Attachment 03a-Drawings ORL.pdf
PDF 4 MB Posted
- Attached to
- Upgrade Taskers 500 RVR, Three Separate Locations Federal contract opportunity
- Solicitation number
- DTFASA-17-R-00047
About this file
Attachment 03a-Drawings ORL (pdf)
View the file
Other files for this federal contract opportunity
Show all 50
Upgrade Taskers 500 RVR, Three Separate Locations has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTFASA-17-R-00047 Attachment 3a
Linda Hennequant Stamp for Specs
A1
3" TYP
M
IN
M
IN
M
IN
C
A
B
PLAN VIEW 1
ELEVATION "C"
STEEL CONDUIT
2" GALV RIGID
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
+/-1/4"
8 1/2"
S001
S001
S001
S001
S002
1" MAX
P O W E R
E E S
G N D
L C
V S A L S
S I E
V S A L S
S I E
G N D
C L C L
6"
1’-6"
(REF)
R
E F
R
E F
(TYP ALL SIDES)
1/2" CHAMFER
C
B
S001 S001 S001
GRADE
FINISH
3" MIN
1" MAX
M
IN
M
IN
A-A
FINISH GRADE
3/4" PVC CND
GRADE
FINISH
ALL (4) FOUR FACES
VERTICAL REINFORCEMENT
#4 @ 12" OC
M
IN
S002
A-A
S002
S001
"A-A"/S002
SEE DETAIL
COUPLING
DISC. SW. EQ ENCLOSURE
1-3/4" PVC CONDUIT FOR
CONDUIT
3/4" PVC
FOR LPC END
3/4" RGSC
(TYP)
3" CLEARANCE
3" (TYP)
8’-6"
30"30"
GRADE
3" TYP
E E S
G N D
TYP.
3" (MIN)
TOP OF FOUNDATION
(REF)
2" PVC (TYP. FOR 2)
COUNTERPOISE CONN. IN
LPC BOX GND IN 3/4" PVC, SHOWN (REF)
LPC GND IN 3/4" RGSC, BEYOND (REF)
S002
B-B
A1
A2
A3
(1 REQ’D)
(2 REQ’D)
(4 REQ’D)
4 1/2"
+/-1/16"
6 5/8" +/-1/16"
6 5/8"
+/-1/16"
1 1/8"
1’-6"
NOT TO SCALE
4 1/2"
POLE
VS (LIR)
ANCHOR BOLT AND PLATE LAYOUT
S001 S002
BRASS PLATE
A2 A3
+/-1/16"
7 3/4"
+/-1/16"
7 3/4"
N
5’-6"
3/4" PVC FOR LPC BOX GND
SEE C002.
ELEVATION.
CONCRETE
TOP OF
NOTE
2" RGSC POWER
T V S S
G N D
V S A L S
G N D
LEG SPACING LEG SPACING
1’-6"
’RVR’ EQ. ENCLOSURE GNDS
TVSS VS/ALS SIE AND PANEL
3/4" PVC CONDUIT FOR
L E
G
S P
A C
IN
G L
S P
A C
IN
G
4 3/4"
5 1/4"
6 1/4"
5 1/4"
1" PVC
PC-BASED RVR SYSTEM TOUCHDOWN
S001
SEE DRAWING S002
TYP 3 PLCS
EQUIPMENT STAND LEG
CONDUIT WITH 24"R ELBOW
RIGID STEEL CONTINUOUS
2" GALVANIZED
VS ALS SIE GROUND
1-3/4" PVC CONDUIT FOR
SECTION "A"
SECTION "B"
EACH VERT. FACE
#4 AT 12" OC
EACH FACE
AT EQ. SPA.
3 #4 HORIZONTAL
EACH FACE
AT EQ. SPA.
3 #4 HORIZONTAL
EACH FACE
AT EQ. SPA.
3 #4 HORIZONTAL
EACH VERT FACE
#4 AT 12" OC
AND BOTTOM
EQ. SPA. TOP
12 #5 REBAR
AND BOTTOM
EQ. SPA. TOP
8 #5 REBAR
(POWER)
2" RGSC
DWG S002
SEE NOTE 6
VS/ALS SIE
2"DIA RGSC
(CONTROL)
2" RGSC
(BEYOND) (REF)
2" RGSC
1" MAX
1" MAX
SEE SECTION "A"
EXITING THIS FACE
FOR CONDUIT
C O N T R O L
TYP
3"
2" RGSC CONTROL
ALS, VS AND SIE FOUNDATION DETAILS 1 OF 2
(BEYOND) (REF)
2" RGSC
(TYP. 2 LOCATIONS)
2" PVC FOR COUNTERPOISE CONN.
THIS DRAWING.
DRAWING ORL-D-RVR07-S002 ARE ALSO A PART OF
1. DETAILS "A-A", "B-B", A1, A2 AND A3 ON
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
F
IL
E
D
A T
E
T
IM
E
N
A M
E
DATE
APPROVED
AJW-E14C EASTERN SERVICE AREA
10/20/2015 600235
ORL-D-RVR07-
NAME:
SIGNATURE:
STRUCTURAL
DATE:
DISCIPLINE:
Tel. No. (678) 808-8800 Fax. (678) 808-8400
Suite 900 Atlanta, Georgia 30328
400 Northpark Town Center, 1000 Abernathy Road, N.E.
RANDY W. PRESNELL, P.E.
PROJECT ENGINEER MGR: ENGINEER - CENTER A
NAVAIDS
ENGINEERING SERVICES
FL
RVR
RUNWAY 07
PC-BASED RVR SYSTEM TOUCHDOWN
66213FLORIDA REG. #
ORLANDO ORLANDO EXECUTIVE AIRPORT
N
T Y
P
ANCHOR BOLT
ANCHOR BOLT
NOT TO SCALE
NOT TO SCALE
4" MIN
A2
A1
4" MIN
NUT AND WASHER
8/26/97
ANCHORS
W/2 STUD
BRASS PLATE
3"x 6"x 1/4"
AND WASHER
LEVELING NUT
CONC FDN
TOP OF REINF
T
H R
D
U
C
P
R O J
THE TILTING DEVICE
RESTRAINT ON
(TO PROVIDE
NUT AND WASHER
S002 S001
B-B FDN MARKER DETAIL
NOT TO SCALE
8 UNC)
(1 3/4" THRD,
2" PROJ
CONC FDN
TOP OF REINF
(MAT’L ASTM-A-325)
J- BOLT
3/4" DIA
(MAT’L ASTM-A-325)
J- BOLT
3/4" DIA
GENERAL NOTES STRUCTURAL
L
1" 1"
3"
1/2"
ANCHOR PLATE
NOT TO SCALE
7/8" DIA HOLE
A3
CONCRETE FDN
TOP OF REINF
(MAT’L ASTM-A-36)
P 2"x 1/2"x 15"
1 3/8"
7/8"
2 PLACES
TACK WELD
TOP OF FOUNDATION
A-A
S002 S001NOT TO SCALE
POWER AND CONTROL/COMM
TOP OF FOUNDATION
1/2" MAX
RGSC
COUPLING
XXX’ FDN ELEV
XXX’ RWY ELEV
NOT TO SCALE
EQUIPMENT STAND LEG DETAIL1
S002
COUPLING DETAIL
S002
C. SEE DRAWING C002 FOR TOP OF FOUNDATION ELEVATIONS.
1 FEET 6 INCHES.
B. TOP OF LIR POLE TO CENTERLINE OF TRANSMITTER/RECEIVER IS APPROX.
ABOVE ELEVATION OF RUNWAY CENTERLINE PERPENDICULAR TO STRUCTURE.
A. HEIGHT FROM CENTERLINE OF TRANSMITTER/RECEIVER IS 14 FEET, +/- 4’
10. BASIC REQUIREMENTS FOR TOUCHDOWN, VS INSTALLATIONS ARE AS FOLLOWS:
TO VS STRUCTURE.
C. ELEVATION (IN FEET AMSL) OF RUNWAY CENTERLINE PERPENDICULAR
B. ELEVATION (IN FEET AMSL) OF VS STRUCTURE FOUNDATION.
A. ARROW POINTING TOWARD TRUE NORTH.
THE FOLLOWING INFORMATION STAMPED INTO IT. (SEE DETAIL "B-B")
9. INSTALL BRASS PLATE ON SURFACE OF EACH RVR FOUNDATION WITH
OF ANCHOR BOLTS, INSERTS AND CONDUITS.
8. CONCRETE REINFORCEMENT MAY BE SHIFTED TO ALLOW FOR PLACEMENT
7. TOTAL UNDERGROUND VS CABLE RUN SHALL NOT EXCEED 6’-6".
2 1/2" HOLE IN THE PLATE ASSEMBLY.
6. 2" RIGID CONDUIT MUST BE LOCATED AS SHOWN TO LINE UP WITH THE
MINIMUM OF 3" BEYOND CONCRETE FOUNDATION.
ABOVE CONCRETE SURFACE. EXTEND UNDERGROUND END OF CONDUIT A
5. TOP OF 3/4" PVC CONDUIT SHOULD NOT EXTEND MORE THAN ONE INCH
RWY SAFETY AREA, WORK MUST COMPLY WITH FAA AC 150/5300-13.
ACCORDANCE WITH AASHTO-T99. IF FILL MATERIAL IS REQUIRED WITHIN
TO 95% OF MAXIMUM DENSITY AND OF OPTIMUM MOISTURE CONTENT IN
EXCEED 6 INCHES AND EACH LAYER SHALL BE THOROUGHLY COMPACTED
POLE HEIGHT REQUIREMENTS. FILL SHALL BE PLACED IN LAYERS NOT TO
4 FOUNDATION AREA MAY REQUIRE CUT OR FILL OPERATIONS TO MEET RVR
GALVANIZED.
3. ALL PLATES, ANCHOR BOLTS, NUTS AND WASHERS SHALL BE HOT DIPPED
2. FOUNDATIONS SHALL BE FORMED TO FULL DEPTH BELOW FINISH GRADE.
ALL CONCRETE SHALL BE PLACED ON UNDISTURBED SOIL.
INVESTIGATION SHALL BE CONDUCTED AT SITE PRIOR TO CONSTRUCTION.
1. SOIL SHALL HAVE A MINIMUM BEARING CAPACITY OF 3000 PSF. SOIL
ALS, VS AND SIE FOUNDATION DETAILS 2 OF 2
HEIGHT (2’ MAX)
ONE THIRD OF RACK
EMBED INTO FOUNDATION
GALVANIZED STEEL PIPE.
2" RIGID
RGSC CONDUIT
SCHEDULE 40
22. INSTALL METALLIC INSULATED BUSHINGS ON GRSC IF CABLE RUN IS D.E.B..
21. EXTEND ALL METALLIC CONDUIT 5 FEET BEYOND COUNTERPOISE FOR D.E.B. CABLE.
COMPOUND FOR METAL PROTECTION.
20. COAT FLOOR FLANGE SURFACE RESTING ON CONCRETE WITH AN ASPHALTIC
SUPPORTS HAVE BEEN ACCURATELY LOCATED.
19. INSTALL ANCHOR BOLTS WHEN SIE BOX
STEEL.
18. ALL CHANNELS, CLAMPS AND MOUNTING HARDWARE SHALL BE STAINLESS
GROUNDED IN ACCORDANCE WITH FAA-STD-019E.
17. ALL METAL PARTS, CONDUITS, EQUIPMENT AND JUNCTION BOXES SHALL BE
PROVIDED BY OTHERS.
16. ALL RVR MATERIALS AND EQUIPMENTS INDICATED "BY OTHERS" WILL BE
NOTED.
15. ALL PVC FOR EXTERNAL USES SHALL BE UV RESISTANT UNLESS OTHERWISE
DIRECTION. OTHER APPROVED CONTROL DEVICES MAY BE USED.
CENTERLINE. PHOTOELECTRIC CONTROL SWITCH MUST FACE IN A NORTHERLY
14. ORIENT DUAL LIGHT AXIS OF OBSTRUCTION LIGHTS PERPENDICULAR TO RUNWAY
TRUE EAST DIRECTION. ALS SIE MUST FACE TRUE NORTH.
13. ORIENT MG-20 MOUNTING STAND TILT AXIS TO LOWER RVR POLE IN A
12. SEE DRAWING C002 FOR LOCATION AND ORIENTATION RESTRICTIONS.
AND A 1 FOOT MINIMUM CABLE SLACK.
HEIGHT OF VS AND SIE BOX ABOVE GRADE, VERTICAL CABLE RUN BELOW GRADE
11. DISTANCE FROM CENTER OF LIR POLE TO SIE BOX LEG IS DETERMINED BY
BAR X 6"
#8 STEEL
FOR #8 BAR
1" DIA HOLE
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
F
IL
E
D
A T
E
T
IM
E
N
A M
E
ORL-D-RVR07-
NAME:
SIGNATURE:
STRUCTURAL
DATE:
DISCIPLINE:
Tel. No. (678) 808-8800 Fax. (678) 808-8400
Suite 900 Atlanta, Georgia 30328
400 Northpark Town Center, 1000 Abernathy Road, N.E.
RANDY W. PRESNELL, P.E.
PROJECT ENGINEER MGR: ENGINEER - CENTER A
NAVAIDS
ENGINEERING SERVICES
FL
RVR
RUNWAY 07
PC-BASED RVR SYSTEM TOUCHDOWN
66213FLORIDA REG. #
S003
ELEVATION VIEW
POLE CAP
VISIBILITY SENSOR
ARM
BAND STRAP
STAINLESS
TRANSMITTER
NOT TO SCALES003
VAISALA PC-BASED RVR VISIBILITY
LINE UP PIN WITH SLOT.
M6X16 SS SOCKET
HEAD CAP SCREWS
LIR POLE
ALIGNMENT PIN
RECEIVER
SEE NOTE
SENSORS TO POLE MOUNTING
CONTRACTOR PROVIDED
NORTH OR TO WITHIN PLUS/MINUS 10 DEGREES OF TRUE NORTH.
DIRECTION. ROTATE VISIBILITY SENSOR ASSEMBLY TO TRUE
VISIBILITY SENSOR RECEIVER MUST FACE IN A NORTHERLY
NOTE:
S003
(LOOKING EAST) NOT TO SCALE
R V
R
O
U N
T I
H
I G
H T
(H
H
MAINTENANCE STAND
IN TILTED-DOWN
POSITION
SIE BOX
WINCH MOUNT
CONCRETE
FOUNDATION
SEE DETAIL 2
UNIT
VS
RVR
CL
20"
(2 PLACES)
TOP OF PIPE TO
BE SET LEVEL
GRADE
M I N
M A
X
POLE IN LOWERED
POSITION
FRONT ELEVATION SIDE ELEVATION
36" 9"
3" SCHEDULE 80, PVC PIPE
(2 PLACES)
18"
3"
8" X 12" X 36" CONCRETE PAD (2 PLACES)
3" SCHEDULE 80, PVC "TEES"
3" SCHEDULE 80, 90° PVC ELBOW
(4) #3’s
(4) #3 TIES @ EQ. SPA.
FORK ASSEMBLY
VS TRANSMITTER
LIR POLE AND SIE BOX SUPPORT
L
POLE MAINTENANCE AREA DETAIL
SCALE: NONE
POLE MAINTENANCE STAND DETAIL
SCALE: NONE
S003 S003
LIR POLE MISC. DETAILS
NOTES
ELEVATION
CENTERLINE
RUNWAY GRADE
FINISH
(GFM) (6 1/4" OD),
VS (LIR) POLE
SIE BOX
SEE DWG S001
FOR FOUNDATION
POLE
C VS (LIR)
MG-20 LIR POLE
CIVIL DRAWING C002
CRUSHED STONE SEE
FINISHED GRADE
CRUSHED ROCK
TRUE EAST
(FACING TRUE NORTH ONLY)
VS RECEIVER
S
O
T E
FROM SUPPLIER OF POLE AS REQUIRED.
RVR POLES AT DESIGNATED SITES. TILT DEVICE IS TO BE PROCURED
4. ONE WINCH MOUNTED TILT DEVICE SHALL BE PROVIDED TO SERVICE ALL
3. ONE MAINTENANCE STAND SHALL BE PROVIDED FOR EACH POLE.
PREVENT DAMAGE TO THE LOW IMPACT RESISTANT FIBERGLASS POLE.
2. CARE SHALL BE EXERCISED WHILE SERVICING THE LOWERED POLE TO
HEIGHT OF TRANSMITTER/RECEIVER. SEE NOTE 10, S002.
PERPENDICULAR TO THE RUNWAY CENTERLINE. THEN DETERMINE
AND RUNWAY CENTERLINE AT A POINT AT WHICH THE RVR IS
1. CONTRACTOR SHALL SURVEY TOP HEIGHT OF RVR FOUNDATION
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
F
IL
E
D
A T
E
T
IM
E
N
A M
E
ORL-D-RVR07-
NAME:
SIGNATURE:
STRUCTURAL
DATE:
DISCIPLINE:
Tel. No. (678) 808-8800 Fax. (678) 808-8400
Suite 900 Atlanta, Georgia 30328
400 Northpark Town Center, 1000 Abernathy Road, N.E.
RANDY W. PRESNELL, P.E.
PROJECT ENGINEER MGR: ENGINEER - CENTER A
NAVAIDS
ENGINEERING SERVICES
FL
RVR
RUNWAY 07
PC-BASED RVR SYSTEM TOUCHDOWN
66213FLORIDA REG. #
MATERIAL:
CAUTION: 3.
INFO:
CAUTION: 2.
CAUTION: 1.
LIR POLE: FILAMENT WOUND GLASS REINFORCED PLASTIC.
6 IN. I.D. (LIR) POLES: HANDLE WITH CARE.
TEL: (814) 868-3611
FUSOR 304 - MANUFACTURED BY: LORD CORPORATION, ERIE, PENNSYLVANIA
REDUCE CURE TIME. FOLLOW MANUFACTURER’S RECOMMENDATIONS.
TEMPERATURE AND CURE TIME. INCREASE TEMPERATURE CAN
BOND STRENGTH IS SENSITIVE TO SURFACE PREPARATION
BONDING INVOLVES USE OF CHEMICALS. FOLLOW MANUFACTURER’S PRECAUTIONS.
STAND PLATE
LIR POLE
SEE FIGURE NO 4
LIFTING BAR
ANCHOR BOLTS
STAND PLATE
PIVOT ROD
ANCHOR BOLT
0.035"
0.050"
3/32" DIA
6"
6"
FIGURE 4
(FOR INSTALLATION OF TUBE CAP)
FIGURE 3
SECTION A-A
6061-T6 ALUMINUM TUBING
3 1/2"
7"
5"
2" 2"
6061-T6 ALUMINUM PLATE
1" THICK
5" 3B
3A
LIR POLE
FIGURE 1
FIGURE 2
ANODIZED ALUMINUM (6061-T6)
(GFM)
ROUGHEN ID
ROUGHEN OD
20’-0"+/-1/8"
10"+/-1/8"
5.980" +.000"
-.010"
A-A
NOT TO SCALE
A-A
1/4"
3B 3A
TO FIT TUBE CAP
(IF NECESSARY)
SAND INSIDE SURFACE
IMPORTANT)
TO MOUNTING STAND NOT
(ORIENTATION OF SLOTS
CUT (4) SLOTS-90°APART
(4 PLACES)
ADH (OR EQUAL)
RTV11B SILICONE
FILL HOLE WITH
FOR WIRING)
(FOR 1/2" FLEX CONDUIT FITTING
CENTERLINE OF TAPPED HOLES
(2) BOLTS
5/8"-11
FRAME
MOUNTING
+/-1/32"
1/16"
(2) HOLES
23/32" TAP
1/2"-14 NPT
(4) HOLES
11/16" DIA
S004
NOTES
ASSEMBLY INSTRUCTIONS
S004
S004
MG-20 POLE AND STAND
.000"
6" ID+/- .005"
AND BASE.
3. RAISE MG-20 LIR POLE TO VERTICAL POSITION. LEVEL AND PLUMB LIR POLE
FASTEN WITH HEX NUTS. NOTE POSITION OF TAPPED HOLES IN STAND PLATE.
STAND PLATE (BOTTOM OF POLE) OVER (4) 5/8" STUDS IN MTG. STAND AND
STAND ASSEMBLY AND PIVOT INNER SECTION UP TO VERTICAL POSITION. PLACE
LEVEL. FASTEN WITH (4) 3/4" NUTS. REMOVE (2) 5/8" BOLTS AT REAR OF MTG.
ASSEMBLY SHOWN IN FIG. 3, SET MOUNTING STAND ON ANCHOR BOLTS, SHIM TO
(SEE FIG. 1). ELECTRICAL WORK NOT SHOWN HERE. USING MOUNTING STAND
IMPORTANT - ALL LIR POLES ARE TO BE ASSEMBLED IN HORIZONTAL POSITION
2. ASSEMBLY INSTRUCTIONS:
CURE 48 HOURS AT ROOM TEMPERATURE ABOVE 65 DEGREES (F).
SLOWLY SLIDE TUBE ONTO STAND PLATE WHILE ROTATING IT TO EXCLUDE AIR.
ON BOTH THE SURFACES TO BE BONDED.
FOR EACH JOINT TO BE BONDED, SPREAD A LIGHT COAT OF MIXED ADHESIVE
RESIN AND 304-2 HARDENER, STIR THOROUGHLY BUT AVOID AIR INCLUSION.
(TRICHLOROETHYLENE OR ACETONE). MIX EQUAL PARTS OF FUSOR 304-1 EPOXY
USING EMERY CLOTH, CLEAN ROUGHEN SURFACES THOROUGHLY WITH A SOLVENT
FOR BONDING - ROUGHEN SURFACES TO BE BONDED, AS SHOWN IN FIG. 1.
SHALL BE AT RIGHT ANGLE TO POLE AXIS. DEBUR SAW CUT EDGES WITH A FILE.
A TABLE SAW WITH A DIAMOND OR CARBIDE ABRASIVE BLADE. ALL SAW CUTS
FOR CUTTING (SEE FIG. 1 AND 2) - CUT POLE LENGTH AS REQUIRED, USING
1. CUTTING OR BONDING INSTRUCTIONS:
(CONTRACTOR PROVIDED)
(CONTRACTOR PROVIDED)(CONTRACTOR PROVIDED)
(CONTRACTOR PROVIDED)
(CONTRACTOR PROVIDED)
(CONTRACTOR PROVIDED)
N O T E
(S
EE
AS
S
EM
B
LY
IN
S T R
U C T
IO
N S
(P O
LE)
C U T -L
EN
G T
H L
STAND PLATE DETAIL
S004 NOT TO SCALE
FIELD CUT SLOTS AND HOLES DETAIL
(11) 5/8" BOLTS
AND STORE)
USE, DISCONNECT LIFTING BAR
DEVICE WITH LIFTING BAR AFTER
12 FT MAY REQUIRE USE OF TILT
LOWERED BY HAND. (POLE ABOVE
MG-20 POLE MAY BE RAISED AND
NOTE:
MG-20 MOUNTING STAND DETAIL
20 FT POLE DETAIL
(SEE NOTE 5)
3 1/2" DIA HOLE
6. GOVERNMENT FURNISHED MG-20 MOUNTING STAND COMES PRE-ASSEMBLED.
DEBUR AND SMOOTH EDGES.
5. DRILL A 3 1/2" DIAMETER HOLE IN CENTER OF STAND PLATE.
UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL PROVIDE BONDING GLUE SPECIFIED BY POLE MANUFACTURER
BOOK (TI-6850.77).
3. LIR STRUCTURE SHALL BE MAINTAINED PER MANUFACTURER’S INSTRUCTION
2. BASE OF LIR STRUCTURE SHALL BE GROUNDED ELECTRICALLY IN FIELD.
CURED IN A SUITABLE WORK AREA ACCORDING TO THE ABOVE INSTRUCTIONS.
1. LIR STRUCTURE SHALL BE ACCURATELY CUT, BONDED, AND PROPERLY
LIR POLE ASSEMBLY AND MOUNTING STAND DETAILS
S004
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
F
IL
E
D
A T
E
T
IM
E
N
A M
E
ORL-D-RVR07-
NAME:
SIGNATURE:
STRUCTURAL
DATE:
DISCIPLINE:
Tel. No. (678) 808-8800 Fax. (678) 808-8400
Suite 900 Atlanta, Georgia 30328
400 Northpark Town Center, 1000 Abernathy Road, N.E.
RANDY W. PRESNELL, P.E.
PROJECT ENGINEER MGR: ENGINEER - CENTER A
NAVAIDS
ENGINEERING SERVICES
FL
RVR
RUNWAY 07
PC-BASED RVR SYSTEM TOUCHDOWN
66213FLORIDA REG. #
| orl-d-rvr07-g000 |
| orl-d-rvr07-g001 |
| orl-d-rvr07-g002 |
| orl-d-rvr07-g006 |
| orl-d-rvr07-g010 |
| orl-d-rvr07-g011 |
| orl-d-rvr07-g045 |
| orl-d-rvr07-c001 |
| orl-d-rvr07-c002 |
| orl-d-rvr07-c003 |
| orl-d-rvr07-d001 |
| orl-d-rvr07-e001 |
| orl-d-rvr07-e002 |
| orl-d-rvr07-e003 |
| orl-d-rvr07-e004 |
| orl-d-rvr07-e005 |
| orl-d-rvr07-e006 |
| orl-d-rvr07-e007 |
| orl-d-rvr07-e008 |
| ORL-D-RVR07-S001 |
| ORL-D-RVR07-S002 |
| ORL-D-RVR07-S003 |
| ORL-D-RVR07-S004 |
File details come from the government source that posted it. Updated .