Q&A_5-17-17.pdf

PDF 76 KB Posted

Attached to
MT DOT 543(1), North of Jordan
Solicitation number
DTFH7017B00014
Issued by

View the file

Other files

File Type Posted
BidSum_North_of_Jordan.pdf PDF
Plan_Set_-_North_of_Jordan_-_Final.pdf PDF
Plan_Request_for_Internet_Jordan.pdf PDF
SWPPP_MT_DOT_543(1),_North_of_Jordan.pdf PDF
IFB_Jordan.pdf PDF
PROJECT_DESCRIPTION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No.: MT DOT 543(1) Project: North of Jordan

# General Technical Question Answer Date

1 X Will locally available sandstone be acceptable for rip rap?

See Section 105. Provide riprap meeting the requirements of Subsection 705.02.

5/17/17

2 X Can I get clarification on 62901‐0500 ROLLED EROSION CONTROL PRODUCT, TYPE 2.A, in the standard specifications it states that this product is short term mulch control netting. Is this a coir net blanket without straw or coconut?

See Subsection 629.01 and 713.17. Provide a woven biodegradable natural fiber or photodegradable synthetic mesh.

5/17/17

3 X Could automatic traffic stop/go signal lights be used instead of flaggers for the traffic control?

See Subsection 156.04. Bid according to the Bid Schedule. Submit alternate traffic control plans at least 30 days before intended use. 5/17/17

4 X Could water filled barriers be used instead of concrete barriers?

See Subsection 635.02 and Subsection 156.04.

Bid according to the Bid Schedule. Submit alternate traffic control plans at least 30 days before intended use.

5/17/17

5 X Is Filter Rock (705.08) incidental to any of the bid items on this project?

Yes. Filter Rock (if used) is paid for indirectly.

See Subsection 109.05. 5/17/17

6 X Will a hand drawn Bar Chart (BCM) meet the requirements of Section 155?

Yes. See Subsection 155.03.

5/17/17

7 X Will hydration stabilizer(s) be allowed or a dry batch process be allowed for this project since the nearest capable readymix plant is over 100 road miles away from the project?

Yes. Construct Minor concrete according to Section 601. Submit concrete mix designs according to Subsection 601.03. Furnish chemical admixtures conforming to Subsection 711.03.

5/17/17