MT PFH 101(1), West Fork Rock Creek Road Reconstruction, Carbon County, MT
This 2.8 mile project includes widening the road, constructing the roadway base, building walls, replacing culverts, and paving new roadway surface.
The work will be solicited under two alternate schedules:
• Schedule A consists of all work with base aggregate materials consisting of all virgin crushed aggregate.
• Schedule B consists of all work with base aggregate materials consisting of a layer of virgin crushed aggregate and a layer of recycled existing asphalt.
Project length: 2.8 Miles
Tentative Fixed Completion Date: Fall 2016 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $5 million to $6 million
Location: Approximately 1.3 miles South of Red Lodge, MT
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-03
Sc he du le
A
Sc he du
B
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes Yes 154 Contractor Sampling & Testing (yes/no) Yes Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes 157 Soil Erosion Control Devices (erosion control devices) 17,000 LNFT 17,000 LNFT 158 Watering for Dust Control 2000 MGAL 2000 MGAL
DIVISION 200 – Earthwork 201 Clearing & Grubbing 10.5 ACRE 10.5 ACRE 202 Additional Clearing & Grubbing (clearing & grubbing) du
Sc he du
203 Removal of Structures & Obstructions (structures, demolition) 204 Excavation & Embankment 20,200 CUYD 20,200 CUYD 205 Rock Blasting: Controlled Blast Hole (rock blasting) 205 Blasting Consultant (Consultant/Engineering Services) (yes/no) Select Select 207 Earthwork Geotextiles (geotextiles) 4,500 SQYD 4,500 SQYD DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap 60 CUYD 60 CUYD 257 Alternate Retaining Walls (retaining walls) 4,500 SQFT 4,500 SQFT
DIVISION 300 – Aggregate Courses 301 Untreated Aggregate Courses (crushed aggregate) 34,300 TON 21,270 TON
310 Recycled Aggregate Course (asphalt pavement recycling) 6,700
DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Superpave Hot Asphalt Concrete Pavement 11,348 TON 11,348 TON
412 Asphalt Tack Coat (asphalt surface treatment) 23 TON 23 TON 413 Asphalt Pavement Milling
DIVISION 600 – Incidental Construction 601 Minor Concrete Structures (concrete – minor structures) 602 Culverts & Drains (indicate one or both) 800 LNFT culverts
800 LNFT culverts
617 Guardrail 650 LNFT 650 LNFT 621 Monuments & Markers (construction survey & staking) (yes/no) No No 622 Rental Equipment (yes/no) Yes Yes 624 Topsoil (landscaping & related items) 625 Turf Establishment (indicate seeding or mulching separately)
4 ACRE Seeding 4 ACRE Mulching
4 ACRE Seeding 4 ACRE Mulching
626 Plants, Trees, Shrubs, Vines & Groundcovers du
Sc he du
629 Rolled Erosion Control Products & Cellular Confinement Systems (turf establishment) 633 Permanent Traffic Control Devices (traffic control devices) 634 Permanent Pavement Markings (traffic pavement markings) 635 Temporary Traffic Control – Flagger 3,200 hrs 3,200 hrs 635 Temporary Traffic Control – Pilot Car 1,000 hrs 1,000 hrs