This document provides details on a federal contract opportunity for replacing an air handling unit. The solicitation number is 36C24923B0006 to replace Air Handling Unit (AHU) #23 under Project 626-20-201. The opportunity is being offered by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. The opportunity type is a solicitation to replace AHU #23. No other details are provided on response dates, pricing terms, set asides, or incumbent. The attached file references drawings but does not provide further context on the requirements or work scope.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24923B0006 0003.docx | DOCX document | |
| 36C24923B0006 0002.docx | DOCX document | |
| 36C24923B0006 0001.docx | DOCX document | |
| Contractor EMR Certification Form.docx | DOCX document | |
| COVID Language_Updated 12-14-2021.docx | DOCX document | |
| RFI Form.docx | DOCX document | |
| Specifications Project_626-20-201 AHU 23.pdf | ||
| DUNS _ TAX ID.docx | DOCX document | |
| Wage Determination TN20220178 12-23-2022.pdf | ||
| 36C24923B0006_2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY
AGREEMENT BETWEEN THE COR AND CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DRAWINGS FOR SPECIFIC PRODUCTS. DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE.
THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE
OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE
CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR
GREATER QUANTITY OF WORK.
5. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE DRAWINGS AND SPECIFICATIONS.
6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT, FOR EACH PHASE.
SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD CONDITIONS, NOTIFY THE COR PRIOR TO PROCEEDING WITH
THE WORK.
7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT
ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.
8. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10. REFER TO ALL OTHER TRADE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THIS PROJECT.
11. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS: PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS REQUIRED FOR COMPLETION OF THE WORK.
12. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED FACE OF EXISTING WALL SURFACE.
13. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT PORTRAY FULL SCOPE OF THE
PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO PROCEEDING WITH NEW
CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS. COORDINATE WITH COR.
4. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, FOR ADDITION AND RENOVATION PROJECTS: THE CONSTRUCTION AND ASSEMBLY OF THE PATCH OR REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT EXISTING CONSTRUCTION, FOR FIRE RATING, MATERIALS, FINISH, THICKNESS, AND QUALITY.
5. COORDINATE WORKING HOURS ALLOWED FOR DEMOLITION AND WASTE REMOVAL WITH COR.
6. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH EXISTING.
7. CONTRACTOR SHALL PROTECT AREA ADJACENT TO THE DEMOTION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES, (IF DAMAGED REPAIR, RE-PATCH, SAND SMOOTH AND REFINISH TO MATCH EXISTING.) REPAIR OR REPLACE ITEMS DAMAGED DURING
CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST.
8. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE COMPLETION OF THE PROJECT.
9. DO NOT ENCROACH ON ADJACENT OCCUPIED AREAS NOT IDENTIFIED WITHIN THE SCOPE OF WORK.
10. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF ELECTRICAL SYSTEMS.
11. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW, OR OUTSIDE THE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS AND PATCH
THE SAME AS A PART OF THE SCOPE OF THE PROJECT.
12. ALL ITEMS TO BE TEMPORARILY REMOVED TO ACCOMMODATE INSTALLATION OF NEW WORK BY OTHER TRADES (INCLUDING, BUT NOT LIMITED TO ACOUSTICAL TILE AND CEILING MOUNTED DEVICES) SHALL BE CAREFULLY REMOVED AND REINSTALLED TO IT'S ORIGINAL AND OPERATIONAL STATE, FOLLOWING THE COMPLETION OF THE WORK. CONTRACTOR SHALL REPAIR OR REPLACE DAMAGED ITEMS AND EXISTING AREAS DURING CONSTRUCTION ACTIVITIES TO MATCH EXISTING CONDITION AT NO ADDITIONAL COST.
13. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERING FROM THOSE INDICATED OR THAT ARE NOT IDENTIFIED, SHALL BE REPORTED TO THE COR.
14. AFTER REMOVAL OF EXISTING SOLID CONCRETE MASONRY WALL, FILL FLOOR VOIDS UP TO FINISH CONCRETE LEVEL AND PERFORM
FLOOR LEVELING FOR ENTIRE AREA OF RENOVATION.|
15. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR AND ARCHITECT OF ANY CONFLICTS PRIOR TO PROCEEDING
WITH DEMOLITION.
16. ALL ITEMS BEING SALVAGED OR REMOVED SHALL REMAIN THE PROPERTY OF THE COR UNTIL CONFIRMATION HAS BEEN MADE AS TO WHETHER THE COR WILL RETAIN SUCH ITEMS. ALL ITEMS NOT BEING SALVAGED BY THE VA TO BE REMOVED AND DISPOSED OF BY THE
CONTRACTOR IN APPROVED MANNER.
17. CONTRACTOR SHALL NOTIFY COR OF ANY AREA REQUIRING DEMOLITION OTHER THAN SHOWN IN THESE DRAWINGS DUE TO UNFORSEEN CONDITIONS, TO ACCOMMODATE INSTALLATION OF ALL OTHER TRADES (INCLUDING ROOF PENETRATIONS). AFTER SUCH DEMOLITION AND
INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH EXISTING.
18. THE CONTRACTOR SHALL SCHEDULE AND COORDINATE WITH THE COR, THE USE OF THE CONSTRUCTION ACCESS ROUTE TO DUMPSTER
AREA AND FREIGHT ELEVATOR (AS REQUIRED) FOR WASTE REMOVAL.
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL
CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC
SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
0 4 8 16
DEMOLITION KEYNOTE WINDOW/LOUVER TYPE
ROOF PITCH SYMBOL
DOOR NUMBER
TYPICAL KEYNOTE CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
1##
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
/2 /2
:1
:3
P M
C U s e rs \a p u lle n
\D o c u m e n ts
\A
-3
-Q
-V A
N a s h v ill e -R e p la c e
A H
U
-T N a p u lle n V
D X
T .r v t
G-001
COVER, ARCHITECTURAL SYMBOLS,
AND NOTES
1 4LB
REPLACE AIR HANDLING
UNIT #23
VA Tennessee Valley Healthcare System 1310 24th Avenue South
Nashville, TN 37212 AUGUST 27, 2021
100% CONSTRUCTION DOCUMENTS
626-20-20120-326
REPLACE AIR HANDLING UNIT #23
VA Tennessee Valley Healthcare System 1310 24th Avenue South Nashville, TN 37212
VA PROJECT #: 626-20-201
KK
DRAWING LIST
GENERAL
G-001 COVER, ARCHITECTURAL SYMBOLS, AND NOTES 1 4
G-100 SITE LOGISTICS PLAN 2 4
G-101 ICRA NOTES AND DETAILS 3 4
G-102 BASEMENT PLAN - CONSTRUCTION ACCESS ROUTE 4 4
ARCHITECTURAL
A-101 FAN ROOM #6 DEMOLITION AND NEW WORK PLANS 1 1
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 10
MD101 SECOND FLOOR WEST MECHANICAL DEMOLITION PLAN 2 10
MD102 SECOND FLOOR EAST MECHANICAL DEMOLITION PLAN 3 10
MD103 PENTHOUSE MECHANICAL DEMOLITION PLAN 4 10
M-101 SECOND FLOOR WEST MECHANICAL PLAN 5 10
M-102 SECOND FLOOR EAST MECHANICAL PLAN 6 10
M-103 PENTHOUSE MECHANICAL PLAN 7 10
M-501 MECHANICAL DETAILS 8 10
M-503 MECHANICAL CONTROLS 9 10
M-601 MECHANICAL SCHEDULES 10 10
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 6
ED101 PENTHOUSE ELECTRICAL DEMOLITION PLAN 2 6
EP101 PENTHOUSE POWER PLAN 3 6
EP102 SECOND FLOOR NORTH POWER PLAN 4 6
EP103 SECOND FLOOR SOUTH POWER PLAN 5 6
E-601 ELECTRICAL SCHEDULES 6 6
GENERAL NOTES DEMOLITION NOTES
GENERAL SYMBOL LEGEND ARCHITECTURAL SYMBOL LEGEND
PROJECT LOCATIONPROJECT AREA
11811
KO
RLA K . KUDJ IKU
CHARLOTTE , NORTH CAROL
I N
ANOR T H C A R O L I N
A
RE
G I
STERED ARCH ITECT
T
H A
V E
S
HIGHLAND AVE
PIERCE AVE
GARLAND AVE
T
H A
V E
S
SITE LOGISTICS LEGEND
BUILDING IN CONTRACT
EXISTING BUILDINGS
AREA OF WORK
PROPOSED STAGING AREA
A. CONTRACTOR SHALL PROVIDE TEMPORARY
ENTRANCES AND STAIR TOWERS TO PROVIDE
CONSTRUCTION ACCESS TO FAN ROOM
CONSTRUCTION AREA.
B. CONTRACTOR TO ENSURE THAT TEMPORARY
ENTRANCES AND PROTECTIVE MEASURES
COMPLY WITH ALL OSHA REQUIREMENTS.
CONTRACTOR WILL BE RESPONSIBLE FOR
DESIGN AND ENGINEERING OF TEMPORARY
ENTRANCES AND PROTECTIVE MEASURES.
C. CONTRACTOR SHALL BE REQUIRED TO INSPECT
ALL TEMPORARY ENTRANCES AND PROTECTIVE
MEASURES DAILY TO ENSURE THEY ARE SAFE
AND COMPLY WITH OSHA REQUIREMENTS.
D. CONTRACTOR SHALL REPAIR ALL AREAS
DAMAGED OR DISTURBED DURING
CONSTRUCTION. THIS INCLUDES BUILDING
FINISHES, EXTERIOR OR INTERIOR, ROOFING
SYSTEM AND ROOFTOP EQUIPMENT, LANDSCAPE,
SIDEWALKS, PAVING OR ANY AREA DAMAGED BY
THE CONSTRUCTION WORK. RESTORE AREAS TO
ORIGINAL CONDITION.
E. DUMPSTER AND TRASH CHUTE LOCATIONS ARE
TO BE COORDINATED WITH THE COR PRIOR TO
LOCATION ON SITE.
F. CONTRACTOR SHALL PROTECT THE LANDSCAPE
SPRINKLER SYSTEM IN CONSTRUCTION LAY
DOWN ARE FROM DAMAGE. CAP ALL HEADS IN
THIS AREA DURING THE CONSTRUCTION PERIOD.
RESTORE SPRINKLER SYSTEM TO FULL
OPERATION AT END OF CONSTRUCTION.
G. CONTRACTOR SHALL PREPARE A PLAN OF THE
LAY DOWN/SECURITY FENCE AREA WITH
LOCATION ALL ELEMENTS INCLUDING DUMPSTER
AND TRASH CHUTE/COLLECTION AREA, TO BE
APPROVED BY COR.
H. CONTRACTOR TO ENSURE THE CONSTRUCTION
FENCED AREA IS LOCKED/SECURED DURING ALL
PERIODS WHEN CONSTRUCTION WORK IS NOT
BEING PERFORMED.
I. CONTRACTOR SHALL COORDINATE ANY WORK
THAT PRODUCES EXCESSIVE NOISE. TO BE
PERFORMED DURING OFF HOURS, COORDINATE
THIS WORK WITH COR.
J. CONTRACTOR SHALL RESTORE ALL
LANDSCAPING, HARDSCAPING AND SITE
ELEMENTS TO THE ORIGINAL CONDITION AT THE
COMPLETION OF CONSTRUCTION. CONTRACTOR
WILL PHOTOGRAPH AND DOCUMENT EXISTING
CONDITIONS PRIOR TO INSTALLING FENCING,
TEMPORARY ENTRANCES OR STARTING ANY
CONSTRUCTION WORK.
K. EXISITING ROOF FRAMING/STRUCTURE TO BE
EVALUATED BY STRUCTURAL ENGINEER TO
VERIFY ADEQUATE CAPACITY TO SUPPORT
ADDITIONAL LOADS TO BE IMPOSED BY STAGING
ACTIVITIES. CONTRACTOR TO PROTECT ENTIRE
ROOFING SYSTEM, AND ROOFTOP EQUIPMENT
FROM DAMAGE. ANY DAMAGED/ DISTURBED
ITEMS/ SYSTEMS SHALL BE REPLACED/
RESTORED TO IT'S ORIGINAL CONDITION.
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2 /2
:1
:5
P M
C U s e rs \a p u lle n
\D o c u m e n ts
\A
-3
-Q
-V A
N a s h v ill e -R e p la c e
A H
U
-T N a p u lle n V
D X
T .r v t
G-100
SITE LOGISTICS PLAN
2 4LB
REPLACE AIR HANDLING
UNIT #23
VA Tennessee Valley Healthcare System 1310 24th Avenue South
Nashville, TN 37212 AUGUST 27, 2021
100% CONSTRUCTION DOCUMENTS
626-20-20120-326
KK
Scale: 1" = 80'-0"
SITE LOGISTICS PLAN
NORTH
0 4 8 16
1 APPROXIMATE CONSTRUCTION FENCE ROUTE.
2 PRIMARY CONSTRUCTION ENTRANCE.
3 PROPOSED ROOF STAGING AREA TO BE
APPROVED BY COR.
4 CONSTRUCTION LAY-DOWN AREA. ALL
MATERIAL STORAGE, TRAILERS, EQUIPMENT,
AND PORTABLE TOILETS SHALL BE PLACED IN
THIS AREA WITH COR APPROVAL.
5 TEMPORARY LAY-DOWN AREA FOR
RECEIVING/INSTALLING/REMOVING
TEMPORARY AHU ON WEEKENDS ONLY. ROAD
TO REMAIN UNOBSTRUCTED OTHERWISE.
6 CONSTRUCTION FENCE SHOULD BE CLEAR OF
FIRE LANE.
7 CONSTRUCTION ACCESS ROUTE.
8 LOADING DOCK.
9 STAIR #1.
10 ELEVATOR MACHINE ROOM.
11 IF REQUIRED, PORTABLE TOILET LOCATION TO
APPROVED BY COR.
11811
KO
RLA K . KUDJ IKU
CHARLOTTE , NORTH CAROL
I N
ANOR T H C A R O L I N
A
RE
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS
FOR CONSTRUCTION AND RENOVATION
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H E
IG
H
T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
3 5/8" INSULATED WALL WITH
16 GAUGE METAL STUDS @
16" O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
4 7/8"
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
/2
4 7/8"
3 5/8" 16 GAUGE METAL
STUDS @ 16" O.C. WALL TO
EXTEND TO UNDERSIDE OF
DECK
A B
3 5/8" INSULATED WALL WITH
16 GAUGE METAL STUDS @
16" O.C. (2) LAYERS 5/8"
GYPSUM BOARD EACH SIDE.
WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
6 1/8"
C
FIRE RESISTANT SEALANT,
BOTH SIDES
FIRE RESISTANT SEALANT,
BOTH SIDES
FIRE RESISTANT SEALANT,
BOTH SIDES
1-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U404
SMOKE RATED 2-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U404
HEPA
NEGATIVE AIR
UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE
EXISTING WINDOW TO
BE RE-INSTALLED
AFTER CONSTRUCTION
IS COMPLETE.
V .I
.F
V .I
.F
V.I.F.
V .I .F
E X
IS
T
IN
G
W A
L L
V .I .F
E X
IS
T
IN
G
W A
L L
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY
MATS (CHANGED END
OF SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
SUPPLY DUCTS
EITHER KEEP
RUNNING OR COVER
WHEN RUNNING TO
KEEP DUST OUT
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
F L E
X D
U C
T
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL
STATION WITH
AUDIO / VISUAL
G-101
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
FOR RENOVATION REPLACE AIR HANDLING UNIT #23
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE
DESIGNATION FOR THIS PROJECT IS LEVEL III FOR THE CLASS OF
PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES. HARD
SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON
THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA
FROM NON-WORK AREA AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND
ACTIVE.
1A. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES
(PROVIDE AND LOCATE A STAGING AREA FOR HAZMAT SUITS NEAR THE
PLASTIC BARRIER ENTRANCE SPACES - CONSTRUCTION ANTEROOM. THEY
SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND LEAVING THE
CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS SHALL BE
MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS.
ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE
CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION
PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE
SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY
DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.
2. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER
ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR
MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS
INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS
CONTROL
3. USE CORRIDORS CB-1A, CB-10A, CB-16, CB-16C, CB-16E, CB-17, AND
CB-18 AS PRIMARY CONSTRUCTION ACCESS.
3A. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES
SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;
DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED TIMES; AND
ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE
CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC
AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.
4. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION
MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED;
THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND
THE CONSTRUCTION STAGING/PREP AREA.
4A. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH
TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES.
EFFORTS SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN
EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.
DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC.
IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY
PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE
USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE.
FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT
OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR.
4B. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE
INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.
4C. ALL EQUIPMENT REMAIN IN THE ORs AND ASSOCIATED ROOMS SHALL
BE COVERED AND PROTECTED PRIOR STARTING EACH CONSTRUCTION
PHASE.
VENTILATION AND ENVIRONMENTAL CONTROLS
5. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE
CONTRACTOR WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE
OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS
COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW
FROM CLEAN TO DIRTY AREAS.
5A. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA
SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO
DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE
AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL
PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER
CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE
(FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY
VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A
PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST TO
PREVENT CONTAMINATION OF THE DUCTS.
5B. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND
INTACT CEILING SHALL BE VERIFIED DAILY.
5C. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND
CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL
AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-
CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA
ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE
PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED
AREAS
6. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE
FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION
AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G., COVERALLS, FOOTGEAR
AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO REMOVE
DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE
APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR
ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT
(DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS
TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM
DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR
REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.
6A. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL
HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION SITE,
VA EMS STAFF HAS DONE A TERMINAL CLEANING, AND VA INFECTIOUS
DISEASE CONTROL HAS INSPECTED AND APPROVED THE CLEANING.
ICRA NOTES
III/IVLOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
II
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 IV
IV
IV
III/IV
III/IV
III
III/IV
I
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete ceiling system
- new construction
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet
- painting (but not sanding), wall covering
- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
- Therapy areas
- Respiratory Therapy
- Outpatient Clinics
- CBOC's
- Mental Health Units
- VACANT AREA ADJACENT TO
OCCUPIED AREA
- Office areas (non-clinical)
- Hallways
- FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
- Pharmacy
- Radiology/ CT Scanner
- Urgent Care
- Laboratories
- CLCs
- SPD; AMCU;
- Respiratory Isolation Rooms
- Surgery
III
TYPE DTYPE CTYPE B
Class IV or control procedures are necessary.
C
LA
S S
IV
C
LA
S
S
II
During Construction Project
C L-
I C
LA
S
S
II
I
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant after barriers are removed.
6. Remove or isolate HVAC system in areas where work was being performed.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work with HEPA-filtered vacuums.
