DTFH6815B00005.pdf
PDF 5 MB Posted
- Attached to
- CA FLAP CR 4S07(1), Convict Lake Road
- Solicitation number
- DTFH6815B00005
About this file
Invitation for Bid
View the file
Other files
| File | Type | Posted |
|---|---|---|
| bid_tabs.pdf | ||
| Bid_Opening_Summary.pdf | ||
| A001.pdf | ||
| Q-A _4-27.pdf | ||
| Pavements_Report.pdf | ||
| 2015-03-06_Geotechnical_Report_Final.pdf | ||
| Plan_Sheets.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BID
SOLICITATION NUMBER: DTFH6815B00005
PROJECT NUMBER: CA FLAP CR4S07(1)
PROJECT NAME: CONVICT LAKE ROAD
BID OPENING DATE:
See Page A-1, Item 13A
This solicitation cites Standard Specifications for Construction of Roads and Bridges on
Federal Highway Projects, FP-03 US Customary Units
ISSUING OFFICE:
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 W. DAKOTA AVENUE, SUITE 360
LAKEWOOD, CO 80228
Web site: http://www.fbo.gov E-mail: CFLContracts@dot.gov mailto:CFLContracts@dot.gov
PROJECT CA FLAP CR4S07(1)
CONVICT LAKE ROAD
LOCATION INYO NATIONAL FOREST
COUNTY MONO
STATE CALIFORNIA
LENGTH SCHEDULE A: 2.72 MILES
OPTION X: 0.32 MILES
TYPE OF CONSTRUCTION PULVERIZATION, WIDENING, ASPHALT
SURFACING, PEDESTRIAN BRIDGE
REPLACEMENT, ROCKERY WALL,
TRAIL, AND DRAINAGE
TABLE OF CONTENTS
Notice to Bidders ............................................................................................................. A-i
Solicitation, Offer, and Award ........................................................................................ A-1
Basis for Award ............................................................................................................. A-4
Bid Schedule .................................................................................................................. A-6
Solicitation Provisions .....................................................................................................B-7
Contract Clauses ..............................................................................................................C-1
Davis Bacon Wage Determination .................................................................................. D-1
Division 100 ..................................................................................................................... E-1 Division 150 ................................................................................................................... E-26 Division 200 ................................................................................................................... E-50 Division 300 ................................................................................................................... E-64 Division 400 ................................................................................................................... E-67 Division 500 ................................................................................................................... E-98 Division 600 ................................................................................................................. E-103 Division 700 ................................................................................................................. E-115
APPENDICES
Appendix A ............................................................................. FIRE PREVENTION PLAN
Appendix B ...........................................................................ENCROACHMENT PERMIT
Appendix C ........................ SAMPLE SMALL BUSINESS SUBCONTRACTING PLAN
Appendix D ..................................................................... WASTE DISCHARGE PERMIT
SPECIAL CONTRACT REQUIREMENTS (SCRs)
The following Special Contract Requirements amend and supplement the Standard Specification for Construction of Roads and Bridges on Federal Highway Projects
NOTICE TO BIDDERS
A-i
ELECTRONIC BIDS WILL NOT BE ACCEPTED. Submit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Item 8). Please submit the following with your bid:
Submit the following documents with your Bid Packageï
• SF-1442, Solicitation, Offer & Award, Pages A-1 and A-2
• Indication of interest in formal Partnering, Page A-5
• Bid Schedule including Buy American Act & Hazardous Materials, Pages A-6 through A-19
• Bid Guarantee (see FAR Clause 52.228-1), Pages B-1 and B-2. Bid bonds must be originals with original signatures and corporate seals. Photocopies and Faxed copies are NOT acceptable and will make your bid non-responsive.
• Completed VETS 100, Page A-ii; Bidders’ Information, Pages B-3 through B-6; Reps and Certs, Page B-7 through B-11 and Certification Regarding Responsibility Matters (FAR 52.209-5), Pages B-12 and B-14.
• HUBZone small business concerns electing to waive the evaluation preference, complete 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns, Section C.
Bidders should retain all other pages for their information. Bids should be submitted in a sealed enveloped and include the Contractor’s Name, Solicitation Number and the Project Number/Name.
I. PRE-BID INFORMATION
It is the responsibility of the bidder to verify that this solicitation document, including the plans, are complete as listed in the table of contents and the index to sheets. Plan sheets can be found at http://www.fbo.gov. Physical data relevant to this solicitation may also be viewed or downloaded at the above site.
This solicitation and subsequent contract are governed by the Federal Acquisition Regulations (FAR), agency supplemental regulations, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 US Customary Units (FP-03).
