PROJECT_DESCRIPTION_Shoup.pdf

PDF 17 KB Posted

Attached to
ID PFH 91(1), Williams Creek (Shoup) Bridge Replacement Federal contract opportunity
Solicitation number
DTFH7016B00008
Issued by
Department of Transportation Federal Highway Administration

View the file

Other files for this federal contract opportunity

Other files attached to ID PFH 91(1), Williams Creek (Shoup) Bridge Replacement, newest first.
File Type Posted
BidSum_Shoup.pdf PDF
A001.pdf PDF
Q A_Shoup_6-01.pdf PDF
mt-a2013018_Pavement_Report.pdf PDF
Detour-EW-2015-07-17.pdf PDF
SWPPP-Reduced_Williams_Creek_(Shoup)_Bridge_Replacement_ID_PFH_91(1).pdf PDF
wm_ew_10025-10270.pdf PDF
Fife-EW-2015-07-17.pdf PDF
shoup_bridge_mods_asbuilts_plans1.pdf PDF
Plan_Request_for_Internet.pdf PDF
Cole_Ranch_No_TCE.pdf PDF
CrossSections.pdf PDF
Hinton_No_TCE.pdf PDF
wm_ew_10550-11150.pdf PDF
wm_ew_10500-10550.pdf PDF
ShoupBridgeFinalGeotechReport_20151109.pdf PDF
mt-a2013018_Geotechnical_Bridge_Report.pdf PDF
wm_ew_11150-11324.pdf PDF
idpfh911_Plans_041316_Sign-Off_2.pdf PDF
shoup_bridge_original_plans.pdf PDF
Shoup_bridge_backgroundand_inspectionApril2013.pdf PDF
IFB_Shoup.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID PFH 91(1), Williams Creek (Shoup) Bridge Replacement, Lemhi County, Idaho

The work consists of replacing the existing Williams Creek (Shoup) Bridge with a two-lane structure and realigning the existing roadway approaches. The bridge replacement will be done using slide-in bridge construction methods.

The project includes construction of a single span, 224-foot long structural steel arch bridge with cast-in-place concrete deck. Abutments are founded on steel H-piles. The work includes demolition of the existing steel girder bridge upon completion of the new structure and other small items of work.

Project length: 0.264 Miles

Tentative Fixed Completion Date: Spring 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Tentative Advertisement Date: Spring 2016

Estimated Price Range: Between $5 million and $7 million

Location: 5 miles south of Salmon, Idaho

DESCRIPTION OF WORK in US CUSTOMARY UNITS FP-14 Schedule A

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance (yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes

DIVISION 200 – Earthwork 201 Clearing & Grubbing 1.3 ACRE 203 Removal of Structures & Obstructions (existing bridge) 1 LPSM 204 Waste 6,900 CUYD

DIVISION 250 – Slope Reinforcement and Retaining Walls 255 Mechanically Stabilized Earth Walls (retaining walls) 970 SQFT

DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 4,200 TON

DIVISION 400 – Asphalt Pavements & Surface Treatments

DESCRIPTION OF WORK in US CUSTOMARY UNITS FP-14 Schedule A

403 Asphalt Concrete 2,300 TON

DIVISION 550 – Bridge Construction 551 Driven Piles 610 LNFT 552 Structural Concrete (concrete – major structures) 590 CUYD 554 Reinforcing Steel 111,100 LB 555 Steel Structures (structures, steel) 1 LPSM 556 Bridge Railing 520 LNFT 562 Temporary Works (bridge erection system) 1 LPSM 562 Temporary Works (temp. support structure) 1 LPSM 562 Temporary Works (work bridge) 1 LPSM 581 Structural Cable Systems 1 LPSM

DIVISION 600 – Incidental Construction 602 Culverts & Drains (18-inch pipe) 160 LNFT 602 Culverts & Drains (24-inch pipe) 130 LNFT 602 Culverts & Drains (30-inch arch pipe) 60 LNFT 604 Manholes, Inlets, & Catch Basins (catch basin) 3 EACH 611 Water Systems (irrigation system) 1 LPSM 617 Guardrail 265 LNFT 617 Guardrail (terminal section type tangent) 4 EACH 617 Guardrail (structural transition railing) 85 LNFT 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 624 Topsoil (placing manufactured topsoil) 50 CUYD 625 Turf Establishment (seeding and mulching) 1.3 ACRE 626 Plants, Trees, Shrubs, Vines & Groundcovers 1.3 ACRE 629 Rolled Erosion Control Products & Cellular Confinement Systems (turf establishment) 160 SQYD 634 Permanent Pavement Markings (traffic pavement markings) 10,500 LNFT 635 Temporary Traffic Control – Flagger 600 FXHR 635 Temporary Traffic Control – Crash Cushion 4 EACH 635 Temporary Traffic Control – Portable Changeable Message Sign 2 EACH