5. Wet mop with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
1. Wipe surfaces to remove dust.
Upon Completion of Project
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
4. Complete all critical barriers before construction begins or implement control cube method.
5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.
6. Contain construction waste before transport in tightly covered containers.
7. Cover transport receptacles or carts. Tape covers.
8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.
9. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
1. Includes all activities required by Class I
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Seal holes, pipes, conduits, and punctures appropriately.
7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
9. Place adhesive walk-off mats at entrance to work area within anteroom.
10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.
11. Cover transport receptacles or carts. Tape covering
12. Vacuum work area with HEPA filtered vacuums.
13. Wet mop with disinfectant after barriers are removed.
14. Remove isolation of HVAC system in areas where work is being performed.
A P
P R
O X
A .F
.F
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2 /2
:1
:5
P M
C U s e rs \a p u lle n
\D o c u m e n ts
\A
-3
-Q
-V A
N a s h v ill e -R e p la c e
A H
U
-T N a p u lle n V
D X
T .r v t
G-101
ICRA NOTES AND DETAILS
3 4LB
REPLACE AIR HANDLING
UNIT #23
VA Tennessee Valley Healthcare System 1310 24th Avenue South
Nashville, TN 37212 AUGUST 27, 2021
100% CONSTRUCTION DOCUMENTS
626-20-20120-326
KK
Scale: 1/2" = 1'-0"
ICRA MOBILE CONTAINMENT CART
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPE
Scale: 1/2" = 1'-0"
CROSS SECTION "A"
Scale: 1/2" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
Scale: 3" = 1'-0"
ILSM CONSTRUCTION EGRESS SIGNAGE
Scale: 1/2" = 1'-0"
ROOM ELEVATION
11811
KO
RLA K . KUDJ IKU
CHARLOTTE , NORTH CAROL
I N
ANOR T H C A R O L I N
A
RE
AREAWAY
STAIR
SPECIMEN RECEIVING
TUBE
STA
HI STO L AB
URIN-
ANALYSIS
HEMATOLOGY
P&H STORAGE
(11'x24')
HAZZARD WASTE
(8'x12')
NO 9
CR AWL SPAC E
WAITING SPACE
CB-14A
STRETCHER ALCOVE
CB-24A
TOILET
E-18B
OTHER
F-7C
TELEPHONE CLOSET
F-2A
HONEYWELL RM
D-72
TOILET
LINEN
D-23
DRESS
D-53A
DRESS
D-54A
TOILET
D-53B
TOILET
D-54B
TOILET
D-51B
TOILET
D-52B
DRESS
D-52A
DRESS
D-51A
CLOSET
C-04A
BD
ELECTRICAL
CLOSET
D-30
TELE CLOSET
C-07E
BC
ELECTRICAL
CLOSET
C-07D
ELECTRICAL CLOSET
C-07C
CLOSET
MALE
TOILET
C-08D
FEMALE TOILET
C-08B
FEMALE STAFF TOILET
G-51
FEMALE STAFF TOILET
G-55
CLOSET
G-46
CLOSET
G-08A
ELECTRICAL CLOSET
A-22A
ELECTRICAL CLOSET
BB
FROZEN
SECTION
G-18 B-A118
PEST
CONTROL
WORK RM
E-18A
PETT SCAN
D-40
CORRIDOR
CB-23
OFFICE
F-11A
ELEVATOR LOBBY
CB-F1
CORRIDOR
CB-4
SWITCH GEAR
E-11
BSLE LAB
D-12D
CORRIDOR
CB-12
AREAWAY
CORRIDOR
CB-15
CORRIDOR
CB-13
BOILER RM
E-25F
CORRIDOR
CB-9C
CORRIDOR
CB-3
SCRUB
UP
ALCOVE
CB-3C
CLEAN CORE
CB-3
CLEAN CORE
CB-3
FAN RM - 4
B-B105
MECH
RM
AHU-26
FAN RM 11
HEART
POS RM
C-07I
CLEAN
ALCOVE
C-07
MED
PREP
C-07A
POS RM
C-07J
POS RM
C-07K
NEG RM
C-07L
OFFICE
C-07M
STORAGE ALCOVE
SPD
C-07N
NEG RM
C-07O
BARIATRIC NEG RM
C-07P
STORAGE ALCOVE
SHOWER / TOILET
C-07Q
NEG RM
C-07R
POS RM
C-07S
POS RM
C-07T
POS RM
C-07U
BARIATRIC POS RM
C-07V
EMERGENCY GENERATOR
B-G124B
FAN RM 5
B-G124
ELECTRICAL
B-G124A
MECH EQUIP
F-10
CORRIDOR
CB-14
RECEIVING AND SHIPPING DOCK
CORRIDOR
CB-18
STORAGE
E-23
STORAGE
E-23A
RECEIVING & ISSUE
AREA EQUIP STORAGE
FORMS STORAGE
E-22
CORRIDOR
CB-17
OFFICE
E-09A
STAFF
TOILET
E-08
BREAK SHOP
D-68C
E-10
E-10A
MAIL RM
E-14
ELEVATOR EQUIP
E-13
CORRIDOR
CB-16
CORRIDOR
CB-16B
CORRIDOR
D-26
CORRIDOR
CB-20
CORRIDOR
CB-19
STORAGE
D-13
FILTER STORAGE
F-6A
STORAGE
F-5
RAID STORAGE
F-4
DUCT SHAFT
OFFICE
F-3
ELECTRICAL CLOSET
F-2
JANITOR CLOSET
F-1
VACANT
HOUSE
KEEPING
F-6
VIEWING RM
F-6B
GROUP RM
F-6A
STORAGE
F-9C
TOILET
D-16
BIOMED SHOP
D-15
CONTROL RM
F-11B
F-11
COMPRESSOR RM
F-12
CLOSET
F-12A
MECH EQUIP
CRAWL SPACE
F-8
TRANSFORMER RM
F-14
SWITCH BOARD
F-13
SHOP
F-9
PIT
OFFICE
F-9A CB-F4
STORAGE
F-9B
STORAGE
D-14
CORRIDOR
CB-24
CORRIDOR
CB-24
CORRIDOR
CB-11
CYTO LAB
D-05
CORRIDOR
CB-10
CORRIDOR
CB-9D
CORRIDOR
CB-9
CORRIDOR
CB-16E
CORRIDOR
CB-16C
CORRIDOR
CB-16A
MECH
E-5
BIOMED ENG
REPAIRING &
DEVELOPMENT
E-01
CONTROL RM
D-18CATH LAB 1
D-17
ELECTRICAL SHOP STORAGE
D-68A
ELECTRONICS
D-68B
KEY SHOP
D-69
MULTI PURPOSE
E-09E
OFFICE
E-11A
VESTIBULE
E-09
TOILET
E-12
ELEVATOR
P-9
EQUIP RM
E-19
OFFICE
E-22A
MED GAS
E-21
MED GAS
E-20
PEST
CONTROL
OFFICE
E-18ELECTRICAL
E-17
OFFICE
E-14A
SIGNAL
E-15
SIGNAL
E-16
SVC RM
E-26
GROUNDS EQUIP
E-25
CLOSET
E-25A
BOILER OPERATOR
E-25E
A/C
OPERATIONS
SHOP
E-25B
FIRE EXT
FLAM
STORAGE
E-24
E-25C
GROUNDS & TRANS
E-25D
CORRIDOR
CB-19
CORRIDOR
CB-22
SICU
G-56
CORRIDOR
CB-9A
CORRIDOR
CB-1
ELEVATOR LOBBY
CB-1A
CORRIDOR
CB-24
CORRIDOR
CB-21
EQUIP STORAGE & TESTING
B-01
DISPATCH AREA
B-01A
DECONTAMINATION RM
B-02
PREPARATION,
ASSEMBLY &
STERILIZATION
B-02B
STERIS RM
B-01B
OFFICE
B-02A
OFFICE
B-01D
EQUIP
B-01C
MANUAL WASH
B-01E
VESTIBULE
CB-19A
EMERGENCY
GENERATOR RM
E-25G
STAIR
NO 8
EMERGENCY
GENERATOR RM
E-25H
CORRIDOR
CB-7
ELECTRICAL CLOSET
A-16
CORRIDOR
CB-8
SCRUB
CB-3B
CORRIDOR
CB-6A
STORAGE
CB-5
CORRIDOR
CB-6
FLOW CYTOMETRY
A-04
OFFICE
A-04A
STAIR
NO 2
OFFICE
A-04B
CORRIDOR
CB-6
EMBALMING
A-03
CHEMISTRY
A-17
BLOOD BANK
A-14
TOILET
C-02
SIGNAL CLOSET
C-01
WAITING
C-03
ELECTRICAL CLOSET
A-15 BA2
COMM
CLOSET
A-17A
OFFICE
A-14A
CENTRAL STORAGE
A-17G
FEMALE TOILET
A-06ELEVATOR EQUIP
A-05
ELEVATOR
S-1
AUTOPSY
A-02
A-01B A-01D
A-01C
CHEM
SUPER LEAD
TECH
A-17F
LEAD TECH
A-17E
LEAD TECH
A-17D
RESIDENTS
A-07
HAC
A-08
PATH CHIEF
A-09
HEMA SUPER
A-17C
FEMALE TOILET
A-10
FEMALE TOILET
A-11
MULTI PURPOSE
A-17B
MALE
TOILET
A-12
MALE
TOILET
A-13
OFFICE
D-06A
STAIR
F1
ELEVATOR
FS-1
ELEVATOR
FS-2
CATH LAB 2
D-19
FILM PROCESSING LAB
D-24
CORRIDOR
CB-12
WAITING
D-27G
RADIOGRAPHIC
FLUOROSCOPIC
D-54
MULTI PURPOSE
D-73A
ELECTRICAL ENG
D-70 OFFICE
D-71
STAIR
NO 6
STAFF
D-65B
STAFF
D-65A
WAITING
D-02
MALE TOILET
D-49
CONTROL RM
D-27D
RADIOGRAPHIC
FLUOROSCOPIC
RM
D-51
RADIOGRAPHIC
FLUOROSCOPIC
D-52
RADIOGRAPHIC
FLUOROSCOPIC
D-53
COMPUTER RM
D-57CONTROL
D-24A
CT RM
D-25
WAITING
D-27
FEMALE TOILET
D-27A
MICRO LAB
D-12
T C LAB
D-12E
GEN WASH
D-09
ELECTRICAL CLOSET
A-26
READING RM
D-04
STAIR
NO 4
CUTTING RM
D-05A
SAW RM
MULTI PURPOSE
D-05C
SCREENIING
D-06
FEMALE TOILET
D-07
MALE TOILET
D-08
BLK STORAGE
D-05D
MICRO OFFICE
D-05E
WORK RM
D-12C
ANTE RM
D-12B
OFFICE
D-12A
BD2
D-11
BD1
D-10
ELECTRICAL CLOSET
D-29
CT EXAM RM
D-28E
COMPUTER
D-27F
SCRUB/WORK AREA
D-24B
DARK RM
D-27E
CONTROL
D-51C
CONTROL
D-52C
DARK RM
D-22A
MAMMOGRAPHY
D-22
READING RM
D-21
VESTIBULE
D-20
HC TOILET
D-20A
HC TOILET
D-20B
LOUNGE/LOCKERS
D-58
CONTROL
D-53C
CONTROL
D-54C
HAC
D-55
STORAGE
D-56
CHEST RM
D-62
TOILET
D-63
TOILET
D-64
CONTROL RM
D-61
AUTOMATED
RADIOGRAPHIC
D-60
STORAGE
D-59
ELECTRIC SHOP
D-68
SWITCHBOARD RM
D-67
D-66
OFFICE
E-09B
OFFICE
E-09C
OFFICE
E-09D OFFICE
E-09F
OFFICE
E-09G
OFFICE
E-09H
BUSINESS RM
E-09I
OFFICE
E-09J
HEART
POS RM
C-07H
A/C SHOP
E-27
MAINT
FOREMAN
E-07
OFFICE
E-08
OFFICE
E-08A
A/C
FOREMAN
E-06
PAINT SHOP
E-05
CARPENTER SHOP
E-04
MACH
SHOP
E-03
ELECTRICAL CLOSET
BE
E-26A
PLUMBING SHOP
E-02
OFFICE
E-01C
BIOMEDICAL
ENGG
STORAGE
E-01B
RECEIVING
& CLEANING
E-01A
ELECTRICAL RM
B-01F
STAIR
NO 7
BLDG
MGT
LOCKERS
B-03
ELEVATOR
P-3
ELEVATOR
P-4
ELEVATOR
P-5
BLDG
MGT
TOILET
B-03A
VESTIBULE
CONSULT/
MEDITATION
C-03A
SOILED
C-07G
