WALEWIS707(1)-Plans.pdf
PDF 7 MB Posted
- Attached to
- WA LEWIS 707(1), Cispus Road Improvements
- Solicitation number
- DTFH70-16-B-00003
About this file
Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_Cispus.pdf | ||
| A004.pdf | ||
| Q A_4-11.pdf | ||
| A003_Cispus.pdf | ||
| A002.pdf | ||
| Q A.pdf | ||
| A001_Cispus.pdf | ||
| Plan_Request_form_Cispus.pdf | ||
| IFB_Cispus.pdf | ||
| PROJECT_DESCRIPTION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material P
M
A u g u s t
U
S C c m y fi le s p w p r o d u c ti o n d w a a a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2 LEWIS 707(1) WA
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
VICINITY MAP
NATIONAL FOREST
R
E
VIR
SUPSIC
R E
VI
R
Information Station
Woods Creek
RANDLE
Course
Golf
Park
Trailer
Yellowjacket Pond
Day Use site nr o h ne er G k e e r C
SUPSIC
RE
VI
R p m ut S k e e r
C relitS keerC zti lwo
C r eviR ztilwoC revi R
Wood Way dR enilC
Cispus
Environmental
Learning Center
Tower Rock
S
UP
SI
C
Yellowjscket Creek
Hampton
Lake
Gibbs s u ps i
C da o R
Pond
Mill
28 23
FN
d a oR en ilC
GIFFORD PINCHOT
d a o R s r et e
P daoR sreteP
Shelton Rd
BEGIN PROJECT
END PROJECT
Bishop
Mountain
Bluff
Mountain
Lone Tree
Mountain
Huffaker
Mountain
N
M.P. 0.00
A.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D m y fi le s p w p r o d u c ti o n d w a a a c .d g n
WA LEWIS 707(1)
e c e m b e r
C h e c k e d b y
D e s ig n e d b y
SCALE IN MILES
0 1
M.P. 1
M.P. 2
M.P. 4
M.P. 5
M.P. 6
M.P. 7
M.P. 8
M.P. 9
M.P. 9.53
NF 2504
48 miles
I-5
88 miles
Yakima
M.P. 3
Sheet and Description
Section C Section E Section F Section G Section H Section I
Typical Section
Erosion Control Drainage Pavement
Patch Temporary
Traffic Control Permanent
Traffic Control ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15401-0000 CONTRACTOR TESTING LPSM ALL
A0060 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0080 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION
CHANNEL LPSM ALL
A0100 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 CUYD 46 4 50
A0120 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 CUYD 19 1 20
A0140 40601-0000 FOG SEAL TON 94 6 100
A0160 40702-1100 CHIP SEAL, TYPE 2A(RUBBER) SQYD 145,364 4,636 150,000
A0180 40710-0000 ASPHALT BINDER(RUBBER) TON 336 4 340
A0200 40712-0000 BLOTTER TON 8 2 10
A0220 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1 SQYD 1,062 13 1,075
A0240 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2 SQYD 2,255 45 2,300
A0260 41801-3000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 3 SQYD 804 46 850
A0280 60201-0600 18-INCH PIPE CULVERT LNFT 504 16 520
A0300 60201-0800 24-INCH PIPE CULVERT LNFT 122 8 130
A0320 60201-1000 36-INCH PIPE CULVERT LNFT 100 5 105
A0340 62201-0050 DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY HOUR 20
A0360 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED
CAPACITY BUCKET, 18-INCH WIDTH HOUR 20
A0380 62301-0000 GENERAL LABOR HOUR 40
A0400 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID(WHITE) LNFT 201,274 1,226 202,500
A0420 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID(YELLOW) LNFT 150,956 944 151,900
A0440 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN(YELLOW) LNFT 50,318 282 50,600
A0460 63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE
42-INCH EACH 300 300
A0480 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 50,318 82 50,400
A0500 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 220 220
A0520 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 190 190
A0540 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL
SUPERVISOR DAY 55 55
A0560 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FXHR 1,100 1,100
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-F eb -2
:2
PM
c:
\m yf ile s\ pw
_p ro du ct io n\ d0
W
A
LE
W
IS
7(
1) -E st im at e-
.x ls x]
Sh ee t
STATE PROJECT
B.1LEWIS 707(1)WA
SHEET
NUMBER
NOTE:
2.
1.
Variable
Existing Slope
Variable Existing Slope
Shldr
1'
12'12'
M.P. 0.00 to 9.53
TYPICAL SECTION
CISPUS ROAD
Existing asphalt surface
Traveled WayTraveled Way
Shldr
1'
Construction Limits
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a a c a .d g n
A
F e b r u a r y
STATE PROJECT
NUMBER
SHEET
C.1 WA LEWIS 707(1)
C h e c k e d b y
D e s ig n e d b y
Chip Seal, Type 2A (RUBBER)
Dimensions shown are approximate.
Existing superelevated and widened sections are not shown.
TYPICAL SECTION
Match existing Match existing
H I G
H W
A Y
CISPUS RD.
N
Lake
Gibbs daor reltu B d aor relt u
B
CISPUS RD.
.dR dduJ
Sho rt Ro ad
K a r e n A v e
P a u l
A v e
C li n e R d
Lake
Gibbs
Woods Way
Cowlitz River
Siler
Creek
M.P.
BEGIN PROJECT
SHEET 1 of 4
PLAN & PLAN
NOTE:
D.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a a fb .d g n
WA LEWIS 707(1)
e c e m b e r
C h e c k e d b y
D e s ig n e d b y
1.
C.O. prior to construction.
All locations are approximate and to be field verified
Centerline
M.P. 0.00
IMPROVEMENTS
CISPUS ROAD
M.P.
Install 18" pipe culvert
Remove existing culvert.
M.P. 2.30
F N ke erC reli S
.dR dduJ d
R s s e nr e dli W
.r D k c u B
Install 18" pipe culvert
Remove existing culvert.
M.P. 2.58
Install 18" pipe culvert
Remove existing culvert.
M.P. 2.65 Install 36" pipe culvert
Remove existing culvert.
M.P. 2.76
M.P.
Squire
C re e k
Install 18" pipe culvert
Remove existing culvert.
M.P. 3.17
Install 24" pipe culvert
Remove existing culvert.
M.P. 3.42
Install 18" pipe culvert
Remove existing culvert.
M.P. 3.78
M.P.
SHEET 2 of 4
PLAN & PLAN
CISPUS RD
CISPUS RD
See Sheet G.2 pavement patch, type 2
Asphalt concrete
M.P. 2.32 LT
Spears Rd
G I F F
O R
D P I
N C
H O
T N
A T I
O N
A L F
O R
E S
T
N F
N F -2
NF-23
D.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a a fc .d g n
WA LEWIS 707(1)
e c e m b e r
C h e c k e d b y
D e s ig n e d b y
NOTE:
1.
type 2. See Sheet G.2 pavement patch, Asphalt concrete
M.P. 2.28 LT
type 1. See Sheet G.2 pavement patch, Asphalt concrete
M.P. 2.23 LT
by C.O. prior to construction.
All locations are approximate and to be field verified
Centerline pavement patch, type 3
Asphalt concrete
M.P. 2.47 LT & RT
See Sheet G.2 pavement patch, type 2
Asphalt concrete
M.P. 2.84 LT
Install 18" pipe culvert
Remove existing culvert.
pavement patch, type 3.
Asphalt concrete
M.P. 2.94 LT
type 2. See Sheet G.2 pavement patch, Asphalt concrete
M.P. 3.40 RT
type 2. See Sheet G.2 pavement patch, Asphalt concrete
M.P. 3.37 RT
type 3 pavement patch, Asphalt concrete
M.P. 3.34 LT
type 1. See Sheet G.2 pavement patch, Asphalt concrete
M.P. 3.85 LT & RT
type 3pavement patch, Asphalt concrete
M.P. 3.67 RT
pavement patch, type 3
Asphalt concrete
M.P. 3.71 RT
M.P.Install 18" pipe culvert
Remove existing culvert.
M.P. 4.75
Install 18" pipe culvert
Remove existing culvert.
M.P. 4.85
Install 18" pipe culvert
Remove existing culvert.
M.P. 4.91 Install 18" pipe culvert
Remove existing culvert.
M.P. 5.03
M.P. 5.82
Remove existing culvert.
Install 24" pipe culvert
M.P.
SHEET 3 of 4
PLAN & PLAN
CISPUS ROAD
CISPUS ROAD
N F
6NF-2
Install 24" pipe culvert
Remove existing culvert.
M.P. 5.15 D.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a a fd .d g n
WA LEWIS 707(1)
e c e m b e r
C h e c k e d b y
D e s ig n e d b y
NOTE:
1.
by C.O. prior to construction.
All locations are approximate and to be field verified type 2. See Sheet G.2 pavement patch, Asphalt concrete
M.P. 5.10 LT
type 2. See Sheet G.2 pavement patch, Asphalt concrete
M.P. 5.17 LT
M.P. 5.47 LT
Asphalt concrete pavement patch, type 2. See Sheet G.2
M.P. 5.69 LT & RT
Asphalt concrete pavement patch, type 2.
See Sheet G.2
M.P. 5.87 LT
Asphalt concrete pavement patch, type 2.
See Sheet G.2
See Sheet G.2 pavement patch, type 1.
Asphalt concrete
M.P. 6.55 RT
See Sheet G.2 pavement patch, type 1.
Asphalt concrete
M.P. 6.64 RT
See Sheet G.2 pavement patch, type 2.
Asphalt concrete
M.P. 4.89 LT
See Sheet G.2 pavement patch, type 2.
Asphalt concrete
M.P. 4.50 RT
Centerline
See Sheet G.2 pavement patch, type 2.
Asphalt concrete
M.P. 4.78 LT
pavement patch, type 3.
Asphalt concrete
M.P. 6.33 LT & RT
pavement patch, type 3
Asphalt concrete
M.P. 6.85 RT
M.P.
N
Install 24" pipe culvert
Remove existing culvert.
M.P. 7.90
M.P.
M.P.
SHEET 4 of 4
PLAN & PLAN
END PROJECT
CISPUS ROAD
CIS
PUS R
OAD
C is p u s
River
N F
NF-29
D ry C re e k
N F
Yell owja cke t
C re e k
NOTE:
1.
by C.O. prior to construction.
All locations are approximate and to be field verified
M.P. 9.53
IMPROVEMENTS
CISPUS ROAD
type 2. See Sheet G.2 pavement patch, Asphalt concrete
M.P. 9.50 LT
See Sheet G.2 pavement patch, type 2.
Asphalt concrete
M.P. 97.55 RT
D.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a a fe .d g n
WA LEWIS 707(1)
J a n u a r y
C h e c k e d b y
D e s ig n e d b
CONTROL QUANTITIES
TABULATION OF EROSION
E.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a a d a .d g n
WA LEWIS 707(1)
A u g u s t
C h e c k e d b y
D e s ig n e d b
6" deep and secure with riprap or sandbags.
Bury plastic liner 6" deep
2'2'2' 2'
E.2
STATE PROJECT
NUMBER
SHEET
U m y fi le s p w p r o d u c ti o n d w a a d b .d g n
WA LEWIS 707(1)
F e b r u a r y
C h e c k e d b y
D e s ig n e d b y
DIVERSION DETAIL
TEMPORARY
NOTE:
PLASTIC LINED DIVERSION CHANNEL
RIPRAP LINED DIVERSION CHANNEL
TEMPORARY CULVERT
DIVERSION CHANNEL
SECTION B-B
SECTION A-A
SECTION A-A SECTION B-B
SECTION B-B
PLAN
W
B
W
B
W
B B
W
T T
Ø when scheduled)
Silt fence (typ.
embankment
Roadway embankment
Roadway
Temporary culvert backfill
Subgrade
Bedding
Sandbags
Riprap lining Riprap lining backflow into natural channel
Use sandbags to prevent
Permanent natural channel
Earthwork limits with plastic liner or riprap
Temporary diversion channel when scheduled)
Silt fence (typ.
See Note 5
Permanent culvert
Roadway centerline temporary barrier
Use sandbags to construct
SandbagsPlastic liner
SSSS
SS SS
D
D D
D
SS
SS
SS SS
FlowFlow
FlowFlow
Plastic liner when scheduled)
Silt fence (typ.
using one of the methods listed in Subsection 204.11(a).
temporary culvert. Compact temporary culvert backfill channel through the roadway embankment with
When specified replace the portion of the diversion
A
A
BB
GeotextileGeotextile
Flow
Natural ground and secure with sandbags (typ.)
liner. Bury the upstream edge of the liner a minimum of
Do not construct with longitudinal joints if using a plastic
Construct channel at a minimum grade of 0.5 percent.
width of the temporary diversion channel.
Use plastic liner or riprap along the entire length and
4.
3.
2.
1.
10.4 x 16 25101 -0200
25101 -0300
60201 -0600
60201 -0800
60201 -1000
Mile Post
ES
TI
M
A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
C R U
S H
ED
A
G G
R
EG
A
TE
A S
PH
A
LT
C O
N C R
ET
E
PA
V
EM
EN
T
TU
R F
ES
TA
B
LI
S H
M
EN
T
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD CUYD CUYD LNFT LNFT LNFT SQYD SQYD SQYD Lt Rt
2.30 3 44 19 19 8 AS
2.58 6 44 19 19 14 AS
2.65 3 44 19 19 8 AS Pavement Patch, See Sheet G.1
2.76 19 100 32 32 39 AS
2.94 3 48 19 19 11 AS
3.17 3 44 19 19 7 AS
3.42 5 68 23 23 13 AS
3.78 3 50 19 19 9 AS
4.75 3 40 19 19 9 AS
4.85 3 60 19 19 22 AS
4.91 3 40 19 19 16 AS
5.03 3 40 19 19 8 AS
5.15 3 50 19 19 8 locate culvert
5.82 5 54 23 23 13
PROJECT TOTAL 0 46 19 504 122 100 287 287 185
Allowable Pipe Material
NOTE: A Aluminum
1. Aluminized steel pipe culvert minimum wall thickness is the larger of 0.168" or the AS Aluminized steel by the Std. 602-1 fill height table. C Concrete
GS Galvanized steel P Plastic (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER FOR INFO ONLY
TABULATION OF DRAINAGE QUANTITIES
c:
\m yf ile s\ pw _p ro du ct io n\ d0
W A
LE
W
IS
7(
1) -D ra in ag e.
xl sx
]S he et
-J an
-2
1:
P
M S
W it uc ki 9/
D
C he ck er
/2
D es ig ne d by
C he ck ed b y:
STATE PROJECT
F.1
SHEET
NUMBER
LEWIS 707(1)WA
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
602-1
METAL PIPE CULVERT
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
5" x 1" CORRUGATIONS3" x 1" CORRUGATIONS" CORRUGATIONS2 1" x 3
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
0.060/160.075/140.105/120.135/100.060/160.075/140.105/120.135/100.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET) MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
3.5
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
3.5
INCHESINCHES INCHESINCHES
INCHESINCHESINCHESINCHESINCHESINCHESINCHESINCHES
Fill heights exceeding 100 feet require
STATE PROJECT
NUMBER
SHEET
F.2
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
O c to b e r
U m y fi le s p w p r o d u c ti o n d m s S td .6
.D
R A
F T .d g n
LEWIS 707(1)WA
4.
3.
2.
1.
METAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
DIAMETER
VALENT
EQUI-
RADIUS
CORNER
MINIMUM
COVER
MINIMUM
SPAN x RISE
SIZE
PIPE ARCH
SIZE
PIPE ARCH
SPAN x RISE DIAMETER
VALENT
EQUI-
RADIUS
CORNER
MINIMUM
COVER
MINIMUM
COVER
MINIMUM
DIAMETER
SIZE
PIPE
SIZE
PIPE
DIAMETER COVER
MINIMUM
ALUMINUMSTEEL
NOTE:
NO SCALE
of camber or increase the pipe culvert gradient.
elevation of the inlet invert, reduce the amount parabolic curve as designed exceeds the curve. If the midpoint elevation on the pipe length. Develop camber on a parabolic inverts an ordinate amount equal to 1% of the from a chord through the inlet and outlet
When directed, camber pipe culverts upward pavement for both flexible and rigid pavement.
from the top of the pipe to the top of the rigid pavements. Measure maximum fill height pavements, and to the top of the pavement for pipe culvert to the subgrade for flexible
Measure minimum cover from the top of the corrugation pipe.
Obtain approval before furnishing annular of helical lockseam and welded seam pipe.
corrugations are more restrictive than those
Fill heights for culvert pipe with annular lockseam and welded seam pipe only.
The fill heights in the table are for helical special analysis by the CO.
william.witucki Inserted Text
REVISED: 4/1994 6/2005
602-2
COUPLING BAND
METAL PIPE CULVERT
MINIMUM BAND WIDTH (INCHES)
1 x 2
1 x 3
3 x 1
5 x 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 x 64 to 142 x 91
60 x 46 to 81 x 59
87 x 64 to 142 x 91
60 x 46 to 81 x 59
49 x 33 to 83 x 57
17 x 13 to 42 x 29
10.5
10.5
10.5
10.5
10.5
10.5
10.5
INCHESINCHESINCHES
STATE PROJECT
NUMBER
SHEET
F.3
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
c to b e r
U m y fi le s p w p r o d u c ti o n d m s S td .6
.D
R A
F T .d g n
LEWIS 707(1) WA
" for 18" round culvert (21" x 15" pipe arch) or less8
" for 21" round culvert (24" x 18" pipe arch) or more2 having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on pipe rerolled with 3" x 1" pipe corrugations.
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" x 3
2ends rerolled with 2
The minimum band widths shown for 3" x 1" and 5" x 1" corrugated sizes apply to
" corrugations on rerolled pipe ends.2 1" x 3 steel, or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
less. Use a matching metal having a nominal thickness of not less than 0.040 inch for
Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or
42" diameter to 42" diameter, required above
42" diameter to 42" diameter, required above steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for
2.
1.
SMOOTH SLEEVE BAND FLAT BAND
SEMI-CORRUGATED BAND
HELICAL BANDANNULAR BANDSTANDARD BAND CONNECTIONS
SLEEVE JOINT
SIDE VIEW SIDE VIEW SIDE VIEW
END VIEW
END VIEWEND VIEW
Oval Lug
Band Angle
Bar & Strap
Integral Flange Wedge and Strap
Stab type joint
Smoother sleeve with center stop.
DIAMETER
ROUND PIPE
SPAN x RISE
PIPE ARCH
BANDS
CORRUGATED
ANNULAR
BANDS
CORRUGATED
HELICALLY
BANDS
CORRUGATED
SEMI-
SIZE
CORRUGATION
underdrain
COUPLING BANDS FOR METAL PIPE CULVERT
NOTE:
NO SCALE
W
W W W
Band Band
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
Band Bolts Band Bolts
Pipe
Band
Bolts
Angle
Pipe
BandBand
Bolts
Pipe heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or
Angle
Wedge be used.
Highway Bridges, Division II Section 26 may criteria of AASHTO Standard specifications for devices that comply with the joint performance
Other types of coupling bands or fastening specified in the Special Contract Requirements.
Watertight pipe joints are not required unless
3 4 5 of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest strap connector
Bolt, bar and
Use annular corrugated bands with pipes having annular corrugations or with helical pipe dimension of the end corrugation in the pipe.
For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the
Use helical corrugated bands with pipes having helically corrugated ends.
as the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses
Fabricate annular, helical and semi-corrugated type coupling bands from the same metal
Second angle connection optional Second angle connection optional
DRAFT: 10/2014
REVISED: 4/1994 6/2005
602-3
PIPE CULVERT BEDDING
METAL AND PLASTIC
or 36" (max.) for embankment installations not exceeding 6" compacted depth.
exceeding 6" compacted depth. Or lean concrete
> 54"
12" to 54"
6"
4"
48" and UP
UP to 48" 24"
2'-0" ±
STATE PROJECT
NUMBER
SHEET
F.4
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
c to b e r
U m y fi le s p w p r o d u c ti o n d m s S td .6
.D
R A
F T .d g n
LEWIS 707(1) WA
1'-0" ±
2H or 12' (max.)2H or 12' (max.)
18" ±
18" ±18"±
18" (min.)
minimum
1'-0"
"2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.)1
2H or 12' (max.)
(min.)
6"
2H or 12' (max.)
(min.)
6"
2H or 12' (max.) 2H or 12' (max.)
6" in uncompacted depth.
12" (min.), 24" (max.)
"/foot of cover,2
* Reduce to 18" for span or 36", See Section 704 for bedding and backfill requirements.
dimension of all pipe arch culverts.
H equals the diameter of all round pipe culverts or the rise amount of camber or increase the pipe culvert gradient.
designed exceeds the elevation of the inlet invert, reduce the curve. If the midpoint elevation on the parabolic curve as to 1% of the pipe length. Develop camber on a parabolic through the inlet and outlet inverts an ordinate amount equal
When directed, camber pipe culverts upward from a chord
3.
2.
1.
be adjusted to tie into impervious material.
granular material is used for backfill. Width may material at the pipe culvert inlet where
Construct piping plug of impermeable backfill
MULTIPLE PIPE INSTALLATION
PIPING PLUG
TRENCH EXCAVATION IN EMBANKMENT
BELOW NATURAL GROUND OR
ON UNSTABLE MATERIAL
NATURAL GROUND
ABOVE AND BELOW
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
LEGEND:
Bedding material (uncompacted)
Impermeable backfill material.
BEDDING DEPTH
MINIMUM SPACING
SPACING
or SPAN
DIAMETER
PIPE SIZE (H) DEPTH
Roadway embankment Roadway embankment
Natural ground
Toe plate Toe plate
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
NOTE:
NO SCALE
H H or Span
Diameter or Span
Diameter
H
Width
(see table)
Minimum spacing
H H
H H
H H
H H
H
H
H H
Finished subgrade Finished subgrade
Natural ground section
Metal end
Finished subgrade
Pipe culvert
Embankment slope
High water elevation treatment
Culvert end
Piping plug before trench excavation embankment height
Finished subgrade or
Original natural ground surface
A
A
Finished subgrade
Roadway embankment
Metal end section
Roadway embankment
Finished subgrade compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material trench excavations
Embankment material placed in layers
Compacted backfill material placed in layers not backfill in accordance with Section 614.
whichever is less fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Bedding
Bedding
Bedding
Bedding depth table
See bedding excavation in trench
Half diameter or
HH
CLASS
RIPRAP
SECTION
END
WITH
SECTION
END
WITHOUT
(CY)
QUANTITY
RIPRAP
ESTIMATED
(SY)
QUANTITY
GEOTEXTILE
ESTIMATED
(inches) D
SIZE
CULVERT
(feet) L
APRON
OF
LENGTH
(feet) H
APRON
OF
DEPTH
CLASS
RIPRAP
SECTION
END
WITH
SECTION
END
WITHOUT
PROTECTIVE APRON DIMENSIONS AND ESTIMATED QUANTITIES
OUTLET WITHOUT DITCH
(CY)
QUANTITY
RIPRAP
ESTIMATED
(SY)
QUANTITY
GEOTEXTILE
ESTIMATED
(inches) D
SIZE
CULVERT
(feet) L
APRON
OF
LENGTH
(feet) H
APRON
OF
DEPTH
PROTECTIVE APRON DIMENSIONS AND ESTIMATED QUANTITIES
OUTLET WITH DITCH
14.5
12.5
2.5
2.5
1.5
1.5
1.5
2.5
2.5
1.5
1.5
1.5
14.5
12.5
2.5
2.5
1.5
1.5
1.5
2.5
2.5
1.5
1.5
1.5
2'
49.8
38.7
18.5
13.3
5.2
3.2
1.7
44.5
34.1
15.6
10.9
3.9
2.2
2'
38.6
29.9
15.2
10.8
4.5
2.7
1.4
35.6
27.3
13.4
9.3
3.6
0.9
U
S E
R
NOTE:
NO SCALE
payment.
3. Excavation for placement of riprap will not be measured for
2. Furnish geotextile conforming to Subsection 714.01(a).
1. Use for aprons serving culverts with slopes of less than 10%.
F.5
STATE PROJECT
NUMBER
SHEET
U
S C u s to m a r m y fi le s p w p r o d u c ti o n d w a a e e .d g n
WA LEWIS 707(1)
N o v e m b e r
C h e c k e d b y
D e s ig n e d b y
AT CULVERT OUTLETS
PLACED RIPRAP
PLAN VIEW PLAN VIEW
Geotextile
END SECTION
CULVERT WITHOUT STANDARD
SECTION C-C
END SECTION
CULVERT WITH STANDARD
S p a n
D ia o r m in
S p a n
D ia o r
L
A A
B B
PLAN VIEW
Variable slope ground Original
Geotextile
END SECTION
CULVERT WITHOUT STANDARD
SECTION B-BSECTION A-A
END SECTION
CULVERT WITH STANDARD
S p a n
D ia o r
S p a n
D ia o r m in
Geotextile
Variable slope ground Original m in
L
D D
D
H
H
D D
D
WITHOUT DITCH
PROTECTIVE APRON AT CULVERT OUTLET
WITH DITCH
PROTECTIVE APRON AT CULVERT OUTLET
L
C C
C
Geotextile
SECTION E-ESECTION D-D
Geotextile ground Original m in ditch slope
Match existing
D
H m in ground Original m in
D m in
H ditch slope
Match existing
D D EE
ground
Original
D
D it c h B o tt o m
W id th
D it c h B o tt o m
W id th
D
4D
PLAN VIEW
or flatter
Sloped 1V:2H
D
D D
Flowline
D
D D
(min.)
(min.)
PATCH QUANTITIES
TABULATION OF PAVEMENT
G.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a a s a .d g n
WA LEWIS 707(1)
e c e m b e r
C h e c k e d b y
D e s ig n e d b
NOTE:
Pay Limits
Fog seal
FULL DEPTH PATCH TYPE 2
FULL DEPTH PATCH TYPE 1
Pay Limits
Fog seal
FULL DEPTH PATCH
FLEXIBLE PAVEMENT
NO SCALE
6" crushed aggregate [2] Stabilization geogrid
[1]
Tack coat around the perimeter of the patch
Tack coat around the perimeter of the patch
All items shown within the pay limits are included in the pay item.
encountered at time of construction.
Extent of patch to be determined by the CO based on conditions
2.
1.
[1]
FOOTNOTE:
[2] to a depth of 10"
Remove existing material to a depth of 4"
Remove existing material
4" Asphalt concrete pavement
4" Asphalt concrete pavement
Top of existing asphalt
Top of existing asphalt varies up to 10" thick
Existing asphalt depth varies up to 10" thick
Existing asphalt depth
See Detail A
Pay Limits
Fog seal
6" crushed aggregate [2] Stabilization geogrid
[1]
Tack coat around the perimeter of the patch to a depth of 10"
Remove existing material
4" Asphalt concrete pavement
Top of existing asphalt
DETAIL A
M atch
E xistin g
G.2
STATE PROJECT
NUMBER
SHEET
F le x P a v e m e n t
F u ll D e p th P a tc h c m y fi le s p w p r o d u c ti o n d w a a s b .d g n
WA LEWIS 707(1)
F e b r u a r y
C h e c k e d b y
D e s ig n e d b y material conforming to Subsection 703.06.
Asphalt millings can be used as crushed aggregate slope.
geogrid below crushed aggregate an extend to face of
When patch extends to the shoulder, place stabilization crushed aggregate when contained within the roadway.
For Type 1 patch, place stabilization geogrid below
CONTROL QUANTITIES
TEMPORARY TRAFFIC
TABULATION OF
H.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a a n a .d g n
WA LEWIS 707(1)
J a n u a r y
C h e c k e d b y
D e s ig n e d b
SIGNS IN FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
For work zones that are 2 miles or more in length, install G20-1 signs at signs "B" feet apart according to the Sign Spacing Table.
sign when approach speeds exceed 50 MPH. When used place the two W20-1
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2014
REVISED:
635-1
TEMPORARY TRAFFIC CONTROL
ADVANCE SIGNING
STATE PROJECT
NUMBER
SHEET
H.2
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
e p te m b e r
U m y fi le s p w p r o d u c ti o n d w a a n b .d g n
LEWIS 707(1) WA
G20-2
G20-2
G20-2
See Note 11
G20-1
See Note 11
G20-1
M in o r R o a d
M a jo r R o a d
See Note 10
W20-1
See Note 10
W20-1
See Note 9
W16-8P
W20-1 over
See Note 9
W16-8P
W20-1 over
W20-1
Ro ad N am e
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
See Note 10
W20-1
See Note 10
W20-1
G20-2
NOTE:
NO SCALE
the distance to the work area in feet or in miles. Install an additional W20-1
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify of the road on which the construction does occur (applies to major roads only).
construction work occurs, include a supplementary plaque indicating the name
If W20-1 is placed on a roadway other than that on which the actual post-mounted signs when not applicable.
Do not store traffic control devices along the roadway when not in use. Cover
Maintain two-way traffic during all non-work hours except as approved by the CO.
NCHRP-350 or MASH for crashworthiness.
Ensure all sign supports exposed to impact by traffic meet the requirements of indicate a maximum recommended speed through the construction area.
Install advisory speed plates under the W20 series warning signs as needed to construction conditions.
Additional or different message signs may be required to fit the actual messages as required.
locate the warning signs as determined by the CO for best results. Vary
Where advance warning signs, placed as shown, interfere with permanent signs, traffic control plan as necessary to accommodate actual operations.
to this project. The Contractor may add or delete information and details in this
Not all details shown on the temporary traffic control sheets may be applicable
Erect all project advance warning signs before starting construction work.
retroreflective sheeting types.
Refer to the Section 635 of the Special Contract Requirements for allowable
State standards may be used as an alternative if approved by the CO.
that an encroachment permit has been obtained.
If signing on a roadway under a jurisdiction other than the client agency, verify whole mile.
each end of the project. Show the distance on the G20-1 sign to the nearest
Expressway / Freeway
A
B
C
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
B as d et er m in ed b y th e
CO
W or k zo ne A re a of In flu en ce
Pr oj ec t L im its
A
A
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
A
A
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
(optional)
W13-1P
(optional)
W13-1P xx
MPH
xx
MPH
NO SCALE
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
DO
NOT
PASS
DO
NOT
PASS
DO
NOT
PASS
PASS
WITH
CARE
PASS
WITH
CARE
PASS
WITH
CARE
NO
PASSING
ZONE
NO
PASSING
ZONE
NO
PASSING
ZONE
635-3
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
On curves with radius less than 500', reduce cycle length to 20'.
with paint or tape, use Standard 635-2.
temporary traffic control zones greater than 3 miles long.
Repeat W8-12 after each major intersection and every 2 miles for
Repeat R4-1 at 1 mile intervals.
FOR UNMARKED PAVEMENTS
DELINEATION AND SIGNING
500'
500'
500'
500'
500' cycle length
40'
500' cycle length
40' cycle length
40'
STATE PROJECT
NUMBER
SHEET
H.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
LEWIS 707(1) WA
u g u s t
U m y fi le s p w p r o d u c ti o n d m s S td
.d g n
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
Traffic flow
Traffic flow
W8-12
Traffic flow
Traffic flow
Traffic flow
Traffic flow
W8-12
W8-12
W8-12
W8-12
W8-12 each direction of travel.
Use permanent markings plan to determine no passing zones for
(optional)
W14-3
(optional)
W14-3
(optional)
W14-3
TABLE A
Markings Are Required
Maximum Duration Before
ADT
See Note 2
See Note 2
See Note 2
3 Days
14 Days
> 1000
≤ 1000
R4-1
R4-1
R4-1
See Note 6
R4-2
See Note 6
R4-2
See Note 6
R4-2
6.
5.
4.
3.
2.
1.
longer periods/higher ADT or for application of temporary markings positioning guides and signing are provided per this detail. For
For periods noted in Table A, pavement may be unmarked if vehicle installed at the upstream end of the zone.
a no-passing zone only if a "DO NOT PASS" (R4-1) sign has been
Use the "PASS WITH CARE" (R4-2) sign at the downstream end of vehicle positioning guides
Bi-directional yellow vehicle positioning guides
Bi-directional yellow vehicle positioning guides
Bi-directional yellow
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
Passing AllowedNo Passing ZonePassing Allowed
Two-way traffic
No Passing zone one direction
DETAIL B
Two-way traffic
No Passing zone both directions
DETAIL C
Two-way traffic
Passing zone both directions
DETAIL A
MPH
SPACING IN FEET
FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
50' - 100' (optional)50' - 100'
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
(WITH FLAGGERS)
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
635-6
See Note 6
10' min.
STATE PROJECT
NUMBER
SHEET
H.4
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
N o v e m b e r
U m y fi le s p w p r o d u c ti o n d w a a n d .d g n
LEWIS 707(1) WA
Traffic flow
Traffic flow
See Note 4
W20-1 W20-7W20-4
See Note 4
G20-2
Spacing Table)
(See Length and
(optional)
WORK SPACE (optional)(optional)
(optional)
W13-1P
(optional)
W16-2P
7.
6.
5.
4.
3.
2.
1.
the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
Requirements, Section 156.
For project specific minimum width, refer to the Special Contract
For night time flagging operation, provide floodlighting at flagger stations.
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD name of the contractor on the pilot car.
a conspicuous location on the rear of vehicle. Prominently display the
For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign at conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit field those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place devices similar to
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
not the advisory speed.
Approach speed based on the regulatory posted speed, *
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
LENGTH
BUFFER SPACE
NOTE:
NO SCALE
Expressway / Freeway
Channelizing devices
Flagger location
Flagger location
ATAPER AREABUFFER SPACEVARIABLEBUFFER SPACETAPER AREAABC
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table) TERMINATION AREA
Device spacing
BUFFER SPACE
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
xx
MPH
xxx
FEET
ROAD WORK
END
"X"
WIDTH AREA
OF POSTS
NUMBER POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
S e e N o te
S e e N o te
See Note 4 E d g e o f tr a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL
NO SCALE
Post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
D
See post detail (typ.)
Break-away holes.
Long side of post
D
90°
93°
635-14
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2014
REVISED:
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)
1.5
1.5
1.5
(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
200' m in m in
6' - 12'
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
" dia. bolts 4 1Attach sign panels with a minimum of 2 -
STATE PROJECT
NUMBER
SHEET
H.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
LEWIS 707(1) WA
u g u s t
U m y fi le s p w p r o d u c ti o n d w a a n e .d g n
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
7.
6.
5.
4.
3.
2.
1.
by the CO.
State standards may be used as an alternative if approved
In areas where lateral distance is limited, a minimum
D = Post embedment depth for average soil conditions.
Select post lengths to fit field conditions.
H1 and H2 = Overall post length.
per post.
In pedestrian locations, or in areas with obstructed views, the curb may be used.
NOTE:
See table for hole size parallel to sign face.
Field drill holes through post
I.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a a p a .d g n
WA LEWIS 707(1)
e c e m b e r
C h e c k e d b y
D e s ig n e d b y
TRAFFIC CONTROL
TABULATION OF PERMANENT
NOTE:
FOOTNOTE:
1.
approximate. The CO will verify the final stations before marking.
The quantities of the permanent pavement markings shown are two applications according to Section 634.
Permanent pavement marking quantities shown reflect[1] two applications according to Section 634.
Permanent pavement marking quantities shown reflect[1]
[1][1]
10'30'10'30'10'
2' to 6'
REVISED: 10/2012
W634-2
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 10/2007
PAVEMENT MARKINGS
LINEAR
2' m a x m in
4" dotted white line
4" solid white edge
4" solid double
4" dotted white
Locate 12" wide stop line to
4" solid white edge line
4" broken yellow centerline o v e m b e r
U m y fi le s p w p r o d u c ti o n d m s D e t.
W .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
I.2 LEWIS 707(1) WA
NOTE:
NO SCALE
s s w
Transition
Curve widening
Transition
S h o u ld e r s
T ra v e l
L
T ra v e l
L
S h o u ld e r s s L
L s when specified in plans h o u ld e r
L a n e
T r a v e l
L a n e
T r a v e l h o u ld e r required by the maintaining agency.
pavement markings when specified on the plans or when
Typical pavement marking widths are shown. Use wider for curve widening transition locations.
throughout the curve widening area. See staking details the roadway. Maintain a constant shoulder width "s" curve widening "w" to achieve equal lane widths within
Paint centerline pavement markings on curves with curb interface when curb is present.
Place edge line pavement markings at asphalt/concrete required by the maintaining agency when specified in the plans or when
Increase spacing between parallel lines
3.
2.
1.
markings when specified
Approach road pavement
TYPICAL PAVEMENT MARKING APPLICATIONS
CENTERLINE MODIFICATION FOR CURVES WITH WIDENING APPLIED ON INSIDE
CENTERLINE DETAIL
See Note 2 for treatment of curves when widening "w" is split equally on both sides of centerline
L w break specified in plans extension when edge line line when specified in plans yellow centerline line extension
Turnout
Edge of pavement allow sufficient sight distance
Major approach road
Minor approach
Centerline as required
Edge line when specified in plans and location of top lift pavement joint
Offset centerline for pavement markings
Design
Edge line when specified in plans w w w
CL
CL
L a n e
L a n e
| A.1 |
| A.2 |
| A.3 |
| C.1 |
| D.1 |
| D.2 |
| D.3 |
| D.4 |
| E.1 |
| E.2 |
| F.2 |
| F.3 |
| F.4 |
| F.5 |
| G.1 |
| G.2 |
| H.1 |
| H.2 |
| H.3 |
| H.4 |
| I.1 |
| I.2 |
File details come from the government source that posted it. Updated .