Amendment_A004.pdf

PDF 897 KB Posted

Attached to
NM FLAP TRAIL 5200(1), 2nd Street SW Corridor
Solicitation number
DTFH6817B00030
Issued by

About this file

Amendment A004 corrects a minor pay item discrepancy. This is anticipated to be the last Amendment issued prior to bid opening.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

B I D S C H E D U L E Schedule A Account: ALL

Project No: NM FLAP 52000(1)

Name: 2nd Street Southwest Corridor Improvements and AdditCQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

15101-0000 Line A0020 ALL LPSM $

15214-1000 Line A0040 ALL LPSM $

15215-3000 Line A0060 35 EACH $ $

15225-0000 Line A0080 1.800 MILE $ $

15236-2000 Line A0100 3.600 MILE $ $

15301-0000 Line A0120 ALL LPSM $

15401-0000 Line A0140 ALL LPSM $

15501-0000 Line A0160 ALL LPSM $

15705-1400 Line A0180 15,500 LNFT $ $

15705-1800 Line A0200 110 LNFT $ $

15706-1000 Line A0220 19 EACH $ $

15706-1600 Line A0240 4 EACH $ $

15802-0000 Line A0260 ALL LPSM $

20101-0000 Line A0280 14.5 ACRE $ $

20302-1200 Line A0300 1,330 LNFT $ $

20302-2100 Line A0320 90 LNFT $ $

20303-1600 Line A0340 8,000 SQYD $ $

20315-0000 Line A0360 8,100 LNFT $ $

20401-0000 Line A0380 10,000 CUYD $ $

Schedule Total: ________________________

Submitted by: _________________________

REMOVAL OF PIPE CULVERT

REMOVAL OF PAVEMENT, ASPHALT

SAWCUTTING PAVEMENT

MOBILIZATION

SURVEY AND STAKING, BRIDGE (GRS-IBS)

SURVEY AND STAKING, DRAINAGE STRUCTURE

SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL

SURVEY CONTROL, GRADE FINISHING

CONTRACTOR QUALITY CONTROL

ROADWAY EXCAVATION

WATERING FOR DUST CONTROL

CLEARING AND GRUBBING

REMOVAL OF GUARDRAIL

CONTRACTOR TESTING

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, FIBER ROLL

SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM

SOIL EROSION CONTROL, INLET PROTECTION

SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

Jeremiah.Rogers Typewritten Text Amendment A004, 12/20/2017

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

Full Appendix B.pdf
APPENDIX B.pdf
subcontractingplan
Text1:
Text2:
0: 1
1: 2
Text3:
0: A004
1: 12/20/2017
2:
0:
1: NM FLAP 52000(1)
Text4:
0:
0: FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 WEST DAKOTA AVENUE, SUITE 360

LAKEWOOD, COLORADO 80228

ATTENTION: JEREMIAH ROGERS

1:

1:
0:
Text6:
0: DTFH6817B00030
1: 11/20/2017
2:
3:
Check Box7:
0: Yes
2: Yes
1:
0:
0: Off
1: Off
2: Yes
Check Box9:
1: Off
2: Off
0:
0: Off
1: Off
Text10: 0*
Text11:
0:
1:
Text12: * See Item 14 Below
Text13: INVITATION FOR BID

Remove page A-6 and replace with new page A-6. The correct quantity for Item 15225-0000 is 1.80 miles.

*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)

Text14:
0:
1: Jeremiah Rogers
Text15:
1:
0:
1:
0:
0:
1:
Text16:
0:
1:
Text17:
Text5:
0: 6905001
1:
Check Box1:
0: Yes
1: Off

File details come from the government source that posted it.