Attachment 01-Specs LEX.pdf

PDF 2 MB Posted

Attached to
Upgrade Taskers 500 RVR, Three Separate Locations Federal contract opportunity
Solicitation number
DTFASA-17-R-00047
Issued by
Department of Transportation Federal Aviation Administration Southern Region

About this file

Attachment 01-Specs LEX (pdf)

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Taskers 500 RVR, Three Separate Locations, newest first.
File Type Posted
Attachment 02-Specs MLB.pdf PDF
Attachment 03-Specs ORL.pdf PDF
Attachment 04-Wage Rate-KY161.pdf PDF
Attachment 03a-Drawings ORL.pdf PDF
Attachment 09-Draft Schedule.pdf PDF
Attachment 01a-Drawings LEX.pdf PDF
SIR DTFASA-17-R-00047.pdf PDF
Attachment 02a-Drawings MLB.pdf PDF
Attachment 01-Specs LEX.pdf PDF
Amendment 0001.pdf PDF
Attachment 08-Performance Survey.pdf PDF
Attachment 07-Business Declaration.pdf PDF
Attachment 05-Wage Rate-FL149.pdf PDF
Attachment 07-Business Declaration.pdf PDF
Attachment 03-Specs ORL.pdf PDF
Attachment 04-Wage Rate-KY161.pdf PDF
Attachment 03a-Drawings ORL.pdf PDF
Attachment 011.pdf PDF
Attachment 08-Performance Survey.pdf PDF
Attachment 06-Wage Rate-FL171.pdf PDF
Attachment 09-Draft Schedule.pdf PDF
SIR DTFASA-17-R-00047.pdf PDF
Attachment 01a-Drawings LEX.pdf PDF
Attachment 05-Wage Rate-FL149.pdf PDF
Attachment 01-Specs LEX.pdf PDF
Attachment 02a-Drawings MLB.pdf PDF
Attachment 05-Wage Rate-FL149.pdf PDF
Attachment 03-Specs ORL.pdf PDF
Attachment 011.pdf PDF
Attachment 07-Business Declaration.pdf PDF
Attachment 10-List of GFM.pdf PDF
Attachment 01a-Drawings LEX.pdf PDF
Attachment 06-Wage Rate-FL171.pdf PDF
SIR DTFASA-17-R-00047.pdf PDF
Attachment 04-Wage Rate-KY161.pdf PDF
Attachment 09-Draft Schedule.pdf PDF
Attachment 08-Performance Survey.pdf PDF
Attachment 03a-Drawings ORL.pdf PDF
Attachment 04-Wage Rate-KY161.pdf PDF
Attachment 09-Draft Schedule.pdf PDF
Attachment 05-Wage Rate-FL149.pdf PDF
Attachment 01a-Drawings LEX.pdf PDF
Attachment 01-Specs LEX.pdf PDF
Attachment 06-Wage Rate-FL171.pdf PDF
Attachment 02-Specs MLB.pdf PDF
Attachment 10-List of GFM.pdf PDF
Attachment 07-Business Declaration.pdf PDF
Attachment 08-Performance Survey.pdf PDF
Attachment 02a-Drawings MLB.pdf PDF
Attachment 03a-Drawings ORL.pdf PDF
Show all 50

Upgrade Taskers 500 RVR, Three Separate Locations has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

RVR – LEXINGTON, KENTUCKY

RUNWAY 04

REPLACE TASKER 500 WITH PC-BASED RVR

FAA LEX-600231

Prepared for and Submitted to:

FAA NAVAIDS

Submitted: October 13, 2015

Prepared by:

URS Corporation

400 Northpark Town Center

1000 Abernathy Road, Suite 900

Atlanta, GA 30328

DTFASA-17-R-00047 Attachment 1

FEDERAL AVIATION ADMINISTRATION OCTOBER 13, 2015

LEXINGTON BLUE GRASS AIRPORT RUNWAY 04 RVR FAA-LEX-600231

SPECIFICATIONS

TABLE OF CONTENTS

02050 Demolition and Removals

02053 Existing Utility Exploration

02200 Earthwork

02205 Walkways and Graveled Areas

02220 Installation of Underground Cable Systems

02270 Prevention, Control and Abatement of Erosion and Water Pollution

02324 Trenching

02325 Excavating, Backfilling and Compacting for Utilities

02503 General Requirements for Demolition and Renovation

02510 Asphalt Paving

02920 Grassing (By Seeding)

02920-1 Sodding

03301 Cast-In-Place Concrete

05120 Structural Steel

16050 Basic Electrical Materials and Methods

16060 Grounding and Bonding

16120 Wires and Cables

16130 Raceways, Fittings, Boxes and Cabinets

16190 Supporting Devices

16195 Electrical Identification

16470 Panelboards and Overcurrent Protective Devices

DTFASA-17-R-00047 Attachment 1

Linda Hennequant Stamp for Specs

02050-1

SECTION 02050

DEMOLITION AND REMOVALS

PART 1 - GENERAL

1.1 Scope: The procedures proposed for the accomplishment of demolition and removal work shall be as described and reviewed by the COR. The procedures shall provide safe conduct of the work, careful removal and disposition of materials specified to be salvaged, protection of property which is to remain undisturbed, coordination with other work in progress, and timely disconnection of utility services. The procedures shall include a detailed description of the methods and equipment to be used for each operation and the sequence of operations.

PART 2 - PRODUCTS - NOT USED

PART 3 - EXECUTION

1. General: Demolition and removal work shall be in compliance with approved demolition procedures and applicable requirements of the applicable agencies having jurisdiction.

2. Protection Of Existing Work: Before beginning any cutting or demolition work, the Contractor shall carefully survey the existing work and examine the drawings and specifications to determine the extent of the work. The Contractor shall take all necessary precautions to ensure against damage to existing work that will remain in place, be reused, or remain the property of the Government, and any damage to such work shall be repaired or replaced so as to be equal to or better than the pre-construction condition as approved by the

Contracting Officer at no additional cost to the Government. The Contractor shall carefully coordinate the work of this division with all other work and construct and maintain any necessary protective structures.

A. Dust Control: Any dust resulting from removal shall be controlled to prevent the spread of dust and to avoid creation of a nuisance in the surrounding area. Existing communications and electronics equipment is acutely sensitive to dust and must be safeguarded. Use of water or other materials shall not be permitted when it will result in, or create, hazardous or objectionable conditions such as ice, flooding, or pollution.

B. Protection Of Buildings From The Weather: The interior of all shelters and other structures shall be protected from the weather at all times. Material and equipment shall be protected from the weather as recommended by the manufacturer.

C. Burning: Burning at the project sites for the disposal of refuse and debris will not be permitted.

D. Use of Explosives: The use of explosives and pyrotechnics for demolition is not permitted.

3. Disposition Of Equipment And Materials:

A. Title To Materials: All fixtures (installed property) removed shall be designated as either

“salvage”, “unsalvageable”, or “rubble” by the Contracting Officer's Representative (COR).

B. Designation Of Government Salvage, Unsalvageable Property : All fixtures desired for salvage shall be designated as “Salvage” by the COR. Items designated as “Salvage” are indicated on the drawings. All remaining materials and equipment not designated as salvage are “Unsalvageable

Material” or “Rubble”.

02050-2

C. Disposition Of Unsalvageable Material: The Contractor shall remove all u n s a l v a g e a b l e materials and rubble from the work areas. The unsalvageable materials removed from the work areas shall be disposed of by the Contractor outside of the limits of the site or the leased areas at the Contractor’s responsibility and expense in accordance with all governmental agencies having jurisdiction.

4. Cutting And Patching:

A. Cutting and Drilling: The Contractor shall be held responsible at all times for contents and structural conditions of the premises and building within the work area, and shall do or supervise all cutting, drilling, reinforcing, and patching required for work of all the Contractors and trades included in work of this Contract, and to do so in a timely manner to avoid any hindrance to work of others.

Cutting done by anyone other than the Contractor shall be approved by the COR. In such cases the Contractor shall supervise such cutting and shall not be relieved of responsibility for error or damage to related or adjoining work. Cutting and patching of specific items may be separately described under the various divisions of these specifications that do not, in any way, diminish the

Contractor's primary responsibility for all cutting and drilling.

B. Patching: Any cutting of finished surfaces occurring in the course of the work shall be patched and/or repaired to match the existing work in color, texture, alignment, and every other respect to the satisfaction of the COR. Materials shall be equal to or better than the pre-construction condition.

C. Repair of Masonry Walls: Openings in masonry walls shall be closed with 16 gauge galvanized steel sheet securely attached at the midpoint of the wall thickness and fire stopped on both sides of the steel sheet with not less than 1/2-inch thick layer of non-sagging silicone elastomer to fully cover the opening.

5. Quality Assurance: The Contractor shall establish and maintain quality control for the demolition and removal work to assure compliance with subcontract requirements. Records shall be maintained for all demolition and removal operations but not limited to the following:

A. Procedures: Safety measures, protection of property, coordination of work, and dust control.

B. Salvaging: Removal and preparation of materials for storage.

C. Demolition: Extent of demolition and disposition of materials.

6. Clean-Up: The Contractor shall remove debris and rubbish from the site daily. Do not allow debris to accumulate in building nor on-site. Remove debris and excess materials.

A. Debris Control: The Contractor shall remove and transport debris in a manner as to prevent spillage on streets or adjacent areas. The Contractor shall immediately clean up any spillage or tracking of soil or debris onto pavement outside the work area.

B. Regulations: The Contractor shall comply with all regulations regarding hauling and disposal of removed materials. The legal disposal of removed materials and debris is the Contractor’s responsibility.

END OF SECTION

02053-1

SECTION 02053

EXISTING UTILITY EXPLORATION

PART 1 – GENERAL

1. WORK INCLUDED

A. This section includes all labor, materials and equipment necessary to establish and ensure the exact location and depth of each existing underground facility/utility, including but not limited to existing electrical, communication conduit direct FAA buried cables, fuel & gas lines, water storm and any other existing underground facility .

B. This section shall also include the maintaining of open communication beginning at the planning stage and continuing to the completion of the project. No trenching or excavation work shall be performed by the contractor unless the site has been surveyed and utilities marked by a utility designator firm.

2. DEFINITIONS

A. Excavation – The procedure that includes all activities where the earth is disturbed by mechanical or non-mechanical methods. These methods shall include excavating, trenching, pneumatic/vacuum exploratory extraction (potholing), vertical and horizontal boring, directional drilling and any other ground penetrations and the digging of postholes and the driving of ground rods.

B. High Priority – Any utility that, if damaged, would disrupt the normal airport operations and/or any utility designated “high priority” by its operator/owner.

C. Utility – Any underground facility/utility including telephone, power, water, gas, sewer, storm water, and

FAA communications/electronics. Utility owners include the telephone company; electrical power service; sewer, water and gas utilities; airport operations (lighting and power) and the FAA (power and control)

3. PROCEDURES

The following procedures shall be required for all trenching and digging activities on airport property:

A. The Contractor shall designate the route and/or construction area, to be excavated using white pre-marking paint prior to the arrival of the locators (Utility Designator Firm) and contacts the One- Call

System, the Airport Officials, and the local FAA.

B. The Contractor shall ensure that all Airport officials, FAA technicians, and One-Call System utilities performing location services mark the entire path in the construction area. The Contractor shall further ensure that all utility Owner/Operators have located their utilities and that their utilities are properly marked.

C. Contractor shall be aware of the designated color for each utility as indicated by the COR. If a particular marking fades or is destroyed prior to excavation, Contractor shall contact the appropriate utility location service to remark any underground utilities prior to the start of excavation.

D. After completion of the utility locations described above, Contractor shall be required to hire a certified independent utility location service utilizing ground penetration radar to search the entire excavation area to confirm the locations of the marked utilities and to identify any additional unidentified utilities that may be in this area.

E. Contractor shall require that the independent utility location service provide a written report documenting the ground penetration radar search results to the Contractor. Contractor shall provide the

02053-2

COR with a copy of this report prior to any excavation. The COR shall provide a copy of this report to the Birmingham Airport Authority, the System Support Center (SSC), and the COR for their review prior to the start of any excavation.

F. If an unknown utility is discovered during the locating phase, Contractor shall notify the COR. The COR will contact the SSC, and Airport Authority to determine if there is an impact on design and to receive direction on how to proceed.

G. Contractor shall maintain a current list of names and phone numbers of the One-Call System and emergency numbers and verify the location of disconnects and shut-off valves.

H. Contractor shall determine facilities that are serviced by identified utilities and notify users of excavation work that will be performed on or near those utilities.

I. If “high priority” facility lines are identified during the utility location phase, then, a representative of the agency responsible for that utility shall be notified by Contractor and requested to be onsite during any excavation within the greater of three feet (3’) or the minimum distance recommended by the utility.

J. Contractor shall accomplish all excavation within the tolerance zone established by the specifications, the responsible utility, and/or ground penetrating radar location service, by hand digging or pneumatic vacuum extraction.

K. If Contractor does not find an underground facility or utility that was previously marked, the excavation shall be stopped and the appropriate owner/operator of the utility shall be contacted directly or through the One-Call System.

L. The Contractor shall notify the COR, the One-Call System, and the Owner/Operator of any underground facility or utility that is discovered as damaged, or has been damaged or contacted during the excavation.

M. The Contractor shall take care to maintain due diligence not to damage existing facilities and utilities during backfill and compaction.

4. SCHEDULE

All explorations, except those allowed by the COR, shall be completed and permission shall be given by the COR to proceed before excavation can begin. The COR shall permit excavation to proceed no later than fourteen (14) calendar days from the date on which all the information from this section of the specification is received.

5. ELEVATION ACCURACY

Information shall be provided to the COR by the Contractor to verify the proposed foundation/trench profiles. The cost of all labor, materials and equipment necessary to remove, repair and/or reconstruct any of the work due to inaccurate information or damage to the existing underground facility or electrical conduit/cable by the Contractor shall be at the Contractor’s expense.

6. SUBMITTALS

Contractor shall submit five (5) copies of drawings showing all underground utilities which cross each proposed excavation for the COR approval.

The Contractor shall submit the name, address and documentation on the Utility Designator Firm’s Capabilities to located underground utilities. Firm shall have a minimum of three years’ experience locating underground utilities.

02053-3

PART 2 – PRODUCTS - NOT USED

PART 3 – EXECUTION

1. GENERAL

A. The locations and top elevations of each existing utility shall be established relative to a taxiway, runway or roadway edge along each proposed excavation. This information shall be transmitted to the COR for evaluation of the proposed foundation/trench profile. The demolition or excavation of existing airfield pavement, roadways or pavement of any kind shall not be allowed during this operation. Coordinate with C O R for Runway Safety Area and Taxiway Object Free Area restrictions on work under this item.

B. The Contractor shall obtain utility locations from the utility owners. SSC will mark its cable locations and provide a minimum of 72 hours advance notice. Contact local One-Call for commercial utility marking and Airport Authority Maintenance for airport lightning and power.

C. Excavation by hand shall be required when excavating within three feet (5’) each side of marked existing utility services. Trenches running parallel to an existing utility shall be separated by ten feet

(10’).

D. Contractor shall be responsible for prompt restoration of service to any facility impacted by construction operations. Contractor shall immediately repair any damage done to utilities or cables within the work area. A certified splicer shall be on site continuously to splice cables that have been damaged. FAA cables shall be repaired to the standards described in FAA Specification, FAA-C-1391c, Installation and Splicing of Underground Cables.

E. The necessary personnel, materials, and equipment shall be present for each exploration in the event of cable damage.

2. INSPECTIONS

A. Prior to any excavation, all control points established by the Contractor shall be inspected by the COR.

B. All cable trenches shall be inspected by the COR prior to backfill. Normally, all trenches shall be backfilled on the same day they are excavated. In the event a trench or excavation must be left open overnight, it shall be properly barricaded, flagged and lighted.

3. UNKNOWN UTILITIES

If unknown utilities are encountered, immediately notify the COR of the location and type of utility encountered.

THIS PAGE INTENTIONALLY LEFT BLANK

02200- 1

SECTION 02200

EARTHWORK

1. Section Includes: This Section includes the excavation and backfilling requirements for underground utilities and appurtenances

2. Work Included: The work under this Section includes, but is not limited to the following:

A. Preparing sub-grades for the removed pads and foundations.

B. Sub-base courses for damaged existing access roads.

C. Backfilling for utilities.

D. Removal of foundations and underground utilities indicated on the construction drawings.

E. General excavation and fill to include stripping and salvaging top soil, stockpiling soil, and spreading topsoil.

F. Erosion and Sediment Control.

G. Protection of Underground Utilities.

3. Related Sections:

FAA-C-1391c Installation and Splicing of Underground Cables

1. 4 Standards and References: The current issues of the following documents in effect on the date of the

Request For Proposal form a part of this specification and are applicable to the extent specified herein.

A. Unless otherwise indicated on the Construction Drawings or herein specified, all work under this Section shall be performed in accordance with the current State Department of Transportation Standard

Specifications for Construction of Roads and Bridges

B. American Association of State Highway and Transportation Officials (AASHTO):

T-99– Moisture-Density Relations of Soils Using 5.5 lb (2.5 Kg) Rammer and 12-in. (305 mm) Drop.

C. American Society of Testing and Materials (ASTM) Publications:

ASTM D-1557 Moisture-Density Relationship of Soils and Soil Aggregate Mixtures.

ASTM D-2487 Standard Practice for Classification of Soils for Engineering Purposes

(Unified Soil Classification System).

ASTM D-4253 Test Methods for Maximum Index Density of Soils Using a Vibratory Table

ASTM D-4254 Test Methods for Minimum Index Density of Soils and Calculations of

Relative Density

D. Natural Resources Conservation Service, (NRCS)

02200- 2

5. Definitions: The following terms shall mean the following for this contract:

A. Excavation: Consists of the removal of material encountered to subgrade elevations and the reuse or disposal of materials removed.

B. Sub-grade: The uppermost surface of an excavation or the top surface of a fill or backfill immediately below sub-base, drainage fill, or topsoil materials.

C. Sub-base Course: The layer placed between the subgrade and base course in a paving system or the layer placed between the subgrade and surface of a pavement or walk.

D. Base Course: The layer placed between the sub-base and surface pavement in a paving system.

6. Submittals: The following items shall be submitted:

A. Gradation and compaction reports.

B. Name of site-material source and load ticket for each delivery.

C. Name of testing firm/lab.

D. Vendor data for erosion control materials

E. As-Built drawings

PART 2 - PRODUCTS

1. Soil Materials:

A. Sub-base and Base Material: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand, as defined in the State of K e n t u c k y DOT

Standards for sub-base course.

B. Engineered Fill: Sub-base or base materials.

C. Foundation Backfill: Foundation backfill shall be crushed stone, well-graded from coarse to fine, other aggregate, or an approved sand-gravel mixture. No overburden or decomposed and disintegrated rock allowed. The material shall meet the following gradation 100 percent passing a 1 1/2 inch sieve, 80-100 percent passing a 1 inch sieve and 0-5 percent passing a No. 8 sieve.

D. Filtering Material: Evenly graded mixture of natural or crushed gravel or crushed stone and natural sand, with 100 percent passing a 1-1/2 inch sieve and 0 to 5 percent passing a No. 50 sieve.

E. Earth Fill: Approved type of soil classified as GW, GP, GM, GC, SW, SP, SM, SC, ML or CL according to the Unified Soil Classification System and free of foreign substances, obtained from excavation for this construction or an approved source and having a plasticity index of 20 or less.

Excavated material that meets the requirements for earth fill may be used for filling, backfilling, and grading.

F. Unsuitable Fill: Any material construction debris, containing roots or other organic matter, such as peat, organic silt, or sod, shall be considered unsuitable for use as backfill material or in embankment construction.

02200- 3

G. Top Soil: Top layer of soil containing organic material suitable for growing grass and other vegetative materials, free of roots, debris, and other deleterious materials. Topsoil from an off-site location must be from an approved source and have similar characteristics as the on-site topsoil.

H. Rip Rap: Dumped or hand-placed stone with gradation and characteristics specified in the S ta t e of

Kentucky DOT standards.

2. Geosynthetics

A. Geosynthetic Material: Woven or non-woven plastic fabric used for soil separation as defined in State of Kentucky DOT Standards for their respective use. Geosynthetic material for sediment control shall follow State of Kentucky NRCS standards unless otherwise directed by the COR.

1. Excavation:

A. Excavation shall be to the contours and dimensions indicated. Notify the COR and Contract

Administrator immediately in writing in the event that it becomes necessary to remove hard, soft, weak, or wet material to a depth greater than indicated in order for any adjustment in Contract price to be considered. Excavations cut below the depths indicated shall, unless otherwise specified, be backfilled with fill or granular fill and be compacted.

B. In case of an accident and/or damage to an existing utility, the Contractor shall:

1. Immediately contact the COR and Airport Emergency Services or facility manager in the case evacuation is required. Follow the Emergency Procedures Plan.

2. Immediately report all damages, including kinking or sheath damage to the COR. Notify facility owner or operator as directed by the COR.

3. Repair any damages and complete the Damage Investigation Report in accordance with Section

01720 and the Contractor’s Site Specific Safety Plan, and submit to the COR. Pictures shall be taken and attached to the report to help documenting the damage.

C. Comply with local codes, ordinances, and requirements of authorities having jurisdiction to maintain stable excavations.

D. Preserve, protect and maintain existing operable drains, sewers, and electrical ducts during grading, excavating and backfilling operations. Keep excavations dry. Locations indicated for existing utility facilities are approximate. Pipes or other manmade obstructions, in addition to those indicated, may be encountered. Movement of construction machinery and equipment over pipes and utilities during construction shall be at the Contractor’s risk. Perform all work adjacent to non-Government utilities as indicated in accordance with procedures outlined by utility owner. Excavation made with power driven equipment is not permitted within five feet of any known existing utility. Start hand excavation on each side of the indicated obstruction and continue the obstruction is uncovered. Support uncovered lines until approval for backfill is granted by the COR.

E. Excavation shall be performed so that the area of the site and the area immediately surrounding the site and affecting operations at the site will be continually and effectively drained. Water shall not be permitted to accumulate in the excavation. The excavation shall be drained by pumping or other satisfactory methods to prevent softening of the foundation bottom, undercutting of footings, or other actions detrimental to proper construction procedures.

F. Plan for and provide the equipment and construction for the collection and disposal of surface and subsurface water encountered in the course of construction.

02200- 4

G. Where it is necessary to cross paved areas, the pavement surface shall be saw-cut to a minimum depth of 2 inches. Lines shall be straight and true to ensure a neat finish between the existing and restored surfaces. The width of excavated pavement shall extend 1 foot and 6 inches beyond each side of the proposed excavated width for the trench in the subgrade below. Permission of the COR shall be obtained before starting any such trenching. All rubble and waste material from this operation shall be completely removed from the site.

H. Where existing paved surfaces have been removed to allow for utility line crossings, backfill trenches as specified below. Replace the pavement with material of thickness and proportions that are as near to those of the existing pavement as can practically be accomplished, or as otherwise specified.

I. Satisfactory excavated material shall be used in the work. No excavated material shall be disposed of in such a manner as to obstruct the flow of any stream, endanger a partly finished structure, impair the efficiency or appearance of any structure, or be detrimental to the completed work in any way.

J. When excavations have reached the required elevations, the Contractor shall not proceed with further construction of the excavated area, until the area has been inspected by the COR.

K. Excavate trenches to indicated slopes, lines, depths, and invert elevations.

1. Excavate trenches to uniform widths to provide a working clearance on each side of pipe or conduit.

Excavate trench walls vertically from trench bottom to 12 inches (300 mm) higher than top of pipe or conduit, unless otherwise indicated.

2. Clearance: 6 inches (150 mm) each side of pipe or conduit.

3. Excavate and shape trench bottoms to provide uniform bearing and support of pipes and conduit.

Shape subgrade to provide continuous support for bells, joints, and barrels of pipes and for joints, fittings, and bodies of conduits. Remove stones and sharp objects to avoid point loading. For pipes or conduit less than 6 inches (150 mm) in nominal diameter and flat- bottomed, multiple-duct conduit units, hand-excavate trench bottoms and support pipe and conduit on an undisturbed subgrade. For pipes and conduit 6 inches (150 mm) or larger in nominal diameter, shape bottom of trench to support bottom 90 degrees of pipe circumference. Fill depressions with tamped sand backfill.

L. Stockpile excavated materials acceptable for backfill and fill soil materials, including acceptable borrow materials. Stockpile soil materials without intermixing. Place, grade, and shape stockpiles to drain surface water. Cover to prevent wind-blown dust. Stockpile soil materials away from edge of excavations. Do not store within drip line of remaining trees.

M. Rock Excavation: When rock conditions are encountered during excavations for slabs, footings, or foundations, all material in the excavation area shall be removed to a depth of 6 inches below the bottom of the excavation grade and replaced with satisfactory material. Over excavation is not required if excavation reveals solid rock at the bottom of the excavation grade and no potentially faulty bearing surfaces, such as soil or crumbling rock, are apparent by visual inspection by the COR. Rock encountered during footing excavations shall be leveled to a clean, even, hard surface at the indicated grade. No footings shall be permitted to rest partly on soil and partly on rock. In the event that excavation reveals potential foundation bearing surfaces of part rock and part soil, the Contractor shall contact the

COR for resolution of the problem.

02200- 5

2. Backfill:

A. General

1. Prior to backfilling, the owners/operators of existing facilities/utilities that were exposed during potholing or excavation shall be contacted and given the opportunity to inspect for damage that may have occurred during the excavation process. All responses and inspections shall be documented.

2. The Contractor shall take care not to damage existing facilities and utilities during backfill and compaction.

3. All material used to backfill potholed or excavated existing utilities shall be clean and free of large rocks, sharp objects, and large chunks of hard-packed dirt or clay. The requirements for backfill may be found in FAA-C-1391c, Installation and Splicing of Underground Cables. The utility owner/operators shall be contacted for additional requirements regarding their utilities.

B. Foundation Excavation/ Backfill:

Backfill excavations promptly with Foundation Backfill, but not before completing the following:

1. Acceptances of construction below finish grade including, where applicable, damp proofing, waterproofing, perimeter insulation and underground utilities.

2. Concrete formwork removal.

3. Removal of trash and debris any deleterious materials and unsatisfactory soil materials from excavation.

C. Backfill Material:

1. Preparation: Remove vegetation, topsoil, debris, wet and unsatisfactory soil materials, obstructions, and deleterious materials from ground surface prior to placing fills.

2. Plow strip, or break up sloped surfaces steeper than 1 vertical to 4 horizontal so fill material will bond with existing surface.

3. When subgrade or existing ground surface which is to receive fill has a density less than that required for fill, break up ground surface to depth required, pulverize, moisture-condition or aerate soil and re-compact to required density as indicated in this specification.

4. Place fill material in layers to required elevations for each location listed below. Flooding is not permitted.

5. Under grass, use satisfactory excavated or borrow soil material, expect top 3”, use topsoil material.

6. Under walks and pavements, use sub-base or base material or satisfactory excavated or borrow soil materials.

7. Under footings and foundations, use engineered fill.

D. Moisture Control:

1. Uniformly moisten or aerate sub-grade and each subsequent fill or backfill layer before compaction to within 4 percent of optimum moisture content for on-site clayey soils and to within 2 percent of optimum moisture content for relatively non-expansive soils as determine by AASHTO T-99.

2. Do not place backfill or fill material on surfaces that are muddy or has exceeds moisture.

3. Remove and replace, or scarify and air-dry satisfactory soil material that is too wet to compact to specified density.

4. Stockpile or spread and dry removed wet satisfactory soil material.

02200- 6

E. Compaction:

1. Place backfill and fill materials in layers not more than 6 inches in loose depth for material compacted by heavy compaction equipment, and not more than 4 inches in loose depth for material compacted by hand-operated tampers.

2. Place backfill and fill materials evenly on all sides of structures to required elevations. Place backfill and fill uniformly along the full length of each structure.

3. Percentage of Maximum Dry Density Requirements: Compact soil to not less than the following percentages of maximum dry density according to AASHTO T-99.

a. Under existing building foundation compact the top 12 inches below subgrade and each layer of backfill or fill material to 95 percent maximum dry density.

b. Under walkways, compact the top 6 inches below subgrade and each layer of backfill or fill material to 95 percent maximum dry density.

c. Under lawn or unpaved areas, compact the top 6 inches below subgrade and each layer of backfill or fill material to 90 percent maximum dry density.

4 Trench Compaction Requirements:

a. Compact earth fill and cohesive aggregate fill in maximum 6 inch lifts with pneumatic rollers or power hand tampers and make a minimum of eight (8) passes.

b. Compact cohesion less aggregate fill in maximum 6 inch lifts with vibratory rollers or vibratory plate power hand compactors and make a minimum of eight (8) passes.

c. The acceptability of the compaction equipment shall be based upon the results of a test section.

d. Compact earth fill and cohesive aggregate fill to a minimum of 95% of maximum dry density as determined by ASTM D-1557, Standard Proctor by using nuclear methods.

e. Compact cohesion less aggregate fill on which it is not practical to control the density by “Proctor” methods to a minimum of 75% of relative density as determined by ASTM D- 4253 and D-4254, by a field compaction mold method correlated to ASTM D-4253 and D-4254. Compact cohesion less aggregate fill at moisture content within a range that accommodates consistent placement and compaction to the minimum relative density specified above.

F. Grading

1. General: Uniformly grade areas to a smooth surface free from irregular surface changes. Comply with compaction requirements and grade to cross sections, lines, and elevations indicated.

a. Provide a smooth transition between existing adjacent grades and new grades.

b. Cut out soft spots, fill low spots, and trim high spots to conform to required surface tolerances.

2. Site Grading: Slope grades to direct water away from structures and to prevent ponding. Finish subgrades to required elevations within the following tolerances:

3. Lawn or Unpaved Areas: Plus or minus 1 inch.

4 Walks: Plus or minus 1 inch.

5. Pavements: Plus or minus 1/2 inch.

02200- 7

G. Sub-base and Base Courses: Under pavements and walks, place sub-base course material on prepared subgrades. Place base course material over sub-bases to pavements.

1. Grade and compact sub-base and base courses to grades, lines, cross sections and thickness to not less than shown on the Construction Drawings.

2. Shape sub-base and base to required elevations and cross-slope grades.

3. When thickness of compacted sub-base or base course is 6 inches or less, place materials in a single layer.

4. When thickness of compacted sub-base or base course exceeds 6 inches, place materials in equal layers, with no layer more than 6 inches thick or less than 3 inches thick when compacted.

H. Drainage Fill:

1. Under slabs-on-grade, place drainage fill of course aggregates on prepared subgrade.

2. Compact drainage fill to required cross sections and thickness.

3. When compacted thickness of drainage fill is 6 inches or less, place materials in a single layer.

4. When compacted thickness of drainage fill exceeds 6 inches thick place materials in equal layers, with no layer more than 6 inches thick nor less than 3 inches thick when compacted.

I. Field Quality Control:

1. Testing Agency Services: Allow testing agency to inspect and test each subgrade, sub –base and each fill or backfill layer. Do not proceed until test results for previously completed work verify compliance with requirements. Unless otherwise specified in these specifications, all testing shall be in accordance with DOT standard procedures.

2. Footing Subgrade: At footing subgrades, perform at least one test of each soil stratum to verify design-bearing capacities. Subsequent verification and approval of other footing subgrades may be based on a visual comparison of each subgrade with related tested strata when acceptable to the COR.

3. Paved and Building Slab Areas: At subgrade and at each compacted fill and backfill layer, perform at least one field in-place density test for every 2000 sq. ft. or less of paved area or building slab, but in no case fewer than three tests per layer.

4. When testing agency reports that subgrades, fills, backfills, subbase or bases are below specified density, scarify and moisten or aerate, or remove and replace soil to the depth required, re-compact and retest until required density is obtained at no additional cost to the government.

J. Disposal of Surplus and Waste Materials

1. Disposal: Transport surplus satisfactory soil to designated storage areas on the Government's property.

Stockpile or spread soil as directed by COR. Protect stockpiles from erosion. Seed and/or stabilize stockpiled material as directed by the COR.

2. Remove waste material, including unsatisfactory soil, trash, and debris, and legally dispose of it off the

Government's property.

3. No burning of materials shall be permitted on the site.

02205-1

SECTION 02205

WALKWAYS AND GRAVELED AREAS

1. Work Included – The Contractor shall provide the necessary materials, labor, and equipment for the construction of walkways and access roads as specified herein or on applicable drawings.

2. Related Work Covered Elsewhere

Section 02200 Earthwork

Section 03301 Cast-In-Place Concrete

3. Submittals

A. Reports: The Contractor shall submit reports in accordance with the Contract Documents.

B. Gradation Curves: The Contractor shall submit a gradation curve for the aggregate materials prior to delivery of material.

C. Delivery Tickets: The tickets shall indicate the delivery date, time dispatched, name and location of the project, name of Contractor, name of supplier, truck number, quantity, and composition.

PART 2 – PRODUCTS

1. Materials: The Contractor shall furnish materials for walkways and access roads in accordance with State

Department of Transportation standards or specifications that meet or exceed the requirements specified herein.

2. Aggregate Material: Aggregate material shall be composed of pit-run gravel, stream-bed gravel, crushed rock, slag, or shell. Material shall not be larger than 1 inch. The aggregate shall be reasonable well graded from coarse to fine, with a maximum allowable 15 percent by volume and a minimum allowable 5 percent by volume of binding material. Loam shall not be used as a binding material.

3. Concrete: The concrete shall be as specified on the construction drawings and in Section 03301.

4. Soil Sterilant: Walks and walkways about and beyond foundations shall not be treated with a soil sterilant prior to application of the gravel.

