Drawings_Project_626-20-201 AHU 23.pdf

PDF 20 MB Posted

Attached to
4120--626-20-201 Replace Air Handling Unit (AHU) #23
Solicitation number
36C24923B0006
Issued by

About this file

This document provides details on a federal contract opportunity for replacing an air handling unit. The solicitation number is 36C24923B0006 to replace Air Handling Unit (AHU) #23 under Project 626-20-201. The opportunity is being offered by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. The opportunity type is a solicitation to replace AHU #23. No other details are provided on response dates, pricing terms, set asides, or incumbent. The attached file references drawings but does not provide further context on the requirements or work scope.

View the file

Other files

File Type Posted
36C24923B0006 0003.docx DOCX document
36C24923B0006 0002.docx DOCX document
36C24923B0006 0001.docx DOCX document
Contractor EMR Certification Form.docx DOCX document
COVID Language_Updated 12-14-2021.docx DOCX document
RFI Form.docx DOCX document
Specifications Project_626-20-201 AHU 23.pdf PDF
DUNS _ TAX ID.docx DOCX document
Wage Determination TN20220178 12-23-2022.pdf PDF
36C24923B0006_2.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY

AGREEMENT BETWEEN THE COR AND CONTRACTOR BEFORE THE START OF THE WORK.

2. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DRAWINGS FOR SPECIFIC PRODUCTS. DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE.

THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE

OF THESE DIFFERENCES.

3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE

CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.

4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR

GREATER QUANTITY OF WORK.

5. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE DRAWINGS AND SPECIFICATIONS.

6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT, FOR EACH PHASE.

SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD CONDITIONS, NOTIFY THE COR PRIOR TO PROCEEDING WITH

THE WORK.

7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT

ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.

8. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS.

9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.

10. REFER TO ALL OTHER TRADE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THIS PROJECT.

11. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS: PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS REQUIRED FOR COMPLETION OF THE WORK.

12. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED FACE OF EXISTING WALL SURFACE.

13. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.

1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT PORTRAY FULL SCOPE OF THE

PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.

2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO PROCEEDING WITH NEW

CONSTRUCTION.

3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS. COORDINATE WITH COR.

4. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, FOR ADDITION AND RENOVATION PROJECTS: THE CONSTRUCTION AND ASSEMBLY OF THE PATCH OR REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT EXISTING CONSTRUCTION, FOR FIRE RATING, MATERIALS, FINISH, THICKNESS, AND QUALITY.

5. COORDINATE WORKING HOURS ALLOWED FOR DEMOLITION AND WASTE REMOVAL WITH COR.

6. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH EXISTING.

7. CONTRACTOR SHALL PROTECT AREA ADJACENT TO THE DEMOTION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES, (IF DAMAGED REPAIR, RE-PATCH, SAND SMOOTH AND REFINISH TO MATCH EXISTING.) REPAIR OR REPLACE ITEMS DAMAGED DURING

CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST.

8. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE COMPLETION OF THE PROJECT.

9. DO NOT ENCROACH ON ADJACENT OCCUPIED AREAS NOT IDENTIFIED WITHIN THE SCOPE OF WORK.

10. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF ELECTRICAL SYSTEMS.

11. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW, OR OUTSIDE THE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS AND PATCH

THE SAME AS A PART OF THE SCOPE OF THE PROJECT.

12. ALL ITEMS TO BE TEMPORARILY REMOVED TO ACCOMMODATE INSTALLATION OF NEW WORK BY OTHER TRADES (INCLUDING, BUT NOT LIMITED TO ACOUSTICAL TILE AND CEILING MOUNTED DEVICES) SHALL BE CAREFULLY REMOVED AND REINSTALLED TO IT'S ORIGINAL AND OPERATIONAL STATE, FOLLOWING THE COMPLETION OF THE WORK. CONTRACTOR SHALL REPAIR OR REPLACE DAMAGED ITEMS AND EXISTING AREAS DURING CONSTRUCTION ACTIVITIES TO MATCH EXISTING CONDITION AT NO ADDITIONAL COST.

13. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERING FROM THOSE INDICATED OR THAT ARE NOT IDENTIFIED, SHALL BE REPORTED TO THE COR.

14. AFTER REMOVAL OF EXISTING SOLID CONCRETE MASONRY WALL, FILL FLOOR VOIDS UP TO FINISH CONCRETE LEVEL AND PERFORM

FLOOR LEVELING FOR ENTIRE AREA OF RENOVATION.|

15. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR AND ARCHITECT OF ANY CONFLICTS PRIOR TO PROCEEDING

WITH DEMOLITION.

16. ALL ITEMS BEING SALVAGED OR REMOVED SHALL REMAIN THE PROPERTY OF THE COR UNTIL CONFIRMATION HAS BEEN MADE AS TO WHETHER THE COR WILL RETAIN SUCH ITEMS. ALL ITEMS NOT BEING SALVAGED BY THE VA TO BE REMOVED AND DISPOSED OF BY THE

CONTRACTOR IN APPROVED MANNER.

17. CONTRACTOR SHALL NOTIFY COR OF ANY AREA REQUIRING DEMOLITION OTHER THAN SHOWN IN THESE DRAWINGS DUE TO UNFORSEEN CONDITIONS, TO ACCOMMODATE INSTALLATION OF ALL OTHER TRADES (INCLUDING ROOF PENETRATIONS). AFTER SUCH DEMOLITION AND

INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH EXISTING.

18. THE CONTRACTOR SHALL SCHEDULE AND COORDINATE WITH THE COR, THE USE OF THE CONSTRUCTION ACCESS ROUTE TO DUMPSTER

AREA AND FREIGHT ELEVATOR (AS REQUIRED) FOR WASTE REMOVAL.

WALL SECTION

SYMBOL

INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL

CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

ROOF SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC

SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

VIEW NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

WALL GRID

(REPRESENTS

FACE OF EXISTING

WALL)

XX.X

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

NORTHNORTH

0 4 8 16

DEMOLITION KEYNOTE WINDOW/LOUVER TYPE

ROOF PITCH SYMBOL

DOOR NUMBER

TYPICAL KEYNOTE CEILING/ SOFFIT

HEIGHT

MATL

1'-0"

1##

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

PROJECT IMAGE

/2 /2

:1

:3

P M

C U s e rs \a p u lle n

\D o c u m e n ts

\A

-3

-Q

-V A

N a s h v ill e -R e p la c e

A H

U

-T N a p u lle n V

D X

T .r v t

G-001

COVER, ARCHITECTURAL SYMBOLS,

AND NOTES

1 4LB

REPLACE AIR HANDLING

UNIT #23

VA Tennessee Valley Healthcare System 1310 24th Avenue South

Nashville, TN 37212 AUGUST 27, 2021

100% CONSTRUCTION DOCUMENTS

626-20-20120-326

REPLACE AIR HANDLING UNIT #23

VA Tennessee Valley Healthcare System 1310 24th Avenue South Nashville, TN 37212

VA PROJECT #: 626-20-201

KK

DRAWING LIST

GENERAL

G-001 COVER, ARCHITECTURAL SYMBOLS, AND NOTES 1 4

G-100 SITE LOGISTICS PLAN 2 4

G-101 ICRA NOTES AND DETAILS 3 4

G-102 BASEMENT PLAN - CONSTRUCTION ACCESS ROUTE 4 4

ARCHITECTURAL

A-101 FAN ROOM #6 DEMOLITION AND NEW WORK PLANS 1 1

MECHANICAL

M-001 MECHANICAL GENERAL INFORMATION 1 10

MD101 SECOND FLOOR WEST MECHANICAL DEMOLITION PLAN 2 10

MD102 SECOND FLOOR EAST MECHANICAL DEMOLITION PLAN 3 10

MD103 PENTHOUSE MECHANICAL DEMOLITION PLAN 4 10

M-101 SECOND FLOOR WEST MECHANICAL PLAN 5 10

M-102 SECOND FLOOR EAST MECHANICAL PLAN 6 10

M-103 PENTHOUSE MECHANICAL PLAN 7 10

M-501 MECHANICAL DETAILS 8 10

M-503 MECHANICAL CONTROLS 9 10

M-601 MECHANICAL SCHEDULES 10 10

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 6

ED101 PENTHOUSE ELECTRICAL DEMOLITION PLAN 2 6

EP101 PENTHOUSE POWER PLAN 3 6

EP102 SECOND FLOOR NORTH POWER PLAN 4 6

EP103 SECOND FLOOR SOUTH POWER PLAN 5 6

E-601 ELECTRICAL SCHEDULES 6 6

GENERAL NOTES DEMOLITION NOTES

GENERAL SYMBOL LEGEND ARCHITECTURAL SYMBOL LEGEND

PROJECT LOCATIONPROJECT AREA

11811

KO

RLA K . KUDJ IKU

CHARLOTTE , NORTH CAROL

I N

ANOR T H C A R O L I N

A

RE

G I

STERED ARCH ITECT

T

H A

V E

S

HIGHLAND AVE

PIERCE AVE

GARLAND AVE

T

H A

V E

S

SITE LOGISTICS LEGEND

BUILDING IN CONTRACT

EXISTING BUILDINGS

AREA OF WORK

PROPOSED STAGING AREA

A. CONTRACTOR SHALL PROVIDE TEMPORARY

ENTRANCES AND STAIR TOWERS TO PROVIDE

CONSTRUCTION ACCESS TO FAN ROOM

CONSTRUCTION AREA.

B. CONTRACTOR TO ENSURE THAT TEMPORARY

ENTRANCES AND PROTECTIVE MEASURES

COMPLY WITH ALL OSHA REQUIREMENTS.

CONTRACTOR WILL BE RESPONSIBLE FOR

DESIGN AND ENGINEERING OF TEMPORARY

ENTRANCES AND PROTECTIVE MEASURES.

C. CONTRACTOR SHALL BE REQUIRED TO INSPECT

ALL TEMPORARY ENTRANCES AND PROTECTIVE

MEASURES DAILY TO ENSURE THEY ARE SAFE

AND COMPLY WITH OSHA REQUIREMENTS.

D. CONTRACTOR SHALL REPAIR ALL AREAS

DAMAGED OR DISTURBED DURING

CONSTRUCTION. THIS INCLUDES BUILDING

FINISHES, EXTERIOR OR INTERIOR, ROOFING

SYSTEM AND ROOFTOP EQUIPMENT, LANDSCAPE,

SIDEWALKS, PAVING OR ANY AREA DAMAGED BY

THE CONSTRUCTION WORK. RESTORE AREAS TO

ORIGINAL CONDITION.

E. DUMPSTER AND TRASH CHUTE LOCATIONS ARE

TO BE COORDINATED WITH THE COR PRIOR TO

LOCATION ON SITE.

F. CONTRACTOR SHALL PROTECT THE LANDSCAPE

SPRINKLER SYSTEM IN CONSTRUCTION LAY

DOWN ARE FROM DAMAGE. CAP ALL HEADS IN

THIS AREA DURING THE CONSTRUCTION PERIOD.

RESTORE SPRINKLER SYSTEM TO FULL

OPERATION AT END OF CONSTRUCTION.

G. CONTRACTOR SHALL PREPARE A PLAN OF THE

LAY DOWN/SECURITY FENCE AREA WITH

LOCATION ALL ELEMENTS INCLUDING DUMPSTER

AND TRASH CHUTE/COLLECTION AREA, TO BE

APPROVED BY COR.

H. CONTRACTOR TO ENSURE THE CONSTRUCTION

FENCED AREA IS LOCKED/SECURED DURING ALL

PERIODS WHEN CONSTRUCTION WORK IS NOT

BEING PERFORMED.

I. CONTRACTOR SHALL COORDINATE ANY WORK

THAT PRODUCES EXCESSIVE NOISE. TO BE

PERFORMED DURING OFF HOURS, COORDINATE

THIS WORK WITH COR.

J. CONTRACTOR SHALL RESTORE ALL

LANDSCAPING, HARDSCAPING AND SITE

ELEMENTS TO THE ORIGINAL CONDITION AT THE

COMPLETION OF CONSTRUCTION. CONTRACTOR

WILL PHOTOGRAPH AND DOCUMENT EXISTING

CONDITIONS PRIOR TO INSTALLING FENCING,

TEMPORARY ENTRANCES OR STARTING ANY

CONSTRUCTION WORK.

K. EXISITING ROOF FRAMING/STRUCTURE TO BE

EVALUATED BY STRUCTURAL ENGINEER TO

VERIFY ADEQUATE CAPACITY TO SUPPORT

ADDITIONAL LOADS TO BE IMPOSED BY STAGING

ACTIVITIES. CONTRACTOR TO PROTECT ENTIRE

ROOFING SYSTEM, AND ROOFTOP EQUIPMENT

FROM DAMAGE. ANY DAMAGED/ DISTURBED

ITEMS/ SYSTEMS SHALL BE REPLACED/

RESTORED TO IT'S ORIGINAL CONDITION.

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2 /2

:1

:5

P M

C U s e rs \a p u lle n

\D o c u m e n ts

\A

-3

-Q

-V A

N a s h v ill e -R e p la c e

A H

U

-T N a p u lle n V

D X

T .r v t

G-100

SITE LOGISTICS PLAN

2 4LB

REPLACE AIR HANDLING

UNIT #23

VA Tennessee Valley Healthcare System 1310 24th Avenue South

Nashville, TN 37212 AUGUST 27, 2021

100% CONSTRUCTION DOCUMENTS

626-20-20120-326

KK

Scale: 1" = 80'-0"

SITE LOGISTICS PLAN

NORTH

0 4 8 16

1 APPROXIMATE CONSTRUCTION FENCE ROUTE.

2 PRIMARY CONSTRUCTION ENTRANCE.

3 PROPOSED ROOF STAGING AREA TO BE

APPROVED BY COR.

4 CONSTRUCTION LAY-DOWN AREA. ALL

MATERIAL STORAGE, TRAILERS, EQUIPMENT,

AND PORTABLE TOILETS SHALL BE PLACED IN

THIS AREA WITH COR APPROVAL.

