DTFH6814B00022_CO_FLAP_CR_5(1).pdf
PDF 2 MB Posted
- Attached to
- CO FLAP 5(1), CR5 & CR3 Intersection Federal contract opportunity
- Solicitation number
- DTFH6814B00022
About this file
IFB for CO FLAP CR 5(1) CR 5 CR 3 Intersection.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Tabs.pdf | ||
| Bid_Opening_Summary.pdf | ||
| QA_for_CO_FLAP_CR_5(1)_3-13.pdf | ||
| Interested_Vendors.pdf | ||
| A003.pdf | ||
| A002_CO_FLAP_CR_5(1).pdf | ||
| QA_for_CO_FLAP_CR_5(1)_3-5.pdf | ||
| 2-27_QA_for_CO_FLAP_CR_5(1).pdf | ||
| 2-26_QA_for_CO_FLAP_CR_5(1).pdf | ||
| A001_CO_FLAP_CR_5(1).pdf | ||
| CO_FLAP_5(1)_PRE-Bid_Agenda_with_Notes_2-24-15.pdf | ||
| RBCR_5 3_Intersection_-_CenturyLink_Reloc_Plan_Dwgs.pdf | ||
| SP-6_Technical_Memorandum.pdf | ||
| 2011_June_17_Final_GeoTech_Investigation_CR_5.pdf | ||
| 2010_Aug_6_Final_Pavement_Report_Rio_Blanco_CR_5.pdf | ||
| CO_FLAP_CR5(1)_Final_Stamped_Plans.pdf | ||
| CO_FLAP_CR5(1)_Final_Stamped_Xsecs.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BID
SOLICITATION NUMBER: DTFH68-14-B-00022
PROJECT NUMBER: CO FLAP CR 5(1)
PROJECT NAME: CR 5 & CR 3 INTERSECTION
BID OPENING DATE:
See Page A-1, Block 13A
This solicitation cites Standard Specifications for Construction of Roads and Bridges on
Federal Highway Projects, FP-03 US Customary Units
ISSUING OFFICE:
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 W. DAKOTA AVENUE, SUITE 360
LAKEWOOD, CO 80228
Web site: http://www.fbo.gov E-mail: CFLContracts@dot.gov
PROJECT CO FLAP CR 5(1)
COUNTY RIO BLANCO COUNTY
STATE COLORADO
LENGTH SCHEDULE A: .89 MILES
TYPE OF IMPROVEMENT ROAD RECONSTRUCTION, STRUCTURE
REPLACEMENT, INTERSECTION
IMPROVEMENTS
TABLE OF CONTENTS
Notice to Bidders ............................................................................................................. A-i
Solicitation, Offer, and Award ........................................................................................ A-1
Basis for Award and Bid Schedule ................................................................................ A-5
Solicitation Provisions .....................................................................................................B-7
Contract Clauses ..............................................................................................................C-1
Davis Bacon Wage Determination .................................................................................. D-1
Division 100 ..................................................................................................................... E-1 Division 150 ................................................................................................................... E-45 Division 200 ................................................................................................................... E-70 Division 300 ................................................................................................................... E-91 Division 400 ................................................................................................................... E-92 Division 500 ................................................................................................................. E-121 Division 600 ................................................................................................................. E-126 Division 700 ................................................................................................................. E-135
APPENDICES
Appendix A ................................................................................................... 401/404 Permit
SPECIAL CONTRACT REQUIREMENTS (SCRs)
The following Special Contract Requirements amend and supplement the Standard Specification for Construction of Roads and Bridges on Federal Highway Projects
NOTICE TO BIDDERS
A-i
SITE VISIT NOTICE: A CFLHD LED SITE VISIT WILL TAKE PLACE:
THURSDAY, FEBRUARY 19TH 1:00PM TO 4:00PM DENVER TIME
PICEANCE CREEK CLINIC
23406 COUNTY ROAD 5, MEEKER CO, 81641
ELECTRONIC BIDS WILL NOT BE ACCEPTED. Submit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Block 8). Please submit the following with your bid:
Submit the following documents with your Bid Package–
SF-1442, Solicitation, Offer & Award, Pages A-1 and A-2
Bid Schedule including Buy American Act & Hazardous Materials, Pages A-6 through A-14
Bid Guarantee (see FAR Clause 52.228-1), Pages B-1 and B-2. Bid bonds must be originals with original signatures and corporate seals. Photocopies and Faxed copies are NOT acceptable and will make your bid non-responsive.
Completed VETS 100, Page A-ii; Bidders’ Information, Pages B-3 through B-6; Reps and Certs, Page B-7 to B-11 and Certification Regarding Responsibility Matters (FAR 52.209- 5), Pages B-12 and B-14.
HUBZone small business concerns electing to waive the evaluation preference, complete 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns, Section C.
Bidders should retain all other pages for their information. Bids should be submitted in a sealed enveloped and include the Contractor’s Name, Solicitation Number and the Project Number/Name.
I. PRE-BID INFORMATION
It is the responsibility of the bidder to verify that this solicitation document, including the plans, are complete as listed in the table of contents and the index to sheets. Plan sheets can be found at http://www.fbo.gov and viewed by individual sections, downloaded by individual sections, or the entire plan set downloaded in a zip file. Physical data relevant to this solicitation may also be viewed or downloaded at the above site.
This solicitation and subsequent contract are governed by the Federal Acquisition Regulations (FAR), agency supplemental regulations, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 US Customary Units (FP-03).
The FP-03 was utilized for the design of this project. Hard copies of the FP-03 will not be provided to bidders. The FP-03 is available electronically at http://flh.fhwa.dot.gov/resources/pse/standard/ or may be purchased by contacting Bob Rosenblatt at ARC Western, telephone number 303-785- 2520 or email bob.rosenblatt@e-arc.com. Limited numbers of hard copies of the FP-03 will be provided to the awarded Prime Contractor.
A-ii
Applicable FAR provisions and clauses in this IFB are incorporated by reference or full text. FAR provisions and clauses incorporated by reference can be accessed on the Internet at https://www.acquisition.gov/far/.
Notice of SAM Registration – you must register in the System for Award Management (SAM – replaced CCR) prior to award of a contract resulting from this solicitation. Failure to register prior to contract award may require award to the next successful registered offeror. See FAR Subpart 4.1103©. Register online at www.sam.gov.
Representations and Certifications – This solicitation is issued under NAICS 237310 – Highway, Street & Bridge Construction with a small business size standard of $36.5 million. If your average annual gross receipts for the past 3 years are above $36.5 million, you are a large business for this solicitation. If they are below $36.5 million you are a small business. Please complete the certification listed in paragraph (b) of FAR Provision 52.204-8 Annual Representation and Certifications on Page B-7. Your small business information is pulled into the Online Representations and Certifications Application (ORCA) website from the System for Award Management (SAM). Please include NAICS 237310 in your SAM. Before submitting bids, please ensure you have completed your annual representations and certifications electronically at the SAM website at www.sam.gov.
Vets100 Reporting: - The Contractor must complete the report if required. See reporting requirements at: www.dol.gov/vets/programs/fcp/main.htm.
My firm had a qualifying Federal Contract in 2013 and has complied with the reporting requirements.
My firm did not have a qualifying Federal Contract in 2013 and is therefore exempt from the reporting requirements
This Solicitation Contains a Price Evaluation Factor - The Government will apply a factor of 10% to an apparent low bid submitted by a large business when we also receive a bid from a certified HUBZone small business concern. The 10% factor does not apply to apparent low bids submitted by small businesses. See FAR Clause 52.219-4 Notice of price evaluation preference for HUBZone small business concerns.
In the event this full and open competition results in a contract award to a qualified HUBZone SBC after a price evaluation preference, FAR Clause 52.236-1, Performance of Work by the Contractor does not apply.
§126.700 of the Code of Federal Regulations (Title 13, Part 126, Subpart G), stated below, will replace the performance of work requirements stated in the above mentioned FAR clause.
A qualified HUBZone SBC receiving a contract under this solicitation for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs. This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified
A-iii
HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs.
Bid Guarantee – Follow the requirements of FAR Clause 52.228-1 Bid Guarantee and Subpart
102.03 of the FP-03. Bid bonds must be originals and have original signatures and corporate seals.
Photocopied and faxed copies of bonds will be rejected and cause your bid to be non-responsive.
ATTENTION: Minority, Women-owned, and Disadvantaged Business Enterprises (DBEs). The Department of Transportation (DOT), offers working capital financing and bonding assistance for transportation related contracts. DOT's Bonding Assistance Program (BAP) offers bid, performance and payment bonds on contracts up to $1,000,000. DOT's Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $500,000 with interest at the prime rate. For further information, call (800) 532-1169. Internet address:
http://osdbuweb.dot.gov.
The Contractor is fully responsible to verify that all data is correct when an offer is submitted.
Failure to properly update your data may cause the offer to be rejected.
Request for Technical Information – Questions relative to the plans and SCRs for this solicitation will only be accepted in writing (see Block 9 on Page A-3).
TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE
ACCEPTED AFTER 4 P.M. ON MARCH 13, 2015
Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at http://www.fbo.gov
Modifications to Bids – NOTE: Original bid documents with blank bid schedules will be considered non-responsive. If you plan to modify your bid, you MUST include bid prices in your original bid document. These bids may be modified or withdrawn by facsimile or telegraphic notice, if such notice is received prior to the time specified for receipt of bids. The Government will not be responsible for ANY failure attributable to the transmission or receipt of telegraphic or facsimile data.
For all modifications, we STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total. See FAR Provision 52.214-5, Submission of Bids. Modifications which make the bid ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the bid to be rejected as nonresponsive.
FAX Number to submit modifications to bids for this project is (720) 963-3360
II. Post Award Information.
Subcontracting - FAR Clause 52.219-8, Utilization of Small Business Concerns states that Prime
A-iv
Contractors afford small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns the maximum practicable opportunity to participate in performing contracts let by any Federal agency.
FAR Clause 52.219-9, Small Business Subcontracting Plan, Alternate I, requires that the large business concern who is the successful low bidder on a Federal project with an anticipated award amount exceeding $1 million, is required to submit a subcontracting plan prior to contract award.
The subcontracting plan expresses goals in terms of percentages of total planned subcontracting dollars for the use of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns as subcontractors. To view and download a sample plan for subcontracting requirements, visit http://www.cflhd.gov/contracting/construction/ReferenceLinks.cfm. If the apparent successful low bidder fails to submit an acceptable subcontracting plan acceptable to the CO within 7 days of bid opening, that bidder may be ineligible for award of the contract.
Prime Contractors, who are large businesses, are encouraged to post sources sought notices at the Small Business Administration’s Subcontracting Network (SUB-NET) http://web.sba.gov/subnet/ so that small businesses can identify opportunities in their areas of expertise. The use of SUB-Net fulfills the requirements set forth in Federal Acquisition Regulation (FAR) 5.206, Notice of Subcontracting Opportunities, for contractors and subcontractors to post notices and thereby increase competition for subcontracts.
A list of currently known business concerns owned and controlled by socially and economically disadvantaged individuals and/or women-owned small business concerns that have indicated an interest in participating in highway construction is available at http://www.ccr.gov
Insurance requirements - See Subsection 107.05 of the FP-03.
EEBACS - Contractors shall use the Government’s web-based system, Engineer’s Estimating, Bidding, Award, and Construction System (EEBACS), to prepare all “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes).
The Contractor shall be required to attend a training session on the use of EEBACS. The training session will require up to 4 hours. No more than 3 Contractor staff may attend the training unless approved by the CO. The Contractor shall be responsible for training additional staff.
The Contractor shall be required to submit a user account form to gain access to the EEBACS system. See Subsection 108.01.
A user guide, “EEBACS for Construction Contractors”, is available. An electronic version can be found at http://flh.fhwa.dot.gov/resources/pse/estimate/guide.htm
A-1
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration or Repair)
1. SOLICITATION NO.
DTFH68-14-B-00022
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
02/13/2015
PAGE OF
PAGES
IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
CO FLAP CR 5(1)
7. ISSUED BY:
CENTRAL FEDERAL LANDS DIVISION
12300 WEST DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CODE: 69050001 8. ADDRESS OFFER TO:
Jeremiah Rogers, Contract Specialist Federal Highway Administration Central Federal Lands Division Office 12300 W. Dakota Avenue Lakewood, CO 80228
9. FOR INFORMATION CALL
SEE PAGE A-3
A. NAME:
SEE PAGE A-3
B. TELEPHONE NO. (Include area code)
SEE PAGE A-3
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:
ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH:
1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)
2. DEPARTMENT OF LABOR, DAVIS BACON MINIMUM WAGE RATES
3. SPECIAL CONTRACT REQUIREMENTS
4. PLANS
5. BID SCHEDULE
6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS
7. SUBCONTRACTING PLAN (IF APPLICABLE)
See Subsection 104.04 of the FP-03 for governing order of precedence
11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. *Refer to Subsection 108.01 as amended in the Special Contract Requirements.
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m. (hour) local time on 3/19/15 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-102 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53-236-1(e)
X
X
X
X
X
A-2
GPO: 1985 0 - 469-796 STANDARD FORM 1442 PAGE 2 (REV. 4-85)
OFFEROR (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
DUNS NO.
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing with calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
SEE INDIVIDUAL BID SCHEDULE(S)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED
TO SIGN OFFER (Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 27
(4 copies unless otherwise specified)
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
□ 15 U.S.C. 637( ) □ 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE:
27. PAYMENT WILL BE MADE BY
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 W. DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.)
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by
(a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON
AUTHORIZED TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD
DATE
A-3
Item 8: LOCATION OF PUBLIC BID OPENING: Offers must be received by designated date and time as stated in Block 13A.
Item 9: FOR GENERAL INFORMATION: Call 720-963-3090 or e-mail us at
CFLContracts@dot.gov.
FOR TECHNICAL INFORMATION (plans and specifications): Questions must be submitted in writing by e-mail at CFLContracts@dot.gov or by fax to 720-963-3360.
FOR PHYSICAL DATA: The following data is available electronically with this solicitation at:
Geotechnical Report Pavement Report Hydraulic Report
Item 11: COMPLETION DATE: Work shall be completed on or before the date specified in Subsection 108.01 of the SCRs.
Item 12A: PERFORMANCE AND PAYMENT BONDS: See FAR Clause 52.228-15
Performance and Payment Bonds-Construction (Clauses begin on Page C-1) and Subsection 102.06 of the FP-03.
Item 13B: BID BOND AMOUNT: See FAR Provision 52.228-1 Bid Guarantee
(Provisions begin on Page B-1) and Subsection 102.03 Bid Guarantee of the FP-03. All bid guarantees must have original signatures with original corporate seals.
Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO
ACKNOWLEDGE AMENDMENTS, IN BLOCK 19 OF THE SF-1442, BY
THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION
MAY RESULT IN REJECTION OF YOUR BID. If amendments are issued, they will be posted to www.fbo.gov.
Item 24: SUBMITTING INVOICES: See Subsection 109.08 Progress Payments of the
FP-03.
ESTIMATED
PRICE: The price range of the project work is between $4 and $6 million.
A-4
Bid Schedule Instructions
BIDDERS, PLEASE NOTE: This Bid Proposal is comprised of one schedule. Before preparing the bid, carefully read the Solicitation Provisions and the following:
• Insert a numeric unit bid price for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government
• Multiply the unit price by the quantity for each pay item and show the amount bid.
When the words “Lump Sum” appear as a unit bid price, insert an amount for each lump sum pay item.
• Total all amounts bid for each pay item and show the Construction Cost Total on the space provided on the last page of each schedule or option.
NOTE: If the amount bid for a pay item is inconsistent with the product of the unit price provided by the bidder and the quantity provided by the Government, the unit price will govern and the Government will determine a corrected amount bid for the pay item by multiplying the unit price by the quantity.
Evaluation Factors for Award
To be eligible for award of contract, the offeror shall submit prices for each item necessary to complete all contract work in Schedule A. Accordingly, award of contract, if made, will be made to the lowest responsive, responsible bidder, if funds are available.
A - 5
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0001 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0011 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A0021 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
A0031 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0041 15705-0100 SOIL EROSION CONTROL, SILT FENCE
6,550 LNFT $____________ $____________
A0051 15705-0500 SOIL EROSION CONTROL, TEMPORARY CULVERT PIPE
325 LNFT $____________ $____________
A0061 15705-1400 SOIL EROSION CONTROL, SEDIMENT LOG
720 LNFT $____________ $____________
A0071 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION
28 EACH $____________ $____________
A0081 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION ENTRANCE -
(Concrete Washout Structure - 2 EACH) INCLUDED IN ITEM 15706-1600
4 EACH $____________ $____________
A0091 15708-1000 SOIL EROSION CONTROL, SUPERVISOR
36 DAY $____________ $____________
A0101 20102-0000 CLEARING AND GRUBBING
ALL LPSM $___LPSM_____ $____________
A0111 20301-0600 REMOVAL OF CATTLE GUARD
1 EACH $____________ $____________
A0121 20301-0700 REMOVAL OF DELINEATOR
42 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP 5(1)
Project Name:CR5 - CR3 Intersection
A - 6
A0131 20301-1900 REMOVAL OF PIPE CULVERT
4 EACH $____________ $____________
A0141 20301-2400 REMOVAL OF SIGN
7 EACH $____________ $____________
A0151 20301-2700 REMOVAL OF STRUCTURE
1 EACH $____________ $____________
A0161 20302-0700 REMOVAL OF FENCE
6,739 LNFT $____________ $____________
A0171 20302-1200 REMOVAL OF GUARDRAIL - (Removal of End Anchorage - 7 EACH) INCLUDED
IN ITEM 20302-1200
1,719 LNFT $____________ $____________
A0181 20402-0000 SUBEXCAVATION
2,000 CUYD $____________ $____________
A0191 20420-0000 EMBANKMENT CONSTRUCTION
76,082 CUYD $____________ $____________
A0201 20435-1000 BACKFILL, SELECT GRANULAR
6 CUYD $____________ $____________
A0211 20801-0000 STRUCTURE EXCAVATION
3,171 CUYD $____________ $____________
A0221 20803-0000 STRUCTURAL BACKFILL
4,041 CUYD $____________ $____________
A0231 25101-2000 PLACED RIPRAP, CLASS 2
3 CUYD $____________ $____________
A0241 25101-3000 PLACED RIPRAP, CLASS 3 - (Geotextile (Erosion Control) (Class 1) - 152 SY)
INCLUDED IN ITEM 25101-3000
102 CUYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 7
A0251 25110-5000 GROUTED RIPRAP, CLASS 5
164 CUYD $____________ $____________
A0261 25501-1000 MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE -
(Mechanical Reinforecement of Soil - 2,561 CY), (Geotextile (Drainage) (Class 2) - 4,619
SY), (6 Inch Peforated Pipe Underdrain - 674 LF), (Geocomposite Drain - 243 SY) &
(Subsurface Drain Outlet - 397 LF) INLUDED IN ITEM 25501-1000
7,258 SQFT $____________ $____________
A0271 30101-3000 AGGREGATE BASE GRADING E
12,197 TON $____________ $____________
A0281 30105-1000 SUBBASE GRADING A
10,123 TON $____________ $____________
A0291 40101-0900 SUPERPAVE PAVEMENT, 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE,
<0.3 MILLION ESAL - (Asphalt Cement Performance Grade (PG 76-28) - 232 TON) &
(Asphalt Cement Peformance Grade (PG 58-28) - 425 TON) INCLUDED IN ITEM
40101-0900
10,070 TON $____________ $____________
A0311 41202-0000 TACK COAT
1,568 GAL $____________ $____________
A0321 41301-0000 ASPHALT PAVEMENT MILLING
14,329 SQYD $____________ $____________
A0331 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
264 SQYD $____________ $____________
A0341 42801-0100 FLEXIBLE PAVEMENT, FULL DEPTH PATCH, TYPE 1
125 SQYD $____________ $____________
A0351 55201-0600 STRUCTURAL CONCRETE, CLASS C (AE) - (Reinforcing Steel - 2,495 LB)
INCLUDED IN ITEM 60101-0000
71 CUYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 8
A0361 60201-0400 12-INCH PIPE CULVERT
124 LNFT $____________ $____________
A0371 60201-1000 36-INCH PIPE CULVERT
547 LNFT $____________ $____________
A0381 60220-3250 10 FEET SPAN, 10 FEET RISE PRECAST REINFORCED CONCRETE BOX
CULVERT
99 LNFT $____________ $____________
A0391 60403-0000 INLET
1 EACH $____________ $____________
A0401 60811-0000 DRAINAGE CHUTE
3 EACH $____________ $____________
A0411 60901-2100 CURB, ASPHALT, 4-INCH DEPTH
650 LNFT $____________ $____________
A0421 60908-1000 PAVED DITCH, ASPHALT
9 SQYD $____________ $____________
A0431 61601-1000 SLOPE PAVING, CONCRETE
11 SQYD $____________ $____________
A0441 61701-1200 GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEEL POSTS
2,285 LNFT $____________ $____________
A0451 61702-0600 TERMINAL SECTION, TYPE FLARED
3 EACH $____________ $____________
A0461 61702-0800 TERMINAL SECTION TYPE TANGENT
2 EACH $____________ $____________
A0471 61901-0000 FENCE
1,000 LNFT $____________ $____________
A0481 61901-0600 FENCE, BARBED WIRE
6,405 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 9
A0491 61902-1100 GATE, METAL, 10 FEET WIDTH
2 EACH $____________ $____________
A0501 61902-1500 GATE, METAL, 18 FEET WIDTH
3 EACH $____________ $____________
A0511 61902-1600 GATE, METAL, 20 FEET WIDTH
1 EACH $____________ $____________
A0521 61902-1800 GATE, METAL, 24 FEET WIDTH
1 EACH $____________ $____________
A0531 61903-1500 CATTLE GUARD, 40 FEET
1 EACH $____________ $____________
A0541 62201-0000 EQUIPMENT
50 HOUR $____________ $____________
A0551 62201-0350 BACKHOE
50 HOUR $____________ $____________
A0561 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
20 HOUR $____________ $____________
A0571 62201-1350 BULLDOZER, 200HP MINIMUM FLYWHEEL POWER
70 HOUR $____________ $____________
A0581 62201-2050 ROLLER
50 HOUR $____________ $____________
A0591 62201-2750 MOTOR GRADER
70 HOUR $____________ $____________
A0601 62301-0000 GENERAL LABOR
170 HOUR $____________ $____________
A0611 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
20 HOUR $____________ $____________
A0621 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH - (Soil Conditioning -
12.14 ACRE) INCLUDED IN ITEM 62401-0300
52,864 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 10
A0631 62510-1000 SEEDING, DRY METHOD
10.92 ACRE $____________ $____________
A0641 62515-1000 MULCHING, DRY METHOD - (Mulch Tackifier - 2,442 LB) INCLUDED IN ITEM
62515-1000
10.92 ACRE $____________ $____________
A0651 62901-0000 ROLLED EROSION CONTROL PRODUCT
7,845 SQYD $____________ $____________
A0661 63302-0000 SIGN SYSTEM
47 SQFT $____________ $____________
A0671 63302-0000 SIGN SYSTEM - (Steel Sign Post (U-2) - 8 LF), (Steel Sign Support (2-Inch
Round)(Post & Socket) - 85 LF) & (Steel Sign Support (2-1/2 Inch Round)(Post and
Slipbase) - 22 LF) INCLUDED IN ITEM 63302-0000
18 SQFT $____________ $____________
A0681 63309-0100 DELINEATOR, TYPE 1
65 EACH $____________ $____________
A0691 63309-0200 DELINEATOR, TYPE 2
31 EACH $____________ $____________
A0701 63309-0300 DELINEATOR, TYPE 3
14 EACH $____________ $____________
A0711 63316-1000 REMOVE AND RESET SIGN
2 EACH $____________ $____________
A0721 63403-0900 PAVEMENT MARKINGS, TYPE I
24 SQFT $____________ $____________
A0731 63403-0900 PAVEMENT MARKINGS, TYPE I
163 SQFT $____________ $____________
A0741 63404-0500 PAVEMENT MARKINGS, TYPE E
115 GAL $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 11
A0751 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
ALL LPSM $___LPSM_____ $____________
A0761 63502-0100 TEMPORARY TRAFFIC CONTROL, ADVANCE WARNING ARROW PANEL,
TYPE A
3 EACH $____________ $____________
A0771 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
200 EACH $____________ $____________
A0781 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
155 EACH $____________ $____________
A0791 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
8 EACH $____________ $____________
A0801 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
3 EACH $____________ $____________
A0811 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
3 EACH $____________ $____________
A0821 63502-2100 TEMPORARY TRAFFIC CONTROL, CRASH CUSHION
8 EACH $____________ $____________
A0831 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
1 EACH $____________ $____________
A0841 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
72 LNFT $____________ $____________
A0851 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
1,800 LNFT $____________ $____________
A0861 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
51 SQFT $____________ $____________
A0871 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
12 SQFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 12
A0881 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
3,000 HOUR $____________ $____________
A0891 63601-2000 SYSTEM INSTALLATION, LIGHTING - (2 Inch Electrical Conduit (Plastic) - 1,890
LF) & (Pull Box (24"x20"x12") - 10 EACH) INCLUDED IN ITEM 63601-2000
ALL LPSM $___LPSM_____ $____________
A0901 63601-3000 SYSTEM INSTALLATION, ELECTRICAL - (2 Inch Electrical Conduit (Plastic) - 453
LF), (3 Inch Electrical Conduit (Plastic) - 580 LF), (Pull Box (Special) - 1 EACH) & (Pull
Box (24"x36"x18" - 3 EACH) INCLUDED IN ITEM 63601-3000
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
A-13
BUY AMERICAN ACT- CONSTRUCTION MATERIALS
UNDER TRADE AGREEMENTS
It is understood and agreed that the materials and components listed in Subparts 25.1 and 25.2 of the FAR are a part of this contract and are deemed to be Domestic Construction Material for the purposes of this contract.
NOTE TO CONTRACTOR:
The following information and any applicable supporting data is required for evaluation of requests under FAR Clause 52.225-9 Paragraph (c) & (d) and FAR Provision 52.225-10 Paragraph (b).
Material and/or Component
Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
Material and/or Component
Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]
A-14
HAZARDOUS MATERIALS
As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data - Alternate I, the apparent low bidder must submit prior to award a Material Safety Data Sheet (MSDS) for all hazardous materials that the bidder identifies in paragraph (b) of the FAR clause and defined under the latest version of Federal Standard No. 313.
Hazardous Material Identification Number
USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS
Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) of 1976, as amended (42 U.S.C. 6901 et seq.), requires Federal, State, and local procuring agencies using appropriated Federal funds to purchase items composed of the highest percentage of recovered materials practical. Use of recovered materials is strongly encouraged on Federal Lands Highway Projects. Highway construction items covered by the Environmental Protection Agency’s Comprehensive Guidelines for Procurement of Products Containing Recovered Materials include fly ash, ground granulated blast furnace slag, traffic barricades, traffic cones, hydraulic mulch and compost for mulch.
Use of fly ash and ground granulated blast furnace slag and construction materials containing fly ash and ground granulated blast furnace slag on Federal Lands Highway Projects:
It is the policy of the United States Government that fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag shall have maximum practicable opportunity for incorporation into its construction projects.
The Contractor agrees to investigate the use of fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag to the fullest extent consistent with the efficient performance of this contract. Both the contractor and the subcontractors are urged to seek out suppliers of fly ash and ground granulated blast furnace slag, cement and concrete containing fly ash and ground granulated blast furnace slag and to solicit bids for these materials.
Names of firms that supply fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag are available from the American Coal Ash Association and the National Slag Association.
B-1
BID BOND
(See instructions on reverse)
DATE BOND EXECUTED (Must not be later than bid opening date) OMB NO. 9000-0045
Public reporting burden for this collection of information is estimated to average 25 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the FAR Secretariat (MVR), Federal Acquisition Policy Division, GSA, Washington, D.C. 20405.
PRINCIPAL (Legal name and business address)
TYPE OF ORGANIZATION (AX@ one)
INDIVIDUAL PARTNERSHIP
JOINT VENTURE CORPORATION
STATE OF INCORPORATION
SURETY(IES) (Name and business address)
PENAL SUM OF BOND BID IDENTIFICATION
PERCENT OF
BID PRICE
AMOUNT NOT TO EXCEED BID DATE INVITATION NO.
DTFH68-14-B-00022
20 PERCENT
MILLION(S)
THOUSAND(S)
HUNDRED(S) CENTS FOR (Construction, Supplies or Services) CONSTRUCTION
OBLIGATION:
We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum “jointly and severally” as well as “severally” only for the purpose of allowing a joint action or actions against any or all of
us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.
CONDITIONS:
The Principal has submitted the bid identified above.
THEREFORE:
The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty
(60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.
Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of time for acceptance of the bid that the Principal may grant to the Government. Notice to the surety(ies) of extension(s) are waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.
WITNESS:
The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.
PRINCIPAL
SIGNATURE(S)
1.
(Seal)
2.
3.
Corporate
Seal
NAMES(S) &
TITLE(S)
(Typed)
2. 3.
INDIVIDUAL SURETY(IES)
NAME(S)
CORPORATE SURETY(IES)
NAME &
ADDRESS
STATE OF INC. LIABILITY LIMIT
SURETY A
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 24 (Rev. 10-98) Previous edition is usable Prescribed by GSA - FAR (48 CFR) 53.228(a)
B-2
CORPORATE SURETY(IES) (Continued)
SURETY B
SURETY C
SURETY D
SURETY E
SURETY F
SURETY G
INSTRUCTIONS
1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.
2. Insert the full legal name and business address of the Principal in the space designated “Principal” on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.
3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed 3,000,000.00 dollars).
4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury=s list of approved sureties and must act within the limitation listed therein. Where more than one corporate surety is involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed “CORPORATE SURETY(IES).” In the space designated “SURETY(IES)” on the face of the form, insert only the letter identification of the sureties.
(b) Where individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28), for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capacity.
5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word “Corporate Seal”;
and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.
6. Type the name and title of each person signing this bond in the space provided.
7. In its application to negotiated contracts, the terms “bid” and “bidder” shall include “proposal” and “offeror.”
STANDARD FORM 24 (Rev. 10-98) BACK
B-3
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
BIDDER'S INFORMATION
INSTRUCTIONS: Answer all questions on this form inserting "none" or "not applicable" where appropriate. If more space is required attach additional sheets. Return the signed, dated and completed form with the bid to the address shown in the invitation for bids on or before the time set for bid opening. The prospective bidder shall provide any additional information requested by the Government during evaluation of the bids.
If the prospective bidder is a joint venture or general partnership, a separate Bidder's Qualifications form shall be provided individually for each joint venture participant or partner.
1. Name and address of business:
Name DUNS Number (See FAR Provision 52.204-6)*
Street Home Office Congressional District (Insert District #) *
City State Zip Code
* Necessary for Government reporting purposes only To obtain a Dun & Street number, call County 800-333-0505.
Telephone Number (Include Area Code)
Fax Number (Include Area Code)
2. a. Type of organization (check appropriate box):
If a Foreign entity:
Individual
Non-profit organization
Corporation
Partnership
Joint Venture
Registered in:
b. Size and type of Business Concern (check appropriate boxes):
Large Business Concern
Small Disadvantaged Business Concern
Emerging Small Business
Small Business Concern
Women-Owned Small Business
SBA 8(a) Certified
HUB Zone Business Concern
Veteran Owned Business Concern
Service-Disabled Veteran-Owned Business Concern
Individual
Non-profit organization
Corporation
Partnership
Joint Venture Incorporated in:
B-4
3. If a joint venture or general partnership:
a. Provide the name under which the project will be bid, the home office address, and name of the principal who will represent the company with regard to this project if different from "1." above.
Principal
Business Name
Street
City State Zip Code
b. Provide the name and home office addresses of each of the joint venture partners; indicate which partner is the sponsoring partner. Attach a separate sheet for additional partners.
Sponsoring Partner Other Partner
Street Street
City State Zip Code City State Zip Code
4. Date organization established: _______________________
5. Name of succeeded business, if any: _________________________________________________________
6. How many years have you been in business as:
a. General contractor years.
b. Subcontractor years.
7. a. Furnish the following information concerning the owner, partners, officers and directors:
Percent of Business Owned
Years of Business Experience
Name
Title Contracting
Other
b. Attach resumes of these key personnel as well as the on-site project manager(s) and superintendent(s), and specifically identify the following:
- Present position, responsibility, and length of employment.
- Amount and type of construction experience.
- Amount and type of highway construction experience, including position, responsibility, and a brief project description of each period of employment.
- Formal education and training, professional or technical registrations or licenses.
B-5
8. a. Contracts in force. (Attach additional sheets if necessary)
Project Name and Contract Numbers
Owner's Name, Address, and
Contact Name and Telephone #
Scope of Work Performed
Contract Amount
Estimated
Completion Date
Name of Surety
b. Are there any unresolved claims or lawsuits associated with these projects? If so, state the amount in dispute, parties involved, nature and circumstances of the dispute, and status of the matter on a separate sheet.
B-6
9. a. List at least five of the largest jobs you have completed in the last five years which are similar in project work scope to this project. (Attach additional sheets if necessary)
Project Name and Contract Numbers
Owner's Name, Address, Contact Name and Telephone #
Scope of Work
Performed
Original and Final Contract Amounts
Original and Final Completion Dates
Names of On-site Project
Manager and Superintendent
Name of Surety
b. Are there any unresolved claims or lawsuits associated with these projects? If so, state the amount in dispute, parties involved, nature and circumstances of the dispute, and status of the matter on a separate sheet.
B-7
Solicitation Provisions
52.204-5 Women-Owned Business (Other Than Small Business). (MAY 1999)
(a) Definition. "Women-owned business concern," as used in this provision, means a concern that is at least 51 percent owned by one or more women; or in the case of any publicly owned business, at least 51 percent of its stock is owned by one or more women; and whose management and daily business operations are controlled by one or more women.6
(b) Representation. [Complete only if the offeror is a women-owned business concern and has not represented itself as a small business concern in paragraph (b)(1) of FAR 52.219-1, Small Business Program Representations, of this solicitation.] The offeror represents that it * is a women-owned business concern.
(End of provision)
52.204-8 Annual Representations and Certifications. (MAY 2014)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237310.
(2) The small business size standard is $36.5 million or less.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
[ ] (i) Paragraph (d) applies.
[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
B-8
(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(iv) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(v) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations— Representation. This provision applies to solicitations using funds appropriated in fiscal years 2008, 2009, 2010, or 2012.
(vi) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
B-9
(vii) 52.214-14, Place of Performance—Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(viii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(ix) 52.219-1, Small Business Program Representations (Basic & Alternate I).
This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(x) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.
(xi) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xii) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xiii) 52.222-38, Compliance with Veterans’ Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.
(xiv) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA–designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(xv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA–designated items.
B-10
(xvi) 52.225-2, Buy American…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .