spill Prevention and Response Procedures
3. 7 .12. Off-Site Vehicle Trucking of Sediment
3.7.13. local Sediment and Erosion Control Requirements
3.8. Final Stabilization
3.9. Post-Construction Storm Water Management
3.10. Inspection and BMP Maintenance Procedures
3.11. Water Quality Controls for Discharges to Impaired Waterbodies
3.12. SWPPP Revisions and Updates
4. STANDARD CONDITfONS
4.1. Duty to Comply
4.2. Duty to Reapply
4.3. Need to Halt or Reduce Activity Not a Defense
4.4. Duty to Mitigate
4.5. Proper Operation and Maintenance
4.6. Permit Actions
4.7. Property Rights
4.8. Duty to Provide lnformation
4.9. Inspection and Entry
4.10. Monitoring and Records-Representative Sampling
4.11. Monitoring and Records-Retention of Records .......................................................................... 28 .
4.12. Monitoring and Records-Records Contents .......................................................................... :
4.13. Monitoring and Records-Test Procedures
4.14. Monitoring and Records-Falsification and Tampering
4.15. Signatory Requirement
4.16. Reporting Requirements-Planned Changes
4.17. Reporting Requirements-Anticipated Noncomptiance
4.18. Reporting Requirements-Transfers
4.19. Reporting Requirements-Monitoring Reports
4.20. Reporting Requirements-Compliance Schedules
Permit No. MTR100000
4.21. Reporting Requirements-Twenty-four Hour Reporting
4.22. Reporting Requirements-Other Noncompliance
4.23. Reporting Requirements-Other Information
4.24. Bypass
4.25. Upset
4.26. Fees
5. DEFIN!TiONS AND ABBREVIATIONS
5.1. General Definitions and Abbreviations
The purpose of this Preamble is to provide the construction project "owner or operator" (permittee) who submits a Notice of Intent Package for a "storm water discharge associated with construction activity" under the "General Permit for Storm Water Discharges Associated with Construction Activity"· (permit) with a summary of the requirements of this permit.
The basic principle of the permit is to identify pollutant sources associated with construction activities and install and maintain Best Management Practices {BMPs) reduce the potential discharge of pollutants from the construction project The degree of pollution control necessary will vary depending on the site and the associated construction activity, but the BMPs and pollution control measures must collectively prevent exceedances of applicable water quality standards in state surface waters.
The primary potential pollutant from construction activities is sediment. Adequate erosion and sediment control BMPs must be used to minimize or prevent sediment discharges from the construction activity to state surface waters.
Other potential pollutants likely to be a problem sites are fuels, lubricating oils, construction materials, various wastes, fertilizers, or pesticides. Proper management of these materials is essential to ensure potential pollutants are not discharged from the construction activity to state surface waters.
In order to achieve compliance with the conditions of this permit, the permittee is required to address the effluent limitations in Part 2 by developing a Storm Water Pollution Prevention Pian (SWPPP) as described in Part 3. The SWPPP must clearly address the effluent limitations and the selected Best Management Practices to be used to manage pollutant sources and ensure appropriate protection of state surface waters.
The permit requires that the site reach "final stabilization" before permit coverage may be terminated. In Montana's semi-arid climate, the time necessary to achieve this "final stabilization" often requires permit coverage well beyond…