SOILED UTILITY
G-56A
RECOVERY STORAGE
G-56B
OFF LINE
MONITORING
G-47
ALCOVE
G-49
TELE
G-49C
ELECRICAL CLOSET SIGNAL
G-49B
CLEAN LINEN
G-56D
SIGNAL
G-49A
RECOVERY CLEAN UTILITY
G-56E
RECOVERY NURSE STATION
RECOVERY ISOLATION BEDROOM
G-54
G-53
ANTE RM
G-56C
RECOVERY ISOLATION BEDROOM
G-52
PACU
G-50
BATH
G-48A
ON CALL
G-48
STAIR
NO 10
HAC
G-43
OFFICE
C-09
FEMALE LOCKER
C-08A
MALE LOCKER
C-08C
STAFF
MULTIPURPOSE
C-08
OFFICE
C-07W
HAC
C-06
CLOSET
C-07B
HEART
POS RM
C-07F
CLEAN EQUIP /
SUPPLY
C-05
ELECTRICAL CLOSET
C-04
GAS STORAGE NURSE MGR
OFFICE
B-01Q
MALE
LOCKERS
B-01O
MALE
TOILET
B-01P
FEMALE TOILET
B-01N
FEMALE
LOCKERS
B-01M
HAC
B-01L
SPD
CHIEF &
ASSIST
B-01K
LOGISTICS
SUPV
B-01J
SPD ADMIN
B-01I
LOGISTICS
ITEM MGRS
B-01H
BREAKOUT AREA
B-01G
LOGISTICS
ITEM MGRS
B-06
ENGG TOILET
B-04A
ENGG
LOCKERS
B-04
HAC
B-05
OFFICE
D-73
OFFICE
D-74
STORAGE
D-74A
OFFICE
D-73D
OFFICE
D-73C
CLERICAL OFFICE
D-73B
STAFF
D-65C
STAFF
D-65D
STAFF
D-65E
RESIDENT/ INTERN
D-65F
CONFERENCE/ CLASS RM
D-65G
ADP
D-01
SIG
CLOSET
D-02G
CHIEF TECH
D-50
SVC CHIEF
D-65
SEC
D-65I
RECEPTION & SEC
D-65H
ELEVATOR
S-2
ELEVATOR
S-1
FEMALE TOILET
D-48
MALE
TOILET
D-27B
MRI
D-27C
READING RM
D-28B
OFFICE
D-28A
CONTROL
D-28
COMPUTER
D-28D
DARK RM
D-28C
TECH
D-03A
HOT LAB
D-40D
TREAT
D-40E
TREAT
D-40F
TOILET
D-40C
CTRL RM
D-40B
MULTI
VIEWING
D-41
MULTI
VIEWING
CB-12D D-42
STORAGE
CB-12C D-43
MULTI
VIEWING
D-44
MULTI
VIEWING
D-45
OFFICE
D-46
ADP
COORD
D-47
ELECTRICAL CLOSET
D-02F
OFFICE
D-02E
OFFICE
D-02D
GANTRY
D-40A
OFFICE
D-02C
OFFICE
D-02B
OFFICE
D-02A
ADP COMPUTER RM
D-03
FEC
ELEVATOR
P-8
OFFICE
A-19D
LAB SEC
A-19
TISSUE TYP
A-20
FLOW CYTO
A-20A
IMMUN LAB
A-21
RADIATION SAFETY
& EQUIP RM
A-25P
EXIST TELEPHONE EQUIP RM
LABORATORY-LOW LEVEL IN-VITRO COUNTING
A-25K
VIEWING/
CONFERENCE
A-25J
SEC
A-25H
CHIEF
A-25I
TELE
EQUIP
EXPANS
A-22
HOT LAB
A-25O
BIOCHEMISTRY LAB
A-25N
EXAM
A-25L
LABORATORY HIGH LEVEL IN-VITRO COUNTING
A-25M
ELECTRICAL CLOSET
A-25R
BA2
STORAGE
EQUIP STORAGE
A-25S
OFFICE
A-19E
OFFICE
A-19F
MULTI-PURPOSE
A-19A
OFFICE
A-18
OFFICE
A-19B
OFFICE
A-19C
ELECTRICAL CLOSET
A-27
COMPUTER RM
A-25U
NUCLEAR IMAGING
A-25T
STAFF TOILET
A-25W
EXAM RM
A-0V
WAITING RM
A-25X
RCPT
& FILES
A-25
FEMALE TOILET
A-25A
MALE TOILET
A-25B
OFFICE HOUSE STAFF
A-25C
STAFF
LOUNGE
A-25D
EXIST
FIRE
ALARM
PANELS
A-23
STAFF
NON-PHYSICIAN
OFFICE
A-25E
STAFF
PHYSICIAN
OFFICE
A-25F
STUDY
CUBICLES
A-25G
VEST
B-01R
ANEST
WORK RM
B-07
ANEST
EQUIP STOR
SCRUB-UP ALCOVE
G-33
EXT RAD
CONTROL
G-32
NEUROSURGERY O R 9
G-36
SUB STERILE
G-37
PUMP
TECHS
PREP RM
G-36A
CARDIAC OR 8
G-38
CORRIDOR
CB-2C
CORRIDOR
CB-2B
CORRIDOR
CB-2
CHIEF
G-08
OFFICE
G-11
FEMALE SHOWER
G-23B
DICTATING
G-23A
MALE LOCKERS
G-24B
MALE
TOILET &
SHOWER
G-24A
CLEAN
CORE
SUPPORT
G-34
ETO RM
B-02C
VESTIBULE
HAC
B-02F
TOILET
B-02D
TOILET
B-02E
STAIR
NO 1
ELEVATOR
P-6
ELEVATOR
P-7
FEMALE TOILET
G-23C
FEMALE
LOCKERS
G-23D
VESTIBULE
STAFF LOUNGE
G-23
PHYSICIAN LOUNGE
G-24
ORTHOPEDIC OR 7
G-39
OFFICE
G-28
SCRUB
UP
ALCOVE
G-29
SCRUB-UP ALCOVE
G-30
OFFICE
G-31
EQUIP
G-28A
SUB
STERILE
G-42
PLASTER
& SPLINTS
G-41
EQUIP
STORAGE
G-40
OPERATING
RM GENERAL
G-27
SUB STERILE
G-26A
OPERATING
RM GENERAL
G-26
GENERAL
OPERATING RM
G-25
SUB
STERILE
G-21A
OPERATING
RM GENERAL
G-21
OPERATING
RM GENERAL
G-19
SCRUB
SUB
STERILE
G-19A
REC & OR
HEAD NURSES
G-01
ELECTRICAL CLOSET
G-22
PHONE/SGNL RM
EXT RAD
CNTROLRM
G-20A
STORAGE
G-20B
INSTRUMENT & STERILE
G-20C
CYSTOSCOPY RM
G-20
HOLDING
G-17
OFFICE
G-02A
CLERICAL
G-02
OFFICE
G-02E
OFFICE
G-02D
OFFICE
G-02C
OFFICE
G-02B
CONTROL
G-03
DRESSING
& HOLDING
G-15
SEC
G-16
OFFICE
G-04
TOILET
G-15A
TOILET
G-15B
OFFICE
G-07
SEC
G-13
CONFERENCE RM
G-14
HAC
G-12
ELEVATOR LOBBY
CB-10A
ELEVATOR LOBBY
CB-16D
NUCLEAR
CARDIOLOGY
A-25Q
HAZ.
HAZ.
45 & 30 KVA
45 KVA
MENS RESTROOM WOMENS RESTROOM
45 KVA
150 KVA
30 KVA
HOUSE KEEPING
STORAGE
45 & 30 KVA
45 KVA 45 KVA
KVA
112.5 KVA
75 KVA
EQUIP
F-7A
PEN
D-19A
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
STRETCHER ALCOVE
WC
ALCOVE
STRETCHER ALCOVEWC
ALCOVE
STERILE STORAGE
30KVA
112.5 KVA
112.5 KVA
MULTI-PURPOSE
B-G127S
TLT
B-B101G
ALCOVE
B-G127V
C
LE
A N
S U
P P
LY
B \-G
7R
PV CV LAB #1
B-B101I
EPS CV LAB #2
B-G127J
CONTROL #1
B-B101J
CV LAB #3 (BID
ITEM 5)
B-B101O
CONTROL #2 (BID
ITEM 5)
B-B101Q
CORRIDOR
B-G127F
VIEW
B-G127O
CV EQUIP #2
B-B101N
SOILED UTIL
B-B101E
PREP/HOLDING
B-G127T
H.A.C
B-B101H
CRASH CART
ALCOVE
B-B101R
TLT
1-G127W
CV EQUIP #3
B-B101P
ALCOVE
B-G127W
ALCOVE
B-G127X
CHANGE
B-G127Y
COR.
B-G127Z
CLEAN LINEN
B-G127AA
ALCOVE
B-G127BB
C V
E Q
U
IP
B -B
1N
R am p U p
O V
E R
A L L T
R A
V E
L D
IS
T
A N
C E
SITE LOGISTICS LEGEND
BUILDING FOOTPRINT
PROPOSED STAGING AREA
AREA OF WORK BOUNDARY
LEGEND
NOT IN SCOPE
APROXIMATE CONSTRUCTION
ACCESS ROUTE
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2 /2
:1
:5
P M
C U s e rs \a p u lle n
\D o c u m e n ts
\A
-3
-Q
-V A
N a s h v ill e -R e p la c e
A H
U
-T N a p u lle n V
D X
T .r v t
G-102
BASEMENT PLAN - CONSTRUCTION
ACCESS ROUTE
4 4LB
REPLACE AIR HANDLING
UNIT #23
VA Tennessee Valley Healthcare System 1310 24th Avenue South
Nashville, TN 37212 AUGUST 27, 2021
100% CONSTRUCTION DOCUMENTS
626-20-20120-326
KK
N
AREA OF WORK
BUILDING 107
KEY PLAN
SCALE: NO SCALE
Scale: 3/64" = 1'-0"
BASEMENT PLAN - CONSTRUCTION ACCESS ROUTE
1 LOADING DOCK ACCESS.
2 STAIRS LEADING FROM BASEMENT TO FAN
ROOM #6.
3 APPROXIMATE CONSTRUCTION FENCE ROUTE.
4 PRIMARY CONSTRUCTION ENTRANCE.
5 PROPOSED CONSTRUCTION LAY-DOWN AREA
TO BE APPROVED BY COR. ALL MATERIAL
STORAGE, TRAILERS, EQUIPMENT, AND
PORTABLE TOILETS SHALL BE PLACED IN THIS
AREA.
6 STICKY MAT.
7 PROTECT STAIRWAY FINISHES, RAILING, AND
DOOR FROM CONSTRUCTION MATERIAL
MANEUVERING.
N O
R T
H0 4 8 16
11811
KO
RLA K . KUDJ IKU
CHARLOTTE , NORTH CAROL
I N
ANOR T H C A R O L I N
A
RE
UP
I
10 11 12
G
F
E
H
FAN ROOM
6A
ROOM
STAIR
I
10 11 12
G
F
E
H
FAN ROOM
ROOM
6A
STAIR
L1
AREA OF WORK BOUNDARY
LEGEND
EXISTING WALL TO REMAIN
NEW WALL
EXISTING DOOR TO REMAIN
DEMOLISHED WALL
NOT IN SCOPE
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSERS ARE PROVIDED AT
ALL ENTRY/EXIT POINTS FROM BUILDING WHERE
WORK IS BEING PERFORMED ABOVE.
B. CONTRACTOR TO SET UP AND MAINTAIN
TEMPORARY ENTRANCES AND PROTECTIVE
MEASURES WHERE WORK IS BEING PERFORMED,
AND ENSURE THAT ALL PERSONNEL WEAR
PROPER SAFE DEVICES/FALL PROTECTION.
C. SEE SHEET G-001 FOR GENERAL NOTES.
D. CONTRACTOR TO PROVIDE TEMPORARY
PROTECTION DURING CONSTRUCTION AT
TEMPORARY OPENINGS. REPAIR AND PATCH
DISTURBED FINISH TO MATCH EXISTING
SURFACE.
E. CONTRACTOR TO PROVIDE LINTEL AT NEW
OPENING IN EXTERIOR WALL.
F. PROTECT STAIRWAY FINISHES, RAILING, AND
DOOR FROM CONSTRUCTION MATERIAL
MANEUVERING.
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2 HR - FIRE SEPARATION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2 /2
:1
:5
P M
C U s e rs \a p u lle n
\D o c u m e n ts
\A
-3
-Q
-V A
N a s h v ill e -R e p la c e
A H
U
-T N a p u lle n V
D X
T .r v t
A-101
FAN ROOM #6 DEMOLITION AND NEW
WORK PLANS
1 1LB
REPLACE AIR HANDLING
UNIT #23
VA Tennessee Valley Healthcare System 1310 24th Avenue South
Nashville, TN 37212 AUGUST 27, 2021
100% CONSTRUCTION DOCUMENTS
626-20-20120-326
KK
N O
R T
H0 4 8 16
Scale: 1/8" = 1'-0"
FAN ROOM #6 DEMOLITION PLAN
Scale: 1/8" = 1'-0"
FAN ROOM #6 NEW WORK PLAN
N O
R T
H0 4 8 16
N
AREA OF WORK
BUILDING 107
KEY PLAN
SCALE: NO SCALE
1 INSTALL NEW AHU AND EQUIPMENT PLATFORM.
SEE MECHANICAL DRAWINGS.
2 EXISTING CONCRETE STEP TO REMAIN.
3 EXISTING ROOF TO REMAIN.
4 EXISTING EQUIPMENT TO REMAIN.
5 REINSTALL EXISTING DOOR FOLLOWING
REPLACEMENT OF NEW AHU.
6 INFILL TEMPORARY WALL OPENING FOLLOWING
REPLACEMENT OF NEW AHU. WALL INFILL AND
FINISHES TO MATCH EXISTING EXTERIOR WALL
CONSTRUCTION.
7 TEMPORARY AHU. SEE MECHANICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
8 NEW LOUVER. SEE MECHANICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
9 EXISTING DOOR TO REMAIN.
1 REMOVE EXISTING AHU AND EQUIPMENT
PLATFORM. REPAIR AND PATCH DISTURBED FINISH
TO MATCH EXISTING SURFACE. SEE MECHANICAL
DRAWINGS FOR ADDITIONAL DETAILS AND
REQUIRED SUPPORT FOR EXISTING EQUIPMENT TO
REMAIN.
2 EXISTING CONCRETE STEP TO REMAIN.
3 EXISTING ROOF TO REMAIN.
4 EXISTING EQUIPMENT TO REMAIN.
5 EXISTING DOOR TO BE TEMPORARILY REMOVED TO
FACILITATE AHU EQUIPMENT REMOVAL AND
REPLACEMENT. CONTRACTOR TO PROVIDE
TEMPORARY PROTECTION DURING
CONSTRUCTION.
6 REMOVE PORTION OF EXISTING WALL AS
REQUIRED FOR THE REMOVAL AND REPLACEMENT
OF AHU EQUIPMENT. CONTRACTOR TO
COORDINATE REQUIRED OPENING SIZE AND
LOCATION WITH AHU MANUFACTURER AND
EXISTING SPRINKLER PIPING.
7 EXISTING EXTERIOR WALL (GYPSUM BOARD ON
METAL STUDS AND CORRUGATED PANEL).
8 PLASTIC ZIPPER WALL CURTAIN BARRIER.
9 PROVIDE STICKY MATS (CHANGED AT THE END OF
SHIFT OR MORE IF NECESSARY TO MAINTAIN
CLEANLINESS).
10 EXISTING SPRINKLER PIPE.
11 EXISTING DOOR TO REMAIN.
Scale: No Scale
FAN ROOM #6 DEMOLITION PHOTOS
DEMO
NEW
apullen Model
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR-COOLED CONDENSER
ACCH AIR-COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,TWO
POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT
EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BSC BIOLOGICAL SAFETY CABINETS
BT BUFFER TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELSIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CH CHILLER
CHWP CHILLED WATER PUMP
CHW CHILLER WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CHWCC CHILLED WATER COOLING COIL
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
D-4 ECONOMIZER OUTDOOR AIR
DAMPER
dB DECIBELS Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE
ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
H HUMIDIFIER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HHW HEATING HOT WATER
HHWC HEATING HOT WATER COIL
HHWP HEATING HOT WATER PUMP
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
Hz HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTEGRATED PART LOAD VALUE
IRH INFRARED HEATER
IS INSECT SCREEN
IV INLET VANES
kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
L LITER
L/s LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPS LOW PRESSURE SUPPLY (STEAM)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL
PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/s METERS PER SECOND (OR
METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM
CONDENSATE)
MPS MEDIUM PRESSURE SUPPLY (STEAM)
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OR OPERATING ROOM
OSA OUTSIDE SUPPLY AIR
(CONDITIONED)
P PUMP
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PHCP PREHEAT COIL PUMP
PPM PARTS PER MILLION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
R/E RETURN OR EXHAUST
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RAH RETURN AIR HUMIDITY
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND
DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSR SOLID SEPARATOR
ST STEAM TRAP
SV STEAM SAFETY VALVE
SVS STEAM VENT SILENCER
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL
OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE)
RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
Wb WET-BULB (TEMPERATURE)
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
XT EXPANSION TANK
YR YEAR
CO2 CARBON DIOXIDE SENSOR
HUMIDISTAT OR HUMIDITY SENSOR
SUPPLY DIFFUSER
RETURN GRILLE
EXHAUST GRILLE
ROUND FLEX DUCT
EQUIPMENT TAG
LINEAR SLOT DIFFUSER
BALANCING DAMPER
FIRE DAMPER
SMOKE DAMPER
D
R INCLINED RISE, IN
DIRECTION OF AIRFLOW
INCLINED DROP, IN DIRECTION
OF AIRFLOW
CONNECT NEW DUCT
TO EXISTING
LIMIT OF DEMOLITION
VANED ELBOW (PROVIDE ALL
SQUARE OR RECTANGULAR
ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
STANDARD RADIUS ELBOW
(LONG RADIUS)
10x8 NEW DUCT (INSIDE
DIMENSIONS: WIDTH X DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO BE
DEMOLISHED
DUCT TRANSITION
END MOUNTED OR SIDEWALL GRILLE
SUPPLY
RETURN45°
45°
DN
DN
UP
UP
DNUP
STANDARD BRANCH SUPPLY OR
RETURN, NO SPLITTER…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .