T A B U L A T I O N O F B I D S Schedule A Central Federal Lands Highway Division
Project No : NM FLAP 52000(1) FLMA No:
Project Name : 2nd Street Southwest Corridor Improvements and Additions Solcitation No:
State : NM County : Bernalillo Federal Location : Valle de Oro NWR
Opened at: 2:00pm Opened by: Joe Wilson Date: 12/28/2017
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed:
Title:
Date:
Contract Awarded to: Award Date:
Contract Number: Data is Public
Contractor Comment Bid Amount Responsive
Engineer's Estimate 9,555,000.00$
Albuquerque Asphalt, I 5,143,551.45$
Star Paving Company 5,642,638.60$
SWP Contracting & Pav 6,670,410.00$
Cutting Edge Concrete 8,941,230.00$
La Forge and Budd Con 8,884,454.00$
DTFH6817B00030
Albuquerque Asphalt, Inc.
1/5/2018 FHWA Confidential Page 1 of 1
Schedule A Total of Bid Items: 9,555,000.00$ -46.2% 5,143,551.45$ Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvements and Additions CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
15101-0000 Line A0020 ALL LPSM 1,637,755.00$ 1,637,755.00$ 370,967.28$
15214-1000 Line A0040 ALL LPSM 30,000.00$ 30,000.00$ 3,199.08$
15215-3000 Line A0060 35 EACH 2,500.00$ 87,500.00$ 6,531.35$
15225-0000 Line A0080 1.800 MILE 25,000.00$ 45,000.00$ 5,758.34$
15236-2000 Line A0100 3.600 MILE 20,000.00$ 72,000.00$ 26,872.27$
15301-0000 Line A0120 ALL LPSM 250,000.00$ 250,000.00$ 95,820.89$
15401-0000 Line A0140 ALL LPSM 91,000.00$ 91,000.00$ 112,844.35$
15501-0000 Line A0160 ALL LPSM 50,350.00$ 50,350.00$ 3,328.23$
15705-1400 Line A0180 15,500 LNFT 20.00$ 310,000.00$ 22,165.00$
15705-1800 Line A0200 110 LNFT 60.00$ 6,600.00$ 1,141.80$
15706-1000 Line A0220 19 EACH 3,000.00$ 57,000.00$ 1,580.42$
15706-1600 Line A0240 4 EACH 4,000.00$ 16,000.00$ 4,180.12$
15802-0000 Line A0260 ALL LPSM 40,000.00$ 40,000.00$ 47,135.65$
Engineer's Estimate
47,135.65$
1,045.03$
83.18$
10.38$
1.43$
3,328.23$
112,844.35$
95,820.89$
7,464.52$
186.61$
Albuquerque Asphalt, Inc.
3,199.08$
370,967.28$
MOBILIZATION
SURVEY AND STAKING, BRIDGE (GRS-IBS)
SURVEY AND STAKING, DRAINAGE STRUCTURE
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, FIBER ROLL
SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM
SOIL EROSION CONTROL, INLET PROTECTION
SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
SURVEY CONTROL, GRADE FINISHING
CONTRACTOR QUALITY CONTROL
WATERING FOR DUST CONTROL
SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL
3,199.08$
1/5/2018 Page 1 of 24
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvements and Additions CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Engineer's Estimate Albuquerque Asphalt, Inc.
20101-0000 Line A0280 14.5 ACRE 3,000.00$ 43,500.00$ 18,400.07$
20302-1200 Line A0300 1,330 LNFT 4.00$ 5,320.00$ 4,256.00$
20302-2100 Line A0320 90 LNFT 50.00$ 4,500.00$ 6,229.80$
20303-1600 Line A0340 8,000 SQYD 10.00$ 80,000.00$ 19,440.00$
20315-0000 Line A0360 8,100 LNFT 4.00$ 32,400.00$ 9,477.00$
20401-0000 Line A0380 10,000 CUYD 20.00$ 200,000.00$ 71,900.00$
20420-0000 Line A0400 140 CUYD 45.00$ 6,300.00$ 3,826.20$
20441-0000 Line A0420 6,500 CUYD 15.00$ 97,500.00$ 75,530.00$
20801-0000 Line A0440 350 CUYD 40.00$ 14,000.00$ 11,508.00$
21102-2000 Line A0460 ALL LPSM 10,000.00$ 10,000.00$ 8,378.09$
25101-0100 Line A0480 10 CUYD 135.00$ 1,350.00$ 959.70$
25101-0200 Line A0500 5 CUYD 150.00$ 750.00$ 479.85$
25101-0300 Line A0520 540 CUYD 180.00$ 97,200.00$ 44,339.40$ 82.11$
95.97$
95.97$
8,378.09$
32.88$
11.62$
27.33$
7.19$
1.17$
2.43$
69.22$
3.20$
1,268.97$
REMOVAL OF PIPE CULVERT
REMOVAL OF PAVEMENT, ASPHALT
SAWCUTTING PAVEMENT
PLACED RIPRAP, METHOD A, CLASS 2
PLACED RIPRAP, METHOD A, CLASS 3
ROADWAY EXCAVATION
EMBANKMENT CONSTRUCTION
WASTE
STRUCTURE EXCAVATION
ROADWAY OBLITERATION, METHOD 2
PLACED RIPRAP, METHOD A, CLASS 1
CLEARING AND GRUBBING
REMOVAL OF GUARDRAIL
1/5/2018 Page 2 of 24
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvements and Additions CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Engineer's Estimate Albuquerque Asphalt, Inc.
30202-2000 Line A0540 7,000 TON 50.00$ 350,000.00$ 242,620.00$
30402-1000 Line A0560 12,500 SQYD 5.00$ 62,500.00$ 50,375.00$
40301-0100 Line A0580 8,500 TON 150.00$ 1,275,000.00$ 719,440.00$
40301-0100 Line A0600 2,000 TON 150.00$ 300,000.00$ 166,820.00$
40601-0000 Line A0620 20 TON 900.00$ 18,000.00$ 15,906.00$
41102-1000 Line A0640 29,000 SQYD 3.00$ 87,000.00$ 25,810.00$
41105-0000 Line A0660 110 TON 200.00$ 22,000.00$ 2,444.20$
41201-0000 Line A0680 20 TON 900.00$ 18,000.00$ 15,132.80$
41301-0600 Line A0700 14,000 SQYD 3.00$ 42,000.00$ 19,740.00$
41801-3000 Line A0720 1,600 SQYD 5.00$ 8,000.00$ 52,336.00$
55201-0600 Line A0740 40 CUYD 800.00$ 32,000.00$ 20,687.20$
55401-1000 Line A0760 1,100 LB 2.00$ 2,200.00$ 4,103.00$
55504-0000 Line A0780 ALL LPSM 250,000.00$ 250,000.00$ 158,674.37$ 158,674.37$
3.73$
517.18$
32.71$
1.41$
756.64$
22.22$
0.89$
795.30$
83.41$
84.64$
4.03$
34.66$
ROADWAY AGGREGATE, METHOD 2
FULL DEPTH RECLAMATION, METHOD 1
ASPHALT CONCRETE PAVEMENT, TYPE 1 (MAINLINE PAVEMENT, PG 76-28)
ASPHALT CONCRETE PAVEMENT, TYPE 1 (TRAIL PAVEMENT, PG 70-22)
STRUCTURAL CONCRETE, CLASS C (AE)
REINFORCING STEEL
PRE-FABRICATED STEEL BRIDGE (GRS-IBS, PEDESTRIAN BRIDGE)
FOG SEAL
PRIME COAT, METHOD 1
BLOTTER
TACK COAT
ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
ASPHALT CONCRETE PAVEMENT PATCH, TYPE 3
1/5/2018 Page 3 of 24
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvements and Additions CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Engineer's Estimate Albuquerque Asphalt, Inc.
56301-1000 Line A0800 ALL LPSM 1,500.00$ 1,500.00$ 13,862.68$
57401-0000 Line A0820 710 SQYD 15.00$ 10,650.00$ 10,600.30$
57402-0000 Line A0840 360 TON 50.00$ 18,000.00$ 36,468.00$
57403-0000 Line A0860 60 SQYD 250.00$ 15,000.00$ 14,076.00$
60103-0000 Line A0880 1 EACH 50,000.00$ 50,000.00$ 40,359.80$
60103-0000 Line A0900 1 EACH 50,000.00$ 50,000.00$ 32,744.31$
60202-0200 Line A0920 3,800 LNFT 180.00$ 684,000.00$ 174,382.00$
60202-0400 Line A0940 500 LNFT 220.00$ 110,000.00$ 25,380.00$
60211-0800 Line A0960 1 EACH 700.00$ 700.00$ 528.94$
60220-2950 Line A0980 200 LNFT 1,000.00$ 200,000.00$ 227,562.00$
60401-0000 Line A1000 3 EACH 5,000.00$ 15,000.00$ 11,487.06$
60403-0000 Line A1020 10 EACH 5,000.00$ 50,000.00$ 50,754.50$
60403-2200 Line A1040 9 EACH 6,000.00$ 54,000.00$ 56,017.62$ 6,224.18$
5,075.45$
3,829.02$
1,137.81$
528.94$
50.76$
45.89$
32,744.31$
40,359.80$
234.60$
101.30$
14.93$
13,862.68$
10 FEET SPAN, 4 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT
MANHOLE
INLET
INLET, FLH TYPE 7A
GRS-IBS, CONCRETE MASONRY UNIT
CONCRETE, HEADWALL (INLET HEADWALL, WINGWALLS, APRON)
CONCRETE, HEADWALL (OUTLET HEADWALL, WINGWALLS, APRON)
18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
END SECTION FOR 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
PAINTING, CONCRETE STRUCTURE
GRS-IBS, GEOSYNTHETIC REINFORCEMENT
GRS-IBS, OPEN-GRADED BACKFILL
1/5/2018 Page 4 of 24
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvements and Additions CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Engineer's Estimate Albuquerque Asphalt, Inc.
60421-0000 Line A1060 1 EACH 20,000.00$ 20,000.00$ 37,941.97$
60901-0000 Line A1080 3,900 LNFT 25.00$ 97,500.00$ 43,719.00$
60902-0800 Line A1100 70 LNFT 35.00$ 2,450.00$ 4,131.40$
60902-1200 Line A1120 7,500 LNFT 40.00$ 300,000.00$ 133,275.00$
61110-1000 Line A1140 ALL LPSM 50,000.00$ 50,000.00$ 312,539.45$
61501-0100 Line A1160 1,600 SQYD 110.00$ 176,000.00$ 67,488.00$
61502-1000 Line A1180 25 SQYD 120.00$ 3,000.00$ 4,057.25$
61504-1000 Line A1200 300 SQYD 110.00$ 33,000.00$ 21,837.00$
61509-0000 Line A1220 90 SQYD 200.00$ 18,000.00$ 12,542.40$
61601-1000 Line A1240 50 SQYD 100.00$ 5,000.00$ 6,931.50$
61701-4500 Line A1260 1,100 LNFT 30.00$ 33,000.00$ 23,463.00$
61702-1500 Line A1280 10 EACH 4,000.00$ 40,000.00$ 20,260.80$
61707-4000 Line A1300 55 LNFT 35.00$ 1,925.00$ 6,744.65$
139.36$
72.79$
162.29$
42.18$
312,539.45$
17.77$
59.02$
11.21$
37,941.97$
CURB AND GUTTER, CONCRETE, 10-INCH DEPTH (ROLL TYPE)
CURB AND GUTTER, CONCRETE, 14-INCH DEPTH
IRRIGATION SYSTEM
SIDEWALK, CONCRETE
DRIVE PAD, CONCRETE
ACCESSIBILITY RAMP, CONCRETE
OIL/GRIT SEPARATOR (WATER QUALITY STRUCTURE)
CURB, CONCRETE (FLUSH CURB)
DETECTABLE WARNING PANELS
SLOPE PAVING, CONCRETE
GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS
TERMINAL SECTION, TYPE MGS TANGENT
STRUCTURE TRANSITION RAILING, MGS SYSTEM
138.63$
2,026.08$
21.33$
122.63$
1/5/2018 Page 5 of 24
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvements and Additions CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Engineer's Estimate Albuquerque Asphalt, Inc.
61901-2250 Line A1320 4,800 LNFT 70.00$ 336,000.00$ 158,448.00$
61901-2500 Line A1340 1,800 LNFT 25.00$ 45,000.00$ 41,940.00$
61902-1600 Line A1360 2 EACH 5,000.00$ 10,000.00$ 7,193.66$
62201-0250 Line A1380 40 HOUR 100.00$ 4,000.00$ 2,772.40$
62201-0400 Line A1400 40 HOUR 125.00$ 5,000.00$ 714.40$
62201-0950 Line A1420 40 HOUR 150.00$ 6,000.00$ 1,919.60$
62201-2800 Line A1440 40 HOUR 200.00$ 8,000.00$ 3,235.20$
62301-0000 Line A1460 100 HOUR 50.00$ 5,000.00$ 4,576.00$
62302-1000 Line A1480 100 HOUR 100.00$ 10,000.00$ 8,321.00$
62302-1100 Line A1500 100 HOUR 100.00$ 10,000.00$ 13,330.00$
62402-0300 Line A1520 1.3 ACRE 6,000.00$ 7,800.00$ 18,638.10$
62510-1000 Line A1540 4.3 ACRE 3,000.00$ 12,900.00$ 17,997.48$
62515-1000 Line A1560 4.3 ACRE 4,000.00$ 17,200.00$ 5,433.65$
FENCE, RAIL (WROUGHT IRON, 6' HEIGHT)
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH
SEEDING, DRY METHOD
MULCHING, DRY METHOD
FENCE, SPLIT RAIL, 3 RAIL (WOOD)
GATE, METAL, 20 FEET WIDTH (WROUGHT IRON, 6' HEIGHT)
DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
BACKHOE LOADER, 2 CUBIC F00T MINIMUM RATED CAPACITY BUCKET, 12-INCH WIDTH
WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
MOTOR GRADER, 8 FOOT MINIMUM BLADE
33.01$
3,596.83$
23.30$
17.86$
69.31$
80.88$
47.99$
83.21$
45.76$
14,337.00$
133.30$
1,263.64$
4,185.46$
1/5/2018 Page 6 of 24
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvements and Additions CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Engineer's Estimate Albuquerque Asphalt, Inc.
62632-0000 Line A1580 ALL LPSM 280,000.00$ 280,000.00$ 203,693.95$
63301-0000 Line A1600 66 EACH 300.00$ 19,800.00$ 11,964.48$
63401-0700 Line A1620 62,500 LNFT 0.60$ 37,500.00$ 16,250.00$
63401-0800 Line A1640 6,100 LNFT 0.50$ 3,050.00$ 1,586.00$
63405-1300 Line A1660 23 EACH 300.00$ 6,900.00$ 1,962.13$
63405-1400 Line A1680 2 EACH 300.00$ 600.00$ 213.28$
63405-1450 Line A1700 12 EACH 400.00$ 4,800.00$ 1,279.68$
63405-1600 Line A1720 1 EACH 400.00$ 400.00$ 154.62$
63502-0600 Line A1740 10 EACH 500.00$ 5,000.00$ 1,013.00$
63502-0700 Line A1760 100 EACH 30.00$ 3,000.00$ 1,600.00$
63502-1300 Line A1780 100 EACH 50.00$ 5,000.00$ 3,199.00$
63502-2000 Line A1800 3 EACH 20,000.00$ 60,000.00$ 15,275.61$
63502-2100 Line A1820 2 EACH 5,000.00$ 10,000.00$ 5,331.80$
TEMPORARY TRAFFIC CONTROL, CRASH CUSHION
PAVEMENT MARKINGS, TYPE D, "ONLY" WORD MESSAGE
PAVEMENT MARKINGS, TYPE D, RAILROAD SYMBOL
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TEMPORARY TRAFFIC CONTROL, CONE
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
PLANTINGS
SIGN SYSTEM
PAVEMENT MARKINGS, TYPE D, SOLID
PAVEMENT MARKINGS, TYPE D, BROKEN
PAVEMENT MARKINGS, TYPE D, TURN ARROW
PAVEMENT MARKINGS, TYPE D, STRAIGHT/TURN ARROW COMBINATION
181.28$
203,693.95$
0.26$
0.26$
106.64$
85.31$
154.62$
106.64$
16.00$
101.30$
5,091.87$
31.99$
2,665.90$
1/5/2018 Page 7 of 24
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvements and Additions CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Engineer's Estimate Albuquerque Asphalt, Inc.
63503-0400 Line A1840 200 LNFT 50.00$ 10,000.00$ 4,880.00$
63503-1000 Line A1860 4,200 LNFT 3.00$ 12,600.00$ 6,720.00$
63504-1000 Line A1880 500 SQFT 50.00$ 25,000.00$ 5,330.00$
63505-1000 Line A1900 6.1 MILE 5,000.00$ 30,500.00$ 8,033.40$
63506-0500 Line A1920 6,000 HOUR 35.00$ 210,000.00$ 140,820.00$
63511-0100 Line A1940 1,500 HOUR 100.00$ 150,000.00$ 191,940.00$
63601-1000 Line A1960 ALL LPSM 280,000.00$ 280,000.00$ 191,940.00$
63601-2000 Line A1980 ALL LPSM 80,000.00$ 80,000.00$ 111,381.30$
63602-7000 Line A2000 2 EACH 5,000.00$ 10,000.00$ 14,502.50$
63610-2800 Line A2020 4,500 LNFT 3.00$ 13,500.00$ 37,170.00$
63621-1000 Line A2040 14 EACH 500.00$ 7,000.00$ 13,943.72$
64502-0000 Line A2060 20 EACH 1,000.00$ 20,000.00$ 6,706.60$
64604-3000 Line A2080 40 LNFT 50.00$ 2,000.00$ 2,648.80$
UTILITY BOX, PULLBOX
TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, FLAGGER
LOCATE UTILITIES (POTHOLING)
FIXTURE, PEDESTRIAN RAILING
TEMPORARY TRAFFIC CONTROL, RAILROAD FLAGGER
SYSTEM INSTALLATION, TRAFFIC SIGNAL
SYSTEM INSTALLATION, LIGHTING
SYSTEM INSTALLATION, SPEED FEEDBACK SIGN
CONDUIT, 4-INCH, PVC
24.40$
10.66$
1.60$
23.47$
1,316.95$
191,940.00$
127.96$
7,251.25$
111,381.30$
995.98$
8.26$
66.22$
335.33$
1/5/2018 Page 8 of 24
Schedule A Total of Bid Items:
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line A0020 ALL LPSM
15214-1000 Line A0040 ALL LPSM
15215-3000 Line A0060 35 EACH
15225-0000 Line A0080 1.800 MILE
15236-2000 Line A0100 3.600 MILE
15301-0000 Line A0120 ALL LPSM
15401-0000 Line A0140 ALL LPSM
15501-0000 Line A0160 ALL LPSM
15705-1400 Line A0180 15,500 LNFT
15705-1800 Line A0200 110 LNFT
15706-1000 Line A0220 19 EACH
15706-1600 Line A0240 4 EACH
15802-0000 Line A0260 ALL LPSM
MOBILIZATION
SURVEY AND STAKING, BRIDGE (GRS-IBS)
SURVEY AND STAKING, DRAINAGE STRUCTURE
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, FIBER ROLL
SOIL EROSION CONTROL, TEMPORARY DIVERSI
SOIL EROSION CONTROL, INLET PROTECTION
SOIL EROSION CONTROL, STABILIZED CONSTR
SURVEY CONTROL, GRADE FINISHING
CONTRACTOR QUALITY CONTROL
WATERING FOR DUST CONTROL
SLOPE, REFERENCE, AND CLEARING AND GRUBB
-40.9% 5,642,638.60$ -30.2% 6,670,410.00$
Unit Price Amount Unit Price Amount
505,000.00$ 665,000.00$
5,600.00$ 15,000.00$
15,575.00$ 21,000.00$
19,800.00$ 9,900.00$
79,740.00$ 13,500.00$
110,000.00$ 210,000.00$
93,250.00$ 350,000.00$
12,500.00$ 15,000.00$
24,800.00$ 27,125.00$
484.00$ 880.00$
1,558.00$ 1,900.00$
9,000.00$ 14,000.00$
78,000.00$ 272,000.00$ 78,000.00$ 272,000.00$
2,250.00$ 3,500.00$
82.00$ 100.00$
4.40$ 8.00$
1.60$ 1.75$
12,500.00$ 15,000.00$
93,250.00$ 350,000.00$
110,000.00$ 210,000.00$
22,150.00$ 3,750.00$
5,600.00$ 15,000.00$
445.00$ 600.00$
Star Paving Company SWP Contracting & Paving
505,000.00$ 665,000.00$
11,000.00$ 5,500.00$
1/5/2018 Page 9 of 24
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"
Item No. Quantity Unit
20101-0000 Line A0280 14.5 ACRE
20302-1200 Line A0300 1,330 LNFT
20302-2100 Line A0320 90 LNFT
20303-1600 Line A0340 8,000 SQYD
20315-0000 Line A0360 8,100 LNFT
20401-0000 Line A0380 10,000 CUYD
20420-0000 Line A0400 140 CUYD
20441-0000 Line A0420 6,500 CUYD
20801-0000 Line A0440 350 CUYD
21102-2000 Line A0460 ALL LPSM
25101-0100 Line A0480 10 CUYD
25101-0200 Line A0500 5 CUYD
25101-0300 Line A0520 540 CUYD
REMOVAL OF PIPE CULVERT
REMOVAL OF PAVEMENT, ASPHALT
SAWCUTTING PAVEMENT
PLACED RIPRAP, METHOD A, CLASS 2
PLACED RIPRAP, METHOD A, CLASS 3
ROADWAY EXCAVATION
EMBANKMENT CONSTRUCTION
WASTE
STRUCTURE EXCAVATION
ROADWAY OBLITERATION, METHOD 2
PLACED RIPRAP, METHOD A, CLASS 1
CLEARING AND GRUBBING
REMOVAL OF GUARDRAIL
-40.9% 5,642,638.60$ -30.2% 6,670,410.00$
Unit Price Amount Unit Price Amount
Star Paving Company SWP Contracting & Paving
46,400.00$ 6,525.00$
4,522.00$ 4,655.00$
4,050.00$ 3,780.00$
33,600.00$ 26,000.00$
24,300.00$ 8,100.00$
67,500.00$ 90,000.00$
1,820.00$ 2,800.00$
48,750.00$ 35,750.00$
13,300.00$ 4,900.00$
5,500.00$ 10,000.00$
1,530.00$ 1,050.00$
765.00$ 525.00$
46,980.00$ 48,600.00$ 87.00$ 90.00$
153.00$ 105.00$
153.00$ 105.00$
5,500.00$ 10,000.00$
38.00$ 14.00$
7.50$ 5.50$
13.00$ 20.00$
6.75$ 9.00$
3.00$ 1.00$
4.20$ 3.25$
45.00$ 42.00$
3.40$ 3.50$
3,200.00$ 450.00$
1/5/2018 Page 10 of 24
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"
Item No. Quantity Unit
30202-2000 Line A0540 7,000 TON
30402-1000 Line A0560 12,500 SQYD
40301-0100 Line A0580 8,500 TON
40301-0100 Line A0600 2,000 TON
40601-0000 Line A0620 20 TON
41102-1000 Line A0640 29,000 SQYD
41105-0000 Line A0660 110 TON
41201-0000 Line A0680 20 TON
41301-0600 Line A0700 14,000 SQYD
41801-3000 Line A0720 1,600 SQYD
55201-0600 Line A0740 40 CUYD
55401-1000 Line A0760 1,100 LB
55504-0000 Line A0780 ALL LPSM
ROADWAY AGGREGATE, METHOD 2
FULL DEPTH RECLAMATION, METHOD 1
ASPHALT CONCRETE PAVEMENT, TYPE 1 (MAINL
ASPHALT CONCRETE PAVEMENT, TYPE 1 (TRAIL
STRUCTURAL CONCRETE, CLASS C (AE)
REINFORCING STEEL
PRE-FABRICATED STEEL BRIDGE (GRS-IBS, PED
FOG SEAL
PRIME COAT, METHOD 1
BLOTTER
TACK COAT
ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
ASPHALT CONCRETE PAVEMENT PATCH, TYPE 3
-40.9% 5,642,638.60$ -30.2% 6,670,410.00$
Unit Price Amount Unit Price Amount
Star Paving Company SWP Contracting & Paving
142,100.00$ 217,000.00$
31,250.00$ 37,500.00$
705,500.00$ 705,500.00$
168,400.00$ 162,000.00$
18,000.00$ 9,500.00$
20,300.00$ 11,600.00$
7,370.00$ 2,200.00$
12,500.00$ 22,000.00$
16,800.00$ 35,000.00$
38,400.00$ 136,000.00$
24,800.00$ 84,000.00$
3,850.00$ 2,200.00$
183,000.00$ 250,000.00$ 183,000.00$ 250,000.00$
3.50$ 2.00$
620.00$ 2,100.00$
24.00$ 85.00$
1.20$ 2.50$
625.00$ 1,100.00$
67.00$ 20.00$
0.70$ 0.40$
900.00$ 475.00$
84.20$ 81.00$
83.00$ 83.00$
2.50$ 3.00$
20.30$ 31.00$
1/5/2018 Page 11 of 24
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"
Item No. Quantity Unit
56301-1000 Line A0800 ALL LPSM
57401-0000 Line A0820 710 SQYD
57402-0000 Line A0840 360 TON
57403-0000 Line A0860 60 SQYD
60103-0000 Line A0880 1 EACH
60103-0000 Line A0900 1 EACH
60202-0200 Line A0920 3,800 LNFT
60202-0400 Line A0940 500 LNFT
60211-0800 Line A0960 1 EACH
60220-2950 Line A0980 200 LNFT
60401-0000 Line A1000 3 EACH
60403-0000 Line A1020 10 EACH
60403-2200 Line A1040 9 EACH
10 FEET SPAN, 4 FEET RISE PRECAST REINFORC
MANHOLE
INLET
INLET, FLH TYPE 7A
GRS-IBS, CONCRETE MASONRY UNIT
CONCRETE, HEADWALL (INLET HEADWALL, WIN
CONCRETE, HEADWALL (OUTLET HEADWALL, W
18-INCH EQUIVALENT DIAMETER ARCH OR ELLI
24-INCH EQUIVALENT DIAMETER ARCH OR ELLI
END SECTION FOR 24-INCH EQUIVALENT DIAME
PAINTING, CONCRETE STRUCTURE
GRS-IBS, GEOSYNTHETIC REINFORCEMENT
GRS-IBS, OPEN-GRADED BACKFILL
-40.9% 5,642,638.60$ -30.2% 6,670,410.00$
Unit Price Amount Unit Price Amount
Star Paving Company SWP Contracting & Paving
4,000.00$ 7,500.00$
10,401.50$ 8,875.00$
24,480.00$ 21,600.00$
12,000.00$ 16,200.00$
18,000.00$ 60,000.00$
21,000.00$ 60,000.00$
205,200.00$ 247,000.00$
28,750.00$ 37,500.00$
800.00$ 3,400.00$
210,000.00$ 220,000.00$
20,280.00$ 10,500.00$
34,750.00$ 35,000.00$
28,350.00$ 45,000.00$ 3,150.00$ 5,000.00$
3,475.00$ 3,500.00$
6,760.00$ 3,500.00$
1,050.00$ 1,100.00$
800.00$ 3,400.00$
57.50$ 75.00$
54.00$ 65.00$
21,000.00$ 60,000.00$
18,000.00$ 60,000.00$
200.00$ 270.00$
68.00$ 60.00$
14.65$ 12.50$
4,000.00$ 7,500.00$
1/5/2018 Page 12 of 24
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"
Item No. Quantity Unit
60421-0000 Line A1060 1 EACH
60901-0000 Line A1080 3,900 LNFT
60902-0800 Line A1100 70 LNFT
60902-1200 Line A1120 7,500 LNFT
