Drawings - Bid Full Set.pdf

PDF 13 MB Posted

Attached to
Y1DA-- 561A4-20-101 - Replace Flooring Federal contract opportunity
Solicitation number
36C24222B0008
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This notice is for a federal contract solicitation to replace flooring at multiple buildings on the campus of the VA New Jersey Healthcare System in Lyons, New Jersey. The solicitation number is 36C24222B0008 and has an estimated value between $500,000 and $1,000,000. This is a service-disabled veteran-owned small business set aside requiring bonding. The scope of work involves removing and replacing carpeted flooring installed over 30 years ago across approximately 18,000 square feet in buildings 2, 3, 10 and 11. The contract drawings and specifications are provided in the related file. The response deadline will be included in the solicitation to be posted on December 1, 2021. All offerors must be registered in the System for Award Management and verified as an SDVOSB in the Vendor Information Pages database by the time of proposal submission and award.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA-- 561A4-20-101 - Replace Flooring, newest first.
File Type Posted
36C24222B0008 0001.docx DOCX document
Response to Request for Information No. 1.xlsx XLSX spreadsheet
Project Manual and Specifications.pdf PDF
36C24222B0008_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIRCLE RD

KN

O

LLC

R

O

FT R

D

CIRCLE RD

S.W . G

ATE N

O

2 R D

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C :\U se rs

\jo n\

D oc um en ts \V

AM

C

L yo ns _C

D S et _J on 7X

K2 F.

rv t

7/

/2

4:

:0

PM

G-001

TITLE SHEET FLOORING REPLACEMENT AT

THE LYONS VAMC

151 KNOLLCROFT RD, LYONS, NJ 07939

561A4-20-101

AS NOTED

Project Director

01/26/21 JMC DRN

ISSUED FOR BID

FLOORING REPLACEMENT

AT THE LYONS VAMC

151 KNOLLCROFT RD, LYONS, NJ 07939 - BUILDINGS 2, 3,10,11

SITE VICINITY MAP SYMBOLS

x x

TITLE

SHEET

XX

x x x x x x x x

N

E

S

W

WINDOW TYPE

REVISIONS

ROOM NAME

ROOM NUMBER

DATUM LINE

DETAIL NUMBER

SHEET NUMBER

PARTITION TYPE

DOOR NUMBER

KEYED NOTE

SECTION

SHEET NUMBER

BUILDING ELEVATION

SHEET NUMBER

INTERIOR ELEVATIONS

SHEET NUMBER

DETAIL

SHEET NUMBER

KEY MAPS - PROJECT AREAS FLOOR PLANS

1" = 50'-0" 3 Building 10 Key Plan

1" = 50'-0" 4 Building 11 - First Floor Key Plan

1" = 50'-0" 5 Building 11 Second Floor Key Plan

1" = 50'-0" 1 Building 2 Key Plan

1" = 50'-0" 2 Building 3 Key Plan

DRAWING LIST

Sheet Number Sheet Name

G-001 TITLE SHEET

G-003 CODE NOTES AND INFECTION CONTROL

AD101 DEMOLITION PLANS - BUILDINGS 2 AND 3

AD102 DEMOLITION PLANS - BUILDINGS 10 AND 11

AS101 PHASING PLANS - BUILDINGS 2 AND 3

AS102 PHASING PLANS - BUILDINGS 10 AND 11

AS103 FINISH PLANS - BUILDINGS 2 AND 3

AS104 FINISH PLANS - BUILDINGS 10 AND 11

AS300 FINISH SCHEDULE, NOTES, AND DETAILS

NORTH ARROW

PROJECT AREAS:

BUILDING 2: 262 SF

BUILDING 3: 7,242 SF

BUILDING 10: 1,469 SF

BUILDING 11 FIRST FLOOR: 2,997 SF

BUILDING 11 SECOND FLOOR: 5,460 SF

COMBINED TOTAL NET SF: 17,430 SF

ABBREVIATIONS

4IB 4" INTEGRAL BASE

6IB 6" INTEGRAL BASE

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/E ARCHITECT/ENGINEER

ABV ABOVE

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADH ADHESIVE

ADJ ADJACENT

ADMIN ADMINISTRATION

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

ALT ALTERNATE

ALUM ALUMINUM

APPROX APPROXIMATE

ARCH ARCHITECT

ASB ASBESTOS

ASPH ASPHALT

ASSN ASSOCIATION

AUTO AUTOMATIC

AUX AUXILIARY

BAT BATTEN

BD BOARD

BEV BEVEL

BKG BACKING

BLDG BUILDING

BOT BOTTOM

BTWN BETWEEN

C TO C CENTER TO CENTER

CAB CABINET

CONC CONCRETE

CIR CIRCLE

CL CENTER LINE

CLDG CLADDING

CLG CEILING

CLG HTCEILING HEIGHT

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CNTR COUNTER

COL COLUMN

CONC FLR CONCRETE FLOOR

CONSTR CONSTRUCTION

CONT CONTINUE

COORDCOORDINATE

CPT CARPET OR CARPET TILE

CSWK CASEWORK

CT CERAMIC TILE

CTRL CONTROL

DAT DATUM

DC DIRECT CURRENT

DEG DEGREE

DEL DELETE

DEMO DEMOLITION

DEPT DEPARTMENT

DTL DETAIL

DIFF DIFFERENCE

DIM DIMENSION

DIR DIRECTION

DR DOOR, OR DRAIN

DR OPNG DOOR OPENING

E.J. EXPANSION JOINT

EL ELEVATION

ELEC ELECTRIC

ELEV ELEVATOR

EMER EMERGENCY

ENGR ENGINEER

EQ EQUAL

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ESP ESPECIALLY

EXIST EXISTING

FA FIRE ALARM

FAS FASCIA

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FIN FLRFINISH FLOOR

FIXT FIXTURE

FLR FLOOR

FP FIRE PROTECTION OR FIREPROOF

FRT FIRE RETARDANT TREATED

FRZ FREEZER

FT FEET OR FOOT

FURN FURNISH OR FURNITURE

GA GAGE OR GYPSUM ASSOCIATION

GAL GALLON

GALV GALVANIC OR GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GEN GENERAL OR GENERATOR

GL GLASS

GLU LAM GLUED LAMINATED WOOD

GT GROUT

GYP GYPSUM

GYP BD GYPSUM BOARD

HB HOSE BIBB

HC HOLLOW CORE

HDWD HARDWOOD

HM HOLLOW METAL

HT HEIGHT

HVAC HEATING, VENTILATING,

AND AIR CONDITIONING

ID IDENTIFICATION

ILLUM ILLUMINATION

INCL INCLUDED

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

JAN JANITOR

J-BOX JUNCTION BOX

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LDR LEADER

LED LIGHT EMITTING DIODE

LT LIGHT

LVD LOUVERED

LVR LOUVER

LVT LUXURY VINYL TILE

LYR LAYER

MAINT MAINTENANCE

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MEMO MEMORANDUM

MEZZ MEZZANINE

MID MIDDLE

MIRR MIRROR

MISC MISCELLANEOUS

MLDG MOLDING (MOULDING)

MLWK MILLWORK

MO MASONRY OPENING

MTL METAL

MULL MULLION

NA NOT APPLICABLE

NAT NATURAL

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NUM NUMERAL

OC ON CENTER

OCC OCCUPY

OFF OFFICE

OPNG OPENING

OPP OPPOSITE

OSHA OCCUPATIONAL SAFETY

AND HEALTH ADMINSTRATION

OZ OUNCE

PART PARTIAL

PAT PATTERN

PEN PENETRATE

PERF PERFORATED

PERP PERPENDICULAR

PLAS PLASTER OR PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PNL PANEL

PRB PROFILE BASE

PRCST PRECAST

PREFAB PREFABRICATE

PRELIMPRELIMINARY

PREP PREPARATION

PREV PREVIOUS

PROP PROPERTY

PTD PAINTED

PVC POLYVINYL CHLORIDE (PLASTIC)

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QT QUARRY TILE

QTB QUARRY TILE BASE

QTR QUARTER

QTY QUANTITY

R RADIUS OR RISER

RAD RADIATOR

RB RESILIENT BASE OR RUBBER BASE

RBR RUBBER

RCP REFLECTED CEILING PLAN

RCVR RECEIVER

RD ROAD OR ROOF DRAIN

REC RECESSED

RECT RECTANGLE

REF REFERENCE OR REFRIGERATOR

REINF REINFORCE

REQ REQUIRE

REQD REQUIRED

RES RESINOUS FLOORING

RESIL RESILIENT

RET RETURN

REV REVISION

RF RUBBER FLOORING

RM ROOM

RND ROUND

RO ROUGH OPENING

SALV SALVAGE

SBSTR SUBSTRATE

SCHED SCHEDULE

SCHEM SCHEMATIC

SECT SECTION

SEP SEPARATE

SF SQUARE FOOT (FEET)

SLNT SEALANT

SMK SMOKE

SPEC SPECIFICATION

SPKLR SPRINKLER

SPLY SUPPLY

SQ SQUARE

SS STAINLESS STEEL

STD STANDARD

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

SURF SURFACE

SUSP SUSPEND

SVT SOLID VINYL FLOOR TILE

SYS SYSTEM

T&G TONGUE AND GROOVE

TECH TECHNICAL

TEL TELEPHONE

TEMP TEMPERATURE OR TEMPORARY

THK THICKNESS

THRU THROUGH

TMPD TEMPERED

TO TOP OF ___

TRANS TRANSOM

TRTD TREATED

TYP TYPICAL

U HEAT TRANSFER COEFFICIENT

UPS UNINTERRUPTIBLE POWER SUPPLY

UTIL UTILITY

UV ULTRAVIOLET

VAC VACUUM

VAR VARIES

VCT VINYL COMPOSITION TILE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VIF VERIFY IN FIELD

VOL VOLUME

W/ WITH

W/O WITHOUT

WD WOOD

WSCT WAINSCOT

WSF WELDED SEAM SHEET FLOORING

WT WEIGHT

Revisions: Date:

50% WORKING DRAWINGS 01/25/21

100% WORKING DRAWINGS 05/12/21

ISSUED FOR BID 07/21/21

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C :\U se rs

\jo n\

D oc um en ts \V

AM

C

L yo ns _C

D S et _J on 7X

K2 F.

rv t

7/

/2

4:

:1

PM

G-003

CODE NOTES AND INFECTION

CONTROL

FLOORING REPLACEMENT AT

THE LYONS VAMC

151 KNOLLCROFT RD, LYONS, NJ 07939

561A4-20-101

AS NOTED

Approver

01/26/21 JMC HJIII

ISSUED FOR BID

INFECTION CONTROL NOTES

THE PURPOSE OF INFECTION CONTROL PROCEDURES IS TO MINIMIZE THE POTENTIAL FOR THE SPREAD OF INFECTIONS DUE TO DEGRADED AIR QUALITY, ENVIRONMENTAL CONTAMINATION, OR CONTAMINATION OF WATER. IT IS THE POLICY OF THIS MEDICAL CENTER THAT A SYSTEMATIC APPROACH BASED ON ASSESSMENT AND PLANNING WILL EFFECTIVELY MANAGE THE ISSUE OF TRANSMISSION OF INFECTIOUS DISEASES AND THE AGGRAVATION OF ALLERGIES. THE OVERALL APPROACH RELIES ON PRE-CONSTRUCTION ASSESSMENT, MANAGEMENT OF HVAC SYSTEMS, AND AGGRESSIVE USE OF A VARIETY OF BARRIERS. CONTRACTOR IS TO WORK CLOSELY WITH THE VA FACILITY MANAGEMENT SERVICE. THE INFECTION CONTROL PROGRAM STAFF AND THE SAFETY AND OCCUPATION HEALTH MANAGER TO HAVE IN PLACE A MONITORING A PROGRAM TO ASSURE RIGOROUS IMPLEMENTATION OF THE REQUIRED MEASURES. REFER TO PROJECT SPECIFICATIONS.

A. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD AND COORDINATE ALL

INFECTION CONTROL REQUIREMENTS WITH THE DEMOLITION AND NEW CONSTRUCTION. THE

CONTRACTOR SHALL REPORT ALL DISCOVERIES TO THE OWNER'S REPRESENTATIVE FOR

RESOLUTION PRIOR TO BEGINNING.

B. CONTRACTOR TO INSTALL BARRIERS AND OTHER MEASURES. CONSTRUCTION BARRIER DOOR(S) MUST BE SELF-CLOSING. PROVIDE DUST CONTROL AND CONTAINMENT STICKY MATS ON ALL ACCESS

DOORS INTO CONSTRUCTION AREA. ANTE-ROOM REQUIRED AT CONSTRUCTION ENTRY. PROVIDE

MANOMETER MONITORS FOR ALL CONSTRUCTION BARRIERS.

C. CONTRACTOR TO DISPOSE OF MATERIALS BEFORE 8:00AM OR AFTER 4:00PM UNLESS ARRANGED WITH

THE VA TO DISPOSE OF DURING NORMAL HOURS. USE ROUTE AGREED UPON BY ICRA TEAM AND

COTR FOR TRANSPORT OF TRANSPORT CONTAINERS THROUGH THE FACILITY. CONTRACTORS CAN

ONLY DEVIATE TO NORMAL HOURS WITH THE APPROVAL OF THE INFECTION CONTROL NURSE AND COR DUE TO PARTICULAR CIRCUMSTANCES THAT MAY OBSTRUCT PROGRESS. A CLEAR PLAN WILL

HAVE TO BE SUBMITTED AND PRECAUTIONARY INFECTION CONTROL MEASURES IMPLEMENTED.

D. CONTRACTOR TO COVER CARTS AND WEAR BOOTIES WHEN DISPOSING MATERIALS.

E. CONTRACTOR TO CHANGE MATS MULTIPLE TIMES A DAY AS NEEDED AND MOP FLOORS BEHIND THEM

MULTIPLE TIMES A DAY.

F. CONTRACTOR TO MAINTAIN CONTINUOUS NEGATIVE AIR PRESSURE WITHIN THE WORK SITE UTILIZING

WINDOW EXHAUST FANS STRATEGICALLY LOCATED OR PROVIDE NEGATIVE PRESSURE AIR HEPA

UNITS AND EXHAUST TO EXTERIOR OF THE BUILDING. CONTRACTOR TO INCLUDE MONITORING

MANOMETER AT ANTEROOM SO THE NEGATIVE PRESSURE CAN BE INSPECTED.

BUILDINGS 2 AND 3 - CODE NOTES

A. 1. PRIMARY APPLICABLE CODES AND STANDARDS - EXISTING BUILDING / RECONSTRUCTION THE DEPARTMENT OF VETERANS AFFAIRS HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION OR

IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURE.

a. NFPA 101 LIFE SAFETY CODE, 2021 EDITION

NFPA 101 REVIEW

A. INTERIOR FLOOR FINISH - BUSINESS OCCUPANCIES - SECTION 38.3.3.3 AND 10.2

1. (38.3.3.3.1) INTERIOR FLOOR FINISH SHALL COMPLY WITH SECTION 10.2.

- (10.2.1.1) CLASSIFICATION OF INTERIOR FINISH MATERIALS SHALL BE IN ACCORDANCE WITH TESTS MADE UNDER CONDITIONS SIMULATING ACTUAL INSTALLATIONS, PROVIDED THAT THE AUTHORITY HAVING JURISDICTION IS PERMITTED TO ESTABLISH THE CLASSIFICATION OF ANY MATERIAL FOR WHICH

CLASSIFICATION BY A STANDARD TEST IS NOT AVAILABLE.

- (10.2.2.2) INTERIOR FLOOR FINISH SHALL COMPLY WITH 10.2.7 UNDER ANY OF THE FOLLOWING CONDITIONS:

1. WHERE FLOOR FINISH REQUIREMENTS ARE SPECIFIED ELSEWHERE IN THE CODE.

(2) WHERE THE FIRE PERFORMANCE OF THE FLOOR FINISH CANNOT BE DEMONSTRATED TO BE EQUIVALENT TO FLOOR FINISHES WITH A CRITICAL RADIANT FLUX OF AT LEAST 0.1 W/cm2.

2. (38.3.3.3.3) INTERIOR FLOOR FINISH SHALL COMPLY WITH 10.2.7.1 OR 10.2.7.2, AS APPLICABLE.

- (10.2.7.2) FLOOR COVERINGS, OTHER THAN CARPET FOR WHICH 10.2.2.2 ESTABLISHES REQUIREMENTS FOR FIRE PERFORMANCE, SHALL HAVE A MINIMUM CRITICAL RADIANT FLUX OF 0.1 W/cm2.

B. INTERIOR FLOOR FINISH - HEALTH CARE OCCUPANCIES - SECTIONS 18.3.3.3, 18.4.4.6.3, 19.3.3.3, AND 10.2

1. (18.3.3.3.1) INTERIOR FLOOR FINISH SHALL COMPLY WITH SECTION 10.2.

- (10.2.1.1) CLASSIFICATION OF INTERIOR FINISH MATERIALS SHALL BE IN ACCORDANCE WITH TESTS MADE UNDER CONDITIONS SIMULATING ACTUAL INSTALLATIONS, PROVIDED THAT THE AUTHORITY HAVING JURISDICTION IS PERMITTED TO ESTABLISH THE CLASSIFICATION OF ANY MATERIAL FOR WHICH

CLASSIFICATION BY A STANDARD TEST IS NOT AVAILABLE.

- (10.2.2.2) INTERIOR FLOOR FINISH SHALL COMPLY WITH 10.2.7 UNDER ANY OF THE FOLLOWING CONDITIONS:

1. WHERE FLOOR FINISH REQUIREMENTS ARE SPECIFIED ELSEWHERE IN THE CODE.

(2) WHERE THE FIRE PERFORMANCE OF THE FLOOR FINISH CANNOT BE DEMONSTRATED TO BE EQUIVALENT TO FLOOR FINISHES WITH A CRITICAL RADIANT FLUX OF AT LEAST 0.1 W/cm2.

(18.3.3.3.3) INTERIOR FLOOR FINISH SHALL COMPLY WITH 10.2.7.1 OR 10.2.7.2, AS APPLICABLE.

- (10.2.7.2) FLOOR COVERINGS, OTHER THAN CARPET FOR WHICH 10.2.2.2 ESTABLISHES REQUIREMENTS FOR FIRE PERFORMANCE, SHALL HAVE A MINIMUM CRITICAL RADIANT FLUX OF 0.1 W/cm2.

2. (19.3.3.3) NO RESTRICTIONS SHALL APPLY TO EXISTING INTERIOR FLOOR FINISH.

C. FLOOR LEVEL - SECTIONS 7.2.1.3

1. (7.2.1.3.1) THE ELEVATION OF THE FLOOR SURFACES ON BOTH SIDES OF A DOOR OPENING SHALL NOT VARY BY MORE THAN 1/2 IN. (13 MM), UNLESS OTHERWISE PERMITTED BY 7.2.1.3.5, 7.2.1.3.6, OR 7.2.1.3.7.

- (7.2.1.3.5) IN EXISTING BUILDINGS, WHERE THE DOOR OPENING DISCHARGES TO THE OUTSIDE OR TO AN EXTERIOR BALCONY OR EXTERIOR EXIT ACCESS, THE FLOOR LEVEL OUTSIDE THE DOOR OPENING SHALL BE PERMITTED TO BE ONE STEP LOWER THAN THAT OF THE INSIDE, BUT SHALL BE NOT MORE THAN 8 IN.

(205 MM) LOWER.

- (7.2.1.3.6) IN EXISTING BUILDINGS, A DOOR ASSEMBLY AT THE TOP OF A STAIR SHALL BE PERMITTED TO OPEN DIRECTLY AT A STAIR, PROVIDED THAT THE DOOR LEAF DOES NOT SWING OVER THE STAIR AND THAT

THE DOOR OPENING SERVES AN AREA WITH AN OCCUPANT LOAD OF FEWER THAN 50 PERSONS.

- (7.2.1.3.7) WHERE DOORS SERVE SPACES THAT ARE NOT NORMALLY OCCUPIED, THE FLOOR LEVEL SHALL BE PERMITTED TO BE LOWER THAN THAT OF THE DOOR OPENING BUT SHALL BE NOT MORE THAN 8 IN.

(205 MM) LOWER.

BUILDINGS 2, 10, 11 INFECTION CONTROL RISK ASSESSMENT BUILDING 3 INFECTION CONTROL RISK ASSESSMENT

BUILDINGS 10 AND 11 - CODE NOTES

A. 1. PRIMARY APPLICABLE CODES AND STANDARDS - EXISTING BUILDING / RECONSTRUCTION THE DEPARTMENT OF VETERANS AFFAIRS HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION OR

IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURE.

a. NFPA 101 LIFE SAFETY CODE, 2021 EDITION

NFPA 101 REVIEW

A. INTERIOR FLOOR FINISH - BUSINESS OCCUPANCIES - SECTION 38.3.3.3 AND 10.2

1. (38.3.3.3.1) INTERIOR FLOOR FINISH SHALL COMPLY WITH SECTION 10.2.

