Cole_Ranch_No_TCE.pdf
PDF 28 KB Posted
- Attached to
- ID PFH 91(1), Williams Creek (Shoup) Bridge Replacement Federal contract opportunity
- Solicitation number
- DTFH7016B00008
About this file
Cole_Ranch_No_TCE
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidSum_Shoup.pdf | ||
| A001.pdf | ||
| Q A_Shoup_6-01.pdf | ||
| mt-a2013018_Pavement_Report.pdf | ||
| Detour-EW-2015-07-17.pdf | ||
| SWPPP-Reduced_Williams_Creek_(Shoup)_Bridge_Replacement_ID_PFH_91(1).pdf | ||
| wm_ew_10025-10270.pdf | ||
| wm_ew_10500-10550.pdf | ||
| ShoupBridgeFinalGeotechReport_20151109.pdf | ||
| mt-a2013018_Geotechnical_Bridge_Report.pdf | ||
| wm_ew_11150-11324.pdf | ||
| idpfh911_Plans_041316_Sign-Off_2.pdf | ||
| shoup_bridge_original_plans.pdf | ||
| Shoup_bridge_backgroundand_inspectionApril2013.pdf | ||
| IFB_Shoup.pdf | ||
| Fife-EW-2015-07-17.pdf | ||
| shoup_bridge_mods_asbuilts_plans1.pdf | ||
| Plan_Request_for_Internet.pdf | ||
| CrossSections.pdf | ||
| Hinton_No_TCE.pdf | ||
| wm_ew_10550-11150.pdf | ||
| PROJECT_DESCRIPTION_Shoup.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cole_Ranch_No_TCE.log Input File: ewkprj.inp Output File: Cole_Ranch_No_TCE.log 1 1 1 1 2 2 1 3 3 Earthwork 1 4 4 1 5 5 tolerance = 0.010000 1 6 6 1 7 7 vertical search distance = 500.000000 1 8 8 1 9 9 xs dgn = J:\80421 WFLHD IDIQ\80421W Williams Creek (Shoup) Bridge\CADD\References\IDPFH911_XS_100_NoTCE.dgn 1 10 10 1 11 11 Proposed Finish Grade 1 12 12 soil type = ASPHALT 1 13 13 roadway exc mult factor = 1.000000 1 14 14 subsoil exc mult factor = 1.000000 1 15 15 fill mult factor = 1.000000 1 16 16 type = line, line_string 1 17 17 lvname = X_P_Pave_Layer_1 1 18 18 lvname = X_P_Cutslope 1 19 19 lvname = X_P_Pave_Layer_3 1 20 20 lvname = X_P_Fillslope 1 21 21 lvname = X_P_Pave_Layer_Top 1 22 22 lc = ByLevel 1 23 23 wt = ByLevel 1 24 24 co = ByLevel 1 25 25 1 26 26 Existing Ground Line 1 27 27 soil type = EARTH 1 28 28 roadway exc mult factor = 1.000000 1 29 29 subsoil exc mult factor = 1.000000 1 30 30 fill mult factor = 1.000000 1 31 31 type = line, line_string 1 32 32 lvname = X_E_Ground_XS 1 33 33 lc = ByLevel 1 34 34 wt = ByLevel 1 35 35 co = ByLevel 1 36 36 1 37 37 Write Earthwork Shapes 1 38 38 plot param 1 39 39 lv = 0 1 40 40 lvname = Default 1 41 41 co = 1 1 42 42 wt = 0 1 43 43 lc = 0 1 44 44 Stratify Shape Color 1 45 45 1 46 46 combine common exc + subgrade exc + subsoil exc 1 47 47 1 48 48 End Area Decimal Places = 0 1 49 49 1 50 50 Process Earthwork for Baseline = Cole_Ranch_Dwy 1 51 51 job number = 21w 1 52 52 1 53 53 beg sta = 30+00.00 R 1 1 54 54 end sta = 30+45.00 R 1
0 0 55 END_OF_FILE
COMPUTING EARTHWORKS FOR BASELINE = COLE_RANCH_DWY
COMPUTING EARTHWORKS FOR JOB = 21W
FORMING LIST OF XSCELLS
BEGINNING EARTHWORKS COMPUTATION
Cole_Ranch_No_TCE.log Material Name End Areas Unadjusted Adjusted Mult Mass Station Volumes Volumes Factor Ordinate
(sq. ft.) (cu. yd.) (cu. yd.)
30+20.00 ASPHALT
Excavation 0 0 0 1.00 Fill 0 0 0 1.00 0
EARTH
Excavation 27 5 5 1.00 Fill 0 0 0 1.00 5
30+30.00 ASPHALT
Excavation 0 0 0 1.00 Fill 0 0 0 1.00 5
EARTH
Excavation 16 8 8 1.00 Fill 0 0 0 1.00 13
30+40.00 ASPHALT
Excavation 0 0 0 1.00 Fill 0 0 0 1.00 13
EARTH
Excavation 13 5 5 1.00 Fill 0 0 0 1.00 18
30+43.12 ASPHALT
Excavation 0 0 0 1.00 Fill 0 0 0 1.00 18
EARTH
Excavation 13 2 2 1.00 Fill 0 0 0 1.00 20
30+44.93 EARTH
Excavation 13 1 1 1.00 Fill 0 0 0 1.00 21 � G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
EARTH
Excavation 21 21 1.00 Fill 0 0 1.00 � S P L I T S U M M A R Y T O T A L S
XS Quant XS Quant Add/Sub Quant Add/Sub Quant Material Name Unadjusted Adjusted Unadjusted Adjusted Mult Volume Volume Volume Volume Factor
(cu. yd.) (cu. yd.) (cu. yd.) (cu. yd.)
EARTH
Excavation 21 21 0 0 1.00 Fill 0 0 0 0 1.00
File details come from the government source that posted it. Updated .