61110-1000 Line A1140 ALL LPSM
61501-0100 Line A1160 1,600 SQYD
61502-1000 Line A1180 25 SQYD
61504-1000 Line A1200 300 SQYD
61509-0000 Line A1220 90 SQYD
61601-1000 Line A1240 50 SQYD
61701-4500 Line A1260 1,100 LNFT
61702-1500 Line A1280 10 EACH
61707-4000 Line A1300 55 LNFT
CURB AND GUTTER, CONCRETE, 10-INCH DEPTH
CURB AND GUTTER, CONCRETE, 14-INCH DEPTH
IRRIGATION SYSTEM
SIDEWALK, CONCRETE
DRIVE PAD, CONCRETE
ACCESSIBILITY RAMP, CONCRETE
OIL/GRIT SEPARATOR (WATER QUALITY STRUCT
CURB, CONCRETE (FLUSH CURB)
DETECTABLE WARNING PANELS
SLOPE PAVING, CONCRETE
GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STE
TERMINAL SECTION, TYPE MGS TANGENT
STRUCTURE TRANSITION RAILING, MGS SYSTEM
-40.9% 5,642,638.60$ -30.2% 6,670,410.00$
Unit Price Amount Unit Price Amount
Star Paving Company SWP Contracting & Paving
50,700.00$ 25,000.00$
62,400.00$ 117,000.00$
1,330.00$ 2,100.00$
105,000.00$ 210,000.00$
305,132.00$ 315,000.00$
56,000.00$ 59,200.00$
1,850.00$ 3,250.00$
15,000.00$ 34,500.00$
17,460.00$ 18,900.00$
4,300.00$ 7,500.00$
24,860.00$ 23,100.00$
21,500.00$ 22,000.00$
7,150.00$ 6,875.00$
194.00$ 210.00$
50.00$ 115.00$
74.00$ 130.00$
35.00$ 37.00$
305,132.00$ 315,000.00$
14.00$ 28.00$
19.00$ 30.00$
16.00$ 30.00$
50,700.00$ 25,000.00$
86.00$ 150.00$
2,150.00$ 2,200.00$
22.60$ 21.00$
130.00$ 125.00$
1/5/2018 Page 13 of 24
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"
Item No. Quantity Unit
61901-2250 Line A1320 4,800 LNFT
61901-2500 Line A1340 1,800 LNFT
61902-1600 Line A1360 2 EACH
62201-0250 Line A1380 40 HOUR
62201-0400 Line A1400 40 HOUR
62201-0950 Line A1420 40 HOUR
62201-2800 Line A1440 40 HOUR
62301-0000 Line A1460 100 HOUR
62302-1000 Line A1480 100 HOUR
62302-1100 Line A1500 100 HOUR
62402-0300 Line A1520 1.3 ACRE
62510-1000 Line A1540 4.3 ACRE
62515-1000 Line A1560 4.3 ACRE
FENCE, RAIL (WROUGHT IRON, 6' HEIGHT)
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
FURNISHING AND PLACING TOPSOIL, 4-INCH D
SEEDING, DRY METHOD
MULCHING, DRY METHOD
FENCE, SPLIT RAIL, 3 RAIL (WOOD)
GATE, METAL, 20 FEET WIDTH (WROUGHT IRON
DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPAC
BACKHOE LOADER, 2 CUBIC F00T MINIMUM RAT
WHEEL LOADER, 3 CUBIC YARD MINIMUM RATE
MOTOR GRADER, 8 FOOT MINIMUM BLADE
-40.9% 5,642,638.60$ -30.2% 6,670,410.00$
Unit Price Amount Unit Price Amount
Star Paving Company SWP Contracting & Paving
226,800.00$ 158,400.00$
26,640.00$ 43,200.00$
14,344.00$ 7,500.00$
3,559.60$ 4,200.00$
3,440.00$ 3,400.00$
4,400.00$ 4,000.00$
5,600.00$ 4,400.00$
3,570.00$ 3,000.00$
7,000.00$ 15,000.00$
13,800.00$ 12,000.00$
33,325.50$ 49,400.00$
40,076.00$ 29,025.00$
14,598.50$ 12,900.00$
47.25$ 33.00$
7,172.00$ 3,750.00$
14.80$ 24.00$
86.00$ 85.00$
88.99$ 105.00$
140.00$ 110.00$
110.00$ 100.00$
70.00$ 150.00$
35.70$ 30.00$
25,635.00$ 38,000.00$
138.00$ 120.00$
3,395.00$ 3,000.00$
9,320.00$ 6,750.00$
1/5/2018 Page 14 of 24
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"
Item No. Quantity Unit
62632-0000 Line A1580 ALL LPSM
63301-0000 Line A1600 66 EACH
63401-0700 Line A1620 62,500 LNFT
63401-0800 Line A1640 6,100 LNFT
63405-1300 Line A1660 23 EACH
63405-1400 Line A1680 2 EACH
63405-1450 Line A1700 12 EACH
63405-1600 Line A1720 1 EACH
63502-0600 Line A1740 10 EACH
63502-0700 Line A1760 100 EACH
63502-1300 Line A1780 100 EACH
63502-2000 Line A1800 3 EACH
63502-2100 Line A1820 2 EACH
TEMPORARY TRAFFIC CONTROL, CRASH CUSHIO
PAVEMENT MARKINGS, TYPE D, "ONLY" WORD M
PAVEMENT MARKINGS, TYPE D, RAILROAD SYMB
TEMPORARY TRAFFIC CONTROL, BARRICADE TY
TEMPORARY TRAFFIC CONTROL, CONE
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, PORTABLE CHA
PLANTINGS
SIGN SYSTEM
PAVEMENT MARKINGS, TYPE D, SOLID
PAVEMENT MARKINGS, TYPE D, BROKEN
PAVEMENT MARKINGS, TYPE D, TURN ARROW
PAVEMENT MARKINGS, TYPE D, STRAIGHT/TURN
-40.9% 5,642,638.60$ -30.2% 6,670,410.00$
Unit Price Amount Unit Price Amount
Star Paving Company SWP Contracting & Paving
182,065.00$ 175,000.00$
21,714.00$ 20,790.00$
141,250.00$ 37,500.00$
13,786.00$ 3,660.00$
6,486.00$ 7,245.00$
678.00$ 800.00$
6,780.00$ 3,900.00$
1,977.00$ 525.00$
4,050.00$ 950.00$
4,000.00$ 1,500.00$
9,800.00$ 8,000.00$
54,000.00$ 15,000.00$
11,600.00$ 5,400.00$
329.00$ 315.00$
182,065.00$ 175,000.00$
2.26$ 0.60$
2.26$ 0.60$
339.00$ 400.00$
282.00$ 315.00$
1,977.00$ 525.00$
565.00$ 325.00$
40.00$ 15.00$
405.00$ 95.00$
18,000.00$ 5,000.00$
98.00$ 80.00$
5,800.00$ 2,700.00$
1/5/2018 Page 15 of 24
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"
Item No. Quantity Unit
63503-0400 Line A1840 200 LNFT
63503-1000 Line A1860 4,200 LNFT
63504-1000 Line A1880 500 SQFT
63505-1000 Line A1900 6.1 MILE
63506-0500 Line A1920 6,000 HOUR
63511-0100 Line A1940 1,500 HOUR
63601-1000 Line A1960 ALL LPSM
63601-2000 Line A1980 ALL LPSM
63602-7000 Line A2000 2 EACH
63610-2800 Line A2020 4,500 LNFT
63621-1000 Line A2040 14 EACH
64502-0000 Line A2060 20 EACH
64604-3000 Line A2080 40 LNFT
UTILITY BOX, PULLBOX
TEMPORARY TRAFFIC CONTROL, CONCRETE BAR
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO
TEMPORARY TRAFFIC CONTROL, PAVEMENT MAR
TEMPORARY TRAFFIC CONTROL, FLAGGER
LOCATE UTILITIES (POTHOLING)
FIXTURE, PEDESTRIAN RAILING
TEMPORARY TRAFFIC CONTROL, RAILROAD FLAG
SYSTEM INSTALLATION, TRAFFIC SIGNAL
SYSTEM INSTALLATION, LIGHTING
SYSTEM INSTALLATION, SPEED FEEDBACK SIGN
CONDUIT, 4-INCH, PVC
-40.9% 5,642,638.60$ -30.2% 6,670,410.00$
Unit Price Amount Unit Price Amount
Star Paving Company SWP Contracting & Paving
7,000.00$ 11,000.00$
12,600.00$ 12,600.00$
14,000.00$ 5,000.00$
34,251.50$ 15,250.00$
201,900.00$ 192,000.00$
199,500.00$ 225,000.00$
202,140.00$ 225,000.00$
117,440.00$ 135,000.00$
15,290.00$ 15,000.00$
39,150.00$ 37,125.00$
14,700.00$ 13,650.00$
9,120.00$ 5,000.00$
2,920.00$ 2,600.00$
35.00$ 55.00$
28.00$ 10.00$
3.00$ 3.00$
33.65$ 32.00$
5,615.00$ 2,500.00$
202,140.00$ 225,000.00$
133.00$ 150.00$
7,645.00$ 7,500.00$
117,440.00$ 135,000.00$
1,050.00$ 975.00$
8.70$ 8.25$
73.00$ 65.00$
456.00$ 250.00$
1/5/2018 Page 16 of 24
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line A0020 ALL LPSM
15214-1000 Line A0040 ALL LPSM
15215-3000 Line A0060 35 EACH
15225-0000 Line A0080 1.800 MILE
15236-2000 Line A0100 3.600 MILE
15301-0000 Line A0120 ALL LPSM
15401-0000 Line A0140 ALL LPSM
15501-0000 Line A0160 ALL LPSM
15705-1400 Line A0180 15,500 LNFT
15705-1800 Line A0200 110 LNFT
15706-1000 Line A0220 19 EACH
15706-1600 Line A0240 4 EACH
15802-0000 Line A0260 ALL LPSM
MOBILIZATION
SURVEY AND STAKING, BRIDGE (GRS-IBS)
SURVEY AND STAKING, DRAINAGE STRUCTURE
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, FIBER ROLL
SOIL EROSION CONTROL, TEMPORARY DIVERSI
SOIL EROSION CONTROL, INLET PROTECTION
SOIL EROSION CONTROL, STABILIZED CONSTR
SURVEY CONTROL, GRADE FINISHING
CONTRACTOR QUALITY CONTROL
WATERING FOR DUST CONTROL
SLOPE, REFERENCE, AND CLEARING AND GRUBB
-6.4% 8,941,230.00$ -7.0% 8,884,454.00$
Unit Price Amount Unit Price Amount
1,275,000.00$ 1,700,000.00$
12,000.00$ 5,000.00$
35,000.00$ 17,500.00$
14,400.00$ 54,000.00$
19,800.00$ 54,000.00$
200,000.00$ 250,000.00$
125,000.00$ 250,000.00$
25,000.00$ 10,000.00$
77,500.00$ 46,500.00$
2,750.00$ 3,300.00$
14,250.00$ 8,550.00$
6,000.00$ 16,000.00$
95,000.00$ 150,000.00$ 95,000.00$ 150,000.00$
1,500.00$ 4,000.00$
750.00$ 450.00$
25.00$ 30.00$
5.00$ 3.00$
25,000.00$ 10,000.00$
125,000.00$ 250,000.00$
200,000.00$ 250,000.00$
5,500.00$ 15,000.00$
1,700,000.00$
12,000.00$ 5,000.00$
1,000.00$ 500.00$
Cutting Edge Concrete Services La Forge and Budd Construction Co.
1,275,000.00$
8,000.00$ 30,000.00$
1/5/2018 Page 17 of 24
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"
Item No. Quantity Unit
20101-0000 Line A0280 14.5 ACRE
20302-1200 Line A0300 1,330 LNFT
20302-2100 Line A0320 90 LNFT
20303-1600 Line A0340 8,000 SQYD
20315-0000 Line A0360 8,100 LNFT
20401-0000 Line A0380 10,000 CUYD
20420-0000 Line A0400 140 CUYD
20441-0000 Line A0420 6,500 CUYD
20801-0000 Line A0440 350 CUYD
21102-2000 Line A0460 ALL LPSM
25101-0100 Line A0480 10 CUYD
25101-0200 Line A0500 5 CUYD
25101-0300 Line A0520 540 CUYD
REMOVAL OF PIPE CULVERT
REMOVAL OF PAVEMENT, ASPHALT
SAWCUTTING PAVEMENT
PLACED RIPRAP, METHOD A, CLASS 2
PLACED RIPRAP, METHOD A, CLASS 3
ROADWAY EXCAVATION
EMBANKMENT CONSTRUCTION
WASTE
STRUCTURE EXCAVATION
ROADWAY OBLITERATION, METHOD 2
PLACED RIPRAP, METHOD A, CLASS 1
CLEARING AND GRUBBING
REMOVAL OF GUARDRAIL
-6.4% 8,941,230.00$ -7.0% 8,884,454.00$
Unit Price Amount Unit Price Amount
Cutting Edge Concrete Services La Forge and Budd Construction Co.
88,450.00$ 36,250.00$
26,600.00$ 5,320.00$
6,750.00$ 6,750.00$
48,000.00$ 40,000.00$
16,200.00$ 56,700.00$
250,000.00$ 100,000.00$
10,500.00$ 4,900.00$
130,000.00$ 195,000.00$
24,500.00$ 14,000.00$
25,000.00$ 4,000.00$
2,500.00$ 1,250.00$
1,250.00$ 625.00$
64,800.00$ 54,000.00$ 120.00$ 100.00$
250.00$ 125.00$
250.00$ 125.00$
25,000.00$ 4,000.00$
70.00$ 40.00$
20.00$ 30.00$
75.00$ 35.00$
25.00$ 10.00$
2.00$ 7.00$
6.00$ 5.00$
75.00$ 75.00$
20.00$ 4.00$
6,100.00$ 2,500.00$
1/5/2018 Page 18 of 24
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"
Item No. Quantity Unit
30202-2000 Line A0540 7,000 TON
30402-1000 Line A0560 12,500 SQYD
40301-0100 Line A0580 8,500 TON
40301-0100 Line A0600 2,000 TON
40601-0000 Line A0620 20 TON
41102-1000 Line A0640 29,000 SQYD
41105-0000 Line A0660 110 TON
41201-0000 Line A0680 20 TON
41301-0600 Line A0700 14,000 SQYD
41801-3000 Line A0720 1,600 SQYD
55201-0600 Line A0740 40 CUYD
55401-1000 Line A0760 1,100 LB
55504-0000 Line A0780 ALL LPSM
ROADWAY AGGREGATE, METHOD 2
FULL DEPTH RECLAMATION, METHOD 1
ASPHALT CONCRETE PAVEMENT, TYPE 1 (MAINL
ASPHALT CONCRETE PAVEMENT, TYPE 1 (TRAIL
STRUCTURAL CONCRETE, CLASS C (AE)
REINFORCING STEEL
PRE-FABRICATED STEEL BRIDGE (GRS-IBS, PED
FOG SEAL
PRIME COAT, METHOD 1
BLOTTER
TACK COAT
ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
ASPHALT CONCRETE PAVEMENT PATCH, TYPE 3
-6.4% 8,941,230.00$ -7.0% 8,884,454.00$
Unit Price Amount Unit Price Amount
Cutting Edge Concrete Services La Forge and Budd Construction Co.
315,000.00$ 385,000.00$
37,500.00$ 112,500.00$
892,500.00$ 935,000.00$
220,000.00$ 220,000.00$
16,000.00$ 22,000.00$
29,000.00$ 58,000.00$
8,800.00$ 3,300.00$
16,000.00$ 18,000.00$
63,000.00$ 28,000.00$
144,000.00$ 30,400.00$
40,000.00$ 60,000.00$
4,400.00$ 3,300.00$
210,000.00$ 400,000.00$ 210,000.00$ 400,000.00$
4.00$ 3.00$
1,000.00$ 1,500.00$
90.00$ 19.00$
4.50$ 2.00$
800.00$ 900.00$
80.00$ 30.00$
1.00$ 2.00$
800.00$ 1,100.00$
110.00$ 110.00$
105.00$ 110.00$
3.00$ 9.00$
45.00$ 55.00$
1/5/2018 Page 19 of 24
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"
Item No. Quantity Unit
56301-1000 Line A0800 ALL LPSM
57401-0000 Line A0820 710 SQYD
57402-0000 Line A0840 360 TON
57403-0000 Line A0860 60 SQYD
60103-0000 Line A0880 1 EACH
60103-0000 Line A0900 1 EACH
60202-0200 Line A0920 3,800 LNFT
60202-0400 Line A0940 500 LNFT
60211-0800 Line A0960 1 EACH
60220-2950 Line A0980 200 LNFT
60401-0000 Line A1000 3 EACH
60403-0000 Line A1020 10 EACH
60403-2200 Line A1040 9 EACH
10 FEET SPAN, 4 FEET RISE PRECAST REINFORC
MANHOLE
INLET
INLET, FLH TYPE 7A
GRS-IBS, CONCRETE MASONRY UNIT
CONCRETE, HEADWALL (INLET HEADWALL, WIN
CONCRETE, HEADWALL (OUTLET HEADWALL, W
18-INCH EQUIVALENT DIAMETER ARCH OR ELLI
24-INCH EQUIVALENT DIAMETER ARCH OR ELLI
END SECTION FOR 24-INCH EQUIVALENT DIAME
PAINTING, CONCRETE STRUCTURE
GRS-IBS, GEOSYNTHETIC REINFORCEMENT
GRS-IBS, OPEN-GRADED BACKFILL
-6.4% 8,941,230.00$ -7.0% 8,884,454.00$
Unit Price Amount Unit Price Amount
Cutting Edge Concrete Services La Forge and Budd Construction Co.
6,500.00$ 12,000.00$
10,650.00$ 7,100.00$
18,000.00$ 21,600.00$
12,000.00$ 30,000.00$
20,000.00$ 35,000.00$
20,000.00$ 20,000.00$
437,000.00$ 361,000.00$
80,000.00$ 42,500.00$
1,000.00$ 1,500.00$
360,000.00$ 340,000.00$
19,500.00$ 19,500.00$
75,000.00$ 75,000.00$
67,500.00$ 63,000.00$ 7,500.00$ 7,000.00$
7,500.00$ 7,500.00$
6,500.00$ 6,500.00$
1,800.00$ 1,700.00$
1,000.00$ 1,500.00$
160.00$ 85.00$
115.00$ 95.00$
20,000.00$ 20,000.00$
20,000.00$ 35,000.00$
200.00$ 500.00$
50.00$ 60.00$
15.00$ 10.00$
6,500.00$ 12,000.00$
1/5/2018 Page 20 of 24
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"
Item No. Quantity Unit
60421-0000 Line A1060 1 EACH
60901-0000 Line A1080 3,900 LNFT
60902-0800 Line A1100 70 LNFT
60902-1200 Line A1120 7,500 LNFT
61110-1000 Line A1140 ALL LPSM
61501-0100 Line A1160 1,600 SQYD
61502-1000 Line A1180 25 SQYD
61504-1000 Line A1200 300 SQYD
61509-0000 Line A1220 90 SQYD
61601-1000 Line A1240 50 SQYD
61701-4500 Line A1260 1,100 LNFT
61702-1500 Line A1280 10 EACH
61707-4000 Line A1300 55 LNFT
CURB AND GUTTER, CONCRETE, 10-INCH DEPTH
CURB AND GUTTER, CONCRETE, 14-INCH DEPTH
IRRIGATION SYSTEM
SIDEWALK, CONCRETE
DRIVE PAD, CONCRETE
ACCESSIBILITY RAMP, CONCRETE
OIL/GRIT SEPARATOR (WATER QUALITY STRUCT
CURB, CONCRETE (FLUSH CURB)
DETECTABLE WARNING PANELS
SLOPE PAVING, CONCRETE
GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STE
TERMINAL SECTION, TYPE MGS TANGENT
STRUCTURE TRANSITION RAILING, MGS SYSTEM
-6.4% 8,941,230.00$ -7.0% 8,884,454.00$
Unit Price Amount Unit Price Amount
Cutting Edge Concrete Services La Forge and Budd Construction Co.
17,000.00$ 25,000.00$
58,500.00$ 117,000.00$
3,500.00$ 3,150.00$
225,000.00$ 225,000.00$
325,000.00$ 300,000.00$
112,000.00$ 96,000.00$
3,500.00$ 1,500.00$
42,000.00$ 45,000.00$
36,000.00$ 18,000.00$
12,500.00$ 20,000.00$
93,500.00$ 27,500.00$
35,000.00$ 22,000.00$
13,750.00$ 6,875.00$
400.00$ 200.00$
140.00$ 150.00$
140.00$ 60.00$
70.00$ 60.00$
325,000.00$ 300,000.00$
30.00$ 30.00$
50.00$ 45.00$
15.00$ 30.00$
17,000.00$ 25,000.00$
250.00$ 400.00$
3,500.00$ 2,200.00$
85.00$ 25.00$
250.00$ 125.00$
1/5/2018 Page 21 of 24
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"
Item No. Quantity Unit
61901-2250 Line A1320 4,800 LNFT
61901-2500 Line A1340 1,800 LNFT
61902-1600 Line A1360 2 EACH
62201-0250 Line A1380 40 HOUR
62201-0400 Line A1400 40 HOUR
62201-0950 Line A1420 40 HOUR
62201-2800 Line A1440 40 HOUR
62301-0000 Line A1460 100 HOUR
62302-1000 Line A1480 100 HOUR
62302-1100 Line A1500 100 HOUR
62402-0300 Line A1520 1.3 ACRE
62510-1000 Line A1540 4.3 ACRE
62515-1000 Line A1560 4.3 ACRE
FENCE, RAIL (WROUGHT IRON, 6' HEIGHT)
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
FURNISHING AND PLACING TOPSOIL, 4-INCH D
SEEDING, DRY METHOD
MULCHING, DRY METHOD
FENCE, SPLIT RAIL, 3 RAIL (WOOD)
GATE, METAL, 20 FEET WIDTH (WROUGHT IRON
DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPAC
BACKHOE LOADER, 2 CUBIC F00T MINIMUM RAT
WHEEL LOADER, 3 CUBIC YARD MINIMUM RATE
MOTOR GRADER, 8 FOOT MINIMUM BLADE
-6.4% 8,941,230.00$ -7.0% 8,884,454.00$
Unit Price Amount Unit Price Amount
Cutting Edge Concrete Services La Forge and Budd Construction Co.
528,000.00$ 216,000.00$
117,000.00$ 36,000.00$
9,000.00$ 10,000.00$
5,000.00$ 3,200.00$
5,600.00$ 3,200.00$
6,400.00$ 3,200.00$
6,400.00$ 3,200.00$
6,500.00$ 3,500.00$
17,500.00$ 15,000.00$
17,500.00$ 15,000.00$
26,000.00$ 45,500.00$
32,250.00$ 34,400.00$
19,350.00$ 15,050.00$
110.00$ 45.00$
4,500.00$ 5,000.00$
65.00$ 20.00$
140.00$ 80.00$
125.00$ 80.00$
160.00$ 80.00$
160.00$ 80.00$
175.00$ 150.00$
65.00$ 35.00$
20,000.00$ 35,000.00$
175.00$ 150.00$
4,500.00$ 3,500.00$
7,500.00$ 8,000.00$
1/5/2018 Page 22 of 24
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"
Item No. Quantity Unit
62632-0000 Line A1580 ALL LPSM
63301-0000 Line A1600 66 EACH
63401-0700 Line A1620 62,500 LNFT
63401-0800 Line A1640 6,100 LNFT
63405-1300 Line A1660 23 EACH
63405-1400 Line A1680 2 EACH
63405-1450 Line A1700 12 EACH
63405-1600 Line A1720 1 EACH
63502-0600 Line A1740 10 EACH
63502-0700 Line A1760 100 EACH
63502-1300 Line A1780 100 EACH
63502-2000 Line A1800 3 EACH
63502-2100 Line A1820 2 EACH
TEMPORARY TRAFFIC CONTROL, CRASH CUSHIO
PAVEMENT MARKINGS, TYPE D, "ONLY" WORD M
PAVEMENT MARKINGS, TYPE D, RAILROAD SYMB
TEMPORARY TRAFFIC CONTROL, BARRICADE TY
TEMPORARY TRAFFIC CONTROL, CONE
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, PORTABLE CHA
PLANTINGS
SIGN SYSTEM
PAVEMENT MARKINGS, TYPE D, SOLID
PAVEMENT MARKINGS, TYPE D, BROKEN
PAVEMENT MARKINGS, TYPE D, TURN ARROW
PAVEMENT MARKINGS, TYPE D, STRAIGHT/TURN
-6.4% 8,941,230.00$ -7.0% 8,884,454.00$
Unit Price Amount Unit Price Amount
Cutting Edge Concrete Services La Forge and Budd Construction Co.
350,000.00$ 200,000.00$
19,800.00$ 19,800.00$
18,750.00$ 15,625.00$
1,830.00$ 1,464.00$
6,900.00$ 1,840.00$
1,000.00$ 160.00$
3,600.00$ 1,200.00$
1,000.00$ 145.00$
1,000.00$ 3,000.00$
3,500.00$ 10,000.00$
8,500.00$ 10,000.00$
15,000.00$ 30,000.00$
1,500.00$ 20,000.00$
300.00$ 300.00$
350,000.00$ 200,000.00$
0.30$ 0.24$
0.30$ 0.25$
500.00$ 80.00$
300.00$ 80.00$
1,000.00$ 145.00$
300.00$ 100.00$
35.00$ 100.00$
100.00$ 300.00$
5,000.00$ 10,000.00$
85.00$ 100.00$
750.00$ 10,000.00$
1/5/2018 Page 23 of 24
Project No: NM FLAP 52000(1)
Project Name: 2nd Street Southwest Corridor Improvem CQ = "Contract Quantity"
Item No. Quantity Unit
63503-0400 Line A1840 200 LNFT
63503-1000 Line A1860 4,200 LNFT
63504-1000 Line A1880 500 SQFT
63505-1000 Line A1900 6.1 MILE
63506-0500 Line A1920 6,000 HOUR
63511-0100 Line A1940 1,500 HOUR
63601-1000 Line A1960 ALL LPSM
63601-2000 Line A1980 ALL LPSM
63602-7000 Line A2000 2 EACH
63610-2800 Line A2020 4,500 LNFT
63621-1000 Line A2040 14 EACH
64502-0000 Line A2060 20 EACH
64604-3000 Line A2080 40 LNFT
UTILITY BOX, PULLBOX
TEMPORARY TRAFFIC CONTROL, CONCRETE BAR
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO
TEMPORARY TRAFFIC CONTROL, PAVEMENT MAR
TEMPORARY TRAFFIC CONTROL, FLAGGER
LOCATE UTILITIES (POTHOLING)
FIXTURE, PEDESTRIAN RAILING
TEMPORARY TRAFFIC CONTROL, RAILROAD FLAG
SYSTEM INSTALLATION, TRAFFIC SIGNAL
SYSTEM INSTALLATION, LIGHTING
SYSTEM INSTALLATION, SPEED FEEDBACK SIGN
CONDUIT, 4-INCH, PVC
-6.4% 8,941,230.00$ -7.0% 8,884,454.00$
Unit Price Amount Unit Price Amount
Cutting Edge Concrete Services La Forge and Budd Construction Co.
8,000.00$ 20,000.00$
16,800.00$ 16,800.00$
17,500.00$ 2,000.00$
12,200.00$ 18,300.00$
360,000.00$ 180,000.00$
97,500.00$ 187,500.00$
200,000.00$ 210,000.00$
150,000.00$ 135,000.00$
35,000.00$ 20,000.00$
67,500.00$ 45,000.00$
14,000.00$ 14,000.00$
30,000.00$ 15,000.00$
7,000.00$ 10,000.00$
40.00$ 100.00$
35.00$ 4.00$
4.00$ 4.00$
60.00$ 30.00$
2,000.00$ 3,000.00$
200,000.00$ 210,000.00$
65.00$ 125.00$
17,500.00$ 10,000.00$
150,000.00$ 135,000.00$
1,000.00$ 1,000.00$
15.00$ 10.00$
175.00$ 250.00$
1,500.00$ 750.00$
1/5/2018 Page 24 of 24
Option X Central Federal Lands Highway Division
Project No : NM FTFW VAOR(1) FLMA No:
Project Name : Entrance Road Solcitation No:
State : NM County : Bernalillo Federal Location : Valle de Oro NWR
Opened at: 2:00pm Opened by: Joe Wilson Date: 12/28/2017
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed:
Title:
Date:
Contract Awarded to: Award Date:
Contract Number: Data is Public
Contractor Comment Bid Amount Responsive
Engineer's Estimate 710,000.00$
Albuquerque Asphalt 348,614.27$
Star Paving Company 430,829.87$
Stormwater Plans, LLC 392,441.00$
Cutting Edge Concrete 700,085.00$
LaForge & Budd Constr 802,410.40$
DTFH6817B00030
Albuquerque Asphalt
1/5/2018 FHWA Confidential Page 1 of 1
Option X Total of Bid Items: 710,000.00$ -50.9% 348,614.27$
Project No: NM FTFW VAOR(1)
Project Name: Entrance Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
15101-0000 Line X0020 ALL LPSM 90,446.00$ 90,446.00$ 23,041.15$
15215-3000 Line X0040 5 EACH 2,000.00$ 10,000.00$ 1,332.95$
15215-7000 Line X0060 1 EACH 2,500.00$ 2,500.00$ 5,065.21$
15225-0000 Line X0080 0.600 MILE 12,000.00$ 7,200.00$ 1,919.45$
15236-2000 Line X0100 1.100 MILE 11,000.00$ 12,100.00$ 8,210.97$
15301-0000 Line X0120 ALL LPSM 16,500.00$ 16,500.00$ 19,164.18$
15401-0000 Line X0140 ALL LPSM 5,500.00$ 5,500.00$ 8,116.60$
15501-0000 Line X0160 ALL LPSM 2,500.00$ 2,500.00$ 1,331.29$
15705-1400 Line X0180 3,600 LNFT 10.00$ 36,000.00$ 5,148.00$
15706-1600 Line X0200 1 EACH 2,000.00$ 2,000.00$ 1,045.03$
15802-0000 Line X0220 ALL LPSM 10,000.00$ 10,000.00$ 4,364.28$
20101-0000 Line X0240 1.2 ACRE 2,000.00$ 2,400.00$ 5,854.24$
20304-1000 Line X0260 ALL LPSM 10,000.00$ 10,000.00$ 3,745.75$
SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL
3,199.08$
MOBILIZATION
SURVEY AND STAKING, DRAINAGE STRUCTURE
SURVEY AND STAKING, PARKING AREA
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, FIBER ROLL
SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
WATERING FOR DUST CONTROL
CLEARING AND GRUBBING
SURVEY CONTROL, GRADE FINISHING
CONTRACTOR QUALITY CONTROL
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Albuquerque Asphalt
266.59$
23,041.15$
7,464.52$
5,065.21$
1,331.29$
8,116.60$
19,164.18$
1,045.03$
1.43$
4,878.53$
4,364.28$
3,745.75$
Engineer's Estimate
1/5/2018 Page 1 of 9
Project No: NM FTFW VAOR(1)
Project Name: Entrance Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Albuquerque AsphaltEngineer's Estimate
20420-0000 Line X0280 4,600 CUYD 35.00$ 161,000.00$ 30,084.00$
25101-0200 Line X0300 20 CUYD 150.00$ 3,000.00$ 1,919.40$
30202-2000 Line X0320 1,590 TON 40.00$ 63,600.00$ 43,518.30$
40301-0100 Line X0340 260 TON 150.00$ 39,000.00$ 29,146.00$
40301-0100 Line X0360 650 TON 150.00$ 97,500.00$ 56,407.00$
40601-0000 Line X0380 2 TON 800.00$ 1,600.00$ 1,590.62$
41102-1000 Line X0400 3,900 SQYD 2.00$ 7,800.00$ 3,510.00$
41201-0000 Line X0420 2 TON 800.00$ 1,600.00$ 1,513.28$
50101-2600 Line X0440 190 SQYD 130.00$ 24,700.00$ 20,026.00$
60202-0200 Line X0460 70 LNFT 180.00$ 12,600.00$ 3,210.90$
60202-0400 Line X0480 100 LNFT 220.00$ 22,000.00$ 5,076.00$
60211-0600 Line X0500 3 EACH 700.00$ 2,100.00$ 1,180.74$
60211-0800 Line X0520 4 EACH 800.00$ 3,200.00$ 2,115.80$
ROADWAY AGGREGATE, METHOD 2
ASPHALT CONCRETE PAVEMENT, TYPE 1 (PG 70-22) FOR TRAIL CONSTRUCTION
ASPHALT CONCRETE PAVEMENT, TYPE 1 (PG 76-28) FOR ROAD CONSTUCTION
END SECTION FOR 18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
END SECTION FOR 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
FOG SEAL
PRIME COAT, METHOD 1
TACK COAT
MINOR CONCRETE PAVEMENT, PLAIN, 6-INCH DEPTH
18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
EMBANKMENT CONSTRUCTION
PLACED RIPRAP, METHOD A, CLASS 2
6.54$
27.37$
95.97$
86.78$
112.10$
0.90$
795.31$
105.40$
756.64$
50.76$
45.87$
528.95$
393.58$
1/5/2018 Page 2 of 9
Project No: NM FTFW VAOR(1)
Project Name: Entrance Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Albuquerque AsphaltEngineer's Estimate
60403-2200 Line X0540 2 EACH 5,000.00$ 10,000.00$ 12,448.34$
61901-2500 Line X0560 700 LNFT 30.00$ 21,000.00$ 16,310.00$
61902-2200 Line X0580 1 EACH 5,000.00$ 5,000.00$ 4,798.62$
61904-0000 Line X0600 3 EACH 600.00$ 1,800.00$ 1,238.04$
62402-0400 Line X0620 0.7 ACRE 9,000.00$ 6,300.00$ 10,037.50$
62510-1000 Line X0640 0.7 ACRE 2,000.00$ 1,400.00$ 2,929.82$
62515-1000 Line X0660 0.7 ACRE 3,000.00$ 2,100.00$ 884.55$
63301-0000 Line X0680 13 EACH 300.00$ 3,900.00$ 2,356.64$
63401-0700 Line X0700 6,490 LNFT 0.60$ 3,894.00$ 1,687.40$
63401-0800 Line X0720 720 LNFT 0.50$ 360.00$ 187.20$
63405-1300 Line X0740 4 EACH 300.00$ 1,200.00$ 341.24$
63405-1450 Line X0760 3 EACH 400.00$ 1,200.00$ 319.92$
63501-0000 Line X0780 ALL LPSM 5,000.00$ 5,000.00$ 7,437.86$
BOLLARD POST
PAVEMENT MARKINGS, TYPE D, TURN ARROW
PAVEMENT MARKINGS, TYPE D, "ONLY" WORD MESSAGE
TEMPORARY TRAFFIC CONTROL
FURNISHING AND PLACING TOPSOIL, 6-INCH DEPTH
SEEDING, DRY METHOD
MULCHING, DRY METHOD
SIGN SYSTEM
PAVEMENT MARKINGS, TYPE D, SOLID
PAVEMENT MARKINGS, TYPE D, BROKEN
INLET, FLH TYPE 7A
FENCE, SPLIT RAIL, 3 RAIL
GATE, METAL, 34 FEET WIDTH
23.30$
6,224.17$
412.68$
4,798.62$
4,185.46$
14,339.29$
181.28$
1,263.64$
0.26$
0.26$
106.64$
85.31$
7,437.86$
1/5/2018 Page 3 of 9
Option X Total of Bid Items:
Project No: NM FTFW VAOR(1)
Project Name: Entrance Road CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line X0020 ALL LPSM
15215-3000 Line X0040 5 EACH
15215-7000 Line X0060 1 EACH
15225-0000 Line X0080 0.600 MILE
15236-2000 Line X0100 1.100 MILE
15301-0000 Line X0120 ALL LPSM
15401-0000 Line X0140 ALL LPSM
15501-0000 Line X0160 ALL LPSM
15705-1400 Line X0180 3,600 LNFT
15706-1600 Line X0200 1 EACH
15802-0000 Line X0220 ALL LPSM
20101-0000 Line X0240 1.2 ACRE
20304-1000 Line X0260 ALL LPSM
SLOPE, REFERENCE, AND CLEARING AND GRUBB
MOBILIZATION
SURVEY AND STAKING, DRAINAGE STRUCTURE
SURVEY AND STAKING, PARKING AREA
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, FIBER ROLL
SOIL EROSION CONTROL, STABILIZED CONSTR
WATERING FOR DUST CONTROL
CLEARING AND GRUBBING
SURVEY CONTROL, GRADE FINISHING
CONTRACTOR QUALITY CONTROL
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
-39.3% 430,829.87$ -44.7% 392,441.00$
Unit Price Amount Unit Price Amount
14,250.00$ 37,000.00$
2,214.65$ 3,000.00$
3,325.00$ 5,000.00$
3,324.00$ 3,150.00$
9,746.00$ 4,125.00$
31,000.00$ 4,000.00$
15,060.00$ 7,000.00$
2,000.00$ 5,000.00$
5,760.00$ 6,300.00$
2,250.00$ 3,500.00$
16,700.00$ 5,000.00$
3,820.10$ 1,800.00$
5,000.00$ 7,000.00$
5,540.00$ 5,250.00$
14,250.00$ 37,000.00$
Star Paving Company Stormwater Plans, LLC
8,860.00$ 3,750.00$
442.93$ 600.00$
3,325.00$ 5,000.00$
2,000.00$ 5,000.00$
15,060.00$ 7,000.00$
31,000.00$ 4,000.00$
2,250.00$ 3,500.00$
1.60$ 1.75$
3,183.42$ 1,500.00$
16,700.00$ 5,000.00$
5,000.00$ 7,000.00$
1/5/2018 Page 4 of 9
Project No: NM FTFW VAOR(1)
Project Name: Entrance Road CQ = "Contract Quantity"
Item No. Quantity Unit
20420-0000 Line X0280 4,600 CUYD
25101-0200 Line X0300 20 CUYD
30202-2000 Line X0320 1,590 TON
40301-0100 Line X0340 260 TON
40301-0100 Line X0360 650 TON
40601-0000 Line X0380 2 TON
41102-1000 Line X0400 3,900 SQYD
41201-0000 Line X0420 2 TON
50101-2600 Line X0440 190 SQYD
60202-0200 Line X0460 70 LNFT
60202-0400 Line X0480 100 LNFT
60211-0600 Line X0500 3 EACH
60211-0800 Line X0520 4 EACH
ROADWAY AGGREGATE, METHOD 2
ASPHALT CONCRETE PAVEMENT, TYPE 1 (PG 70-
ASPHALT CONCRETE PAVEMENT, TYPE 1 (PG 76-
END SECTION FOR 18-INCH EQUIVALENT DIAME
END SECTION FOR 24-INCH EQUIVALENT DIAME
FOG SEAL
PRIME COAT, METHOD 1
TACK COAT
MINOR CONCRETE PAVEMENT, PLAIN, 6-INCH D
18-INCH EQUIVALENT DIAMETER ARCH OR ELLI
24-INCH EQUIVALENT DIAMETER ARCH OR ELLI
EMBANKMENT CONSTRUCTION
PLACED RIPRAP, METHOD A, CLASS 2
-39.3% 430,829.87$ -44.7% 392,441.00$
Unit Price Amount Unit Price Amount
Star Paving Company Stormwater Plans, LLC
59,800.00$ 18,400.00$
3,060.00$ 2,100.00$
32,277.00$ 39,750.00$
22,100.00$ 39,000.00$
53,950.00$ 58,500.00$
1,760.00$ 950.00$
2,730.00$ 1,560.00$
1,250.00$ 2,200.00$
18,430.00$ 26,600.00$
4,200.00$ 5,950.00$
6,100.00$ 9,000.00$
1,299.00$ 1,500.00$
3,200.00$ 13,600.00$
13.00$ 4.00$
20.30$ 25.00$
153.00$ 105.00$
83.00$ 90.00$
85.00$ 150.00$
0.70$ 0.40$
880.00$ 475.00$
97.00$ 140.00$
625.00$ 1,100.00$
61.00$ 90.00$
60.00$ 85.00$
800.00$ 3,400.00$
433.00$ 500.00$
1/5/2018 Page 5 of 9
Project No: NM FTFW VAOR(1)
Project Name: Entrance Road CQ = "Contract Quantity"
Item No. Quantity Unit
60403-2200 Line X0540 2 EACH
61901-2500 Line X0560 700 LNFT
61902-2200 Line X0580 1 EACH
61904-0000 Line X0600 3 EACH
62402-0400 Line X0620 0.7 ACRE
62510-1000 Line X0640 0.7 ACRE
62515-1000 Line X0660 0.7 ACRE
63301-0000 Line X0680 13 EACH
63401-0700 Line X0700 6,490 LNFT
63401-0800 Line X0720 720 LNFT
63405-1300 Line X0740 4 EACH
63405-1450 Line X0760 3 EACH
63501-0000 Line X0780 ALL LPSM
BOLLARD POST
PAVEMENT MARKINGS, TYPE D, TURN ARROW
PAVEMENT MARKINGS, TYPE D, "ONLY" WORD M
TEMPORARY TRAFFIC CONTROL
FURNISHING AND PLACING TOPSOIL, 6-INCH D
SEEDING, DRY METHOD
MULCHING, DRY METHOD
SIGN SYSTEM
PAVEMENT MARKINGS, TYPE D, SOLID
PAVEMENT MARKINGS, TYPE D, BROKEN
INLET, FLH TYPE 7A
FENCE, SPLIT RAIL, 3 RAIL
GATE, METAL, 34 FEET WIDTH
-39.3% 430,829.87$ -44.7% 392,441.00$
Unit Price Amount Unit Price Amount
Star Paving Company Stormwater Plans, LLC
6,300.00$ 9,000.00$
10,360.00$ 16,800.00$
4,252.00$ 5,000.00$
1,320.00$ 1,575.00$
27,426.00$ 26,600.00$
6,524.00$ 4,725.00$
2,795.80$ 2,100.00$
4,277.00$ 4,095.00$
14,667.40$ 3,894.00$
1,627.20$ 432.00$
1,129.84$ 1,260.00$
1,694.88$ 975.00$
23,850.00$ 5,000.00$
14.80$ 24.00$
3,150.00$ 4,500.00$
440.00$ 525.00$
4,252.00$ 5,000.00$
9,320.00$ 6,750.00$
39,180.00$ 38,000.00$
329.00$ 315.00$
3,994.00$ 3,000.00$
2.26$ 0.60$
2.26$ 0.60$
564.96$ 325.00$
282.46$ 315.00$
23,850.00$ 5,000.00$
1/5/2018 Page 6 of 9
Project No: NM FTFW VAOR(1)
Project Name: Entrance Road CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line X0020 ALL LPSM
15215-3000 Line X0040 5 EACH
15215-7000 Line X0060 1 EACH
15225-0000 Line X0080 0.600 MILE
15236-2000 Line X0100 1.100 MILE
15301-0000 Line X0120 ALL LPSM
15401-0000 Line X0140 ALL LPSM
15501-0000 Line X0160 ALL LPSM
15705-1400 Line X0180 3,600 LNFT
15706-1600 Line X0200 1 EACH
15802-0000 Line X0220 ALL LPSM
20101-0000 Line X0240 1.2 ACRE
20304-1000 Line X0260 ALL LPSM
SLOPE, REFERENCE, AND CLEARING AND GRUBB
MOBILIZATION
SURVEY AND STAKING, DRAINAGE STRUCTURE
SURVEY AND STAKING, PARKING AREA
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, FIBER ROLL
SOIL EROSION CONTROL, STABILIZED CONSTR
WATERING FOR DUST CONTROL
CLEARING AND GRUBBING
SURVEY CONTROL, GRADE FINISHING
CONTRACTOR QUALITY CONTROL
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
-1.4% 700,085.00$ 13.0% 802,410.40$
Unit Price Amount Unit Price Amount
45,000.00$ 75,000.00$
5,000.00$ 2,500.00$
3,500.00$ 8,000.00$
4,800.00$ 18,000.00$
6,050.00$ 16,500.00$
35,000.00$ 75,000.00$
35,000.00$ 40,000.00$
5,000.00$ 5,000.00$
18,000.00$ 10,800.00$
2,500.00$ 5,000.00$
35,000.00$ 25,000.00$
7,320.00$ 6,000.00$
25,000.00$ 4,500.00$
8,000.00$ 30,000.00$
45,000.00$
Cutting Edge Concrete Services LaForge & Budd Construction Co
5,500.00$ 15,000.00$
75,000.00$
1,000.00$ 500.00$
3,500.00$ 8,000.00$
5,000.00$ 5,000.00$
35,000.00$ 40,000.00$
35,000.00$ 75,000.00$
2,500.00$ 5,000.00$
5.00$ 3.00$
6,100.00$ 5,000.00$
35,000.00$ 25,000.00$
25,000.00$ 4,500.00$
1/5/2018 Page 7 of 9
Project No: NM FTFW VAOR(1)
Project Name: Entrance Road CQ = "Contract Quantity"
Item No. Quantity Unit
20420-0000 Line X0280 4,600 CUYD
25101-0200 Line X0300 20 CUYD
30202-2000 Line X0320 1,590 TON
40301-0100 Line X0340 260 TON
40301-0100 Line X0360 650 TON
40601-0000 Line X0380 2 TON
41102-1000 Line X0400 3,900 SQYD
41201-0000 Line X0420 2 TON
50101-2600 Line X0440 190 SQYD
60202-0200 Line X0460 70 LNFT
60202-0400 Line X0480 100 LNFT
60211-0600 Line X0500 3 EACH
60211-0800 Line X0520 4 EACH
ROADWAY AGGREGATE, METHOD 2
ASPHALT CONCRETE PAVEMENT, TYPE 1 (PG 70-
ASPHALT CONCRETE PAVEMENT, TYPE 1 (PG 76-
END SECTION FOR 18-INCH EQUIVALENT DIAME
END SECTION FOR 24-INCH EQUIVALENT DIAME
FOG SEAL
PRIME COAT, METHOD 1
TACK COAT
MINOR CONCRETE PAVEMENT, PLAIN, 6-INCH D
18-INCH EQUIVALENT DIAMETER ARCH OR ELLI
24-INCH EQUIVALENT DIAMETER ARCH OR ELLI
EMBANKMENT CONSTRUCTION
PLACED RIPRAP, METHOD A, CLASS 2
-1.4% 700,085.00$ 13.0% 802,410.40$
Unit Price Amount…