Bid_Tabs_Summary.pdf
PDF 47 KB Posted
- Attached to
- CA FTNP MOJA 10(1) ROADWAY SAFETY IMPROVEMENTS Federal contract opportunity
- Solicitation number
- DTFH6815B00023
About this file
Summary of Bids
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary.pdf | ||
| Q A_18_Nov_15.pdf | ||
| Q A.pdf | ||
| Hydraulic_Report.pdf | ||
| Pavement_ _Materials_Report.pdf | ||
| DTFH6815B00023.pdf | ||
| DTFH6815B00024.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T A B U L A T I O N O F B I D S
Schedule A Total of Bid Items: 4,333,600.00$ 0.3% 4,346,690.00$ 26.4% 5,476,635.00$ -1.4% 4,271,354.00$ 0.0% 4,335,440.00$ 4.8% 4,540,125.00$ -3.1% 4,201,354.00$ Project No: CA FTNP MOJA 10(1)
Project Name: Roadway Safety Improvements
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000
Line A0020 ALL LPSM 404,290.00$ 404,290.00$ 770,000.00$ 1,300,000.00$ 650,000.00$ 705,000.00$ 874,500.00$ 460,000.00$
15301-0000
Line A0040 ALL LPSM 95,000.00$ 95,000.00$ 125,000.00$ 110,000.00$ 50,000.00$ 75,000.00$ 250,000.00$ 45,000.00$
15401-0000
Line A0060 ALL LPSM 95,000.00$ 95,000.00$ 75,000.00$ 110,000.00$ 28,080.00$ 135,000.00$ 250,000.00$ 28,500.00$
15501-0000
Line A0080 ALL LPSM 3,000.00$ 3,000.00$ 10,000.00$ 10,000.00$ 5,000.00$ 7,500.00$ 15,000.00$ 6,500.00$
40910-0300
Line A0100 830,000 SQYD 1.50$ 1,245,000.00$ 1,452,500.00$ 1,660,000.00$ 1,162,000.00$ 979,400.00$ 323,700.00$ 1,087,300.00$
40920-1000
Line A0120 550 TON 600.00$ 330,000.00$ 110,000.00$ 165,000.00$ 143,000.00$ 134,750.00$ 324,500.00$ 143,825.00$
40940-1300
Line A0140 1,530 TON 700.00$ 1,071,000.00$ 459,000.00$ 841,500.00$ 811,512.00$ 734,400.00$ 1,075,590.00$ 803,250.00$
41105-0000
Line A0160 100 TON 65.00$ 6,500.00$ 2,000.00$ 75.00$ 4,800.00$ 8,000.00$ 5,000.00$ 23,000.00$
42801-0200
Line A0180 30,000 SQYD 10.00$ 300,000.00$ 540,000.00$ 450,000.00$ 900,000.00$ 810,000.00$ 570,000.00$ 870,000.00$
42803-0200
Line A0200 1,050 TON 300.00$ 315,000.00$ 236,250.00$ 341,250.00$ 141,750.00$ 262,500.00$ 393,750.00$ 425,250.00$
62201-0050
Line A0220 20 HOUR 100.00$ 2,000.00$ 2,500.00$ 2,900.00$ 3,000.00$ 2,500.00$ 2,500.00$ 2,700.00$
62201-0450
Line A0240 20 HOUR 175.00$ 3,500.00$ 3,000.00$ 2,800.00$ 960.00$ 2,900.00$ 4,000.00$ 3,000.00$
62201-2850
Line A0260 20 HOUR 150.00$ 3,000.00$ 3,000.00$ 3,800.00$ 600.00$ 3,500.00$ 3,700.00$ 3,500.00$
62301-0000
Line A0280 40 HOUR 75.00$ 3,000.00$ 2,600.00$ 3,200.00$ 3,200.00$ 3,000.00$ 3,200.00$ 2,880.00$
63401-0000
Line A0300 1,210,000 LNFT 0.20$ 242,000.00$ 121,000.00$ 145,200.00$ 145,200.00$ 217,800.00$ 145,200.00$ 133,100.00$
63405-0050
Line A0320 3 EACH 1,000.00$ 3,000.00$ 1,875.00$ 2,064.00$ 3,420.00$ 1,350.00$ 1,650.00$ 3,240.00$
63501-1000
Line A0340 ALL LPSM 55,000.00$ 55,000.00$ 275,000.00$ 125,000.00$ 25,000.00$ 45,000.00$ 100,000.00$ 23,500.00$
63502-0700
Line A0360 220 EACH 25.00$ 5,500.00$ 4,400.00$ 3,740.00$ 3,960.00$ 6,600.00$ 5,500.00$ 4,840.00$
63503-0700
Line A0380 316,000 LNFT 0.15$ 47,400.00$ 47,400.00$ 88,480.00$ 72,680.00$ 79,000.00$ 72,680.00$ 18,960.00$
63504-1000
Line A0400 233 SQFT 20.00$ 4,660.00$ 1,165.00$ 5,126.00$ 5,592.00$ 6,990.00$ 8,155.00$ 5,359.00$
63506-0500
Line A0420 1,000 HOUR 70.00$ 70,000.00$ 70,000.00$ 75,000.00$ 78,000.00$ 82,000.00$ 80,000.00$ 73,000.00$
63506-0600
Line A0440 350 HOUR 85.00$ 29,750.00$ 35,000.00$ 31,500.00$ 33,600.00$ 33,250.00$ 31,500.00$ 34,650.00$
Engineer's Estimate
100.00$ 90.00$ 96.00$ 95.00$ 90.00$ 99.00$
70.00$ 75.00$ 78.00$ 82.00$ 80.00$ 73.00$
5.00$ 22.00$ 24.00$ 30.00$ 35.00$ 23.00$
0.15$ 0.28$ 0.23$ 0.25$ 0.23$ 0.06$
20.00$ 17.00$ 18.00$ 30.00$ 25.00$ 22.00$
275,000.00$ 125,000.00$ 25,000.00$ 45,000.00$ 100,000.00$ 23,500.00$
625.00$ 688.00$ 1,140.00$ 450.00$ 550.00$ 1,080.00$
0.10$ 0.12$ 0.12$ 0.18$ 0.12$ 0.11$
65.00$ 80.00$ 80.00$ 75.00$ 80.00$ 72.00$
150.00$ 190.00$ 30.00$ 175.00$ 185.00$ 175.00$
150.00$ 140.00$ 48.00$ 145.00$ 200.00$ 150.00$
125.00$ 145.00$ 150.00$ 125.00$ 125.00$ 135.00$
225.00$ 325.00$ 135.00$ 250.00$ 375.00$ 405.00$
18.00$ 15.00$ 30.00$ 27.00$ 19.00$ 29.00$
20.00$ 0.75$ 48.00$ 80.00$ 50.00$ 230.00$
300.00$ 550.00$ 530.40$ 480.00$ 703.00$ 525.00$
200.00$ 300.00$ 260.00$ 245.00$ 590.00$ 261.50$
1.75$ 2.00$ 1.40$ 1.18$ 0.39$ 1.31$
874,500.00$ 460,000.00$
110,000.00$ 50,000.00$ 75,000.00$ 250,000.00$ 45,000.00$
75,000.00$ 110,000.00$ 28,080.00$ 135,000.00$ 250,000.00$ 28,500.00$
Leaders Contracting, Inc.Intermountain Slurry Seal, Inc. RBK Construction, Inc. Four Star Construction, LLC Cutting Edge Concrete Services, Inc. Storm Water Plans, LLC
125,000.00$
770,000.00$ 1,300,000.00$ 650,000.00$ 705,000.00$
MOBILIZATION
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
PAVEMENT MARKINGS, SYMBOLS
TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
TEMPORARY TRAFFIC CONTROL, CONE
EMULSIFIED ASPHALT, GRADE CRS-2P
BLOTTER
FLEXIBLE PAVEMENT, FULL DEPTH PATCH, TYPE 3
FLEXIBLE PAVEMENT PATCH, TYPE 3
DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY
BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
SURFACE TREATMENT, DESIGNATION 1C
FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H
MOTOR GRADER, 12 FOOT MINIMUM BLADE
GENERAL LABOR
PAVEMENT MARKINGS
CONSTRUCTION SCHEDULE
10,000.00$ 10,000.00$ 5,000.00$ 7,500.00$ 15,000.00$ 6,500.00$
12/30/2015 Page 1 of 1
Schedule B Total of Bid Items: 7,808,200.00$ -4.1% 7,487,611.25$ -7.2% 7,247,470.20$ -7.1% 7,252,109.40$ -3.0% 7,570,883.90$ -1.6% 7,683,641.40$ 16.1% 9,064,871.98$ Project No: CA FTNP MOJA 10(1)
Project Name: Roadway Safety Improvements
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000
Line B0020 ALL LPSM 764,902.10$ 764,902.10$ 979,979.00$ 1,300,000.00$ 650,000.00$ 705,000.00$ 946,000.00$ 985,000.00$
15206-0000
Line B0040 102.180 STA 230.00$ 23,501.40$ 20,436.00$ 20,436.00$ 69,482.40$ 15,327.00$ 15,327.00$ 19,516.38$
15215-1000
Line B0060 1 EACH 5,000.00$ 5,000.00$ 4,000.00$ 1,100.00$ 20,000.00$ 1,500.00$ 2,000.00$ 3,900.00$
15215-3000
Line B0080 2 EACH 3,000.00$ 6,000.00$ 8,000.00$ 3,400.00$ 17,000.00$ 3,000.00$ 4,000.00$ 7,800.00$
15215-3000
Line B0100 1 EACH 1,500.00$ 1,500.00$ 4,000.00$ 1,700.00$ 2,500.00$ 1,500.00$ 2,000.00$ 3,900.00$
15215-7000
Line B0120 1 EACH 4,000.00$ 4,000.00$ 4,000.00$ 2,500.00$ 3,500.00$ 1,500.00$ 7,500.00$ 3,900.00$
15216-1000
Line B0140 6.760 STA 700.00$ 4,732.00$ 2,163.20$ 1,352.00$ 16,900.00$ 1,014.00$ 1,081.60$ 2,061.80$
15216-2000
Line B0160 217.880 STA 150.00$ 32,682.00$ 34,860.80$ 35,950.20$ 76,258.00$ 17,430.40$ 34,860.80$ 34,860.80$
15301-0000
Line B0180 ALL LPSM 215,000.00$ 215,000.00$ 325,000.00$ 110,000.00$ 50,000.00$ 55,000.00$ 300,000.00$ 240,000.00$
15401-0000
Line B0200 ALL LPSM 165,000.00$ 165,000.00$ 150,000.00$ 110,000.00$ 58,500.00$ 80,000.00$ 300,000.00$ 57,000.00$
15501-0000
Line B0220 ALL LPSM 13,000.00$ 13,000.00$ 10,000.00$ 10,000.00$ 2,500.00$ 2,500.00$ 15,000.00$ 6,500.00$
15705-1400
Line B0240 1,400 LNFT 10.00$ 14,000.00$ 8,400.00$ 8,400.00$ 9,100.00$ 8,400.00$ 14,000.00$ 14,000.00$
15802-0000
Line B0260 ALL LPSM 30,000.00$ 30,000.00$ 100,000.00$ 10,000.00$ 40,000.00$ 150,000.00$ 350,000.00$ 42,000.00$
20101-0000
Line B0280 16.9 ACRE 3,000.00$ 50,700.00$ 8,450.00$ 10,140.00$ 84,500.00$ 109,850.00$ 33,800.00$ 64,220.00$
20301-0600
Line B0300 1 EACH 2,100.00$ 2,100.00$ 4,500.00$ 3,000.00$ 3,500.00$ 7,500.00$ 3,000.00$ 4,500.00$
20301-0700
Line B0320 80 EACH 20.00$ 1,600.00$ 2,000.00$ 880.00$ 12,000.00$ 3,200.00$ 4,000.00$ 2,800.00$
20301-1900
Line B0340 1 EACH 2,000.00$ 2,000.00$ 465.00$ 4,000.00$ 2,500.00$ 4,500.00$ 5,000.00$ 3,200.00$
20301-2400
Line B0360 32 EACH 120.00$ 3,840.00$ 2,016.00$ 3,520.00$ 48,000.00$ 4,800.00$ 3,200.00$ 11,200.00$
20302-0300
Line B0380 440 LNFT 12.00$ 5,280.00$ 4,180.00$ 4,400.00$ 2,860.00$ 11,880.00$ 6,600.00$ 11,000.00$
20401-0000
Line B0400 26,000 CUYD 20.00$ 520,000.00$ 286,000.00$ 338,000.00$ 260,000.00$ 728,000.00$ 338,000.00$ 624,000.00$
20402-0000
Line B0420 500 CUYD 70.00$ 35,000.00$ 8,500.00$ 30,000.00$ 17,500.00$ 37,500.00$ 20,000.00$ 62,000.00$
20441-0000
Line B0440 11,000 CUYD 10.00$ 110,000.00$ 187,000.00$ 22,000.00$ 165,000.00$ 297,000.00$ 154,000.00$ 407,000.00$
20443-0000
Line B0460 210 LNFT 10.00$ 2,100.00$ 5,250.00$ 4,200.00$ 10,500.00$ 8,400.00$ 3,570.00$ 19,530.00$
21101-2000
Line B0480 6,500 SQYD 10.00$ 65,000.00$ 13,000.00$ 26,000.00$ 91,000.00$ 78,650.00$ 32,500.00$ 91,000.00$
25101-3000
Line B0500 25 CUYD 180.00$ 4,500.00$ 7,500.00$ 3,125.00$ 11,250.00$ 6,250.00$ 9,375.00$ 7,000.00$
25305-1000
Line B0520 390 SQYD 120.00$ 46,800.00$ 37,050.00$ 48,750.00$ 32,487.00$ 42,900.00$ 78,000.00$ 69,030.00$
30101-0000
Line B0540 12,700 TON 40.00$ 508,000.00$ 508,000.00$ 635,000.00$ 508,000.00$ 609,600.00$ 495,300.00$ 1,333,500.00$
40301-0000
Line B0560 5,900 TON 150.00$ 885,000.00$ 885,000.00$ 826,000.00$ 708,000.00$ 855,500.00$ 826,000.00$ 926,300.00$
40910-0300
Line B0580 830,000 SQYD 1.50$ 1,245,000.00$ 1,452,500.00$ 1,203,500.00$ 1,079,000.00$ 1,020,900.00$ 323,700.00$ 1,128,800.00$
40920-1000
Line B0600 560 TON 600.00$ 336,000.00$ 112,000.00$ 145,600.00$ 376,320.00$ 137,200.00$ 330,400.00$ 148,400.00$
40940-1300
Line B0620 1,530 TON 700.00$ 1,071,000.00$ 459,000.00$ 765,000.00$ 811,512.00$ 734,400.00$ 1,075,590.00$ 803,250.00$
41103-0000
Line B0640 29,650 SQYD 1.25$ 37,062.50$ 23,720.00$ 14,825.00$ 5,930.00$ 22,237.50$ 51,591.00$ 29,650.00$
41105-0000
Line B0660 120 TON 65.00$ 7,800.00$ 2,400.00$ 18,000.00$ 17,280.00$ 9,600.00$ 6,000.00$ 27,000.00$
Engineer's Estimate
20.00$ 150.00$ 144.00$ 80.00$ 50.00$ 225.00$
0.80$ 0.50$ 0.20$ 0.75$ 1.74$ 1.00$
300.00$ 500.00$ 530.40$ 480.00$ 703.00$ 525.00$
200.00$ 260.00$ 672.00$ 245.00$ 590.00$ 265.00$
1.75$ 1.45$ 1.30$ 1.23$ 0.39$ 1.36$
150.00$ 140.00$ 120.00$ 145.00$ 140.00$ 157.00$
40.00$ 50.00$ 40.00$ 48.00$ 39.00$ 105.00$
95.00$ 125.00$ 83.30$ 110.00$ 200.00$ 177.00$
300.00$ 125.00$ 450.00$ 250.00$ 375.00$ 280.00$
2.00$ 4.00$ 14.00$ 12.10$ 5.00$ 14.00$
25.00$ 20.00$ 50.00$ 40.00$ 17.00$ 93.00$
17.00$ 2.00$ 15.00$ 27.00$ 14.00$ 37.00$
17.00$ 60.00$ 35.00$ 75.00$ 40.00$ 124.00$
11.00$ 13.00$ 10.00$ 28.00$ 13.00$ 24.00$
9.50$ 10.00$ 6.50$ 27.00$ 15.00$ 25.00$
63.00$ 110.00$ 1,500.00$ 150.00$ 100.00$ 350.00$
465.00$ 4,000.00$ 2,500.00$ 4,500.00$ 5,000.00$ 3,200.00$
25.00$ 11.00$ 150.00$ 40.00$ 50.00$ 35.00$
4,500.00$ 3,000.00$ 3,500.00$ 7,500.00$ 3,000.00$ 4,500.00$
500.00$ 600.00$ 5,000.00$ 6,500.00$ 2,000.00$ 3,800.00$
100,000.00$ 10,000.00$ 40,000.00$ 150,000.00$ 350,000.00$ 42,000.00$
6.00$ 6.00$ 6.50$ 6.00$ 10.00$ 10.00$
10,000.00$ 10,000.00$ 2,500.00$ 2,500.00$ 15,000.00$ 6,500.00$
150,000.00$ 110,000.00$ 58,500.00$ 80,000.00$ 300,000.00$ 57,000.00$
325,000.00$ 110,000.00$ 50,000.00$ 55,000.00$ 300,000.00$ 240,000.00$
160.00$ 165.00$ 350.00$ 80.00$ 160.00$ 160.00$
320.00$ 200.00$ 2,500.00$ 150.00$ 160.00$ 305.00$
4,000.00$ 2,500.00$ 3,500.00$ 1,500.00$ 7,500.00$ 3,900.00$
4,000.00$ 1,700.00$ 2,500.00$ 1,500.00$ 2,000.00$ 3,900.00$
946,000.00$ 985,000.00$
200.00$ 680.00$ 150.00$ 150.00$ 191.00$
4,000.00$ 1,100.00$ 20,000.00$ 1,500.00$ 2,000.00$ 3,900.00$
Leaders Contracting, Inc.Intermountain Slurry Seal, Inc. RBK Construction, Inc. Four Star Construction, LLC Cutting Edge Concrete Services, Inc. Storm Water Plans, LLC
200.00$
979,979.00$ 1,300,000.00$ 650,000.00$ 705,000.00$
MOBILIZATION
SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
SURVEY AND STAKING, APPROACH ROAD
REMOVAL OF DELINEATOR
REMOVAL OF PIPE CULVERT
REMOVAL OF SIGN
SURVEY AND STAKING, ROADWAY CROSS-SECTIONS
SURVEY AND STAKING, GRADE FINISHING STAKES
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SEDIMENT LOG
PLACED RIPRAP, CLASS 3
REVET MATTRESS, GALVANIZED OR ALUMINIZED COATED
AGGREGATE BASE
HOT ASPHALT CONCRETE PAVEMENT
SURFACE TREATMENT, DESIGNATION 1C
REMOVAL OF CURB AND GUTTER, CONCRETE
ROADWAY EXCAVATION
SUBEXCAVATION
WASTE
BERMS
ROADWAY OBLITERATION, METHOD 2
SURVEY AND STAKING, DRAINAGE STRUCTURE
SURVEY AND STAKING, PARKING AREA
WATERING FOR DUST CONTROL
CLEARING AND GRUBBING
REMOVAL OF CATTLE GUARD
SURVEY AND STAKING, DRAINAGE STRUCTURE
4,000.00$ 1,700.00$ 8,500.00$ 1,500.00$ 2,000.00$ 3,900.00$
FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H
EMULSIFIED ASPHALT, GRADE CRS-2P
PRIME COAT
BLOTTER
12/30/2015 Page 1 of 3
Schedule B Total of Bid Items: 7,808,200.00$ -4.1% 7,487,611.25$ -7.2% 7,247,470.20$ -7.1% 7,252,109.40$ -3.0% 7,570,883.90$ -1.6% 7,683,641.40$ 16.1% 9,064,871.98$ Project No: CA FTNP MOJA 10(1)
Project Name: Roadway Safety Improvements
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate Leaders Contracting, Inc.Intermountain Slurry Seal, Inc. RBK Construction, Inc. Four Star Construction, LLC Cutting Edge Concrete Services, Inc. Storm Water Plans, LLC
41201-1000
Line B0680 36 TON 650.00$ 23,400.00$ 30,600.00$ 31,500.00$ 16,200.00$ 27,000.00$ 36.00$ 41,400.00$
42801-0200
Line B0700 30,000 SQYD 10.00$ 300,000.00$ 540,000.00$ 375,000.00$ 900,000.00$ 615,000.00$ 570,000.00$ 675,000.00$
42803-0200
Line B0720 1,050 TON 300.00$ 315,000.00$ 236,250.00$ 302,400.00$ 141,750.00$ 262,500.00$ 393,750.00$ 367,500.00$
60201-1000
Line B0740 115 LNFT 200.00$ 23,000.00$ 8,625.00$ 17,825.00$ 40,250.00$ 34,500.00$ 17,250.00$ 16,100.00$
60210-1000
Line B0760 2 EACH 1,200.00$ 2,400.00$ 1,400.00$ 1,400.00$ 10,000.00$ 3,000.00$ 5,000.00$ 4,500.00$
60901-2300
Line B0780 850 LNFT 16.00$ 13,600.00$ 11,900.00$ 11,050.00$ 17,000.00$ 25,500.00$ 22,950.00$ 5,525.00$
60908-1000
Line B0800 85 SQYD 40.00$ 3,400.00$ 13,600.00$ 14,875.00$ 3,400.00$ 4,675.00$ 9,775.00$ 8,500.00$
60920-0000
Line B0820 10 EACH 50.00$ 500.00$ 700.00$ 3,000.00$ 2,500.00$ 2,000.00$ 1,000.00$ 1,500.00$
61801-0000
Line B0840 580 LNFT 100.00$ 58,000.00$ 34,800.00$ 49,300.00$ 72,500.00$ 31,900.00$ 95,700.00$ 35,380.00$
61901-0000
Line B0860 200 LNFT 3.00$ 600.00$ 1,200.00$ 3,000.00$ 5,000.00$ 5,000.00$ 2,000.00$ 3,500.00$
61901-3300
Line B0880 1,000 LNFT 10.00$ 10,000.00$ 6,000.00$ 17,000.00$ 25,000.00$ 9,500.00$ 15,000.00$ 6,500.00$
62201-0050
Line B0900 40 HOUR 100.00$ 4,000.00$ 5,000.00$ 5,800.00$ 6,000.00$ 5,000.00$ 5,000.00$ 5,400.00$
62201-0450
Line B0920 40 HOUR 175.00$ 7,000.00$ 6,000.00$ 5,600.00$ 10,000.00$ 5,800.00$ 8,000.00$ 6,000.00$
62201-1350
Line B0940 20 HOUR 200.00$ 4,000.00$ 3,000.00$ 5,200.00$ 6,000.00$ 5,200.00$ 5,000.00$ 4,400.00$
62201-2850
Line B0960 20 HOUR 150.00$ 3,000.00$ 3,000.00$ 3,800.00$ 6,000.00$ 3,500.00$ 3,700.00$ 4,000.00$
62301-0000
Line B0980 80 HOUR 75.00$ 6,000.00$ 5,200.00$ 6,400.00$ 6,400.00$ 6,000.00$ 6,000.00$ 6,480.00$
62302-1000
Line B1000 40 HOUR 150.00$ 6,000.00$ 11,720.00$ 6,600.00$ 3,800.00$ 4,400.00$ 5,600.00$ 13,320.00$
62302-1100
Line B1020 40 HOUR 300.00$ 12,000.00$ 11,720.00$ 8,000.00$ 3,800.00$ 8,800.00$ 6,800.00$ 9,080.00$
63301-0000
Line B1040 62 EACH 400.00$ 24,800.00$ 43,400.00$ 29,450.00$ 31,620.00$ 27,280.00$ 27,900.00$ 30,070.00$
63312-0000
Line B1060 1 EACH 2,000.00$ 2,000.00$ 5,000.00$ 9,000.00$ 3,000.00$ 2,500.00$ 7,500.00$ 17,000.00$
63313-0000
Line B1080 36 LNFT 100.00$ 3,600.00$ 2,076.84$ 1,620.00$ 64,800.00$ 1,440.00$ 4,140.00$ 1,728.00$
63313-0000
Line B1100 25,000 LNFT 0.70$ 17,500.00$ 2,500.00$ 2,750.00$ 3,000.00$ 26,250.00$ 25,000.00$ 17,250.00$
63316-1000
Line B1120 1 EACH 250.00$ 250.00$ 700.00$ 220.00$ 3,500.00$ 400.00$ 225.00$ 550.00$
63401-0000
Line B1140 1,215,000 LNFT 0.20$ 243,000.00$ 133,650.00$ 145,800.00$ 170,100.00$ 243,000.00$ 145,800.00$ 157,950.00$
63405-0050
Line B1160 9 EACH 300.00$ 2,700.00$ 5,625.00$ 6,192.00$ 6,750.00$ 1,350.00$ 4,950.00$ 6,390.00$
63501-1000
Line B1180 ALL LPSM 105,000.00$ 105,000.00$ 384,674.41$ 125,000.00$ 55,000.00$ 45,000.00$ 100,000.00$ 125,000.00$
63502-0700
Line B1200 320 EACH 25.00$ 8,000.00$ 6,400.00$ 5,440.00$ 5,760.00$ 9,600.00$ 8,000.00$ 7,040.00$
63502-1300
Line B1220 140 EACH 70.00$ 9,800.00$ 2,800.00$ 4,900.00$ 5,040.00$ 9,100.00$ 14,000.00$ 14,700.00$
63502-2000
Line B1240 2 EACH 30,000.00$ 60,000.00$ 40,000.00$ 13,200.00$ 1,020.00$ 17,000.00$ 50,000.00$ 19,000.00$
63503-0300
Line B1260 120 LNFT 60.00$ 7,200.00$ 3,600.00$ 4,200.00$ 4,320.00$ 6,600.00$ 3,600.00$ 12,600.00$
63503-0700
Line B1280 334,000 LNFT 0.15$ 50,100.00$ 50,100.00$ 93,520.00$ 76,820.00$ 83,500.00$ 76,820.00$ 20,040.00$
63504-1000
Line B1300 900 SQFT 20.00$ 18,000.00$ 4,500.00$ 19,800.00$ 21,600.00$ 27,000.00$ 31,500.00$ 20,700.00$
63506-0500
Line B1320 2,150 HOUR 70.00$ 150,500.00$ 150,500.00$ 161,250.00$ 167,700.00$ 176,300.00$ 172,000.00$ 156,950.00$
20.00$ 35.00$ 36.00$ 65.00$ 100.00$ 105.00$
20.00$ 17.00$ 18.00$ 30.00$ 25.00$ 22.00$
384,674.41$ 125,000.00$ 55,000.00$ 45,000.00$ 100,000.00$ 125,000.00$
625.00$ 688.00$ 750.00$ 150.00$ 550.00$ 710.00$
0.11$ 0.12$ 0.14$ 0.20$ 0.12$ 0.13$
700.00$ 220.00$ 3,500.00$ 400.00$ 225.00$ 550.00$
0.10$ 0.11$ 0.12$ 1.05$ 1.00$ 0.69$
57.69$ 45.00$ 1,800.00$ 40.00$ 115.00$ 48.00$
5,000.00$ 9,000.00$ 3,000.00$ 2,500.00$ 7,500.00$ 17,000.00$
700.00$ 475.00$ 510.00$ 440.00$ 450.00$ 485.00$
293.00$ 200.00$ 95.00$ 220.00$ 170.00$ 227.00$
293.00$ 165.00$ 95.00$ 110.00$ 140.00$ 333.00$
65.00$ 80.00$ 80.00$ 75.00$ 75.00$ 81.00$
150.00$ 190.00$ 300.00$ 175.00$ 185.00$ 200.00$
150.00$ 260.00$ 300.00$ 260.00$ 250.00$ 220.00$
150.00$ 140.00$ 250.00$ 145.00$ 200.00$ 150.00$
125.00$ 145.00$ 150.00$ 125.00$ 125.00$ 135.00$
6.00$ 17.00$ 25.00$ 9.50$ 15.00$ 6.50$
6.00$ 15.00$ 25.00$ 25.00$ 10.00$ 17.50$
60.00$ 85.00$ 125.00$ 55.00$ 165.00$ 61.00$
70.00$ 300.00$ 250.00$ 200.00$ 100.00$ 150.00$
160.00$ 175.00$ 40.00$ 55.00$ 115.00$ 100.00$
14.00$ 13.00$ 20.00$ 30.00$ 27.00$ 6.50$
700.00$ 700.00$ 5,000.00$ 1,500.00$ 2,500.00$ 2,250.00$
75.00$ 155.00$ 350.00$ 300.00$ 150.00$ 140.00$
225.00$ 288.00$ 135.00$ 250.00$ 375.00$ 350.00$
18.00$ 12.50$ 30.00$ 20.50$ 19.00$ 22.50$
850.00$ 875.00$ 450.00$ 750.00$ 1.00$ 1,150.00$
TEMPORARY TRAFFIC CONTROL, FLAGGER
RUMBLE STRIP
REMOVE AND RESET SIGN
PAVEMENT MARKINGS
PAVEMENT MARKINGS, SYMBOLS
TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
TEMPORARY TRAFFIC CONTROL, CONE
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
SIGN SYSTEM
SPEED HUMP
RUMBLE STRIP
FENCE
FENCE, TORTOISE BARRIER
DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY
BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH
BULLDOZER, 200HP MINIMUM FLYWHEEL POWER
MOTOR GRADER, 12 FOOT MINIMUM BLADE
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
20,000.00$ 6,600.00$ 510.00$ 8,500.00$ 25,000.00$ 9,500.00$
36-INCH PIPE CULVERT
END SECTION FOR 36-INCH PIPE CULVERT
CURB, ASPHALT, 6-INCH DEPTH
PAVED DITCH, ASPHALT
RESET WHEELSTOP
CONCRETE BARRIER
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
FLEXIBLE PAVEMENT, FULL DEPTH PATCH, TYPE 3
FLEXIBLE PAVEMENT PATCH, TYPE 3
0.15$ 0.28$ 0.23$ 0.25$ 0.23$ 0.06$
30.00$ 35.00$ 36.00$ 55.00$ 30.00$ 105.00$
70.00$ 75.00$ 78.00$ 82.00$ 80.00$ 73.00$
5.00$ 22.00$ 24.00$ 30.00$ 35.00$ 23.00$
12/30/2015 Page 2 of 3
Schedule B Total of Bid Items: 7,808,200.00$ -4.1% 7,487,611.25$ -7.2% 7,247,470.20$ -7.1% 7,252,109.40$ -3.0% 7,570,883.90$ -1.6% 7,683,641.40$ 16.1% 9,064,871.98$ Project No: CA FTNP MOJA 10(1)
Project Name: Roadway Safety Improvements
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate Leaders Contracting, Inc.Intermountain Slurry Seal, Inc. RBK Construction, Inc. Four Star Construction, LLC Cutting Edge Concrete Services, Inc. Storm Water Plans, LLC
63506-0600
Line B1340 350 HOUR 85.00$ 29,750.00$ 35,000.00$ 31,500.00$ 33,600.00$ 33,250.00$ 33,250.00$ 35,000.00$
63602-7000
Line B1360 3 EACH 22,000.00$ 66,000.00$ 27,000.00$ 5,100.00$ 60,000.00$ 30,000.00$ 15,000.00$ 15,000.00$
TEMPORARY TRAFFIC CONTROL, PILOT CAR
SYSTEM INSTALLATION, SPEED FEEDBACK SIGN
9,000.00$ 1,700.00$ 20,000.00$ 10,000.00$ 5,000.00$ 5,000.00$
100.00$ 90.00$ 96.00$ 95.00$ 95.00$ 100.00$
12/30/2015 Page 3 of 3
Option W Total of Bid Items: 247,700.00$ -6.0% 232,879.07$ -26.8% 181,204.15$ 274.9% 928,741.00$ 76.5% 437,142.80$ 46.8% 363,741.29$ 104.8% 507,270.63$ Project No: CA FTNP MOJA 10(1)
Project Name: Roadway Safety Improvements
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000
Line W0020 ALL LPSM 23,664.29$ 23,664.29$ 25,000.00$ 2,500.00$ 10,000.00$ 55,000.00$ 37,000.00$ 115,000.00$
15206-0000
Line W0040 8.907 STA 230.00$ 2,048.61$ 3,447.01$ 1,336.05$ 169,233.00$ 1,781.40$ 1,336.05$ 3,830.01$
15215-1000
Line W0060 2 EACH 5,000.00$ 10,000.00$ 6,880.00$ 2,000.00$ 40,000.00$ 2,000.00$ 4,000.00$ 3,900.00$
15215-3000
Line W0080 1 EACH 1,500.00$ 1,500.00$ 3,440.00$ 1,500.00$ 8,500.00$ 1,500.00$ 2,000.00$ 3,900.00$
15216-2000
Line W0100 17.814 STA 150.00$ 2,672.10$ 5,166.06$ 2,672.10$ 356,280.00$ 1,781.40$ 2,850.24$ 5,878.62$
15301-0000
Line W0120 ALL LPSM 5,000.00$ 5,000.00$ 3,200.00$ 2,500.00$ 15,000.00$ 15,000.00$ 33,000.00$ 12,750.00$
15401-0000
Line W0140 ALL LPSM 5,000.00$ 5,000.00$ 5,000.00$ 2,500.00$ 13,398.00$ 35,000.00$ 33,000.00$ 28,500.00$
15705-1400
Line W0160 30 LNFT 10.00$ 300.00$ 180.00$ 150.00$ 300.00$ 225.00$ 300.00$ 1,050.00$
20101-0000
Line W0180 2.2 ACRE 3,000.00$ 6,600.00$ 1,100.00$ 1,100.00$ 11,000.00$ 15,400.00$ 4,400.00$ 20,350.00$
20301-0700
Line W0200 20 EACH 20.00$ 400.00$ 500.00$ 200.00$ 3,000.00$ 1,000.00$ 1,000.00$ 700.00$
20301-2400
Line W0220 6 EACH 120.00$ 720.00$ 2,016.00$ 600.00$ 9,000.00$ 1,200.00$ 600.00$ 1,020.00$
20401-0000
Line W0240 1,100 CUYD 20.00$ 22,000.00$ 12,100.00$ 11,000.00$ 11,000.00$ 40,700.00$ 33,000.00$ 50,600.00$
21101-2000
Line W0260 600 SQYD 10.00$ 6,000.00$ 1,200.00$ 2,400.00$ 30,000.00$ 6,000.00$ 3,000.00$ 11,400.00$
25101-3000
Line W0280 15 CUYD 180.00$ 2,700.00$ 4,500.00$ 1,875.00$ 6,750.00$ 3,750.00$ 5,625.00$ 8,700.00$
30101-0000
Line W0300 1,150 TON 40.00$ 46,000.00$ 46,000.00$ 51,750.00$ 41,400.00$ 86,250.00$ 44,850.00$ 83,950.00$
40301-0000
Line W0320 450 TON 150.00$ 67,500.00$ 67,500.00$ 60,750.00$ 54,000.00$ 112,500.00$ 99,000.00$ 96,300.00$
40920-1000
Line W0340 1 TON 800.00$ 800.00$ 2,250.00$ 250.00$ 500.00$ 1,500.00$ 1,500.00$ 1,150.00$
41103-0000
Line W0360 2,700 SQYD 1.25$ 3,375.00$ 3,780.00$ 1,350.00$ 540.00$ 2,700.00$ 4,725.00$ 6,075.00$
41201-1000
Line W0380 1 TON 850.00$ 850.00$ 2,250.00$ 875.00$ 800.00$ 1,200.00$ 3,000.00$ 3,130.00$
60201-0900
Line W0400 50 LNFT 180.00$ 9,000.00$ 4,000.00$ 11,250.00$ 17,500.00$ 13,750.00$ 7,500.00$ 9,750.00$
60210-0900
Line W0420 2 EACH 1,000.00$ 2,000.00$ 1,600.00$ 1,200.00$ 5,000.00$ 3,000.00$ 3,600.00$ 3,000.00$
63301-0000
Line W0440 6 EACH 400.00$ 2,400.00$ 4,200.00$ 2,850.00$ 90,000.00$ 2,700.00$ 2,700.00$ 2,910.00$
63316-1000
Line W0460 1 EACH 250.00$ 250.00$ 700.00$ 220.00$ 3,500.00$ 295.00$ 225.00$ 575.00$
63401-0000
Line W0480 3,600 LNFT 0.30$ 1,080.00$ 3,600.00$ 432.00$ 4,320.00$ 1,260.00$ 5,220.00$ 4,104.00$
63502-0700
Line W0500 20 EACH 25.00$ 500.00$ 400.00$ 340.00$ 360.00$ 700.00$ 500.00$ 440.00$
63502-1300
Line W0520 20 EACH 70.00$ 1,400.00$ 400.00$ 700.00$ 720.00$ 600.00$ 2,000.00$ 2,100.00$
63503-0300
Line W0540 40 LNFT 60.00$ 2,400.00$ 1,200.00$ 1,400.00$ 1,440.00$ 2,600.00$ 1,200.00$ 4,200.00$
63503-0700
Line W0560 1,800 LNFT 0.30$ 540.00$ 270.00$ 504.00$ 1,800.00$ 2,250.00$ 2,610.00$ 108.00$
63506-0500
Line W0580 300 HOUR 70.00$ 21,000.00$ 21,000.00$ 15,000.00$ 23,400.00$ 25,500.00$ 24,000.00$ 21,900.00$
SURVEY AND STAKING, DRAINAGE STRUCTURE
3,440.00$ 1,500.00$ 8,500.00$ 1,500.00$ 2,000.00$ 3,900.00$
MOBILIZATION
SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
SURVEY AND STAKING, APPROACH ROAD
HOT ASPHALT CONCRETE PAVEMENT
FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H
PRIME COAT
CONTRACTOR TESTING
SOIL EROSION CONTROL, SEDIMENT LOG
CLEARING AND GRUBBING
REMOVAL OF DELINEATOR
REMOVAL OF SIGN
ROADWAY EXCAVATION
TEMPORARY TRAFFIC CONTROL, CONE
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, FLAGGER
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
30-INCH PIPE CULVERT
END SECTION FOR 30-INCH PIPE CULVERT
SIGN SYSTEM
REMOVE AND RESET SIGN
PAVEMENT MARKINGS
SURVEY AND STAKING, GRADE FINISHING STAKES
CONTRACTOR QUALITY CONTROL
ROADWAY OBLITERATION, METHOD 2
PLACED RIPRAP, CLASS 3
AGGREGATE BASE
2,500.00$ 10,000.00$ 55,000.00$
Leaders Contracting, Inc.Intermountain Slurry Seal, Inc. RBK Construction, Inc. Four Star Construction, LLC Cutting Edge Concrete Services, Inc. Storm Water Plans, LLC
387.00$
25,000.00$
290.00$ 150.00$ 20,000.00$ 100.00$ 160.00$ 330.00$
37,000.00$ 115,000.00$
150.00$ 19,000.00$ 200.00$ 150.00$ 430.00$
3,440.00$ 1,000.00$ 20,000.00$ 1,000.00$ 2,000.00$ 1,950.00$
6.00$ 5.00$ 10.00$ 7.50$ 10.00$ 35.00$
5,000.00$ 2,500.00$ 13,398.00$ 35,000.00$ 33,000.00$ 28,500.00$
3,200.00$ 2,500.00$ 15,000.00$ 15,000.00$ 33,000.00$ 12,750.00$
25.00$ 10.00$ 150.00$ 50.00$ 50.00$ 35.00$
500.00$ 500.00$ 5,000.00$ 7,000.00$ 2,000.00$ 9,250.00$
11.00$ 10.00$ 10.00$ 37.00$ 30.00$ 46.00$
336.00$ 100.00$ 1,500.00$ 200.00$ 100.00$ 170.00$
300.00$ 125.00$ 450.00$ 250.00$ 375.00$ 580.00$
2.00$ 4.00$ 50.00$ 10.00$ 5.00$ 19.00$
150.00$ 135.00$ 120.00$ 250.00$ 220.00$ 214.00$
40.00$ 45.00$ 36.00$ 75.00$ 39.00$ 73.00$
1.40$ 0.50$ 0.20$ 1.00$ 1.75$ 2.25$
2,250.00$ 250.00$ 500.00$ 1,500.00$ 1,500.00$ 1,150.00$
80.00$ 225.00$ 350.00$ 275.00$ 150.00$ 195.00$
2,250.00$ 875.00$ 800.00$ 1,200.00$ 3,000.00$ 3,130.00$
700.00$ 475.00$ 15,000.00$ 450.00$ 450.00$ 485.00$
800.00$ 600.00$ 2,500.00$ 1,500.00$ 1,800.00$ 1,500.00$
1.00$ 0.12$ 1.20$ 0.35$ 1.45$ 1.14$
700.00$ 220.00$ 3,500.00$ 295.00$ 225.00$ 575.00$
20.00$ 35.00$ 36.00$ 30.00$ 100.00$ 105.00$
20.00$ 17.00$ 18.00$ 35.00$ 25.00$ 22.00$
0.15$ 0.28$ 1.00$ 1.25$ 1.45$ 0.06$
30.00$ 35.00$ 36.00$ 65.00$ 30.00$ 105.00$
70.00$ 50.00$ 78.00$ 85.00$ 80.00$ 73.00$
Engineer's Estimate
Option X Total of Bid Items: 575,000.00$ -57.6% 243,743.88$ -64.2% 205,572.00$ -45.5% 313,626.62$ -57.8% 242,598.00$ -26.4% 423,189.00$ 13.1% 650,223.96$ Project No: CA FTNP MOJA 10(1)
Project Name: Roadway Safety Improvements
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000
Line X0020 ALL LPSM 52,118.80$ 52,118.80$ 40,000.00$ 5,000.00$ 75,000.00$ 35,000.00$ 56,000.00$ 135,000.00$
15210-3000
Line X0040 509.520 STA 85.00$ 43,309.20$ 35,156.88$ 38,214.00$ 61,142.40$ 38,214.00$ 50,952.00$ 39,742.56$
15301-0000
Line X0060 ALL LPSM 3,000.00$ 3,000.00$ 2,200.00$ 2,500.00$ 20,000.00$ 10,000.00$ 17,000.00$ 38,000.00$
15401-0000
Line X0080 ALL LPSM 3,000.00$ 3,000.00$ 14,000.00$ 2,500.00$ 606.20$ 10,000.00$ 9,500.00$ 28,500.00$
30305-1500
Line X0100 509.520 STA 850.00$ 433,092.00$ 114,642.00$ 127,380.00$ 112,502.02$ 101,904.00$ 242,022.00$ 366,854.40$
63502-0700
Line X0120 100 EACH 25.00$ 2,500.00$ 2,000.00$ 1,700.00$ 1,800.00$ 3,500.00$ 2,500.00$ 2,200.00$
63504-1000
Line X0140 149 SQFT 20.00$ 2,980.00$ 745.00$ 3,278.00$ 3,576.00$ 2,980.00$ 5,215.00$ 3,427.00$
63506-0500
Line X0160 500 HOUR 70.00$ 35,000.00$ 35,000.00$ 25,000.00$ 39,000.00$ 41,000.00$ 40,000.00$ 36,500.00$
CONTRACTOR TESTING
14,000.00$ 2,500.00$ 606.20$ 10,000.00$ 9,500.00$ 28,500.00$
MOBILIZATION
CENTERLINE, VERIFICATION AND STAKING
CONTRACTOR QUALITY CONTROL
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
PULVERIZING, 3-INCH DEPTH
TEMPORARY TRAFFIC CONTROL, CONE
5,000.00$ 75,000.00$ 35,000.00$
Leaders Contracting, Inc.Intermountain Slurry Seal, Inc. RBK Construction, Inc. Four Star Construction, LLC Cutting Edge Concrete Services, Inc. Storm Water Plans, LLC
69.00$
40,000.00$
225.00$ 250.00$ 220.80$ 200.00$ 475.00$ 720.00$
56,000.00$ 135,000.00$
75.00$ 120.00$ 75.00$ 100.00$ 78.00$
2,200.00$ 2,500.00$ 20,000.00$ 10,000.00$ 17,000.00$ 38,000.00$
70.00$ 50.00$ 78.00$ 82.00$ 80.00$ 73.00$
5.00$ 22.00$ 24.00$ 20.00$ 35.00$ 23.00$
20.00$ 17.00$ 18.00$ 35.00$ 25.00$ 22.00$
Option Y Total of Bid Items: 1,253,600.00$ -51.9% 603,330.00$ -48.0% 651,390.00$ -31.8% 855,415.00$ -3.3% 1,212,740.00$ -20.4% 998,187.50$ 18.1% 1,480,090.00$ Project No: CA FTNP MOJA 10(1)
Project Name: Roadway Safety Improvements
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000
Line Y0020 ALL LPSM 113,625.00$ 113,625.00$ 15,000.00$ 2,500.00$ 75,000.00$ 75,000.00$ 99,000.00$ 111,000.00$
15215-3000
Line Y0040 1 EACH 3,000.00$ 3,000.00$ 3,440.00$ 1,000.00$ 15,000.00$ 1,500.00$ 2,000.00$ 3,900.00$
15301-0000
Line Y0060 ALL LPSM 10,000.00$ 10,000.00$ 3,500.00$ 1,000.00$ 15,000.00$ 10,000.00$ 7,000.00$ 64,000.00$
15401-0000
Line Y0080 ALL LPSM 5,000.00$ 5,000.00$ 6,000.00$ 1,000.00$ 28,080.00$ 15,000.00$ 5,500.00$ 28,500.00$
20101-0000
Line Y0100 2.7 ACRE 3,000.00$ 8,100.00$ 1,350.00$ 1,350.00$ 13,500.00$ 17,550.00$ 5,400.00$ 33,750.00$
21201-0000
Line Y0120 7.750 STA 2,500.00$ 19,375.00$ 5,890.00$ 11,625.00$ 151,125.00$ 15,500.00$ 6,587.50$ 50,375.00$
25101-3000
Line Y0140 5,700 CUYD 180.00$ 1,026,000.00$ 501,600.00$ 570,000.00$ 484,500.00$ 969,000.00$ 798,000.00$ 1,083,000.00$
30101-0000
Line Y0160 700 TON 40.00$ 28,000.00$ 28,000.00$ 31,500.00$ 28,000.00$ 63,000.00$ 27,300.00$ 63,000.00$
63301-0000
Line Y0180 9 EACH 400.00$ 3,600.00$ 4,500.00$ 4,275.00$ 4,590.00$ 4,050.00$ 4,050.00$ 4,365.00$
63502-0700
Line Y0200 20 EACH 50.00$ 1,000.00$ 400.00$ 340.00$ 360.00$ 600.00$ 500.00$ 440.00$
63504-1000
Line Y0220 150 SQFT 20.00$ 3,000.00$ 750.00$ 3,300.00$ 3,600.00$ 3,000.00$ 5,250.00$ 3,450.00$
63506-0500
Line Y0240 470 HOUR 70.00$ 32,900.00$ 32,900.00$ 23,500.00$ 36,660.00$ 38,540.00$ 37,600.00$ 34,310.00$
CONTRACTOR TESTING
6,000.00$ 1,000.00$ 28,080.00$ 15,000.00$ 5,500.00$ 28,500.00$
MOBILIZATION
SURVEY AND STAKING, DRAINAGE STRUCTURE
CONTRACTOR QUALITY CONTROL
PLACED RIPRAP, CLASS 3
AGGREGATE BASE
SIGN SYSTEM
TEMPORARY TRAFFIC CONTROL, CONE
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
CLEARING AND GRUBBING
LINEAR GRADING
2,500.00$ 75,000.00$ 75,000.00$
Leaders Contracting, Inc.Intermountain Slurry Seal, Inc. RBK Construction, Inc. Four Star Construction, LLC Cutting Edge Concrete Services, Inc. Storm Water Plans, LLC
3,440.00$
15,000.00$
500.00$ 500.00$ 5,000.00$ 6,500.00$ 2,000.00$ 12,500.00$
99,000.00$ 111,000.00$
1,000.00$ 15,000.00$ 1,500.00$ 2,000.00$ 3,900.00$
3,500.00$ 1,000.00$ 15,000.00$ 10,000.00$ 7,000.00$ 64,000.00$
40.00$ 45.00$ 40.00$ 90.00$ 39.00$ 90.00$
88.00$ 100.00$ 85.00$ 170.00$ 140.00$ 190.00$
760.00$ 1,500.00$ 19,500.00$ 2,000.00$ 850.00$ 6,500.00$
20.00$ 17.00$ 18.00$ 30.00$ 25.00$ 22.00$
500.00$ 475.00$ 510.00$ 450.00$ 450.00$ 485.00$
70.00$ 50.00$ 78.00$ 82.00$ 80.00$ 73.00$
5.00$ 22.00$ 24.00$ 20.00$ 35.00$ 23.00$
Option Z Total of Bid Items: 3,551,400.00$ -43.2% 2,016,640.00$ -34.8% 2,315,146.00$ -21.9% 2,774,243.60$ -14.6% 3,033,235.00$ -3.3% 3,433,550.00$ -11.4% 3,145,883.42$ Project No: CA FTNP MOJA 10(1)
Project Name: Roadway Safety Improvements
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000
Line Z0020 ALL LPSM 347,990.00$ 347,990.00$ 90,000.00$ 2,500.00$ 75,000.00$ 175,000.00$ 600,000.00$ 195,000.00$
15301-0000
Line Z0040 ALL LPSM 80,000.00$ 80,000.00$ 20,000.00$ 2,500.00$ 15,000.00$ 45,000.00$ 100,000.00$ 38,000.00$
15401-0000
Line Z0060 ALL LPSM 80,000.00$ 80,000.00$ 12,750.00$ 2,500.00$ 19,353.00$ 65,000.00$ 100,000.00$ 28,500.00$
15501-0000
Line Z0080 ALL LPSM 3,000.00$ 3,000.00$ 1,000.00$ 1,000.00$ 2,500.60$ 2,500.00$ 7,000.00$ 3,000.00$
40910-0300
Line Z0100 607,500 SQYD 1.50$ 911,250.00$ 607,500.00$ 607,500.00$ 850,500.00$ 771,525.00$ 236,925.00$ 856,575.00$
40920-1000
Line Z0120 400 TON 600.00$ 240,000.00$ 80,000.00$ 104,000.00$ 86,000.00$ 98,000.00$ 236,000.00$ 104,000.00$
40940-1300
Line Z0140 1,120 TON 700.00$ 784,000.00$ 336,000.00$ 560,000.00$ 594,048.00$ 537,600.00$ 787,360.00$ 588,000.00$
41105-0000
Line Z0160 120 TON 65.00$ 7,800.00$ 2,400.00$ 18,000.00$ 17,280.00$ 9,600.00$ 6,000.00$ 24,000.00$
42801-0200
Line Z0180 19,000 SQYD 10.00$ 190,000.00$ 266,000.00$ 237,500.00$ 570,000.00$ 513,000.00$ 361,000.00$ 418,000.00$
42803-0200
Line Z0200 1,800 TON 300.00$ 540,000.00$ 315,000.00$ 518,400.00$ 261,000.00$ 450,000.00$ 675,000.00$ 621,000.00$
62201-0050
Line Z0220 20 HOUR 100.00$ 2,000.00$ 2,500.00$ 2,900.00$ 2,500.00$ 2,500.00$ 2,500.00$ 2,700.00$
62201-0450
Line Z0240 20 HOUR 175.00$ 3,500.00$ 3,000.00$ 2,800.00$ 4,400.00$ 2,900.00$ 4,000.00$ 3,000.00$
62201-2850
Line Z0260 20 HOUR 150.00$ 3,000.00$ 3,000.00$ 3,800.00$ 7,000.00$ 3,500.00$ 3,700.00$ 3,500.00$
62301-0000
Line Z0280 40 HOUR 75.00$ 3,000.00$ 2,600.00$ 3,200.00$ 3,200.00$ 3,000.00$ 3,000.00$ 3,240.00$
63401-0000
Line Z0300 890,000 LNFT 0.20$ 178,000.00$ 89,000.00$ 97,900.00$ 106,800.00$ 160,200.00$ 106,800.00$ 97,900.00$
63405-0050
Line Z0320 5 EACH 1,000.00$ 5,000.00$ 3,125.00$ 3,440.00$ 3,750.00$ 2,250.00$ 2,750.00$ 3,550.00$
63501-1000
Line Z0340 ALL LPSM 40,000.00$ 40,000.00$ 50,000.00$ 2,500.00$ 20,000.00$ 20,000.00$ 60,000.00$ 37,000.00$
63502-0700
Line Z0360 220 EACH 25.00$ 5,500.00$ 4,400.00$ 3,740.00$ 3,960.00$ 7,700.00$ 5,500.00$ 4,840.00$
63503-0700
Line Z0380 228,000 LNFT 0.15$ 34,200.00$ 34,200.00$ 63,840.00$ 27,360.00$ 57,000.00$ 27,360.00$ 13,680.00$
63504-1000
Line Z0400 233 SQFT 20.00$ 4,660.00$ 1,165.00$ 5,126.00$ 5,592.00$ 4,660.00$ 8,155.00$ 5,298.42$
63506-0500
Line Z0420 900 HOUR 70.00$ 63,000.00$ 63,000.00$ 45,000.00$ 70,200.00$ 73,800.00$ 72,000.00$ 65,700.00$
63506-0600
Line Z0440 300 HOUR 85.00$ 25,500.00$ 30,000.00$ 27,000.00$ 28,800.00$ 28,500.00$ 28,500.00$ 29,400.00$
CONSTRUCTION SCHEDULE
1,000.00$ 1,000.00$ 2,500.60$ 2,500.00$ 7,000.00$ 3,000.00$
MOBILIZATION
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
PAVEMENT MARKINGS, SYMBOLS
TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
TEMPORARY TRAFFIC CONTROL, CONE
EMULSIFIED ASPHALT, GRADE CRS-2P
BLOTTER
FLEXIBLE PAVEMENT, FULL DEPTH PATCH, TYPE 3
FLEXIBLE PAVEMENT PATCH, TYPE 3
DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY
BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
SURFACE TREATMENT, DESIGNATION 1C
FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H
MOTOR GRADER, 12 FOOT MINIMUM BLADE
GENERAL LABOR
PAVEMENT MARKINGS
2,500.00$ 75,000.00$ 175,000.00$
Leaders Contracting, Inc.Intermountain Slurry Seal, Inc. RBK Construction, Inc. Four Star Construction, LLC Cutting Edge Concrete Services, Inc. Storm Water Plans, LLC
20,000.00$
90,000.00$
1.00$ 1.00$ 1.40$ 1.27$ 0.39$ 1.41$
600,000.00$ 195,000.00$
2,500.00$ 15,000.00$ 45,000.00$ 100,000.00$ 38,000.00$
12,750.00$ 2,500.00$ 19,353.00$ 65,000.00$ 100,000.00$ 28,500.00$
20.00$ 150.00$ 144.00$ 80.00$ 50.00$ 200.00$
300.00$ 500.00$ 530.40$ 480.00$ 703.00$ 525.00$
200.00$ 260.00$ 215.00$ 245.00$ 590.00$ 260.00$
175.00$ 288.00$ 145.00$ 250.00$ 375.00$ 345.00$
14.00$ 12.50$ 30.00$ 27.00$ 19.00$ 22.00$
150.00$ 140.00$ 220.00$ 145.00$ 200.00$ 150.00$
125.00$ 145.00$ 125.00$ 125.00$ 125.00$ 135.00$
65.00$ 80.00$ 80.00$ 75.00$ 75.00$ 81.00$
150.00$ 190.00$ 350.00$ 175.00$ 185.00$ 175.00$
625.00$ 688.00$ 750.00$ 450.00$ 550.00$ 710.00$
0.10$ 0.11$ 0.12$ 0.18$ 0.12$ 0.11$
20.00$ 17.00$ 18.00$ 35.00$ 25.00$ 22.00$
50,000.00$ 2,500.00$ 20,000.00$ 20,000.00$ 60,000.00$ 37,000.00$
5.00$ 22.00$ 24.00$ 20.00$ 35.00$ 22.74$
0.15$ 0.28$ 0.12$ 0.25$ 0.12$ 0.06$
100.00$ 90.00$ 96.00$ 95.00$ 95.00$ 98.00$
70.00$ 50.00$ 78.00$ 82.00$ 80.00$ 73.00$