5 TEMPORARY LAY-DOWN AREA FOR

RECEIVING/INSTALLING/REMOVING

TEMPORARY AHU ON WEEKENDS ONLY. ROAD

TO REMAIN UNOBSTRUCTED OTHERWISE.

6 CONSTRUCTION FENCE SHOULD BE CLEAR OF

FIRE LANE.

7 CONSTRUCTION ACCESS ROUTE.

8 LOADING DOCK.

9 STAIR #1.

10 ELEVATOR MACHINE ROOM.

11 IF REQUIRED, PORTABLE TOILET LOCATION TO

APPROVED BY COR.

11811

KO

RLA K . KUDJ IKU

CHARLOTTE , NORTH CAROL

I N

ANOR T H C A R O L I N

A

RE

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS

FOR CONSTRUCTION AND RENOVATION

PLASTIC WINDOW

SWIVEL CASTERS

WITH TWO

LOCKING BRAKES

MOBILE CART

A D

J U

S T

A B

L E

H E

IG

H

T

HEPA NEGATIVE

AIR UNIT

EXISTING WALL

EXISTING CEILING

FLEX DUCT

3 5/8" INSULATED WALL WITH

16 GAUGE METAL STUDS @

16" O.C. WALL TO EXTEND TO

UNDERSIDE OF DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

4 7/8"

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

/2

4 7/8"

3 5/8" 16 GAUGE METAL

STUDS @ 16" O.C. WALL TO

EXTEND TO UNDERSIDE OF

DECK

A B

3 5/8" INSULATED WALL WITH

16 GAUGE METAL STUDS @

16" O.C. (2) LAYERS 5/8"

GYPSUM BOARD EACH SIDE.

WALL TO EXTEND TO

UNDERSIDE OF DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

6 1/8"

C

FIRE RESISTANT SEALANT,

BOTH SIDES

FIRE RESISTANT SEALANT,

BOTH SIDES

FIRE RESISTANT SEALANT,

BOTH SIDES

1-HR RATED AND SMOKE RATED

U.L. DESIGN NO. U404

SMOKE RATED 2-HR RATED AND SMOKE RATED

U.L. DESIGN NO. U404

HEPA

NEGATIVE AIR

UNIT

FINISHED FLOORING TO BE KEPT

CLEAN. FLOORS NOT BEING REPLACED

MUST BE PROTECTED. COVER WITH

ROSIN PAPER / FIRE RATED PLYWOOD.

FIRE RATED PLYWOOD,

TEMPORARY. SALVAGE

PROTECT AND STORE

EXISTING WINDOW TO

BE RE-INSTALLED

AFTER CONSTRUCTION

IS COMPLETE.

V .I

.F

V .I

.F

V.I.F.

V .I .F

E X

IS

T

IN

G

W A

L L

V .I .F

E X

IS

T

IN

G

W A

L L

ISLM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

FIRE EXTINGUISHER ON

PORTABLE FLOOR

BRACKET (ILSM MAY

REQUIRE MORE THAN

ONE).

PROVIDE STICKY

MATS (CHANGED END

OF SHIFT OR MORE IF

NECESSARY TO

MAINTAIN

CLEANLINESS).

HEPA NEGATIVE

AIR UNIT

SUPPLY DUCTS

EITHER KEEP

RUNNING OR COVER

WHEN RUNNING TO

KEEP DUST OUT

COVER ALL RETURNS

AT THE

GRATE/DIFFUSERS

F L E

X D

U C

T

SUSPENDED PLASTIC

ZIPPER WALL

CURTAIN BARRIER

POST ICRA, ILSM, FIRE

INPECTION SHEETS

VISIBLE TO PUBLIC

FIRE PULL

STATION WITH

AUDIO / VISUAL

G-101

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT

FOR RENOVATION REPLACE AIR HANDLING UNIT #23

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA.

PLEASE USE ALL ALTERNATE EXITS AS MARKED.

1' - 5"

1/2"1/2"

/2

/2

/2

/2

/2

/2

EQ.EQ.

DUST CONTROL PLAN NOTES

1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE

DESIGNATION FOR THIS PROJECT IS LEVEL III FOR THE CLASS OF

PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES. HARD

SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON

THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA

FROM NON-WORK AREA AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND

ACTIVE.

1A. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES

(PROVIDE AND LOCATE A STAGING AREA FOR HAZMAT SUITS NEAR THE

PLASTIC BARRIER ENTRANCE SPACES - CONSTRUCTION ANTEROOM. THEY

SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND LEAVING THE

CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS SHALL BE

MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS.

ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE

CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION

PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE

SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY

DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.

2. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER

ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR

MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS

INTO ADJACENT CLEAN SPACE.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS

CONTROL

3. USE CORRIDORS CB-1A, CB-10A, CB-16, CB-16C, CB-16E, CB-17, AND

CB-18 AS PRIMARY CONSTRUCTION ACCESS.

3A. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES

SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;

DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED TIMES; AND

ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE

CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC

AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.

4. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION

MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED;

THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND

THE CONSTRUCTION STAGING/PREP AREA.

4A. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH

TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES.

EFFORTS SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN

EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.

DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC.

IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY

PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE

USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE.

FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT

OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS

THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR.

4B. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE

INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.

4C. ALL EQUIPMENT REMAIN IN THE ORs AND ASSOCIATED ROOMS SHALL

BE COVERED AND PROTECTED PRIOR STARTING EACH CONSTRUCTION

PHASE.

VENTILATION AND ENVIRONMENTAL CONTROLS

5. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE

CONTRACTOR WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE

OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS

COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW

FROM CLEAN TO DIRTY AREAS.

5A. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA

SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO

DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE

AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL

PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER

CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE

(FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY

VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A

PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST TO

PREVENT CONTAMINATION OF THE DUCTS.

5B. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND

INTACT CEILING SHALL BE VERIFIED DAILY.

5C. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND

CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL

AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-

CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA

ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE

PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.

CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED

AREAS

6. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE

FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION

AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G., COVERALLS, FOOTGEAR

AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO REMOVE

DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE

APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR

ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT

(DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS

TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM

DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR

REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.

6A. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL

HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION SITE,

VA EMS STAFF HAS DONE A TERMINAL CLEANING, AND VA INFECTIOUS

DISEASE CONTROL HAS INSPECTED AND APPROVED THE CLEANING.

ICRA NOTES

III/IVLOW Risk Group 1

Class III

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

II

I

III

MEDIUM Risk Group 2

HIGH Risk Group 3

HIGHEST Risk Group 4 IV

IV

IV

III/IV

III/IV

III

III/IV

I

III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects

Includes, but is not limited to:

- activities which require consecutive work shifts

- requires heavy demolition or removal of a complete ceiling system

- new construction

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies

Includes, but is not limited to:

- sanding of walls for painting or wall covering

- removal of floor coverings, ceiling tiles and casework

- new wall construction

- minor duct work or electrical work above ceilings

- major cabling activities

- any activity which cannot be completed within a single work shift

Small scale, short duration activities which create minimal dust

Includes, but is not limited to:

- installation of telephone and computer cabling

- access to chase spaces

- cutting of walls or ceiling where dust migration can be controlled

Inspection and Non-Invasive Activities

Includes, but is not limited to:

- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet

- painting (but not sanding), wall covering

- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection

Type of Construction / Project Activity Table

Group 2 Medium Risk

Group 1 Low Risk

- Therapy areas

- Respiratory Therapy

- Outpatient Clinics

- CBOC's

- Mental Health Units

- VACANT AREA ADJACENT TO

OCCUPIED AREA

- Office areas (non-clinical)

- Hallways

- FES/EMS areas

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4 Highest Risk

Group 3 High Risk

- Pharmacy

- Radiology/ CT Scanner

- Urgent Care

- Laboratories

- CLCs

- SPD; AMCU;

- Respiratory Isolation Rooms

- Surgery

III

TYPE DTYPE CTYPE B

Class IV or control procedures are necessary.

C

LA

S S

IV

C

LA

S

S

II

During Construction Project

C L-

I C

LA

S

S

II

I

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant after barriers are removed.

6. Remove or isolate HVAC system in areas where work was being performed.

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering.

4. Vacuum work with HEPA-filtered vacuums.

5. Wet mop with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

1. Wipe surfaces to remove dust.

Upon Completion of Project

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.

4. Remove isolation of HVAC system in areas where work is being performed.

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

4. Complete all critical barriers before construction begins or implement control cube method.

5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.

6. Contain construction waste before transport in tightly covered containers.

7. Cover transport receptacles or carts. Tape covers.

8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.

9. Remove isolation of HVAC system in areas where work is being performed.

1. Execute work by methods to minimize raising dust from construction operations.

2. Immediately replace a ceiling tile displaced for visual inspection.

1. Includes all activities required by Class I

2. Provide active means to prevent airborne dust from dispersing into atmosphere.

3. Water mist work surfaces to control dust while cutting.

4. Seal unused doors with duct tape.

5. Block off and seal air vents.

6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.

4. Complete all critical barriers or implement control cube method before construction begins.

5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

6. Seal holes, pipes, conduits, and punctures appropriately.

7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.

8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

9. Place adhesive walk-off mats at entrance to work area within anteroom.

10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.

11. Cover transport receptacles or carts. Tape covering

12. Vacuum work area with HEPA filtered vacuums.

13. Wet mop with disinfectant after barriers are removed.

14. Remove isolation of HVAC system in areas where work is being performed.

A P

P R

O X

A .F

.F

SUSPENDED

PLASTIC ZIPPER

WALL CURTAIN

BARRIER

POST ICRA, ILSM, FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2 /2

:1

:5

P M

C U s e rs \a p u lle n

\D o c u m e n ts

\A

-3

-Q

-V A

N a s h v ill e -R e p la c e

A H

U

-T N a p u lle n V

D X

T .r v t

G-101

ICRA NOTES AND DETAILS

3 4LB

REPLACE AIR HANDLING

UNIT #23

VA Tennessee Valley Healthcare System 1310 24th Avenue South

Nashville, TN 37212 AUGUST 27, 2021

100% CONSTRUCTION DOCUMENTS

626-20-20120-326

KK

Scale: 1/2" = 1'-0"

ICRA MOBILE CONTAINMENT CART

Scale: 3/4" = 1'-0"

ICRA BARRIER WALL TYPE

Scale: 1/2" = 1'-0"

CROSS SECTION "A"

Scale: 1/2" = 1'-0"

TYPICAL CONSTRUCTION PLAN LAYOUT

Scale: 3" = 1'-0"

ILSM CONSTRUCTION EGRESS SIGNAGE

Scale: 1/2" = 1'-0"

ROOM ELEVATION

11811

KO

RLA K . KUDJ IKU

CHARLOTTE , NORTH CAROL

I N

ANOR T H C A R O L I N

A

RE

AREAWAY

STAIR

SPECIMEN RECEIVING

TUBE

STA

HI STO L AB

URIN-

ANALYSIS

HEMATOLOGY

P&H STORAGE

(11'x24')

HAZZARD WASTE

(8'x12')

NO 9

CR AWL SPAC E

WAITING SPACE

CB-14A

STRETCHER ALCOVE

CB-24A

TOILET

E-18B

OTHER

F-7C

TELEPHONE CLOSET

F-2A

HONEYWELL RM

D-72

TOILET

LINEN

D-23

DRESS

D-53A

DRESS

D-54A

TOILET

D-53B

TOILET

D-54B

TOILET

D-51B

TOILET

D-52B

DRESS

D-52A

DRESS

D-51A

CLOSET

C-04A

BD

ELECTRICAL

CLOSET

D-30

TELE CLOSET

C-07E

BC

ELECTRICAL

CLOSET

C-07D

ELECTRICAL CLOSET

C-07C

CLOSET

MALE

TOILET

C-08D

FEMALE TOILET

C-08B

FEMALE STAFF TOILET

G-51

FEMALE STAFF TOILET

G-55

CLOSET

G-46

CLOSET

G-08A

ELECTRICAL CLOSET

A-22A

ELECTRICAL CLOSET

BB

FROZEN

SECTION

G-18 B-A118

PEST

CONTROL

WORK RM

E-18A

PETT SCAN

D-40

CORRIDOR

CB-23

OFFICE

F-11A

ELEVATOR LOBBY

CB-F1

CORRIDOR

CB-4

SWITCH GEAR

E-11

BSLE LAB

D-12D

CORRIDOR

CB-12

AREAWAY

CORRIDOR

CB-15

CORRIDOR

CB-13

BOILER RM

E-25F

CORRIDOR

CB-9C

CORRIDOR

CB-3

SCRUB

UP

ALCOVE

CB-3C

CLEAN CORE

CB-3

CLEAN CORE

CB-3

FAN RM - 4

B-B105

MECH

RM

AHU-26

FAN RM 11

HEART

POS RM

C-07I

CLEAN

ALCOVE

C-07

MED

PREP

C-07A

POS RM

C-07J

POS RM

C-07K

NEG RM

C-07L

OFFICE

C-07M

STORAGE ALCOVE

SPD

C-07N

NEG RM

C-07O

BARIATRIC NEG RM

C-07P

STORAGE ALCOVE

SHOWER / TOILET

C-07Q

NEG RM

C-07R

POS RM

C-07S

POS RM

C-07T

POS RM

C-07U

BARIATRIC POS RM

C-07V

EMERGENCY GENERATOR

B-G124B

FAN RM 5

B-G124

ELECTRICAL

B-G124A

MECH EQUIP

F-10

CORRIDOR

CB-14

RECEIVING AND SHIPPING DOCK

CORRIDOR

CB-18

STORAGE

E-23

STORAGE

E-23A

RECEIVING & ISSUE

AREA EQUIP STORAGE

FORMS STORAGE

E-22

CORRIDOR

CB-17

OFFICE

E-09A

STAFF

TOILET

E-08

BREAK SHOP

D-68C

E-10

E-10A

MAIL RM

E-14

ELEVATOR EQUIP

E-13

CORRIDOR

CB-16

CORRIDOR

CB-16B

CORRIDOR

D-26

CORRIDOR

CB-20

CORRIDOR

CB-19

STORAGE

D-13

FILTER STORAGE

F-6A

STORAGE

F-5

RAID STORAGE

F-4

DUCT SHAFT

OFFICE

F-3

ELECTRICAL CLOSET

F-2

JANITOR CLOSET

F-1

VACANT

HOUSE

KEEPING

F-6

VIEWING RM

F-6B

GROUP RM

F-6A

STORAGE

F-9C

TOILET

D-16

BIOMED SHOP

D-15

CONTROL RM

F-11B

F-11

COMPRESSOR RM

F-12

CLOSET

F-12A

MECH EQUIP

CRAWL SPACE

F-8

TRANSFORMER RM

F-14

SWITCH BOARD

F-13

SHOP

F-9

PIT

OFFICE

F-9A CB-F4

STORAGE

F-9B

STORAGE

D-14

CORRIDOR

CB-24

CORRIDOR

CB-24

CORRIDOR

CB-11

CYTO LAB

D-05

CORRIDOR

CB-10

CORRIDOR

CB-9D

CORRIDOR

CB-9

CORRIDOR

CB-16E

CORRIDOR

CB-16C

CORRIDOR

CB-16A

MECH

E-5

BIOMED ENG

REPAIRING &

DEVELOPMENT

E-01

CONTROL RM

D-18CATH LAB 1

D-17

ELECTRICAL SHOP STORAGE

D-68A

ELECTRONICS

D-68B

KEY SHOP

D-69

MULTI PURPOSE

E-09E

OFFICE

E-11A

VESTIBULE

E-09

TOILET

E-12

ELEVATOR

P-9

EQUIP RM

E-19

OFFICE

E-22A

MED GAS

E-21

MED GAS

E-20

PEST

CONTROL

OFFICE

E-18ELECTRICAL

E-17

OFFICE

E-14A

SIGNAL

E-15

SIGNAL

E-16

SVC RM

E-26

GROUNDS EQUIP

E-25

CLOSET

E-25A

BOILER OPERATOR

E-25E

A/C

OPERATIONS

SHOP

E-25B

FIRE EXT

FLAM

STORAGE

E-24

E-25C

GROUNDS & TRANS

E-25D

CORRIDOR

CB-19

CORRIDOR

CB-22

SICU

G-56

CORRIDOR

CB-9A

CORRIDOR

CB-1

ELEVATOR LOBBY

CB-1A

CORRIDOR

CB-24

CORRIDOR

CB-21

EQUIP STORAGE & TESTING

B-01

DISPATCH AREA

B-01A

DECONTAMINATION RM

B-02

PREPARATION,

ASSEMBLY &

STERILIZATION

B-02B

STERIS RM

B-01B

OFFICE

B-02A

OFFICE

B-01D

EQUIP

B-01C

MANUAL WASH

B-01E

VESTIBULE

CB-19A

EMERGENCY

GENERATOR RM

E-25G

STAIR

NO 8

EMERGENCY

GENERATOR RM

E-25H

CORRIDOR

CB-7

ELECTRICAL CLOSET

A-16

CORRIDOR

CB-8

SCRUB

CB-3B

CORRIDOR

CB-6A

STORAGE

CB-5

CORRIDOR

CB-6

FLOW CYTOMETRY

A-04

OFFICE

A-04A

STAIR

NO 2

OFFICE

A-04B

CORRIDOR

CB-6

EMBALMING

A-03

CHEMISTRY

A-17

BLOOD BANK

A-14

TOILET

C-02

SIGNAL CLOSET

C-01

WAITING

C-03

ELECTRICAL CLOSET

A-15 BA2

COMM

CLOSET

A-17A

OFFICE

A-14A

CENTRAL STORAGE

A-17G

FEMALE TOILET

A-06ELEVATOR EQUIP

A-05

ELEVATOR

S-1

AUTOPSY

A-02

A-01B A-01D

A-01C

CHEM

SUPER LEAD

TECH

A-17F

LEAD TECH

A-17E

LEAD TECH

A-17D

RESIDENTS

A-07

HAC

A-08

PATH CHIEF

A-09

HEMA SUPER

A-17C

FEMALE TOILET

A-10

FEMALE TOILET

A-11

MULTI PURPOSE

A-17B

MALE

TOILET

A-12

MALE

TOILET

A-13

OFFICE

D-06A

STAIR

F1

ELEVATOR

FS-1

ELEVATOR

FS-2

CATH LAB 2

D-19

FILM PROCESSING LAB

D-24

CORRIDOR

CB-12

WAITING

D-27G

RADIOGRAPHIC

FLUOROSCOPIC

D-54

MULTI PURPOSE

D-73A

ELECTRICAL ENG

D-70 OFFICE

D-71

STAIR

NO 6

STAFF

D-65B

STAFF

D-65A

WAITING

D-02

MALE TOILET

D-49

CONTROL RM

D-27D

RADIOGRAPHIC

FLUOROSCOPIC

RM

D-51

RADIOGRAPHIC

FLUOROSCOPIC

D-52

RADIOGRAPHIC

FLUOROSCOPIC

D-53

COMPUTER RM

D-57CONTROL

D-24A

CT RM

D-25

WAITING

D-27

FEMALE TOILET

D-27A

MICRO LAB

D-12

T C LAB

D-12E

GEN WASH

D-09

ELECTRICAL CLOSET

A-26

READING RM

D-04

STAIR

NO 4

CUTTING RM

D-05A

SAW RM

MULTI PURPOSE

D-05C

SCREENIING

D-06

FEMALE TOILET

D-07

MALE TOILET

D-08

BLK STORAGE

D-05D

MICRO OFFICE

D-05E

WORK RM

D-12C

ANTE RM

D-12B

OFFICE

D-12A

BD2

D-11

BD1

D-10

ELECTRICAL CLOSET

D-29

CT EXAM RM

D-28E

COMPUTER

D-27F

SCRUB/WORK AREA

D-24B

DARK RM

D-27E

CONTROL

D-51C

CONTROL

D-52C

DARK RM

D-22A

MAMMOGRAPHY

D-22

READING RM

D-21

VESTIBULE

D-20

HC TOILET

D-20A

HC TOILET

D-20B

LOUNGE/LOCKERS

D-58

CONTROL

D-53C

CONTROL

D-54C

HAC

D-55

STORAGE

D-56

CHEST RM

D-62

TOILET

D-63

TOILET

D-64

CONTROL RM

D-61

AUTOMATED

RADIOGRAPHIC

D-60

STORAGE

D-59

ELECTRIC SHOP

D-68

SWITCHBOARD RM

D-67

D-66

OFFICE

E-09B

OFFICE

E-09C

OFFICE

E-09D OFFICE

E-09F

OFFICE

E-09G

OFFICE

E-09H

BUSINESS RM

E-09I

OFFICE

E-09J

HEART

POS RM

C-07H

A/C SHOP

E-27

MAINT

FOREMAN

E-07

OFFICE

E-08

OFFICE

E-08A

A/C

FOREMAN

E-06

PAINT SHOP

E-05

CARPENTER SHOP

E-04

MACH

SHOP

E-03

ELECTRICAL CLOSET

BE

E-26A

PLUMBING SHOP

E-02

OFFICE

E-01C

BIOMEDICAL

ENGG

STORAGE

E-01B

RECEIVING

& CLEANING

E-01A

ELECTRICAL RM

B-01F

STAIR

NO 7

BLDG

MGT

LOCKERS

B-03

ELEVATOR

P-3

ELEVATOR

P-4

ELEVATOR

P-5

BLDG

MGT

TOILET

B-03A

VESTIBULE

CONSULT/

MEDITATION

C-03A

SOILED

C-07G

SOILED UTILITY

G-56A

RECOVERY STORAGE

G-56B

OFF LINE

MONITORING

G-47

ALCOVE

G-49

TELE

G-49C

ELECRICAL CLOSET SIGNAL

G-49B

CLEAN LINEN

G-56D

SIGNAL

G-49A

RECOVERY CLEAN UTILITY

G-56E

RECOVERY NURSE STATION

RECOVERY ISOLATION BEDROOM

G-54

G-53

ANTE RM

G-56C

RECOVERY ISOLATION BEDROOM

G-52

PACU

G-50

BATH

G-48A

ON CALL

G-48

STAIR

NO 10

HAC

G-43

OFFICE

C-09

FEMALE LOCKER

C-08A

MALE LOCKER

C-08C

STAFF

MULTIPURPOSE

C-08

OFFICE

C-07W

HAC

C-06

CLOSET

C-07B

HEART

POS RM

C-07F

CLEAN EQUIP /

SUPPLY

C-05

ELECTRICAL CLOSET

C-04

GAS STORAGE NURSE MGR

OFFICE

B-01Q

MALE

LOCKERS

B-01O

MALE

TOILET

B-01P

FEMALE TOILET

B-01N

FEMALE

LOCKERS

B-01M

HAC

B-01L

SPD

CHIEF &

ASSIST

B-01K

LOGISTICS

SUPV

B-01J

SPD ADMIN

B-01I

LOGISTICS

ITEM MGRS

B-01H

BREAKOUT AREA

B-01G

LOGISTICS

ITEM MGRS

B-06

ENGG TOILET

B-04A

ENGG

LOCKERS

B-04

HAC

B-05

OFFICE

D-73

OFFICE

D-74

STORAGE

D-74A

OFFICE

D-73D

OFFICE

D-73C

CLERICAL OFFICE

D-73B

STAFF

D-65C

STAFF

D-65D

STAFF

D-65E

RESIDENT/ INTERN

D-65F

CONFERENCE/ CLASS RM

D-65G

ADP

D-01

SIG

CLOSET

D-02G

CHIEF TECH

D-50

SVC CHIEF

D-65

SEC

D-65I

RECEPTION & SEC

D-65H

ELEVATOR

S-2

ELEVATOR

S-1

FEMALE TOILET

D-48

MALE

TOILET

D-27B

MRI

D-27C

READING RM

D-28B

OFFICE

D-28A

CONTROL

D-28

COMPUTER

D-28D

DARK RM

D-28C

TECH

D-03A

HOT LAB

D-40D

TREAT

D-40E

TREAT

D-40F

TOILET

D-40C

CTRL RM

D-40B

MULTI

VIEWING

D-41

MULTI

VIEWING

CB-12D D-42

STORAGE

CB-12C D-43

MULTI

VIEWING

D-44

MULTI

VIEWING

D-45

OFFICE

D-46

ADP

COORD

D-47

ELECTRICAL CLOSET

D-02F

OFFICE

D-02E

OFFICE

D-02D

GANTRY

D-40A

OFFICE

D-02C

OFFICE

D-02B

OFFICE

D-02A

ADP COMPUTER RM

D-03

FEC

ELEVATOR

P-8

OFFICE

A-19D

LAB SEC

A-19

TISSUE TYP

A-20

FLOW CYTO

A-20A

IMMUN LAB

A-21

RADIATION SAFETY

& EQUIP RM

A-25P

EXIST TELEPHONE EQUIP RM

LABORATORY-LOW LEVEL IN-VITRO COUNTING

A-25K

VIEWING/

CONFERENCE

A-25J

SEC

A-25H

CHIEF

A-25I

TELE

EQUIP

EXPANS

A-22

HOT LAB

A-25O

BIOCHEMISTRY LAB

A-25N

EXAM

A-25L

LABORATORY HIGH LEVEL IN-VITRO COUNTING

A-25M

ELECTRICAL CLOSET

A-25R

BA2

STORAGE

EQUIP STORAGE

A-25S

OFFICE

A-19E

OFFICE

A-19F

MULTI-PURPOSE

A-19A

OFFICE

A-18

OFFICE

A-19B

OFFICE

A-19C

ELECTRICAL CLOSET

A-27

COMPUTER RM

A-25U

NUCLEAR IMAGING

A-25T

STAFF TOILET

A-25W

EXAM RM

A-0V

WAITING RM

A-25X

RCPT

& FILES

A-25

FEMALE TOILET

A-25A

MALE TOILET

A-25B

OFFICE HOUSE STAFF

A-25C

STAFF

LOUNGE

A-25D

EXIST

FIRE

ALARM

PANELS

A-23

STAFF

NON-PHYSICIAN

OFFICE

A-25E

STAFF

PHYSICIAN

OFFICE

A-25F

STUDY

CUBICLES

A-25G

VEST

B-01R

ANEST

WORK RM

B-07

ANEST

EQUIP STOR

SCRUB-UP ALCOVE

G-33

EXT RAD

CONTROL

G-32

NEUROSURGERY O R 9

G-36

SUB STERILE

G-37

PUMP

TECHS

PREP RM

G-36A

CARDIAC OR 8

G-38

CORRIDOR

CB-2C

CORRIDOR

CB-2B

CORRIDOR

CB-2

CHIEF

G-08

OFFICE

G-11

FEMALE SHOWER

G-23B

DICTATING

G-23A

MALE LOCKERS

G-24B

MALE

TOILET &

SHOWER

G-24A

CLEAN

CORE

SUPPORT

G-34

ETO RM

B-02C

VESTIBULE

HAC

B-02F

TOILET

B-02D

TOILET

B-02E

STAIR

NO 1

ELEVATOR

P-6

ELEVATOR

P-7

FEMALE TOILET

G-23C

FEMALE

LOCKERS

G-23D

VESTIBULE

STAFF LOUNGE

G-23

PHYSICIAN LOUNGE

G-24

ORTHOPEDIC OR 7

G-39

OFFICE

G-28

SCRUB

UP

ALCOVE

G-29

SCRUB-UP ALCOVE

G-30

OFFICE

G-31

EQUIP

G-28A

SUB

STERILE

G-42

PLASTER

& SPLINTS

G-41

EQUIP

STORAGE

G-40

OPERATING

RM GENERAL

G-27

SUB STERILE

G-26A

OPERATING

RM GENERAL

G-26

GENERAL

OPERATING RM

G-25

SUB

STERILE

G-21A

OPERATING

RM GENERAL

G-21

OPERATING

RM GENERAL

G-19

SCRUB

SUB

STERILE

G-19A

REC & OR

HEAD NURSES

G-01

ELECTRICAL CLOSET

G-22

PHONE/SGNL RM

EXT RAD

CNTROLRM

G-20A

STORAGE

G-20B

INSTRUMENT & STERILE

G-20C

CYSTOSCOPY RM

G-20

HOLDING

G-17

OFFICE

G-02A

CLERICAL

G-02

OFFICE

G-02E

OFFICE

G-02D

OFFICE

G-02C

OFFICE

G-02B

CONTROL

G-03

DRESSING

& HOLDING

G-15

SEC

G-16

OFFICE

G-04

TOILET

G-15A

TOILET

G-15B

OFFICE

G-07

SEC

G-13

CONFERENCE RM

G-14

HAC

G-12

ELEVATOR LOBBY

CB-10A

ELEVATOR LOBBY

CB-16D

NUCLEAR

CARDIOLOGY

A-25Q

HAZ.

HAZ.

45 & 30 KVA

45 KVA

MENS RESTROOM WOMENS RESTROOM

45 KVA

150 KVA

30 KVA

HOUSE KEEPING

STORAGE

45 & 30 KVA

45 KVA 45 KVA

KVA

112.5 KVA

75 KVA

EQUIP

F-7A

PEN

D-19A

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

STRETCHER ALCOVE

WC

ALCOVE

STRETCHER ALCOVEWC

ALCOVE

STERILE STORAGE

30KVA

112.5 KVA

112.5 KVA

MULTI-PURPOSE

B-G127S

TLT

B-B101G

ALCOVE

B-G127V

C

LE

A N

S U

P P

LY

B \-G

7R

PV CV LAB #1

B-B101I

EPS CV LAB #2

B-G127J

CONTROL #1

B-B101J

CV LAB #3 (BID

ITEM 5)

B-B101O

CONTROL #2 (BID

ITEM 5)

B-B101Q

CORRIDOR

B-G127F

VIEW

B-G127O

CV EQUIP #2

B-B101N

SOILED UTIL

B-B101E

PREP/HOLDING

B-G127T

H.A.C

B-B101H

CRASH CART

ALCOVE

B-B101R

TLT

1-G127W

CV EQUIP #3

B-B101P

ALCOVE

B-G127W

ALCOVE

B-G127X

CHANGE

B-G127Y

COR.

B-G127Z

CLEAN LINEN

B-G127AA

ALCOVE

B-G127BB

C V

E Q

U

IP

B -B

1N

R am p U p

O V

E R

A L L T

R A

V E

L D

IS

T

A N

C E

SITE LOGISTICS LEGEND

BUILDING FOOTPRINT

PROPOSED STAGING AREA

AREA OF WORK BOUNDARY

LEGEND

NOT IN SCOPE

APROXIMATE CONSTRUCTION

ACCESS ROUTE

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2 /2

:1

:5

P M

C U s e rs \a p u lle n

\D o c u m e n ts

\A

-3

-Q

-V A

N a s h v ill e -R e p la c e

A H

U

-T N a p u lle n V

D X

T .r v t

G-102

BASEMENT PLAN - CONSTRUCTION

ACCESS ROUTE

4 4LB

REPLACE AIR HANDLING

UNIT #23

VA Tennessee Valley Healthcare System 1310 24th Avenue South

Nashville, TN 37212 AUGUST 27, 2021

100% CONSTRUCTION DOCUMENTS

626-20-20120-326

KK

N

AREA OF WORK

BUILDING 107

KEY PLAN

SCALE: NO SCALE

Scale: 3/64" = 1'-0"

BASEMENT PLAN - CONSTRUCTION ACCESS ROUTE

1 LOADING DOCK ACCESS.

2 STAIRS LEADING FROM BASEMENT TO FAN

ROOM #6.

3 APPROXIMATE CONSTRUCTION FENCE ROUTE.

4 PRIMARY CONSTRUCTION ENTRANCE.

5 PROPOSED CONSTRUCTION LAY-DOWN AREA

TO BE APPROVED BY COR. ALL MATERIAL

STORAGE, TRAILERS, EQUIPMENT, AND

PORTABLE TOILETS SHALL BE PLACED IN THIS

AREA.

6 STICKY MAT.

7 PROTECT STAIRWAY FINISHES, RAILING, AND

DOOR FROM CONSTRUCTION MATERIAL

MANEUVERING.

N O

R T

H0 4 8 16

11811

KO

RLA K . KUDJ IKU

CHARLOTTE , NORTH CAROL

I N

ANOR T H C A R O L I N

A

RE

UP

I

10 11 12

G

F

E

H

FAN ROOM

6A

ROOM

STAIR

I

10 11 12

G

F

E

H

FAN ROOM

ROOM

6A

STAIR

L1

AREA OF WORK BOUNDARY

LEGEND

EXISTING WALL TO REMAIN

NEW WALL

EXISTING DOOR TO REMAIN

DEMOLISHED WALL

NOT IN SCOPE

A. CONTRACTOR TO ENSURE PROPER SAFETY

BARRIERS AND ENCLOSERS ARE PROVIDED AT

ALL ENTRY/EXIT POINTS FROM BUILDING WHERE

WORK IS BEING PERFORMED ABOVE.

B. CONTRACTOR TO SET UP AND MAINTAIN

TEMPORARY ENTRANCES AND PROTECTIVE

MEASURES WHERE WORK IS BEING PERFORMED,

AND ENSURE THAT ALL PERSONNEL WEAR

PROPER SAFE DEVICES/FALL PROTECTION.

C. SEE SHEET G-001 FOR GENERAL NOTES.

D. CONTRACTOR TO PROVIDE TEMPORARY

PROTECTION DURING CONSTRUCTION AT

TEMPORARY OPENINGS. REPAIR AND PATCH

DISTURBED FINISH TO MATCH EXISTING

SURFACE.

E. CONTRACTOR TO PROVIDE LINTEL AT NEW

OPENING IN EXTERIOR WALL.

F. PROTECT STAIRWAY FINISHES, RAILING, AND

DOOR FROM CONSTRUCTION MATERIAL

MANEUVERING.

Engineers Architects

# KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2 HR - FIRE SEPARATION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2 /2

:1

:5

P M

C U s e rs \a p u lle n

\D o c u m e n ts

\A

-3

-Q

-V A

N a s h v ill e -R e p la c e

A H

U

-T N a p u lle n V

D X

T .r v t

A-101

FAN ROOM #6 DEMOLITION AND NEW

WORK PLANS

1 1LB

REPLACE AIR HANDLING

UNIT #23

VA Tennessee Valley Healthcare System 1310 24th Avenue South

Nashville, TN 37212 AUGUST 27, 2021

100% CONSTRUCTION DOCUMENTS

626-20-20120-326

KK

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

FAN ROOM #6 DEMOLITION PLAN

Scale: 1/8" = 1'-0"

FAN ROOM #6 NEW WORK PLAN

N O

R T

H0 4 8 16

N

AREA OF WORK

BUILDING 107

KEY PLAN

SCALE: NO SCALE

1 INSTALL NEW AHU AND EQUIPMENT PLATFORM.

SEE MECHANICAL DRAWINGS.

2 EXISTING CONCRETE STEP TO REMAIN.

3 EXISTING ROOF TO REMAIN.

4 EXISTING EQUIPMENT TO REMAIN.

5 REINSTALL EXISTING DOOR FOLLOWING

REPLACEMENT OF NEW AHU.

6 INFILL TEMPORARY WALL OPENING FOLLOWING

REPLACEMENT OF NEW AHU. WALL INFILL AND

FINISHES TO MATCH EXISTING EXTERIOR WALL

CONSTRUCTION.

7 TEMPORARY AHU. SEE MECHANICAL DRAWINGS

FOR ADDITIONAL INFORMATION.

8 NEW LOUVER. SEE MECHANICAL DRAWINGS FOR

ADDITIONAL INFORMATION.

9 EXISTING DOOR TO REMAIN.

1 REMOVE EXISTING AHU AND EQUIPMENT

PLATFORM. REPAIR AND PATCH DISTURBED FINISH

TO MATCH EXISTING SURFACE. SEE MECHANICAL

DRAWINGS FOR ADDITIONAL DETAILS AND

REQUIRED SUPPORT FOR EXISTING EQUIPMENT TO

REMAIN.

2 EXISTING CONCRETE STEP TO REMAIN.

3 EXISTING ROOF TO REMAIN.

4 EXISTING EQUIPMENT TO REMAIN.

5 EXISTING DOOR TO BE TEMPORARILY REMOVED TO

FACILITATE AHU EQUIPMENT REMOVAL AND

REPLACEMENT. CONTRACTOR TO PROVIDE

TEMPORARY PROTECTION DURING

CONSTRUCTION.

6 REMOVE PORTION OF EXISTING WALL AS

REQUIRED FOR THE REMOVAL AND REPLACEMENT

OF AHU EQUIPMENT. CONTRACTOR TO

COORDINATE REQUIRED OPENING SIZE AND

LOCATION WITH AHU MANUFACTURER AND

EXISTING SPRINKLER PIPING.

7 EXISTING EXTERIOR WALL (GYPSUM BOARD ON

METAL STUDS AND CORRUGATED PANEL).

8 PLASTIC ZIPPER WALL CURTAIN BARRIER.

9 PROVIDE STICKY MATS (CHANGED AT THE END OF

SHIFT OR MORE IF NECESSARY TO MAINTAIN

CLEANLINESS).

10 EXISTING SPRINKLER PIPE.

11 EXISTING DOOR TO REMAIN.

Scale: No Scale

FAN ROOM #6 DEMOLITION PHOTOS

DEMO

NEW

apullen Model

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AB AIR BLENDER

AAV AUTOMATIC AIR VENT

ACC AIR-COOLED CONDENSER

ACCH AIR-COOLED CHILLER

ACCU AIR-COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

ACD AUTOMATIC CONTROL DAMPER,

MODULATING

ACD-TP AUTOMATIC CONTROL DAMPER,TWO

POSITION

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERAGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND

REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT

EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BSC BIOLOGICAL SAFETY CABINETS

BT BUFFER TANK

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C CENTIGRADE (CELSIUS)

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CENT CENTRIFUGAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CH CHILLER

CHWP CHILLED WATER PUMP

CHW CHILLER WATER

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXIDE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CHWCC CHILLED WATER COOLING COIL

D DAMPER - AUTOMATIC

D-1 OUTDOOR AIR DAMPER

D-2 RETURN AIR DAMPER

D-3 RELIEF AIR DAMPER

D-4 ECONOMIZER OUTDOOR AIR

DAMPER

dB DECIBELS Db DRY-BULB TEMPERATURE

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE

ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

ECC ENGINEERING CONTROL CENTER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FM FLOW METER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GS GALVANIZED STEEL

H HUMIDIFIER

H&CW HOT & COLD WATER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HD HOOD

HHW HEATING HOT WATER

HHWC HEATING HOT WATER COIL

HHWP HEATING HOT WATER PUMP

HHWR HEATING HOT WATER RETURN

HHWS HEATING HOT WATER SUPPLY

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN (STEAM

CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWUH HOT WATER UNIT HEATER

HX HEAT EXCHANGER

Hz HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTEGRATED PART LOAD VALUE

IRH INFRARED HEATER

IS INSECT SCREEN

IV INLET VANES

kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR

L LITER

L/s LITERS PER SECOND

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LH LATENT HEAT

LPR LOW PRESSURE RETURN (STEAM

CONDENSATE)

LPS LOW PRESSURE SUPPLY (STEAM)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL

PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/s METERS PER SECOND (OR

METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING

VALUE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN (STEAM

CONDENSATE)

MPS MEDIUM PRESSURE SUPPLY (STEAM)

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC & ATMOSPHERIC

ADMINISTRATION

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

OA OUTSIDE AIR

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OR OPERATING ROOM

OSA OUTSIDE SUPPLY AIR

(CONDITIONED)

P PUMP

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PF PRE-FILTER

PG PRESSURE GAGE

PHC PREHEAT COIL

PHCP PREHEAT COIL PUMP

PPM PARTS PER MILLION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH –

ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

R/E RETURN OR EXHAUST

RA RETURN AIR

RAT RETURN AIR TEMPERATURE

RAH RETURN AIR HUMIDITY

RDS ROOM DATA SHEETS

REA RELIEF AIR

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND

DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSR SOLID SEPARATOR

ST STEAM TRAP

SV STEAM SAFETY VALVE

SVS STEAM VENT SILENCER

T & PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TP TRAP

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

UC UNDER CUT

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL

OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE)

RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

W WATTS

Wb WET-BULB (TEMPERATURE)

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

XT EXPANSION TANK

YR YEAR

CO2 CARBON DIOXIDE SENSOR

HUMIDISTAT OR HUMIDITY SENSOR

SUPPLY DIFFUSER

RETURN GRILLE

EXHAUST GRILLE

ROUND FLEX DUCT

EQUIPMENT TAG

LINEAR SLOT DIFFUSER

BALANCING DAMPER

FIRE DAMPER

SMOKE DAMPER

D

R INCLINED RISE, IN

DIRECTION OF AIRFLOW

INCLINED DROP, IN DIRECTION

OF AIRFLOW

CONNECT NEW DUCT

TO EXISTING

LIMIT OF DEMOLITION

VANED ELBOW (PROVIDE ALL

SQUARE OR RECTANGULAR

ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

STANDARD RADIUS ELBOW

(LONG RADIUS)

10x8 NEW DUCT (INSIDE

DIMENSIONS: WIDTH X DEPTH)

EXISTING DUCT TO REMAIN

EXISTING DUCT TO BE

DEMOLISHED

DUCT TRANSITION

END MOUNTED OR SIDEWALL GRILLE

SUPPLY

RETURN45°

45°

DN

DN

UP

UP

DNUP

STANDARD BRANCH SUPPLY OR

RETURN, NO SPLITTER…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .