T A B U L A T I O N O F B I D S Schedule A Central Federal Lands Highway Division

Project No : NM FLAP 52000(1) FLMA No:

Project Name : 2nd Street Southwest Corridor Improvements and Additions Solcitation No:

State : NM County : Bernalillo Federal Location : Valle de Oro NWR

Opened at: 2:00pm Opened by: Joe Wilson Date: 12/28/2017

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed:

Title:

Date:

Contract Awarded to: Award Date:

Contract Number: Data is Public

Contractor Comment Bid Amount Responsive

Engineer's Estimate 9,555,000.00$

Albuquerque Asphalt, I 5,143,551.45$

Star Paving Company 5,642,638.60$

SWP Contracting & Pav 6,670,410.00$

Cutting Edge Concrete 8,941,230.00$

La Forge and Budd Con 8,884,454.00$

DTFH6817B00030

Albuquerque Asphalt, Inc.

1/5/2018 FHWA Confidential Page 1 of 1

Schedule A Total of Bid Items: 9,555,000.00$ -46.2% 5,143,551.45$ Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvements and Additions CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

15101-0000 Line A0020 ALL LPSM 1,637,755.00$ 1,637,755.00$ 370,967.28$

15214-1000 Line A0040 ALL LPSM 30,000.00$ 30,000.00$ 3,199.08$

15215-3000 Line A0060 35 EACH 2,500.00$ 87,500.00$ 6,531.35$

15225-0000 Line A0080 1.800 MILE 25,000.00$ 45,000.00$ 5,758.34$

15236-2000 Line A0100 3.600 MILE 20,000.00$ 72,000.00$ 26,872.27$

15301-0000 Line A0120 ALL LPSM 250,000.00$ 250,000.00$ 95,820.89$

15401-0000 Line A0140 ALL LPSM 91,000.00$ 91,000.00$ 112,844.35$

15501-0000 Line A0160 ALL LPSM 50,350.00$ 50,350.00$ 3,328.23$

15705-1400 Line A0180 15,500 LNFT 20.00$ 310,000.00$ 22,165.00$

15705-1800 Line A0200 110 LNFT 60.00$ 6,600.00$ 1,141.80$

15706-1000 Line A0220 19 EACH 3,000.00$ 57,000.00$ 1,580.42$

15706-1600 Line A0240 4 EACH 4,000.00$ 16,000.00$ 4,180.12$

15802-0000 Line A0260 ALL LPSM 40,000.00$ 40,000.00$ 47,135.65$

Engineer's Estimate

47,135.65$

1,045.03$

83.18$

10.38$

1.43$

3,328.23$

112,844.35$

95,820.89$

7,464.52$

186.61$

Albuquerque Asphalt, Inc.

3,199.08$

370,967.28$

MOBILIZATION

SURVEY AND STAKING, BRIDGE (GRS-IBS)

SURVEY AND STAKING, DRAINAGE STRUCTURE

CONTRACTOR TESTING

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, FIBER ROLL

SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM

SOIL EROSION CONTROL, INLET PROTECTION

SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

SURVEY CONTROL, GRADE FINISHING

CONTRACTOR QUALITY CONTROL

WATERING FOR DUST CONTROL

SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL

3,199.08$

1/5/2018 Page 1 of 24

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvements and Additions CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

Engineer's Estimate Albuquerque Asphalt, Inc.

20101-0000 Line A0280 14.5 ACRE 3,000.00$ 43,500.00$ 18,400.07$

20302-1200 Line A0300 1,330 LNFT 4.00$ 5,320.00$ 4,256.00$

20302-2100 Line A0320 90 LNFT 50.00$ 4,500.00$ 6,229.80$

20303-1600 Line A0340 8,000 SQYD 10.00$ 80,000.00$ 19,440.00$

20315-0000 Line A0360 8,100 LNFT 4.00$ 32,400.00$ 9,477.00$

20401-0000 Line A0380 10,000 CUYD 20.00$ 200,000.00$ 71,900.00$

20420-0000 Line A0400 140 CUYD 45.00$ 6,300.00$ 3,826.20$

20441-0000 Line A0420 6,500 CUYD 15.00$ 97,500.00$ 75,530.00$

20801-0000 Line A0440 350 CUYD 40.00$ 14,000.00$ 11,508.00$

21102-2000 Line A0460 ALL LPSM 10,000.00$ 10,000.00$ 8,378.09$

25101-0100 Line A0480 10 CUYD 135.00$ 1,350.00$ 959.70$

25101-0200 Line A0500 5 CUYD 150.00$ 750.00$ 479.85$

25101-0300 Line A0520 540 CUYD 180.00$ 97,200.00$ 44,339.40$ 82.11$

95.97$

95.97$

8,378.09$

32.88$

11.62$

27.33$

7.19$

1.17$

2.43$

69.22$

3.20$

1,268.97$

REMOVAL OF PIPE CULVERT

REMOVAL OF PAVEMENT, ASPHALT

SAWCUTTING PAVEMENT

PLACED RIPRAP, METHOD A, CLASS 2

PLACED RIPRAP, METHOD A, CLASS 3

ROADWAY EXCAVATION

EMBANKMENT CONSTRUCTION

WASTE

STRUCTURE EXCAVATION

ROADWAY OBLITERATION, METHOD 2

PLACED RIPRAP, METHOD A, CLASS 1

CLEARING AND GRUBBING

REMOVAL OF GUARDRAIL

1/5/2018 Page 2 of 24

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvements and Additions CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

Engineer's Estimate Albuquerque Asphalt, Inc.

30202-2000 Line A0540 7,000 TON 50.00$ 350,000.00$ 242,620.00$

30402-1000 Line A0560 12,500 SQYD 5.00$ 62,500.00$ 50,375.00$

40301-0100 Line A0580 8,500 TON 150.00$ 1,275,000.00$ 719,440.00$

40301-0100 Line A0600 2,000 TON 150.00$ 300,000.00$ 166,820.00$

40601-0000 Line A0620 20 TON 900.00$ 18,000.00$ 15,906.00$

41102-1000 Line A0640 29,000 SQYD 3.00$ 87,000.00$ 25,810.00$

41105-0000 Line A0660 110 TON 200.00$ 22,000.00$ 2,444.20$

41201-0000 Line A0680 20 TON 900.00$ 18,000.00$ 15,132.80$

41301-0600 Line A0700 14,000 SQYD 3.00$ 42,000.00$ 19,740.00$

41801-3000 Line A0720 1,600 SQYD 5.00$ 8,000.00$ 52,336.00$

55201-0600 Line A0740 40 CUYD 800.00$ 32,000.00$ 20,687.20$

55401-1000 Line A0760 1,100 LB 2.00$ 2,200.00$ 4,103.00$

55504-0000 Line A0780 ALL LPSM 250,000.00$ 250,000.00$ 158,674.37$ 158,674.37$

3.73$

517.18$

32.71$

1.41$

756.64$

22.22$

0.89$

795.30$

83.41$

84.64$

4.03$

34.66$

ROADWAY AGGREGATE, METHOD 2

FULL DEPTH RECLAMATION, METHOD 1

ASPHALT CONCRETE PAVEMENT, TYPE 1 (MAINLINE PAVEMENT, PG 76-28)

ASPHALT CONCRETE PAVEMENT, TYPE 1 (TRAIL PAVEMENT, PG 70-22)

STRUCTURAL CONCRETE, CLASS C (AE)

REINFORCING STEEL

PRE-FABRICATED STEEL BRIDGE (GRS-IBS, PEDESTRIAN BRIDGE)

FOG SEAL

PRIME COAT, METHOD 1

BLOTTER

TACK COAT

ASPHALT PAVEMENT MILLING, 2-INCH DEPTH

ASPHALT CONCRETE PAVEMENT PATCH, TYPE 3

1/5/2018 Page 3 of 24

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvements and Additions CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

Engineer's Estimate Albuquerque Asphalt, Inc.

56301-1000 Line A0800 ALL LPSM 1,500.00$ 1,500.00$ 13,862.68$

57401-0000 Line A0820 710 SQYD 15.00$ 10,650.00$ 10,600.30$

57402-0000 Line A0840 360 TON 50.00$ 18,000.00$ 36,468.00$

57403-0000 Line A0860 60 SQYD 250.00$ 15,000.00$ 14,076.00$

60103-0000 Line A0880 1 EACH 50,000.00$ 50,000.00$ 40,359.80$

60103-0000 Line A0900 1 EACH 50,000.00$ 50,000.00$ 32,744.31$

60202-0200 Line A0920 3,800 LNFT 180.00$ 684,000.00$ 174,382.00$

60202-0400 Line A0940 500 LNFT 220.00$ 110,000.00$ 25,380.00$

60211-0800 Line A0960 1 EACH 700.00$ 700.00$ 528.94$

60220-2950 Line A0980 200 LNFT 1,000.00$ 200,000.00$ 227,562.00$

60401-0000 Line A1000 3 EACH 5,000.00$ 15,000.00$ 11,487.06$

60403-0000 Line A1020 10 EACH 5,000.00$ 50,000.00$ 50,754.50$

60403-2200 Line A1040 9 EACH 6,000.00$ 54,000.00$ 56,017.62$ 6,224.18$

5,075.45$

3,829.02$

1,137.81$

528.94$

50.76$

45.89$

32,744.31$

40,359.80$

234.60$

101.30$

14.93$

13,862.68$

10 FEET SPAN, 4 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT

MANHOLE

INLET

INLET, FLH TYPE 7A

GRS-IBS, CONCRETE MASONRY UNIT

CONCRETE, HEADWALL (INLET HEADWALL, WINGWALLS, APRON)

CONCRETE, HEADWALL (OUTLET HEADWALL, WINGWALLS, APRON)

18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

END SECTION FOR 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

PAINTING, CONCRETE STRUCTURE

GRS-IBS, GEOSYNTHETIC REINFORCEMENT

GRS-IBS, OPEN-GRADED BACKFILL

1/5/2018 Page 4 of 24

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvements and Additions CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

Engineer's Estimate Albuquerque Asphalt, Inc.

