MT_Flathead_543(1) _Prelim_Letter.pdf
PDF 22 KB Posted
- Attached to
- MT Flathead 543(1), Pleasant Valley Road Federal contract opportunity
- Solicitation number
- DTFH70-15-B-00010
About this file
Preliminary Letter
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_Pleasant_Valley.pdf | ||
| A003_MT_FLATHEAD_543(1).pdf | ||
| Q A_2_12_16.pdf | ||
| Pleasant_Valley_Road_Silt_Memo_11-18-15.pdf | ||
| A002_PleasantValley.pdf | ||
| Q A_2_10_16.pdf | ||
| Q A_2_4_16.pdf | ||
| Q A_2_1_16.pdf | ||
| Q A_1_29_16.pdf | ||
| A001_MT_Flathead_543(1) _MT_Pleasant_Valley_Road_Relocation.pdf | ||
| PV_Plans_100_.pdf | ||
| PV_XS.pdf | ||
| IFB_PleasantValley.pdf | ||
| Pleasant_Valley_Earthwork.pdf | ||
| 2015_pleasant_valley_rd_Test_Pit_data_with_Notes.pdf_-_Adobe_Acrobat_Pro.pdf | ||
| SWPPP.pdf | ||
| Plan_Request_form_PleasantValley.pdf | ||
| Lost_Trail_Existing_Bridge_Information.pdf | ||
| Stage_2_Fire_Restrictions.pdf | ||
| MT_Flathead_543(1) _Preliminary_Plans.pdf | ||
| MT_Flathead_543(1) _Project_Description.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Western Federal Lands Highway Division 610 E. Fifth Street
Vancouver, WA 98661 Phone 360-619-7700
Fax 360-619-7846
NOTICE TO PROSPECTIVE BIDDERS
RE: MT Flathead 543(1) Pleasant Valley Road Solicitation No. DTFH70-15-B-00010
The attached preliminary plans are being furnished to aid prospective Bidders in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Bidders are encouraged to view the project during fall as conditions permit. After mid-October, access will be weather dependent; contact the Fish and Wildlife Service, Lost Trail Refuge Manager Kevin Shinn at Kevin_Shinn@fws.gov for current road conditions. No Federal Highway Administration personnel will be available for show-me tours.
The work will be solicited under one contract.
Project Location and Type of Work - All project work is located in the Lost Trail National Wildlife Refuge near Marion Montana.
• The project includes installation of three large fish passage culverts, construction of approximately 4 miles of new gravel road on new alignment, utility trench with conduit, cross drainage, roadway obliteration, minor stream re-establishment, wayside exhibits, and 3 miles of gravel road re-surfacing.
Technical Questions – All technical questions must be submitted by email plans_spec@dot.gov (plans_spec@dot.gov) or FAX 360-619-7932
General Questions - Contact our office at wfl.contracts@dot.gov or at 360-619-7520.
Solicitation documents - Documents will be available during the winter of 2015/2016. Please monitor the FedBizOpps (FBO) site for actual date of solicitation release (www.fbo.gov). To receive automatic notification through FBO, select the “Watch this opportunity” feature and follow the steps as indicated.
Thank you for your interest in this project.
September 1, 2015 mailto:Kevin_Shinn@fws.gov mailto:plans_spec@dot.gov mailto:wfl.contracts@dot.gov http://www.fbo.gov/
RE: MT Flathead 543(1)