- (10.2.1.1) CLASSIFICATION OF INTERIOR FINISH MATERIALS SHALL BE IN ACCORDANCE WITH TESTS MADE UNDER CONDITIONS SIMULATING ACTUAL INSTALLATIONS, PROVIDED THAT THE AUTHORITY HAVING JURISDICTION IS PERMITTED TO ESTABLISH THE CLASSIFICATION OF ANY MATERIAL FOR WHICH

CLASSIFICATION BY A STANDARD TEST IS NOT AVAILABLE.

- (10.2.2.2) INTERIOR FLOOR FINISH SHALL COMPLY WITH 10.2.7 UNDER ANY OF THE FOLLOWING CONDITIONS:

(1) WHERE FLOOR FINISH REQUIREMENTS ARE SPECIFIED ELSEWHERE IN THE CODE.

(2) WHERE THE FIRE PERFORMANCE OF THE FLOOR FINISH CANNOT BE DEMONSTRATED TO BE EQUIVALENT

TO FLOOR FINISHES WITH A CRITICAL RADIANT FLUX OF AT LEAST 0.1 W/cm2.

2. (38.3.3.3.3) INTERIOR FLOOR FINISH SHALL COMPLY WITH 10.2.7.1 OR 10.2.7.2, AS APPLICABLE.

- (10.2.7.2) FLOOR COVERINGS, OTHER THAN CARPET FOR WHICH 10.2.2.2 ESTABLISHES REQUIREMENTS FOR FIRE PERFORMANCE, SHALL HAVE A MINIMUM CRITICAL RADIANT FLUX OF 0.1 W/cm2.

B. FLOOR LEVEL - SECTIONS 7.2.1.3

1. (7.2.1.3.1) THE ELEVATION OF THE FLOOR SURFACES ON BOTH SIDES OF A DOOR OPENING SHALL NOT VARY BY MORE THAN 1/2 IN. (13 MM), UNLESS OTHERWISE PERMITTED BY 7.2.1.3.5, 7.2.1.3.6, OR 7.2.1.3.7.

- (7.2.1.3.5) IN EXISTING BUILDINGS, WHERE THE DOOR OPENING DISCHARGES TO THE OUTSIDE OR TO AN EXTERIOR BALCONY OR EXTERIOR EXIT ACCESS, THE FLOOR LEVEL OUTSIDE THE DOOR OPENING SHALL BE PERMITTED TO BE ONE STEP LOWER THAN THAT OF THE INSIDE, BUT SHALL BE NOT MORE THAN 8 IN.

(205 MM) LOWER.

- (7.2.1.3.6) IN EXISTING BUILDINGS, A DOOR ASSEMBLY AT THE TOP OF A STAIR SHALL BE PERMITTED TO OPEN DIRECTLY AT A STAIR, PROVIDED THAT THE DOOR LEAF DOES NOT SWING OVER THE STAIR AND THAT

THE DOOR OPENING SERVES AN AREA WITH AN OCCUPANT LOAD OF FEWER THAN 50 PERSONS.

- (7.2.1.3.7) WHERE DOORS SERVE SPACES THAT ARE NOT NORMALLY OCCUPIED, THE FLOOR LEVEL SHALL BE PERMITTED TO BE LOWER THAN THAT OF THE DOOR OPENING BUT SHALL BE NOT MORE THAN 8 IN.

(205 MM) LOWER.

Revisions: Date:

50% WORKING DRAWINGS 01/25/21

263 SF

WAITING ROOM

ELEVATOR

ELEVATOR

TYP.

PMRS STORAGE

PIPE CHASE

113A

CORRIDOR

TELE. CO.

EMG CLINIC

TYP.

1 2

TYP.

1 2

TYP.

1 2

TYP.

1 2

TYP.

1 2

TYP.

1 2

TYP.

EXISTING VCT

TO REMAIN

AREA OF

DEMOLITION

1 2 1 2

TYP.TYP.

9 WAITING

J101

304 SF

DIGESTIVE /

PULMONARY WAITING

G101

494 SF

NURSES STA.,RECEP.,

G102

662 SF

EXAM / TREATMENT -

WAITING

C101

557 SF

WAITING

B101

465 SF

PULMON. WAIT. 'G

E101

271 SF

EXAM / TREATMENT -

WAITING

505 SF

BREAK

J113

127 SF

SUPERVISOR

J112

105 SF

REMOVE

EXISTING BASE

(TYP)

TYP.

REMOVE CARPET

AROUND FIXED

SHELVING.

SHELVING TO

REMAIN IN PLACE

BROADLOOM CARPET

TO BE REMOVED

VINYL COMPOSITE TILE (VCT)

TO BE REMOVED

EXISTING FLOOR FINISH LEGEND

EXTENT OF BASE TO BE

REMOVED / REPLACED

CARPET TILE

TO BE REMOVED

HIGH POINTS OF EXISTING

SLAB- SEE KEYNOTE 3

GC TO REMOVE

0' - 3 1/2" WOOD BASE

EXISTING TO REMAIN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C :\U se rs

\jo n\

D oc um en ts \V

AM

C

L yo ns _C

D S et _J on 7X

K2 F.

rv t

7/

/2

4:

:3

PM

AD101

DEMOLITION PLANS - BUILDINGS 2

AND 3

FLOORING REPLACEMENT AT

THE LYONS VAMC

151 KNOLLCROFT RD, LYONS, NJ 07939

561A4-20-101

AS NOTED

Approver

01/26/21 JMC DRN

ISSUED FOR BID

1/4" = 1'-0" 1 Building 2 - First Floor Demolition Plan

1/8" = 1'-0" 2 Building 3 - First Floor Demolition Plan

BUILDING 2 - FIRST FLOOR

BUILDING 3 - FIRST FLOOR

KEY PLANS

DEMOLITION LEGEND

Key Value Keynote Text

1 REMOVE EXISTING FLOOR FINISH IN ENTIRETY TO THE SUBSTRATE. IN AREAS OF CARPET TILE, REMOVE ALL ADHESIVE FROM EXISTING SUBSTRATE. IN AREAS WITH BROADLOOM CARPET, REMOVE UNDERLAYMENT, TACK STRIPS AND ADHESIVES. REMOVE ANY TRIP HAZARDS, STEPS, OR HIGH POINTS IN EXISTING SUBSTRATE. REMOVE THRESHOLDS, TRANSITION, REDUCER STRIPS, ETC. REPAIR AND PATCH AS NEEDED.

CLEAN AND PREP SUBSTRATES FOR NEW INSTALLATION. SUBFLOOR SURFACE SHALL BE FLAT TO 3/16" IN

10'-0" AND 1/32" IN 1'-0".

2 REMOVE EXISTING WALL BASE TO THE EXTENT SHOWN. REMOVE ALL MATERIALS, ADHESIVES AND OTHER MATERIALS DOWN TO THE SUBSTRATE. PATCH AND REPAIR AS NECESSARY, AND/OR FILL GAPS AS

NECESSARY, CLEAN, AND PREP SUBSTRATES FOR INSTALLATION OF PROPOSED.

4 REMOVE EXISTING FLOORING AROUND RADIATOR- RADIATOR TO BE PROTECTED THROUGHOUT THE

PROJECT AND REMAIN IN PLACE. COORDINATE WITH VA IF DEMOLITION REQUIRES SCHEDULED

DEACTIVATION. TYPICAL. INSTALL ADJUSTABLE STAINLESS STEEL ESCUTCHEON PLATES AT ALL PIPE

PENETRATIONS.

5 EXISTING (+/-)3-1/2" BOTTOM PORTION OF WOOD BASE TO BE REMOVED FROM RECEPTION DESK. PREP MILLWORK FOR INSTALLATION OF A NEW WOOD BASE. SEE DETAIL 5 / AD 101 FOR EXTENT OF BASE.

6 AREA OF EXISTING VCT TO BE REMOVED TO THE NEXT FULL TILE PAST EXENT OF THE EXISTING CARPET

'TRIANGLE FORM'. ADJACENT VCT TO REMAIN.

7 EXISTING DISPLAY CASE TO BE EMPTIED AND REMOVED BY THE VA TO ALLOW FOR NEW FLOORING INSTALLATION. CONTRACTOR TO COORDINATE WITH VA AND PROVIDE 7 DAY ADVANCE NOTICE BEFORE

SCHEDULED DEMOLITION.

9 CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND STORAGE OF ALL FURNITURE AND EQUIPMENT TO ALLOW FOR DEMO/INSTALLATION, INCLUDING SEATING, PEDESTALS, TABLES, HAND SANITIZER STATIONS, AND CHECK-IN KIOSKS.

10 RETAIN EXISTING CORNER GUARDS AND END WALL CAPS. CONTRACTOR RESPONSIBLE FOR ANY

NECESSARY ALTERATIONS BETWEEN NEW FLOORING, WALL BASE AND CORNER GUARD. TYPICAL.

GENERAL DEMOLITION NOTES:

A. CONTRACTOR TO ABIDE BY ALL THE ICRA INFECTION CONTROL REGULATIONS.

B. PROVIDE STICK MATS WITH NEGATIVE AIR HEPA UNITS AND EXHAUST TO EXTERIOR OF BUILDING, FOR ALL

DEMOLITION WORK AREAS.

C. REFER TO PHASING PLANS FOR G.C. TO COORDINATE DEMOLITION & NEW WORK SCOPE AS REQUIRED TO

MAINTAIN OPERATIONS OF THE OCCUPIED SPACES WITHIN THE FACILITY.

D. G.C. TO COORDINATE ASBESTOS REMEDIATION WITH THE VA.

E. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD AND COORDINATE ALL REMOVAL ACTIVITIES WITH NEW CONSTRUCTION. THE CONTRACTOR SHALL REPORT ALL DISCREPANCIES TO THE

OWNER'S REPRESENTATIVE FOR RESOLUTION PRIOR TO BEGINNING REMOVALS.

F. PROTECT ALL CONSTRUCTION TO REMAIN FROM DAMAGE DURING REMOVAL OF ADJACENT CONSTRUCTION.

REPAIR / REPLACE CONSTRUCTION TO REMAIN THAT WAS DAMAGED DURING DEMOLITION TO MATCH THE QUALITY OF THE NEW WORK. PROVIDE DUST CONTROL AND CONTAINMENT MATS, FLOOR AND WALL

PROTECTION.

G. REPAIR, PATCH, AND FINISH, OR REFINISH AS APPLICABLE, TO MATCH ADJACENT EXISTING FINISHES

DAMAGED OR NEWLY EXPOSED DURING THE PERFORMANCE OF THE WORK OF THIS CONTRACT.

