A002_CO_FLAP_CR_5(1).pdf
PDF 2 MB Posted
- Attached to
- CO FLAP 5(1), CR5 & CR3 Intersection Federal contract opportunity
- Solicitation number
- DTFH6814B00022
About this file
Amendment A002 revises several quantities and removes several details from the plans.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Tabs.pdf | ||
| Bid_Opening_Summary.pdf | ||
| QA_for_CO_FLAP_CR_5(1)_3-13.pdf | ||
| Interested_Vendors.pdf | ||
| A003.pdf | ||
| QA_for_CO_FLAP_CR_5(1)_3-5.pdf | ||
| 2-27_QA_for_CO_FLAP_CR_5(1).pdf | ||
| 2-26_QA_for_CO_FLAP_CR_5(1).pdf | ||
| A001_CO_FLAP_CR_5(1).pdf | ||
| CO_FLAP_5(1)_PRE-Bid_Agenda_with_Notes_2-24-15.pdf | ||
| RBCR_5 3_Intersection_-_CenturyLink_Reloc_Plan_Dwgs.pdf | ||
| SP-6_Technical_Memorandum.pdf | ||
| 2011_June_17_Final_GeoTech_Investigation_CR_5.pdf | ||
| 2010_Aug_6_Final_Pavement_Report_Rio_Blanco_CR_5.pdf | ||
| CO_FLAP_CR5(1)_Final_Stamped_Xsecs.pdf | ||
| CO_FLAP_CR5(1)_Final_Stamped_Plans.pdf | ||
| DTFH6814B00022_CO_FLAP_CR_5(1).pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
D. OTHER (Specify type of modification and authority)
E. IMPORTANT:
Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force a nd effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
PREVIOUS EDITION UNUSABLE STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
( ) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.)
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
1 15
A002 3/5/15 CO FLAP CR 5(1)
6905001
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENU, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: Jeremiah Rogers, Contract Specialist
DTFH6814B00022
2/13/15
0*
✔ * See Below
Invitation for Bid (A Pages) Remove bid schedule page A-5 thru A-12 and replace with new bid schedule A-5 thru A-12. Several quantity changes were made.
Plans Remove plans cover page and replace with new plan cover page.
Remove plan sheets 9 & 10 and replace with new plan sheets 9 & 10. Several quantity changes were made.
Remove plan sheets 70 & 71 and replace with new plan sheets 70 & 71. Several details were deleted from the plans.
Remove plan sheet 84 and replace with new plan sheet 84. Several quantities were changed.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO SF-1442, PAGE A-2, OF THE SOLICITATION)
A - 5
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0001 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0011 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A0021 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
A0031 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0041 15705-0100 SOIL EROSION CONTROL, SILT FENCE
6,550 LNFT $____________ $____________
A0051 15705-0500 SOIL EROSION CONTROL, TEMPORARY CULVERT PIPE
325 LNFT $____________ $____________
A0061 15705-1400 SOIL EROSION CONTROL, SEDIMENT LOG
720 LNFT $____________ $____________
A0071 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION
28 EACH $____________ $____________
A0081 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION ENTRANCE -
(Concrete Washout Structure - 2 EACH) INCLUDED IN ITEM 15706-1600
4 EACH $____________ $____________
A0091 15708-1000 SOIL EROSION CONTROL, SUPERVISOR
36 DAY $____________ $____________
A0101 20102-0000 CLEARING AND GRUBBING
ALL LPSM $___LPSM_____ $____________
A0111 20301-0600 REMOVAL OF CATTLE GUARD
1 EACH $____________ $____________
A0121 20301-0700 REMOVAL OF DELINEATOR
42 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP 5(1)
Project Name:CR5 - CR3 Intersection
Amendment A002 3/5/15
A - 6
A0131 20301-1900 REMOVAL OF PIPE CULVERT
4 EACH $____________ $____________
A0141 20301-2400 REMOVAL OF SIGN
7 EACH $____________ $____________
A0151 20301-2700 REMOVAL OF STRUCTURE
1 EACH $____________ $____________
A0161 20302-0700 REMOVAL OF FENCE
6,739 LNFT $____________ $____________
A0171 20302-1200 REMOVAL OF GUARDRAIL - (Removal of End Anchorage - 7 EACH) INCLUDED
IN ITEM 20302-1200
1,719 LNFT $____________ $____________
A0181 20402-0000 SUBEXCAVATION
2,000 CUYD $____________ $____________
A0191 20420-0000 EMBANKMENT CONSTRUCTION
76,082 CUYD $____________ $____________
A0201 20435-1000 BACKFILL, SELECT GRANULAR
6 CUYD $____________ $____________
A001 A0211 20801-0000 STRUCTURE EXCAVATION
441 CUYD $____________ $____________
A001 A0221 20803-0000 STRUCTURAL BACKFILL
271 CUYD $____________ $____________
A0231 25101-2000 PLACED RIPRAP, CLASS 2
3 CUYD $____________ $____________
A0241 25101-3000 PLACED RIPRAP, CLASS 3 - (Geotextile (Erosion Control) (Class 1) - 152 SY)
INCLUDED IN ITEM 25101-3000
102 CUYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP 5(1)
Project Name:CR5 - CR3 Intersection
A - 7
A0251 25110-5000 GROUTED RIPRAP, CLASS 5
164 CUYD $____________ $____________
A0261 25501-1000 MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE -
(Mechanical Reinforecement of Soil - 2,561 CY), (Geotextile (Drainage) (Class 2) - 4,619
SY), (6 Inch Peforated Pipe Underdrain - 674 LF), (Geocomposite Drain - 243 SY) &
(Subsurface Drain Outlet - 397 LF) INLUDED IN ITEM 25501-1000
7,258 SQFT $____________ $____________
A0271 30101-3000 AGGREGATE BASE GRADING E
12,197 TON $____________ $____________
A0281 30105-1000 SUBBASE GRADING A
10,123 TON $____________ $____________
A0291 40101-0900 SUPERPAVE PAVEMENT, 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE,
<0.3 MILLION ESAL - (Asphalt Cement Performance Grade (PG 76-28) - 232 TON) &
(Asphalt Cement Peformance Grade (PG 58-28) - 425 TON) INCLUDED IN ITEM
40101-0900
10,070 TON $____________ $____________
A0311 41202-0000 TACK COAT
1,568 GAL $____________ $____________
A0321 41301-0000 ASPHALT PAVEMENT MILLING
14,329 SQYD $____________ $____________
A0331 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
264 SQYD $____________ $____________
A0341 42801-0100 FLEXIBLE PAVEMENT, FULL DEPTH PATCH, TYPE 1
125 SQYD $____________ $____________
A001 A0351 55201-0600 STRUCTURAL CONCRETE, CLASS C (AE) - (Reinforcing Steel - 2,495 LB)
INCLUDED IN ITEM 60101-0000
43 CUYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP 5(1)
Project Name:CR5 - CR3 Intersection
A - 8
A0361 60201-0400 12-INCH PIPE CULVERT
124 LNFT $____________ $____________
A0371 60201-1000 36-INCH PIPE CULVERT
547 LNFT $____________ $____________
A0381 60220-3250 10 FEET SPAN, 10 FEET RISE PRECAST REINFORCED CONCRETE BOX
CULVERT
99 LNFT $____________ $____________
A0391 60403-0000 INLET
1 EACH $____________ $____________
A0401 60811-0000 DRAINAGE CHUTE
3 EACH $____________ $____________
A0411 60901-2100 CURB, ASPHALT, 4-INCH DEPTH
650 LNFT $____________ $____________
A0421 60908-1000 PAVED DITCH, ASPHALT
9 SQYD $____________ $____________
A0431 61601-1000 SLOPE PAVING, CONCRETE
11 SQYD $____________ $____________
A0441 61701-1200 GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEEL POSTS
2,285 LNFT $____________ $____________
A0451 61702-0600 TERMINAL SECTION, TYPE FLARED
3 EACH $____________ $____________
A0461 61702-0800 TERMINAL SECTION TYPE TANGENT
2 EACH $____________ $____________
A0471 61901-0000 FENCE
1,000 LNFT $____________ $____________
A0481 61901-0600 FENCE, BARBED WIRE
6,405 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP 5(1)
Project Name:CR5 - CR3 Intersection
A - 9
A0491 61902-1100 GATE, METAL, 10 FEET WIDTH
2 EACH $____________ $____________
A0501 61902-1500 GATE, METAL, 18 FEET WIDTH
3 EACH $____________ $____________
A0511 61902-1600 GATE, METAL, 20 FEET WIDTH
1 EACH $____________ $____________
A0521 61902-1800 GATE, METAL, 24 FEET WIDTH
1 EACH $____________ $____________
A0531 61903-1500 CATTLE GUARD, 40 FEET
1 EACH $____________ $____________
A0541 62201-0000 EQUIPMENT
50 HOUR $____________ $____________
A0551 62201-0350 BACKHOE
50 HOUR $____________ $____________
A0561 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
20 HOUR $____________ $____________
A0571 62201-1350 BULLDOZER, 200HP MINIMUM FLYWHEEL POWER
70 HOUR $____________ $____________
A0581 62201-2050 ROLLER
50 HOUR $____________ $____________
A0591 62201-2750 MOTOR GRADER
70 HOUR $____________ $____________
A0601 62301-0000 GENERAL LABOR
170 HOUR $____________ $____________
A0611 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
20 HOUR $____________ $____________
A0621 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH - (Soil Conditioning -
12.14 ACRE) INCLUDED IN ITEM 62401-0300
52,864 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP 5(1)
Project Name:CR5 - CR3 Intersection
A - 10
A0631 62510-1000 SEEDING, DRY METHOD
10.92 ACRE $____________ $____________
A0641 62515-1000 MULCHING, DRY METHOD - (Mulch Tackifier - 2,442 LB) INCLUDED IN ITEM
62515-1000
10.92 ACRE $____________ $____________
A0651 62901-0000 ROLLED EROSION CONTROL PRODUCT
7,845 SQYD $____________ $____________
A0661 63302-0000 SIGN SYSTEM
47 SQFT $____________ $____________
A0671 63302-0000 SIGN SYSTEM - (Steel Sign Post (U-2) - 8 LF), (Steel Sign Support (2-Inch
Round)(Post & Socket) - 85 LF) & (Steel Sign Support (2-1/2 Inch Round)(Post and
Slipbase) - 22 LF) INCLUDED IN ITEM 63302-0000
18 SQFT $____________ $____________
A0681 63309-0100 DELINEATOR, TYPE 1
65 EACH $____________ $____________
A0691 63309-0200 DELINEATOR, TYPE 2
31 EACH $____________ $____________
A0701 63309-0300 DELINEATOR, TYPE 3
14 EACH $____________ $____________
A0711 63316-1000 REMOVE AND RESET SIGN
2 EACH $____________ $____________
A0721 63403-0900 PAVEMENT MARKINGS, TYPE I
24 SQFT $____________ $____________
A0731 63403-0900 PAVEMENT MARKINGS, TYPE I
163 SQFT $____________ $____________
A0741 63404-0500 PAVEMENT MARKINGS, TYPE E
115 GAL $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP 5(1)
Project Name:CR5 - CR3 Intersection
A - 11
A0751 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
ALL LPSM $___LPSM_____ $____________
A0761 63502-0100 TEMPORARY TRAFFIC CONTROL, ADVANCE WARNING ARROW PANEL,
TYPE A
3 EACH $____________ $____________
A0771 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
200 EACH $____________ $____________
A0781 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
155 EACH $____________ $____________
A0791 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
8 EACH $____________ $____________
A0801 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
3 EACH $____________ $____________
A0811 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
3 EACH $____________ $____________
A0821 63502-2100 TEMPORARY TRAFFIC CONTROL, CRASH CUSHION
8 EACH $____________ $____________
A0831 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
1 EACH $____________ $____________
A0841 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
72 LNFT $____________ $____________
A0851 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
1,800 LNFT $____________ $____________
A0861 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
51 SQFT $____________ $____________
A0871 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
12 SQFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP 5(1)
Project Name:CR5 - CR3 Intersection
A - 12
A0881 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
3,000 HOUR $____________ $____________
A0891 63601-2000 SYSTEM INSTALLATION, LIGHTING - (2 Inch Electrical Conduit (Plastic) - 1,890
LF) & (Pull Box (24"x20"x12") - 10 EACH) INCLUDED IN ITEM 63601-2000
ALL LPSM $___LPSM_____ $____________
A0901 63601-3000 SYSTEM INSTALLATION, ELECTRICAL - (2 Inch Electrical Conduit (Plastic) - 453
LF), (3 Inch Electrical Conduit (Plastic) - 580 LF), (Pull Box (Special) - 1 EACH) & (Pull
Box (24"x36"x18" - 3 EACH) INCLUDED IN ITEM 63601-3000
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP 5(1)
Project Name:CR5 - CR3 Intersection
File details come from the government source that posted it. Updated .