The FP-03 was utilized for the design of this project. Hard copies of the FP-03 will not be provided to bidders. The FP-03 is available electronically at http://flh.fhwa.dot.gov/resources/pse/specs/fp- 03.htm or may be purchased by contacting Bob Rosenblatt at ARC Western, telephone number 303- 785-2520 or email bob.rosenblatt@e-arc.com. Limited numbers of hard copies of the FP-03 will be provided to the awarded Prime Contractor.
Applicable FAR provisions and clauses in this IFB are incorporated by reference or full text. FAR provisions and clauses incorporated by reference can be accessed on the Internet at https://www.acquisition.gov/far/.
Notice of SAM Registration – you must register in the System for Award Management (SAM – replaced CCR) prior to award of a contract resulting from this solicitation. Failure to register prior http://www.fbo.gov/ http://flh.fhwa.dot.gov/resources/pse/specs/fp-03.htm http://flh.fhwa.dot.gov/resources/pse/specs/fp-03.htm mailto:bob.rosenblatt@e-arc.com https://www.acquisition.gov/far/
A-ii to contract award may require award to the next successful registered offeror. See FAR Subpart 4.1103©. Register online at www.sam.gov.
Representations and Certifications – This solicitation is issued under NAICS 237310 ï Highway, Street & Bridge Construction with a small business size standard of $36.5 million. If your average annual gross receipts for the past 3 years are above $36.5 million, you are a large business for this solicitation. If they are below $36.5 million you are a small business. Please complete the certification listed in paragraph (b) of FAR Provision 52.204-8 Annual Representation and Certifications on Page B-7. Your small business information is pulled into the Online Representations and Certifications Application (ORCA) website from the System for Award Management (SAM). Please include NAICS 237310 in your SAM. Before submitting bids, please ensure you have completed your annual representations and certifications electronically at the SAM website at www.sam.gov.
Vets100 Reporting: - The Contractor must complete the report if required. See reporting requirements at: www.dol.gov/vets/programs/fcp/main.htm.
• My firm had a qualifying Federal Contract in 2013 and has complied with the reporting requirements.
• My firm did not have a qualifying Federal Contract in 2013 and is therefore exempt from the reporting requirements
This Solicitation Contains a Price Evaluation Factor - The Government will apply a factor of 10% to an apparent low bid submitted by a large business when we also receive a bid from a certified HUBZone small business concern. The 10% factor does not apply to apparent low bids submitted by small businesses. See FAR Clause 52.219-4 Notice of price evaluation preference for HUBZone small business concerns.
In the event this full and open competition results in a contract award to a qualified HUBZone SBC after a price evaluation preference, FAR Clause 52.236-1, Performance of Work by the Contractor does not apply.
§126.700 of the Code of Federal Regulations (Title 13, Part 126, Subpart G), stated below, will replace the performance of work requirements stated in the above mentioned FAR clause.
A qualified HUBZone SBC receiving a contract under this solicitation for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs. This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs.
Bid Guarantee – Follow the requirements of FAR Clause 52.228-1 Bid Guarantee and Subpart
102.03 of the FP-03. Bid bonds must be originals and have original signatures and corporate seals.
Photocopied and faxed copies of bonds will be rejected and cause your bid to be non-responsive.
http://www.sam.gov/ http://www.sam.gov/ http://www.dol.gov/vets/programs/fcp/main.htm
A-iii
ATTENTION: Minority, Women-owned, and Disadvantaged Business Enterprises (DBEs). The Department of Transportation (DOT), offers working capital financing and bonding assistance for transportation related contracts. DOT's Bonding Assistance Program (BAP) offers bid, performance and payment bonds on contracts up to $1,000,000. DOT's Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $500,000 with interest at the prime rate. For further information, call (800) 532-1169. Internet address:
http://osdbuweb.dot.gov.
The Contractor is fully responsible to verify that all data is correct when an offer is submitted.
Failure to properly update your data may cause the offer to be rejected.
Request for Technical Information ï Questions relative to the plans and SCRs for this solicitation will only be accepted in writing (see Item 9 on Page A-3).
TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE
ACCEPTED AFTER 4 P.M. ON APRIL 28, 2015
NO SITE VISIT WILL BE HELD.
Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at http://www.fbo.gov
Modifications to Bids - Bids may be modified or withdrawn by facsimile or telegraphic notice, if such notice is received prior to the time specified for receipt of bids. The Government will not be responsible for ANY failure attributable to the transmission or receipt of telegraphic or facsimile data.
For all modifications, we STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total. See FAR Provision 52.214-5, Submission of Bids. Modifications which make the bid ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the bid to be rejected as nonresponsive.
FAX Number to submit modifications to bids for this project is (720) 963-3360
II. Post Award Information.
Subcontracting - FAR Clause 52.219-8, Utilization of Small Business Concerns states that Prime Contractors afford small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns the maximum practicable opportunity to participate in performing contracts let by any Federal agency.
FAR Clause 52.219-9, Small Business Subcontracting Plan, Alternate I, requires that the large http://osdbuweb.dot.gov/ http://www.fbo.gov/
A-iv business concern who is the successful low bidder on a Federal project with an anticipated award amount exceeding $1 million, is required to submit a subcontracting plan prior to contract award.
The subcontracting plan expresses goals in terms of percentages of total planned subcontracting dollars for the use of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns as subcontractors. To view and download a sample plan for subcontracting requirements, visit http://www.cflhd.gov/contracting/construction/ReferenceLinks.cfm. If the apparent successful low bidder fails to submit an acceptable subcontracting plan acceptable to the CO within 7 days of bid opening, that bidder may be ineligible for award of the contract.
Prime Contractors, who are large businesses, are encouraged to post sources sought notices at the Small Business Administration’s Subcontracting Network (SUB-NET) http://web.sba.gov/subnet/ so that small businesses can identify opportunities in their areas of expertise. The use of SUB-Net fulfills the requirements set forth in Federal Acquisition Regulation (FAR) 5.206, Notice of Subcontracting Opportunities, for contractors and subcontractors to post notices and thereby increase competition for subcontracts. A sample plan is also in Appendix C.
A list of currently known business concerns owned and controlled by socially and economically disadvantaged individuals and/or women-owned small business concerns that have indicated an interest in participating in highway construction is available at http://www.sam.gov
Insurance requirements - See Subsection 107.05 of the FP-03.
EEBACS - Contractors shall use the Government’s web-based system, Engineer’s Estimating, Bidding, Award, and Construction System (EEBACS), to prepare all “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes).
The Contractor shall be required to attend a training session on the use of EEBACS. The training session will require up to 4 hours. No more than 3 Contractor staff may attend the training unless approved by the CO. The Contractor shall be responsible for training additional staff.
The Contractor shall be required to submit a user account form to gain access to the EEBACS system. See Subsection 108.01.
A user guide, “EEBACS for Construction Contractors”, is available. An electronic version can be found at http://flh.fhwa.dot.gov/resources/pse/estimate/guide.htm http://www.cflhd.gov/contracting/construction/ReferenceLinks.cfm http://web.sba.gov/subnet/ http://www.sam.gov/ http://flh.fhwa.dot.gov/resources/pse/estimate/guide.htm
A-1
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration or Repair)
1. SOLICITATION NO.
DTFH6815B00005
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
4/6/2015
IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
CFL15HFPM102
6. PROJECT NO.
CA FLAP CR4S07(1)
CONVICT LAKE ROAD
7. ISSUED BY:
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS DIVISION
12300 WEST DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CODE: 69050001 8. ADDRESS OFFER TO:
JOE WILSON, CONTRACT SPECIALIST
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS DIVISION
12300 WEST DAKOTA AVENUE
LAKEWOOD, COLORADO 80228
9. FOR INFORMATION CALL
SEE PAGE A-3
A. NAME:
SEE PAGE A-3
B. TELEPHONE NO. (Include area code)
SEE PAGE A-3
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:
ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH:
1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)
2. DEPARTMENT OF LABOR, DAVIS BACON MINIMUM WAGE RATES
3. SPECIAL CONTRACT REQUIREMENTS
4. PLANS
5. BID SCHEDULE
6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS
7. SUBCONTRACTING PLAN (IF APPLICABLE)
See Subsection 104.04 of the FP-03 for governing order of precedence
11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. *Refer to Subsection 108.01 as amended in the Special Contract Requirements.
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m. (hour) local time on 5/6/15 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-102 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53-236-1(e)
X
A-2
GPO: 1985 0 - 469-796 STANDARD FORM 1442 PAGE 2 (REV. 4-85)
OFFEROR (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
DUNS NO.
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing with calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
SEE INDIVIDUAL BID SCHEDULE(S)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED
TO SIGN OFFER (Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 27
(4 copies unless otherwise specified)
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
□ 15 U.S.C. 637( ) □ 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE:
27. PAYMENT WILL BE MADE BY
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 W. DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.)
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by
(a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON
AUTHORIZED TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD
DATE
A-3
Item 8: LOCATION OF PUBLIC BID OPENING: Offers must be received by designated date and time as stated in Item 13A.
Item 9: FOR GENERAL INFORMATION: e-mail us at CFLContracts@dot.gov.
FOR TECHNICAL INFORMATION (plans and specifications): Questions must be submitted in writing by e-mail at CFLContracts@dot.gov or by fax to 720-963-3360.
FOR PHYSICAL DATA: The following data is available electronically with this solicitation at http://www.fbo.gov:
Geotechnical Report Pavements Report
Item 11: COMPLETION DATE: Work shall be completed on or before the date specified in Subsection 108.01 of the SCRs.
Item 12A: PERFORMANCE AND PAYMENT BONDS: See FAR Clause 52.228-15
Performance and Payment Bonds-Construction (Clauses begin on Page C-1) and Subsection 102.06 of the FP-03.
Item 13B: BID BOND AMOUNT: See FAR Provision 52.228-1 Bid Guarantee
(Provisions begin on Page B-1) and Subsection 102.03 Bid Guarantee of the FP-03. All bid guarantees must have original signatures with original corporate seals.
Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO
ACKNOWLEDGE AMENDMENTS, IN ITEM 19 OF THE SF-1442, BY THE
DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION
MAY RESULT IN REJECTION OF YOUR BID. If amendments are issued, they will be posted to www.fbo.gov.
Item 24: SUBMITTING INVOICES: See Subsection 109.08 Progress Payments of the
FP-03.
ESTIMATED
PRICE: The price range of the project work is between $3 and $5 million.
http://www.fbo.gov/
A-4
Bid Schedule Instructions BIDDERS, PLEASE NOTE: Before preparing the bid, carefully read the Solicitation Provisions.
The Bid Proposal is comprised on one schedule and one option as follows:
Schedule A: Resurfacing, rehabilitation, and restoration on 2.72 miles of road.
Option X: Resurfacing, rehabilitation, and restoration on 0.32 miles of trail.
• Insert a numeric unit bid price for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government
• Multiply the unit price by the quantity for each pay item and show the amount bid.
When the words “Lump Sum” appear as a unit bid price, insert an amount for each lump sum pay item.
• Total all amounts bid for each pay item and show the Construction Cost Total on the space provided on the last page of each schedule or option.
• Also show the Construction Cost Total for each schedule/option as well as the combined Total of each Schedule and the Option in the spaces provided on the Bid Summary page.
NOTE: If the amount bid for a pay item is inconsistent with the product of the unit price provided by the bidder and the quantity provided by the Government, the unit price will govern and the Government will determine a corrected amount bid for the pay item by multiplying the unit price by the quantity.
Pay Item 15401-0000, Contractor Testing Bidders must provide prices on two alternative Contractor Testing pay items in two different places in each schedule’s bid tab.
On Pages A-6 and A-14 in Schedule A and Option X bidders must provide a price for Contractor Testing using a Contractor- Furnished field laboratory. As part of Schedule A and Option X the price for this alternative item will be included in the "Schedule A Total" and "Option X Total" lines and, therefore, included in the evaluation for award.
Bidders must also provide a stand-alone price on the bottom of Page A-13 and A-16 for the alternative item, Contractor Testing using a Government-furnished field laboratory. This price will not be factored into the evaluation for award. The Government retains the discretion to award a contract which includes either of the alternative Contractor Testing items at the respective bid price.
Evaluation Factors for Award To be eligible for award of contract, the offeror shall submit prices for each item in Bid Schedule A and Option X. Accordingly, contract award will be made to the lowest responsible bidder conforming to the solicitation, provided funds are available. Per FAR Provision 52.217-5, Evaluation of Options (JUL 1990), the Government will evaluate offers for award purposes by adding the total price for all options to the total price for Schedule A. Evaluation of options will not obligate the Government to exercise the option(s).
A-5
Partnering
A Partnership recognizes the Government and the Contractor are both responsible and can affect the successful completion of this project. Partnering is a vehicle to ensure the partnership has structure and quality. It recognizes the strengths of each party and uses those strengths to identify and achieve shared goals. One of the primary objectives of Partnering is to facilitate the resolution of disputes in a timely, professional, and non-adversarial manner with the outcome focused on achieving those shared goals.
CFLHD supports the concepts and tenets of Partnering and as such is encouraging the Contractors and it’s subcontractors to establish a Partnering relationship on this project.
A formal Partnering meeting can help facilitate this relationship by helping do document the parties’ common purpose and goals, and ensuring alignment. The goals are mutually agreed upon and address effective and efficient performance within the scope of the contract.
Participation in a formal Partnering meeting is voluntary. Costs of implementing and maintaining the partnership would be agreed to by both parties as described in Subsection 103.05 Partnering of the FP-03. Costs of partnering would be in addition to the contract award amount.
Please indicate your desire to participate in a formal partnering meeting on this project.
(___) We would like to participate in a formal partnering meeting.
(___) We do not want to participate in a formal partnering meeting.
A - 6
Contract Quantity Pay Items
20801-0000 STRUCTURE EXCAVATION
20803-0000 STRUCTURAL BACKFILL
55302-0200 PRECAST, PRESTRESSED CONCRETE SLABS, 36-INCH NON-VOIDED
55401-1000 REINFORCING STEEL
55601-0900 BRIDGE RAILING, STEEL (PEDESTRIAN)
60101-0000 CONCRETE
61901-0550 FENCE, BARB-LESS WIRE
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0100 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0110 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
69.00 STA $____________ $____________
A0120 15210-3000 CENTERLINE, VERIFICATION AND STAKING
150.00 STA $____________ $____________
A0130 15214-1000 SURVEY AND STAKING, BRIDGE
ALL LPSM $___LPSM_____ $____________
A0140 15214-2000 SURVEY AND STAKING, RETAINING WALL
ALL LPSM $___LPSM_____ $____________
A0150 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
3 EACH $____________ $____________
A0160 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
76.00 STA $____________ $____________
A0170 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
A0180 15401-0000 CONTRACTOR TESTING (CONTRACTOR-FURNISHED FIELD LABORATORY)
ALL LPSM $___LPSM_____ $____________
A0190 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A0200 15705-0100 SOIL EROSION CONTROL, SILT FENCE
4,830 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA FLAP CR4S07(1)
Project Name:Convict Lake Road
A - 7
A0210 15705-1500 SOIL EROSION CONTROL, SEDIMENT WATTLE
800 LNFT $____________ $____________
A0220 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION ENTRANCE
1 EACH $____________ $____________
A0230 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
A0240 20101-0000 CLEARING AND GRUBBING
2.0 ACRE $____________ $____________
A0250 20301-0100 REMOVAL OF BOLLARD
2 EACH $____________ $____________
A0260 20301-0700 REMOVAL OF DELINEATOR (SNOWPOLE)
70 EACH $____________ $____________
A0270 20301-1900 REMOVAL OF PIPE CULVERT
3 EACH $____________ $____________
A0280 20301-2400 REMOVAL OF SIGN
45 EACH $____________ $____________
A0290 20301-2700 REMOVAL OF STRUCTURE (TIMBER RETAINING WALLS)
3 EACH $____________ $____________
A0300 20301-3400 REMOVAL OF WHEELSTOP
80 EACH $____________ $____________
A0310 20301-3700 REMOVAL OF TERMINAL SECTION
4 EACH $____________ $____________
A0320 20302-0200 REMOVAL OF CURB
50 LNFT $____________ $____________
A0330 20302-1200 REMOVAL OF GUARDRAIL
55 LNFT $____________ $____________
A0340 20302-2500 REMOVAL OF HANDRAIL
660 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 8
A0350 20303-0300 REMOVAL OF CONCRETE
30 SQYD $____________ $____________
A0360 20303-1600 REMOVAL OF PAVEMENT, ASPHALT
50 SQYD $____________ $____________
A0370 20304-2000 REMOVAL OF BRIDGE
ALL LPSM $___LPSM_____ $____________
A0380 20402-0000 SUBEXCAVATION
140 CUYD $____________ $____________
A0390 20420-0000 EMBANKMENT CONSTRUCTION
4,150 CUYD $____________ $____________
A0400 20430-1000 SHOULDER, EXCAVATION
11,800 LNFT $____________ $____________
A0410 20708-0000 GEOSYNTHETIC REINFORCEMENT
4,870 SQYD $____________ $____________
A0420 20801-0000 STRUCTURE EXCAVATION
50 CUYD $____________ $____________
A0430 20803-0000 STRUCTURAL BACKFILL
8 CUYD $____________ $____________
A0440 25101-2000 PLACED RIPRAP, CLASS 2
16 CUYD $____________ $____________
A0450 25126-0000 REMOVE AND RESET BOULDER
6 EACH $____________ $____________
A0460 25201-0000 SPECIAL ROCK EMBANKMENT
100 CUYD $____________ $____________
A0470 25210-0000 ROCKERY
460 SQYD $____________ $____________
A0480 30305-3000 PULVERIZING, 6-INCH DEPTH
155 STA $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 9
A0490 30802-2000 ROADWAY AGGREGATE, METHOD 2
3,400 TON $____________ $____________
A0500 40101-5600 SUPERPAVE PAVEMENT, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL
8,300 TON $____________ $____________
A0520 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
85 TON $____________ $____________
A0540 40920-1000 FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H
23 TON $____________ $____________
A0550 41103-0000 PRIME COAT (METHOD 1)
50,500 SQYD $____________ $____________
A0560 41105-0000 BLOTTER
50 TON $____________ $____________
A0570 41201-1000 TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
23 TON $____________ $____________
A0580 55302-0200 PRECAST, PRESTRESSED CONCRETE SLABS, 36-INCH NON-VOIDED
93 LNFT $____________ $____________
A0590 55401-1000 REINFORCING STEEL
2,000 LB $____________ $____________
A0600 55601-0900 BRIDGE RAILING, STEEL (PEDESTRIAN)
112 LNFT $____________ $____________
A0610 60101-0000 CONCRETE
12 CUYD $____________ $____________
A0620 60201-0600 18-INCH PIPE CULVERT
10 LNFT $____________ $____________
A0630 60201-0800 24-INCH PIPE CULVERT
110 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 10
A0640 60202-0200 18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
40 LNFT $____________ $____________
A0650 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
1 EACH $____________ $____________
A0660 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
4 EACH $____________ $____________
A0670 60211-0600 END SECTION FOR 18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT
2 EACH $____________ $____________
A0680 60405-0000 MANHOLE ADJUSTMENT
21 EACH $____________ $____________
A0690 60901-1100 CURB, CONCRETE, 13-INCH DEPTH
460 LNFT $____________ $____________
A0700 60915-1000 WHEELSTOP, CONCRETE
28 EACH $____________ $____________
A0710 61501-0100 SIDEWALK, CONCRETE
14 SQYD $____________ $____________
A0720 61504-1000 ACCESSIBILITY RAMP, CONCRETE
15 SQYD $____________ $____________
A0730 61701-2000 GUARDRAIL SYSTEM G4, TYPE 4, CLASS B WOOD POSTS
107 LNFT $____________ $____________
A0740 61702-0800 TERMINAL SECTION TYPE TANGENT
2 EACH $____________ $____________
A0750 61703-2000 TERMINAL END, TYPE ROUND END SECTION
2 EACH $____________ $____________
A0760 61704-4000 REPLACEMENT BLOCKOUT
12 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 11
A0770 61901-0550 FENCE, BARB-LESS WIRE
214 LNFT $____________ $____________
A0780 61904-0000 BOLLARD POST
2 EACH $____________ $____________
A0790 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
40 HOUR $____________ $____________
A0800 62201-0350 BACKHOE
40 HOUR $____________ $____________
A0810 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY
40 HOUR $____________ $____________
A0820 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
40 HOUR $____________ $____________
A0830 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
40 HOUR $____________ $____________
A0840 62202-1000 MATERIALS TRANSFER VEHICLE
ALL LPSM $___LPSM_____ $____________
A0850 62301-0000 GENERAL LABOR
40 HOUR $____________ $____________
A0860 62302-0100 SPECIAL LABOR, SLOPE SCALING
24 HOUR $____________ $____________
A0870 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
20 HOUR $____________ $____________
A0880 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
40 HOUR $____________ $____________
A0890 62511-2000 SEEDING, HYDRAULIC METHOD
6,950 SQYD $____________ $____________
A0900 62516-2000 MULCHING, HYDRAULIC METHOD
6,950 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 12
A0910 63301-0000 SIGN SYSTEM
55 EACH $____________ $____________
A0920 63308-0000 OBJECT MARKER
6 EACH $____________ $____________
A0930 63309-0200 DELINEATOR, TYPE 2
70 EACH $____________ $____________
A0940 63309-1000 DELINEATOR, TYPE SNOWPOLE
70 EACH $____________ $____________
A0950 63316-1000 REMOVE AND RESET SIGN
12 EACH $____________ $____________
A0960 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID
16.0 MILE $____________ $____________
A0970 63402-0400 PAVEMENT MARKINGS, TYPE B, BROKEN
0.6 MILE $____________ $____________
A0980 63403-0800 PAVEMENT MARKINGS, TYPE H
1,150 SQFT $____________ $____________
A0990 63405-3250 PAVEMENT MARKINGS, TYPE H, ACCESSIBILITY SYMBOL
5 EACH $____________ $____________
A1000 63502-0500 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 2
30 EACH $____________ $____________
A1010 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
2 EACH $____________ $____________
A1020 63502-1200 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 28-INCH
100 EACH $____________ $____________
A1030 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
10 EACH $____________ $____________
A1040 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
1 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 13
A1050 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
100 LNFT $____________ $____________
A1060 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
1,100 LNFT $____________ $____________
A1070 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
500 SQFT $____________ $____________
A1080 63505-1000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
31.2 MILE $____________ $____________
A1090 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
1,100 HOUR $____________ $____________
A1100 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
500 HOUR $____________ $____________
A1110 64603-2100 FIXTURE, STAIRWAY
2 EACH $____________ $____________
A1120 64604-1000 FIXTURE, HANDRAIL
660 LNFT $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA FLAP CR4S07(1)
Project Name:Convict Lake Road
Joe.Wilson Typewritten Text
A0180 15401-0000 CONTRACTOR TESTING (GOVERNMENT-FURNISHED FIELD LABORATORY)
ALL LPSM $___LPSM_____ $____________
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
A - 14
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
X0100 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
X0200 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
8.00 STA $____________ $____________
X0300 15210-3000 CENTERLINE, VERIFICATION AND STAKING
11.00 STA $____________ $____________
X0400 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
7 EACH $____________ $____________
X0500 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
15.00 STA $____________ $____________
X0600 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
X0700 15401-0000 CONTRACTOR TESTING (CONTRACTOR-FURNISHED FIELD LABORATORY)
ALL LPSM $___LPSM_____ $____________
X0800 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
X0900 15705-0100 SOIL EROSION CONTROL, SILT FENCE
750 LNFT $____________ $____________
X1000 15705-1500 SOIL EROSION CONTROL, SEDIMENT WATTLE
210 LNFT $____________ $____________
X1100 20101-0000 CLEARING AND GRUBBING
0.3 ACRE $____________ $____________
X1200 20301-0080 REMOVAL OF BENCH
8 EACH $____________ $____________
X1300 20301-1900 REMOVAL OF PIPE CULVERT
7 EACH $____________ $____________
X1400 20302-0200 REMOVAL OF CURB
100 LNFT $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
A - 15
X1500 20303-1600 REMOVAL OF PAVEMENT, ASPHALT
670 SQYD $____________ $____________
X1600 20420-0000 EMBANKMENT CONSTRUCTION
80 CUYD $____________ $____________
X1700 20708-0000 GEOSYNTHETIC REINFORCEMENT
420 SQYD $____________ $____________
X1800 21101-2000 ROADWAY OBLITERATION, METHOD 2
80 SQYD $____________ $____________
X1900 25101-2000 PLACED RIPRAP, CLASS 2
25 CUYD $____________ $____________
X2000 25125-0000 BOULDER
4 EACH $____________ $____________
X2100 25210-0000 ROCKERY
40 SQYD $____________ $____________
X2200 30802-2000 ROADWAY AGGREGATE, METHOD 2
130 TON $____________ $____________
X2300 40401-0000 MINOR HOT ASPHALT CONCRETE
190 TON $____________ $____________
X2400 40920-1000 FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H
0.5 TON $____________ $____________
X2500 60201-0400 12-INCH PIPE CULVERT
130 LNFT $____________ $____________
X2600 60210-0400 END SECTION FOR 12-INCH PIPE CULVERT
14 EACH $____________ $____________
X2700 60901-8000 CURB, TIMBER (EDGING)
110 LNFT $____________ $____________
X2800 60901-8000 CURB, TIMBER (STABILIZATION)
850 LNFT $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
A - 16
X2900 62301-0000 GENERAL LABOR
20 HOUR $____________ $____________
X3000 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
10 HOUR $____________ $____________
X3100 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
10 HOUR $____________ $____________
X3200 62511-2000 SEEDING, HYDRAULIC METHOD
820 SQYD $____________ $____________
X3300 62516-2000 MULCHING, HYDRAULIC METHOD
820 SQYD $____________ $____________
X3400 63316-1000 REMOVE AND RESET SIGN
1 EACH $____________ $____________
X3500 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
X3600 64604-1000 FIXTURE, HANDRAIL
55 LNFT $____________ $____________
X3700 64620-0300 REMOVE AND RESET BENCH
5 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:CA FLAP CR4S07(1)
Project Name:Convict Lake Road
Joe.Wilson Typewritten Text
X0700 15401-0000 CONTRACTOR TESTING (GOVERNMENT-FURNISHED FIELD LABORATORY)
ALL LPSM $___LPSM_____ $____________
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
A - 17
Bid Schedule Summary
Schedule Bid Total
Schedule A - Base(A - 6)
Schedule X - Option(A - 14)
Total - Schedules
Submitted By: ________________________________
Bid Schedule
A-18
BUY AMERICAN ACT- CONSTRUCTION MATERIALS
UNDER TRADE AGREEMENTS
It is understood and agreed that the materials and components listed in Subparts 25.1 and 25.2 of the FAR are a part of this contract and are deemed to be Domestic Construction Material for the purposes of this contract.
NOTE TO CONTRACTOR:
The following information and any applicable supporting data is required for evaluation of requests under FAR Clause 52.225-9 Paragraph (c) & (d) and FAR Provision 52.225-10 Paragraph (b).
Material and/or Component
Construction Material Description
Unit of Measure
Quantity
*Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
Material and/or Component
Construction Material Description
Unit of Measure
Quantity
*Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]
A-19
HAZARDOUS MATERIALS
As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data - Alternate I, the apparent low bidder must submit prior to award a Material Safety Data Sheet (MSDS) for all hazardous materials that the bidder identifies in paragraph (b) of the FAR clause and defined under the latest version of Federal Standard No. 313.
Hazardous Material
Identification Number
USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS
Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) of 1976, as amended (42 U.S.C. 6901 et seq.), requires Federal, State, and local procuring agencies using appropriated Federal funds to purchase items composed of the highest percentage of recovered materials practical. Use of recovered materials is strongly encouraged on Federal Lands Highway Projects. Highway construction items covered by the Environmental Protection Agency’s Comprehensive Guidelines for Procurement of Products Containing Recovered Materials include fly ash, ground granulated blast furnace slag, traffic barricades, traffic cones, hydraulic mulch and compost for mulch.
Use of fly ash and ground granulated blast furnace slag and construction materials containing fly ash and ground granulated blast furnace slag on Federal Lands Highway Projects:
• It is the policy of the United States Government that fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag shall have maximum practicable opportunity for incorporation into its construction projects.
• The Contractor agrees to investigate the use of fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag to the fullest extent consistent with the efficient performance of this contract. Both the contractor and the subcontractors are urged to seek out suppliers of fly ash and ground granulated blast furnace slag, cement and concrete containing fly ash and ground granulated blast furnace slag and to solicit bids for these materials.
• Names of firms that supply fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag are available from the American Coal Ash Association and the National Slag Association.
B-1
BID BOND
(See instructions on reverse)
DATE BOND EXECUTED (Must not be later than bid opening date)
OMB NO. 9000-0045
Public reporting burden for this collection of information is estimated to average 25 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the FAR Secretariat (MVR), Federal Acquisition Policy Division, GSA, Washington, D.C. 20405.
PRINCIPAL (Legal name and business address)
TYPE OF ORGANIZATION (AX@ one)
INDIVIDUAL PARTNERSHIP
JOINT VENTURE CORPORATION
STATE OF INCORPORATION
SURETY(IES) (Name and business address)
PENAL SUM OF BOND
BID IDENTIFICATION
PERCENT OF
BID PRICE
AMOUNT NOT TO EXCEED
BID DATE
INVITATION NO.
DTFH6815B00005
20 PERCENT
MILLION(S)
THOUSAND(S)
HUNDRED(S)
CENTS
FOR (Construction, Supplies or Services)
CONSTRUCTION
OBLIGATION:
We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum “jointly and severally” as well as “severally” only for the purpose of allowing a joint action or actions against any or all of
us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.
CONDITIONS:
The Principal has submitted the bid identified above.
THEREFORE:
The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty
(60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.
Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of time for acceptance of the bid that the Principal may grant to the Government. Notice to the surety(ies) of extension(s) are waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.
WITNESS:
The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.
PRINCIPAL
SIGNATURE(S)
1.
(Seal)
2.
3.
Corporate
Seal
NAMES(S) &
TITLE(S)
(Typed)
3.
INDIVIDUAL SURETY(IES)
NAME(S)
CORPORATE SURETY(IES)
NAME &
ADDRESS
STATE OF INC.
LIABILITY LIMIT
SURETY A
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 24 (Rev. 10-98) Previous edition is usable Prescribed by GSA - FAR (48 CFR) 53.228(a)
B-2
CORPORATE SURETY(IES) (Continued)
SURETY B
SURETY C
SURETY D
SURETY E
SURETY F
SURETY G
INSTRUCTIONS
1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.
2. Insert the full legal name and business address of the Principal in the space designated “Principal” on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.
3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed 3,000,000.00 dollars).
4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury=s list of approved sureties and must act within the limitation listed therein. Where more than one corporate surety is involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed “CORPORATE SURETY(IES).” In the space designated “SURETY(IES)” on the face of the form, insert only the letter identification of the sureties.
(b) Where individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28), for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capacity.
5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word “Corporate Seal”;
and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.
6. Type the name and title of each person signing this bond in the space provided.
7. In its application to negotiated contracts, the terms “bid” and “bidder” shall include “proposal” and “offeror.”
STANDARD FORM 24 (Rev. 10-98) BACK
B-3
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
BIDDER'S INFORMATION
INSTRUCTIONS: Answer all questions on this form inserting "none" or "not applicable" where appropriate. If more space is required attach additional sheets. Return the signed, dated and completed form with the bid to the address shown in the invitation for bids on or before the time set for bid opening. The prospective bidder shall provide any additional information requested by the Government during evaluation of the bids.
If the prospective bidder is a joint venture or general partnership, a separate Bidder's Qualifications form shall be provided individually for each joint venture participant or partner.
1. Name and address of business:
Name DUNS Number (See FAR Provision 52.204-6)*
Street Home Office Congressional District (Insert District #) *
City State Zip Code
* Necessary for Government reporting purposes only To obtain a Dun & Street number, call County 800-333-0505.
Telephone Number (Include Area Code)
Fax Number (Include Area Code)
2. a. Type of organization (check appropriate box):
If a Foreign entity:
Individual
Non-profit organization
Corporation
Partnership
Joint Venture
Registered in:
b. Size and type of Business Concern (check appropriate boxes):
Large Business Concern
Small Disadvantaged Business Concern
Emerging Small Business
Small Business Concern
Women-Owned Small Business
SBA 8(a) Certified
HUB Zone Business Concern
Veteran Owned Business Concern
Service-Disabled Veteran-Owned Business Concern
Individual
Non-profit organization
Corporation
Partnership
Joint Venture
Incorporated in:
B-4
3. If a joint venture or general partnership:
a. Provide the name under which the project will be bid, the home office address, and name of the principal who will represent the company with regard to this project if different from "1." above.
Principal
Business Name
Street
City State Zip Code
b.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .