PV_Plans_100_.pdf
PDF 23 MB Posted
- Attached to
- MT Flathead 543(1), Pleasant Valley Road Federal contract opportunity
- Solicitation number
- DTFH70-15-B-00010
About this file
Plans
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_Pleasant_Valley.pdf | ||
| A003_MT_FLATHEAD_543(1).pdf | ||
| Q A_2_12_16.pdf | ||
| Pleasant_Valley_Road_Silt_Memo_11-18-15.pdf | ||
| A002_PleasantValley.pdf | ||
| Q A_2_10_16.pdf | ||
| Q A_2_4_16.pdf | ||
| Q A_2_1_16.pdf | ||
| Q A_1_29_16.pdf | ||
| A001_MT_Flathead_543(1) _MT_Pleasant_Valley_Road_Relocation.pdf | ||
| PV_XS.pdf | ||
| IFB_PleasantValley.pdf | ||
| Pleasant_Valley_Earthwork.pdf | ||
| 2015_pleasant_valley_rd_Test_Pit_data_with_Notes.pdf_-_Adobe_Acrobat_Pro.pdf | ||
| SWPPP.pdf | ||
| Plan_Request_form_PleasantValley.pdf | ||
| Lost_Trail_Existing_Bridge_Information.pdf | ||
| Stage_2_Fire_Restrictions.pdf | ||
| MT_Flathead_543(1) _Prelim_Letter.pdf | ||
| MT_Flathead_543(1) _Preliminary_Plans.pdf | ||
| MT_Flathead_543(1) _Project_Description.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX TO SHEETS
A.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft
D c m y fi le s p w p r o d u c ti o n d m t-a a b .d g n
MT FLATHEAD 543(1)
P
M
N o v e m b e r
C J o r g e n s o n
M a d a r
C h e c k e d b y
D e s ig n e d b y
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
S e p te m b e r
U m y fi le s p w p r o d u c ti o n d m t-a a c .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.3 FLATHEAD 543(1) MT
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
F L
A T
H E
A D C
O
L I N
C O
L N C
O
BEGIN PROJECT
Kalispell, Montana
25 miles to
END PROJECT
N
VICINITY MAP
SCALE IN MILES
00.5 0.5 1.0 1.5 2.00.25
Dahl Lake
Lake
Lynch
P L E A S A N T
V A L L E Y
N A
T
IO
N A
L F
O R
E S T B
O U
N D
A R
Y
P L E A S A N T
V A L L E Y
92+71.64 LINE 'A' =
10+00.00 LINE 'APP2'
125+98.48 LINE 'A' =
10+00.00 LINE 'APP3'
78+32.62 LINE 'A' =
10+00.00 LINE 'APP1'
147+15.33 LINE 'A' =
10+00.00 LINE 'APP4'
184+71.13 LINE 'A' =
10+00.00 LINE 'APP5'
500+82.51 LINE 'B' =
14+85.34 LINE 'APP4'
205+00.00 LINE 'A' =
10+00.00 LINE 'APP6'
284+26.88 LINE 'A' =
600+30.35 LINE 'B'
45+60.00 LINE 'A'
MT FLATHEAD 543(1)
757+00.00 LINE 'B'
MT FLATHEAD 543(1)
500+00.00 LINE 'B'
MT FLATHEAD 543(1)
BEGIN CONSTRUCTION
P le a s a n t V a lle y R o a d
NATIONAL WILDLIFE REFUGE
LOST TRAIL
NATIONAL FOREST
FLATHEAD
Pleasant Valley Road
A.4
STATE PROJECT
NUMBER
SHEET
o v e m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a a d .d g
MT FLATHEAD 543(1)
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
LINE 'A'
LINE 'B'
LINE 'B'
END CONSTRUCTION
284+26.88 LINE 'A'
Refuge BoundryRefuge Boundry re hsi
F r e vi
R
Refuge Boundry
Sheet and Description
Section C Section D Section F Section G Section H Section I
Typical Section
Plan & Profile
Erosion Control Drainage Temporary
Traffic Control
Permanent Traffic Control
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 3,515 485 4,000
A0140 15802-0000 WATERING FOR DUST CONTROL LPSM ALL ALL
A0160 20101-0000 CLEARING AND GRUBBING ACRE 74.7 4.3 79.0
A0180 20220-1000 REMOVAL, INDIVIDUAL TREE EACH 109 11 120
A0200 20301-1100 REMOVAL OF GATE EACH 1 1
A0220 20301-2700 REMOVAL OF STRUCTURE (BRIDGE
SALVAGE, LOST TRAIL NWR
#61545-63008) EACH 1 1
A0240 20302-1000 REMOVAL OF FENCE, RAIL LNFT 400 50 450
A0260 20302-2100 REMOVAL OF PIPE CULVERT
(18-INCH CMP) LNFT 45 45
A0280 20302-2100 REMOVAL OF PIPE CULVERT
(24-INCH CMP) LNFT 30 30
A0300 20302-2100 REMOVAL OF PIPE CULVERT
(48-INCH CMP) LNFT 40 40
A0320 20302-2100 REMOVAL OF PIPE CULVERT
(5-FEET X 4-FEET CMP) LNFT 40 40
A0340 20401-0000 ROADWAY EXCAVATION CUYD 122,913 12,287 135,200
A0360 20411-0000 SELECT BORROW TON 52,218 5,282 57,500
A0380 20425-1000 DITCH, EXCAVATION LNFT 1,275 125 1,400
A0400 20702-0600 GEOTEXTILE FILTER, CLASS 2,
TYPE A SQYD 449 51 500
A0420 20820-0000 DEWATERING LPSM ALL ALL
A0440 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 66,150 6,150 72,300
A0460 21101-2000 ROADWAY OBLITERATION, METHOD 2 SQYD 3,902 398 4,300
A0480 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 595 55 650
A0500 30202-2000 ROADWAY AGGREGATE, METHOD 2
(SURFACE COURSE A) TON 40,228 4,022 44,250
A0520 30202-2000 ROADWAY AGGREGATE, METHOD 2
(PATH/OVERLOOK SURFACING) TON 28 7 35
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-N ov -2
4:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0 m t-a2
_b a.
xl sx ]S he et
STATE PROJECT
B.1FLATHEAD 543(1)MT
NUMBER
Typical Section
Plan & Profile
Erosion Control Drainage Temporary
Traffic Control
Permanent Traffic Control
ALLOWANCE Bid Schedule
A0540 60103-0440 CONCRETE, HEADWALL FOR
144-INCH PIPE CULVERT EACH 2 2
A0560 60201-0800 24-INCH PIPE CULVERT LNFT 633 633
A0580 60201-1000 36-INCH PIPE CULVERT LNFT 268 268
A0600 60201-1600 72-INCH PIPE CULVERT LNFT 70 70
A0620 60201-2500 144-INCH PIPE CULVERT LNFT 144 144
A0640 60220-0000 PRECAST REINFORCED CONCRETE
BOX CULVERT (THREE SIDED,
20-FEET SPAN 10 FEET RISE) LNFT 36 36
A0660 61902-0000 GATE EACH 1 1
A0680 62101-0000 MONUMENT EACH 182 182
A0700 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 20 20
A0720 62201-0950 WHEEL LOADER, 3 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 40 40
A0740 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 80 80
A0760 62301-0000 GENERAL LABOR HOUR 40 40
A0780 62501-0000 TURF ESTABLISHMENT ACRE 76.7 8.3 85.0
A0800 62901-0400 ROLLED EROSION CONTROL
PRODUCT, TYPE 1.D SQYD 1,700 200 1,900
A0820 63302-0000 SIGN SYSTEM SQFT 160 160
A0840 63316-1000 REMOVE AND RESET SIGN EACH 25 5 30
A0860 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 14 14
A0880 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 136 136
A0900 63621-5000 UTILITY BOX, CONCRETE (4'X4'
OPEN LID) EACH 12 12
A0920 63621-5000 UTILITY BOX, CONCRETE (4'X4'
CLOSED LID) EACH 8 8
A0940 63622-0000 UTILITY TRENCH (TYPE 1) LNFT 16,000 1,600 17,600
A0960 63622-0000 UTILITY TRENCH (TYPE 2) LNFT 2,400 240 2,640
A0980 64603-0300 FIXTURE, BENCH (LOG,
GOVERNMENT FURNISHED) EACH 4 4
A1000 64603-1200 FIXTURE, WAYSIDE EXHIBIT (4'
X 3' INTERPRETIVE PANNEL
FOUNDATION) EACH 4 4
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-N ov -2
4:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0 m t-a2
_b a.
xl sx ]S he et
2)
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.2FLATHEAD 543(1)MT
Typical Section
Plan & Profile
Erosion Control Drainage Temporary
Traffic Control
Permanent Traffic Control
ALLOWANCE Bid Schedule
A1020 64603-1200 FIXTURE, WAYSIDE EXHIBIT (5'
X 3' INTERPRETIVE PANNEL
FOUNDATION) EACH 2 2
A1040 64620-0400 REMOVE AND RESET MAILBOX EACH 1 1
A1060 64704-1000 MITIGATION, STREAMBED
MATERIAL (TYPE 1) CUYD 250 480 70 800
A1080 64704-1000 MITIGATION, STREAMBED
MATERIAL (TYPE 2) CUYD 330 35 365
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-N ov -2
4:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0 m t-a2
_b a.
xl sx ]S he et
3)
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.3FLATHEAD 543(1)MT
Typical Section
Plan & Profile
Erosion Control Drainage Temporary
Traffic Control
Permanent Traffic Control
ALLOWANCE Bid Schedule
B0020 15101-0000 MOBILIZATION LPSM ALL
B0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
B0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
B0080 15401-0000 CONTRACTOR TESTING LPSM ALL
B0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
B0120 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 3,515 485 4,000
B0140 15802-0000 WATERING FOR DUST CONTROL LPSM ALL ALL
B0160 20101-0000 CLEARING AND GRUBBING ACRE 74.7 4.3 79.0
B0180 20220-1000 REMOVAL, INDIVIDUAL TREE EACH 109 11 120
B0200 20301-1100 REMOVAL OF GATE EACH 1 1
B0220 20301-2700 REMOVAL OF STRUCTURE (BRIDGE
SALVAGE, LOST TRAIL NWR
#61545-63008) EACH 1 1
B0240 20302-1000 REMOVAL OF FENCE, RAIL LNFT 400 50 450
B0260 20302-2100 REMOVAL OF PIPE CULVERT
(18-INCH CMP) LNFT 45 45
B0280 20302-2100 REMOVAL OF PIPE CULVERT
(24-INCH CMP) LNFT 30 30
B0300 20302-2100 REMOVAL OF PIPE CULVERT
(48-INCH CMP) LNFT 40 40
B0320 20302-2100 REMOVAL OF PIPE CULVERT
(5-FEET X 4-FEET CMP) LNFT 40 40
B0340 20401-0000 ROADWAY EXCAVATION CUYD 122,913 12,287 135,200
B0360 20411-0000 SELECT BORROW TON 52,218 5,282 57,500
B0380 20425-1000 DITCH, EXCAVATION LNFT 1,275 125 1,400
B0400 20702-0600 GEOTEXTILE FILTER, CLASS 2,
TYPE A SQYD 449 51 500
B0420 20820-0000 DEWATERING LPSM ALL ALL
B0440 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 66,150 6,150 72,300
B0460 21101-2000 ROADWAY OBLITERATION, METHOD 2 SQYD 3,902 398 4,300
B0480 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 595 55 650
B0500 30202-2000 ROADWAY AGGREGATE, METHOD 2
(SURFACE COURSE B) TON 40,228 4,022 44,250
B0520 30202-2000 ROADWAY AGGREGATE, METHOD 2
(PATH/OVERLOOK SURFACING) TON 28 7 35
-N ov -2
4:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0 m t-a2
_b d .x ls x]
S he et SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.4FLATHEAD 543(1)MT
Typical Section
Plan & Profile
Erosion Control Drainage Temporary
Traffic Control
Permanent Traffic Control
ALLOWANCE Bid Schedule
B0540 60103-0440 CONCRETE, HEADWALL FOR
144-INCH PIPE CULVERT EACH 2 2
B0560 60201-0800 24-INCH PIPE CULVERT LNFT 633 633
B0580 60201-1000 36-INCH PIPE CULVERT LNFT 268 268
B0600 60201-1600 72-INCH PIPE CULVERT LNFT 70 70
B0620 60201-2500 144-INCH PIPE CULVERT LNFT 144 144
B0640 60220-0000 PRECAST REINFORCED CONCRETE
BOX CULVERT (THREE SIDED,
20-FEET SPAN 10 FEET RISE) LNFT 36 36
B0660 61902-0000 GATE EACH 1 1
B0680 62101-0000 MONUMENT EACH 182 182
B0700 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 20 20
B0720 62201-0950 WHEEL LOADER, 3 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 40 40
B0740 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 80 80
B0760 62301-0000 GENERAL LABOR HOUR 40 40
B0780 62501-0000 TURF ESTABLISHMENT ACRE 76.7 8.3 85.0
B0800 62901-0400 ROLLED EROSION CONTROL
PRODUCT, TYPE 1.D SQYD 1,700 200 1,900
B0820 63302-0000 SIGN SYSTEM SQFT 160 160
B0840 63316-1000 REMOVE AND RESET SIGN EACH 25 5 30
B0860 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 14 14
B0880 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 136 136
B0900 63621-5000 UTILITY BOX, CONCRETE (4'X4'
OPEN LID) EACH 12 12
B0920 63621-5000 UTILITY BOX, CONCRETE (4'X4'
CLOSED LID) EACH 8 8
B0940 63622-0000 UTILITY TRENCH (TYPE 1) LNFT 16,000 1,600 17,600
B0960 63622-0000 UTILITY TRENCH (TYPE 2) LNFT 2,400 240 2,640
B0980 64603-0300 FIXTURE, BENCH (LOG,
GOVERNMENT FURNISHED) EACH 4 4
B1000 64603-1200 FIXTURE, WAYSIDE EXHIBIT (4'
X 3' INTERPRETIVE PANNEL
FOUNDATION) EACH 4 4
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-N ov -2
4:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0 m t-a2
_b d .x ls x]
S he et
2) SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.5FLATHEAD 543(1)MT
Typical Section
Plan & Profile
Erosion Control Drainage Temporary
Traffic Control
Permanent Traffic Control
ALLOWANCE Bid Schedule
B1020 64603-1200 FIXTURE, WAYSIDE EXHIBIT (5'
X 3' INTERPRETIVE PANNEL
FOUNDATION) EACH 2 2
B1040 64620-0400 REMOVE AND RESET MAILBOX EACH 1 1
B1060 64704-1000 MITIGATION, STREAMBED
MATERIAL (TYPE 1) CUYD 250 480 70 800
B1080 64704-1000 MITIGATION, STREAMBED
MATERIAL (TYPE 2) CUYD 330 35 365
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-N ov -2
4:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0 m t-a2
_b d .x ls x]
S he et
3) SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.6FLATHEAD 543(1)MT
QUANTITIES
TYPICAL SECTION
TABULATION OF
C.1
STATE PROJECT
MT
FLATHEAD 543(1)
o v e m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a c a .d g
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b
TYPICAL SECTIONS
LC
LC
1:3 1:3
Existing ground
Traveled way
12'
Traveled way
12'
M a d
J o r g e n s
4% 4%
Existing ground
Match existing
12' 12'
1:3
1:
21:2 Varies
DITCH EXCAVATION
LC
PLEASANT VALLEY ROAD OVERLAY
PLEASANT VALLEY ROAD REALIGNMENT
D e s ig n e d b y
C h e c k e d b y
12" compacted depth
Select borrow, 10'
600+30.35 to 757+00.00 Line 'B'
45+60.00 to 72+24.73 Line 'A'
72+24.73 to 284+26.88 Line 'A'
203+50.00 Line 'A'
56+35.00 Line 'A'
Profile grade
Profile grade control product, type 1D
Rolled erosion
Existing ground material (type 1), 6"
Place mitigation, streambed
LC
12' 12'
Traveled Way Traveled Way
Existing Ground
Width Varies
Proposed Grade
1:3 1:3
2% 2%
Varies
CUT SLOPE
ROUNDING DETAIL
5'
5'
D ground
Original
0.25D
C le a r in g l im it s
B = 10'
PATH/OVERLOOK
PLEASANT VALLEY ROAD
Existing ground
Width varies
LC
91+50.00, RT, Line 'A'
2" compacted depth
(path/overlook surfacing) method 2
Roadway aggregate, Roadway Obliteration, Method 1 and Turf Establishment limits
534+70.00 to 598+00.00 Line 'B'
FOOTNOTE:
Existing ditch Existing ditch
Existing roadway prism
Use material from existing roadway prism to fill existing ditches.
and reduce the front slope rounding distance proportionally.
heights less than "B" reduce "B" to the cut height dimension
Cut and rounding detail applies to all typical sections. For cut
Construct slopes as shown in the Staking Report.
o v e m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a c b .d g n
STATE PROJECT
NUMBER
C.2 class 2, type A
Geotextile filter, control product, type 1D
Rolled erosion this sheet
See Roadway aggregate table, table, this sheet
See Roadway aggregate
Turf establishment
10' (Typical)
Turf establishment
(Typical)
5'
C le a r in g l im it s
C le a r in g l im it s
C o n s tr u c ti o n l im it s
(Typical)
5'
(Typical)
5'
C o n s tr u c ti o n l im it s
PLEASANT VALLEY ROAD OBLITERATION
Match existing table, this sheet
See Roadway aggregate
TYPICAL SECTIONS
1:3
1:3
C le a r in g l im it
C le a r in g l im it
M a d
J o r g e n s
4% 4% 1:3
PLEASANT VALLEY ROAD - APPROACHES
1:3 C le a r in g l im it establishment
Turf
4%
PLEASANT VALLEY ROAD - TURNOUTS
turnout
Width varies
D e s ig n e d b y
C h e c k e d b
See approach table this sheet
Traveled way width varies
10+12.00 to 25+16.94 Line 'APP6'
10+12.00 to 13+70.63 Line 'APP5'
10+12.00 to 20+82.78 Line 'APP4'
11+00.00 to 11+51.36 Line 'APP3'
12+72.00 to 13+84.36 Line 'APP2'
10+12.00 to 11+20.71 Line 'APP1'
754+50.00, RT, Line 'B'
686+00.00, RT, Line 'B'
673+00.00, RT, Line 'B'
629+00.00, RT, Line 'B'
626+00.00, RT, Line 'B'
601+50.00, LT, Line 'B'
229+25.00, RT, Line 'A'
91+50.00, LT, Line 'A'
91+50.00, RT, Line 'A'
1'
UTILITY TRENCH (TYPE 1)
1'
UTILITY TRENCH (TYPE 2)
1'
FOOTNOTE:
1 Construct slopes as shown in the Staking Report.
A o v e m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a c c .d g n
STATE PROJECT
NUMBER
C.3
RT Line 'APP1'
LT/RT Line 'A'
LT Line 'A'
LT Line 'A'
LT Line 'A'
LT Line 'A'
LT/RT Line 'A'
9+50.00 - 15+50.00
197+65.00 - 205+50.00
184+25.00 - 185+25.00
124+75.00 - 126+25.00
94+00.00 - 96+00.00
54+00.00 - 57+00.00
46+25
Turf establishment by Flathead Electric. Contractor to install electric utility. Conduit to be provided
3" Schedule 40 PVC conduit for
Utility warning ribbon by Flathead Electric. Contractor to install electric utility. Conduit to be provided
3" Schedule 40 PVC conduit for
Existing ground/subgrade
LT Line 'APP6'
LT Line 'A'
LT Line 'A'
LT Line 'A'
LT Line 'A'
LT Line 'A'
10+50.00 - 25+17.00
185+25.00 - 197+65.00
126+25.00 - 184+25.00
96+00.00 - 124+75.00
57+00.00 - 94+00.00
46+25.00 - 54+00.00
6" min.
Turf establisment
10' (Typical)
(Typical)
5'
Profile grade
(Typical)
5' and installed by contractor phone utility. Conduit to be supplied
2" Schedule 40 PVC conduit for to be placed by CenturyLink
Direct burial line for phone utility
Utility warning ribbon
6" min.
2' min.
Existing ground
6" min.
.5 c o v e r m in
6" min.
6" min.
2' min.
6" min.
m in c o v e r
.5
12" compacted depth
Select borrow, 12" compacted depth
Select borrow, Edge of traveled way table, this sheet
See Roadway aggregate
Existing ground
Existing ground table, this sheet
See Roadway aggregate
LC
m a te r ia l
B a c k fi ll m a te r ia l
B a c k fi ll
PLAN & PROFILE
TABULATION OF
D.1
STATE PROJECT
o v e m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a fa .d g
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b
T
2827 244650
244600
T
244653
UP
ISLK
T
244651
ATTENTION
EM
L O
S T T
R A I L
N A
T I O
N A
L W
I L
D L I F E R
E F
U G
E
R E F
U G
E O
F F I C
E
S P
E E
D L I
M I T
M
P H
245600 246602
T
246650
?46600
247600 248600
249601 249600
U.B.
U.B.
U.B.
N
BEGIN PROJECT
Line 'A' to be constructed
EL = 3,490.55
E = 636634.40
N = 1478476.90
45+60.00 Line 'A'
MT FLATHEAD 543(1)
be constructed by others
Stream restoration to
Ditch Excavation
P10
P11
P12
P13
P14
P15
P16
P17
P18
P19
P20
P21
P22
P23
Ditch Excavation be constructed by others
Stream restoration to
Match existing stream channel relocated for ditch construction
Existing phone to be temporarily
LINE 'A'
45+60 to 72+24.73
PLAN & PLAN
(type 2)trench
Utility trench (type 1)Utility trench (type 1)Utility
S e e S h e e t
G .1
R e m o v a l o f x p ip e c u lv e r t
S e e S h e e t
G .1
I n s ta ll
X b o x c u lv e r t
UTILITY CONTACT:
D.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a fb .d g n
MT FLAATHEAD 543(1)
o v e m b e r
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
Utility trench (type 2)
LEGEND:
Utility Trench Type 2
Utility Trench Type 1
Clearing limits
Clearing limits
IR
IR WASHER
s.pluid@flathead.coop
(406) 751-4461
Stan Pluid
Flathead Electric ronald.o.smith@centurylink.com
(406) 585-1926
Ronald Smith
CenturyLink
R=100'
R=30' R=45'
R=30'
R=55'
R=60' R=100' stream channel
Match existing
P C
.7
N A
TI
O N
A L
W
IL
D
LI
FE
F
R E
FU
G E
W A
LK
I
N O
N
LY
T
E M
W V
W V
W V
W V
W V
J H
J H
J H
W V
48" CMP
J H
,4
.4
,4
.5
+0.5676%
.3
450' VC
,5
.7
-0.5233%
400' VC
U.B.
U .B
U.
B.
Profile grade
Existing ground
N
S e e S h e e t
G .1
I n s ta ll i n c h c u lv e r t
Line 'A' to be constructed
78+32.62 Line 'A' =
10+00.00 Line 'APP1'
92+71.64 Line 'A' =
10+00.00 Line 'APP2'
Slope stake limits be constructed by others
Stream restoration to be constructed by others
Stream restoration to
S e e S h e e t
G .1
I n s ta ll i n c h c u lv e r t
Special ditch profile, LT
Remove and reset sign
NOTE:
Removal of fence, rail Removal of fence, rail
S e e S h e e t
H .1
I n s ta ll p ip e c u lv e r t
R e m o v e in c h p ip e c u lv e r t
Utility trench (type 1)
Utility trench (type 2) obliteration, method 2
Roadway reset mailbox
Remove and
72+24.73
Begin Realignment
End Overlay
CUYD
EXC.
CUYD
EMB.
95+0090+0085+0080+0075+0070+00
3470 3470
3480 3480
3490 3490
3500 3500
3510 3510
3520 3520
3530 3530
3540 3540
3550 3550
D.3
STATE PROJECT
NUMBER
SHEET
o v e m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a fc .d g
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
2.
1.
See Sheet D.2 for Utility Trench Table.
Location of all reset signs and mailboxes to be approved by CO.
See sheet E.1 Line 'APP1'
See sheet E.1 Line 'APP2'
Clearing limits
Clearing limits
A C
N R C S -W
R P
PC
.7
P T
.3
P C
.6
P T
.2
P C
.4
D
T= 300.90'
L= 584.57'
R= 1,000.00'
Curve= PVALGNAC1001
Curve= PVALGNAC1002
R= 400.00'
T= 176.00'
L= 331.61'
D
10,042
2,806
RT Line 'A', see Sheet E.7
Path/Overlook 91+50, LT Line 'A', see Sheet E.8
Turnout 91+50, Utility trench (type 2)
RT Line 'A', see Sheet E.7
Turnout 91+50, method 2 obliteration, Roadway
,5
.0
-0.5233%
250' VC
,5
.0
+1.500 0% -0.5517%
250' VC
,5
.0
-3.0108%300' VC
,5
.0
+0.5571%
350' VC
U.B
U.B.
N
Profile grade
Existing ground
S e e S h e e t
G .1
I n s ta ll i n c h c u lv e r t
S e e S h e e t
G .1
I n s ta ll i n c h c u lv e r t
S e e S h e e t
G .1
I n s ta ll i n c h c u lv e r t
S e e S h e e t
G .1
I n s ta ll i n c h c u lv e r t
Line 'A' to be constructed
125+98.48 Line 'A' =
10+00.00 Line 'APP3'
Slope stake limits
Special ditch profile, LT
S e e S h e e t
G .1
I n s ta ll i n c h c u lv e r t
Utility trench (type 1)
(type 2) trench
Utility
(type 2) trench
Utility
11,330
7,150
CUYD
EXC.
CUYD
EMB.
125+00120+00115+00110+00105+00100+0095+00
3480 3480
3490 3490
3500 3500
3510 3510
3520 3520
3530 3530
3540 3540
3550 3550
3560 3560
D.4
STATE PROJECT
NUMBER
SHEET
o v e m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a fd .d g
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
NOTE:
1.See Sheet D.2 for Utility Trench Table.
See sheet E.2
Line 'APP3'
Clearing limits
Clearing limits
AC
2" 1999 6992E
AC
NRCS-WRP1998
P T
.7
P C
.5
P C
C
.5
Curve= PVALGNAC1003
R= 1,000.00'
T= 390.87'
L= 745.22'
D
Curve= PVALGNAC1004
D
R= 925.00'
T= 237.52'
L= 465.00'
Curve= PVALGNAC1005
D
R= 5,500.00'
T= 883.54'
L= 1,752.11'
101170
100170
JH
JH
T
NATIO
NAL W
ILDLIF
E R
EFUGE
,5
.0
+0.5571%
+2.01 09%
500' VC
,5
.5
-0.5422%
300' VC
,5
.0
-3.0968%
350' VC
U.B.
U.B.
N
Curve= PVALGNAC1006
D
R= 1,500.00'
T= 114.72'
L= 228.99'
Curve= PVALGNBC2001
D
R= 900.00'
T= 376.94'
L= 713.92'
Curve= PVALGNAC1007
D
R= 700.00'
T= 330.14'
L= 616.97'
Profile grade
Existing ground
S e e S h e e t
G .1
I n s ta ll i n c h c u lv e r t
S e e S h e e t
G .1
I n s ta ll i n c h c u lv e r t
125+98.48 Line 'A' =
10+00.00 Line 'APP3'
Line 'A' to be constructed
Roadway Obliteration, Method 2
147+15.33 Line 'A' =
10+00.00 Line 'APP4'
500+82.51 Line 'B' =
14+85.34 Line 'APP4'
EL = 3,505.42
E = 645166.74
N = 1479929.25
500+00.00 Line 'B'
MT FLATHEAD 543(1)
BEGIN CONSTRUCTION
Slope stake limits be constructed by others
Stream restoration to
Utility trench (type 2)
Utility trench (type 1)
12,006
19,046
CUYD
EXC.
CUYD
EMB.
155+00150+00145+00140+00135+00130+00125+00
3490 3490
3500 3500
3510 3510
3520 3520
3530 3530
3540 3540
3550 3550
3560 3560
3570 3570
D.5
STATE PROJECT
NUMBER
SHEET
o v e m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a fe .d g
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
NOTE:
1.See Sheet D.2 for Utility Trench Table.
See sheet E.2
Line 'APP3'
See sheet D.11
Line 'B'
Clearing limits
Clearing limits
AC
NRCS-W
RP199
AC
NRCS-W
RP199
AC
NRCS-W
RP199
P T
.6
P C
.1
P T
.0
P C
.0
P T
.0
P O
T
.0
P C
.0
P T
.0
See sheet E.3
Line 'APP4'
,5
.0
+0.8235%
450' VC
,5
.0
+0.8235% -2.9327%
250' VC
U .B
U.B . U.B.
N
D
Curve= PVALGNAC1008
R= 475.00'
T= 281.07'
L= 507.59'
D
Curve= PVALGNAC1009
R= 1,400.00'
T= 255.80'
L= 506.02'
R= 650.00'
T= 502.47'
L= 855.51'
D
Curve= PVALGNAC1010
Profile grade
Existing ground
S e e S h e e t
G .1
I n s ta ll i n c h c u lv e r t
S e e S h e e t
G .1
I n s ta ll i n c h c u lv e r t
S e e S h e e t
G .1
I n s ta ll i n c h c u lv e r t
Line 'A' to be constructed
184+71.13 Line 'A' =
10+00.00 Line 'APP5'
Slope stake limits
Special ditch profile, LT
Utility trench (type 1)
Utility trench (type 2) obliteration, method 2
Roadway
18.570
20,555
CUYD
EXC.
CUYD
EMB.
185+00180+00175+00170+00165+00160+00155+00
3480 3480
3490 3490
3500 3500
3510 3510
3520 3520
3530 3530
3540 3540
3550 3550
3560 3560
D.6
STATE PROJECT
NUMBER
SHEET
o v e m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a ff .d g
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
NOTE:
1.See Sheet D.2 for Utility Trench Table.
See sheet E.4
Line 'App5'
A C
A C
N R S
C
W R P
N R S
C
W R P
Clearing limits
Clearing limits
P T
.0
P C
.2
0 P
T
.8
0 1
P C
.4
P T
.4
P C
.2
,5
.7
-2.9327%
+0.7007%
700' VC
,5
.9
-0.5066%
750' VC
,5
.5
+1.3514
%400' VC
+1.3514
U .B
U .B
U.B.
U .B
N
Curve= PVALGNAC1010
R= 650.00'
T= 502.47'
L= 855.51'
D
Profile grade
Existing ground
S e e S h e e t
G .1
I n s ta ll i n c h c u lv e r t
Line 'A' to be constructed
205+00.00 Line 'A' =
10+00.00 Line 'APP6'
S e e S h e e t
G .1
R e m o v a l o f i n c h p ip e c u lv e r t
S e e S h e e t
G .1
I n s ta ll p ip e c u lv e r t
Ditch excavation
Ditch excavation
Match existing stream channel
Match existing stream channel
Utility trench (type 1)
Utility trench (type 2) method 2 obliteration, Roadway
Temporary staging/stockpile area stake limits
Slope
(type 1)
Utility trench method 2 obliteration, Roadway
4,660 as directed by CO existing ground contours
Minor grading to match
Ditch Excavation information
See Sheet D.20 for method 2 obliteration, Roadway
CUYD
EXC.
CUYD
EMB.
205+00200+00195+00190+00185+00
3480 3480
3490 3490
3500 3500
3510 3510
3520 3520
3530 3530
3540 3540
3550 3550
3560 3560
D.7
STATE PROJECT
NUMBER
SHEET
o v e m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a fg .d g
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
NOTE:
1.See Sheet D.2 for Utility Trench Table.
190+00
512' RT
197+00
512' RT
See sheet E.4
Line 'APP5'
See sheet E.5 - E.6
Line 'APP6'
Clearing limits
Clearing limits
PC 180+85.21
P T
.7
P C
.2
184+71.13 Line 'A' =
10+00.00 Line 'APP5'
Utility trench (type 2)
C 1 -4
-1
U .B
U.B.
N
Curve= PVALGNAC1011 D
R= 1,000.00' T= 578.91' L= 1,049.54'
Curve= PVALGNAC1012
R= 3,000.00'
T= 448.10'
L= 889.61'
D Curve= PVALGNAC1013 D
R= 700.00' T= 460.14'
L= 814.13'
Profile grade
Existing ground
Line 'A' to be constructed
205+00.00 Line 'A' =
10+00.00 Line 'APP6' be constructed by others
Stream restoration to
Special ditch profile, LT
Utility trench (type 2)
Utility trench (type 1) RT Line 'A', see Sheet E.9
Turnout 229+25, 31,549
Slope stake limits
CUYD
EXC.
CUYD
EMB.
235+00230+00225+00220+00215+00210+00205+00
3480 3480
3490 3490
3500 3500
3510 3510
3520 3520
3530 3530
3540 3540
3550 3550
3560 3560
D.8
STATE PROJECT
NUMBER
SHEET
o v e m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a fh .d g
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
NOTE:
1.See Sheet D.2 for Utility Trench Table.
See sheet E.5 - E.6
Line 'APP6'
,5
.5
+1.3514 % -0.5412%
300' VC
,5
.0
-0.5412%
-1.6467%
300' VC
Clearing limits
Clearing limits
P C .2
P T
.8
P C
.1
5 P
T
.7
P C
.2
PT
5+ .42
,5
.6
-1.6467% +0.5022%
350' VC
,5
.2
-0.5053%
1,500' VC
,5
.5
+0.5000%350' VC
7,803
21,516
N
Curve= PVALGNAC1014
D
R= 1,000.00'
T= 411.64'
L= 781.01' Curve= PVALGNAC1015 D
R= 800.00'
T= 630.61'
L= 1,068.07'
Profile grade
Existing ground
S e e S h e e t
G .1
I n s ta ll i n c h c u lv e r t
S e e S h e e t
G .1
I n s ta ll i n c h c u lv e r t
Line 'A' to be constructed
Slope stake limits
Special ditch profile, LT
CUYD
EXC.
CUYD
EMB.
265+00260+00255+00250+00245+00240+00235+00
3470 3470
3480 3480
3490 3490
3500 3500
3510 3510
3520 3520
3530 3530
3540 3540
3550 3550
D.9
STATE PROJECT
NUMBER
SHEET
o v e m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a fi .d g
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
Clearing limits
Clearing limits
PT
.4
PC
.1
P T
.1
P C
.7
PT 263+13.82
PC 2
63+
20.
D
Curve= PVALGNAC1016
R= 750.00' T= 379.94' L= 703.36'
,5
.5
+0.5000%
+1.714 7%
300' VC
,5
.4
N
Curve= PVALGNAC1017 D
R= 825.00'
T= 587.49'
Profile grade
Existing ground
Line 'A' to be constructed
Line 'B'
284+26.88 Line 'A' =
Slope stake limits
600+30.35 Line 'B'
EL = 3,536.45
E = 654784.34
N = 1478831.00
284+26.88 LINE 'A'
MT FLATHEAD 543(1)
END CONSTRUCTION
Special ditch profile, LT
19,245
4,994
L= 1,021.03'
Begin Overlay
End Realignment
CUYD
EXC.
CUYD
EMB.
285+00280+00275+00270+00265+00
3470 3470
3480 3480
3490 3490
3500 3500
3510 3510
3520 3520
3530 3530
3540 3540
3550 3550
D.10
STATE PROJECT
NUMBER
SHEET
o v e m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a fj .d g
J o r g e n s
M a d
C h e c k e d b e s ig n e d b y method 1
Roadway obliteration, 0 P
T
.9
P C
.8
PT 28
4+26.88
P C
.2
PT 60
0+14.13
PT 284+26.88
Clearing limits
Construction limits
Construction limits
Clearing limits
200 177
B
O X E S
REFUGE
OFFI
CE
ONE L
ANE B
RID
GE
ONE LANE B
RID
GE
T
JH
JH
JH
JH
N A
T
IO
N A
L W
IL
D
L
IF
E R
E F U
G E
C M
P 'X
C M
P
U .B
T
T
T
GPS
14106
C M
P 'X
'X ' C
P C
.3
P T
.8
U.B.
N
N
Curve= PVALGNBC2001 D
R= 900.00'
T= 376.94'
L= 713.92'
Curve= PVALGNBC2002 D
R= 850.00'
T= 285.31'
L= 550.52'
GPS
EL = 3,505.42
E = 645166.74
N = 1479929.25
500+00.00 Line 'B'
MT FLATHEAD 543(1)
BEGIN CONSTRUCTION
Line 'B' to be constructed
Line 'A'
147+15.33 Line 'A' =
10+00.00 Line 'APP4'
500+82.51 Line 'B' =
14+85.34 Line 'APP4'
Line 'APP4'
Line 'B' to be constructed
Removal of Gate
NOTE:
S e e S h e e t
G .1
I n s ta ll p ip e c u lv e r t
Utility trench (type 1) gate Install method 2
Roadway obliteration, Slope stake limits be constructed by others
Stream restoration to
1.
LINE 'B'
500+00 to 555+00
PLAN & PLAN
be constructed by others
Stream restoration to
See sheet E.6 for stockpile location
(Bridge salvage, Lost Trail NWR #61545-63008)
Removal of structure
14106
D.11
STATE PROJECT
NUMBER
SHEET
o v e m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a fk .d g
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
534+50, LT Line 'B'
PLEASANT VALLEY ROAD - REMOVAL OF STRUCTURE
bridge deck
Remove and stockpile
2.
as directed by the CO.
Only clear trees in areas of Roadway Obliteration, Method 1
Final location of gate installation to be approved by CO.
Construction limits
Construction limits
Construction limits control product and turf establishment.
to 1:3 maximum and apply rolled erosion
Remove and stockpile bridge footings, lay back slope method 1
Roadway obliteration, Clearing limits
Clearing limits
Clearing limits
AC
AC
AC
NRSC-WRP1998
NRSC-WRP1998
NRCS-WRP1998
P C
.0
5 P
T
.0
P C
.2
P O T .0
P C .0
P T
.0
P C
.3
T
IO
N A
L W
IL
D
L
IF
E R
E F
U G
E
N A
T
IO
N A
L W
IL
D
L
IF
E R
E F
U G
E
C
M P
C
M P
N
Curve= PVALGNBC2003
D
R= 1,425.00'
T= 490.56'
L= 944.91'
Curve= PVALGNBC2004
D
R= 885.00'
T= 326.73'
L= 625.98'
Curve= PVALGNBC2005
R= 1,150.00'
T= 242.51'
L= 478.02'
N
Line 'A'
284+26.88 Line 'A' =
600+30.35 Line 'B'
Line 'B' to be constructed
Remove and reset sign
Remove and reset sign
NOTE:
1.
LINE 'B'
555+00 to 615+00
PLAN & PLAN
600+30.35
Begin Overlay
End Realignment
D.12
STATE PROJECT
NUMBER
SHEET
o v e m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a fl .d g
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
2.
as directed by CO.
Only clear trees in areas of Roadway Obliteration, Method 1
Location of all reset signs to be approved by CO.
Construction limits
Construction limits
Construction limits
Construction limits
S e e S h e e t
G .1
R e m o v a l o f in c h p ip e c u lv e r t method 1
Roadway obliteration, Clearing limits
Clearing limits method 1
Roadway obliteration, AC
.25
IR
D
LT Line 'B', see Sheet E.10
Turnout 601+50, PC
.8
P T
.8
P C
.2
0 P
T
.1
P C
.5
P C
C
.5
P T .5
Slope stake limits
Line 'B' to be constructed
Line 'B' to be constructed
PARKI
NG
PARKI
NG
GPS
C M
P
C M
P
C M
P
N O P
A R
K
IN
G
N O P
A R
K I N
G
N O P
A R
K I N
G
N O P
A R
K I N
G
C M
P
P T
.7
P C
.8
P T
.7
P C
.9
P T
.0
P C
.4
P T
.0
P C
.6
Curve= PVALGNBC2006 D
R= 1,850.00'
T= 241.68'
L= 480.65'
Curve= PVALGNBC2007 D
R= 1,525.00'
T= 335.64'
L= 660.75'
N
N
Curve= PVALGNBC2008 D
R= 1,300.00' T= 280.69' L= 552.90'
Curve= PVALGNBC2009
D
R= 1,300.00'
T= 252.69'
L= 499.16'
Curve= PVALGNBC2010
D
R= 775.00'
T= 373.82'
L= 696.60'
Line 'B' to be constructed
Line 'B' to be constructed
Remove and reset sign
Remove and reset sign
Remove and reset sign
NOTE:
Location of all reset signs to be approved by CO.
RT Line 'B', see Sheet E.11
Turnout 626+00, RT Line 'B', see Sheet E.11
Turnout 629+00, RT Line 'B', see Sheet E.12
Turnout 673+00, 1.
LINE 'B'
615+00 to 675+00
PLAN & PLAN
GPS
14109
D.13
STATE PROJECT
NUMBER
SHEET
o v e m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a fm .d g
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
AC
P C
C
.5
P T
.5
P C
.6
P T
.2
5 P
C
.9
P T
.7
Remove and reset sign
CMP IN
LET?
?IN
C M
P
P C
.6
P T
.0
5 6
P C
.2
P T .2
5Curve= PVALGNBC2011
D
R= 1,600.00'
T= 704.02'
L= 1,326.45'
Curve= PVALGNBC2012
D
R= 700.00'
T= 566.85'
L= 952.95'
Curve= PVALGNBC2013 D
R= 2,000.00' T= 105.98' L= 211.76'
NN
Curve= PVALGNBC2014 D
R= 2,900.00'
T= 588.26'
L= 1,160.77'
N
Line 'B' to be constructed
Line 'B' to be constructed
Remove and reset sign
LINE 'B'
675+00 to 735+00
PLAN & PLAN
NOTE:
1.Location of all reset signs to be approved by CO.
RT Line 'B', see Sheet E.12
Turnout 686+00, Remove and reset sign
D.14
STATE PROJECT
NUMBER
SHEET
o v e m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a fn .d g
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
AC
IR
AC
3.5
COACHER73
2" 2 3-1
0 1
P C
.8
P T
.5
P C
.8
5/8" IR W/FHWA ALUM CAP
Curve= PVALGNBC2016
D
R= 5,000.00'
T= 86.16'
L= 172.31'
Curve= PVALGNBC2017
R= 750.00'
T= 398.40'
L= 732.45'
D
N
END PROJECT
757+00.00 Line 'B'
MT FLATHEAD 543(1)
EL = 3,753.72
E = 668882.47
N = 1476621.72
Line 'B' to be constructed
Remove and reset sign
Remove and reset sign
NOTE:
1.Location of all reset signs to be approved by CO.
LINE 'B'
735+00 to 757+00
PLAN & PLAN
Remove and reset sign
RT Line 'B', see Sheet E.13
Turnout 754+50, GPS
14111
D.15
STATE PROJECT
NUMBER
SHEET
o v e m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a fo .d g
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
AC
2" 24-11 1999
P T
.5
P C
.4
0 P
T
.5
P C
.5
P T
.8
P C
.7
PT
.2 1 760
D
Curve= PVALGNBC2015
R= 5,000.00'
T= 153.62'
L= 307.13'
PROJECT COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION
14101 1478584.624 635318.527 3492.749 48°10'40.677040" N 114°58'14.582020" W 3441.8766 0.99943597 5/8" IR w/FHWA Alum cap
14102 1478537.752 636250.612 3488.995 48°10'40.857383" N 114°58'00.809165" W 3438.1357 0.99943617 5/8" IR w/FHWA Alum cap
14103 1479723.636 642066.886 3496.088 48°10'56.531998" N 114°56'36.380342" W 3445.3074 0.99943739 5/8" IR w/FHWA Alum cap
14104 1479923.690 642627.325 3496.941 48°10'58.886311" N 114°56'28.332186" W 3446.1704 0.99943758 5/8" IR w/FHWA Alum cap
14105 1479819.227 645862.761 3504.256 48°11'00.071908" N 114°55'40.578568" W 3453.514 0.99943735 5/8" IR w/FHWA Alum cap
14106 1480412.833 647296.957 3510.476 48°11'06.897868" N 114°55'20.063693" W 3459.7446 0.99943773 5/8" IR w/FHWA Alum cap
14107 1478940.385 653267.436 3511.257 48°10'56.464091" N 114°53'50.636249" W 3460.5715 0.99943665 5/8" IR w/FHWA Alum cap
14108 1478725.127 654532.336 3530.688 48°10'55.203468" N 114°53'31.789684" W 3480.0159 0.9994356 5/8" IR w/FHWA Alum cap
14109 1476307.417 661119.347 3631.990 48°10'35.853503" N 114°51'52.339684" W 3581.3565 0.99942884 5/8" IR w/FHWA Alum cap
14110 1476389.682 661892.511 3646.405 48°10'37.185937" N 114°51'41.037416" W 3595.7784 0.99942828 5/8" IR w/FHWA Alum cap
14111 1476412.242 668337.042 3743.512 48°10'41.748913" N 114°50'06.157476" W 3692.9217 0.9994241 5/8" IR w/FHWA Alum cap
14112 1476492.931 668763.057 3748.829 48°10'42.829839" N 114°49'59.964830" W 3698.2452 0.99942395 5/8" IR w/FHWA Alum cap
Note:
PROJECT : Pleasant Valley Road Relocation DATE OF FIELD WORK : September, 2014 DATE OF FINAL ADJUSTMENT : September, 2014
PROJECT UNITS : International foot COORDINATE SYSTEM : Montana SPCS NAD83 (2011)
EPOCH DATE : 2010.0000
VERTICAL DATUM : NAVD88 based on Geoid 12A
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
STATE PROJECT
FLATHEAD 543(1) D.16MT
C
M yF ile s\
Pr oj ec ts
\M on ta na
\P le as an t_ V al le y\
G
PS
Pl ea sa nt Va lle y_ co nt ro ls he et
.x ls x] S he et 3-
Ju n-
:5
PM
A
D es ig ne r
D
C he ck er
D es ig ne d by
C he ck ed b y:
NUMBER
SURVEY CONTROL
TABLE
MONUMENT LOCATION
Boundary (see Survey Certificate 13686).
** Station to be actual intersection with existing NRCS
* Station to be actual intersection with Section Line.
D.17
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a fq .d g n
MT FLATHEAD 543(1)
O c to b e r
C h e c k e d b y
D e s ig n e d b
8" Ø Reinforcing steel, 30" long
8" Ø Reinforcing steel, 15" long
NO SCALE
MONUMENT DETAILS
Fit to end of bar by surveyor.
stamped
2" aluminum cap
MONUMENT
Fit to end of bar by surveyor.
stamped
2" aluminum cap
MONUMENT
.00+01 AT
S
.TL tf 0 m a x m a x
RIGHT-OF-WAY MONUMENTATION
TYPICAL SECTION
CAP DETAIL
NOTE:
Right-of-Way Witness Post:
5701 SL
P
LC
Variable widthVariable width
EARTH INSTALLATION
RIGHT-OF-WAY MONUMENT
SOLID ROCK INSTALLATION
RIGHT-OF-WAY MONUMENT
No witness posts or lath shall be set.
flush to existing ground
Set R/W monuments
PLS information into cap
Stamp station, offset and flush to existing ground
Set R/W monuments with grout
Drill hole and fill
-inch iron rod.8
a) one Right-of-Way stamped monument mounted on the following:
Each monument paid for under Section 621 will include
-inch from the point established.2 1than
Install markers so that the center of the cap is not more
Station and distances based on Right-of-Way centerline.
to the requirements of the state code.
Set monuments using a professional land surveyor according
3.
2.
1.
4.
D.18
STATE PROJECT
NUMBER
SHEET
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d m t-a fr .d g n
MT FLATHEAD 543(1)
S e p te m b e r
C h e c k e d b y
D e s ig n e d b y
12" 12" timber lathe) post (1" X 2" untreated
Right-of-way witness m a x m a x timber lathe) post (1" X 2" untreated
Right-of-way witness
4'-0"
Drain knockout
B a s e
ClampClamp
Walls
4"
8" Wire typical of all sides
4" Poly-Loks 5" Wire
23"
12"
" Inserts (typ.)8
UTILITY BOX DETAIL
Closed or open lid
D.19
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a fs .d g n
MT FLATHEAD 543(1)
O c to b e r
C h e c k e d b y
D e s ig n e d b
LINE 'A'
AT STATION 203+50
DITCH EXCAVATION
Match existing stream channel
Match existing stream channel
P12
P13
R=20'
Ditch excavation
P10
P11
P14
P15
R=20'
R=20'
R=14'
P16
P17
P18
P19
P20
P21
P22
P23
P24
P25
R=18'
R=20'
R=33'
R=22'
R=22.5'
R=20'
Ditch excavation
Utility trench (type 2)
D.20
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a ft .d g n
MT FLATHEAD 543(1)
S e p te m b e r
C h e c k e d b y
D e s ig n e d b y
Line 'A'
Line 'APP6'
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 3/2010
REVISED:
W619-61
1'-4" No. 2 electrically from 4' to 20' in 2' increments)
16' gate opening (Also available in widths
2" dia. galvanized or
" dia. x 10" bolt hooks8
NOTE:
NO SCALE
bars and weld solid
Miter all cross
U-Channel vertical members painted steel tube (typ.)
securely stapled to post welded twist link chain
GATE
Furnish an approved commerical product. Galvanize all metal parts.
Alternate gates may be used when approved by the CO.
an approved drop bar and fastener between the gates.
Where a single opening requires two gates, provide
3.
2.
1.
GATE DETAIL
NUMBER
SHEET
STATE
D.21
PROJECT
FLATHEAD 543 (1)
U.S. CUSTOMARY DETAIL
DETAIL
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
o v e m b e r
U m y fi le s p w p r o d u c ti o n d m t-a fu .d g n
T
E M
W V
W V
W V
W V
W V
C
M P
P C
.1
P T
.2
P O
T
.7
P O
T
.0
U .B
U .B
U .B
,4
.6
-4.0000% -0.4631%
,5
.1
,4
.1
P O
T
.0
P O
T
.3
U.B.
D
L= 60.03'
T= 30.16'
R= 250.00'
Curve= PVAPONEC1001 method 2
Roadway obliteration, 11+00 12+00
Profile grade
Existing ground
N
Slope stake limits
Profile grade
Existing ground
11+00 12+00 13+00 14+00
92+71.64 LINE 'A' =
10+00.00 LINE 'APP1'
78+32.62 LINE 'A' =
Line 'APP1' to be constructed Line 'APP2' to be constructed
10+00.00 LINE 'APP2'
Line 'A'
Line 'A'
CUYD
EXC.
CUYD
EMB.
10+00 10+00
3475 3510
3480 3515
3485 3520
3490 3525
3495 3530
3500 3535
3505 3540
3510 3545
3515 3550
R
' R
25' R see Sheet E.7
Path/Overlook 91+50, RT Line 'A', LINE 'APP1' LINE 'APP2'
Utility trench (type 1)
Utility trench (type 1)
Utility trench (type 2)
Utility trench (type 2)
E.1
STATE PROJECT
NUMBER
SHEET
o v e m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a g a .d g
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
NOTE:
See Sheet D.2 for Utility Trench Table.1.
see Sheet E.7
Turnout 91+50, RT Line 'A', see Sheet E.8
Turnout 91+50, LT Line 'A', Clearing limits
Clearing limits
Clearing limits
Clearing limits
,5
.1
-1.0326% -1.5338%
,5
.1
,5
.3
-0.7257%
,5
.5
O
T
.3
P O
T
.0
R=25'
Clearing limits
11+00 12+00
N
125+98.48 LINE 'A' =
Slope stake limits
Existing ground
Profile grade
10+00.00 LINE 'APP3'
Line 'APP3' to be constructed
Line 'A'
' R
Utility trench (type 2)
Utility trench (type 1)
Utility trench (type 1)
CUYD
EXC.
CUYD
EMB.
10+00
E.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a g b .d g n
MT FLATHEAD 543(1)
o v e m b e r
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
LINE 'APP3'
NOTE:
See Sheet D.2 for Utility Trench Table.1.
,5
.4
,5
.6
-2.8300%
+2.47 94%
100' VC
,5
.8
'X
C
1,524
2,763
N
500+82.51 LINE 'B' =
Line 'A'
Line 'B' method 2 obliteration, stake limits
Slope
Profile grade
Existing ground
Line 'APP4' to be construced
14+85.34 LINE 'APP4'
R
' R
P C
.4
P T
.7
P O
T
.7
P T
.9
P C
.1
P T
.4
P C
.5
Existing ground
Profile grade
CUYD
EXC.
CUYD
EMB.
22+5020+0017+5015+0012+5010+00
3505 3480
3510 3485
3515 3490
3520 3495
3525 3500
3530 3505
3535 3510
3540 3515
3545 3520
LINE 'APP4'
Utility trench (type 1)
Curve= PVAPFOURC1003
D
R= 300.00'
T= 65.64'
L= 129.25'
Curve= PVAPFOURC1002 D
R= 100.00'
T= 25.98'
L= 50.84'
L= 66.90'
D
T= 33.46'
R= 1,000.00'
Curve= PVAPFOURC1001
Install gate be constructed by others
Stream restoration to
E.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a g c .d g n
MT FLATHEAD 543(1)
o v e m b e r
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
NOTE:
See Sheet D.2 for Utility Trench Table.1.
,5
.7
-1 .0
,5
.2
,4
.4
-1 .0
+4.2
3%
400' VC
,5
.6
+0.0351%
125' VC
,5
.7
+3.2
165' VC
,5
.6 reset sign
Remove and
Removal of gate reset sign
Remove and
Clearing limits
Clearing limits
147+15.33 LINE 'A' =
10+00.00 LINE 'APP4'
stake limits
Slope stake limits
Slope
,5
.3
-4.0000%
+3.0
,5
.8
,5
.9
.0
,5
.2
+0.6336%
190' VC
,5
.8
P T
.6
P C
.9
P O
T
.0
P O
T
.6
U .B
U .B
11+00 12+00 13+00 14+00 15+00 obliteration, method 2
184+71.13 LINE 'A' =
Line 'A'
Profile grade
Existing ground
N
Line 'APP5' to be constructed
10+00.00 LINE 'APP5'
CUYD
EXC.
CUYD
EMB.
10+00
3520 3520
3525 3525
3530 3530
3535 3535
3540 3540
3545 3545
3550 3550
3555 3555
3560 3560
R
50' R Curve= PVAPFIVEC1001
D
R= 450.00'
T= 148.39'
L= 286.67'
LINE 'APP5'
Utility trench (type 2)
Utility trench (type 1)
Utility trench (type 1)
E.4
STATE PROJECT
NUMBER
SHEET
o v e m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a g d .d g
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
NOTE:
See Sheet D.2 for Utility Trench Table.1.
,5
.6
-4.0000%
-2.8032%
,5
.1
,5
.6
125' VC 1
,5
.0
-0.5087%
50' VC
,5
.7
-1.1538%
+0.5061%
100' VC
P O
T
.0
P C
.8
P T
.2
P C
.6
P T
.2
P C
.8
U.B.
12+00 13+00 14+00 16+00 17+00 18+00
N
205+00 LINE 'A' =
10+00 LINE 'APP 6'
11+00
Profile grade
Existing ground
S e e S h e e t
G .1
I n s ta ll i n c h c u lv e r t
Line 'APP6' to be constructed
CUYD
EXC.
CUYD
EMB.
15+00 10+00
3500 3500
3505 3505
3510 3510
3515 3515
3520 3520
3525 3525
3530 3530
3535 3535
3540 3540
' R
' R
Curve= PVAPSIXC1001 D
R= 500.00' T= 170.91' L= 329.36'
Curve= PVAPSIXC1002
D
R= 400.00'
T= 77.75'
L= 153.59'
Curve= PVAPSIXC1003
D
R= 400.00'
T= 68.73'
L= 136.14'
(Sheet 1 of 2)
LINE 'APP6'
Utility trench (type 2)
Utility trench (type 1)
2,841
Ditch excavation
Roadway obliteration, method 2
Ditch excavation
E.5
STATE PROJECT
NUMBER
SHEET
O c to b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a g e .d g
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
NOTE:
See Sheet D.2 for Utility Trench Table.1.
Roadway obliteration, method 2
,5
.0
-1.5544%75' VC
,5
.0
-0.6667%
50' VC
,5
.0
-2.0874%
50' VC
,5
.9
P C
.5
P T
.7
P T
.9
P O
T
.9
5U.B.
U.B.
20+00 21+00 22+00 24+00 25+00 26+00
N
19+00
Profile grade
Existing ground
S e e S h e e t
G .1
I n s ta ll i n c h c u lv e r t
Line 'APP6' to be constructed
CUYD
EXC.
CUYD
EMB.
23+00
18+00
3500 3500
3505 3505
3510 3510
3515 3515
3520 3520
3525 3525
3530 3530
3535 3535
3540 3540
' R
R
Curve= PVAPSIXC1004
D
R= 300.00'
T= 87.44'
L= 170.17'
(Sheet 2 of 2)
LINE 'APP6'
Utility trench (type 1)
3,899
Refuge Headquarters
E.6
STATE PROJECT
NUMBER
SHEET
o v e m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a g f.
d g
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
NOTE:
See Sheet D.2 for Utility Trench Table.1.
Clearing limitsMONTANA KEY MAP
COLUMBIA
BRITISH
ALBERTA
SASKATCHEWAN
N O
R T
H D
A K
O T
A
S O
U T
H D
A K
O T
A
WYOMING
ID
A
H O
UNITED STATES
CANADA
GLACIER
NATIONAL
PARK
YELLOWSTONE
NATIONAL
PARK
CHARLES M. RUSSELL
NATIONAL
WILDLIFE RANGE
Lake
Flathead
Elwell
Lake
M
Lake
Fort Peck
I SOS U IR
KALISPELL
MISSOULA
Anaconda
HELENA
BUTTE
BOZEMAN
Livingston
BILLINGS
City
Miles
Glendive
Point
Wolf Glasgow
HAVRE
Shelby
FALLS
GREAT
Lewistown
Dillon
E N
O T
S
WOLLEY
R E
VIR
90 15
2 2
MONTANA
REVIR
Project Location
Stockpile location: 44° 39' 2.1" N 111° 38' 56" W
Removal of Structure (Lost Trail NWR #61545-63008)
NOTE:
See Sheet C.3 for turnout Typical Section.1.
TURNOUT DETAILS
2.Final fixture location to be approved by CO.
E.7
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a g g .d g n
MT FLATHEAD 543(1)
o v e m b e r
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
Line 'A'
P10
10' R
10' R P11
P12
P13
P14
P15
P16
P17
80' R
P18
P19
40' R
P20
P22
P25
P21
P23
P24
Path/Overlook - See Typical Sheet C.2
(4' x 3' Interpretive Panel Foundation)
Fixture, Wayside Exhibit
(5' x 3' Interpretive Panel Foundation)
Fixture, Wayside Exhibit
(4' x 3' Interpretive Panel Foundation)
Fixture, Wayside Exhibit
(Log, Government Furnished)
Fixture, Bench
(Log, Government Furnished)
Fixture, Bench
5'
Clearing limits
'50'
See Sheet C.3 for turnout Typical Section.
TURNOUT DETAILS
1.
E.8
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a g h .d g n
MT FLATHEAD 543(1)
O c to b e r
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
P10
Line 'A'
P11 P12
60' R
40' R
P13
P14
P15
60' R
P16 40' R
Clearing limits
N
1 9
TURNOUT DETAILS
NOTE:
See Sheet C.3 for turnout Typical Section.1.
2.Final fixture location to be approved by CO.
E.9
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a g i.
d g n
MT FLATHEAD 543(1)
O c to b e r
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
Government Furnished)
Fixture, Bench (Log, 60' R
P11 P10
P12
P13
40' R
40' R
P14
60' R
P15
TURNOUT DETAILS
1.
Line 'B'
P10
10' R
10' R P11
P12 P13
P14
P15
E.10
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a g j.
d g n
MT FLATHEAD 543(1)
O c to b e r
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
TURNOUT DETAILS
1.
Line 'B'
P10
P11
P12
60' R
40' R 40' R
P13 P14
P15
60' R
Line 'B'
P15
60' R
60' R P14P13
40' R40' R
P12 P11
P10
E.11
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a g k .d g n
MT FLATHEAD 543(1)
O c to b e r
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
TURNOUT DETAILS
NOTE:
See Sheet C.3 for turnout Typical Section.1.
2.Final fixture location to be approved by CO.
E.12
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a g l.
d g n
MT FLATHEAD 543(1)
O c to b e r
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
Line 'B'
P10
60' R
P11
P12 P13
P14
60' R
P15
40' R 40' R
P10
60' R
P11
P12
40' R
40' R
Line 'B'
P14
60' R P15
P13
(4' x 3' Interpretive Panel Foundation)
Fixture, Wayside Exhibit
(5' x 3' Interpretive Panel Foundation)
Fixture, Wayside Exhibit
(4' x 3' Interpretive Panel Foundation)
Fixture, Wayside Exhibit
TURNOUT DETAILS
1.
Line 'B'
P10
10' R
P11
P12
P13
P14
10' R
P15
E.13
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a g m .d g n
MT FLATHEAD 543(1)
O c to b e r
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b y
EROSION CONTROL
TABULATION OF
F.1
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a d a .d g n
MT FLATHEAD 543(1)
S e p te m b e r
J o r g e n s
M a d
C h e c k e d b y
D e s ig n e d b
ATTENTION
L O
S T T
R A I L
N A
T I O
N A
L W
I L
D L I F E R
E F
U G
E
R E F
U G
E O
F F I C
E
S P
E E
D L I
M I T
M
P H
3485 3485
34903490
3490349034903490
349034903490
34903490
3490 3490
3490 3490 3490
3490 3490 3490 3490 3490 3490 3490 3490
3485 3485
34903490
3490 3490 3490 3490 3490
34903490
34903490
LINE 'A'
45+60 to 72+24.73
EROSION CONTROL
F.2
STATE PROJECT
NUMBER
SHEET
o v e m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a d b .d g
C h e c k e d b y
D e s ig n e d b y
SCALE IN FEET
100 0 100 200
LEGEND:
BEGIN PROJECT
EL = 3,490.55
E = 636634.40
N = 1478476.90
45+60.00 Line 'A'
MT FLATHEAD 543(1)
N
N
Line 'A'
Line 'A'
Toe of Fill
Top of Cut
Slope Stake Limits
Direction of River/Stream Flow
Surface Flow Direction
Fiber Roll
Ditch Excavation
Ditch Excavation
3505 3
35153515
3530 3530
03490
LINE A
70+00 TO 95+00
EROSION CONTROL
F.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a d c .d g n
MT FLATHEAD 543(1)
o v e m b e r
C h e c k e d b y
D e s ig n e d b y
Slope stake limits
Slope stake limits
Line 'APP2'
Line 'A'
Line 'APP1'
N
BEGIN CONSTRUCTION
72+00.00 LINE 'A'
10+00.00 Line 'APP1'
78+32.62 Line 'A' =
92+71.64 Line 'A' =
10+00.00 Line 'APP2'
SCALE IN FEET
50 0 50 100
35303530
35303530
3535 35
3515 3
35203520
F.4
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a d d…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .