Q A_2_1_16.pdf

PDF 79 KB Posted

Attached to
MT Flathead 543(1), Pleasant Valley Road Federal contract opportunity
Solicitation number
DTFH70-15-B-00010
Issued by
Department of Transportation Federal Highway Administration

About this file

Q A

View the file

Other files for this federal contract opportunity

Other files attached to MT Flathead 543(1), Pleasant Valley Road, newest first.
File Type Posted
Bid_Opening_Summary_Pleasant_Valley.pdf PDF
A003_MT_FLATHEAD_543(1).pdf PDF
Q A_2_12_16.pdf PDF
Pleasant_Valley_Road_Silt_Memo_11-18-15.pdf PDF
A002_PleasantValley.pdf PDF
Q A_2_10_16.pdf PDF
Q A_2_4_16.pdf PDF
Q A_1_29_16.pdf PDF
A001_MT_Flathead_543(1) _MT_Pleasant_Valley_Road_Relocation.pdf PDF
PV_XS.pdf PDF
IFB_PleasantValley.pdf PDF
PV_Plans_100_.pdf PDF
Pleasant_Valley_Earthwork.pdf PDF
2015_pleasant_valley_rd_Test_Pit_data_with_Notes.pdf_-_Adobe_Acrobat_Pro.pdf PDF
SWPPP.pdf PDF
Plan_Request_form_PleasantValley.pdf PDF
Lost_Trail_Existing_Bridge_Information.pdf PDF
Stage_2_Fire_Restrictions.pdf PDF
MT_Flathead_543(1) _Preliminary_Plans.pdf PDF
MT_Flathead_543(1) _Prelim_Letter.pdf PDF
MT_Flathead_543(1) _Project_Description.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

# General Technical Question Answer Date

1 x what happens to the 20401-0000 unsuitable material and how is it paid?

Refer to Subsection 204.06; incidental to

20401. Also See Amendment A001

1/26/2016

2 x Is there a geo technical report for this project?

Just the test pits 1/27/2016

3 x

Initial investigation shows that US Fish Wildlife and Parks are a MT DEQ permitted gravel pit known as the “Horse Ranch Site.” Will this source be available for Select Borrow and or

Roadway Aggregate?

The contractor is responsible for locating their own source

1/27/2016

4 x Why are there 2 different roadway aggregates?

Requested by partner agency 1/27/2016

5 x

Can burning of trees and other materials from clearing and grubbing be done on site? . Refer to FP‐14 Subsection 201.06

2/1/2016

6 x

There appears to be excess excavation

(unsuitable material), can this material be wasted on site to make slopes flatter or somewhere else? If more unsuitable material exists, will there be added pay item for import fill? See Amendment A001

2/1/2016

7 x

It appears that almost all quantities have a 10% or more “Allowance” factor. We assume only the actual measured quantities will be paid and not the allowance amount? yes

2/1/2016

8 x

How and what spec is bedding material paid for placement around pipe culverts?

Refer to FP‐14 Subsection 602.03

(incidental) 2/1/2016

9 x

Is there bedding material for utility trench and if so, how is it paid and what is the spec? Refer to 704.03 2/1/2016

10 x

Can you supply the link the current average bid tab data?

See http://flh.fhwa.dot.gov/business/constructi on/bids/ (still up to contractor to determine average)

2/1/2016