MT_Flathead_543(1) _Prelim_Letter.pdf

PDF 22 KB Posted

Attached to
MT Flathead 543(1), Pleasant Valley Road Federal contract opportunity
Solicitation number
DTFH70-15-B-00010
Issued by
Department of Transportation Federal Highway Administration

About this file

Preliminary Letter

View the file

Other files for this federal contract opportunity

Other files attached to MT Flathead 543(1), Pleasant Valley Road, newest first.
File Type Posted
Bid_Opening_Summary_Pleasant_Valley.pdf PDF
A003_MT_FLATHEAD_543(1).pdf PDF
Q A_2_12_16.pdf PDF
Pleasant_Valley_Road_Silt_Memo_11-18-15.pdf PDF
A002_PleasantValley.pdf PDF
Q A_2_10_16.pdf PDF
Q A_2_4_16.pdf PDF
Q A_2_1_16.pdf PDF
Q A_1_29_16.pdf PDF
A001_MT_Flathead_543(1) _MT_Pleasant_Valley_Road_Relocation.pdf PDF
PV_Plans_100_.pdf PDF
PV_XS.pdf PDF
IFB_PleasantValley.pdf PDF
Pleasant_Valley_Earthwork.pdf PDF
2015_pleasant_valley_rd_Test_Pit_data_with_Notes.pdf_-_Adobe_Acrobat_Pro.pdf PDF
SWPPP.pdf PDF
Plan_Request_form_PleasantValley.pdf PDF
Lost_Trail_Existing_Bridge_Information.pdf PDF
Stage_2_Fire_Restrictions.pdf PDF
MT_Flathead_543(1) _Preliminary_Plans.pdf PDF
MT_Flathead_543(1) _Project_Description.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Western Federal Lands Highway Division 610 E. Fifth Street

Vancouver, WA 98661 Phone 360-619-7700

Fax 360-619-7846

NOTICE TO PROSPECTIVE BIDDERS

RE: MT Flathead 543(1) Pleasant Valley Road Solicitation No. DTFH70-15-B-00010

The attached preliminary plans are being furnished to aid prospective Bidders in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Bidders are encouraged to view the project during fall as conditions permit. After mid-October, access will be weather dependent; contact the Fish and Wildlife Service, Lost Trail Refuge Manager Kevin Shinn at Kevin_Shinn@fws.gov for current road conditions. No Federal Highway Administration personnel will be available for show-me tours.

The work will be solicited under one contract.

Project Location and Type of Work - All project work is located in the Lost Trail National Wildlife Refuge near Marion Montana.

• The project includes installation of three large fish passage culverts, construction of approximately 4 miles of new gravel road on new alignment, utility trench with conduit, cross drainage, roadway obliteration, minor stream re-establishment, wayside exhibits, and 3 miles of gravel road re-surfacing.

Technical Questions – All technical questions must be submitted by email plans_spec@dot.gov (plans_spec@dot.gov) or FAX 360-619-7932

General Questions - Contact our office at wfl.contracts@dot.gov or at 360-619-7520.

Solicitation documents - Documents will be available during the winter of 2015/2016. Please monitor the FedBizOpps (FBO) site for actual date of solicitation release (www.fbo.gov). To receive automatic notification through FBO, select the “Watch this opportunity” feature and follow the steps as indicated.

Thank you for your interest in this project.

September 1, 2015 mailto:Kevin_Shinn@fws.gov mailto:plans_spec@dot.gov mailto:wfl.contracts@dot.gov http://www.fbo.gov/

RE: MT Flathead 543(1)

File details come from the government source that posted it. Updated .