H. WHERE CUTTING OF EXISTING SURFACES OR REMOVAL OF EXISTING FINISHES IS REQUIRED TO PERFORM THE WORK UNDER THIS CONTRACT, AND A NEW FINISH IS NOT INDICATED, FILL RESULTING OPENINGS AND PATCH THE SURFACE AFTER DOING THE WORK, AND FINISH TO MATCH ADJACENT UN-REMOVED FLOORS.

I. WORK SHOWN IS NEW UNLESS SPECIFICALLY NOTED OR OTHERWISE INDICATED AS EXISTING.

J. WHERE "MATCH EXISTING" IS INDICATED, NEW CONSTRUCTION OR FINISHES, AS APPROPRIATE TO THE NOTE, SHALL MATCH THE EXISTING IN PARTICULAR.

K. DEFINITIONS:

K1. REMOVE: REMOVE AND LEGALLY DISPOSE OF ITEMS EXCEPT THOSE INDICATED TO BE REINSTALLED, SALVAGED, OR EXISTING.

K2. SALVAGE: ITEMS INDICATED TO BE SALVAGED SHALL REMAIN THE OWNER'S PROPERTY. REMOVE, CLEAN AND PACK OR CRATE ITEMS TO PROTECT AGAINST DAMAGE. IDENTIFY CONTENTS OF CONTAINERS AND

DELIVER TO OWNER'S DESIGNATED STORAGE AREA.

K3. REINSTALL: REMOVE ITEMS INDICATED. CLEAN SERVICE AND OTHERWISE PREPARE THEM FOR REUSE.

STORE AND PROTECT AGAINST DAMAGE. REINSTALL ITEMS IN THE SAME LOCATIONS OR IN LOCATIONS

INDICATED.

K4. EXISTING: ORIGINAL ITEM TO REMAIN. PROTECT CONSTRUCTION INDICATED AS EXISTING AGAINST

DAMAGE AND SOILING DURING SELECTIVE DEMOLITION.

K5. RESTORE: ITEMS INDICATED SHALL BE BROUGHT BACK TO THEIR ORIGINAL CONDITION. ORIGINAL CONDITION IS THE CONDITION THAT THE REFERENCED ITEM WAS IN WHEN THE BUILDING WAS FIRST

CONSTRUCTED.

K6. REPLACE: EXISTING ITEM TO BE REMOVED. PROVIDE NEW ITEM TO MATCH EXISTING.

L. G.C. TO COORDINATE THE PHASING OF ALL WORK WITH THE VA.

M. TRASH IS TO BE REMOVED DAILY, CONTRACTOR SHALL KEEP THE SITE CLEAN AT ALL TIMES. G.C. TO PROVIDE THEIR OWN DUMPSTER(S) FOR TRASH REMOVAL AND CONSTRUCTION DEBRIS. G.C. IS NOT AUTHORIZED TO US

VA DUMPSTERS. G.C. TO COORDINATE DUMPSTERS DROP OFF LOCATION(S) WITH THE COR.

N. WHERE REQUIRED BY ICRA, TEMPORARY CONTINOUS CONSTRUCTION BARRIER MUST BE IN PLACE PRIOR TO ANY DEMOLITION. G.C. TO DETERMINE LOCATION FOR TEMPORARY CONSTRUCTION BARRIER DOOR ACCESS.

CONSTRUCTION BARRIER DOOR(S) MUST BE SELF-CLOSING. PROVIDE STICKY MATS ON ALL ACCESS DOORS INTO CONSTRUCTION AREA (BOTH SIDES OF DOORS). ANTE-ROOM REQUIRED AT CONSTRUCTION ENTRY.

PAINT PUBLIC FACE OF TEMP BARRIER WHITE.

O. PROVIDE NANOMETER PRESSURE MONITORS FOR ALL CONSTRUCTION BARRIERS.

P. DEMOLITION DEBRIS MUST BE BAGGED PRIOR TO REMOVAL FROM SECURED AREA. DISCARD ALL MATERIALS IN

ACCORDANCE WITH ALL APPLICABLE LAWS & REGULATIONS.

Q. PROVIDE PLASTIC ZIP WALL BARRIERS AT ALL DOORS INTO AREAS TO CREATE CONTAINED DEMO AREAS.

ALL REMOVED FLOORING MATERIALS MUST BE BAGGED PRIOR TO REMOVAL FROM CONTAINED DEMO AREAS.

COORDINATE WITH ICRA REQUIREMENTS.

3" = 1'-0" 5 Reception Desk Base Removal

NOTE:

ALL FURNITURE SHOWN WAS SURVEYED DURING TIMES OF SOCIAL DISTANCING DUE TO

COVID 19. THIS MAY CAUSE THE QUANTITY AND POSITION OF FURNITURE SHOWN TO BE

INACCURATE COMPARED TO THE TIME OF BID AND/OR CONSTRUCTION. BIDDING PARTIES

MUST ACCOUNT FOR THE REMOVAL, STORAGE, AND RESINSTATEMENT OF ADDITIONAL

FURNITURE AT THE TIME OF CONSTRUCTION.

Revisions: Date:

50% WORKING DRAWINGS 01/25/21

M .O

R ef

U.C.

Refr.

U.C.

Refr.

R ef

U .C

R ef r.

TV

CART

UP

R ef

.Ref.

DN

UP

DN

RAD.

RAD.RAD.

R

AD

RAD. RAD.

RAD.

RAD.

1 2

TYP.

1 2

TYP.

OFFICE AREA

PRINT ROOM

215A

AREA OF SCOPE

NOTE: BID THIS AREA

AS DEDUCT ALTERNATE

TYP.

9 3

TYP.

TYP.

CROSS HATCH

AREA DENOTE

HIGH AREAS OF

THE EXISTING

CONCRETE FLOOR

STRUCTURE. SEE

KEYNOTE 3.

175 SF

CHIEF IRM

145 SF

SUPERVISOR I.T.

SPECIALISTS

180 SF

IT ROOM

1089 SF

IRM TECHS

913 SF

IRM OPEN WORK

AREA

108A

162 SF

IRM RECEPTION

NIC

1 2

TYP.

1 2

TYP.

1 2

TYP.

1 2

TYP.

1 2

TYP. 1 2

TYP.

AREA OF SCOPE

CONFERENCE ROOM

333 SF

2 9

9 9

85 SF

SUPERVISORY NV

SPECIALIST

172 SF

CHIEF LOGISTICS

SERVICES

87 SF

KITCHEN

234B

1810 SF

LOGISTICS

SERVICES OPEN

OFFICE AREA

179 SF

ADMINISTRATIVE

OFFICER

206 SF

RECEPTION

194 SF

RECEPTION

76 SF

PRINT ROOM

234A NIC

NIC

NIC

TYP.

TYP.

1 2

TYP.

1 2

TYP.1 2

TYP.

1 2

TYP.

1 2

TYP.

1 2

TYP.

1 2

TYP.

1 2

TYP.

TYP.

AREAS OF SCOPE

1 2 TYP.

1 2

TYP.

TYP.8

CENTRALIZED

SCHEDULING OPEN

OFFICE AREA

1995 SF

RECEPTION

226 SF

MAS SPECIALIST

175 SF

SUPERVISOR MAS

151 SF

MEDICAL

ADMINSTRATIVE

SPECIALIST

104 SF

NIC

108B

BROADLOOM CARPET

TO BE REMOVED

VINYL COMPOSITE TILE (VCT)

TO BE REMOVED

EXISTING FLOOR FINISH LEGEND

EXTENT OF BASE TO BE

REMOVED / REPLACED

CARPET TILE

TO BE REMOVED

HIGH POINTS OF EXISTING

SLAB- SEE KEYNOTE 3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C :\U se rs

\jo n\

D oc um en ts \V

AM

C

L yo ns _C

D S et _J on 7X

K2 F.

rv t

7/

/2

4:

:1

PM

AD102

DEMOLITION PLANS - BUILDINGS

10 AND 11

FLOORING REPLACEMENT AT

THE LYONS VAMC

151 KNOLLCROFT RD, LYONS, NJ 07939

561A4-20-101

AS NOTED

01/26/21 JMC DRN

ISSUED FOR BID

3/16" = 1'-0" 1 Building 10 - Second Floor Demolition Plan

3/16" = 1'-0" 2 Building 11 - First Floor Demolition Plan

3/16" = 1'-0" 3 Building 11 - Second Floor Demolition Plan

BUILDING 10 - SECOND FLOOR

BUILDING 11 - SECOND FLOOR

BUILDING 11 - FIRST FLOOR

KEY PLANS

DEMOLITION LEGEND

Key Value Keynote Text

1 REMOVE EXISTING FLOOR FINISH IN ENTIRETY TO THE SUBSTRATE. IN AREAS OF CARPET TILE, REMOVE ALL ADHESIVE FROM EXISTING SUBSTRATE. IN AREAS WITH BROADLOOM CARPET, REMOVE UNDERLAYMENT, TACK STRIPS AND ADHESIVES. REMOVE ANY TRIP HAZARDS, STEPS, OR HIGH POINTS IN EXISTING SUBSTRATE. REMOVE THRESHOLDS, TRANSITION, REDUCER STRIPS, ETC. REPAIR AND PATCH AS NEEDED. CLEAN AND PREP SUBSTRATES FOR NEW INSTALLATION. SUBFLOOR SURFACE

SHALL BE FLAT TO 3/16" IN 10'-0" AND 1/32" IN 1'-0".

2 REMOVE EXISTING WALL BASE TO THE EXTENT SHOWN. REMOVE ALL MATERIALS, ADHESIVES AND OTHER MATERIALS DOWN TO THE SUBSTRATE. PATCH AND REPAIR AS NECESSARY, AND/OR FILL GAPS

AS NECESSARY, CLEAN, AND PREP SUBSTRATES FOR INSTALLATION OF PROPOSED.

3 PREP EXISTING FLOORING TO BE LEVELED. SURVEY OVERALL FLOOR LEVEL, AND IF REQUIRED

UNDERTAKE SCABBLING PROCESS TO GRIND DOWN HIGH POINTS OF EXISTING SLAB WHICH ARE

ABOVE THE PROPOSED FFL. TO MEET THE NEW FINISHED FLOOR LEVEL (FFL), NEW FLOOR MUST BE

LEVEL WITH THRESHOLD TO THE HALLWAY.

4 REMOVE EXISTING FLOORING AROUND RADIATOR- RADIATOR TO BE PROTECTED THROUGHOUT THE

PROJECT AND REMAIN IN PLACE. COORDINATE WITH VA IF DEMOLITION REQUIRES SCHEDULED

DEACTIVATION. TYPICAL. INSTALL ADJUSTABLE STAINLESS STEEL ESCUTCHEON PLATES AT ALL PIPE

PENETRATIONS.

8 CONTRACTOR TO DISASSEMBLE SYSTEMS FURNITURE DIVIDERS SEPEARATING THE CONFERENCE

ROOM, AND CUBICLES AND STORE FOR REINSTATEMENT.

9 CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND STORAGE OF ALL FURNITURE AND EQUIPMENT TO ALLOW FOR DEMO/INSTALLATION, INCLUDING SEATING, PEDESTALS, TABLES, HAND SANITIZER

STATIONS, AND CHECK-IN KIOSKS.

REFER TO AD-101 FOR GENERAL DEMOLITION NOTES

Revisions: Date:

50% WORKING DRAWINGS 01/25/21

PHASE IIID

PHASE IIIB PHASE IIICPHASE IIIA

PHASE IIIF

PHASE IIB PHASE IIA

PHASE IIIE

263 SF

WAITING ROOM

ELEVATOR

ELEVATOR

PHASE I

NOTE: PARTITION TO BE FULL HT

FLOOR SLAB TO STRUCTURE

ABOVE, PASSING THROUGH

INTERSITIAL SPACE. CONTRACTOR

RESPONSIBLE FOR COORDINATING

WORK AROUND EXISTING

CONDITIONS AND/OR REROUTING

EXISTING SYSTEMS TO ACHIEVE A

TIGHT BARRIER.

-PREFABRICATED ICRA BARRIERS

MAY BE UTILIZED IN PLACE OF SITE

BUILT PARTITIONS WHERE

ALLOWED BY THE VA.

1 HR RATED

TEMPORARY CONSTRUCTION BARRIER

- 5/8" SHEETROCK FIRECODE CORE GYPSUM PANELS

- 3 5/8" 25 GUAGE STEEL STUDS @ 24" O.C.

- TEST NO. UL DES U419

LINE OF STRUCTURE

ABOVE

SEALANT

CEILING TRACK

DRYWALL CASING

CEILING

5/8" FIRE-RATED GYP.

BD BOTH SIDES-

PUBLIC SIDE PTD

WHITE

TRACK-ATTACH WITH

ANCHORS 2'-0" O.C. MAX

FLEXIBLE SEALANT

0' - 4 7/8"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C :\U se rs

\jo n\

D oc um en ts \V

AM

C

L yo ns _C

D S et _J on 7X

K2 F.

rv t

7/

/2

4:

:2

PM

AS101

PHASING PLANS - BUILDINGS 2

AND 3

FLOORING REPLACEMENT AT

THE LYONS VAMC

151 KNOLLCROFT RD, LYONS, NJ 07939

561A4-20-101

AS NOTED

Approver

01/26/21 JMC DRN

ISSUED FOR BID

1/8" = 1'-0" 2 Building 3 - First Floor Phasing Plan

1/4" = 1'-0" 1 Building 2 - First Floor Phasing Plan

BUILDING 2 - FIRST FLOOR

BUILDING 3 - FIRST FLOOR

KEY PLANS

GENERAL PHASING NOTES:

• G.C. TO COORDINATE DEMOLITION AND NEW WORK AS TO MAINTAIN DAILY OPERATION OF VA STAFF & PATIENTS OCCUPIED SPACES WITHIN THE FACILITY. G.C. TO PROVIDE VA COR WITH PHASING AND SCHEDULE WITH DATES FOR APPROVAL. ALL WORK IS TO BE COORDINATED AND AGREED WITH THE VA COR PRIOR TO THE START OF CONSTRUCTION.

• PHASING PLANS SHOW SUGGESTED SEGMENTS OF WORK FOR EACH AREA. INDIVIDUAL PHASES SHOWN MAY REQUIRE TO BE BROKEN DOWN INTO SMALLER SEGMENTS AS PER GC STAFFING AND THE AMOUNT OF WORK THAT CAN BE ACCOMPLISHED IN THE OFF-HOURS WITH THE NEED TO BE OPENED TO THE STAFF AND PUBLIC DURING NORMAL BUSINESS DAYS.

• IN AREAS WHERE THE AREA CANNOT BE FULLY VACATED, EGRESS ACCESS MUST BE MAINTAINED AT ALL TIMES. WHERE NECESSARY, GC SHALL PROVIDE STAFF TO ESCORT VA STAFF AND PATIENTS THROUGH

AN ACTIVE CONSTRUCTION ZONE DURING AFTER-HOUR WORK.

• SPACES MUST BE COMPLETELY CLEANED FOLLOWING ANY WORK. CLEANING MUST BE COMPLETED NO LATER THAN 1 HOUR PRIOR TO OCCUPANCY OF THE SPACE BY STAFF & PATIENTS.

• UNLESS OTHERWISE NOTED, DEMOLITION AND NEW WORK TO BE PERFORMED DURING EVENINGS (5PM - 6AM) & WEEKENDS. WEEKEND WORK MAY BEGIN FRIDAY AT 5 PM AND CONTINUE TO 6 AM MONDAY.

• UNLESS OTHERWISE NOTED SPACES ARE REQUIRED TO MAINTAIN OCCUPANCY THROUGHOUT THE DURATION OF CONSTRUCTION, IN COORDINATION WITH PHASING.

• BUILDING 2: WORK TO OCCUR DURING THE EVENINGS AND WEEKENDS.

• BUILDING 3: CORRIDOR AND WAITING ROOMS: DEMOLITION WORK FOR THE CORRIDOR AND WAITING ROOMS TO OCCUR IN THE EVENINGS. CONSTRUCTION WORK FOR THE NEW CORRIDOR FLOORING NEEDS TO OCCUR OVER A 3 DAY HOLIDAY WEEKEND IN WHICH EITHER MONDAY OR FRIDAY IS A SCHEDULED AND OBSERVED HOLIDAY. COORDINATE IN ADVANCE WITH THE C.O.R.

• BUILDING 3: PHARMACY WORK MAY OCCUR DURING EVENINGS AND WEEKEND, AND MUST BE COMPLETED IN SECTIONS TO RETAIN OPERATIONS. COORDINATE WITH THE C.O.R. AND PHARMACY.

• BUILDING 10: (BID AS A DEDUCT ALTERNATE). WORK TO OCCUR DURING THE EVENINGS AND WEEKENDS.

• BUILDING 11 1ST FLOOR: WORK FOR MAY TAKE PLACE DURING NORMAL WORKING HOURS. PHASE I MUST BE COMPLETED PRIOR TO THE START OF PHASE II.

• BUILDING 11 2ND FLOOR: WORK TO OCCUR DURING THE EVENINGS AND WEEKENDS.

• G.C. TO FOLLOW ALL ICRA REQUIREMENTS TO MAINTAIN INFECTION CONTROL WITHIN THE FACILITY PER VA REQUIREMENTS. SEE ICRA DOCUMENTS ON G-003.

• CONTRACTOR IS RESPONSIBLE FOR CONDUCTING A PHOTOGRAPHIC SURVEY OF THE EXISTING LOCATIONS FOR ALL FURNITURE AND EQUIPMENT. ALL COMPUTER SCREENS MUST BE TURNED OFF WHILE

PHOTOGRAPHING. PHOTOGRAPHS ARE TO BE SENT TO THE C.O.R. FOR CATALOGING PURPOSES.

• CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL, SAFE STORAGE, AND REINSTATEMENT OF ALL FURNITURE, EQUIPMENT, ETC NOTED ON THE DEMO PLANS. GC'S "SAFE STORAGE" MUST BE PROVIDED AS A SECURED STORAGE LOCATION, UNDER LOCK AND KEY, IN A STORAGE TRAILER OR OTHER DESIGNATED FORM OF STORAGE TO HOUSE FURNITURE AND/OR EQUIPMENT. THE VA WILL NOT PROVIDE TEMPORARY STORAGE SPACE. AFTER CONSTRUCTION IS COMPLETE, GC TO REINSTALL FURNISHINGS TO PREVIOUSLY DOCUMENTED LOCATIONS . ANY LOSS OR DAMAGES ARE THE SOLE RESPONSIBILTY OF THE

CONTRACTOR DURING REMOVAL, AND STORAGE, UNTIL REINSTATEMENT IS COMPLETE.

• ANY OIT EQUIPMENT OR ELECTRONICS, INCLUDING BUT NOT LIMITED TO DESKTOP COMPUTERS, MONITORS, PHONES, PRINTERS, SCANNERS, AND COPIERS, WILL BE DISCONNECTED AND RELOCATED BY THE VA's OIT TEAM. G.C. TO COORDINATE WITH THE COR AND OIT TEAM. OIT TEAM WILL REINSTATE FOLLOWING REINSTALLATION OF FURNITURE .

PHASING NOTES:

PHASE I: BUILDING 2, ROOM 115 - CONTRACTOR IS LIMITED TO ONE WEEK FOR THE DEMOLITION AND CONSTRUCTION.

THIS WORK MAY RUN CONCURRENTLY WITH WORK IN OTHER BUILDINGS. SCHEDULING OF THE WORK

START TO BE COORDINATED WITH THE VA.

G.C. TO DOCUMENT FURNITURE LOCATION & TEMPORARILY RELOCATE TO SECURE STORAGE (PROVIDE BY G.C.). G.C. TO INSTALL PROTECTIVE BARRIERS, REMOVE EXISTING FLOOR FINISH, PREP EXISTING SLAB &

INSTALL NEW FLOORING.

PHASE II: BUILDING 3, PHARMACY - CONTRACTOR IS LIMITED TO TWO WEEKS FOR THE DEMOLITION AND CONSTRUCTION. THIS WORK MAY RUN CONCURRENTLY WITH WORK IN OTHER BUILDINGS. SCHEDULING OF

THE WORK START TO BE COORDINATED WITH THE VA.

WORK TO BE BROKEN INTO SMALLER PHASES AS TO MAINTAIN OCCUPANCY & FUNCTION OF THE PHARMACY DURING NORMAL WORK WEEKS. G.C. TO COORDINATE EXTENT OF WORK & NUMBER OF PHASES REQUIRED TO MAINTAIN OCCUPANCY AND OPERATIONS OF THE PHARMACY DURING ALL PHASES. G.C. TO TAKE EXTRA PRECAUTIONS FOLLOWING ALL ICRA REQUIREMENTS. G.C. TO DOCUMENT FURNITURE LOCATION & TEMPORARILY RELOCATE DURING DEMOLITION & NEW WORK TO SECURE STORAGE LOCATIONS, PROVIDED BY G.C.

PHASE III: BUILDING 3, GALLERY CORRIDOR & WAITING AREAS (3) - CONTRACTOR IS LIMITED TO SIX WEEKS FOR THE DEMOLITION AND CONSTRUCTION. THIS WORK MAY RUN CONCURRENTLY WITH WORK IN OTHER BUILDINGS.

SCHEDULING OF THE WORK START TO BE COORDINATED WITH THE VA.

WORK TO BE BROKEN INTO SMALLER PHASES TO MAINTAIN OCCUPANCY & FUNCTION OF THE SPACES, INCLUDING PATHS OF EGRESS DURING NORMAL WORK WEEKS. G.C. TO COORDINATE EXTENT OF WORK &

NUMBER OF PHASES REQUIRED TO MAINTAIN OCCUPANCY.

REQUIREMENT OF PHASING IS TO KEEP AT LEAST ONE RECEPTION DESK, AND WAITING ROOM FULLY OPERATIONAL, AND RETAIN ACCESS TO ALL KEY AREAS OF THE HOSPTIAL VIA THE GALLERY CORRIDOR.

CONSTRUCTION OF THE NEW CORRIDOR FLOORING MUST OCCUR OVER A 3-DAY HOLIDAY WEEKEND- IN

WHICH THE ADJOINED MONDAY OR FRIDAY IS AN OBSERVED FEDERAL HOLIDAY.

NOTE- PHASING BOUNDRIES SHOWN ARE DELINIATIONS FOR CONCEPTUAL REPRESENTATION ONLY. GC TO COORDINATE THE DIVISION OF SPACES THROUGHOUT ALL PHASES OF DEMOLITION AND CONSTRUCTION WITH VA'S ACCESS REQUIREMENTS AND SITE LOGISTICS. GC TO PROVIDE FOR APPROVAL DETAILED PHASING PLANS TO ILLUSTRATE SITE DIVISION, TEMPORARY BARRIERS AND EGRESS ROUTES DURING EACH PHASE OF THE PROJECT.

1 1/2" = 1'-0"

5 TEMPORARY ICRA BARRIER PARTITION

Revisions: Date:

50% WORKING DRAWINGS 01/25/21

M .O

R ef

U.C.

Refr.

U.C.

Refr.

R ef

U .C

R ef r.

TV

CART

UP

R ef

.Ref.

DN

1307 SF

OFFICE AREA

162 SF

PRINT ROOM

215A

PHASE IVB

PHASE IVA

AREA OF SCOPE

NOTE: BID THIS AREA

AS DEDUCT ALTERNATE

175 SF

CHIEF IRM

145 SF

SUPERVISOR I.T.

SPECIALISTS

180 SF

IT ROOM

1089 SF

IRM TECHS

913 SF

IRM OPEN WORK

AREA

108A

162 SF

IRM RECEPTION

NIC

PHASE VB

PHASE VA

85 SF

SUPERVISORY NV

SPECIALIST

172 SF

CHIEF LOGISTICS

SERVICES

87 SF

KITCHEN

234B

247 SF

CONFERENCE

ROOM

179 SF

ADMINISTRATIVE

OFFICER

1551 SF

LOGISTICS

SERVICES OPEN

OFFICE AREA

206 SF

RECEPTION

194 SF

RECEPTION

226 SF

RECEPTION

1995 SF

CENTRALIZED

SCHEDULING

OPEN OFFICE

AREA

76 SF

PRINT ROOM

NIC

LADIES

RM

CORRIDOR

HAC

MEDICAL

ADMINSTRATIVE

SPECIALIST

PHASE VIA PHASE VIIA

MEN'S RM

108B

MAS SPECIALIST

SUPERVISOR MAS

PHASE VIB PHASE VIIB

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C :\U se rs

\jo n\

D oc um en ts \V

AM

C

L yo ns _C

D S et _J on 7X

K2 F.

rv t

7/

/2

4:

:5

PM

AS102

PHASING PLANS - BUILDINGS 10

AND 11

FLOORING REPLACEMENT AT

THE LYONS VAMC

151 KNOLLCROFT RD, LYONS, NJ 07939

561A4-20-101

AS NOTED

Approver

01/26/21 JMC DRN

ISSUED FOR BID

3/16" = 1'-0" 1 Building 10 - Second Floor Phasing Plan

3/16" = 1'-0" 2 Building 11 - First Floor Phasing Plan

3/16" = 1'-0" 4 Building 11 - Second Floor Phasing Plan

BUILDING 10 - SECOND FLOOR

BUILDING 11 - SECOND FLOOR

BUILDING 11 - FIRST FLOOR

KEY PLANS

PHASING NOTES:

PHASE IV: BUILDING 10, SECOND FLOOR- (NOTE THIS IS TO BE BID AS A DEDUCT ALTERNATE) CONTRACTOR IS LIMITED TO THREE WEEKS FOR THE DEMOLITION AND CONSTRUCTION. THIS WORK MAY RUN CONCURRENTLY WITH WORK IN OTHER BUILDINGS. SCHEDULING OF THE WORK START TO BE COORDINATED

WITH THE VA.

WORK TO BE BROKEN INTO SMALLER PHASES AS TO MAINTAIN OCCUPANCY & FUNCTION OF THE SPACE. G.C.

TO CATALOG FURNITURE AND DOCUMENT LOCATIONS AND TEMPORARILY RELOCATE AS REQUIRED TO PERFORM WORK. TEMPORARY BARRIERS SET UP PER ICRA REQUIREMENTS. DEMOLISH EXISTING FLOOR FINISH, PREP EXISTING FLOOR SLAB & INSTALL NEW FLOOR FINISH. AFTER INSTALLATION OF NEW WORK IS

COMPLETE, GC TO INSTALL FURNITURE TO ORIGINAL LOCATIONS.

PHASE V: BUILDING 11: FIRST FLOOR-

PHASE VA- CONTRACTOR IS LIMITED TO ONE WEEK FOR THE DEMOLITION AND CONSTRUCTION. THIS WORK MAY RUN CONCURRENTLY WITH WORK IN OTHER BUILDINGS. SCHEDULING THE WORK START TO BE COORDINATED WITH

THE VA.

VA TO VACATE CONFERENCE ROOM FOR G.C. TO PERFORM CONSTRUCTION. G.C. TO DOCUMENT

FURNITURE LOCATIONS & TEMPORARILY RELOCATE AS REQUIRED TO PERFORM WORK. TEMPORARY BARRIERS SET UP PER ICRA, DEMOLISH EXISTING FLOOR FINISH, PREP EXISTING FLOOR SLAB & INSTALL NEW FLOOR FINISH.AFTER INSTALLATION OF NEW WORK IS COMPLETE, GC TO MOVE EXISTING FURNITURE BACK TO

THEIR ORIGINAL LOCATIONS.

PHASE VB- CONTRACTOR IS LIMITED TO ONE WEEK FOR THE DEMOLITION AND CONSTRUCTION. THIS WORK MAY RUN CONCURRENTLY WITH WORK IN OTHER BUILDINGS. SCHEDULING THE WORK START TO BE COORDINATED WITH

THE VA.

VA WILL VACATE THE SPACE FOLLOWING THE COMPLETION OF PREVIOUS PHASE (PHASE-VA) G.C. TO

DOCUMENT FURNITURE LOCATIONS & TEMPORARILY RELOCATE AS REQUIRED TO PERFORM WORK.

TEMPORARY BARRIERS SET UP PER ICRA, DEMOLISH EXISTING FLOOR FINISH, PREP EXISTING FLOOR SLAB & INSTALL NEW FLOOR FINISH.AFTER INSTALLATION OF NEW WORK IS COMPLETE, GC TO MOVE EXISTING

FURNITURE BACK TO THEIR ORIGINAL LOCATIONS.

PHASING NOTES (CONTINUED):

PHASE VI: BUILDING 11: SECOND FLOOR (LOGISTICS)- CONTRACTOR IS LIMITED TO THREE WEEKS FOR THE DEMOLITION AND CONSTRUCTION. THIS WORK MAY RUN CONCURRENTLY WITH WORK IN OTHER BUILDINGS. SCHEDULING

OF THE WORK START TO BE COORDINATED WITH THE VA.

WORK TO BE BROKEN INTO SMALLER PHASES AS TO MAINTAIN OCCUPANCY & FUNCTION OF THE SPACE. G.C.

TO CATALOG FURNITURE AND DOCUMENT LOCATIONS. TEMPORARILY RELOCATE AS REQUIRED TO PERFORM WORK. TEMPORARY BARRIERS SET UP PER ICRA REQUIREMENTS. DEMOLISH EXISTING FLOOR FINISH, PREP EXISTING FLOOR SLAB & INSTALL NEW FLOOR FINISH. AFTER INSTALLATION OF NEW WORK IS COMPLETE, GC

TO INSTALL FURNITURE TO ORIGINAL LOCATIONS.

PHASE VII: BUILDING 11: SECOND FLOOR (CENTRALIZED SCHEDULING) -CONTRACTOR IS LIMITED TO THREE WEEKS FOR THE DEMOLITION AND CONSTRUCTION. THIS WORK MAY RUN CONCURRENTLY WITH WORK IN OTHER

BUILDINGS. SCHEDULING OF THE WORK START TO BE COORDINATED WITH THE VA.

WORK TO BE BROKEN INTO SMALLER PHASES AS TO MAINTAIN OCCUPANCY & FUNCTION OF THE SPACE. G.C.

TO CATALOG FURNITURE AND DOCUMENT LOCATIONS. TEMPORARILY RELOCATE AS REQUIRED TO PERFORM WORK. TEMPORARY BARRIERS SET UP PER ICRA REQUIREMENTS. DEMOLISH EXISTING FLOOR FINISH, PREP EXISTING FLOOR SLAB & INSTALL NEW FLOOR FINISH. AFTER INSTALLATION OF NEW WORK IS COMPLETE, GC

TO INSTALL FURNITURE TO ORIGINAL LOCATIONS.

NOTE- PHASING BOUNDRIES SHOWN ARE DELINIATIONS FOR CONCEPTUAL REPRESENTATION ONLY. GC TO COORDINATE THE DIVISION OF SPACES THROUGHOUT ALL PHASES OF DEMOLITION AND CONSTRUCTION WITH VA'S ACCESS REQUIREMENTS AND SITE LOGISTICS. GC TO PROVIDE FOR APPROVAL DETAILED PHASING PLANS TO ILLUSTRATE SITE DIVISION, TEMPORARY BARRIERS AND EGRESS ROUTES DURING EACH PHASE OF THE PROJECT.

SEE AS-101 FOR GENERAL PHASING NOTES

Revisions: Date:

50% WORKING DRAWINGS 01/25/21

262 SF

WAITING ROOM

NIC

NIC

113A

NIC

NIC

ELEVATOR

ELEVATOR

LVT-2

LVT-1

3 FULL TILES & CUT TILES

5 FULL TILES

3 FULL TILES

EQ 16 FULL TILES EQ

VINYL BASE AS

SCHEDULED

AS300

TYP

INFILL VCT TO

MATCH

EXISTING

ADJACENT

LVT-2 LVT-1

LVT-2 LVT-2 LVT-2

T-2

LVT-2

LVT-1

T-1

LVT-4

T-4 T-4

T-1

LVT-1 LVT-1

T-3

T-1-TRANS.

LVT-1

T-1-TRANS.

5 FULL TILES +

7' - 6" , VIF

12 FULL TILES

18' - 0"

5 FULL TILES +

7' - 6" , VIF

7 FULL TILES 10' - 6"

2 1/2 TILES 3' - 9 1/8"

EXISTING VCT TO REMAIN

NURSES STA.,RECEP.,

G102

662 SF

DIGESTIVE /

PULMONARY WAITING

G101

494 SF

GALLERY CORRIDOR

J104

2644 SF

WAITING

J101

304 SF

PHARMACY

J106

841 SF

STORAGE RM

J113

127 SF

SUPERVISOR OFFICE

J112

105 SF

PHARMACIST OFFICE

J103

100 SF

MAS. RECEP. / NURSE

STATION

C102

505 SF

WAITING

B101

465 SF

EXAM / TREATMENT -

WAITING

C101

557 SF

WAITING

D101

167 SF

PULMON. WAIT. 'G

E101

271 SF

AS300

VINYL BASE (TYP)

AS300

AS300

TYP3'

3/

4"

ALIGN 6'

" R

1' - 9 1/4"

6' - 0" R

T-3 T-3

1' - 7"

TERAZZO BASE TERAZZO BASE

2 FULL TILES

7 - 1/2 TILES

2 FULL TILES

8 FULL TILES

WELDED FLOOR

SEAMS- VIF

ALIGN

ALIGNWSF-1

AS103

T-3 TRANS.

AS300

AS300

TYP

T-3 TRANS.

T-3 TRANS.

VINYL BASE

VINYL

BASE

VINYL BASE

AS300

TYP

9'

4"

R

AD

IU

S

9'

9 "

R

AD

IU

S

126' - 9 21/32"

94' - 11 25/32"

AS300

TYP

AS300

TYP

NEW FLOOR FINISH LEGEND

VINYL BASE AS SCHEDULED

TERAZZO BASE AS SCHEDULED

WOOD BASE AS SCHEDULED

LVT-2

LVT-4

LVT-1

LVT-3

T-3

T-4

T-1

T-2

TERRAZZO TILE FLOORING:

LUXURY VINYL TILE FLOORING:

WELDED RUBBER SHEET FLOORING:

WSF-1

INTEGRATED WSF-1 COVE BASE

LVT-2 LVT-2LVT-1 LVT-1

4 FULL TILES, +/-

6' - 0" , VIF

14 FULL TILES

21' - 0"

4 FULL TILES

6' - 0"

14 FULL TILES

21' - 0"

4 FULL TILES

6' - 0"

14 FULL TILES

21' - 0"

4 FULL TILES, +/-

6' - 0" , VIF

6 1/2 TILES, 9' - 9"

2 1/2 TILES, 3' - 9"

AS300

TYP 5' - 10"ALIGN

T-1

T-4T-2

T-3

LVT-1LVT-2

T-1-TRANS.

START ON

FULL TILE

12"x24" RUNNING BOND

PATTERN, TYPICAL FOR

ALL TERRAZZO TILE

START ON

FULL TILE

18"x18" LVT FLOOR

TILE IN RUNNING

BOND PATTERN ,

TYPICAL

0' - 6"

ALIGN

ALIGN ALIGN

TI

LE

C

EN

TE

R

ED

O

N C

O R

R

ID

O R

T-4

6" TERRAZZO BASE

AS SCHEDULED(TYP)

2'

6"

AS300

TYP

T-3 TRANS.

T-3 TRANS.

T-3 TRANS.

T-3 TRANS.

T-3 TRANS.

T-3 TRANS.

EXISTING

CORNER

GUARDS &

END CAPS TO

REMAIN, TYP.

T-3

T-2

T-3 TRANSITION TO

EXISTING CARPET

VINYL BASE AS

SCHEDULED

(TYP)

LVT-1

3'

1/

4"

1' - 1"

1' - 0" 0' - 10 1/2" 0' - 2"

2' - 6"

AS300

TYP

AS300

TYP

AS300

AS300

TYP

AS300

TYP

AS300

TYP

AS300

AS300

TYP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C :\U se rs

\jo n\

D oc um en ts \V

AM

C

L yo ns _C

D S et _J on 7X

K2 F.

rv t

7/

/2

4:

:1

PM

AS103

FINISH PLANS - BUILDINGS 2 AND

FLOORING REPLACEMENT AT

THE LYONS VAMC

151 KNOLLCROFT RD, LYONS, NJ 07939

561A4-20-101

AS NOTED

Approver

01/26/21 JMC DRN

ISSUED FOR BID

1/4" = 1'-0" 1 Building 2 - First Floor Finish Plan

1/8" = 1'-0" 2 Building 3 - First Floor Finish Plan

BUILDING 2 - FIRST FLOOR

BUILDING 3 - FIRST FLOOR

KEY PLANS

1. VERIFY AND ADJUST IF NEEDED, DOOR UNDERCUTS. REF. CODE

NOTES, SHEET G-003. SEE DETAIL 12/AS300.

2. ADD NEW WEATHERSTRIPPING FOR ALL EXTERIOR DOORS IN THE

CONTRACT AREAS.

3. PRIOR TO APPLICATION OF FINISHES, VERIFY THE CONDITION OF ALL

SUBSTRATES. AS NEEDED CLEAN, REPAIR, PATCH, AND LEVEL ALL

SUBSTRATES. REFER TO SPECS, INCLUDING BUT NOT LIMITED TO

SECTION 090516, SUBSURFACE PREPARATION FOR FLOOR FINISHES.

4. REFER TO PHASING REQUIREMENTS FOR WORK AREA LIMITATIONS.

5. TERAZZO TILE WITH RADIUS CUTS ARE TO BE TEMPLATED AND

FACTORY CUT BASED ON SITE MEASUREMENTS. PROVIDE SHOP

DRAWINGS OF TILE LAYOUT OVERLAID ON G.C. SURVEY OF THE

CORRIDOR FOR APPROVAL.MAINTAIN ALL ALIGNMENTS, AND NOTIFY

ARCHITECT OF ANY DISCREPANCY.

6. SEE AS300 FOR TYPICAL FLOOR TRANSITION DETAILS - COORDINATE

TRANSITIONS WITH SITE CONDITIONS. ADVISE ARCHITECT OF ANY

DISCREPANCIES.

1. SUBFLOOR SURFACE SHALL BE FLAT TO 3/16" IN 10'-0" AND 1/32" IN

1'-0".

NEW WORK NOTES:

1/4" = 1'-0" 6 Building 3 - Gallery Corridor / Pulminary Waiting Pattern Plan

Revisions: Date:

50% WORKING DRAWINGS 01/25/21

UP

DN

1307 SF

OFFICE AREA

162 SF

PRINT ROOM

215A 175 SF

CHIEF IRM

145 SF

SUPERVISOR I.T.

SPECIALISTS

180 SF

IT ROOM

1089 SF

IRM TECHS

913 SF

IRM OPEN WORK

AREA

108A

162 SF

IRM RECEPTION

NIC

333 SF

CONFERENCE

ROOM

137 SF

NIC

263 SF

NIC

0' - 0"

175 SF

MAS SPECIALIST

85 SF

SUPERVISORY NV

SPECIALIST

172 SF

CHIEF LOGISTICS

SERVICES

87 SF

KITCHEN

234B

179 SF

ADMINISTRATIVE

OFFICER

1810 SF

LOGISTICS

SERVICES OPEN

OFFICE AREA

206 SF

RECEPTION

194 SF

RECEPTION

232 226 SF

RECEPTION

1995 SF

CENTRALIZED

SCHEDULING

OPEN OFFICE

AREA

76 SF

PRINT ROOM

234A NIC

NIC

NIC

NIC

104 SF

MEDICAL

ADMINSTRATIVE

SPECIALIST

151 SF

SUPERVISOR

MAS

LVT-3

LVT-4

LVT-3

LVT-3

LVT-3

NEW FLOOR FINISH LEGEND

VINYL BASE AS SCHEDULED

TERAZZO BASE AS SCHEDULED

WOOD BASE AS SCHEDULED

LVT-2

LVT-4

LVT-1

LVT-3

T-3

T-4

T-1

T-2

TERRAZZO TILE FLOORING:

LUXURY VINYL TILE FLOORING:

WELDED RUBBER SHEET FLOORING:

WSF-1

INTEGRATED WSF-1 COVE BASE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C :\U se rs

\jo n\

D oc um en ts \V

AM

C

L yo ns _C

D S et _J on 7X

K2 F.

rv t

7/

/2

4:

:4

PM

AS104

FINISH PLANS - BUILDINGS 10 AND

FLOORING REPLACEMENT AT

THE LYONS VAMC

151 KNOLLCROFT RD, LYONS, NJ 07939

561A4-20-101

AS NOTED

Approver

01/26/21 JMC DRN

ISSUED FOR BID

3/16" = 1'-0" 1 Building 10 - Second Floor Finish Plan

3/16" = 1'-0" 2 Building 11 - First Floor Finish Plan

3/16" = 1'-0" 3 Building 11 - Second Floor Finish Plan

BUILDING 10 - SECOND FLOOR

BUILDING 11 - SECOND FLOOR

BUILDING 11 - FIRST FLOOR

KEY PLANS

1. VERIFY AND ADJUST IF NEEDED, DOOR UNDERCUTS. REF. CODE

NOTES, SHEET G-003. SEE DETAIL 12/AS300.

2. ADD NEW WEATHERSTRIPPING FOR ALL EXTERIOR DOORS IN THE

CONTRACT AREAS.

3. PRIOR TO APPLICATION OF FINISHES, VERIFY THE CONDITION OF ALL

SUBSTRATES. AS NEEDED CLEAN, REPAIR, PATCH, AND LEVEL ALL

SUBSTRATES. REFER TO SPECS, INCLUDING BUT NOT LIMITED TO

SECTION 090516, SUBSURFACE PREPARATION FOR FLOOR FINISHES.

4. REFER TO PHASING REQUIREMENTS FOR WORK AREA LIMITATIONS.

5. TERAZZO TILE WITH RADIUS CUTS ARE TO BE TEMPLATED AND

FACTORY CUT BASED ON SITE MEASUREMENTS. PROVIDE SHOP

DRAWINGS OF TILE LAYOUT OVERLAID ON G.C. SURVEY OF THE

CORRIDOR FOR APPROVAL.MAINTAIN ALL ALIGNMENTS, AND NOTIFY

ARCHITECT OF ANY DISCREPANCY.

6. SEE AS300 FOR TYPICAL FLOOR TRANSITION DETAILS - COORDINATE

TRANSITIONS WITH SITE CONDITIONS. ADVISE ARCHITECT OF ANY

DISCREPANCIES.

1. SUBFLOOR SURFACE SHALL BE FLAT TO 3/16" IN 10'-0" AND 1/32" IN

1'-0".

NEW WORK NOTES:

Revisions: Date:

50% WORKING DRAWINGS 01/25/21

NEW FLOOR FINISH,

REFER TO PLAN,

SCHEDULES, & DETAILS

EXISTING DOOR

TO REMAIN

0' - 0 1/2" CLR.

MATERIAL SCHEDULE

LUXURY VINYL TILE:

LVT-1: 18"X18" TILE

MANNINGTON AMTICO SIGNATURE

STRIA ASH- AR0SMS13

LVT-2: 18"X18" TILE

MANNINGTON AMTICO SIGNATURE

COMPOSITE CALCIUM - AR0SGN11

LVT-3: 6" x 36" PLANK

MANNINGTON NATURES PATH

WINDSOR OAK, "ASHEN"

LVT-4: 6" x 36" PLANK

MANNINGTON NATURES PATH

NORTHERN MAPLE, "NATURAL"

WELDED SEAM RUBBER

FLOORING:

WSF-1:

48" ROLL

NORAPLAN IONA SHEET

6902 CEZANNE

VCT:

REPLACEMENT VCT TO MATCH

THE EXISTING FINISH.

GC TO PROVIDE SAMPLES FOR

APPROVAL.

TERRAZO TILE:

T-1: TERRAZO TILE

12"x24" RUNNING BOND

WAUSAU TERRAZZO TILE

ANALYTICAL - TZ53

T-2: TERRAZO TILE

12"x24" RUNNING BOND

WAUSAU TERRAZZO TILE

KEY WEST - TZ45

T-3:TERRAZO TILE

12"x24" RUNNING BOND

WAUSAU TERRAZZO TILE

SWISS ALPS - TZ41

T-4: TERRAZO TILE

12"x24" RUNNING BOND

WAUSAU TERRAZZO TILE

BARBADOS - TZ47

TERAZZO TRANSITIONS:

T-(#) TRANS.

EPOXY TERAZZO

TRANSITIONS.

CUSTOM SIZED TO MATERIAL

THICKNESS AS NEEDED.

MATCH WALL THICKNESS

WHERE SHOWN

WALL BASE:

VINYL BASE:

VB-1: 129 DOLPHIN

VB-2: 624 CHAMALEON

A SUFFIX = 4" BASE

B SUFFIX = 6" BASE

ROPPE VINYL BASE

TB: TERRAZO TILE BASE

6"x5/8"x 24"

BEVELED TOP EDGE

WAUSAU TERRAZZO TILE

ANALYTICAL - TZ53

WSF-1 COVE BASE

4" INTEGRAL COVE BASE

SAME AS WSF-1

WOOD BASE:

W-1: INSTALL NEW BASE TO

MATCH EXISTING WOOD

BASE . PROVIDE SAMPLES OF

EXIST. AND PROPOSED FOR

APPROVAL.

NOTE: MATERIALS NOTED ARE BASIS OF DESIGN. CONTRACTOR MAY SELECT SAME OR

PROPOSE EQUAL.

LVT/VCT FLOOR TILE (2.5MM THICK)PRECAST TERRAZZO TILE (5/8")

FLOOR, WITH UNDERLAYMENT

AND FLOOR PREP.

TERAZZO EPOXY TRANSITION TO MATCH

FFL OF LVT AND TERRAZZO TILE IN

SETTING BED PER MANUFATURER'S

RECOMMENDATION

ALIGN TILE EDGE

WITH THE WALL OF

WALL BEYOND

1/4".

1/4".

BEVELED EDGE

VINYL BASE AS

SCHEDULED

ALIGN TILE

EDGE WTH

FACE OF

ADJACENT WALL

/ LOW WALL

(TYP EACH SIDE)

NEW BASES TO ALIGN

WITH EDGE OF

EXISTING CORNER

GUARD

TERRAZZO THRESHOLD

ALIGN EDGE OF

TERAZZO BASE WITH

FACE OF WALL AND

EDGE OF EXISTING

CORNER GUARD

TERRAZZO THRESHOLD

PROPOSED BASE

COVE TO TERMINATE

AT EXISTING CORNER

GUARD (TYP)

TERRAZZO

BASE WITH

POLISHED

ENDS

REPLACE FULL LENGTH OF

EXISTING WOOD BASE WITH

NEW WOOD BASE TO MATCH

EXISTING PROFILE & FINISH

AL

IG

N

INSTALL VINYL BASE TO

EXISTING LAMINATE BASE OF

UNDERCOUNTER CASEWORK

TERRAZZO TILE (5/8") FLOOREXISTING TERRAZZO FLOORING

TERAZZO EPOXY TRANSITION TO MATCH

FFL OF EXISTING TERRAZZO AND

TERRAZZO TILE.INSTALL IN SETTING

BED PER MANUFATURER'S

RECOMMENDATION

UNDERLAYMENT / FLOOR LEVELER

ALIGN TILE EDGE WITH THE

FACE OF WALL BEYONDEXISTING BRASS STRIP TO REMAIN

1/4" MAX

+/- 0' - 0 1/8"

ALIGN EDGE OF TERAZZO

BASE WITH FACE OF WALL

(TYP EACH SIDE)

TERRAZZO THRESHOLD

PROPOSED BASE

COVE TO TERMINATE

AT EXISTING CORNER

GUARD (TYP)

TERRAZZO BASE

WITH POLISHED

ENDS, TERMINATES

AT EXISTING

CORNER GUARD

BRASS STRIP EDGING

OF EXISTING

TERRAZZO FLOOR TO

REMAIN

AS300

VINYL REDUCER STRIP

EXISTING CARPET

NEW LVT FLOORING

FLOOR LEVELING

COMPOUND

1/4".

VINYL TRANSITION STRIP

EXISTING VCT

LVT FLOOR TILE

FLOOR LEVELING

COMPOUND

0' - 4"

PREFORMED

FILLET STRIP

PREFORMED

COVE BASE

CONTINUOUS

WSF-1 SHEET

FLOORING

EX. CONCRETE SUBSTRATE

LVT FLOOR SET IN ADHESIVE

VINYL BASE

FLOOR LEVELING COMPOUND

VARIES

4" OR 6"

EX. CONCRETE SUBSTRATE

PRECAST TERRAZZO TILE FLOOR

SET IN GROUT

PRECAST TERRAZZO TILE BASE

POLISH ALL EXPOSED FACES, ENDS

MORTAR BED

0' - 6"

WSF INTEGRAL

BASE

COVE CAP

VB-1

VINYL BASE

BENT TO FOLLOW

COVE OF INTEGRAL

BASE

EASED EDGE OF

DIVIDER STRIP

TRIM -

TACK STRIP OF ZINC

DIVIDER TO ACCEPT

VINYL COVE CAP

ZINC

DIVIDER STRIP

1/8".

FLOOR REDUCER

STRIP

PREFORMED

FILLET STRIP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C :\U se rs

\jo n\

D oc um en ts \V

AM

C

L yo ns _C

D S et _J on 7X

K2 F.

rv t

7/

/2

4:

:4

PM

AS300

FINISH SCHEDULE, NOTES, AND

DETAILS

FLOORING REPLACEMENT AT

THE LYONS VAMC

151 KNOLLCROFT RD, LYONS, NJ 07939

561A4-20-101

AS NOTED

Project Director

01/26/21 JMC DRN

ISSUED FOR BID

1" = 1'-0"

12 TYPICAL DOOR UNDERCUT DETAIL

ROOM FINISH SCHEDULE

ROOM # ROOM NUMBER AREA FLOOR FINISH BASE FINISH

BUILDING 2

115 WAITING ROOM 262 SF LVT-1. LVT-2 VB-1A

BUILDING 3

J103 PHARMACIST OFFICE 100 SF LVT-4 VB-2A

J112 SUPERVISOR OFFICE 105 SF LVT-4 VB-2A

J113 STORAGE RM 127 SF LVT-4 VB-2A

E101 PULMON. WAIT. 'G 271 SF LVT-1, LVT-2 VB-1B

D101 WAITING 167 SF LVT-1, LVT-2 VB-1B

B101 WAITING 465 SF LVT-1, LVT-2 VB-1B

J101 WAITING 304 SF LVT-1, LVT-2 VB-1B

G102 NURSES STA.,RECEP., 662 SF LVT-1, LVT-2 VB-1B, W-1

G101 DIGESTIVE / PULMONARY WAITING 494 SF LVT-1, LVT-2 VB-1B

C102 MAS. RECEP. / NURSE STATION 505 SF LVT-1, LVT-2 VB-1B, W-1

C101 EXAM / TREATMENT - WAITING 557 SF LVT-1, LVT-2 VB-1B

J106 PHARMACY 841 SF WSF-1 WSF-1 COVE

BASE

J104 GALLERY CORRIDOR 2644 SF T-1, T-2, T-3, T-4 TB

BUILDING 10, SECOND FLOOR

215 OFFICE AREA 1307 SF LVT-3 VB-1A

215A PRINT ROOM 162 SF LVT-3 VB-1A

BUILDING 11, FIRST FLOOR

109 CHIEF IRM 175 SF LVT-3 VB-2A

111 SUPERVISOR I.T. SPECIALISTS 145 SF LVT-3 VB-2A

107 IT ROOM 180 SF LVT-4 VB-1A

108 IRM TECHS 1089 SF LVT-4 VB-1A

108A IRM OPEN WORK AREA 913 SF LVT-4 VB-1A

110 IRM RECEPTION 162 SF LVT-4 VB-1A

112 CONFERENCE ROOM 333 SF LVT-3 VB-2A

BUILDING 11,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .