Pleasant_Valley_Road_Silt_Memo_11-18-15.pdf

PDF 175 KB Posted

Attached to
MT Flathead 543(1), Pleasant Valley Road Federal contract opportunity
Solicitation number
DTFH70-15-B-00010
Issued by
Department of Transportation Federal Highway Administration

About this file

Test Pit Memo

View the file

Other files for this federal contract opportunity

Other files attached to MT Flathead 543(1), Pleasant Valley Road, newest first.
File Type Posted
Bid_Opening_Summary_Pleasant_Valley.pdf PDF
A003_MT_FLATHEAD_543(1).pdf PDF
Q A_2_12_16.pdf PDF
A002_PleasantValley.pdf PDF
Q A_2_10_16.pdf PDF
Q A_2_4_16.pdf PDF
Q A_2_1_16.pdf PDF
Q A_1_29_16.pdf PDF
A001_MT_Flathead_543(1) _MT_Pleasant_Valley_Road_Relocation.pdf PDF
SWPPP.pdf PDF
Plan_Request_form_PleasantValley.pdf PDF
Lost_Trail_Existing_Bridge_Information.pdf PDF
PV_XS.pdf PDF
IFB_PleasantValley.pdf PDF
PV_Plans_100_.pdf PDF
Pleasant_Valley_Earthwork.pdf PDF
2015_pleasant_valley_rd_Test_Pit_data_with_Notes.pdf_-_Adobe_Acrobat_Pro.pdf PDF
Stage_2_Fire_Restrictions.pdf PDF
MT_Flathead_543(1) _Preliminary_Plans.pdf PDF
MT_Flathead_543(1) _Prelim_Letter.pdf PDF
MT_Flathead_543(1) _Project_Description.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Memorandum

Western Federal Lands Highway Division 610 E. Fifth Street

Vancouver, WA 98661-3801

TO: Michael Traffalis, Project Manager Michael Madar, Designer

In Reply Refer to: HFL-17

FROM:

Megan Chatfield, Assistant Materials Engineer

DATE: November 18, 2015

SUBJECT: INFORMATION:

Test Pit Observations Pleasant Valley Road Relocation

MT FLATHEAD 543(1)

This memorandum provides test pit observations for Pleasant Valley Road.

1. Test Pit and Grab Sample approximate locations (see project physical data for test results):

2. All test pits and grab samples have similar materials. Approximately the top 6+ inches of the test pits contain some vegetative layers including vegetative debris and organic material. The underlying material meets the requirements for embankment construction.

Note:

• Test pits and grab samples show high silt content in the existing material; therefore, the material may be moisture sensitive if the moisture content is over optimum. Work should be sequenced to limit the area of disturbance to avoid exposure to precipitation.

Excavated and embankment areas should be a shaped to drain and any irregularities in the surface removed to eliminate areas that could hold water.

• Even if the materials are at or below optimum moisture content, hauling directly on these materials could result in reduced strength of the material and require additional work to stabilize the area. Care should be used to evaluate moisture content of excavated materials and embankments such that haul loads do not induce pumping of the underlying soils. Continuous hauling across this material should be minimized to prevent reduced stability of the roadbed.

3. Potholed existing roadway within the existing road prism and visually evaluated the surfacing materials. The existing Pleasant Valley road generally consists of 18 to 20 inches of existing crushed aggregate with high fines content. The existing crushed aggregate can be used for embankment construction.

cc: Materials/Pavement File