mt-d201602_DAR2016(2)_Plans_Signoff.pdf
PDF 6 MB Posted
- Attached to
- MT DAR 2016(2), 2016 By Mile Wheatland Area
- Solicitation number
- DTFH70-16-B-00029
About this file
Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID_SUMMARY_Wheatland.pdf | ||
| A002.pdf | ||
| A001_Wheatland.pdf | ||
| mt-d201602_DAR2016(2)_K-03_ew.pdf | ||
| Plan_Request__Wheatland.pdf | ||
| IFB_Wheatland_Area.pdf | ||
| Prelim_Letter_DAR_2016(2).pdf | ||
| Preliminary_Plans.pdf | ||
| PROJECT_DESCRIPTION(2).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material P
M
S e p te m b e r
U
C
F h ig h w a y s F
H W
A m t-d
D A
R D e s ig n G e n e r a l I n fo r m a ti o n m t-d a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2 DAR 2016(2) MT
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub
Ø spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
Roberts
C re e k
B la k e
G a ll o w a y
T im b e r
C re e k
Roberts
Creek
Creek
A n te lo p e
C r e e k m t-d a c
K .d g n
U
S S u r ft
D
A.3
STATE PROJECT
NUMBER
MT
DAR 2016(2)
S e p
B
T h o m p s o n
B e ll
C h e c k e d b y
D s ig n e d b
K-03
LOWER NIHILL RD
1 0.5 0 1 2
SCALE IN MILES
N
HARLOWTON
K-03 ROAD
VICINITY MAP
MONTANA
UPPER NIHILL RD
P R
O N
G H
O R
N R
D
L I V I N
G S
P R I N
G S R
D
M.P. 0.01
BEGIN K-03 ROAD WORK
M.P. 7.46
END K-03 ROAD WORK
[1]M.P. 2.36 - M.P. 2.59
Grade raise location
FOOTNOTE:
See Sheet D.5.[1]
S
F
L it tl e
R o b e rts
C re e k W e s t
C r e e k
C re e k
F o rk
G a ll o w a y
B la k e
G a ll o w a y
T im b e r
C re e k
C re e k
C re ek
C r e e k
E a s t
Gulch
Coule e
C re e k
B N
S F T im b e r1 0.5 0 1 2
SCALE IN MILES
N
JU
D
IT
H G
A P R
D
OXFORD RD
P
R O
N G
H O
R N R
D
L I V I N
G S
P R I N
G S R
D
JUDITH GAP RD
N E
L S
O N R
D
RED FOX RD
L-06 m t-d a d
L .d g n
U
S S u r ft
D
A.4
STATE PROJECT
S e p
T h o m p s
B
C h e c k e d b s ig n e d b
L-06 ROAD
VICINITY MAP
M.P. 0.01
BEGIN L-06 ROAD WORK
M.P. 6.39
END L-06 ROAD WORK
JUDITH GAP
MONTANA
FERGUS CO.
WHEATLAND CO.
An tel op e
A n te lo p e
C r e e k
C r e e k
Creek
B ig
Coulee
R o s s
H a u c k
C ou le e
Hauck
F o rkB
N S F
B N S F
1 0.5 0 1 2
SCALE IN MILES
N
L-09 m t-d a e
L .d g n
U
S S u r ft
D
A.5
STATE PROJECT
S e p
T h o m p s
B
C h e c k e d b s ig n e d b
L-09 ROAD
VICINITY MAP
MONTANA
EAST LAKE RD
SOUTHWIND RD
BUFFALO WAY RD
B U F F A L O W
A Y R
D
DIAMOND WAY RD
MONTANA
BASIN CO.
JUDITH
FERGUS CO.
B A
S I N C
O
J U
D I T
H
F E
R G
U S C
O
J A
C K
R A
B B I T R
D
STRAW RD
RED BARN RD
LAKE
ACKLEY
WHITE ROCK RD
TROUT SPRINGS RD
SUNRIDGE RD
B E
L L
V I E
W R
D
BRIARWOOD RD
BI
G
COULE
E
NEW LIBERTY RD
A N
T E
L O
P E C
R E
E K R
D
BIRCH RD
M.P. 0.00
BEGIN L-09 ROAD WORK
M.P. 6.89
END L-09 ROAD WORK
M il e s
T o H o b s o n
M il e s
T o E d d ie 's C o rn e r
M ile s T o J u d ith G a p
K-03 1 2.35 K-03 2 0.23 K-03 1 4.87 L-06 1 6.38 L-09 1 6.89
20.72
FOOTNOTE:
[1] See Sheets C.2 - C.3.
[2] Quantities are based on 1.93 TON/CUYD.
[3] Quantity represents material for road approaches.
Quantities based on the following:
1. 15 TON/approach for private approaches.
2. 10 TON/approach for farm field approaches.
3. 40 TON/approach for public approaches.
4. 60 TON/approach for missile launch facility approaches.
[4] Calcium chloride quantities based on 1.85% by dry weight of surface course aggregate.
260 386
1,253Total
ESTIMATED TYPICAL SECTION QUANTITIES
(For Information Only)
21,960325
Calcium chloride [4]
(TON)
(TON)(TON)
Section 302 Section 311
66,063
80 294
Stabilized aggregate surface course, calcium chloride, imported aggregate [2]
7,490
20,334 15,522
Roadway aggregate, method 2 [2] [3]
Miles Typical No. [1]
Road Number
STATE PROJECT
DAR 2016(2) C.1MT
F:
\h ig hw ay s\
FH
W A\
_m t-d2
1_
D A R
\D es ig n\ Ty pi ca l S ec ti on s\ [m t- 9-
S ep
-2
3:
P
M N
B
EL
L 8/
B
TH
O
M
PS
O N
8/
D es ig ne d
C he ck ed b y:
NUMBER
ESTIMATION OF TYPICAL
SECTION QUANTITIES
C.2
STATE PROJECT
S e p
P
M m t-d c a .d g n
U
S I n t2
T h o m p s h e c k e d b
B s ig n e d b y
1:3
Travel lane Travel lane
1:3
LC
Existing Slope
Existing Slope li m it s
C o n s tr u c ti o n li m it s
C o n s tr u c ti o n
Original ground
FOOTNOTE:
Roadway reconditioning
TYPICAL SECTIONS
NO SCALE
[3]9' min. - 12' max. [3]9' min. - 12' max.
[1] 5% Crown + 1/2% [1]5% Crown + 1/2%
NOTE:
[2]3' [2]3'
(4" AGGREGATE SURFACING)
TYPICAL SECTION NO. 1
1. See Sheet C.1 for estimated quantities.
4" compacted depth calcium chloride, imported aggregate, Stabilized aggregate surface course, Taper at a rate of 25:1 between widths. See Sheet C.4.
Adjust to match existing road width as approved. [3]
Ensure drainage down to existing ditch.
Remove 3 feet of foreslope vegetation and slope to drain.[2] a maximum of 8%.
Superelevate roadway on curves to a minimum of 5% and[1]
C.3
S e p
P
M m t-d c b .d g n
U
S I n t2
T h o m p s e c k e d b
B s ig n e d b y
1:3 1:3
LC
Existing Slope
Existing Slope
Original ground
12' 12'
TYPICAL SECTIONS
5% Crown5% Crown
Profile grade
Slope stake
Slope stake
Select borrow
Turf establishment limits
Placing conserved topsoil, 4-inch depth li m it s
C le a r in g
5' [2]
Placing conserved topsoil, 4-inch depth
Turf establishment limits li m it s
C le a r in g
5' [2]
NOTE:
Construct slopes as shown in the Staking Report.[1]
See Sheet D.5.[3]
5' or to existing permanent easement line, whichever is less.[2]
[1
Va ria ble
[1]
Variable where required
[3]Geogrid, stabilization,
1. See Sheets C.1 and D.1 for estimated quantities.
4" compacted depth calcium chloride, imported aggregate, Stabilized aggregate surface course, Travel lane Travel lane
NO SCALE
M.P. 2.36 - 2.59
)[3](K-03 ROAD GRADE RAISE
TYPICAL SECTION NO. 2
C.4
S e p
P
M m t-d c c .d g n
U
S I n t2
T h o m p s e c k e d b
B s ig n e d b y
TYPICAL DETAILS
CONNECTION WITH NONPAVED ROADWAYS
AT THE BEGINNING AND END OF
TYPICAL TREATMENT OF GRAVEL SECTIONS
PROFILE
PROFILE
d e p th s u r fa c in g
B e g in E n d f u
25:1 Taper
25:1 Taper
TYPICAL TAPER
PLAN
LC
FOOTNOTE:
NO SCALE
or paved roadway
Existing structure e x is ti n g w id th
V a r ia b le e x is ti n g w id th
V a r ia b le
Profile grade grade line
Existing road surfacing section
Match mainline surfacing section
Match mainline
Profile grade
[2]50' min.
[2]50' min.
grade line
[1]Existing road
CATTLE GUARDS TO REMAIN IN-PLACE, AND PAVED INTERSECTIONS
TYPICAL TREATMENT AT EXISTING BRIDGES,
structures and existing roadways as approved.
Adjust transition length to provide a smooth transition to[2] surfacing.
Do not measure excavation and disposal of gravel profile grade from existing grade to the depth shown.
intersecting roadway or from the structure. Taper
Excavate existing gravel surfacing from the edge of [1] calcium chloride, imported aggregate
Stabilized aggregate surface course, calcium chloride, imported aggregate
Stabilized aggregate surface course, K-03 2.36 - 2.59
[1] Includes conserved topsoil.
[2] Quantities are based on 1.93 TON/CUYD.
[3] Based on a conserved topsoil depth of 4 inches.
[4] Includes quantity for farm field approach at M.P. 2.58 LT.
[5] See Sections 622 and 623 for more details. Hours shown are for the entire project, regardless of mileage completed.
FOOTNOTE:
275 [4]
P.O. Box 1140, Havre, MT 59501
USAF - Malmstrom Cable Affairs
Triangle Communications
0.5266
Section 625
Noah Davis
84423 US HWY 87, Lewistown, MT 59457
130 N Main St., Butte, MT 59701
Fergus Electric Cooperative, Inc.
1620 Airport Rd, Lewistown, MT 59457
NorthWestern Energy 302 South Dawes St., Lewistown, MT 59457
338 US HWY 87 E., Billings, MT 59101 Sprint Nextel
Phillips 66 Pipeline LLC
Phone #Contact
Montana Department of Transportation
UTILITY CONTACT INFORMATION
(406) 670-0884
(406) 538-3465
(406) 538-1301
K-03, L-09 Front Range Pipeline, LLC (CHS Inc.) 543 W. Dry Creek Rd., Buffalo, MT 59418
(406) 538-1201
Road Number
Doug Lutke
L-09
K-03, L-06, L-09
Brian Tomlinson
(406) 231-2139
AddressCompany
Monte Obert/Guy Johnson
Kevin Stone
2,133
Scott Leeds Bruce Kudrna
K-03
Roadway excavation [1]
(CUYD)
L-06, L-09
K-03, L-06, L-09 Matt Auger
Geogrid, stabilization
(SQYD)
Road Number
(406) 731-24596932 Goddard Dr., Bldg. 165, Rm. 153, Malmstrom AFB, MT 59402
(406) 394-2786
(406) 394-2751
Placing conserved topsoil, 4-inch depth
(ACRE)
Section 207 Section 624
K-03
ESTIMATED GRADE RAISE QUANTITIES (For Information Only)
ESTIMATED ROADWAY QUANTITIES
(For Information Only) [5]
Section 622
Brendan Flower
0.8
(406) 255-5738
(406) 491-5862
Select borrow [2]
(TON)
6,280
Dump truck, 12 cubic yard minimum capacity
(HOUR)
Backhoe loader, 6 cuft minimum rated capacity, 24" width
(HOUR)
Motor grader, 12 foot minimum blade
(HOUR)
General labor
(HOUR)
M.P.
15 25
Section 204
Jay Kinsey
Turf establishment (hydraulic method)
(SLRY)
Section 201
Clearing and grubbing
(ACRE)
Conserved topsoil [3]
(CUYD)
Section 623
K-03 Kinder Morgan Pipeline USA (Spectra Energy) Suite 352, 800 Werner Ct., Casper, WY 82601
L-09
STATE PROJECT
DAR 2016(2) D.1MT
F:
\h ig hw ay s\
FH
W
A\
_m t-d2
1_ D
A R
\D es ig n\ Pl an a nd P ro fil e\ [m t- 9-
S ep
-2
3:
P
M N
B
EL
L 8/
B
TH
O
M
PS
O N
8/
D es ig ne d by
C he ck ed b y:
NUMBER
ESTIMATION OF PLAN
QUANTITIES
m t-d la
K .d g n
I n t_ ft
D
D.2
STATE PROJECT
S e p
T h o m p s
B
C h e c k e d b y
D e s ig n e d b y
FOOTNOTE:
NO SCALE
NOTE:
See Sheet D.5.[1]
LINE GRAPH
K-03 ROAD
F a r m F ie ld A p p r
R T
M .P .3 r m F ie ld A p p r
R T
M .P le a n C u lv e r t i n P la c e
M .P .2
B e g in P r o je c t
M .P .0
M .P .0
M .P .0
P r iv a te A p p r
L T
M .P .9
M .P .0
D o N o t
D is tu r b x is ti n g
C a tt le G u a r d
M .P .9
M .P .0
M .P .0
M .P .0
R a is e G r a d e
M .P .3
.5 r m F ie ld A p p r
L T
M .P .4
M is s il e L a u n c h F a c il it y K
M is s il e L a u n c h F a c il it y A p p r
L T
.P .4
E n d P r o je c t
M .P .4
M .P .0
M .P .0
M .P .0
F a r m F ie ld A p p r
R T
M .P .9 tr u c tu r e
R e p a ir D r a in a g e
M .P .2
S tr u c tu r e
R e p a ir D r a in a g e
M .P .3
S tr u c tu r e
R e p a ir D r a in a g e
M .P .5
S tr u c tu r e
R e p a ir D r a in a g e
M .P .4
S tr u c tu r e
R e p a ir D r a in a g e
M .P .1
F a r m F ie ld A p p r
L T
M .P .5
F a r m F ie ld A p p r
R T
M .P
214. See Sheet D.1 for utility contact information.
3. See Sheet C.1 for estimated aggregate quantities.
2. All culverts are existing unless otherwise noted.
and radii as approved.
1. Gravel existing approaches and turnouts to match existing widths
P ip e A r c h
R e p la c e w it h
E q u iv a le n t
M .P .4
P ip e A r c h
R e p la c e w it h
E q u iv a le n t
M .P .4
P ip e A r c h
R e p la c e w it h
E q u iv a le n t
M .P
NO SCALE
n d P r o je c t
NOTE:
m t-d lb
L .d g n
I n t_ ft
D
D.3
STATE PROJECT
S e p
T h o m p s
B
C h e c k e d b y
D e s ig n e d b y
LINE GRAPH
L-06 ROAD
P u b li c A p p r
L T
M .P .0
F a r m F ie ld A p p r
L T
M .P .8
S tr u c tu r e
R e p a ir D r a in a g e
M .P .7
F a r m F ie ld A p p r
L T
M .P .5
B e g in P r o je c t
M .P .0
F a r m F ie ld A p p r
R T
M .P .0
.0
F a r m F ie ld A p p r
L T
M .P .9
P r iv a te A p p r
R T
M .P
.0
M .P .0
M .P .0
M .P .0
M .P .0
F a r m F ie ld A p p r
R T
M .P b li c A p p r
L T
M .P .0
M .P .3
M is s il e L a u n c h F a c il it y L
M is s il e L a u n c h F a c il it y A p p r L
T
M .P .3
P r iv a te A p p r
R T
M .P
.0
M .P .0
P u b li c A p p r
R T
M .P fo
C u lv e r t
C o n s tr u c t
E n e r g y D is s ip a to r L
T
M .P .1 fo r
C u lv e r t
C o n s tr u c t
R ip r a p H e a d w a ll R
T
M .P .5
4. See Sheet D.1 for utility contact information.
3. See Sheet C.1 for estimated aggregate quantities.
2. All culverts are existing unless otherwise noted.
and radii as approved.
1. Gravel existing approaches and turnouts to match existing widths
FOOTNOTE:
prior to clean.
Power cables running through culvert. Coordinate with landowner[1]
C le a n C u lv e r t i n P la c e
M .P n d P r o je c t
NOTE:
m t-d lc
L .d g n
I n t_ ft
D
D.4
STATE PROJECT
S e p
T h o m p s
B
C h e c k e d b y
D e s ig n e d b y
LINE GRAPH
L-09 ROAD
F a r m F ie ld A p p r
L T
M .P .6
F a r m F ie ld A p p r
R T
M .P .2 b li c A p p r
L T
M .P .5
F a r m F ie ld A p p r
R T
M .P .6 g in P r o je c t
M .P .0
P r iv a te A p p r
R T
M .P
.0
P r iv a te A p p r
R T
M .P .8 iv a te A p p r
R T
M .P
.0
M .P .0
M .P .0
M .P .0
M .P .0
F a r m F ie ld A p p r
R T
M .P b li c A p p r
L T
M .P .8
M .P .8
P u b li c A p p r
R T
M .P r m F ie ld A p p r
L T
M .P .2
P u b li c A p p r
R T
M .P is s il e L a u n c h F a c il it y L
M is s il e L a u n c h F a c il it y A p p r
L T
M .P .8
F a r m F ie ld A p p r
L T
M .P .1
M .P .0
M .P .0
S tr u c tu r e
R e p a ir D r a in a g e
M .P .1 fo r
A r c h i n P la c n s tr u c t
E n e r g y D is s ip a to r L
T
M .P .1
4. See Sheet D.1 for utility contact information.
3. See Sheet C.1 for estimated aggregate quantities.
2. All culverts are existing unless otherwise noted.
and radii as approved.
1. Gravel existing approaches and turnouts to match existing widths
O
T
.0
N
CP
Line to be constructed
Profile grade
Existing ground
NAME NORTHING EASTING ELEVATION
CONTROL POINTS
CUYD
EXC.
CUYD
EMB.
3011+003008+503006+003003+503001+00
4320 4320
4325 4325
4330 4330
4335 4335
4340 4340
4345 4345
4350 4350
4355 4355
4360 4360 m t-d ld
K
G r a d e
R a is e P
P .d g n
I n t_ ft
D
D.5
STATE PROJECT
S e p
T h o m p s
B
C h e c k e d b y
D e s ig n e d b y
LOWER NIHILL ROAD
CP
14101
14102 14103
3,254
El. = 4346.39
E = 1914010.533
N = 816718.091
El. = 4349.35
E = 1915235.529
N = 816715.157
14103
14102
14101
816743.025
816746.125
816692.072
1915297.996
1914722.585
1914008.350
4349.53
4338.72
4345.94
CP
See Sheet D.1 for complete excavation and embankment quantities.
Embankment volumes represent select borrow quantities.
Excavation volumes do not include conserved topsoil quantities.
K-03 GRADE RAISE
BEGIN GRADE RAISE
K-03 ROAD
3000+50.00 = M.P. 2.36
END GRADE RAISE
K-03 ROAD
3012+75.00 = M.P. 2.59
-4% @ 15'
Farm Field Appr.
M.P. 2.58
See Sheet C.3
Geogrid, stabilization
See Sheet E.3
Install fiber roll
E q u iv a le n t
P ip e A r c h
M .P .4
E q u iv a le n t
P ip e A r c h
M .P .4
E q u iv a le n t
P ip e A r c h
M .P .5
,3
.3
,3
.2
-1.5200%
100' VC
K = 80
,3
.7
-0.2778%
+2.6
%200' VC
K = 69
,3
E.1
S e p
P
M m t-d d a .d g n
U
S S u r
T h o m p s e c k e d b
B s ig n e d b y
EROSION CONTROL PLAN
NO SCALE
Flowing Drainage
F lo w in g D ra in a g e
D it c h
D it c h
Install fiber rolls [1]
Install fiber rolls [1]
D it c h
D it c h
FIBER ROLL PLACEMENT
TYPICAL
NOTE:
field.
approximate. Final locations are to be approved in the
1. The location of soil erosion control devices shown are
FOOTNOTE:
Culvert or bridge
[3]
See Sheet E.2.[4] raise as shown on Sheet D.5.
Place additional fiber rolls for the K-03 Road grade[3] flowing water.
Place fiber rolls adjacent to ditches with standing or[2] with standing or flowing water.
extend across any ditches intersecting the culverts and bridges or flowing water. See Sheet E.3 for details. Ensure rolls
Place fiber rolls around culverts or bridges with standing [1]
[4]
2'2'2'2'
A
A
B B
Flow
SECTION A-A SECTION B-B
SECTION A-A
SECTION B-B
Flow
Flow
Flow embankment
Roadway
NOTE:
PLASTIC LINED DIVERSION CHANNEL
RIPRAP LINED DIVERSION CHANNEL
Flow
Sandbags
SECTION B-B
PLAN
DIVERSION CHANNEL
Plastic linerSandbagsPlastic liner temporary barrier
Use sandbags to construct
Permanent culvert
Roadway centerline
Permanent natural channel
Earthwork limits
Subgrade
Temporary culvert backfill
Natural ground with plastic liner or riprap
Temporary diversion channel
Ø
1:1 1:
6"
1:1 1:
6"
1:1 1:
1:1
1:
whichever is greater.
Ø = 2' or diameter of temporary culvert, DIVERSION CHANNELS
TEMPORARY
see Section A-A backflow into natural channel, Use sandbags to prevent
Riprap, class 1 Riprap, class 1
Silt fence (typ.)
sandbags.
6" deep and secure with riprap or upstream edge of the liner a minimum of joints if using a plastic liner. Bury the
Do not construct channel with longitudinal methods listed in Subsection 204.11(a).
Compact temporary culvert backfill using with temporary culvert as approved by CO.
channel through the roadway embankment
Replace the portion of the diversion
Sandbag (typ.)
embankment
Roadway
Ø
Bedding (typ.)
TEMPORARY CULVERT(S)
See note 6
Temporary culvert(s)
7.
6.
5.
4.
3.
2.
1.
see note 5
Diversion channel, and secure with sandbags (typ.)
Bury plastic liner 6" deep
0.5 percent.
Construct channel at a minimum grade of diversion channel.
length and width of the temporary
Use plastic liner or riprap along the entire channel locations.
See Sheet E.1 for temporary diversion
E.2
STATE PROJECT
S e p
P
M m t-d d b .d g n
U
S C u s to m a r
T h o m p s e c k e d b
B s ig n e d b y
2Ø
4Ø4Ø
2Ø
4Ø
2Ø
4Ø
2Ø when scheduled)
Silt fence (typ.
NO SCALE
when scheduled)
Silt fence (typ.
ØØ
Ø Ø
(typ.)
Sandbag
Subsection 157.10.
be used. Conform to the requirements of
Single or multiple temporary culverts may type E, nonwoven
Geotextile, class 2, type E, nonwoven
Geotextile, class 2, Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction of runof f from distur bed area s sp ac in g ch ar t
S ee F ib er R ol l
Fiber roll ff o n ur f o n oi t c er i
D along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
2.
1.
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls
Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
DRAFT: 7/2016
REVISED:
DETAIL APPROVED FOR USE 10/2014
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FIBER ROLL
(FT)
(FT)
W157-21
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
E.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DAR 2016(2) MT
U S
C
F h ig h w a y s F
H W
A m t-d
D A
R D e s ig n E r o s io n C o n tr o l\ m t-d d c .d g n e p te m b e r
10.4 x 16 Section
Mile Post
ES
TI
M
A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
EN
ER
G
Y D
IS
S
IP
A
TO
R
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
R
IP
R A P
H
EA
D W
A
LL
-I
N C
H E
Q U
IV
A
LE
N T
D
IA
M
ET
ER
A
R C
H O
R
EL
LI
PT
IC
A L
PI
PE
C U
LV
ER
T
C
LE
A N
IN
G
C U
LV
ER
T
IN
P
LA
C E
R
EP
A
IR
IN
G
D R A
IN
A G
E S
TR
U C
TU
R E
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered footnotes
FEET CUYD CUYD CUYD LNFT EACH EACH Lt Rt
K-03 ROAD
0.24 1
0.34 1
0.57 1
1.10 1
1.46 1
2.47 3 26 50 15° LT x/GS,C
2.48 2 28 48 10° LT x/GS,C
2.54 3 46 50 x/GS,C
4.22 1
L-06 ROAD
1.76 1
2.19 4 1
2.57 5 2
3.03 1
L-09 ROAD
0.12 1
6.12 11 1
PROJECT TOTAL 100 15 5 148 2 7
Allowable Pipe Material
NOTE: FOOTNOTE: A Aluminum
1. Aluminized steel and aluminum pipe culvert minimum wall thickness 1. Energy dissipator at outlet. See Sheet F.2. AS Aluminized steel is the thickness required by the Std. 602-1 fill height table, unless otherwise noted on plans. 2. Riprap headwall at inlet. See Sheet F.2. C Concrete
2. In cut sections, construct cut slopes as shown on Std. 602-6. GS Galvanized steel
3. Maintain cover per manufacturer's recommendations on all culverts under live loading P Plastic during construction. (blank) Any appropriate material x/__ Any appropriate material except __
Section 607PAY ITEM NUMBER Section 251
ESTIMATION OF DRAINAGE QUANTITIES (For Information Only) F:
\h ig hw ay s\
FH
W A\
_m t-d2
1_
D A R
\D es ig n\ D ra in ag e\
[m t-
9- S ep
-2
4:
P
M N
B el l 8/
B
Th om ps on
8/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
F.1
SHEET
NUMBER
DAR 2016(2)MT
Note: The quantities shown hereon are approximate and are subject to field adjustments.
m t-d e a .d g n
I n t_ ft
D
F.2
STATE PROJECT
S e p
T h o m p s
B
C h e c k e d b y
D e s ig n e d b y
PLAN
ELEVATION
catch
Fill slope
Flowline length
Variable fill slope catch
Fill slope
Va ria bl e fil l s lo pe le ng th
Va ria bl e
Fi ll Sl op e
12" (min.)
12" (min.)
Flowline
24"
2.
1.
Section
NOTE:
B
B A
A
SECTION B-B
SECTION A-A
Place riprap and earthwork geotextiles in energy dissipators at the following rates:
or Equivalent
Outlet Diameter
NO SCALE
class 2 (energy dissipator)
Placed riprap, method A, class 2 (energy dissipator)
Placed riprap, method A, class 1, type C (nonwoven)
Separation-stabilization geotextile, class 1, type C (nonwoven)
Separation-stabilization geotextile, class 1, type C (nonwoven)
Separation-stabilization geotextile, NO SCALE
DETAILS
RIPRAP STABILIZATION
class 2 (energy dissipator)
Placed riprap, method A, class 2 (energy dissipator)
Placed riprap, method A, 3.
D/2 or 15" min.
D/2 or 15" min.
D or 24" min.
2D or 48" min. or as shown on plans
48" (min.)
on plans or as shown
48" (min.)
Adjust widths and lengths to fit existing scour channels as approved.
A
A
RIPRAP HEADWALL DETAILS
A
A
ELEVATION - SINGLE PIPE ELEVATION - DOUBLE PIPE
D or S
D o r R
D or S D or S
D o r R class 2 (riprap headwall)
Placed riprap, method A, V a r ia b le
V a r ia
[3]X
SECTION A-A
Pipe invertPipe culvert class 1, type C (nonwoven)
Separation-stabilization geotextile, [1]class 2 (riprap headwall)
Placed riprap, method A, V a r ia
1.
½ span or 2' minimum.[4] installations.
minimum pipe spacing as shown on Standard 602-3 for new pipe
Existing spacing for headwall installations at existing pipes or [3]
Slope to match roadway embankment.[1]
2' standard, 1' if headwall extends into subgrade.[2]
SKEW ANGLE DIAGRAM
c e n te r li n e
R o a d w a y
Cu lv er t ce nt er lin e
BOP
EOP
Skew angle
See Sheet F.1 for estimated quantities.
AT PIPE OUTLET DETAIL
ENERGY DISSIPATOR
60"
60"
24"
24"
B-B
A-A
B-B
A-A
0.81 cuyd/ft
0.92 cuyd/ft
0.30 cuyd/ft
0.33 cuyd/ft
1.67 sqyd/ft
1.78 sqyd/ft
0.89 sqyd/ft
1.00 sqyd/ft
Placed Riprap Separation-stabilization Geotextile class 2 (riprap headwall)
Placed riprap, method A, See Sheet F.1 for locations and estimated quantities.
[4]W [4]W [4]W [4]W
2.
3.
4.
METAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVERSPAN x RISE
PIPE ARCH
SIZE
PIPE ARCH
SIZE
SPAN x RISE
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVER
MINIMUM
COVERDIAMETER
PIPE
SIZE
PIPE
SIZE
DIAMETER
MINIMUM
COVER
ALUMINUMSTEEL
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
special analysis by the CO.
The fill heights in the table are for helical lockseam and welded seam pipe only.
Fill heights for culvert pipe with annular corrugations are more restrictive than those of helical lockseam and welded seam pipe.
Obtain approval before furnishing annular corrugation pipe.
Measure minimum cover from the top of the pipe culvert to the subgrade for flexible pavements, and to the top of the pavement for rigid pavements. Measure maximum fill height from the top of the pipe to the top of the pavement for both flexible and rigid pavement.
602-1
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
METAL PIPE CULVERT
Fill heights exceeding 100 feet require
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES
INCHES
INCHES
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
INCHES
3.5
INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
5" x 1" CORRUGATIONS
0.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.109/120.138/10 0.168/8
INCHES INCHES INCHES
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
3.5
" CORRUGATIONS2
1" x 3
METAL THICKNESS (INCH/GAGE)
3" x 1" CORRUGATIONS
0.135/100.105/120.075/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.060/160.135/100.105/120.075/140.060/16
STATE PROJECT
NUMBER
SHEET
F.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DAR 2016(2) MT
U S
C
F h ig h w a y s F
H W
A m t-d
D A
R D e s ig n D r a in a g e m t-d e b .d g n e p te m b e r
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
2.
SMOOTH SLEEVE BAND FLAT BAND
SEMI-CORRUGATED BAND
HELICAL BANDANNULAR BANDSTANDARD BAND CONNECTIONS
SLEEVE JOINT
SIDE VIEW SIDE VIEW SIDE VIEW
END VIEW
END VIEWEND VIEW
Oval Lug
Band Angle
Bar & Strap
Integral Flange Wedge and Strap
Smoother sleeve with center stop.
Stab type joint
ROUND PIPE
DIAMETER
PIPE ARCH
SPAN × RISE
CORRUGATION
W
Band Band
Band Bolts
Pipe
Band
Bolts
Angle
Pipe
BandBand
Bolts
Pipe heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or
Angle
Wedge
Watertight pipe joints are not required unless specified in the Special Contract Requirements.
Other types of coupling bands or fastening devices that comply with the joint performance criteria of AASHTO Standard specifications for
Highway Bridges, Division II Section 26 may be used.
of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest strap connector
Bolt, bar and
[1] Fabricate annular, helical and semi-corrugated type coupling bands from the same metal as
[2] For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the dimension of the end corrugation in the pipe.
COUPLING BANDS FOR METAL PIPE CULVERT [1]
[3] Use annular corrugated bands with pipes having annular corrugations or with helical pipe the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses
ANNULAR
CORRUGATED
HELICALLY
CORRUGATED
BANDS [4]
SEMI-
CORRUGATEDSIZE [2]
BANDS [3] BANDS [5]
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
W
BoltsBand
WW
602-2
MINIMUM BAND WIDTH (INCHES)
1 × 2
1 × 3
3 × 1
5 × 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 × 64 to 142 × 91
60 × 46 to 81 × 59
87 × 64 to 142 × 91
60 × 46 to 81 × 59
49 × 33 to 83 × 57
17 × 13 to 42 × 29
10.5
10.5
10.5
10.5
10.5
10.5
10.5
INCHESINCHESINCHES
rerolled with 3" × 1" pipe corrugations.
COUPLING BAND
METAL PIPE CULVERT
having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" × 3
2pipe ends rerolled with 2 steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
Use a matching metal having a nominal thickness of not less than 0.040 inch for steel, Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or less.
"2 1" × 3
2The minimum band widths shown for 3" × 1" and 5" × 1" corrugated sizes apply to 2 corrugations on rerolled pipe ends.
diameter, required above 42" diameter
Second angle connection optional to 42" diameter, required above 42" diameter
Second angle connection optional to 42"
STATE PROJECT
NUMBER
SHEET
F.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DAR 2016(2) MT
U S
C
F h ig h w a y s F
H W
A m t-d
D A
R D e s ig n D r a in a g e m t-d e c .d g n e p te m b e r
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
underdrain [6]
[4] Use helical corrugated bands with pipes having helically corrugated ends.
[5]
[6]
" for 18" round culvert (21" × 15" pipe arch) or less8
" for 21" round culvert (24" × 18" pipe arch) or more2
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
H equals the diameter of all round pipe culverts or the rise dimension of all pipe arch culverts.
See Section 704 for bedding and backfill requirements.
1.
2.
3.
Construct piping plug of impermeable backfill material at the pipe culvert inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.
MULTIPLE PIPE INSTALLATION
PIPING PLUG
BELOW NATURAL GROUND OR
TRENCH EXCAVATION IN EMBANKMENT
ON UNSTABLE MATERIAL
ABOVE AND BELOW
NATURAL GROUND
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
LEGEND:
Bedding material (uncompacted)
Impermeable backfill material.
BEDDING DEPTH
MINIMUM SPACING
SPACING
DIAMETER
or SPAN
PIPE SIZE (H) DEPTH
Roadway embankment Roadway embankment
Natural ground
Toe plate Toe plate
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
H
Width
H H
H H
H H
H H
H
H
H
H
Finished subgrade Finished subgrade
Natural ground
Finished subgrade
Pipe culvert
Embankment slope
High water elevation treatment
Culvert end
Piping plug before trench excavation embankment height
Finished subgrade or
Original natural ground surface
A
A
Finished subgrade
Roadway embankment
Roadway embankment
Finished subgrade trench excavations
Embankment material placed in layers
Compacted backfill material placed in layers not backfill in accordance with Section 614.
depth table
See bedding excavation in trench
HH
compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Bedding
Bedding
Bedding
Bedding
H
Half diameter or whichever is less
(see table)
Minimum spacing or Span
Diameter or Span
Diameter section
Metal endMetal end section
602-3
STANDARD APPROVED FOR USE 12/1993
DRAFT: 10/2014
REVISED: 4/1994 6/2005
or 36" (max.) for embankment installations not exceeding 6" compacted depth.
exceeding 6" compacted depth. Or lean concrete
> 54"
12" to 54"
6"
4"
18" (min.)
6" in uncompacted depth.
* Reduce to 18" for
UP to 48"
48" and UP
24" span or 36", PIPE CULVERT BEDDING
METAL AND PLASTIC
2'-0" ±
1'-0" ±
18" ±
18" ±18"±
(min.)
6"
(min.)
6"
12" (min.), 24" (max.)
"/foot of cover,2 minimum
1'-0"
STATE PROJECT
NUMBER
SHEET
F.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DAR 2016(2) MT
U S
C
F h ig h w a y s F
H W
A m t-d
D A
R D e s ig n D r a in a g e m t-d e d .d g n e p te m b e r
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.)
2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.)
dimension of all pipe arch culverts.
D equals the diameter of all round pipe or the rise 1.
TYPE II
TYPE I
SECTION B-B
SECTION A-A
N o r m a l d it c h l in e
S u b g r a d e s h o u ld e r
Pipe culvert
E n d o f p ip e
FLOW
Flat b ottom di tch a t culv ert in let
FLOW
Tape r at 1
0:1 r atio
Taper a t 10:1 ratio
FLOW
2D or
FLOW
Taper at 10
:1 rat io
2D or
N o r m a l d it c h l in e subgrade elevation
Maximum 2D or
S u b g r a d e s h o u ld e r o r e n d s e c ti o n
E n d o f p ip e b e v e l
PIPE SIZE (D) WIDENING
DITCH WIDENING
Flat b ottom ditc h at c ulvert inlet
A
A
B
B section
End
PLAN PLAN
Original ground in mountainous terrain flat terrain. Taper at 5:1
Taper at 10:1 in rolling or 5:1 in mountainous terrain.
or flat terrain. Taper at
Taper at 10:1 in rolling
Normal ditch line
Pipe culvert
Original ground cut slope
Normal
(See table)
Ditch widening
Subgrade shoulder Normal ditch lineSubgrade shoulder
Pavement surface
Berm
Pavement surface
Subgrade
End section
Berm pipe as staked
Slope at ditch at end section
Flow line of pipe as staked
Slope at cut slope
Normal
D in lieu of 45° pipe elbow
30° pipe elbows may be required
At skewed pipe locations, 22.5° or
Standard 45° pipe elbow.
slope
1:3 max ditch line
Normal maximum slope
1:1.5
Cut Slope slope
1:3 max maximum slope
1:1.5
Cut Slope
D ditch line
Normal
Subgrade
602-6
TREATMENT IN CUT SLOPES
PIPE CULVERT INLET 30"
24"
18"
7'
6'
5'
1'
1'
STATE PROJECT
NUMBER
SHEET
F.6
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DAR 2016(2) MT
U S
C
F h ig h w a y s F
H W
A m t-d
D A
R D e s ig n D r a in a g e m t-d e f.
d g n e p te m b e r
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
B e r m
D
B e r m
D
(min.)
4' d ip a t c e n te r
(Min.)
4'
1 G20-1 ROAD WORK NEXT XX MILES 36 x 18 2 G20-2 END ROAD WORK 36 x 18 3 W1-6 ONE-DIRECTION LARGE ARROW 48 x 24 4 W3-4 BE PREPARED TO STOP 36 x 36 5 W8-6 TRUCK CROSSING [2] 36 x 36 6 W13-1P 25 MPH 24 x 24 7 W20-1 ROAD WORK AHEAD 36 x 36 8 W20-1 ROAD WORK 500 FT 36 x 36 9 W20-4 ONE LANE ROAD AHEAD 36 x 36 10 W20-7 FLAGGER (SYMBOL) 36 x 36 11 W24-1 DOUBLE REVERSE CURVE 36 x 36
1. Install all signs according to Standard 635-14 and Part 6 of the M.U.T.C.D, current edition.
[1] For information only.
[2] Install signs 500 feet on either side of the material source entrance road.
Temporary traffic control, drum Temporary traffic control, warning light type C
MUTCD
Number
ESTIMATED TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGNS [1]
ESTIMATED TEMPORARY TRAFFIC CONTROL,
CHANNELIZING DEVICES [1]
Description
Temporary traffic control, barricade type 3 Temporary traffic control, cone, type 36-inch
FOOTNOTE:
TEMPORARY
TRAFFIC CONTROL PLAN
NOTE:
Sign Number Description Sign size
(in x in)
DAR 2016(2) G.1MT
F:
\h ig hw ay s\
FH
W
A\
_m t-d2
1_ D
A R
\D es ig n\ Te m po ra ry
T ra ff ic
C on tr ol m t- 9-
S ep
-2
3:
P
M N
B el l 8/
B
Th om ps on
8/
D es ig ne d by
C he ck ed y:
G20-2
G20-2
G20-2
G20-1
See Note 11
G20-1
See Note 11
M in o r R o a d
M a jo r R o a d
W20-1
See Note 10
W20-1
See Note 10
W20-1 over
W16-8P
See Note 9
W20-1 over
W16-8P
See Note 9
W20-1
Ro ad N am e
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
W20-1
See Note 10
W20-1
See Note 10
G20-2
Erect all project advance warning signs before starting construction work.
Not all details shown on the temporary traffic control sheets may be applicable to this project. The Contractor may add or delete information and details in this traffic control plan as necessary to accommodate actual operations.
Where advance warning signs, placed as shown, interfere with permanent signs, locate the warning signs as determined by the CO for best results. Vary messages as required.
Additional or different message signs may be required to fit the actual construction conditions.
Install advisory speed plates under the W20 series warning signs as needed to indicate a maximum recommended speed through the construction area.
Ensure all sign supports exposed to impact by traffic meet the requirements of
NCHRP-350 or MASH for crashworthiness.
Maintain two-way traffic during all non-work hours except as approved by the CO.
Do not store traffic control devices along the roadway when not in use. Cover post-mounted signs when not applicable.
If W20-1 is placed on a roadway other than that on which the actual construction work occurs, include a supplementary plaque indicating the name of the road on which the construction does occur (applies to major roads only).
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify the distance to the work area in feet or in miles. Install an additional W20-1 each end of the project. Show the distance on the G20-1 sign to the nearest whole mile.
If signing on a roadway under a jurisdiction other than the client agency, verify that an encroachment permit has been obtained.
State standards may be used as an alternative if approved by the CO.
Refer to the Section 635 of the Special Contract Requirements for allowable retroreflective sheeting types.
Expressway / Freeway
A
B
C
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
as d et er m in ed b y th e
CO
W or k zo ne A re a of In flu en ce
Pr oj ec t L im its
A
A
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
A
A
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
W13-1P
(optional)
W13-1P
(optional) xx
MPH
xx
MPH
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2014
REVISED:
For work zones that are 2 miles or more in length, install G20-1 signs at signs "B" feet apart according to the Sign Spacing Table.
sign when approach speeds exceed 50 MPH. When used place the two W20-1
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
635-1
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
G.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DAR 2016(2) MT
U S
C
F h ig h w a y s F
H W
A m t-d
D A
R D e s ig n T e m p o r a r y T r a ff ic C o n tr o l\ m t-d n a .d g n e p te m b e r
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx xx
MPH
ROAD WORK
END
NO SCALE
635-4
FOR DIVERSION
TEMPORARY TRAFFIC CONTROL
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2015
REVISED:
STATE PROJECT
NUMBER
SHEET
G.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DAR 2016(2) MT
U S
C
F h ig h w a y s F
H W
A m t-d
D A
R D e s ig n T e m p o r a r y T r a ff ic C o n tr o l\ m t-d n b .d g n
S e p te m b e r
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
W1-6 Rt. or Lt.
Traffic flow
Traffic flow
Signs are shown for one direction of travel only. Place devices similar to those depicted for the opposite direction of travel.
If the area approaching diversion is not already signed and marked as a no passing zone, add signing and/or marking as appropriate. Remove conflicting pavement markings.
W20-1
See Note 4
W20-1
See Note 4
G20-2
See Note 4
LENGTH AND SPACING TABLE
APPROACH
SPEED* TAPER
AREA
BUFFER
SPACE
WORK
SPACE
CHANNELIZING DEVICE
W13-1P
1.
2.
3.
4.
5.
6.
W24-1
See Note 3
* Approach speed based on the regulatory posted speed, not the advisory speed.
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
BUFFER SPACE
LENGTH
NOTE:
Expressway / Freeway use an appropriate "Reverse Curve" sign (W1-4) instead of the "Double
Reverse Curve" sign (W24-1). Install a second, appropriate "Reverse
Curve" sign (W1-4) in advance of the second reverse curve back to the original alignment. Use "Reverse Turn" signs (W1-3) instead when the diversion has sharp curves with recommended speeds of 30 mph or less.
If the diversion is completely within the project limits, eliminate the
"ROAD WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
Place channelizing devices outside temporary roadway.
Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.
ABC
ADVANCE WARNING AREA (See Sign Spacing Table)
TAPER AREA BUFFER SPACE
See Length and Spacing Table
A
TAPER AREABUFFER SPACE
for all diversion curves radius for the signed speed
Use at least the minimum
Mounted on
Type 3 barricades
Show markings as no passing unless otherwise directed by the CO)
Channelizing devices (drums, directed by the CO along diversion as channelizing devices
Delineators or
If the tangent distance along the temporary diversion is more than 600', SIGNS IN FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and lessSPACING IN FEET
FEETMPH
20-70
20-65
20-60
20-55
20-50
20-45
20-40
20-35
20-30
20-25
Traffic flow
Traffic flow
Signs are shown for one direction of travel only. Place devices similar to those depicted for the opposite direction of travel.
Final location and spacing of signs and devices may be changed to fit field conditions as approved by the CO.
For pilot car operation, mount the "PILOT CAR FOLLOW ME" (G20-4) sign at a conspicuous location on the rear of vehicle. Prominently display the name of the Contractor on the pilot car.
If closure is completely within the project limits, eliminate the "ROAD
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
For night time flagging operation, provide floodlighting at flagger stations.
Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.
(See Length and
Spacing Table)
LENGTH AND SPACING TABLE
APPROACH
SPEED* 1.
2.
3.
4.
5.
6.
(See Length and
Spacing Table)
WORK SPACE
G20-2
See Note 4
W20-1
See Note 4
W3-4
W16-2P
(optional)
W20-7
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
* Approach speed based on the regulatory posted speed, not the advisory speed.
BUFFER SPACE
BUFFER SPACE
LENGTH
NOTE:
Expressway / Freeway
WORK
ROAD
AHEAD
BE
PREPARED
TO STOP
ROAD WORK
END
xxx
FEET
ADVANCE WARNING AREA (See Sign Spacing Table)
TERMINATION AREAVARIABLEBUFFER SPACEABC
(optional)
A
Flagger location
Flagger location
635-5
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
MPH
FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
(WITH FLAGGERS)
ROAD CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
G.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DAR 2016(2) MT
U S
C
F h ig h w a y s F
H W
A m t-d
D A
R D e s ig n T e m p o r a r y T r a ff ic C o n tr o l\ m t-d n c .d g n e p te m b e r
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
Traffic flow
Traffic flow
W20-1
See Note 4
W20-7W20-4
G20-2
See Note 4
(See Length and
Spacing Table)
(optional)
WORK SPACE (optional)(optional)
W13-1P
(optional)
W16-2P
(optional)
1.
2.
3.
4.
5.
6.
7.
Signs are shown for one direction of travel only. Place devices similar to those depicted for the opposite direction of travel.
Final location and spacing of signs and devices may be changed to fit field conditions as approved by the CO.
For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign at a conspicuous location on the rear of vehicle. Prominently display the name of the contractor on the pilot car.
If closure is completely within the project limits, eliminate the "ROAD
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
For night time flagging operation, provide floodlighting at flagger stations.
For project specific minimum width, refer to the Special Contract
Requirements, Section 156.
Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.
LENGTH AND SPACING TABLE
APPROACH
SPEED* TAPER
AREA
BUFFER
SPACE
WORK
SPACE
CHANNELIZING DEVICE
* Approach speed based on the regulatory posted speed, not the advisory speed.
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
BUFFER SPACE
LENGTH
NOTE:
Expressway / Freeway
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
xx
MPH
xxx
FEET
ROAD WORK
END
ATAPER AREABUFFER SPACEVARIABLEBUFFER SPACETAPER AREAABC
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table) TERMINATION AREA
Device spacing
BUFFER SPACE
Channelizing devices
Flagger location
Flagger location
635-6
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
MPH FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
(WITH FLAGGERS)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
SPACING IN FEET
50' - 100' 50' - 100' (optional)
See Note 6
10' min.
STATE PROJECT
NUMBER
SHEET
G.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DAR 2016(2) MT
U S
C
F h ig h w a y s F
H W
A m t-d
D A
R D e s ig n T e m p o r a r y T r a ff ic C o n tr o l\ m t-d n d .d g n e p te m b e r
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
WIDTH
"X"
AREA
NUMBER
OF POSTS
POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
S e e N o te
S e e N o te
See Note 4 E d g e o f tr a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL
NO SCALE
Post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
D
See post detail (typ.)
Break-away holes.
Long side of post
D
90°
93°
635-14
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2014
REVISED:
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, Diamond = 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)
1.5
1.5
1.5
(SQFT)
Other Shapes = 48"
Diamond = 36"
Other Shapes = 12'
Diamond = 48"
200' m in m in
6' - 12'
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
" dia. bolts 4 1Attach sign panels with a minimum of 2 -
STATE PROJECT
NUMBER
SHEET
G.6
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DAR 2016(2) MT
U S
C
F h ig h w a y s F
H W
A m t-d
D A
R D e s ig n T e m p o r a r y T r a ff ic C o n tr o l\ m t-d n e .d g n e p te m b e r
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.
2.
3.
4.
5.
6.
7. State standards may be used as an alternative if approved by the CO.
per post.
H1 and H2 = Overall post length.
Select post lengths to fit field conditions.
D = Post embedment depth for average soil conditions.
In areas where lateral distance is limited, a minimum the curb may be used.
In pedestrian locations, or in areas with obstructed views, NOTE:
See table for hole size parallel to sign face.
Field drill holes through post
| mt-d201602aa-US_Int2D-000 |
| mt-d201602ab-USC-000 |
| mt-d201602ac_K-3-US_Sur_ft2D-000 |
| mt-d201602ad_L-6-US_Sur_ft2D-000 |
| mt-d201602ae_L-9-US_Sur_ft2D-000 |
| mt-d201602_Section_C_Quantities |
| mt-d201602ca-US_Int2D-000 |
| mt-d201602cb-US_Int2D-000 |
| mt-d201602cc-US_Int2D-000 |
| mt-d201602_Section_D_Quantities |
| mt-d201602la_K-03-Int_ft2D-000 |
| mt-d201602lb_L-06-Int_ft2D-000 |
| mt-d201602lc_L-09-Int_ft2D-000 |
| mt-d201602ld_K-03_GradeRaise_P&P-Int_ft2D-000 |
| mt-d201602da-US_Sur2D-000 |
| mt-d201602db-US Customary-000 |
| mt-d201602dc-USC-000 |
| mt-d201602_Section_F_Quantities |
| mt-d201602ea-Int_ft2D-000 |
| mt-d201602eb-USC-000 |
| mt-d201602ec-USC-000 |
| mt-d201602ed-USC-000 |
| mt-d201602ef-USC-000 |
| mt-d201602_Section_G_Quantities |
| mt-d201602na-USC-000 |
| mt-d201602nb-USC-000 |
| mt-d201602nc-USC-000 |
| mt-d201602nd-USC-000 |
| mt-d201602ne-USC-000 |
File details come from the government source that posted it. Updated .