5. Polyethylene Sheeting: Polyethylene sheeting shall be a 6-mil sheeting.

1. Preparation: Earthwork and sub grade preparation shall be in accordance with Section 02200.

2. Aggregate Placing: Aggregate surfaced walkways shall consist of a minimum of 4 inches of washed gravel

Aggregate shall be compacted using a small steel drum roller or other equipment approved by the COR.

02205-2

3. Concrete Walkway: The concrete walk shall be constructed in accordance with construction drawings and

State DOT Specifications.

4. After Sub-grade is Prepared: place 6-mil polyethylene sheeting over the subgrade immediately prior to placing of aggregate. Lap edges 6” minimum and neatly cut polyethylene sheeting to conform to pads, piers, conduits, etc., within area to receive aggregate surface.

5. Quality Assurance: The Contractor shall give the COR, at the time of delivery, two copies of the aggregate delivery ticket.

02220-1

SECTION 02220

INSTALLATION OF UNDERGROUND CABLE SYSTEMS

1. Work Included: Installation of underground cable system shall be governed by this section in conformance with FAA Specifications FAA-C-1391c.

2. Work Access: The Contractor shall perform all work with a minimum disruption to FAA and airport operations.

1.3 Related Documents

Section 02200

Earthwork

Section 02324

Section 02325 Trenching

Excavating, Backingfilling and Compacting for Utilities

1.4 Submittals: Schedule of cable work shall be submitted to the Contracting Officer five (5) days prior to commencement of this phase of work.

PART 2 - PRODUCTS - NOT USED

1. Coordination Of Work: The Contractor shall coordinate the construction work for this project with those responsible for facility operations.

2. Inspection

A. Line and Grade: Prior to any excavation, the COR shall inspect all control points established by the

Contractor.

B. Concrete: Prior to placement, the COR shall inspect all excavated areas. No fill or concrete shall be placed without the COR presence.

C. Trenching: Excavation and backfill for trenching shall be in accordance with Sections 02200 and

02324. All cable trenches shall be inspected by the COR prior to both installation of cables and backfill. No cable trench shall be left open and unattended. In the event a trench or excavation must be left open overnight, it shall be properly barricaded, flagged, and lighted.

3. Cables

A. Installation: The cable complement shall be as shown on the drawings. Installation shall include all trenching, testing, backfilling, locator tape, cable markers, terminations, and conduits.

02220-2

B. Termination and Splicing: Cable will be placed in unspliced lengths. Unless otherwise indicated, the

Contractor will terminate all cable. All cables not terminated by the Contractor shall be left with 25 feet of slack with end sealed.

C. Unterminated Cables: The Contractor will make the unterminated ends of all cables watertight as follows: The cable end is to be wrapped with Scotch Electrical Tape No. 33 and then dipped into 0.Z.

Sealing Compound or equal. The sealing compound will be heated to 375 degrees F prior to dipping the cables, in accordance with the manufacturer’s instructions. No direct payment will be made for making the ends of the cables watertight; compensation, therefore, will be included in the price quoted for installing the cables.

D. Testing: All cables shall be tested in accordance with FAA –C-1391c. All cables shall be tested before and after installation.

02270-1

SECTION 02270

PREVENTION, CONTROL AND ABATEMENT OF EROSION AND WATER POLLUTION

1. Work Included: The work covered by this Division shall consist of the Best Management Practices

(BMPs) for furnishing, installing, maintaining and removing temporary erosion control devices on the Project and in areas outside the construction limits where work is accomplished in conjunction with the project, so as to prevent pollution of water, air, detrimental effects to public or private property adjacent to the project limits, and damage to work on the project. Where practical, temporary erosion control features shall be constructed and maintained as outlined within the Contractor’s approved Erosion Control Plan. Construction exits shall be a mandatory BMP on this project.

2. Related Documents:

3. Referenced Specifications, Codes and Standards

A. The American Society for Testing and Materials (ASTM) Publications: Publications listed in paragraph 1.3 of Section 02200 form a part of this specification to the extent referenced.

B. Kentucky Department of Transportation: Standard Specifications For Road and Bridge Construction

(1999) – Section 104.

C. Natural Resources Conservation Service (NRCS): Kentucky Conservation Practice Standards

4. Submittals

A. Erosion Control Plan: The plan shall depict the BMPs for the erosion control measures; at the Pre-construction Conference, the Contractor shall present the proposed plans for installation of erosion control devices. The schedule shall be based on project conditions and shall be in written form. This schedule shall specifically indicate the sequence of earthwork operations and the proposed use of temporary erosion control features. This plan shall also outline the Contractor’s proposed methods of controlling erosion of haul roads and areas used for waste materials from the project. This submission shall include but is not limited to the following:

1. General overall Erosion Control Plan;

2. Detailed breakdown of BMPs (erosion control devices) as required for different stages of construction;

3. Set of marked plans or detailed drawings showing areas of control devices and purpose for each;

4. Subsequent staging plans and specific site plans may be submitted to the Contracting Officer through the COR for approval as the work progresses. These plans shall be submitted a minimum of two (2) weeks in advance of construction, to allow review by the COR. No work shall be started until the aforementioned plans have been accepted by Contracting Officer. The Contractor will be responsible for accomplishment of the work in accordance with the accepted plans. The COR may have changes approved that are necessary due to unforeseen circumstances that are beyond the control of the Contractor.

5. Plan Contents: The plan shall consider, but is not limited to the following:

02270-2

a. Overview of Erosion and Sedimentation Control Plan

1) General Requirements

2) Contractor Submittal a). Contractor must review and sign the Erosion and Sedimentation Control Plan b). Contractor must make commitment to provide erosion and sediment control silt

3) No Work Until Acceptance by Contracting Officer

b. Erosion Control Schedule

1) General Overall Erosion and Sedimentation Implementation Plan (Narrative)

2) Breakdown of Erosion Control Devices (Summary of Quantities)

3) Marked Plans or Detailed drawing showing Control Devices and Purposes

4) Site and Staging Plans

c. Plan Considerations

1) Terrain

a) Hilly

b) Flat

c) Drainage Area

2) Soil Conditions

a) Clay

b) Sandy

c) Rock

3) Adjacent Property

a) Urban

b) Rural

c) Waterways

d) Specific

4) Narrative

a) Worksite Erosion Control Supervisor (WECS) identified and listing of relevant qualifications

b) Summary of quantities for erosion control devices

c) Grassing

5) Plans

a) Before entering drainage ditches, canals

b) Locations of Construction Exit onto Perimeter Road

c) Location of Silt Fence and/or Gates

d) Type of Silt Fence.

1. Best Management Practices: BMPs shall be based on State of Kentucky DOT or State of Kentucky NRCS standards unless otherwise approved by the Contracting Officer. BMPs may include, and are not limited to:

A. Brush Barrier

B. Earth Berm

C. Bituminous Treated Roving

02270-3

D. Check Dam

E. Channel Stabilization

F. Channel Riprap

G. Construction Exit

H. Diversion Channel

I. Down Drain Structure – Flexible

J. Down Drain Structure – Concrete

K. Down Drain Structure – Metal

L. Permanent Soil Reinforcing Mat

M. Riprap Ditch Checks

N. Riprap

O. Retrofit

P. Silt Retention Barrier

Q. Sedimentation Barrier

R. Inlet Trap

S. Sediment Basin

T. Silt Fence

U. Silt Fence – Reinforced

V. Silt Control Gates

W. Stream Crossing

X. Storm Drain Outlet Protection

Y. Surface Roughening

1. Scheduling of Successive Operations: Operations shall be scheduled such that the area of unprotected erodible earth exposed at any one time is not larger than the minimum area necessary for efficient construction operations and that the duration of exposure of uncompleted construction to the elements is as short as practicable.

02270-4

2. Construction Requirements

A. General: The COR has the authority to limit the surface area of erodible earth material exposed by trenching and excavation, and to direct the Contractor to provide immediate permanent and/or temporary erosion control measures to prevent contamination of adjacent drainage ditches, canals, or other areas of water impoundment. Such work should coincide with the Contractor’s Erosion Control

Plan. Cut slopes shall be seeded as the excavation proceeds. Under no circumstances shall grading be allowed to exceed the operating range of the grassing equipment In addition to minimizing erosion, this is necessary to keep attraction to birds, to a minimum. The Contractor shall incorporate all erosion control features into the Project at the earliest practicable time as outlined in his accepted Plan.

B. Erodible Area: The Contractor shall limit the area of excavation and trenching operations commensurate with the Contractor’s capability and progress in keeping the finish grading, seeding and other such erosion control measures current in accordance with the accepted Plan.

3. Protection During Suspension of Contract Time - In the event that it is necessary to suspend the construction operations for any appreciable length of time, the top of the earthwork shall be shaped in such a manner as to permit runoff of rainwater. The COR has the authority to apply temporary seeding or other erosion and sediment control measures to minimize erosion and sediment transport.

02324-1

SECTION 02324

TRENCHING

1. Work Included: Trenches to be excavated as shown on the drawings and as provided for by the specifications.

Perform all work with a minimum disruption to the FAA operations.

2. Related Documents

Section 02220 Installation of Underground Power Cable Systems FAA

- Specification FAA-C-1391c Installation and Splicing of Underground Cables

1. Marking Tape: 2 inches wide with aluminum core, with continuous word identification “WARNING -

UNDERGROUND CABLE”, or previously approved alternative wording.

2. Concrete Cable Markers: Concrete cable markers constructed and inscribed as depicted in the drawings.

1. Trenching Operations

A. Protection of Existing Utilities and FAA Cables: The Contractor shall obtain utility locations from the utility owners (telephone company, electrical power service, water and gas utilities, airport operations, and FAA). SSC will mark its cable locations; provide a minimum of 72 hours advance notice. Contact local One-Call for commercial utility marking before digging, and Airport Authority for airport lighting and power.

B. Hand Excavation: Excavation by hand is required when excavating within 5 feet of existing utility services when crossing the existing service. Trenches running parallel to an existing utility shall be separated by ten feet.

C. Repairs: Contractor shall be responsible for prompt restoration of service to any facility impacted by construction operations. Contractor shall immediately repair any damage done to utilities or cables within the work area. A certified splicer shall be on call to splice cables. FAA cables shall be repaired to the standards described in FAA Specification FAA-C-1391c, Installation and Splicing of Underground

Cables

D. Marking Tape: Install in trenches before final placement of fill and compaction at depth of six inches. Overlap ends of rolls a minimum of three feet and tie ends together with a square knot.

E. Cable Markers: Duct and cable markers are required at the beginning point and ending point of each run; at each change of direction; and every 200 feet along the run.

F. Cable Installation: The installation of underground power cables shall be in accordance with

Division 02220.

02324-2

G. Backfill: The backfill of trenches shall be in accordance with Section 02220. Prior to backfill, the

Contractor shall record on as-built drawings the location and elevation of existing utilities encountered and any deviation from the line and grades shown on the construction drawings.

2. Inspection

A. Line and Grade: Prior to any excavation, all control points established by the Contractor shall be inspected by the COR.

B. Trenching: All cable trenches shall be inspected by the COR prior to backfill. Normally, all trenches shall be backfilled on the same day they are excavated. In the event a trench or excavation must be left open overnight, it shall be properly barricaded, flagged, and lighted.

02325-1

SECTION 02325

EXCAVATING, BACKFILLING AND COMPACTING FOR UTILITIES

1. Work Included: The work under this Section includes, but is not limited to furnishing labor, materials, equipment and incidentals necessary to…