Q A
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_Pleasant_Valley.pdf | ||
| A003_MT_FLATHEAD_543(1).pdf | ||
| Q A_2_12_16.pdf | ||
| Pleasant_Valley_Road_Silt_Memo_11-18-15.pdf | ||
| A002_PleasantValley.pdf | ||
| Q A_2_10_16.pdf | ||
| Q A_2_4_16.pdf | ||
| Q A_1_29_16.pdf | ||
| A001_MT_Flathead_543(1) _MT_Pleasant_Valley_Road_Relocation.pdf | ||
| PV_XS.pdf | ||
| IFB_PleasantValley.pdf | ||
| PV_Plans_100_.pdf | ||
| Pleasant_Valley_Earthwork.pdf | ||
| 2015_pleasant_valley_rd_Test_Pit_data_with_Notes.pdf_-_Adobe_Acrobat_Pro.pdf | ||
| SWPPP.pdf | ||
| Plan_Request_form_PleasantValley.pdf | ||
| Lost_Trail_Existing_Bridge_Information.pdf | ||
| Stage_2_Fire_Restrictions.pdf | ||
| MT_Flathead_543(1) _Preliminary_Plans.pdf | ||
| MT_Flathead_543(1) _Prelim_Letter.pdf | ||
| MT_Flathead_543(1) _Project_Description.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
# General Technical Question Answer Date
1 x what happens to the 20401-0000 unsuitable material and how is it paid?
Refer to Subsection 204.06; incidental to
20401. Also See Amendment A001
1/26/2016
2 x Is there a geo technical report for this project?
Just the test pits 1/27/2016
3 x
Initial investigation shows that US Fish Wildlife and Parks are a MT DEQ permitted gravel pit known as the “Horse Ranch Site.” Will this source be available for Select Borrow and or
Roadway Aggregate?
The contractor is responsible for locating their own source
1/27/2016
4 x Why are there 2 different roadway aggregates?
Requested by partner agency 1/27/2016
5 x
Can burning of trees and other materials from clearing and grubbing be done on site? . Refer to FP‐14 Subsection 201.06
2/1/2016
6 x
There appears to be excess excavation
(unsuitable material), can this material be wasted on site to make slopes flatter or somewhere else? If more unsuitable material exists, will there be added pay item for import fill? See Amendment A001
2/1/2016
7 x
It appears that almost all quantities have a 10% or more “Allowance” factor. We assume only the actual measured quantities will be paid and not the allowance amount? yes
2/1/2016
8 x
How and what spec is bedding material paid for placement around pipe culverts?
Refer to FP‐14 Subsection 602.03
(incidental) 2/1/2016
9 x
Is there bedding material for utility trench and if so, how is it paid and what is the spec? Refer to 704.03 2/1/2016
10 x
Can you supply the link the current average bid tab data?
See http://flh.fhwa.dot.gov/business/constructi on/bids/ (still up to contractor to determine average)
2/1/2016
Check General or Technical
MT Flathead 543(1)
Pleasant Valley Road Relocation