DTFH6815B00023.pdf
PDF 43 MB Posted
- Attached to
- CA FTNP MOJA 10(1) ROADWAY SAFETY IMPROVEMENTS Federal contract opportunity
- Solicitation number
- DTFH6815B00023
About this file
Invitation For Bid - Dismiss DTFH6815B00024
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Tabs_Summary.pdf | ||
| Bid_Opening_Summary.pdf | ||
| Q A_18_Nov_15.pdf | ||
| Q A.pdf | ||
| Hydraulic_Report.pdf | ||
| Pavement_ _Materials_Report.pdf | ||
| DTFH6815B00024.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BID
SOLICITATION NUMBER: DTFH6815B00023
PROJECT NUMBER: CA FTNP MOJA 10(1)
PROJECT NAME: ROADWAY SAFETY IMPROVEMENTS
BID OPENING DATE:
See Page A-1, Block 13A
This solicitation cites Standard Specifications for Construction of Roads and Bridges on
Federal Highway Projects, FP-03 US Customary Units
ISSUING OFFICE:
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 W. DAKOTA AVENUE, SUITE 360
LAKEWOOD, CO 80228
Web site: http://www.fbo.gov E-mail: CFLContracts@dot.gov mailto:CFLContracts@dot.gov
PROJECT CA FTNP MOJA 10(1)
LOCATION MOJAVE NATIONAL PRESERVE
COUNTY SAN BERNARDINO COUNTY
STATE CALIFORNIA
LENGTH SCHEDULE A: 56.98 MILES
SCHEDULE B: 59.00 MILES
OPTION W: 0.17 MILES
OPTION X: 9.65 MILES
OPTION Y: 0.90 MILES
OPTION Z: 41.58 MILES
TYPE OF IMPROVEMENT ROAD RECONSTRUCTION,
REALIGNMENT, PAVEMENT
PRESERVATION DRAINAGE AND
SAFETY IMPROVEMENTS
TABLE OF CONTENTS
Notice to Bidders ............................................................................................................. A-i
Solicitation, Offer, and Award ........................................................................................ A-1
Basis for Award and Bid Schedule ................................................................................ A-6
Solicitation Provisions .....................................................................................................B-7
Contract Clauses ..............................................................................................................C-1
Davis Bacon Wage Determination.................................................................................. D-1
Division 100 ..................................................................................................................... E-1 Division 150 ................................................................................................................... E-33 Division 200 ................................................................................................................... E-59 Division 300 ................................................................................................................... E-68 Division 400 ................................................................................................................... E-71 Division 500 .................................................................................................................... N/A Division 600 ................................................................................................................... E-96 Division 700 ................................................................................................................. E-107
APPENDICES
Appendix A ................................................................................................................... Plans
Appendix B .................................................... Crossing Improvement Agreement, Cima Rd
Appendix C .............................................. Crossing Improvement Agreement, Kelbaker Rd
Appendix D ......................................................................................... Encroachment Permit
Appendix E ......................................................................... Waste Discharge Requirements
Appendix F............................................................................... Subcontracting Plan Sample
SPECIAL CONTRACT REQUIREMENTS (SCRs)
The following Special Contract Requirements amend and supplement the Standard Specification for Construction of Roads and Bridges on Federal Highway Projects
NOTICE TO BIDDERS
A-i
NOTE TO LARGE BUSINESSES:
Due to the compressed schedule for award of this project following the bid opening, large businesses are required to submit their completed subcontracting plan with their bid.
Failure to submit a subcontracting plan may deem your bid non-responsive.
A sample of a subcontracting plan is included as Appendix F in this solicitation.
• Prior to development of this subcontracting plan, please read FAR Clause 52.219- 9 – Small Business Subcontracting Plan (APR 2008).
• It is the Prime Contractor’s responsibility to ensure that all small business concerns included in this subcontracting plan are eligible. The System for Award Management (SAM) is the only source for certification of Small Disadvantaged Business and HUBZone Small Business concerns.
Prime Contractors are encouraged to post sources sought notices for subcontracting opportunities on http://web.sba.gov/subnet/ Small businesses can review this web site to identify opportunities in their areas of expertise. The use of SUB-Net fulfills the requirements set forth in Federal Acquisition Regulation (FAR) 5.206, Notice of Subcontracting Opportunities, for contractors and subcontractors to post notices and thereby increase competition for subcontracts.
ELECTRONIC BIDS WILL NOT BE ACCEPTED. Submit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Block 8). Please submit the following with your bid:
Submit the following documents with your Bid Package–
• SF-1442, Solicitation, Offer & Award, Pages A-1 and A-2
• If applicable, indication of interest in formal Partnering, Page A-5
• Bid Schedule including Buy American Act & Hazardous Materials, Pages A-6 through A-21
• Bid Guarantee (see FAR Clause 52.228-1), Pages B-1 and B-2. Bid bonds must be originals with original signatures and corporate seals. Photocopies and Faxed copies are NOT acceptable and will make your bid non-responsive.
• Completed the VETs-4212 Reporting, Page A-ii; Bidders’ Information, Pages B-3 through B-6; Reps and Certs, Page B-7 through B-12 and Certification Regarding Responsibility Matters (FAR 52.209-5), Pages B-12 through B-15.
• HUBZone small business concerns electing to waive the evaluation preference, complete 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns, Section C.
Bidders should retain all other pages for their information. Bids should be submitted in a sealed enveloped and include the Contractor’s Name, Solicitation Number and the Project Number/Name.
http://web.sba.gov/subnet/
A-ii
I. PRE-BID INFORMATION
It is the responsibility of the bidder to verify that this solicitation document, including the plans, are complete as listed in the table of contents and the index to sheets. Plan sheets can be found at http://www.fbo.gov and viewed by individual sections, downloaded by individual sections, or the entire plan set downloaded in a zip file. Physical data relevant to this solicitation may also be viewed or downloaded at the above site.
This solicitation and subsequent contract are governed by the Federal Acquisition Regulations (FAR), agency supplemental regulations, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 US Customary Units (FP-03).
The FP-03 was utilized for the design of this project. Hard copies of the FP-03 will not be provided to bidders. The FP-03 is available electronically at http://flh.fhwa.dot.gov/resources/pse/standard/ or may be purchased by contacting Bob Rosenblatt at ARC Western, telephone number 303-785- 2520 or email bob.rosenblatt@e-arc.com. Hard copies of the FP-03 will not be provided to the awarded Prime Contractor.
Applicable FAR provisions and clauses in this IFB are incorporated by reference or full text. FAR provisions and clauses incorporated by reference can be accessed on the Internet at https://www.acquisition.gov/far/.
Notice of SAM Registration – you must register in the System for Award Management (SAM – replaced CCR) prior to award of a contract resulting from this solicitation. Failure to register prior to contract award may require award to the next successful registered offeror. See FAR Subpart 4.1103(c). Register online at www.sam.gov.
Representations and Certifications – This solicitation is issued under NAICS 237310 – Highway, Street & Bridge Construction with a small business size standard of $36.5 million. If your average annual gross receipts for the past 3 years are above $36.5 million, you are a large business for this solicitation. If they are below $36.5 million you are a small business. Please complete the certification listed in paragraph (b) of FAR Provision 52.204-8 Annual Representation and Certifications on Page B-7. Your small business information is pulled into the Online Representations and Certifications Application (ORCA) website from the System for Award Management (SAM). Please include NAICS 237310 in your SAM. Before submitting bids, please ensure you have completed your annual representations and certifications electronically at the SAM website at www.sam.gov.
Vets-4212 Reporting: - The Contractor must complete the report if required. See reporting requirements at: www.dol.gov/vets/programs/fcp/main.htm.
• My firm had a qualifying Federal Contract in 2015 and has complied with the reporting requirements.
• My firm did not have a qualifying Federal Contract in 2015 and is therefore exempt from the reporting requirements http://www.fbo.gov/ http://flh.fhwa.dot.gov/resources/pse/standard/ mailto:bob.rosenblatt@e-arc.com https://www.acquisition.gov/far/ http://www.sam.gov/ http://www.sam.gov/ http://www.dol.gov/vets/programs/fcp/main.htm
A-iii
This Solicitation Contains a Price Evaluation Factor - The Government will apply a factor of 10% to an apparent low bid submitted by a large business when we also receive a bid from a certified HUBZone small business concern. The 10% factor does not apply to apparent low bids submitted by small businesses. See FAR Clause 52.219-4 Notice of price evaluation preference for HUBZone small business concerns.
In the event this full and open competition results in a contract award to a qualified HUBZone SBC after a price evaluation preference, FAR Clause 52.236-1, Performance of Work by the Contractor does not apply.
§126.700 of the Code of Federal Regulations (Title 13, Part 126, Subpart G), stated below, will replace the performance of work requirements stated in the above mentioned FAR clause.
A qualified HUBZone SBC receiving a contract under this solicitation for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs. This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs.
Bid Guarantee – Follow the requirements of FAR Clause 52.228-1 Bid Guarantee and Subpart
102.03 of the FP-03. Bid bonds must be originals and have original signatures and corporate seals.
Photocopied and faxed copies of bonds will be rejected and cause your bid to be non-responsive.
ATTENTION: Minority, Women-owned, and Disadvantaged Business Enterprises (DBEs). The Department of Transportation (DOT), offers working capital financing and bonding assistance for transportation related contracts. DOT's Bonding Assistance Program (BAP) offers bid, performance and payment bonds on contracts up to $1,000,000. DOT's Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $500,000 with interest at the prime rate. For further information, call (800) 532-1169. Internet address:
http://osdbuweb.dot.gov.
Accuracy and Completeness of Bid- The Contractor is fully responsible to verify that all data is correct when an offer is submitted. Failure to properly update your data may cause the offer to be rejected.
Request for Technical Information – Questions relative to the plans and SCRs for this solicitation will only be accepted in writing (see Block 9 on Page A-3).
TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE
ACCEPTED AFTER 4 P.M. ON NOVEMBER 17, 2015
Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at http://www.fbo.gov http://osdbuweb.dot.gov/
A-iv
Modifications to Bids - Bids may be modified or withdrawn by facsimile or telegraphic notice, if such notice is received prior to the time specified for receipt of bids. The Government will not be responsible for ANY failure attributable to the transmission or receipt of telegraphic or facsimile data.
For all modifications, we STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total. See FAR Provision 52.214-5, Submission of Bids. Modifications which make the bid ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the bid to be rejected as nonresponsive.
FAX Number to submit modifications to bids for this project is (720) 963-3360
II. Post Award Information.
Subcontracting - FAR Clause 52.219-8, Utilization of Small Business Concerns states that Prime Contractors afford small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns the maximum practicable opportunity to participate in performing contracts let by any Federal agency.
FAR Clause 52.219-9, Small Business Subcontracting Plan, Alternate I, requires that the large business concern who is the successful low bidder on a Federal project with an anticipated award amount exceeding $1 million, is required to submit a subcontracting plan prior to contract award.
The subcontracting plan expresses goals in terms of percentages of total planned subcontracting dollars for the use of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns as subcontractors. To view and download a sample plan for subcontracting requirements, visit http://www.cflhd.gov/contracting/construction/ReferenceLinks.cfm. If the apparent successful low bidder fails to submit an acceptable subcontracting plan acceptable to the CO within 7 days of bid opening, that bidder may be ineligible for award of the contract.
Prime Contractors, who are large businesses, are encouraged to post sources sought notices at the Small Business Administration’s Subcontracting Network (SUB-NET) http://web.sba.gov/subnet/ so that small businesses can identify opportunities in their areas of expertise. The use of SUB-Net fulfills the requirements set forth in Federal Acquisition Regulation (FAR) 5.206, Notice of Subcontracting Opportunities, for contractors and subcontractors to post notices and thereby increase competition for subcontracts.
A list of currently known business concerns owned and controlled by socially and economically disadvantaged individuals and/or women-owned small business concerns that have indicated an interest in participating in highway construction is available at http://www.ccr.gov
Insurance requirements - See Subsection 107.05 of the FP-03.
http://www.cflhd.gov/contracting/construction/ReferenceLinks.cfm http://web.sba.gov/subnet/ http://www.ccr.gov/
A-1
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration or Repair)
1. SOLICITATION NO.
DTFH6815B00023
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
10/26/2015
PAGE OF
PAGES
IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
CA FTNP MOJA 10(1)
7. ISSUED BY:
CENTRAL FEDERAL LANDS DIVISION
12300 WEST DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CODE: 69050001 8. ADDRESS OFFER TO:
MEGAN MAVIS, CONTRACT SPECIALIST
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS DIVISION
12300 WEST DAKOTA AVENUE
LAKEWOOD, COLORADO 80228
9. FOR INFORMATION CALL
SEE PAGE A-3
A. NAME:
SEE PAGE A-3
B. TELEPHONE NO. (Include area code)
SEE PAGE A-3
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:
ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH:
1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)
2. DEPARTMENT OF LABOR, DAVIS BACON MINIMUM WAGE RATES
3. SPECIAL CONTRACT REQUIREMENTS
4. PLANS
5. BID SCHEDULE
6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS, FP-03, U.S. CUSTOMARY UNITS
7. SUBCONTRACTING PLAN (IF APPLICABLE)
See Subsection 104.04 of the FP-03 for governing order of precedence
11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. *Refer to Subsection 108.01 as amended in the Special Contract Requirements.
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m. (hour) local time on 11/25/15 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-102 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53-236-1(e)
X
A-2
GPO: 1985 0 - 469-796 STANDARD FORM 1442 PAGE 2 (REV. 4-85)
OFFEROR (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
DUNS NO.
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing with calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
SEE INDIVIDUAL BID SCHEDULE(S)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED
TO SIGN OFFER (Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 27
(4 copies unless otherwise specified)
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
□ 15 U.S.C. 637( ) □ 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE:
27. PAYMENT WILL BE MADE BY
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 W. DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.)
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by
(a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON
AUTHORIZED TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD
DATE
A-3
Item 8: LOCATION OF PUBLIC BID OPENING: Offers must be received by designated date and time as stated in Block 13A.
Item 9: FOR GENERAL INFORMATION: Call 720-963-3090 or e-mail us at
CFLContracts@dot.gov.
FOR TECHNICAL INFORMATION (plans and specifications): Questions must be submitted in writing by e-mail at CFLContracts@dot.gov or by fax to 720-963-3360.
FOR PHYSICAL DATA: The following data is available electronically with this solicitation at:
• Hydraulics Report
• Pavement & Materials Report
Item 11: COMPLETION DATE: Work shall be completed on or before the date specified in Subsection 108.01 of the SCRs.
Item 12A: PERFORMANCE AND PAYMENT BONDS: See FAR Clause 52.228-15
Performance and Payment Bonds-Construction (Clauses begin on Page C-1) and Subsection 102.06 of the FP-03.
Item 13B: BID BOND AMOUNT: See FAR Provision 52.228-1 Bid Guarantee
(Provisions begin on Page B-1) and Subsection 102.03 Bid Guarantee of the FP-03. All bid guarantees must have original signatures with original corporate seals.
Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO
ACKNOWLEDGE AMENDMENTS, IN BLOCK 19 OF THE SF-1442, BY
THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION
MAY RESULT IN REJECTION OF YOUR BID. If amendments are issued, they will be posted to www.fbo.gov.
Item 24: SUBMITTING INVOICES: See Subsection 109.08 Progress Payments of the
FP-03.
ESTIMATED
PRICE: The price range of the project work is between $10,000,000 and $15,000,000.
A-4
Bid Schedule Instructions
BIDDERS, PLEASE NOTE: This Bid Proposal is comprised of two schedules and four options.
Before preparing the bid, carefully read the Solicitation Provisions and the following:
• Insert a numeric unit bid price for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government
• Multiply the unit price by the quantity for each pay item and show the amount bid.
When the words “Lump Sum” appear as a unit bid price, insert an amount for each lump sum pay item.
• Total all amounts bid for each pay item and show the Construction Cost Total on the space provided on the last page of each schedule or option.
• Also show the Construction Cost Total for each schedule/option as well as the combined Total of each Schedule and the Option in the spaces provided on the Bid Summary page.
NOTE: If the amount bid for a pay item is inconsistent with the product of the unit price provided by the bidder and the quantity provided by the Government, the unit price will govern and the Government will determine a corrected amount bid for the pay item by multiplying the unit price by the quantity.
Pay Item 15401-0000, Contractor testing
Bidders must provide prices on alternative Contractor Testing pay items for EACH SCHEDULE.
Bidders must provide a price for Contractor Testing using a Contractor-furnished field laboratory for each schedule. The price for this item will be included in the Construction Cost Total for each schedule and all totals on the Bid Summary, pages A-6 through A-21, therefore, included in the evaluation for award.
Bidders must also provide a stand alone price on the last page of each schedule for the alternative item, Contractor Testing using a Government-furnished field laboratory, at the end of each bid schedule. This price will not be factored into the evaluation for award.
The Government retains the discretion to award a contract which includes either of the alternative Contractor Testing items at the respective bid price.
A-5
Evaluation Factors for Award
To be eligible for award of contract, the offeror shall submit prices for each item necessary to complete all contract work in Schedule A, Schedule B, Option W, Option X, Option Y, and Option Z. Accordingly, contract award will be made to the lowest responsible bidder conforming to the solicitation, provided funds are available.
Per FAR provision 52.217-5, Evaluation of Options (JULY 1990), the Government will evaluate offers for award purposes by adding the total price for all options to the total price for Schedule B.
Evaluation of options will not obligate the Government to exercise the option(s). If the determination is made to exercise any of the Options, the Contracting Officer will provide the contractor with written notice no later than 120 days after contract award, per FAR clause 52.217-7, Option for Increased Quantity- Separately Priced Line Item (MAR 1989).
PARTNERING
A Partnership recognizes the Government and the Contractor are both responsible and can affect the successful completion of this project. Partnering is a vehicle to ensure the partnership has structure and quality. It recognizes the strengths of each party and uses those strengths to identify and achieve shared goals. One of the primary objectives of Partnering is to facilitate the resolution of disputes in a timely, professional, and non-adversarial manner with the outcome focused on achieving those shared goals.
CFLHD supports the concepts and tenets of Partnering and as such is encouraging the Contractors and it’s subcontractors to establish a Partnering relationship on this project.
A formal Partnering meeting can help facilitate this relationship by helping do document the parties’ common purpose and goals, and ensuring alignment. The goals are mutually agreed upon and address effective and efficient performance within the scope of the contract.
Participation in a formal Partnering meeting is voluntary. Costs of implementing and maintaining the partnership would be agreed to by both parties as described in Subsection 103.05 Partnering of the FP-03. Costs of partnering would be in addition to the contract award amount.
Please indicate your desire to participate in a formal partnering meeting on this project.
(___) We would like to participate in a formal partnering meeting.
(___) We do not want to participate in a formal partnering meeting.
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0100 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0110 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
A0120 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0130 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A0150 40910-0300 SURFACE TREATMENT, DESIGNATION 1C
830,000 SQYD $____________ $____________
A0160 40920-1000 FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H
550 TON $____________ $____________
A0170 40940-1300 EMULSIFIED ASPHALT, GRADE CRS-2P
1,530 TON $____________ $____________
A0180 41105-0000 BLOTTER
100 TON $____________ $____________
A0190 42801-0200 FLEXIBLE PAVEMENT, FULL DEPTH PATCH, TYPE 3 (OVERLAY PATCH)
30,000 SQYD $____________ $____________
A0200 42803-0200 FLEXIBLE PAVEMENT PATCH, TYPE 3 (HAND PATCH)
1,050 TON $____________ $____________
A0210 62201-0050 DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY
20 HOUR $____________ $____________
A0220 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
18-INCH WIDTH
20 HOUR $____________ $____________
A0230 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
20 HOUR $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA FTNP MOJA 10(1)
Project Name:Roadway Safety Improvements
A-6
A0240 62301-0000 GENERAL LABOR
40 HOUR $____________ $____________
A0250 63401-0000 PAVEMENT MARKINGS (TYPE B)
1,210,000 LNFT $____________ $____________
A0260 63405-0050 PAVEMENT MARKINGS, SYMBOLS
3 EACH $____________ $____________
A0270 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
ALL LPSM $___LPSM_____ $____________
A0280 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
220 EACH $____________ $____________
A0290 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
316,000 LNFT $____________ $____________
A0300 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
233 SQFT $____________ $____________
A0310 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
1,000 HOUR $____________ $____________
A0320 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
350 HOUR $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA FTNP MOJA 10(1)
Project Name:Roadway Safety Improvements
A-7 megan.mavis Typewritten Text Schedule A Alternate Bid Item 15401-0000, Contractor Testing (Government furnished lab trailer)* $_________________ *See Page A-4 of this Solicitation for an explanation of how to bid this item.
megan.mavis Typewritten Text
B0050 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
B0100 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
102.180 STA $____________ $____________
B0150 15215-1000 SURVEY AND STAKING, APPROACH ROAD
1 EACH $____________ $____________
B0200 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE (LOW WATER CROSSING)
2 EACH $____________ $____________
B0250 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
1 EACH $____________ $____________
B0300 15215-7000 SURVEY AND STAKING, PARKING AREA
1 EACH $____________ $____________
B0350 15216-1000 SURVEY AND STAKING, ROADWAY CROSS-SECTIONS
6.760 STA $____________ $____________
B0400 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
217.880 STA $____________ $____________
B0450 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
B0500 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
B0550 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
B0600 15705-1400 SOIL EROSION CONTROL, SEDIMENT LOG
1,400 LNFT $____________ $____________
B0650 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
B0700 20101-0000 CLEARING AND GRUBBING
16.9 ACRE $____________ $____________
Bid Schedule Schedule:B Schedule Type:Base
Project No:CA FTNP MOJA 10(1)
A-8
B0750 20301-0600 REMOVAL OF CATTLE GUARD
1 EACH $____________ $____________
B0800 20301-0700 REMOVAL OF DELINEATOR
80 EACH $____________ $____________
B0850 20301-1900 REMOVAL OF PIPE CULVERT
1 EACH $____________ $____________
B0900 20301-2400 REMOVAL OF SIGN
32 EACH $____________ $____________
B0950 20302-0300 REMOVAL OF CURB AND GUTTER, CONCRETE
440 LNFT $____________ $____________
B1000 20401-0000 ROADWAY EXCAVATION
26,000 CUYD $____________ $____________
B1050 20402-0000 SUBEXCAVATION
500 CUYD $____________ $____________
B1100 20441-0000 WASTE
11,000 CUYD $____________ $____________
B1150 20443-0000 BERMS
210 LNFT $____________ $____________
B1200 21101-2000 ROADWAY OBLITERATION, METHOD 2
6,500 SQYD $____________ $____________
B1250 25101-3000 PLACED RIPRAP, CLASS 3
25 CUYD $____________ $____________
B1300 25305-1000 REVET MATTRESS, GALVANIZED OR ALUMINIZED COATED
390 SQYD $____________ $____________
B1350 30101-0000 AGGREGATE BASE
12,700 TON $____________ $____________
B1450 40301-0000 HOT ASPHALT CONCRETE PAVEMENT
5,900 TON $____________ $____________
Bid Schedule Schedule:B Schedule Type:Base
Project No:CA FTNP MOJA 10(1)
A-9
B1500 40910-0300 SURFACE TREATMENT, DESIGNATION 1C
830,000 SQYD $____________ $____________
B1600 40920-1000 FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H
560 TON $____________ $____________
B1650 40940-1300 EMULSIFIED ASPHALT, GRADE CRS-2P
1,530 TON $____________ $____________
B1700 41103-0000 PRIME COAT (METHOD 1)
29,650 SQYD $____________ $____________
B1750 41105-0000 BLOTTER
120 TON $____________ $____________
B1800 41201-1000 TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
36 TON $____________ $____________
B1850 42801-0200 FLEXIBLE PAVEMENT, FULL DEPTH PATCH, TYPE 3 (OVERLAY PATCH)
30,000 SQYD $____________ $____________
B1900 42803-0200 FLEXIBLE PAVEMENT PATCH, TYPE 3 (HAND PATCH)
1,050 TON $____________ $____________
B1950 60201-1000 36-INCH PIPE CULVERT
115 LNFT $____________ $____________
B2000 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT
2 EACH $____________ $____________
B2050 60901-2300 CURB, ASPHALT, 6-INCH DEPTH
850 LNFT $____________ $____________
B2100 60908-1000 PAVED DITCH, ASPHALT
85 SQYD $____________ $____________
B2150 60920-0000 RESET WHEELSTOP
10 EACH $____________ $____________
B2200 61801-0000 CONCRETE BARRIER
580 LNFT $____________ $____________
Bid Schedule Schedule:B Schedule Type:Base
Project No:CA FTNP MOJA 10(1)
A-10
B2250 61901-0000 FENCE (TEMPORARY)
200 LNFT $____________ $____________
B2300 61901-3300 FENCE, TORTOISE BARRIER
1,000 LNFT $____________ $____________
B2350 62201-0050 DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY
40 HOUR $____________ $____________
B2400 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
18-INCH WIDTH
40 HOUR $____________ $____________
B2450 62201-1350 BULLDOZER, 200HP MINIMUM FLYWHEEL POWER
20 HOUR $____________ $____________
B2500 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
20 HOUR $____________ $____________
B2550 62301-0000 GENERAL LABOR
80 HOUR $____________ $____________
B2600 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
40 HOUR $____________ $____________
B2650 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
40 HOUR $____________ $____________
B2700 63301-0000 SIGN SYSTEM
62 EACH $____________ $____________
B2750 63312-0000 SPEED HUMP (SPEED TABLE)
1 EACH $____________ $____________
B2800 63313-0000 RUMBLE STRIP (TRANSVERSE)
36 LNFT $____________ $____________
B2850 63313-0000 RUMBLE STRIP (CENTERLINE AND SHOULDER)
25,000 LNFT $____________ $____________
Bid Schedule Schedule:B Schedule Type:Base
Project No:CA FTNP MOJA 10(1)
A-11
B2900 63316-1000 REMOVE AND RESET SIGN
1 EACH $____________ $____________
B2950 63401-0000 PAVEMENT MARKINGS (TYPE B)
1,215,000 LNFT $____________ $____________
B3000 63405-0050 PAVEMENT MARKINGS, SYMBOLS
9 EACH $____________ $____________
B3050 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
ALL LPSM $___LPSM_____ $____________
B3100 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
320 EACH $____________ $____________
B3150 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
140 EACH $____________ $____________
B3200 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
2 EACH $____________ $____________
B3250 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
120 LNFT $____________ $____________
B3300 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
334,000 LNFT $____________ $____________
B3350 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
900 SQFT $____________ $____________
B3400 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
2,150 HOUR $____________ $____________
B3450 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
350 HOUR $____________ $____________
B3500 63602-7000 SYSTEM INSTALLATION, SPEED FEEDBACK SIGN
3 EACH $____________ $____________
Bid Schedule Schedule:B Schedule Type:Base
Project No:CA FTNP MOJA 10(1)
A-12
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:B Schedule Type:Base
Project No:CA FTNP MOJA 10(1)
Project Name:Roadway Safety Improvements
A-13 megan.mavis Typewritten Text Schedule B Alternate Bid Item 15401-0000, Contractor Testing (Government furnished lab trailer)* $_________________ *See Page A-4 of this Solicitation for an explanation of how to bid this item.
W0050 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
W0100 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
8.907 STA $____________ $____________
W0150 15215-1000 SURVEY AND STAKING, APPROACH ROAD
2 EACH $____________ $____________
W0200 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
1 EACH $____________ $____________
W0250 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
17.814 STA $____________ $____________
W0300 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
W0350 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
W0400 15705-1400 SOIL EROSION CONTROL, SEDIMENT LOG
30 LNFT $____________ $____________
W0450 20101-0000 CLEARING AND GRUBBING
2.2 ACRE $____________ $____________
W0500 20301-0700 REMOVAL OF DELINEATOR
20 EACH $____________ $____________
W0550 20301-2400 REMOVAL OF SIGN
6 EACH $____________ $____________
W0600 20401-0000 ROADWAY EXCAVATION
1,100 CUYD $____________ $____________
W0650 21101-2000 ROADWAY OBLITERATION, METHOD 2
600 SQYD $____________ $____________
W0700 25101-3000 PLACED RIPRAP, CLASS 3
15 CUYD $____________ $____________
Bid Schedule Schedule:W Schedule Type:Options
Project No:CA FTNP MOJA 10(1)
A-14
W0750 30101-0000 AGGREGATE BASE
1,150 TON $____________ $____________
W0850 40301-0000 HOT ASPHALT CONCRETE PAVEMENT
450 TON $____________ $____________
W0900 40920-1000 FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H
1 TON $____________ $____________
W0950 41103-0000 PRIME COAT (METHOD 1)
2,700 SQYD $____________ $____________
W1000 41201-1000 TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
1 TON $____________ $____________
W1050 60201-0900 30-INCH PIPE CULVERT
50 LNFT $____________ $____________
W1100 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT
2 EACH $____________ $____________
W1150 63301-0000 SIGN SYSTEM
6 EACH $____________ $____________
W1200 63316-1000 REMOVE AND RESET SIGN
1 EACH $____________ $____________
W1250 63401-0000 PAVEMENT MARKINGS (TYPE B)
3,600 LNFT $____________ $____________
W1300 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
20 EACH $____________ $____________
W1350 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
20 EACH $____________ $____________
W1400 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
40 LNFT $____________ $____________
W1450 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
1,800 LNFT $____________ $____________
Bid Schedule Schedule:W Schedule Type:Options
Project No:CA FTNP MOJA 10(1)
A-15
W1500 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
300 HOUR $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:W Schedule Type:Options
Project No:CA FTNP MOJA 10(1)
Project Name:Roadway Safety Improvements
A-16 megan.mavis Typewritten Text Option W Alternate Bid Item 15401-0000, Contractor Testing (Government furnished lab trailer)* $_________________ *See Page A-4 of this Solicitation for an explanation of how to bid this item.
megan.mavis Typewritten Text
X0050 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
X0100 15210-3000 CENTERLINE, VERIFICATION AND STAKING
509.520 STA $____________ $____________
X0150 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
X0200 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
X0250 30305-1500 PULVERIZING, 3-INCH DEPTH
509.520 STA $____________ $____________
X0300 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
100 EACH $____________ $____________
X0350 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
149 SQFT $____________ $____________
X0400 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
500 HOUR $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:CA FTNP MOJA 10(1)
Project Name:Roadway Safety Improvements
A-17 megan.mavis Typewritten Text Option X Alternate Bid Item 15401-0000, Contractor Testing (Government furnished lab trailer)* $_________________ *See Page A-4 of this Solicitation for an explanation of how to bid this item.
Y0050 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
Y0100 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE (LOW WATER CROSSING)
1 EACH $____________ $____________
Y0150 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
Y0200 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
Y0250 20101-0000 CLEARING AND GRUBBING
2.7 ACRE $____________ $____________
Y0300 21201-0000 LINEAR GRADING
7.750 STA $____________ $____________
Y0350 25101-3000 PLACED RIPRAP, CLASS 3
5,700 CUYD $____________ $____________
Y0400 30101-0000 AGGREGATE BASE
700 TON $____________ $____________
Y0500 63301-0000 SIGN SYSTEM
9 EACH $____________ $____________
Y0550 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
20 EACH $____________ $____________
Y0600 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
150 SQFT $____________ $____________
Y0650 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
470 HOUR $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:Y Schedule Type:Options
Project No:CA FTNP MOJA 10(1)
Project Name:Roadway Safety Improvements
A-18 megan.mavis Typewritten Text Option Y Alternate Bid Item 15401-0000, Contractor Testing (Government furnished lab trailer)* $_________________ *See Page A-4 of this Solicitation for an explanation of how to bid this item.
megan.mavis Typewritten Text
Z0100 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
Z0110 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
Z0120 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
Z0130 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
Z0150 40910-0300 SURFACE TREATMENT, DESIGNATION 1C
607,500 SQYD $____________ $____________
Z0160 40920-1000 FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H
400 TON $____________ $____________
Z0170 40940-1300 EMULSIFIED ASPHALT, GRADE CRS-2P
1,120 TON $____________ $____________
Z0180 41105-0000 BLOTTER
120 TON $____________ $____________
Z0190 42801-0200 FLEXIBLE PAVEMENT, FULL DEPTH PATCH, TYPE 3 (OVERLAY PATCH)
19,000 SQYD $____________ $____________
Z0200 42803-0200 FLEXIBLE PAVEMENT PATCH, TYPE 3 (HAND PATCH)
1,800 TON $____________ $____________
Z0210 62201-0050 DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY
20 HOUR $____________ $____________
Z0220 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
18-INCH WIDTH
20 HOUR $____________ $____________
Z0230 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
20 HOUR $____________ $____________
Bid Schedule Schedule:Z Schedule Type:Options
Project No:CA FTNP MOJA 10(1)
A-19
Z0240 62301-0000 GENERAL LABOR
40 HOUR $____________ $____________
Z0250 63401-0000 PAVEMENT MARKINGS (TYPE B)
890,000 LNFT $____________ $____________
Z0260 63405-0050 PAVEMENT MARKINGS, SYMBOLS
5 EACH $____________ $____________
Z0270 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
ALL LPSM $___LPSM_____ $____________
Z0280 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
220 EACH $____________ $____________
Z0290 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
228,000 LNFT $____________ $____________
Z0300 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
233 SQFT $____________ $____________
Z0310 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
900 HOUR $____________ $____________
Z0320 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
300 HOUR $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:Z Schedule Type:Options
Project No:CA FTNP MOJA 10(1)
Project Name:Roadway Safety Improvements
A-20 megan.mavis Typewritten Text Option Z Alternate Bid Item 15401-0000, Contractor Testing (Government furnished lab trailer)* $_________________ *See Page A-4 of this Solicitation for an explanation of how to bid this item.
megan.mavis Typewritten Text
Bid Schedule Summary
Schedule Bid Total
Schedule A - Base(Page A - 1)
Schedule W - Option(Page A - 9)
Schedule X - Option(Page A - 12)
Schedule Y - Option(Page A - 13)
Schedule Z - Option(Page A - 14)
Total - Schedules
Schedule Bid Total
Schedule B - Base(Page A - 3)
Schedule W - Option(Page A - 9)
Schedule X - Option(Page A - 12)
Schedule Y - Option(Page A - 13)
Schedule Z - Option(Page A - 14)
Total - Schedules
Submitted By: ________________________________
Bid Schedule
Project No:CA FTNP MOJA 10(1)
Project Name:Roadway Safety Improvements
A-21 megan.mavis Typewritten Text megan.mavis Typewritten Text
A-22
BUY AMERICAN ACT- CONSTRUCTION MATERIALS
UNDER TRADE AGREEMENTS
It is understood and agreed that the materials and components listed in Subparts 25.1 and 25.2 of the FAR are a part of this contract and are deemed to be Domestic Construction Material for the purposes of this contract.
NOTE TO CONTRACTOR:
The following information and any applicable supporting data is required for evaluation of requests under FAR Clause 52.225-11 Paragraph (c) & (d) and FAR Provision 52.225-12 Paragraph (b).
Material and/or Component
Construction Material Description
Unit of Measure
Quantity
*Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
Material and/or Component
Construction Material Description
Unit of Measure
Quantity
*Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]
A-23
HAZARDOUS MATERIALS
As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data - Alternate I, the apparent low bidder must submit prior to award a Material Safety Data Sheet (MSDS) for all hazardous materials that the bidder identifies in paragraph (b) of the FAR clause and defined under the latest version of Federal Standard No. 313.
Hazardous Material
Identification Number
USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS
Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) of 1976, as amended (42 U.S.C. 6901 et seq.), requires Federal, State, and local procuring agencies using appropriated Federal funds to purchase items composed of the highest percentage of recovered materials practical. Use of recovered materials is strongly encouraged on Federal Lands Highway Projects. Highway construction items covered by the Environmental Protection Agency’s Comprehensive Guidelines for Procurement of Products Containing Recovered Materials include fly ash, ground granulated blast furnace slag, traffic barricades, traffic cones, hydraulic mulch and compost for mulch.
Use of fly ash and ground granulated blast furnace slag and construction materials containing fly ash and ground granulated blast furnace slag on Federal Lands Highway Projects:
• It is the policy of the United States Government that fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag shall have maximum practicable opportunity for incorporation into its construction projects.
• The Contractor agrees to investigate the use of fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag to the fullest extent consistent with the efficient performance of this contract. Both the contractor and the subcontractors are urged to seek out suppliers of fly ash and ground granulated blast furnace slag, cement and concrete containing fly ash and ground granulated blast furnace slag and to solicit bids for these materials.
• Names of firms that supply fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag are available from the American Coal Ash Association and the National Slag Association.
B-1
BID BOND
(See instructions on reverse)
DATE BOND EXECUTED (Must not be later than bid opening date)
OMB NO. 9000-0045
Public reporting burden for this collection of information is estimated to average 25 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the FAR Secretariat (MVR), Federal Acquisition Policy Division, GSA, Washington, D.C. 20405.
PRINCIPAL (Legal name and business address)
TYPE OF ORGANIZATION (AX@ one)
INDIVIDUAL PARTNERSHIP
JOINT VENTURE CORPORATION
STATE OF INCORPORATION
SURETY(IES) (Name and business address)
PENAL SUM OF BOND
BID IDENTIFICATION
PERCENT OF
BID PRICE
AMOUNT NOT TO EXCEED
BID DATE
INVITATION NO.
DTFH6815B00023
20 PERCENT
MILLION(S)
THOUSAND(S)
HUNDRED(S)
CENTS
FOR (Construction, Supplies or Services)
CONSTRUCTION
OBLIGATION:
We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum “jointly and severally” as well as “severally” only for the purpose of allowing a joint action or actions against any or all of
us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.
CONDITIONS:
The Principal has submitted the bid identified above.
THEREFORE:
The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty
(60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the…
This is the start of the file's text. The full file is on GovTribe.