60421-0000 Line A1060 1 EACH 20,000.00$ 20,000.00$ 37,941.97$

60901-0000 Line A1080 3,900 LNFT 25.00$ 97,500.00$ 43,719.00$

60902-0800 Line A1100 70 LNFT 35.00$ 2,450.00$ 4,131.40$

60902-1200 Line A1120 7,500 LNFT 40.00$ 300,000.00$ 133,275.00$

61110-1000 Line A1140 ALL LPSM 50,000.00$ 50,000.00$ 312,539.45$

61501-0100 Line A1160 1,600 SQYD 110.00$ 176,000.00$ 67,488.00$

61502-1000 Line A1180 25 SQYD 120.00$ 3,000.00$ 4,057.25$

61504-1000 Line A1200 300 SQYD 110.00$ 33,000.00$ 21,837.00$

61509-0000 Line A1220 90 SQYD 200.00$ 18,000.00$ 12,542.40$

61601-1000 Line A1240 50 SQYD 100.00$ 5,000.00$ 6,931.50$

61701-4500 Line A1260 1,100 LNFT 30.00$ 33,000.00$ 23,463.00$

61702-1500 Line A1280 10 EACH 4,000.00$ 40,000.00$ 20,260.80$

61707-4000 Line A1300 55 LNFT 35.00$ 1,925.00$ 6,744.65$

139.36$

72.79$

162.29$

42.18$

312,539.45$

17.77$

59.02$

11.21$

37,941.97$

CURB AND GUTTER, CONCRETE, 10-INCH DEPTH (ROLL TYPE)

CURB AND GUTTER, CONCRETE, 14-INCH DEPTH

IRRIGATION SYSTEM

SIDEWALK, CONCRETE

DRIVE PAD, CONCRETE

ACCESSIBILITY RAMP, CONCRETE

OIL/GRIT SEPARATOR (WATER QUALITY STRUCTURE)

CURB, CONCRETE (FLUSH CURB)

DETECTABLE WARNING PANELS

SLOPE PAVING, CONCRETE

GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS

TERMINAL SECTION, TYPE MGS TANGENT

STRUCTURE TRANSITION RAILING, MGS SYSTEM

138.63$

2,026.08$

21.33$

122.63$

1/5/2018 Page 5 of 24

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvements and Additions CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

Engineer's Estimate Albuquerque Asphalt, Inc.

61901-2250 Line A1320 4,800 LNFT 70.00$ 336,000.00$ 158,448.00$

61901-2500 Line A1340 1,800 LNFT 25.00$ 45,000.00$ 41,940.00$

61902-1600 Line A1360 2 EACH 5,000.00$ 10,000.00$ 7,193.66$

62201-0250 Line A1380 40 HOUR 100.00$ 4,000.00$ 2,772.40$

62201-0400 Line A1400 40 HOUR 125.00$ 5,000.00$ 714.40$

62201-0950 Line A1420 40 HOUR 150.00$ 6,000.00$ 1,919.60$

62201-2800 Line A1440 40 HOUR 200.00$ 8,000.00$ 3,235.20$

62301-0000 Line A1460 100 HOUR 50.00$ 5,000.00$ 4,576.00$

62302-1000 Line A1480 100 HOUR 100.00$ 10,000.00$ 8,321.00$

62302-1100 Line A1500 100 HOUR 100.00$ 10,000.00$ 13,330.00$

62402-0300 Line A1520 1.3 ACRE 6,000.00$ 7,800.00$ 18,638.10$

62510-1000 Line A1540 4.3 ACRE 3,000.00$ 12,900.00$ 17,997.48$

62515-1000 Line A1560 4.3 ACRE 4,000.00$ 17,200.00$ 5,433.65$

FENCE, RAIL (WROUGHT IRON, 6' HEIGHT)

GENERAL LABOR

SPECIAL LABOR, HIRED TECHNICAL SERVICES

SPECIAL LABOR, HIRED SURVEY SERVICES

FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH

SEEDING, DRY METHOD

MULCHING, DRY METHOD

FENCE, SPLIT RAIL, 3 RAIL (WOOD)

GATE, METAL, 20 FEET WIDTH (WROUGHT IRON, 6' HEIGHT)

DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

BACKHOE LOADER, 2 CUBIC F00T MINIMUM RATED CAPACITY BUCKET, 12-INCH WIDTH

WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY

MOTOR GRADER, 8 FOOT MINIMUM BLADE

33.01$

3,596.83$

23.30$

17.86$

69.31$

80.88$

47.99$

83.21$

45.76$

14,337.00$

133.30$

1,263.64$

4,185.46$

1/5/2018 Page 6 of 24

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvements and Additions CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

Engineer's Estimate Albuquerque Asphalt, Inc.

62632-0000 Line A1580 ALL LPSM 280,000.00$ 280,000.00$ 203,693.95$

63301-0000 Line A1600 66 EACH 300.00$ 19,800.00$ 11,964.48$

63401-0700 Line A1620 62,500 LNFT 0.60$ 37,500.00$ 16,250.00$

63401-0800 Line A1640 6,100 LNFT 0.50$ 3,050.00$ 1,586.00$

63405-1300 Line A1660 23 EACH 300.00$ 6,900.00$ 1,962.13$

63405-1400 Line A1680 2 EACH 300.00$ 600.00$ 213.28$

63405-1450 Line A1700 12 EACH 400.00$ 4,800.00$ 1,279.68$

63405-1600 Line A1720 1 EACH 400.00$ 400.00$ 154.62$

63502-0600 Line A1740 10 EACH 500.00$ 5,000.00$ 1,013.00$

63502-0700 Line A1760 100 EACH 30.00$ 3,000.00$ 1,600.00$

63502-1300 Line A1780 100 EACH 50.00$ 5,000.00$ 3,199.00$

63502-2000 Line A1800 3 EACH 20,000.00$ 60,000.00$ 15,275.61$

63502-2100 Line A1820 2 EACH 5,000.00$ 10,000.00$ 5,331.80$

TEMPORARY TRAFFIC CONTROL, CRASH CUSHION

PAVEMENT MARKINGS, TYPE D, "ONLY" WORD MESSAGE

PAVEMENT MARKINGS, TYPE D, RAILROAD SYMBOL

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

TEMPORARY TRAFFIC CONTROL, CONE

TEMPORARY TRAFFIC CONTROL, DRUM

TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

PLANTINGS

SIGN SYSTEM

PAVEMENT MARKINGS, TYPE D, SOLID

PAVEMENT MARKINGS, TYPE D, BROKEN

PAVEMENT MARKINGS, TYPE D, TURN ARROW

PAVEMENT MARKINGS, TYPE D, STRAIGHT/TURN ARROW COMBINATION

181.28$

203,693.95$

0.26$

0.26$

106.64$

85.31$

154.62$

106.64$

16.00$

101.30$

5,091.87$

31.99$

2,665.90$

1/5/2018 Page 7 of 24

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvements and Additions CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

Engineer's Estimate Albuquerque Asphalt, Inc.

63503-0400 Line A1840 200 LNFT 50.00$ 10,000.00$ 4,880.00$

63503-1000 Line A1860 4,200 LNFT 3.00$ 12,600.00$ 6,720.00$

63504-1000 Line A1880 500 SQFT 50.00$ 25,000.00$ 5,330.00$

63505-1000 Line A1900 6.1 MILE 5,000.00$ 30,500.00$ 8,033.40$

63506-0500 Line A1920 6,000 HOUR 35.00$ 210,000.00$ 140,820.00$

63511-0100 Line A1940 1,500 HOUR 100.00$ 150,000.00$ 191,940.00$

63601-1000 Line A1960 ALL LPSM 280,000.00$ 280,000.00$ 191,940.00$

63601-2000 Line A1980 ALL LPSM 80,000.00$ 80,000.00$ 111,381.30$

63602-7000 Line A2000 2 EACH 5,000.00$ 10,000.00$ 14,502.50$

63610-2800 Line A2020 4,500 LNFT 3.00$ 13,500.00$ 37,170.00$

63621-1000 Line A2040 14 EACH 500.00$ 7,000.00$ 13,943.72$

64502-0000 Line A2060 20 EACH 1,000.00$ 20,000.00$ 6,706.60$

64604-3000 Line A2080 40 LNFT 50.00$ 2,000.00$ 2,648.80$

UTILITY BOX, PULLBOX

TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER

TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

TEMPORARY TRAFFIC CONTROL, FLAGGER

LOCATE UTILITIES (POTHOLING)

FIXTURE, PEDESTRIAN RAILING

TEMPORARY TRAFFIC CONTROL, RAILROAD FLAGGER

SYSTEM INSTALLATION, TRAFFIC SIGNAL

SYSTEM INSTALLATION, LIGHTING

SYSTEM INSTALLATION, SPEED FEEDBACK SIGN

CONDUIT, 4-INCH, PVC

24.40$

10.66$

1.60$

23.47$

1,316.95$

191,940.00$

127.96$

7,251.25$

111,381.30$

995.98$

8.26$

66.22$

335.33$

1/5/2018 Page 8 of 24

Schedule A Total of Bid Items:

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"

Item No. Quantity Unit

15101-0000 Line A0020 ALL LPSM

15214-1000 Line A0040 ALL LPSM

15215-3000 Line A0060 35 EACH

15225-0000 Line A0080 1.800 MILE

15236-2000 Line A0100 3.600 MILE

15301-0000 Line A0120 ALL LPSM

15401-0000 Line A0140 ALL LPSM

15501-0000 Line A0160 ALL LPSM

15705-1400 Line A0180 15,500 LNFT

15705-1800 Line A0200 110 LNFT

15706-1000 Line A0220 19 EACH

15706-1600 Line A0240 4 EACH

15802-0000 Line A0260 ALL LPSM

MOBILIZATION

SURVEY AND STAKING, BRIDGE (GRS-IBS)

SURVEY AND STAKING, DRAINAGE STRUCTURE

CONTRACTOR TESTING

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, FIBER ROLL

SOIL EROSION CONTROL, TEMPORARY DIVERSI

SOIL EROSION CONTROL, INLET PROTECTION

SOIL EROSION CONTROL, STABILIZED CONSTR

SURVEY CONTROL, GRADE FINISHING

CONTRACTOR QUALITY CONTROL

WATERING FOR DUST CONTROL

SLOPE, REFERENCE, AND CLEARING AND GRUBB

-40.9% 5,642,638.60$ -30.2% 6,670,410.00$

Unit Price Amount Unit Price Amount

505,000.00$ 665,000.00$

5,600.00$ 15,000.00$

15,575.00$ 21,000.00$

19,800.00$ 9,900.00$

79,740.00$ 13,500.00$

110,000.00$ 210,000.00$

93,250.00$ 350,000.00$

12,500.00$ 15,000.00$

24,800.00$ 27,125.00$

484.00$ 880.00$

1,558.00$ 1,900.00$

9,000.00$ 14,000.00$

78,000.00$ 272,000.00$ 78,000.00$ 272,000.00$

2,250.00$ 3,500.00$

82.00$ 100.00$

4.40$ 8.00$

1.60$ 1.75$

12,500.00$ 15,000.00$

93,250.00$ 350,000.00$

110,000.00$ 210,000.00$

22,150.00$ 3,750.00$

5,600.00$ 15,000.00$

445.00$ 600.00$

Star Paving Company SWP Contracting & Paving

505,000.00$ 665,000.00$

11,000.00$ 5,500.00$

1/5/2018 Page 9 of 24

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"

Item No. Quantity Unit

20101-0000 Line A0280 14.5 ACRE

20302-1200 Line A0300 1,330 LNFT

20302-2100 Line A0320 90 LNFT

20303-1600 Line A0340 8,000 SQYD

20315-0000 Line A0360 8,100 LNFT

20401-0000 Line A0380 10,000 CUYD

20420-0000 Line A0400 140 CUYD

20441-0000 Line A0420 6,500 CUYD

20801-0000 Line A0440 350 CUYD

21102-2000 Line A0460 ALL LPSM

25101-0100 Line A0480 10 CUYD

25101-0200 Line A0500 5 CUYD

25101-0300 Line A0520 540 CUYD

REMOVAL OF PIPE CULVERT

REMOVAL OF PAVEMENT, ASPHALT

SAWCUTTING PAVEMENT

PLACED RIPRAP, METHOD A, CLASS 2

PLACED RIPRAP, METHOD A, CLASS 3

ROADWAY EXCAVATION

EMBANKMENT CONSTRUCTION

WASTE

STRUCTURE EXCAVATION

ROADWAY OBLITERATION, METHOD 2

PLACED RIPRAP, METHOD A, CLASS 1

CLEARING AND GRUBBING

REMOVAL OF GUARDRAIL

-40.9% 5,642,638.60$ -30.2% 6,670,410.00$

Unit Price Amount Unit Price Amount

Star Paving Company SWP Contracting & Paving

46,400.00$ 6,525.00$

4,522.00$ 4,655.00$

4,050.00$ 3,780.00$

33,600.00$ 26,000.00$

24,300.00$ 8,100.00$

67,500.00$ 90,000.00$

1,820.00$ 2,800.00$

48,750.00$ 35,750.00$

13,300.00$ 4,900.00$

5,500.00$ 10,000.00$

1,530.00$ 1,050.00$

765.00$ 525.00$

46,980.00$ 48,600.00$ 87.00$ 90.00$

153.00$ 105.00$

153.00$ 105.00$

5,500.00$ 10,000.00$

38.00$ 14.00$

7.50$ 5.50$

13.00$ 20.00$

6.75$ 9.00$

3.00$ 1.00$

4.20$ 3.25$

45.00$ 42.00$

3.40$ 3.50$

3,200.00$ 450.00$

1/5/2018 Page 10 of 24

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"

Item No. Quantity Unit

30202-2000 Line A0540 7,000 TON

30402-1000 Line A0560 12,500 SQYD

40301-0100 Line A0580 8,500 TON

40301-0100 Line A0600 2,000 TON

40601-0000 Line A0620 20 TON

41102-1000 Line A0640 29,000 SQYD

41105-0000 Line A0660 110 TON

41201-0000 Line A0680 20 TON

41301-0600 Line A0700 14,000 SQYD

41801-3000 Line A0720 1,600 SQYD

55201-0600 Line A0740 40 CUYD

55401-1000 Line A0760 1,100 LB

55504-0000 Line A0780 ALL LPSM

ROADWAY AGGREGATE, METHOD 2

FULL DEPTH RECLAMATION, METHOD 1

ASPHALT CONCRETE PAVEMENT, TYPE 1 (MAINL

ASPHALT CONCRETE PAVEMENT, TYPE 1 (TRAIL

STRUCTURAL CONCRETE, CLASS C (AE)

REINFORCING STEEL

PRE-FABRICATED STEEL BRIDGE (GRS-IBS, PED

FOG SEAL

PRIME COAT, METHOD 1

BLOTTER

TACK COAT

ASPHALT PAVEMENT MILLING, 2-INCH DEPTH

ASPHALT CONCRETE PAVEMENT PATCH, TYPE 3

-40.9% 5,642,638.60$ -30.2% 6,670,410.00$

Unit Price Amount Unit Price Amount

Star Paving Company SWP Contracting & Paving

142,100.00$ 217,000.00$

31,250.00$ 37,500.00$

705,500.00$ 705,500.00$

168,400.00$ 162,000.00$

18,000.00$ 9,500.00$

20,300.00$ 11,600.00$

7,370.00$ 2,200.00$

12,500.00$ 22,000.00$

16,800.00$ 35,000.00$

38,400.00$ 136,000.00$

24,800.00$ 84,000.00$

3,850.00$ 2,200.00$

183,000.00$ 250,000.00$ 183,000.00$ 250,000.00$

3.50$ 2.00$

620.00$ 2,100.00$

24.00$ 85.00$

1.20$ 2.50$

625.00$ 1,100.00$

67.00$ 20.00$

0.70$ 0.40$

900.00$ 475.00$

84.20$ 81.00$

83.00$ 83.00$

2.50$ 3.00$

20.30$ 31.00$

1/5/2018 Page 11 of 24

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"

Item No. Quantity Unit

56301-1000 Line A0800 ALL LPSM

57401-0000 Line A0820 710 SQYD

57402-0000 Line A0840 360 TON

57403-0000 Line A0860 60 SQYD

60103-0000 Line A0880 1 EACH

60103-0000 Line A0900 1 EACH

60202-0200 Line A0920 3,800 LNFT

60202-0400 Line A0940 500 LNFT

60211-0800 Line A0960 1 EACH

60220-2950 Line A0980 200 LNFT

60401-0000 Line A1000 3 EACH

60403-0000 Line A1020 10 EACH

60403-2200 Line A1040 9 EACH

10 FEET SPAN, 4 FEET RISE PRECAST REINFORC

MANHOLE

INLET

INLET, FLH TYPE 7A

GRS-IBS, CONCRETE MASONRY UNIT

CONCRETE, HEADWALL (INLET HEADWALL, WIN

CONCRETE, HEADWALL (OUTLET HEADWALL, W

18-INCH EQUIVALENT DIAMETER ARCH OR ELLI

24-INCH EQUIVALENT DIAMETER ARCH OR ELLI

END SECTION FOR 24-INCH EQUIVALENT DIAME

PAINTING, CONCRETE STRUCTURE

GRS-IBS, GEOSYNTHETIC REINFORCEMENT

GRS-IBS, OPEN-GRADED BACKFILL

-40.9% 5,642,638.60$ -30.2% 6,670,410.00$

Unit Price Amount Unit Price Amount

Star Paving Company SWP Contracting & Paving

4,000.00$ 7,500.00$

10,401.50$ 8,875.00$

24,480.00$ 21,600.00$

12,000.00$ 16,200.00$

18,000.00$ 60,000.00$

21,000.00$ 60,000.00$

205,200.00$ 247,000.00$

28,750.00$ 37,500.00$

800.00$ 3,400.00$

210,000.00$ 220,000.00$

20,280.00$ 10,500.00$

34,750.00$ 35,000.00$

28,350.00$ 45,000.00$ 3,150.00$ 5,000.00$

3,475.00$ 3,500.00$

6,760.00$ 3,500.00$

1,050.00$ 1,100.00$

800.00$ 3,400.00$

57.50$ 75.00$

54.00$ 65.00$

21,000.00$ 60,000.00$

18,000.00$ 60,000.00$

200.00$ 270.00$

68.00$ 60.00$

14.65$ 12.50$

4,000.00$ 7,500.00$

1/5/2018 Page 12 of 24

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"

Item No. Quantity Unit

60421-0000 Line A1060 1 EACH

60901-0000 Line A1080 3,900 LNFT

60902-0800 Line A1100 70 LNFT

60902-1200 Line A1120 7,500 LNFT

61110-1000 Line A1140 ALL LPSM

61501-0100 Line A1160 1,600 SQYD

61502-1000 Line A1180 25 SQYD

61504-1000 Line A1200 300 SQYD

61509-0000 Line A1220 90 SQYD

61601-1000 Line A1240 50 SQYD

61701-4500 Line A1260 1,100 LNFT

61702-1500 Line A1280 10 EACH

61707-4000 Line A1300 55 LNFT

CURB AND GUTTER, CONCRETE, 10-INCH DEPTH

CURB AND GUTTER, CONCRETE, 14-INCH DEPTH

IRRIGATION SYSTEM

SIDEWALK, CONCRETE

DRIVE PAD, CONCRETE

ACCESSIBILITY RAMP, CONCRETE

OIL/GRIT SEPARATOR (WATER QUALITY STRUCT

CURB, CONCRETE (FLUSH CURB)

DETECTABLE WARNING PANELS

SLOPE PAVING, CONCRETE

GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STE

TERMINAL SECTION, TYPE MGS TANGENT

STRUCTURE TRANSITION RAILING, MGS SYSTEM

-40.9% 5,642,638.60$ -30.2% 6,670,410.00$

Unit Price Amount Unit Price Amount

Star Paving Company SWP Contracting & Paving

50,700.00$ 25,000.00$

62,400.00$ 117,000.00$

1,330.00$ 2,100.00$

105,000.00$ 210,000.00$

305,132.00$ 315,000.00$

56,000.00$ 59,200.00$

1,850.00$ 3,250.00$

15,000.00$ 34,500.00$

17,460.00$ 18,900.00$

4,300.00$ 7,500.00$

24,860.00$ 23,100.00$

21,500.00$ 22,000.00$

7,150.00$ 6,875.00$

194.00$ 210.00$

50.00$ 115.00$

74.00$ 130.00$

35.00$ 37.00$

305,132.00$ 315,000.00$

14.00$ 28.00$

19.00$ 30.00$

16.00$ 30.00$

50,700.00$ 25,000.00$

86.00$ 150.00$

2,150.00$ 2,200.00$

22.60$ 21.00$

130.00$ 125.00$

1/5/2018 Page 13 of 24

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"

Item No. Quantity Unit

61901-2250 Line A1320 4,800 LNFT

61901-2500 Line A1340 1,800 LNFT

61902-1600 Line A1360 2 EACH

62201-0250 Line A1380 40 HOUR

62201-0400 Line A1400 40 HOUR

62201-0950 Line A1420 40 HOUR

62201-2800 Line A1440 40 HOUR

62301-0000 Line A1460 100 HOUR

62302-1000 Line A1480 100 HOUR

62302-1100 Line A1500 100 HOUR

62402-0300 Line A1520 1.3 ACRE

62510-1000 Line A1540 4.3 ACRE

62515-1000 Line A1560 4.3 ACRE

FENCE, RAIL (WROUGHT IRON, 6' HEIGHT)

GENERAL LABOR

SPECIAL LABOR, HIRED TECHNICAL SERVICES

SPECIAL LABOR, HIRED SURVEY SERVICES

FURNISHING AND PLACING TOPSOIL, 4-INCH D

SEEDING, DRY METHOD

MULCHING, DRY METHOD

FENCE, SPLIT RAIL, 3 RAIL (WOOD)

GATE, METAL, 20 FEET WIDTH (WROUGHT IRON

DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPAC

BACKHOE LOADER, 2 CUBIC F00T MINIMUM RAT

WHEEL LOADER, 3 CUBIC YARD MINIMUM RATE

MOTOR GRADER, 8 FOOT MINIMUM BLADE

-40.9% 5,642,638.60$ -30.2% 6,670,410.00$

Unit Price Amount Unit Price Amount

Star Paving Company SWP Contracting & Paving

226,800.00$ 158,400.00$

26,640.00$ 43,200.00$

14,344.00$ 7,500.00$

3,559.60$ 4,200.00$

3,440.00$ 3,400.00$

4,400.00$ 4,000.00$

5,600.00$ 4,400.00$

3,570.00$ 3,000.00$

7,000.00$ 15,000.00$

13,800.00$ 12,000.00$

33,325.50$ 49,400.00$

40,076.00$ 29,025.00$

14,598.50$ 12,900.00$

47.25$ 33.00$

7,172.00$ 3,750.00$

14.80$ 24.00$

86.00$ 85.00$

88.99$ 105.00$

140.00$ 110.00$

110.00$ 100.00$

70.00$ 150.00$

35.70$ 30.00$

25,635.00$ 38,000.00$

138.00$ 120.00$

3,395.00$ 3,000.00$

9,320.00$ 6,750.00$

1/5/2018 Page 14 of 24

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"

Item No. Quantity Unit

62632-0000 Line A1580 ALL LPSM

63301-0000 Line A1600 66 EACH

63401-0700 Line A1620 62,500 LNFT

63401-0800 Line A1640 6,100 LNFT

63405-1300 Line A1660 23 EACH

63405-1400 Line A1680 2 EACH

63405-1450 Line A1700 12 EACH

63405-1600 Line A1720 1 EACH

63502-0600 Line A1740 10 EACH

63502-0700 Line A1760 100 EACH

63502-1300 Line A1780 100 EACH

63502-2000 Line A1800 3 EACH

63502-2100 Line A1820 2 EACH

TEMPORARY TRAFFIC CONTROL, CRASH CUSHIO

PAVEMENT MARKINGS, TYPE D, "ONLY" WORD M

PAVEMENT MARKINGS, TYPE D, RAILROAD SYMB

TEMPORARY TRAFFIC CONTROL, BARRICADE TY

TEMPORARY TRAFFIC CONTROL, CONE

TEMPORARY TRAFFIC CONTROL, DRUM

TEMPORARY TRAFFIC CONTROL, PORTABLE CHA

PLANTINGS

SIGN SYSTEM

PAVEMENT MARKINGS, TYPE D, SOLID

PAVEMENT MARKINGS, TYPE D, BROKEN

PAVEMENT MARKINGS, TYPE D, TURN ARROW

PAVEMENT MARKINGS, TYPE D, STRAIGHT/TURN

-40.9% 5,642,638.60$ -30.2% 6,670,410.00$

Unit Price Amount Unit Price Amount

Star Paving Company SWP Contracting & Paving

182,065.00$ 175,000.00$

21,714.00$ 20,790.00$

141,250.00$ 37,500.00$

13,786.00$ 3,660.00$

6,486.00$ 7,245.00$

678.00$ 800.00$

6,780.00$ 3,900.00$

1,977.00$ 525.00$

4,050.00$ 950.00$

4,000.00$ 1,500.00$

9,800.00$ 8,000.00$

54,000.00$ 15,000.00$

11,600.00$ 5,400.00$

329.00$ 315.00$

182,065.00$ 175,000.00$

2.26$ 0.60$

2.26$ 0.60$

339.00$ 400.00$

282.00$ 315.00$

1,977.00$ 525.00$

565.00$ 325.00$

40.00$ 15.00$

405.00$ 95.00$

18,000.00$ 5,000.00$

98.00$ 80.00$

5,800.00$ 2,700.00$

1/5/2018 Page 15 of 24

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"

Item No. Quantity Unit

63503-0400 Line A1840 200 LNFT

63503-1000 Line A1860 4,200 LNFT

63504-1000 Line A1880 500 SQFT

63505-1000 Line A1900 6.1 MILE

63506-0500 Line A1920 6,000 HOUR

63511-0100 Line A1940 1,500 HOUR

63601-1000 Line A1960 ALL LPSM

63601-2000 Line A1980 ALL LPSM

63602-7000 Line A2000 2 EACH

63610-2800 Line A2020 4,500 LNFT

63621-1000 Line A2040 14 EACH

64502-0000 Line A2060 20 EACH

64604-3000 Line A2080 40 LNFT

UTILITY BOX, PULLBOX

TEMPORARY TRAFFIC CONTROL, CONCRETE BAR

TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO

TEMPORARY TRAFFIC CONTROL, PAVEMENT MAR

TEMPORARY TRAFFIC CONTROL, FLAGGER

LOCATE UTILITIES (POTHOLING)

FIXTURE, PEDESTRIAN RAILING

TEMPORARY TRAFFIC CONTROL, RAILROAD FLAG

SYSTEM INSTALLATION, TRAFFIC SIGNAL

SYSTEM INSTALLATION, LIGHTING

SYSTEM INSTALLATION, SPEED FEEDBACK SIGN

CONDUIT, 4-INCH, PVC

-40.9% 5,642,638.60$ -30.2% 6,670,410.00$

Unit Price Amount Unit Price Amount

Star Paving Company SWP Contracting & Paving

7,000.00$ 11,000.00$

12,600.00$ 12,600.00$

14,000.00$ 5,000.00$

34,251.50$ 15,250.00$

201,900.00$ 192,000.00$

199,500.00$ 225,000.00$

202,140.00$ 225,000.00$

117,440.00$ 135,000.00$

15,290.00$ 15,000.00$

39,150.00$ 37,125.00$

14,700.00$ 13,650.00$

9,120.00$ 5,000.00$

2,920.00$ 2,600.00$

35.00$ 55.00$

28.00$ 10.00$

3.00$ 3.00$

33.65$ 32.00$

5,615.00$ 2,500.00$

202,140.00$ 225,000.00$

133.00$ 150.00$

7,645.00$ 7,500.00$

117,440.00$ 135,000.00$

1,050.00$ 975.00$

8.70$ 8.25$

73.00$ 65.00$

456.00$ 250.00$

1/5/2018 Page 16 of 24

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"

Item No. Quantity Unit

15101-0000 Line A0020 ALL LPSM

15214-1000 Line A0040 ALL LPSM

15215-3000 Line A0060 35 EACH

15225-0000 Line A0080 1.800 MILE

15236-2000 Line A0100 3.600 MILE

15301-0000 Line A0120 ALL LPSM

15401-0000 Line A0140 ALL LPSM

15501-0000 Line A0160 ALL LPSM

15705-1400 Line A0180 15,500 LNFT

15705-1800 Line A0200 110 LNFT

15706-1000 Line A0220 19 EACH

15706-1600 Line A0240 4 EACH

15802-0000 Line A0260 ALL LPSM

MOBILIZATION

SURVEY AND STAKING, BRIDGE (GRS-IBS)

SURVEY AND STAKING, DRAINAGE STRUCTURE

CONTRACTOR TESTING

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, FIBER ROLL

SOIL EROSION CONTROL, TEMPORARY DIVERSI

SOIL EROSION CONTROL, INLET PROTECTION

SOIL EROSION CONTROL, STABILIZED CONSTR

SURVEY CONTROL, GRADE FINISHING

CONTRACTOR QUALITY CONTROL

WATERING FOR DUST CONTROL

SLOPE, REFERENCE, AND CLEARING AND GRUBB

-6.4% 8,941,230.00$ -7.0% 8,884,454.00$

Unit Price Amount Unit Price Amount

1,275,000.00$ 1,700,000.00$

12,000.00$ 5,000.00$

35,000.00$ 17,500.00$

14,400.00$ 54,000.00$

19,800.00$ 54,000.00$

200,000.00$ 250,000.00$

125,000.00$ 250,000.00$

25,000.00$ 10,000.00$

77,500.00$ 46,500.00$

2,750.00$ 3,300.00$

14,250.00$ 8,550.00$

6,000.00$ 16,000.00$

95,000.00$ 150,000.00$ 95,000.00$ 150,000.00$

1,500.00$ 4,000.00$

750.00$ 450.00$

25.00$ 30.00$

5.00$ 3.00$

25,000.00$ 10,000.00$

125,000.00$ 250,000.00$

200,000.00$ 250,000.00$

5,500.00$ 15,000.00$

1,700,000.00$

12,000.00$ 5,000.00$

1,000.00$ 500.00$

Cutting Edge Concrete Services La Forge and Budd Construction Co.

1,275,000.00$

8,000.00$ 30,000.00$

1/5/2018 Page 17 of 24

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"

Item No. Quantity Unit

20101-0000 Line A0280 14.5 ACRE

20302-1200 Line A0300 1,330 LNFT

20302-2100 Line A0320 90 LNFT

20303-1600 Line A0340 8,000 SQYD

20315-0000 Line A0360 8,100 LNFT

20401-0000 Line A0380 10,000 CUYD

20420-0000 Line A0400 140 CUYD

20441-0000 Line A0420 6,500 CUYD

20801-0000 Line A0440 350 CUYD

21102-2000 Line A0460 ALL LPSM

25101-0100 Line A0480 10 CUYD

25101-0200 Line A0500 5 CUYD

25101-0300 Line A0520 540 CUYD

REMOVAL OF PIPE CULVERT

REMOVAL OF PAVEMENT, ASPHALT

SAWCUTTING PAVEMENT

PLACED RIPRAP, METHOD A, CLASS 2

PLACED RIPRAP, METHOD A, CLASS 3

ROADWAY EXCAVATION

EMBANKMENT CONSTRUCTION

WASTE

STRUCTURE EXCAVATION

ROADWAY OBLITERATION, METHOD 2

PLACED RIPRAP, METHOD A, CLASS 1

CLEARING AND GRUBBING

REMOVAL OF GUARDRAIL

-6.4% 8,941,230.00$ -7.0% 8,884,454.00$

Unit Price Amount Unit Price Amount

Cutting Edge Concrete Services La Forge and Budd Construction Co.

88,450.00$ 36,250.00$

26,600.00$ 5,320.00$

6,750.00$ 6,750.00$

48,000.00$ 40,000.00$

16,200.00$ 56,700.00$

250,000.00$ 100,000.00$

10,500.00$ 4,900.00$

130,000.00$ 195,000.00$

24,500.00$ 14,000.00$

25,000.00$ 4,000.00$

2,500.00$ 1,250.00$

1,250.00$ 625.00$

64,800.00$ 54,000.00$ 120.00$ 100.00$

250.00$ 125.00$

250.00$ 125.00$

25,000.00$ 4,000.00$

70.00$ 40.00$

20.00$ 30.00$

75.00$ 35.00$

25.00$ 10.00$

2.00$ 7.00$

6.00$ 5.00$

75.00$ 75.00$

20.00$ 4.00$

6,100.00$ 2,500.00$

1/5/2018 Page 18 of 24

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"

Item No. Quantity Unit

30202-2000 Line A0540 7,000 TON

30402-1000 Line A0560 12,500 SQYD

40301-0100 Line A0580 8,500 TON

40301-0100 Line A0600 2,000 TON

40601-0000 Line A0620 20 TON

41102-1000 Line A0640 29,000 SQYD

41105-0000 Line A0660 110 TON

41201-0000 Line A0680 20 TON

41301-0600 Line A0700 14,000 SQYD

41801-3000 Line A0720 1,600 SQYD

55201-0600 Line A0740 40 CUYD

55401-1000 Line A0760 1,100 LB

55504-0000 Line A0780 ALL LPSM

ROADWAY AGGREGATE, METHOD 2

FULL DEPTH RECLAMATION, METHOD 1

ASPHALT CONCRETE PAVEMENT, TYPE 1 (MAINL

ASPHALT CONCRETE PAVEMENT, TYPE 1 (TRAIL

STRUCTURAL CONCRETE, CLASS C (AE)

REINFORCING STEEL

PRE-FABRICATED STEEL BRIDGE (GRS-IBS, PED

FOG SEAL

PRIME COAT, METHOD 1

BLOTTER

TACK COAT

ASPHALT PAVEMENT MILLING, 2-INCH DEPTH

ASPHALT CONCRETE PAVEMENT PATCH, TYPE 3

-6.4% 8,941,230.00$ -7.0% 8,884,454.00$

Unit Price Amount Unit Price Amount

Cutting Edge Concrete Services La Forge and Budd Construction Co.

315,000.00$ 385,000.00$

37,500.00$ 112,500.00$

892,500.00$ 935,000.00$

220,000.00$ 220,000.00$

16,000.00$ 22,000.00$

29,000.00$ 58,000.00$

8,800.00$ 3,300.00$

16,000.00$ 18,000.00$

63,000.00$ 28,000.00$

144,000.00$ 30,400.00$

40,000.00$ 60,000.00$

4,400.00$ 3,300.00$

210,000.00$ 400,000.00$ 210,000.00$ 400,000.00$

4.00$ 3.00$

1,000.00$ 1,500.00$

90.00$ 19.00$

4.50$ 2.00$

800.00$ 900.00$

80.00$ 30.00$

1.00$ 2.00$

800.00$ 1,100.00$

110.00$ 110.00$

105.00$ 110.00$

3.00$ 9.00$

45.00$ 55.00$

1/5/2018 Page 19 of 24

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"

Item No. Quantity Unit

56301-1000 Line A0800 ALL LPSM

57401-0000 Line A0820 710 SQYD

57402-0000 Line A0840 360 TON

57403-0000 Line A0860 60 SQYD

60103-0000 Line A0880 1 EACH

60103-0000 Line A0900 1 EACH

60202-0200 Line A0920 3,800 LNFT

60202-0400 Line A0940 500 LNFT

60211-0800 Line A0960 1 EACH

60220-2950 Line A0980 200 LNFT

60401-0000 Line A1000 3 EACH

60403-0000 Line A1020 10 EACH

60403-2200 Line A1040 9 EACH

10 FEET SPAN, 4 FEET RISE PRECAST REINFORC

MANHOLE

INLET

INLET, FLH TYPE 7A

GRS-IBS, CONCRETE MASONRY UNIT

CONCRETE, HEADWALL (INLET HEADWALL, WIN

CONCRETE, HEADWALL (OUTLET HEADWALL, W

18-INCH EQUIVALENT DIAMETER ARCH OR ELLI

24-INCH EQUIVALENT DIAMETER ARCH OR ELLI

END SECTION FOR 24-INCH EQUIVALENT DIAME

PAINTING, CONCRETE STRUCTURE

GRS-IBS, GEOSYNTHETIC REINFORCEMENT

GRS-IBS, OPEN-GRADED BACKFILL

-6.4% 8,941,230.00$ -7.0% 8,884,454.00$

Unit Price Amount Unit Price Amount

Cutting Edge Concrete Services La Forge and Budd Construction Co.

6,500.00$ 12,000.00$

10,650.00$ 7,100.00$

18,000.00$ 21,600.00$

12,000.00$ 30,000.00$

20,000.00$ 35,000.00$

20,000.00$ 20,000.00$

437,000.00$ 361,000.00$

80,000.00$ 42,500.00$

1,000.00$ 1,500.00$

360,000.00$ 340,000.00$

19,500.00$ 19,500.00$

75,000.00$ 75,000.00$

67,500.00$ 63,000.00$ 7,500.00$ 7,000.00$

7,500.00$ 7,500.00$

6,500.00$ 6,500.00$

1,800.00$ 1,700.00$

1,000.00$ 1,500.00$

160.00$ 85.00$

115.00$ 95.00$

20,000.00$ 20,000.00$

20,000.00$ 35,000.00$

200.00$ 500.00$

50.00$ 60.00$

15.00$ 10.00$

6,500.00$ 12,000.00$

1/5/2018 Page 20 of 24

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"

Item No. Quantity Unit

60421-0000 Line A1060 1 EACH

60901-0000 Line A1080 3,900 LNFT

60902-0800 Line A1100 70 LNFT

60902-1200 Line A1120 7,500 LNFT

61110-1000 Line A1140 ALL LPSM

61501-0100 Line A1160 1,600 SQYD

61502-1000 Line A1180 25 SQYD

61504-1000 Line A1200 300 SQYD

61509-0000 Line A1220 90 SQYD

61601-1000 Line A1240 50 SQYD

61701-4500 Line A1260 1,100 LNFT

61702-1500 Line A1280 10 EACH

61707-4000 Line A1300 55 LNFT

CURB AND GUTTER, CONCRETE, 10-INCH DEPTH

CURB AND GUTTER, CONCRETE, 14-INCH DEPTH

IRRIGATION SYSTEM

SIDEWALK, CONCRETE

DRIVE PAD, CONCRETE

ACCESSIBILITY RAMP, CONCRETE

OIL/GRIT SEPARATOR (WATER QUALITY STRUCT

CURB, CONCRETE (FLUSH CURB)

DETECTABLE WARNING PANELS

SLOPE PAVING, CONCRETE

GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STE

TERMINAL SECTION, TYPE MGS TANGENT

STRUCTURE TRANSITION RAILING, MGS SYSTEM

-6.4% 8,941,230.00$ -7.0% 8,884,454.00$

Unit Price Amount Unit Price Amount

Cutting Edge Concrete Services La Forge and Budd Construction Co.

17,000.00$ 25,000.00$

58,500.00$ 117,000.00$

3,500.00$ 3,150.00$

225,000.00$ 225,000.00$

325,000.00$ 300,000.00$

112,000.00$ 96,000.00$

3,500.00$ 1,500.00$

42,000.00$ 45,000.00$

36,000.00$ 18,000.00$

12,500.00$ 20,000.00$

93,500.00$ 27,500.00$

35,000.00$ 22,000.00$

13,750.00$ 6,875.00$

400.00$ 200.00$

140.00$ 150.00$

140.00$ 60.00$

70.00$ 60.00$

325,000.00$ 300,000.00$

30.00$ 30.00$

50.00$ 45.00$

15.00$ 30.00$

17,000.00$ 25,000.00$

250.00$ 400.00$

3,500.00$ 2,200.00$

85.00$ 25.00$

250.00$ 125.00$

1/5/2018 Page 21 of 24

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"

Item No. Quantity Unit

61901-2250 Line A1320 4,800 LNFT

61901-2500 Line A1340 1,800 LNFT

61902-1600 Line A1360 2 EACH

62201-0250 Line A1380 40 HOUR

62201-0400 Line A1400 40 HOUR

62201-0950 Line A1420 40 HOUR

62201-2800 Line A1440 40 HOUR

62301-0000 Line A1460 100 HOUR

62302-1000 Line A1480 100 HOUR

62302-1100 Line A1500 100 HOUR

62402-0300 Line A1520 1.3 ACRE

62510-1000 Line A1540 4.3 ACRE

62515-1000 Line A1560 4.3 ACRE

FENCE, RAIL (WROUGHT IRON, 6' HEIGHT)

GENERAL LABOR

SPECIAL LABOR, HIRED TECHNICAL SERVICES

SPECIAL LABOR, HIRED SURVEY SERVICES

FURNISHING AND PLACING TOPSOIL, 4-INCH D

SEEDING, DRY METHOD

MULCHING, DRY METHOD

FENCE, SPLIT RAIL, 3 RAIL (WOOD)

GATE, METAL, 20 FEET WIDTH (WROUGHT IRON

DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPAC

BACKHOE LOADER, 2 CUBIC F00T MINIMUM RAT

WHEEL LOADER, 3 CUBIC YARD MINIMUM RATE

MOTOR GRADER, 8 FOOT MINIMUM BLADE

-6.4% 8,941,230.00$ -7.0% 8,884,454.00$

Unit Price Amount Unit Price Amount

Cutting Edge Concrete Services La Forge and Budd Construction Co.

528,000.00$ 216,000.00$

117,000.00$ 36,000.00$

9,000.00$ 10,000.00$

5,000.00$ 3,200.00$

5,600.00$ 3,200.00$

6,400.00$ 3,200.00$

6,400.00$ 3,200.00$

6,500.00$ 3,500.00$

17,500.00$ 15,000.00$

17,500.00$ 15,000.00$

26,000.00$ 45,500.00$

32,250.00$ 34,400.00$

19,350.00$ 15,050.00$

110.00$ 45.00$

4,500.00$ 5,000.00$

65.00$ 20.00$

140.00$ 80.00$

125.00$ 80.00$

160.00$ 80.00$

160.00$ 80.00$

175.00$ 150.00$

65.00$ 35.00$

20,000.00$ 35,000.00$

175.00$ 150.00$

4,500.00$ 3,500.00$

7,500.00$ 8,000.00$

1/5/2018 Page 22 of 24

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"

Item No. Quantity Unit

62632-0000 Line A1580 ALL LPSM

63301-0000 Line A1600 66 EACH

63401-0700 Line A1620 62,500 LNFT

63401-0800 Line A1640 6,100 LNFT

63405-1300 Line A1660 23 EACH

63405-1400 Line A1680 2 EACH

63405-1450 Line A1700 12 EACH

63405-1600 Line A1720 1 EACH

63502-0600 Line A1740 10 EACH

63502-0700 Line A1760 100 EACH

63502-1300 Line A1780 100 EACH

63502-2000 Line A1800 3 EACH

63502-2100 Line A1820 2 EACH

TEMPORARY TRAFFIC CONTROL, CRASH CUSHIO

PAVEMENT MARKINGS, TYPE D, "ONLY" WORD M

PAVEMENT MARKINGS, TYPE D, RAILROAD SYMB

TEMPORARY TRAFFIC CONTROL, BARRICADE TY

TEMPORARY TRAFFIC CONTROL, CONE

TEMPORARY TRAFFIC CONTROL, DRUM

TEMPORARY TRAFFIC CONTROL, PORTABLE CHA

PLANTINGS

SIGN SYSTEM

PAVEMENT MARKINGS, TYPE D, SOLID

PAVEMENT MARKINGS, TYPE D, BROKEN

PAVEMENT MARKINGS, TYPE D, TURN ARROW

PAVEMENT MARKINGS, TYPE D, STRAIGHT/TURN

-6.4% 8,941,230.00$ -7.0% 8,884,454.00$

Unit Price Amount Unit Price Amount

Cutting Edge Concrete Services La Forge and Budd Construction Co.

350,000.00$ 200,000.00$

19,800.00$ 19,800.00$

18,750.00$ 15,625.00$

1,830.00$ 1,464.00$

6,900.00$ 1,840.00$

1,000.00$ 160.00$

3,600.00$ 1,200.00$

1,000.00$ 145.00$

1,000.00$ 3,000.00$

3,500.00$ 10,000.00$

8,500.00$ 10,000.00$

15,000.00$ 30,000.00$

1,500.00$ 20,000.00$

300.00$ 300.00$

350,000.00$ 200,000.00$

0.30$ 0.24$

0.30$ 0.25$

500.00$ 80.00$

300.00$ 80.00$

1,000.00$ 145.00$

300.00$ 100.00$

35.00$ 100.00$

100.00$ 300.00$

5,000.00$ 10,000.00$

85.00$ 100.00$

750.00$ 10,000.00$

1/5/2018 Page 23 of 24

Project No: NM FLAP 52000(1)

Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"

Item No. Quantity Unit

63503-0400 Line A1840 200 LNFT

63503-1000 Line A1860 4,200 LNFT

63504-1000 Line A1880 500 SQFT

63505-1000 Line A1900 6.1 MILE

63506-0500 Line A1920 6,000 HOUR

63511-0100 Line A1940 1,500 HOUR

63601-1000 Line A1960 ALL LPSM

63601-2000 Line A1980 ALL LPSM

63602-7000 Line A2000 2 EACH

63610-2800 Line A2020 4,500 LNFT

63621-1000 Line A2040 14 EACH

64502-0000 Line A2060 20 EACH

64604-3000 Line A2080 40 LNFT

UTILITY BOX, PULLBOX

TEMPORARY TRAFFIC CONTROL, CONCRETE BAR

TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO

TEMPORARY TRAFFIC CONTROL, PAVEMENT MAR

TEMPORARY TRAFFIC CONTROL, FLAGGER

LOCATE UTILITIES (POTHOLING)

FIXTURE, PEDESTRIAN RAILING

TEMPORARY TRAFFIC CONTROL, RAILROAD FLAG

SYSTEM INSTALLATION, TRAFFIC SIGNAL

SYSTEM INSTALLATION, LIGHTING

SYSTEM INSTALLATION, SPEED FEEDBACK SIGN

CONDUIT, 4-INCH, PVC

-6.4% 8,941,230.00$ -7.0% 8,884,454.00$

Unit Price Amount Unit Price Amount

Cutting Edge Concrete Services La Forge and Budd Construction Co.

8,000.00$ 20,000.00$

16,800.00$ 16,800.00$

17,500.00$ 2,000.00$

12,200.00$ 18,300.00$

360,000.00$ 180,000.00$

97,500.00$ 187,500.00$

200,000.00$ 210,000.00$

150,000.00$ 135,000.00$

35,000.00$ 20,000.00$

67,500.00$ 45,000.00$

14,000.00$ 14,000.00$

30,000.00$ 15,000.00$

7,000.00$ 10,000.00$

40.00$ 100.00$

35.00$ 4.00$

4.00$ 4.00$

60.00$ 30.00$

2,000.00$ 3,000.00$

200,000.00$ 210,000.00$

65.00$ 125.00$

17,500.00$ 10,000.00$

150,000.00$ 135,000.00$

1,000.00$ 1,000.00$

15.00$ 10.00$

175.00$ 250.00$

1,500.00$ 750.00$

1/5/2018 Page 24 of 24

Option X Central Federal Lands Highway Division

Project No : NM FTFW VAOR(1) FLMA No:

Project Name : Entrance Road Solcitation No:

State : NM County : Bernalillo Federal Location : Valle de Oro NWR

Opened at: 2:00pm Opened by: Joe Wilson Date: 12/28/2017

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed:

Title:

Date:

Contract Awarded to: Award Date:

Contract Number: Data is Public

Contractor Comment Bid Amount Responsive

Engineer's Estimate 710,000.00$

Albuquerque Asphalt 348,614.27$

Star Paving Company 430,829.87$

Stormwater Plans, LLC 392,441.00$

Cutting Edge Concrete 700,085.00$

LaForge & Budd Constr 802,410.40$

DTFH6817B00030

Albuquerque Asphalt

1/5/2018 FHWA Confidential Page 1 of 1

Option X Total of Bid Items: 710,000.00$ -50.9% 348,614.27$

Project No: NM FTFW VAOR(1)

Project Name: Entrance Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

15101-0000 Line X0020 ALL LPSM 90,446.00$ 90,446.00$ 23,041.15$

15215-3000 Line X0040 5 EACH 2,000.00$ 10,000.00$ 1,332.95$

15215-7000 Line X0060 1 EACH 2,500.00$ 2,500.00$ 5,065.21$

15225-0000 Line X0080 0.600 MILE 12,000.00$ 7,200.00$ 1,919.45$

15236-2000 Line X0100 1.100 MILE 11,000.00$ 12,100.00$ 8,210.97$

15301-0000 Line X0120 ALL LPSM 16,500.00$ 16,500.00$ 19,164.18$

15401-0000 Line X0140 ALL LPSM 5,500.00$ 5,500.00$ 8,116.60$

15501-0000 Line X0160 ALL LPSM 2,500.00$ 2,500.00$ 1,331.29$

15705-1400 Line X0180 3,600 LNFT 10.00$ 36,000.00$ 5,148.00$

15706-1600 Line X0200 1 EACH 2,000.00$ 2,000.00$ 1,045.03$

15802-0000 Line X0220 ALL LPSM 10,000.00$ 10,000.00$ 4,364.28$

20101-0000 Line X0240 1.2 ACRE 2,000.00$ 2,400.00$ 5,854.24$

20304-1000 Line X0260 ALL LPSM 10,000.00$ 10,000.00$ 3,745.75$

SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL

3,199.08$

MOBILIZATION

SURVEY AND STAKING, DRAINAGE STRUCTURE

SURVEY AND STAKING, PARKING AREA

CONTRACTOR TESTING

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, FIBER ROLL

SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

WATERING FOR DUST CONTROL

CLEARING AND GRUBBING

SURVEY CONTROL, GRADE FINISHING

CONTRACTOR QUALITY CONTROL

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

Albuquerque Asphalt

266.59$

23,041.15$

7,464.52$

5,065.21$

1,331.29$

8,116.60$

19,164.18$

1,045.03$

1.43$

4,878.53$

4,364.28$

3,745.75$

Engineer's Estimate

1/5/2018 Page 1 of 9

Project No: NM FTFW VAOR(1)

Project Name: Entrance Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

Albuquerque AsphaltEngineer's Estimate

20420-0000 Line X0280 4,600 CUYD 35.00$ 161,000.00$ 30,084.00$

25101-0200 Line X0300 20 CUYD 150.00$ 3,000.00$ 1,919.40$

30202-2000 Line X0320 1,590 TON 40.00$ 63,600.00$ 43,518.30$

40301-0100 Line X0340 260 TON 150.00$ 39,000.00$ 29,146.00$

40301-0100 Line X0360 650 TON 150.00$ 97,500.00$ 56,407.00$

40601-0000 Line X0380 2 TON 800.00$ 1,600.00$ 1,590.62$

41102-1000 Line X0400 3,900 SQYD 2.00$ 7,800.00$ 3,510.00$

41201-0000 Line X0420 2 TON 800.00$ 1,600.00$ 1,513.28$

50101-2600 Line X0440 190 SQYD 130.00$ 24,700.00$ 20,026.00$

60202-0200 Line X0460 70 LNFT 180.00$ 12,600.00$ 3,210.90$

60202-0400 Line X0480 100 LNFT 220.00$ 22,000.00$ 5,076.00$

60211-0600 Line X0500 3 EACH 700.00$ 2,100.00$ 1,180.74$

60211-0800 Line X0520 4 EACH 800.00$ 3,200.00$ 2,115.80$

ROADWAY AGGREGATE, METHOD 2

ASPHALT CONCRETE PAVEMENT, TYPE 1 (PG 70-22) FOR TRAIL CONSTRUCTION

ASPHALT CONCRETE PAVEMENT, TYPE 1 (PG 76-28) FOR ROAD CONSTUCTION

END SECTION FOR 18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

END SECTION FOR 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

FOG SEAL

PRIME COAT, METHOD 1

TACK COAT

MINOR CONCRETE PAVEMENT, PLAIN, 6-INCH DEPTH

18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

EMBANKMENT CONSTRUCTION

PLACED RIPRAP, METHOD A, CLASS 2

6.54$

27.37$

95.97$

86.78$

112.10$

0.90$

795.31$

105.40$

756.64$

50.76$

45.87$

528.95$

393.58$

1/5/2018 Page 2 of 9

Project No: NM FTFW VAOR(1)

Project Name: Entrance Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

Albuquerque AsphaltEngineer's Estimate

60403-2200 Line X0540 2 EACH 5,000.00$ 10,000.00$ 12,448.34$

61901-2500 Line X0560 700 LNFT 30.00$ 21,000.00$ 16,310.00$

61902-2200 Line X0580 1 EACH 5,000.00$ 5,000.00$ 4,798.62$

61904-0000 Line X0600 3 EACH 600.00$ 1,800.00$ 1,238.04$

62402-0400 Line X0620 0.7 ACRE 9,000.00$ 6,300.00$ 10,037.50$

62510-1000 Line X0640 0.7 ACRE 2,000.00$ 1,400.00$ 2,929.82$

62515-1000 Line X0660 0.7 ACRE 3,000.00$ 2,100.00$ 884.55$

63301-0000 Line X0680 13 EACH 300.00$ 3,900.00$ 2,356.64$

63401-0700 Line X0700 6,490 LNFT 0.60$ 3,894.00$ 1,687.40$

63401-0800 Line X0720 720 LNFT 0.50$ 360.00$ 187.20$

63405-1300 Line X0740 4 EACH 300.00$ 1,200.00$ 341.24$

63405-1450 Line X0760 3 EACH 400.00$ 1,200.00$ 319.92$

63501-0000 Line X0780 ALL LPSM 5,000.00$ 5,000.00$ 7,437.86$

BOLLARD POST

PAVEMENT MARKINGS, TYPE D, TURN ARROW

PAVEMENT MARKINGS, TYPE D, "ONLY" WORD MESSAGE

TEMPORARY TRAFFIC CONTROL

FURNISHING AND PLACING TOPSOIL, 6-INCH DEPTH

SEEDING, DRY METHOD

MULCHING, DRY METHOD

SIGN SYSTEM

PAVEMENT MARKINGS, TYPE D, SOLID

PAVEMENT MARKINGS, TYPE D, BROKEN

INLET, FLH TYPE 7A

FENCE, SPLIT RAIL, 3 RAIL

GATE, METAL, 34 FEET WIDTH

23.30$

6,224.17$

412.68$

4,798.62$

4,185.46$

14,339.29$

181.28$

1,263.64$

0.26$

0.26$

106.64$

85.31$

7,437.86$

1/5/2018 Page 3 of 9

Option X Total of Bid Items:

Project No: NM FTFW VAOR(1)

Project Name: Entrance Road CQ = "Contract Quantity"

Item No. Quantity Unit

15101-0000 Line X0020 ALL LPSM

15215-3000 Line X0040 5 EACH

15215-7000 Line X0060 1 EACH

15225-0000 Line X0080 0.600 MILE

15236-2000 Line X0100 1.100 MILE

15301-0000 Line X0120 ALL LPSM

15401-0000 Line X0140 ALL LPSM

15501-0000 Line X0160 ALL LPSM

15705-1400 Line X0180 3,600 LNFT

15706-1600 Line X0200 1 EACH

15802-0000 Line X0220 ALL LPSM

20101-0000 Line X0240 1.2 ACRE

20304-1000 Line X0260 ALL LPSM

SLOPE, REFERENCE, AND CLEARING AND GRUBB

MOBILIZATION

SURVEY AND STAKING, DRAINAGE STRUCTURE

SURVEY AND STAKING, PARKING AREA

CONTRACTOR TESTING

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, FIBER ROLL

SOIL EROSION CONTROL, STABILIZED CONSTR

WATERING FOR DUST CONTROL

CLEARING AND GRUBBING

SURVEY CONTROL, GRADE FINISHING

CONTRACTOR QUALITY CONTROL

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

-39.3% 430,829.87$ -44.7% 392,441.00$

Unit Price Amount Unit Price Amount

14,250.00$ 37,000.00$

2,214.65$ 3,000.00$

3,325.00$ 5,000.00$

3,324.00$ 3,150.00$

9,746.00$ 4,125.00$

31,000.00$ 4,000.00$

15,060.00$ 7,000.00$

2,000.00$ 5,000.00$

5,760.00$ 6,300.00$

2,250.00$ 3,500.00$

16,700.00$ 5,000.00$

3,820.10$ 1,800.00$

5,000.00$ 7,000.00$

5,540.00$ 5,250.00$

14,250.00$ 37,000.00$

Star Paving Company Stormwater Plans, LLC

8,860.00$ 3,750.00$

442.93$ 600.00$

3,325.00$ 5,000.00$

2,000.00$ 5,000.00$

15,060.00$ 7,000.00$

31,000.00$ 4,000.00$

2,250.00$ 3,500.00$

1.60$ 1.75$

3,183.42$ 1,500.00$

16,700.00$ 5,000.00$

5,000.00$ 7,000.00$

1/5/2018 Page 4 of 9

Project No: NM FTFW VAOR(1)

Project Name: Entrance Road CQ = "Contract Quantity"

Item No. Quantity Unit

20420-0000 Line X0280 4,600 CUYD

25101-0200 Line X0300 20 CUYD

30202-2000 Line X0320 1,590 TON

40301-0100 Line X0340 260 TON

40301-0100 Line X0360 650 TON

40601-0000 Line X0380 2 TON

41102-1000 Line X0400 3,900 SQYD

41201-0000 Line X0420 2 TON

50101-2600 Line X0440 190 SQYD

60202-0200 Line X0460 70 LNFT

60202-0400 Line X0480 100 LNFT

60211-0600 Line X0500 3 EACH

60211-0800 Line X0520 4 EACH

ROADWAY AGGREGATE, METHOD 2

ASPHALT CONCRETE PAVEMENT, TYPE 1 (PG 70-

ASPHALT CONCRETE PAVEMENT, TYPE 1 (PG 76-

END SECTION FOR 18-INCH EQUIVALENT DIAME

END SECTION FOR 24-INCH EQUIVALENT DIAME

FOG SEAL

PRIME COAT, METHOD 1

TACK COAT

MINOR CONCRETE PAVEMENT, PLAIN, 6-INCH D

18-INCH EQUIVALENT DIAMETER ARCH OR ELLI

24-INCH EQUIVALENT DIAMETER ARCH OR ELLI

EMBANKMENT CONSTRUCTION

PLACED RIPRAP, METHOD A, CLASS 2

-39.3% 430,829.87$ -44.7% 392,441.00$

Unit Price Amount Unit Price Amount

Star Paving Company Stormwater Plans, LLC

59,800.00$ 18,400.00$

3,060.00$ 2,100.00$

32,277.00$ 39,750.00$

22,100.00$ 39,000.00$

53,950.00$ 58,500.00$

1,760.00$ 950.00$

2,730.00$ 1,560.00$

1,250.00$ 2,200.00$

18,430.00$ 26,600.00$

4,200.00$ 5,950.00$

6,100.00$ 9,000.00$

1,299.00$ 1,500.00$

3,200.00$ 13,600.00$

13.00$ 4.00$

20.30$ 25.00$

153.00$ 105.00$

83.00$ 90.00$

85.00$ 150.00$

0.70$ 0.40$

880.00$ 475.00$

97.00$ 140.00$

625.00$ 1,100.00$

61.00$ 90.00$

60.00$ 85.00$

800.00$ 3,400.00$

433.00$ 500.00$

1/5/2018 Page 5 of 9

Project No: NM FTFW VAOR(1)

Project Name: Entrance Road CQ = "Contract Quantity"

Item No. Quantity Unit

60403-2200 Line X0540 2 EACH

61901-2500 Line X0560 700 LNFT

61902-2200 Line X0580 1 EACH

61904-0000 Line X0600 3 EACH

62402-0400 Line X0620 0.7 ACRE

62510-1000 Line X0640 0.7 ACRE

62515-1000 Line X0660 0.7 ACRE

63301-0000 Line X0680 13 EACH

63401-0700 Line X0700 6,490 LNFT

63401-0800 Line X0720 720 LNFT

63405-1300 Line X0740 4 EACH

63405-1450 Line X0760 3 EACH

63501-0000 Line X0780 ALL LPSM

BOLLARD POST

PAVEMENT MARKINGS, TYPE D, TURN ARROW

PAVEMENT MARKINGS, TYPE D, "ONLY" WORD M

TEMPORARY TRAFFIC CONTROL

FURNISHING AND PLACING TOPSOIL, 6-INCH D

SEEDING, DRY METHOD

MULCHING, DRY METHOD

SIGN SYSTEM

PAVEMENT MARKINGS, TYPE D, SOLID

PAVEMENT MARKINGS, TYPE D, BROKEN

INLET, FLH TYPE 7A

FENCE, SPLIT RAIL, 3 RAIL

GATE, METAL, 34 FEET WIDTH

-39.3% 430,829.87$ -44.7% 392,441.00$

Unit Price Amount Unit Price Amount

Star Paving Company Stormwater Plans, LLC

6,300.00$ 9,000.00$

10,360.00$ 16,800.00$

4,252.00$ 5,000.00$

1,320.00$ 1,575.00$

27,426.00$ 26,600.00$

6,524.00$ 4,725.00$

2,795.80$ 2,100.00$

4,277.00$ 4,095.00$

14,667.40$ 3,894.00$

1,627.20$ 432.00$

1,129.84$ 1,260.00$

1,694.88$ 975.00$

23,850.00$ 5,000.00$

14.80$ 24.00$

3,150.00$ 4,500.00$

440.00$ 525.00$

4,252.00$ 5,000.00$

9,320.00$ 6,750.00$

39,180.00$ 38,000.00$

329.00$ 315.00$

3,994.00$ 3,000.00$

2.26$ 0.60$

2.26$ 0.60$

564.96$ 325.00$

282.46$ 315.00$

23,850.00$ 5,000.00$

1/5/2018 Page 6 of 9

Project No: NM FTFW VAOR(1)

Project Name: Entrance Road CQ = "Contract Quantity"

Item No. Quantity Unit

15101-0000 Line X0020 ALL LPSM

15215-3000 Line X0040 5 EACH

15215-7000 Line X0060 1 EACH

15225-0000 Line X0080 0.600 MILE

15236-2000 Line X0100 1.100 MILE

15301-0000 Line X0120 ALL LPSM

15401-0000 Line X0140 ALL LPSM

15501-0000 Line X0160 ALL LPSM

15705-1400 Line X0180 3,600 LNFT

15706-1600 Line X0200 1 EACH

15802-0000 Line X0220 ALL LPSM

20101-0000 Line X0240 1.2 ACRE

20304-1000 Line X0260 ALL LPSM

SLOPE, REFERENCE, AND CLEARING AND GRUBB

MOBILIZATION

SURVEY AND STAKING, DRAINAGE STRUCTURE

SURVEY AND STAKING, PARKING AREA

CONTRACTOR TESTING

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, FIBER ROLL

SOIL EROSION CONTROL, STABILIZED CONSTR

WATERING FOR DUST CONTROL

CLEARING AND GRUBBING

SURVEY CONTROL, GRADE FINISHING

CONTRACTOR QUALITY CONTROL

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

-1.4% 700,085.00$ 13.0% 802,410.40$

Unit Price Amount Unit Price Amount

45,000.00$ 75,000.00$

5,000.00$ 2,500.00$

3,500.00$ 8,000.00$

4,800.00$ 18,000.00$

6,050.00$ 16,500.00$

35,000.00$ 75,000.00$

35,000.00$ 40,000.00$

5,000.00$ 5,000.00$

18,000.00$ 10,800.00$

2,500.00$ 5,000.00$

35,000.00$ 25,000.00$

7,320.00$ 6,000.00$

25,000.00$ 4,500.00$

8,000.00$ 30,000.00$

45,000.00$

Cutting Edge Concrete Services LaForge & Budd Construction Co

5,500.00$ 15,000.00$

75,000.00$

1,000.00$ 500.00$

3,500.00$ 8,000.00$

5,000.00$ 5,000.00$

35,000.00$ 40,000.00$

35,000.00$ 75,000.00$

2,500.00$ 5,000.00$

5.00$ 3.00$

6,100.00$ 5,000.00$

35,000.00$ 25,000.00$

25,000.00$ 4,500.00$

1/5/2018 Page 7 of 9

Project No: NM FTFW VAOR(1)

Project Name: Entrance Road CQ = "Contract Quantity"

Item No. Quantity Unit

20420-0000 Line X0280 4,600 CUYD

25101-0200 Line X0300 20 CUYD

30202-2000 Line X0320 1,590 TON

40301-0100 Line X0340 260 TON

40301-0100 Line X0360 650 TON

40601-0000 Line X0380 2 TON

41102-1000 Line X0400 3,900 SQYD

41201-0000 Line X0420 2 TON

50101-2600 Line X0440 190 SQYD

60202-0200 Line X0460 70 LNFT

60202-0400 Line X0480 100 LNFT

60211-0600 Line X0500 3 EACH

60211-0800 Line X0520 4 EACH

ROADWAY AGGREGATE, METHOD 2

ASPHALT CONCRETE PAVEMENT, TYPE 1 (PG 70-

ASPHALT CONCRETE PAVEMENT, TYPE 1 (PG 76-

END SECTION FOR 18-INCH EQUIVALENT DIAME

END SECTION FOR 24-INCH EQUIVALENT DIAME

FOG SEAL

PRIME COAT, METHOD 1

TACK COAT

MINOR CONCRETE PAVEMENT, PLAIN, 6-INCH D

18-INCH EQUIVALENT DIAMETER ARCH OR ELLI

24-INCH EQUIVALENT DIAMETER ARCH OR ELLI

EMBANKMENT CONSTRUCTION

PLACED RIPRAP, METHOD A, CLASS 2

-1.4% 700,085.00$ 13.0% 802,410.40$

Unit Price Amount…