AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A003 10/02/2013 N/A AK PRA DENA 10(34)
Eagle’s Nest Corner at MP 67.5
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
DTFH70-13-B-00010
9B. DATED (SEE ITEM 11)
08/01/2013
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AK PRA DENA 10(34), Eagle’s Nest Corner at MP 67.5
See page 2 for revisions.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A003, dated October 2, 2013 AK PRA DENA 10(34) Solicitation No. DTFH70-13-B-00010 Eagle’s Nest Corner at MP 67.5
REVISIONS ARE AS FOLLOWS:
BID SCHEDULE
Page A-8 Revises quantity of Item 15705-1500 Soil Erosion Control, Sediment Wattle, Government Furnished
Page A-9. Deletes Item 31102-0000 Stockpiled Aggregate (Reclaimed Asphalt Pavement)
SPECIAL CONTRACT REQUIREMENTS
Page Section/Table Revision E-6 105.02(a) Material Sources Deletes Mile 5 Pit E-7 105.02(a)(1) Material Sources Deletes (j) and (k) E-20 108.01 Commencement, Prosecution, and
Completion of Work Deletes (f).
E-39 Table 153-2 Deletes item F-19-21 311 Stockpiled Aggregate Revises Section – deletes RAP F-24 637.03(b) Vehicles Revises (b) G-3 703.19 Recycled Asphalt Pavement Deletes Subsection
PLANS
Plan sheet #A.4a Deletes Vicinity Map Plan sheet #B.1 Deletes Bid Item 31102-0000 Stockpiled Aggregate (Reclaimed
Asphalt Pavement) Plan sheet #B.1 Revises quantity for Bid Item 15705-1500 Soil Erosion Control, Sediment Wattle , Government Furnished Plan sheet #F.1 Deletes Mile 5 Pit Quantity Table
ENCLOSURES
Pages: A-7 through A-11 E-6 through E-7 E-20 E-39 F-19 through F-21 F-24 G-3
Plan Sheets:
A.4a B.1 F.1
Notice to Bidders: Please submit revised pages A-7 through A-11 with your bid.
A - 7
Bidders please note: Before preparing the bid, carefully read the Solicitation Provisions.
Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit bid price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the Amount Bid for the item will be based on the Unit Bid Price.
When a "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.
When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.
Total the amounts bid for all pay items and insert the total bid amount.
Bid Schedule
Project No:AK PRA DENA 10(34)
Project Name:Eagle's Nest Corner at MP 67.5
A - 8
Contract Quantity Pay Items
20103-0000 CLEARING AND GRUBBING
20401-0000 ROADWAY EXCAVATION
20403-0000 UNCLASSIFIED BORROW
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A001, A003 A0010 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0030 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A0050 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
ALL LPSM $___LPSM_____ $____________
A0070 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0090 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A0110 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
ALL LPSM $___LPSM_____ $____________
A001, A003 A0130 15705-1500 SOIL EROSION CONTROL, SEDIMENT WATTLE , GOVERNMENT FURNISHED
920 LNFT $____________ $____________
A0150 15801-0000 WATERING FOR DUST CONTROL
104 MGAL $____________ $____________
A0170 20103-0000 CLEARING AND GRUBBING
600 SQYD $____________ $____________
A0190 20301-1900 REMOVAL OF PIPE CULVERT
2 EACH $____________ $____________
A0210 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS , CRIB WALL
ALL LPSM $___LPSM_____ $____________
A002 A0230 20401-0000 ROADWAY EXCAVATION
360 CUYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 9
A002 A0250 20403-0000 UNCLASSIFIED BORROW
140 CUYD $____________ $____________
A0270 20701-1000 EARTHWORK GEOTEXTILE, TYPE III-A
118 SQYD $____________ $____________
A0290 20701-1200 EARTHWORK GEOTEXTILE, TYPE IV-A
107 SQYD $____________ $____________
A0310 25101-2000 PLACED RIPRAP, CLASS 2
20 CUYD $____________ $____________
A0330 25101-4000 PLACED RIPRAP, CLASS 4
45 CUYD $____________ $____________
A0350 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED
127 CUYD $____________ $____________
A0370 25501-0000 MECHANICALLY STABILIZED EARTH WALL
1,238 SQFT $____________ $____________
A0390 30419-0000 BENTONITE
451 TON $____________ $____________
A0410 30801-1000 ROADWAY AGGREGATE, METHOD 1 , GOVERNMENT FURNISHED
223 CUYD $____________ $____________
A001, A003 A0420 31102-0000 STOCKPILED AGGREGATE (RECLAIMED ASPHALT PAVEMENT)
0.0 CUYD $____________ $____________
A0430 31102-0000 STOCKPILED AGGREGATE (SELECT BORROW)
6,500 CUYD $____________ $____________
A0450 31102-0000 STOCKPILED AGGREGATE (AGGREGATE SURFACING)
15,250 CUYD $____________ $____________
A0470 60201-1100 42-INCH PIPE CULVERT
120 LNFT $____________ $____________
A0490 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
40 HOUR $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 10
A0510 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY
40 HOUR $____________ $____________
A0530 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
20 HOUR $____________ $____________
A0550 62201-3200 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.5 CUBIC YARD MINIMUM
CAPACITY
20 HOUR $____________ $____________
A0570 62301-0000 GENERAL LABOR
150 HOUR $____________ $____________
A0590 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
4 EACH $____________ $____________
A0610 63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 42-INCH
100 EACH $____________ $____________
A0630 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
4 EACH $____________ $____________
A0650 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
220 LNFT $____________ $____________
A0670 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
130.36 SQFT $____________ $____________
A0690 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER
1,000 FXHR $73.00 $73,000.00
A0710 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
A0730 63703-0000 RESIDENTIAL HOUSING
2 EACH $____________ $____________
A0750 63704-0000 VEHICLE
2 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 11
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
E-6
Special Contract Requirements Project: AK PRA DENA 10(34), Eagle’s Nest Corner at MP 67.5
Section 105. — CONTROL OF MATERIAL
105.02 Material Sources. Amend as follows:
Add the following to the third paragraph:
(a) Government-provided sources. Do not perform aggregate source quality tests listed in the Sampling and Testing Requirements Table of other Sections when using Government-provided sources. Sufficient quantities are available within the Government-provided mandatory source, Toklat Pit.
(1) Government-provided mandatory sources.
(a) Obtain material for use as backfill, select borrow, select topping, topping, unclassified borrow, bedding, foundation fill, and structural backfill under Section 204, Section 208, and Section 209 from existing stockpiles in Toklat pit. Use stockpiles as directed by CO.
Approximate Global Positioning System (GPS) coordinates for the source are N 63.528998 W 150.048787.
(b) Obtain material for use as riprap under Section 251 from existing stockpiles in Toklat pit.
Use stockpiles as directed by CO. Sorting and screening may be required. Approximate Global Positioning System (GPS) coordinates for the source are N 63.528998 W 150.048787.
(c) Obtain material for use as special rock embankment under Section 252 from existing stockpiles in Toklat pit. Use stockpiles as directed by CO. Gradation requirements do not apply. Approximate Global Positioning System (GPS) coordinates for the source are N
63.528998 W 150.048787.
(d) Obtain material for use as select granular backfill and granular backfill under Sections 209 and 255 from stockpiles located at the Toklat Pit. Use stockpiles as directed by CO. Do not use material containing bentonite for select granular backfill. Gradation requirements do not apply. Approximate Global Positioning System (GPS) coordinates for the source are N
63.528998 W 150.048787.
(e) Obtain material for use as crushed aggregate under Section 308 from stockpiles located at the Toklat Pit. Use stockpiles as directed by CO. Approximate Global Positioning System (GPS) coordinates for the source are N 63.528998 W 150.048787.
(f) Obtain raw material (scrape) for use in processing select borrow and aggregate surfacing under Section 311 from stockpiles located at the Toklat Pit. Do not screen off raw material.
Use stockpiles as directed by CO. Approximate Global Positioning System (GPS) coordinates for the source are N 63.528998 W 150.048787.
(g) The following applies to activities performed at Toklat Pit and Toklat Road Camp (MP 53.38).
(1) National Park Service (NPS) will provide a material stockpile to be used for processing aggregate surface course and select borrow under Section 311. NPS operations to provide materials will be ongoing during the spring and summer of 2014 and may impact operations at Toklat Pit. All Government provided raw materials will be available by July 20, 2014. Place all reject material from the aggregate surface course and select borrow processing operations at Toklat Pit at areas within the pit, as shown on the plans and as directed by the CO.
Revised by Amendment A001
Revised by Amendment A003
E-7
(2) There is no charge for raw materials obtained from the Toklat Pit.
(3) Do not operate any equipment at Toklat Pit between 7:00 p.m. and 7:00 a.m.
Equipment maintenance is permitted during this time as long as the equipment engines are not started. The sole exception to this prohibition is that the contractor may load material using a wheel-loader and haul material from the pit in trucks during this shut-down period.
(4) Contractor housing is allowed at Toklat Road Camp according to Subsection 107.13.
(5) See Section 637 for Contractor provided housing and field office for Government staff at Toklat Road Camp.
(h) The following applies for unsuitable or excess material disposal sites.
Haul and place unsuitable or excess suitable material from roadway excavation operations at either of the following sites as directed by the CO and according to Section 108 and Section 156.
(1) Toklat Pit, approximate GPS coordinates for the site is N 63.528998 W 150.048787.
(2) 70 Mile Pit, approximate GPS coordinates for the site is N 63.425838 W 150.429306.
(i) Store clearing and grubbing debris at Toklat. Place and shape clearing and grubbing material on top of previously shaped unsuitable material under Sections 622 and 623 as directed by the CO.
E-20
03USC04/01/13
Section 108. — PROSECUTION AND PROGRESS
108.01 Commencement, Prosecution, and Completion of Work. Add the following:
Furnish at least 48 hours advance notice before changing the current work schedule. Work schedule changes that include additional shifts require 14 days notice.
Perform work under this contract according to the following.
(a) Do not perform construction operations between 6:00 p.m. Friday and 6:00 a.m. the Tuesday of the Memorial Day and Labor Day weekends.
(b) Do not perform construction operations between 6:00 p.m. Thursday and 6:00 a.m. the Tuesday of the Independence Day weekend.
(c) Do not perform construction operations along the Denali Park Road between 6:00 a.m. on Friday, September 12, 2014 and 11:00 p.m. on Monday, September 15, 2014.
(d) Limit material processing and equipment operation at Toklat Pit according to Subsection 105.02.
(e) Pickups and light duty vehicles may access Toklat pit, Toklat Camp and Eagle’s Nest Corner at MP 67.5 beginning approximately May 15, 2014, depending on weather and road conditions. Transport of heavy equipment to the project site is restricted according to Subsection 104.05.
(f)
(g) Beginning at Toklat Pit, Eastbound and Westbound oversized vehicles traveling between Toklat Pit and the project site are restricted along the Denali Park Road to the hours of 9:00 p.m. to 7:00 a.m. through September 12, 2014. In addition, Eastbound oversize vehicles exiting the park must be east of the Teklanika gate (MP 30) by 6:00 a.m. through September 12, 2014. Westbound oversize vehicles must be West of the Teklanika Gate (MP 30) by 7:00 a.m. through September 12, 2014. Westbound oversize vehicles may not travel West of the Teklanika gate before 10:00 p.m. through September 12, 2014. Oversized vehicles are not allowed beyond Savage Check Station (MP 15) until 9:30 p.m. Refer to Subsection 101.04 for the definition of an oversize vehicle.
(h) Limit work as provided for in Sections 105, 107, and 156.
108.01A Labor. (Added Subsection).
Follow the requirements of FAR Clause 52.222-6 Davis Bacon Act.
E-39
Producing aggregate surface course
Plasticity Index, Gradation
Visual inspection and verification measurement
Section 703 Daily Processing Operation
24 hrs
Producing select borrow
Gradation Visual inspection and verification measurement
Section 704 “ “ “
Mixing bentonite Percent bentonite Visual inspection and verification measurement
+/-0.5 percent by mass Subsection 703.05
Bentonite Mineral grain size, mixing capability
Production Certification
Subsection 725.23 “ “ “
Section 602 Culverts and Drains
General Contiguous materials, location, length, Section 209, excavation, backfill
Visual inspection and verification measurements of culvert staking and lift thickness
See Section 209 and 152
See Table 153-2 for quality control testing
Subsection 602.03 Daily Installation 24 hrs
Laying metal pipe Metal lap joint location, coupling bands
" Subsection 602.05 " " "
Laying slotted pipe Coupling bands, backfill
" Subsection 602.07 " " "
Section 605 Underdrains, Sheet Drains, and Pavement Edge Drains
General Contiguous materials, location, Section 209, excavation, backfill, geotextiles, outlet pipe
Visual inspection see Section 209 for quality control testing
Subsection 605.03 Daily Installation End of shift
Placing underdrain Granular backfill, coupling, collector pipes, geocomposite underdrain
Visual inspection Subsection 605.04 " " 24 hrs
Section 635 Temporary Traffic Control
Temporary traffic control
See Section 156.08 for temporary traffic control inspection and reporting requirements.
F-19
Section 311. — STOCKPILED AGGREGATE
(ADDED SECTION)
Description
311.01 This work consists of crushing material from a Government-provided material source and constructing stockpiles of the processed select borrow and aggregate surface course at designated sites prepared by the Contractor.
Material
311.02 Definitions.
(a) Waste. Unsuitable aggregate surface course and select borrow material.
311.03 Conform to the following Subsections:
Surface Course Aggregate 703.05 (a) and (d)
Select Borrow 704.07 Bentonite 725.23
Construction Requirements
311.04 Production. Produce aggregate surface course and RAP as specified under Section 703.
Produce select borrow as specified in Section 704.
After a representative quantity of aggregate is produced, determine the amount (percent by mass) of bentonite to be added to the crushed surface course aggregate to meet the plasticity index requirement in Subsection 703.05.
311.05 Mixing. Incorporate the amount of bentonite required to meet the plasticity index requirement in Subsection 703.05 into the surface course aggregate as follows:
Use a stationary pugmill with weighing or metering equipment capable of accurately controlling the material entering the mixer. Interlock the metering controls for the aggregate feed with those of the bentonite to ensure uniform introduction of material into the mixer. Maintain the accuracy of the amount of bentonite added to within +/-0.5 percent by mass of the target rate determined under Subsection 311.04.
311.06 Stockpiling. Prepare existing sites as necessary to accommodate the quantity of select borrow and aggregate surface course, to be stockpiled and provide a uniform cross-section that drains.
Obtain site approval before stockpiling aggregates or select borrow. Construct the stockpiles neat and regular in shape, with sideslopes no flatter than 1.5:1. Build the stockpiles in layers not to exceed 4 feet in thickness. Construct stockpile layers by spreading materials with trucks or other approved pneumatic-tired equipment. Complete each layer before beginning subsequent layers.
F-20
Do not push aggregates into piles. Do not dump the aggregate so any part of it runs down and over the lower layers in the stockpile. Do not drop aggregates from a bucket or spout in one location to form a cone-shaped pile.
Do not stockpile aggregate where traffic runs through the piles. When operating trucks on stockpiles, use plank runways, where required, to avoid tracking dirt or other foreign matter onto the stockpiled material.
Space stockpiles far enough apart or separate stockpiles by suitable walls or partitions to prevent the mixing of the different aggregate gradations.
311.07 Waste Material. Dispose of processing waste material according to Section 105 and as directed by the CO. Aggregate surface course waste material may be combined with select borrow waste material.
311.08 Acceptance. See Table 311-1 for sampling and testing requirements.
Aggregate will be evaluated under Subsections 106.02, 106.04, and Table 311-1.
Select borrow will be evaluated under Subsections 106.02, 106.04, and Table 311-1.
Bentonite will be evaluated under Subsection 106.03
Measurement
311.09. Measure the Section 311 items listed in the bid schedule according to Subsection 109.02 and this Subsection.
Measure stockpiled aggregate by the cubic yard in its final stockpiled position.
Measure stockpiled select borrow by the cubic yard in its final stockpiled position.
Measure bentonite by the ton.
Inform the CO one day prior to measurement of a stockpile.
Do not add to a stockpile that has been measured. Start subsequent stockpile(s) if needed.
Payment
311.09 The accepted quantities, measured as provided in Subsection 109.02 and above, will be paid at the contract price per unit of measurement for the Section 311 pay items listed in the bid schedule.
Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
F-21
Table 311-1 Sampling, Testing and Acceptance Requirements
Section 311 - Stockpiled Aggregates
Type of
Acceptance (Subsection)
Material or
Product
Characteristic
Category Test Methods /
Specifications Tolerance Sampling
Frequency Point of
Sampling Split
Sample
Reporting
Time Remarks
Measured and tested for conformance (Subsection 106.04)
Surface Course Aggregate
Gradation
Fractured faces
Liquid Limit
Plasticity Index
AASHTO T 11 and
AASHTO T 27
ASTM D 5821
AASHTO T
89, Method A
& T 87
AASHTO T 90
Subsections 703.05
1 for each 1000 tons or fraction thereof
Flowing aggregate stream (bin or belt) or conveyor belt
Yes when requested
End of shift
Measured and tested for conformance (Subsection 106.04)
Select Borrow
Gradation
Liquid Limit
AASHTO T27 &
AASHTO T 11
AASHTO T89,
Method A and T87
Subsection 704.07
1 per soil type but not less than 2 for each day of production
Flowing aggregate stream (bin or belt) or conveyor belt, Source of material
Yes, when requested
End of shift
F-24
Section 637. — FACILITIES AND SERVICES
Description
637.01 Add the following:
This work also includes furnishing vehicles for the exclusive use of Government personnel.
Construction Requirements
637.02 General. Delete the first sentence of the first paragraph and substitute the following:
Locate the facilities in the immediate area of the Toklat Pit at the location(s) designated by the CO. Provide the facilities and services beginning on the Notice to Proceed date and ending 14 days after final acceptance.
637.03 Facilities. Amend as follows:
Delete the first paragraph and substitute the following:
Furnish facilities that are ample, safe, sanitary, and include the appropriate electrical service, potable water supply, toilet accommodations, and waste disposal services. Conform to all applicable ordinances, safety codes, and regulations.
Delete paragraph (a) and (b) and substitute the following:
(a) Residential housing. Furnish and maintain two residential housing units according to Tables 637-1 and 637-2. Provide trailers in good, clean condition, free of damage or excessive wear. Provide residential housing furnishings of the size, character, and condition normally associated with newly built commercial travel trailers. Provide connection to the Park water, power, and sewage facilities.
(b) Vehicles. Provide two 2009 or newer ½ ton, 4x4 wheel drive, 2-door pickup trucks on the date of the Notice-To-Proceed is issued (see FAR Clause 52.211.10). Equip vehicles with a Citizen Band radio. Vehicles shall have no visible company logos. Maintain vehicles in such a manner to provide safety and reasonable comfort for the operator with all factory equipment in working order. Provide all fuels, maintenance, and collision and comprehensive insurance. Insurance is for Contractor protection. The government will be responsible for all government caused damage to the vehicle beyond normal wear and tear. The government will not indemnify the Contractor for government caused damage to third parties. Damage due to no fault of the government will be the responsibility of the contractor. Secure vehicle insurance according to Alaska state standards.
(c) Field office. Furnish and maintain one field office according to Tables 637-1 and 637-2.
G-3
Table 703 – 3B Surface Course Gradations
Sieve Size
Percent by Mass Passing
Designated Sieve
(AASHTO T 27 and T 11)
1 inch 100
3/4 inch 70-100
3/8 inch 50-85
No. 4 35-65
No. 8 20-50
No. 50 15-30
No. 200 8-15
Furnish a material that is free from organic matter and lumps or balls of clay. Do not use material that breaks up when alternately frozen and thawed or wetted and dried.
VICINITY MAP
SCALE IN MILES
0 1.0 2.00.50.5
N
Park
McKinley
Strip
Landing
Campground
Lake
Horseshoe
Park Headquarters
Denali National
Hines
C re e k
N E N
A N A
R I V E R
Lynx
C r e e k
King fishe r
C re e k
Jun co
Cre ek
Iceworm Gulch
C r e e k
R o c k
PARK AND PRESERVE
DENALI NATIONAL
PARK AND PRESERVE
DENALI NATIONAL
ILANED
KRAP
DAOR
m ile s
F a irb a n k s , A
K m ile s
H e a ly , A
K m ile s
A n ch o ra g e , A
K
S K
R A
P
E G
R O
E G
NPS PMIS No. 182809A NPS Drwg. No. 184/80287
MILE 5 PIT
47 miles to Toklat pit MP 53 at MP 67.5
61.5 miles to Eagle's Nest Corner
1 Revised by Amendment 001
A.4a
STATE PROJECT
NUMBER
SHEET
AK
PRA DENA 10(34)
M
A u g u s t
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d d e n a a d .d g n
R J o h n s o
C
S m it h
C h e c k e d b y
D e s ig n e d b y
3 Revised by Amendment 003
Sheet and Description
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I
TYPICAL
SECTIONS
PLAN &
PROFILE
EROSION
CONTROL
MATERIAL
SOURCES
MSE WALL
AND SPECIAL
ROCK
EMBANKMENT
DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
ALLOWANCES Bid Schedule
A001, A003 A0010 15101-0000 MOBILIZATION LPSM ALL
A0030 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0050 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
A0070 15401-0000 CONTRACTOR TESTING LPSM ALL
A0090 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0110 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL LPSM All ALL
A001, A003 A0130 15705-1500 SOIL EROSION CONTROL, SEDIMENT WATTLE, GOVERNMENT
FURNISHED LNFT 570 300 50 920
A0150 15801-0000 WATERING FOR DUST CONTROL MGAL 104 104
A0170 20103-0000 CLEARING AND GRUBBING Contract
SQYD 590 10 600 Quantity
A0190 20301-1900 REMOVAL OF PIPE CULVERT EACH 2 2
A0210 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS, CRIB WALL LPSM All ALL
A002 A0230 20401-0000 ROADWAY EXCAVATION Contract
CUYD 327 33 360 Quantity
A002 A0250 20403-0000 UNCLASSIFIED BORROW Contract
CUYD 129 11 140 Quantity
A0270 20701-1000 EARTHWORK GEOTEXTILE, TYPE III-A SQYD 118 118
A0290 20701-1200 EARTHWORK GEOTEXTILE, TYPE IV-A SQYD 97 10 107
A0310 25101-2000 PLACED RIPRAP, CLASS 2 CUYD 17 3 20
A0330 25101-4000 PLACED RIPRAP, CLASS 4 CUYD 40 5 45
A0350 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED CUYD 117 10 127
A0370 25501-0000 MECHANICALLY STABILIZED EARTH WALL SQFT 1,228 10 1,238
A0390 30419-0000 BENTONITE TON 451 451
A0410 30801-1000 ROADWAY AGGREGATE, METHOD 1, GOVERNMENT FURNISHED CUYD 213 10 223
A0430 31102-0000 STOCKPILED AGGREGATE (SELECT BORROW) CUYD 6,500 6,500
A0450 31102-0000 STOCKPILED AGGREGATE (AGGREGATE SURFACING) CUYD 15,250 15,250
A0470 60201-1100 42-INCH PIPE CULVERT LNFT 108 12 120
A0490 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40 40
A0510 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY HOUR 40 40
A0530 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 20 20
A0550 62201-3200 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.5 CUBIC
YARD MINIMUM CAPACITY HOUR 20 20
A0570 62301-0000 GENERAL LABOR HOUR 150 150
A0590 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 4 4
A0610 63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE
42-INCH EACH 100 100
A0630 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A EACH 4 4
A0650 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER LNFT 200 20 220
MileStone: Amendment A003 Amendment Review Date: In Progress Report Date: 10/02/13
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
2-
O ct
-2
8:
A
M
Remarks and/or Determination of
Estimated Quantity
Pay Item Description Unit
Estimated Quantities
C
U se rs \c ol le en .m
.s m ith \D es kt op de na
4b a_
A
3.
xl sm ]S he et
STATE PROJECT
PRA DENA 10(34) B.1AK
NUMBER
SHEET
Leeann.Bush Text Box
MATERIAL QUANTITIES
TABULATION OF
NPS PMIS No. 182809A NPS Drwg. No. 184/80287
Revised by Amendment 003
F.1
STATE PROJECT
NUMBER
SHEET
AK
PRA DENA 10(34)
M
O c to b e r
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d d e fa .d g
C h e c k e d b y
D e s ig n e d b y
Revised by Amendment 0011
File details come from the government source that posted it. Updated .