This is a construction contract drawing set and specification document for the New York State Office of Parks, Recreation and Historic Preservation (OPRHP) involving the replacement of a short-span reinforced concrete slab bridge at the Red Trail in Connetquot River State Park Preserve in Oakdale, New York. The project, identified as LI-CR-2026-001(A), requires removal of the existing concrete slab bridge and installation of an HS-10 rated pour-in-place reinforced concrete slab bridge with helical pile foundation. The 14-sheet drawing set includes site plans, demolition details, geotechnical soil boring reports, concrete reinforcement specifications, and detailed structural and foundation designs. The contract submission date was June 9, 2026, with requests for quotes due electronically no later than 3:00 p.m. on August 31, 2026. Pre-construction meetings with park officials are required, and the contractor must submit existing condition photographs before commencing work. The contractor bears responsibility for verifying all existing measurements and field conditions prior to construction and must coordinate with the engineer regarding any discrepancies between actual site conditions and contract plans.
The specifications establish comprehensive requirements for safety, earthwork, helical pile installation, concrete forming, reinforcement, and quality control. All structural work must conform to New York State Department of Transportation standard specifications and the 2025 New York State Building Code, with concrete achieving a minimum compressive strength of 4,000 PSI and all reinforcing bars galvanized in accordance with ASTM A615 Grade 60. The contractor is responsible for obtaining a staged area pre-approved by OPRHP and for all erosion control, dewatering, and utility locating costs. Special inspections by a qualified inspector are required for footing, foundation, concrete design mixes, and helical pile installation. The project includes no identified set-aside goals for SDVOB, MBE, WBE, or DBE contracting, and funding source information is not specified in the procurement documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ LI-CR-2026-001(A) Connetquot River State Park Slab Bridge.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RED TRAIL SLAB BRIDGE REPLACEMENT
NOT TO SCALE
LOCATION PLAN
LONG ISLAND CAPITAL DISTRICT
625 BELMONT AVENUE
WEST BABYLON, NY 11704
NOT TO SCALE
AERIAL PHOTO/
EX. SITE/ STRUCTURE
ADDRESS: CONNETQUOT RIVER STATE PARK PRESERVE
4090 SUNRISE HIGHWAY
OAKDALE, NEW YORK, 11769
CONSULTANTS: N/A
NOT TO SCALE
EX. CONCRETE SLAB TRAIL APPROACH
PROJECT ID: LI-CR-2026-001(A)
SUBMISSION: CONSTRUCTION CONTRACT
T-001 SHEET
ENGINEER/ARCHITECT OF RECORD SEAL:
DATE: 10/8/2026
TOM ALWORTH
EXECUTIVE DEPUTY COMMISSIONER
BEVIN COLLINS, RA, LEED AP
DEPUTY COMMISSIONER, CAPITAL PROJECTS
GEORGE GORMAN, JR.
LONG ISLAND REGIONAL DIRECTOR
KATHY HOCHUL
Governor
KATHY MOSER
Commissioner
VESNA HADZIBABIC, PE, LEED AP BD+C
LONG ISLAND STATE PARKS CAPITAL DISTRICT MANAGER
DATE:
SIGNATURE & DATE:
NAME: LICENSE #:
PROJECT LOCATIONSITE LOCATION
Daniel J Rozell 085545
10/8/2026
REMOVAL OF EXISTING SHORT SPAN SLAB BRIDGE ALONG SOUTHERN PORTION OF THE
RED TRAIL. INSTALLATION OF HS-10 RATED POUR IN PLACE CONCRETE SLAB BRIDGE
WITH HELICAL PILE FOUNDATION.
PROJECT SCOPE SUMMARY
EQ EQUAL
LF LINEAR FEET
MUTCD MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES
NYS NEW YORK STATE
OPRHP OFFICE OF PARKS, RECREATION,
AND HISTORIC PRESERVATION
RCA RECYCLED CONCRETE AGGREGATE
TUON TYPICAL UNLESS OTHERWISE NOTED
U.O.N UNLESS OTHERWISE NOTED
VIF VERIFY IN FIELD
FILL
MATERIAL LEGEND
TYPICAL ABBREVIATIONS
CONCRETE
GENERAL NOTES
STAGING AREA
T-1 TITLE PAGE
G-1 GENERAL NOTES
DM-1 SITE PLAN AND EXISTING SLAB BRIDGE
DEMOLITION PLAN
S-1 PROPOSED SHORT SPAN BRIDGE DETAILS
S-2 GEOTECHNICAL SOIL BORING REPORT
S-3 CONCRETE REINFORCEMENT DETAILS
SPEC-1 - 8 PROJECT SPECIFICATIONS
LIST OF DRAWINGS
1. THE LOCATION OF THE FIELD OFFICE, IF REQUIRED, TO BE PRE-APPROVED BY THE
ENGINEER.
2. A PRE-CONSTRUCTION MEETING WITH PARK OFFICIALS RESPONSIBLE FOR PARK
FACILITIES WILL BE REQUIRED.
3. THE CONTRACTOR SHALL SUBMIT EXISTING CONDITION PHOTOGRAPHS TO THE
ENGINEER BEFORE THE START OF CONSTRUCTION.
4. THERE SHALL BE NO CLAIM MADE BY THE CONTRACTOR FOR WORK PERTAINING TO
MODIFICATIONS AS MAY BE REQUIRED DUE TO ANY DIFFERENCE BETWEEN ACTUAL
FIELD CONDITIONS AND THOSE SHOWN ON THE CONTRACT PLANS.
5. DUE TO THE NATURE OF RECONSTRUCTION PROJECTS, THE EXACT EXTENT OF
RECONSTRUCTION WORK CANNOT ALWAYS BE ACCURATELY DETERMINED PRIOR TO
THE COMMENCEMENT OF WORK. THESE CONTRACT DOCUMENTS HAVE BEEN
PREPARED BASED ON FIELD INSPECTION AND OTHER AVAILABLE INFORMATION.
6. ACTUAL FIELD CONDITIONS MAY REQUIRE MODIFICATIONS TO CONSTRUCTION DETAILS
AND WORK QUANTITIES. THE CONTRACTOR SHALL PERFORM THE WORK IN
ACCORDANCE WITH FIELD CONDITIONS TO THE APPROVAL OF THE ENGINEER.
7. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL EXISTING MEASUREMENTS
PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER IN CASE OF DISCREPANCY.
8. ANY CHANGES OF PROPOSED WORK DURING CONSTRUCTION DUE TO FIELD
CONDITIONS SHALL BE APPROVED BY THE ENGINEER.
9. THE OWNER RESERVES THE RIGHT TO ADD/DEDUCT ANY ITEM OR PORTION OF WORK
THEREOF. THE CONTRACTOR SHALL BE CREDITED OR REDUCED IN ACCORDANCE WITH
THE REQUESTED COST BREAKDOWN.
10. WORKING HOURS: THE WORKING HOURS AND HOLIDAYS SHALL BE DETERMINED BY
NYS PARKS DEPARTMENT. THE CONTRACTOR CAN REQUEST IN WRITING TO THE
ENGINEER FOR APPROVAL TO WORK OUTSIDE THE PREDETERMINED HOURS WHEN
DEEMED NECESSARY.
11. WHEREVER ANY ITEMS HAVE ARCHEOLOGICAL VALUE ARE ENCOUNTERED IN THE
COURSE OF THE WORK, THE CONTRACTOR SHALL IMMEDIATELY HALT WORK IN THE
VICINITY AND CALL TO THE ATTENTION OF THE ENGINEER. THE CONTRACTOR SHALL
HAVE NO CLAIM TO OWNERSHIP OF ANY SUCH ITEMS NOR TO EXTRA PAYMENT FOR
DELAY WHICH MAY RESULT.
12. ANY DAMAGE THAT OCCURS TO EXISTING SITE FEATURES DUE TO CONTRACTOR'S
OPERATIONS SHALL BE CORRECTED TO THE SATISFACTION OF THE OWNER/ENGINEER
AT THE CONTRACTOR'S EXPENSE.
1. STRUCTURAL WORK SHALL CONFORM TO THE NEW YORK STATE DEPARTMENT OF
TRANSPORTATION STANDARD SPECIFICATIONS, INCLUDING LATEST ADDENDA, AND
CONTRACT DOCUMENTS. IN CASE OF CONFLICT MOST STRINGENT REQUIREMENT
SHALL GOVERN.
2. CONTRACTOR TO VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS AT THE JOB SITE
BEFORE COMMENCING WORK OR ORDERING MATERIAL. CONTRACTOR SHALL
IMMEDIATELY BRING TO THE ATTENTION OF THE OWNER, IN WRITING, ANY CONFLICT
OR DISCREPANCY WITH THE CONTRACT DRAWINGS OR EXISTING SITE CONDITIONS.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CHANGES AND DEVIATIONS OF THE
APPROVED PLANS.
4. NO STRUCTURAL CHANGES OF ANY KIND SHALL BE PERMITTED WITHOUT PRIOR
WRITTEN APPROVAL FROM THE ENGINEER.
5. THE CONTRACTOR SHALL BE REQUIRED TO REPAIR AND PATCH ANY AREAS THAT ARE
DAMAGED DURING PROCESS OF CONSTRUCTION AT NO EXPENSE TO THE OWNER.
6. VARIATIONS BETWEEN THE FIELD CONDITIONS AND THESE DRAWINGS MAY EXIST.
WHERE SUCH VARIATIONS ARE ENCOUNTERED THEY SHALL BE BROUGHT TO THE
ATTENTION OF THE ENGINEER.
7. DESIGN IS IN ACCORDANCE WITH THE REQUIREMENTS OF THE 2025 NEW YORK STATE
BUILDING CODE.
8. VERIFY ALL FIELD DIMENSIONS BY MEASUREMENT AT THE JOB SITE BEFORE
SUBMITTING SHOP DRAWINGS.
9. DO NOT PLACE CONCRETE WITHOUT APPROVED STRUCTURAL SHOP DRAWINGS
RELATED TO THE CONCRETE WORK.
10. FOR LOCATION OF CURBS SEE ENGINEERING DRAWING SET.
11. FOR FOUNDATION AND SITEWORK REQUIREMENTS, REFER TO ENGINEERING DRAWING
SET.
12. REFER TO SPECIFICATIONS FOR FURTHER INFORMATION. PROVIDE REMEDIAL WORK
TO CORRECT ALL DEFICIENCIES PRIOR TO PROCEEDING WITH WORK INCLUDING BUT
NOT LIMITED TO VERIFYING CONCRETE DIMENSIONS ARE WITHIN 1/8" OF THEORETICAL.
STRUCTURAL NOTES
1. GENERAL:
A. THE CONTRACTOR SHALL CONFORM WITH ALL SAFETY PROVISIONS OF APPLICABLE
LOCAL, COUNTY, STATE AND FEDERAL CODES, LAWS AND REQUIREMENTS,
INCLUDING OSHA.
2. STRUCTURAL:
A. CONTRACTOR TO PROVIDE ADEQUATE TEMPORARY BRACING AND SHORING
WHENEVER STRUCTURAL WORK IS INVOLVED.
B. MEANS OF EGRESS: ALL MEANS OF EGRESS FROM THE WORK AREA TO BE
MAINTAINED CLEAR AND FREE OF ALL OBSTRUCTIONS, SUCH AS BUILDING
MATERIALS, TOOLS, ETC.
3. FIRE SAFETY:
A. ALL BUILDING MATERIALS STORED AT THE CONSTRUCTION AREA ARE TO BE
SECURED IN A LOCKED AREA. ACCESS TO SUCH AREAS TO BE CONTROLLED BY
MANAGEMENT AND/OR GENERAL CONTRACTOR.
B. ALL MATERIALS TO BE STORED IN AN ORDERLY FASHION.
C. ALL FLAMMABLE MATERIALS TO BE KEPT TIGHTLY SEALED IN THEIR RESPECTIVE
MANUFACTURERS CONTAINERS. SUCH MATERIALS TO BE KEPT AWAY FROM HEAT,
AND STORED IN AN ADEQUATELY VENTILATED SPACE, IN COMPLIANCE WITH
APPLICABLE FIRE CODE.
D. CONTRACTOR TO SUBMIT A SCHEDULE OF ANY REQUIRED CUT-OFF FOR WATER, GAS,
OR ELECTRICAL SERVICES TO AFFECTED SURROUNDING BUILDING OCCUPANTS.
E. CONTRACTOR MUST GIVE AT LEAST THREE (3) DAYS WRITTEN NOTICE PRIOR TO ANY
DISRUPTION IN GAS, WATER, OR ELECTRICAL SERVICES. DISRUPTIONS SHALL BE
KEPT TO A MINIMUM.
4. DUST CONTROL:
A. DEBRIS, DIRT AND DUST TO BE KEPT TO A MINIMUM, TO BE CONFINED TO THE
IMMEDIATE CONSTRUCTION AREA.
B. DEBRIS, DUST AND DIRT TO BE CLEANED UP AND CLEARED FROM THE WORK AREA
DAILY TO AVOID ANY EXCESSIVE ACCUMULATION.
5. ALL PEDESTRIAN AND TRAFFIC CONTROL DEVICES SHALL MEET THE FEDERAL
MANUAL OF UNIFORM TRAFFIC CONTROL (MUTCD) WITH NYS
SUPPLEMENT.
6. THE CONTRACTOR SHALL TAKE ALL MEASURES NECESSARY TO KEEP
ALL VEHICLES AND PUBLIC FROM ENTERING THE WORK AREA.
PROJECT SAFETY
1. CALL FOR A MARK-OUT OF EXISTING UNDERGROUND FACILITIES BEFORE WORK
BEGINS.
2. HAND EXCAVATE TO DETERMINE EXACT LOCATION OF ALL MARKED OUT UTILITIES
WITHIN 4'-0" OF ANY EXCAVATIONS.
BEFORE YOU DIG
1. NEW YORK STATE OFFICE OF PARKS, RECREATION & HISTORIC PRESERVATION SHALL
APPROVE STAGING AREA LOCATIONS PRIOR TO COMMENCEMENT OF WORK.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING A STAGING AREA FOR THE
CONTRACT. THIS AREA MUST BE RESTORED TO ITS ORIGINAL CONDITION AFTER
COMPLETION OF THE PROJECT.
1. CONCRETE WORK SHALL CONFORM TO THE ACI 318 - 19, LATEST REVISION.
2. MINIMUM CONCRETE COMPRESSIVE STRENGTH f'c = 4000 PSI UNLESS OTHERWISE
NOTED.
3. MINIMUM ELAPSED TIME BETWEEN ADJACENT CONCRETE PLACEMENTS SHALL BE 24
HOURS.
4. CHAMFER ALL EXPOSED CORNERS OF CONCRETE 3/4" UNLESS OTHERWISE NOTED.
5. ALUMINUM SURFACES IN CONTACT WITH CONCRETE OR DISSIMILAR METALS SHALL BE
THOROUGHLY PROTECTED WITH A HEAVY COATING OF BITUMINOUS PAINT OR OTHER
APPROVED INSULATING MATERIAL.
6. IF FREEZING WEATHER IS ANTICIPATED, USE SET ACCELERATORS AND COVER
CONCRETE MINIMUM 3 DAYS TO PREVENT FREEZING.
7. DESIGN OF REINFORCED CONCRETE MEMBERS IS IN ACCORDANCE WITH THE
PROVISION OF THE BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE
(ACI318-19), AS MODIFIED BY THE 2025 NYS BUILDING CODE USING LOAD FACTORS AND
STRENGTH REDUCTION FACTORS.
3. ALL CONCRETE WORK - MIXES, INSPECTIONS, AND FORMWORK SHALL CONFORM TO
THE REQUIREMENTS OF THE 2025 NYS BUILDING CODE.
4. PROPORTION, BATCH AND MIX CONCRETE IN ACCORDANCE WITH 2025 NYS BUILDING
CODE.
5. SUBMIT THE PROPOSED MIX DESIGN, WITH PRELIMINARY TEST RESULTS TO THE
ENGINEER OF RECORD AND THE SPECIAL INSPECTOR.
6. ALL CONCRETE USED IN THE STRUCTURE SHALL CONFORM IN ALL RESPECTS TO
THE MATERIAL AND PROPORTIONS OF THESE MATERIALS USED IN THE APPROVED
DESIGN MIX. THE USE OF ANY ADDITIVES NOT PRESENT IN THE APPROVED DESIGN MIX
IS PROHIBITED.
7. THE METHOD FOR CONVEYING CONCRETE TO THE PLACE OF DEPOSIT SHALL COMPLY
WITH 2025 NYS BUILDING CODE
8. ROUGHENED SURFACE AT INTERFACE OF SEPARATE CONCRETE POURS (JOINTS)
SHALL BE PREPARED AS FOLLOWS:
8.1. ROUGHEN SURFACE TO A FULL AMPLITUDE OF APPROXIMATELY 1/4" WITH STIFF
BROOM AFTER INITIAL SET.
8.2. BEFORE PLACING FRESH CONCRETE, CLEAN SURFACE AND REMOVE LAITANCE
WITH WIRE BRUSH.
8.3. IMMEDIATELY BEFORE NEW CONCRETE IS PLACED, WET SURFACE AND
REMOVE STANDING WATER.
9. THE CRITERIA FOR EVALUATION AND ACCEPTANCE OF CONCRETE, THE FREQUENCY OF
CONDUCTING STRENGTH TESTS OF CONCRETE SHALL BE IN ACCORDANCE WITH 2025
NYS BUILDING CODE.
10. STRENGTH TESTS SHALL BE PERFORMED FOR EACH 50 CUBIC YARDS OR FRACTION
THEREOF FOR EACH TYPE AND STRENGTH OF CONCRETE PLACED IN ANY ONE DAY'S
CONCRETE ONE CYLINDER IS TO BE TESTED AT 7 DAYS.
11. ONE STRENGTH TEST IS TO BE PERFORMED AT 28 DAYS. IF FIRST CYLINDER INDICATES
STRENGTH IS NOT MET, DO NOT BREAK REMAINING CYLINDERS OF SET.
12. ONE STRENGTH TEST IS TO BE PERFORMED AT 56 DAYS.
13. IN ADDITION, CONCRETE TEST CYLINDERS WILL BE MADE FROM CONCRETE TAKEN OUT
OF THE BUCKET, HOPPER OR FORMS AS DIRECTED BY SPECIAL INSPECTOR WHEN
CONCRETE IS PLACED FROM AN INTERMEDIATE CONVEYANCE. THESE TESTS
CYLINDERS SHALL BE SEPARATE AND DISTINCT FROM THOSE MADE FROM THE MIXER
AND SHALL BE MADE FROM THE SAME BATCH, CURED AND TESTED IN THE SAME
MANNER AS DESCRIBED FOR THE SAMPLES TAKEN FROM THE MIXER. HOWEVER,
STRENGTH TESTS MAY BE REDUCED TO BEING PERFORMED FOR EVERY 150 CUBIC
YARDS OR FRACTION THEREOF FOR EACH STRENGTH OF CONCRETE PLACED IN ANY
ONE DAY'S CONCRETING.
14. WHEN CONCRETE IS PLACED DIRECTLY FROM THE MIXER INTO THE FORMS, WITHOUT
ANY INTERMEDIATE CONVEYANCE, THE ABOVE ADDITIONAL CYLINDERS WILL NOT BE
REQUIRED.
15. IN CONFORMANCE WITH 2025 NYS BC, THE AUTHORITY WILL ASSIGN AN APPROVED
INSPECTION AGENCY/SPECIAL INSPECTOR TO SUPERVISE THE TESTING OF THE
MATERIALS AND THE INSPECTION OF CONCRETE CONSTRUCTION AND TO CHECK THAT
ALL REQUIRED TESTS ARE MADE AND LABORATORY TESTS ARE SUBMITTED. THE
INSPECTOR SHALL HAVE THE RIGHT TO ORDER THE CONTRACTOR TO MAKE SUCH
CHANGES OF THE MIX OF CONCRETE AS REQUIRED TO PRODUCE CONCRETE OF THE
NECESSARY STRENGTH AND TO REPORT TO THE BUILDING DEPARTMENT
SUPERINTENDENT ANY DEVIATION FROM THE REQUIREMENTS OF THE CODE AS
INDICATED BY RECORDS OF INSPECTION AND REPORTS OF TEST.
16. THE APPROVED INSPECTION AGENCY, AS PER REQUIREMENTS OF 2025 NYS BUILDING
CODE, WILL CONDUCT ALL NECESSARY TESTS AT THE LABORATORY AND WILL HAVE
ONE QUALIFIED CONCRETE TECHNICIAN TO BE STATIONED AT THE MIXING PLANT AT
THE AUTHORITY'S DISCRETION, AND HAVE A MINIMUM OF ONE QUALIFIED CONCRETE
TECHNICIAN AT THE JOB SITE. THE CONCRETE TECHNICIAN AT THE JOB SITE WILL
PERFORM THE TESTS AND PREPARE SPECIMENS, AS REQUIRED UNDER THE CODE.
CONCRETE
1. THE CONTRACTOR SHALL PROVIDE ALL MEASURES AND PRECAUTIONS NECESSARY TO
PREVENT DAMAGE AND SETTLEMENT OF EXISTING OR NEW CONSTRUCTION INSIDE OR
OUTSIDE OF THE PROJECT LIMITS CAUSED BY CONSTRUCTION TECHNIQUES OR
MOVEMENT OF THE SOIL RETENTION SYSTEM.
2. ALL EXCAVATION SHORING SHALL BE BASED ON ENGINEERED PLANS. THE EXCAVATION
SEQUENCES SHALL BE CONTROLLED TO MATCH THE REQUIREMENTS OF THE DESIGN
OF THE SOIL RETENTION SYSTEM.
3. PROVIDE PROTECTION FOR ALL EXCAVATIONS FROM INSTABILITY AND DETERIORATION
DUE TO RAIN, WIND OR SNOW.
4. ALL EXCESS EXCAVATED MATERIAL SHALL BE USED FOR GRADING ALONG THE TRAIL.
5. CORRECT ANY UNAUTHORIZED EXCAVATION AT NO ADDITIONAL COST TO OWNER.
6. DO NOT STORE SOIL, MATERIALS OR EQUIPMENT ALONG THE EDGE OF THE
EXCAVATION.
7. THE ESTIMATED LOCATION OF UTILITY INSTALLATIONS SUCH AS SEWER, TELEPHONE,
FUEL, ELECTRIC, WATER LINES, OR ANY OTHER UNDERGROUND INSTALLATIONS THAT
MAY BE EXPECTED TO BE REASONABLY ENCOUNTERED DURING EXCAVATION WORK
SHALL BE DETERMINED PRIOR TO EXCAVATION.
8. UNDERGROUND UTILITIES MAY BE OWNED BY NEW YORK STATE OFFICE OF PARKS,
RECREATION & HISTORIC PRESERVATION. PRIOR TO ANY EXCAVATION, THE
CONTRACTOR WILL NEED TO HIRE A COMPANY TO PERFORM A UTILITY MARKOUT, AS
CALLING ONLY 811 WILL NOT SUFFICE.
9. WHEN EXCAVATION OPERATIONS APPROACH WITHIN 4'-0” OF THE ESTIMATED
LOCATION OF UNDERGROUND UTILITIES, THE EXACT LOCATION OF THE UTILITIES
SHALL BE DETERMINED SAFELY BY HAND EXCAVATION.
10. THE CONTRACTOR SHALL PROVIDE EROSION CONTROL TO PREVENT SURFACE SOIL
RUN-OFF FROM EXCAVATED AREAS AND MATERIALS. COST OF THE WORK AND
MATERIALS REQUIRED FOR EROSION CONTROL SHALL BE INCLUDED IN THE COST FOR
THE EXCAVATION.
EXCAVATION
1. FOUNDATION SIZES SHOWN ARE GIVEN FOR 1.5 TONS PER SQUARE FOOT ALLOWABLE
BEARING PRESSURE FOUNDED IN UNDISTURBED SOIL AND/OR COMPACTED FILL.
2. NO CONCRETE SHALL BE PLACED IN WATER OR ON FROZEN GRADE.
3. ALL CONCRETE STRUCTURAL MEMBERS SHALL BE PLACED IN ONE POUR,
MONOLITHICALLY, UNLESS OTHERWISE NOTED IN DRAWING.
4. THE CONTRACTOR IS REQUIRED TO USE HAND TOOLING TO REMOVE THE SLAB,
AVOIDING ANY IMPACT ON THE EXISTING ABUTMENTS/FOUNDATION. IT IS ALSO
REQUIRED FOR TO INFORM PARKS REPRESENTATIVE 72 HOURS IN ADVANCE OF THE
COMPLETION OF THE SLAB REMOVAL TO ALLOW ENGINEER OF RECORD TO COME
INSPECT, PROVIDE VERIFICATION OF EXISTING FOOTING, OR PROPOSE ANY REPAIR IF
REQUIRED TO THE EXISTING FOUNDATION TO REMAIN. PRIOR TO GETTING APPROVAL
TO PROCEED WITH NEW FOUNDATION/PILES INSTALLATION.
5. REMOVE ALL EXISTING PAVEMENT, VEGETATION, OR ORGANIC MATTER AND STRIP THE
SURFACE SOIL TO AN ADEQUATE DEPTH AND WIDTH NECESSARY TO PERFORM
CONTRACT SCOPED WORK THAT INCLUDES THE REQUIRED AMOUNT OF SELECT FILL
PER THE SITE-SPECIFIC GEOTECHNICAL REPORT (SEE S-2).
6. SELECT FILL SHALL, AS A MINIMUM, CONSIST OF WELL-GRADED GRAVEL FREE OF
ORGANIC MATERIAL, TRASH, OR OTHER DELETERIOUS MATERIALS.
1. THE CONTRACTOR SHALL SUBMIT REBAR AND WIRE MESH SHOP DRAWINGS TO THE
ENGINEER FOR REVIEW AND APPROVAL.
2. SUBMIT PROPOSED MIX DESIGNS WITH PRELIMINARY TEST RESULTS TO THE ENGINEER
FOR REVIEW AND APPROVAL.
SHOP DRAWINGS
1. THE CONTRACTOR SHALL SUBMIT PLANS, DETAILS, AND CATALOG CUTS DESCRIBING
THE METHOD OF DEWATERING AND DISCHARGE FOR ALL EXCAVATIONS TO BE
APPROVED BY THE ENGINEER. THE SUBMISSION SHALL INCLUDE EQUIPMENT,
METHOD(S), STANDBY EQUIPMENT, POWER SUPPLY, AND MEANS OF MEASURING
INFLOW TO EXCAVATIONS. DRAWINGS SHOULD SHOW LOCATIONS OF EQUIPMENT,
DIMENSIONS, AND ALL REQUIRED ELEMENTS. CALCULATIONS SHOULD DEMONSTRATE
ADEQUACY OF PROPOSED SYSTEM THAT HAS BEEN PREPARED AND SEALED BY A NYS
LICENSED PROFESSIONAL ENGINEER.
DEWATERING
NOT TO SCALE
RED TRAIL SITE LOCATION
FOUNDATIONS
EXISTING SLAB BRIDGE LOCATION
NOT TO SCALE
SITE LOCATION ACCESS PATH
PROJECT LOCATION
1. THE CONTRACTOR SHALL SUBMIT PLANS, DETAILS, AND CATALOG CUTS DESCRIBING
THE METHOD OF DEWATERING AND DISCHARGE FOR ALL EXCAVATIONS TO BE
APPROVED BY THE ENGINEER. THE SUBMISSION SHALL INCLUDE EQUIPMENT,
METHOD(S), STANDBY EQUIPMENT, POWER SUPPLY, AND MEANS OF MEASURING
INFLOW TO EXCAVATIONS. DRAWINGS SHOULD SHOW LOCATIONS OF EQUIPMENT,
DIMENSIONS, AND ALL REQUIRED ELEMENTS. CALCULATIONS SHOULD DEMONSTRATE
ADEQUACY OF PROPOSED SYSTEM THAT HAS BEEN PREPARED AND SEALED BY A NYS
LICENSED PROFESSIONAL ENGINEER.
DEWATERING
FLOOD ZONE AREA A COMPLIANCE
FEMA FLOOD ZONE AE (AREA OF SPECIAL FLOOD HAZARD) 1% ANNUAL RISK
MAP #: 36103C0670H
EFF. 09/25/2009
1. WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE NEW YORK STATE BUILDING
CODE REQUIREMENTS, PRACTICE FOR DETAILING REINFORCED CONCRETE
STRUCTURES (ACI 315).
2. STEEL REINFORCEMENT FOR BARS, TIES AND STIRRUPS SHALL CONFORM TO ASTM 615
GRADE 60. ALL STEEL REINFORCEMENT SHALL BE GALVANIZED.
3. REINFORCEMENT SPLICE AND DEVELOPMENT LENGTH PER ACI 318-19.
4. MINIMUM STEEL PERCENTAGE IN ALL CONCRETE NOT SPECIFIED IN DRAWING SHALL BE
0.5% OF THE GROSS CONCRETE AREA.
5. PROVIDE, WITH SHOP DRAWINGS, ALL NECESSARY ACCESSORIES TO HOLD
REINFORCEMENT SECURELY IN PLACE.
6. MINIMUM CONCRETE COVER FOR REINFORCEMENT UNLESS OTHERWISE NOTED SHALL
BE 3 INCHES.
7. ALL REINFORCING BARS SHALL BE DEFORMED BILLET STEEL BARS AND SHALL
CONFORM TO ASTM A615 GRADE 60. REINFORCEMENT TO BE WELDED SHALL CONFORM
TO ASTM A706, GRADE 60. WELDED WIRE FABRIC (WIRE MESH) SHALL CONFORM TO
ASTM A185.
8. THE CONTRACTOR SHALL SUBMIT CHECKED SHOP DRAWINGS CONSISTING OF COMPLETE
PLANS AND DETAILS OF REINFORCEMENT, LOCATIONS OF POUR LINES, CONSTRUCTION
JOINTS. ETC. FOR APPROVAL BEFORE PROCEEDING WITH THE WORK.
9. ALL DETAILING, FABRICATION AND ERECTION OF REINFORCING BARS SHALL COMPLY WITH
THE REQUIREMENTS OF AND ACI 318-19 AND NYS BUILDING CODE.
10. ALL SPLICES SHALL BE IN ACCORDANCE WITH ACI 318-19. THE LOCATIONS SHALL BE
INDICATED ON THE SHOP DRAWINGS AND APPROVED BY THE ENGINEER OF RECORD.
GENERALLY, ALL SPLICES SHALL BE STAGGERED AND LOCATED AWAY FROM THE SECTION
OF MAXIMUM TENSILE STRESS.
11. ALL REINFORCEMENT SHALL BE ACCURATELY PLACED AND SECURELY WIRED TO PREVENT
DISLOCATION FROM PROPER POSITION.
12. PROVIDE CHAIRS FOR SUPPORT OF ALL REINFORCEMENT. LIFTING OF BARS OR MESH
DURING PLACEMENT OF CONCRETE IS NOT PERMITTED.
13. CONCRETE PROTECTION FOR BARS IN SLAB SHALL BE 3/4" CLEAR UNLESS
OTHERWISE NOTED.
14. THE DETAILING OF REINFORCEMENT AND CONNECTION BETWEEN CONCRETE MEMBER AS
RELATED TO REQUIREMENTS FOR STRUCTURAL INTEGRITY SHALL COMPLY WITH
PROVISIONS OF ACI 318-19
15. REINFORCED CONCRETE STRUCTURES SHALL MEET ALL THE REQUIREMENTS OF 2025 NYS
BUILDING CODE, RELATED TO STRUCTURAL INTEGRITY.
REINFORCEMENT
DESIGN DATA
16 KIPS
150 PCF
AXLE LOAD
NORMAL WEIGHT CONCRETE
24"WHEEL LOAD EFFECTIVE WIDTH
8 KIPSWHEEL LOAD
HS-10AASHTO LOAD RATING
CONTRACTOR MUST NOTIFY OPRHP ENGINEER 72 DAYS IN ADVANCE OF EXPECTED INSPECTION DATE.
THE FOLLOWING SPECIAL INSPECTIONS ARE REQUIRED:
1. FOOTING AND FOUNDATION BCNYS SECTION 1803 - GEOTECHNICAL INSPECTION
2. CONCRETE - CAST-IN-PLACE BCNYS SECTION 1705.3
3. CONCRETE SAMPLING AND TESTING - BCNYS SECTIONS 1705, 1905, ACI 301 / ASTM STANDARDS
4. CONCRETE DESIGN MIX- BCNYS SECTIONS 1904, 1905, ACI 318 CHAPTER 19 & 26
5. HELICAL PILES - SECTION BCNYS SECTION1705.9
ADDITIONAL REQUIRED INSPECTIONS ARE AT THE DESCRETION OF THE OPRHP ENGINEER.
SPECIAL INSPECTIONS
LOAD PER PILE ( TOTAL GRAVITY
LL+DL)
HYDRODYNAMIC FORCE ON CURB
(SHEAR)
BUOYANCY FORCE (UPLIFT)
15 KIPS
150 LBS
2.5 KIPS
Description Date
SUBMISSIONS/ REVISIONS
No
Drawn By:
Design By:
Checked By:
Submission Date:
06/9/2026
Approved By:
Sheet:Project ID:
Sheet Title:
Drawing Number:
Project Title:
Project Location:
KATHY HOCHUL
Governor
KATHY MOSER
Commissioner
123456789
89 123467 5
A
B
D
E
F
G
H
C
JC
DR
VH
DR
OFLI-CR-2026-001(A) 14
LONG ISLAND DISTRICT
625 BELMONT AVE
WEST BABYLON, NY 11702
TOM ALWORTH
EXECUTIVE DEPUTY COMMISSIONER
BEVIN COLLINS, RA, LEED AP
DEPUTY COMMISSIONER, CAPITAL PROJECTS
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON,
UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER
TO ALTER THIS DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE THE
SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS,
DATE AND ARCHITECT'S/ENGINEER'S SIGNATURE. COPYRIGHT © 2022
RED TRAIL SLAB BRIDGE REPLACEMENT
CONNETQUOT RIVER STATE PARK PRESERVE
4090 SUNRISE HIGHWAY
OAKDALE, NY, 11769
CONSULTANTS: N/A
KEY PLAN:
CONTRACT #: N/A
GEORGE GORMAN, JR.
LONG ISLAND REGIONAL DIRECTOR
VESNA HADZIBABIC, PE, LEED AP BD+C
LONG ISLAND CAPITAL DISTRICT MANAGER
GENERAL NOTES
G-1
ENVIRONMENTAL REVIEW 8.22.25
90% DD 3.6.26
CODE COMPLIANCE REVIEW 3.13.26
CONSTRUCTION CONTRACT 6.9.26
SEISMIC PARAMETERS (Ss/S1/SM1/SDS)
SEISMIC CATAGORY
IMPORTANCE FACTOR A
.2/.044/.093/.16
Ie = 1
FL
O
W
EXISTING SLAB BRIDGE TO BE REMOVED
TO PARKBUILDINGS
NOT TO SCALE
EXISTING SLAB BRIDGE LAYOUT
NOT TO SCALE
EXISTING SLAB BRIDGE DEMOLITION DETAIL
EXISTING PATH
NOT TO SCALE
VIEW OF SLAB BRIDGE FROM TRAIL LOOKING EAST
NOTES:
1. ALL ELEVATIONS (NAVD88) SHOWN ARE EXISTING AND
ARE TO REMAIN
2. SEE PAGE S-2 FOR DRILLER'S LOG OF B-1 SOIL BORING
3. ALL DIMENSIONS TO BE VERIFIED IN FIELD
EXISTING FOOTING BACKFILL TO BE EXCAVATED
AND USED TO GRADE TRAIL
EXISTING PATH
EXISTING TREE TO REMAIN
STEEL PLATES TO BE REMOVED
±5'-6"
SOIL BORING
B-1
APPROX. 13'
±8'-6"
±18" ±18"
5'-6"
EXISTING FOOTINGS
TO REMAIN
±1 0"
EXISTING CONCRETE ABUTMENTS TO REMAIN
Description Date
SUBMISSIONS/ REVISIONS
No
Drawn By:
Design By:
Checked By:
Submission Date:
06/9/2026
Approved By:
Sheet:Project ID:
Sheet Title:
Drawing Number:
Project Title:
Project Location:
KATHY HOCHUL
Governor
KATHY MOSER
Commissioner
123456789
89 123467 5
A
B
D
E
F
G
H
C
JC
DR
VH
DR
OFLI-CR-2026-001(A) 14
LONG ISLAND DISTRICT
625 BELMONT AVE
WEST BABYLON, NY 11702
TOM ALWORTH
EXECUTIVE DEPUTY COMMISSIONER
BEVIN COLLINS, RA, LEED AP
DEPUTY COMMISSIONER, CAPITAL PROJECTS
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON,
UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER
TO ALTER THIS DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE THE
SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS,
DATE AND ARCHITECT'S/ENGINEER'S SIGNATURE. COPYRIGHT © 2022
RED TRAIL SLAB BRIDGE REPLACEMENT
CONNETQUOT RIVER STATE PARK PRESERVE
4090 SUNRISE HIGHWAY
OAKDALE, NY, 11769
CONSULTANTS: N/A
KEY PLAN:
CONTRACT #: N/A
GEORGE GORMAN, JR.
LONG ISLAND REGIONAL DIRECTOR
VESNA HADZIBABIC, PE, LEED AP BD+C
LONG ISLAND CAPITAL DISTRICT MANAGER
SITE PLAN AND EXISTING SLAB
BRIDGE DEMOLITION PLAN
ENVIRONMENTAL REVIEW 8.22.25
90% DD 3.6.26
CODE COMPLIANCE REVIEW 3.13.26
CONSTRUCTION CONTRACT 6.9.26
DM-1
18" MIN EMBEDMENT
TY
P.
(24
" M
IN
6" (TYP)
EXISTING TREE TO REMAIN, PROTECTION AS NEEDED
SILT FENCE (TYP.)
NOTES:
1. EXCAVATE EXISTING GROUND AS REQUIRED TO INSTALL
FOUNDATION AND BRIDGE STRUCTURE. FILL BEHIND
FOUNDATION INSTALLATION WITH SELECT STRUCTURAL
FILL IF FOUND ON SITE AND APPROVED BY NYS OPRHP
ENGINEER. OTHERWISE SELECT FILL SHALL BE DELIVERED.
2. ANY VEHICLES OR EQUIPMENT MUST BE BELOW NYSDOT
SPECIFIED WEIGHT LIMIT PLACED ON THE SPILLWAY
FURTHER UP THE TRAIL.
3. ALL DRY SOIL REMOVED FROM THE TOP OF THE EXISTING
SLAB BRIDGE MAY BE USED TO GRADE TRAIL.
CONCRETE:
1. ALL CONCRETE REINFORCING BAR SHALL BE GALVANIZED
CONFORM TO ASTM A615. GRADE 60.
2. ALL LAP SPLICES FOR REINFORCEMENT BARS IN
FOUNDATION SHALL BE A MINIMUM OF 48Ø. WHERE Ø IS
THE DIAMETER OF THE BAR.
3. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE
STRENGTH OF 4000 PSI.
4. CONCRETE COVER SHALL BE 3" UNLESS OTHERWISE
NOTED.
5. PROVIDE CHAIR SUPPORTS FOR PROPER CLEARANCE AT
48" O.C MINIMUM.
6. NO HORIZONTAL JOINTS OR VERTICAL JOINTS ARE
PERMITTED IN CONCRETE, EACH FOUNDATION MUST BE
ONE POUR.
7. WIRE MESH REINFORCEMENT IS TO BE 6x6-1.4x1.4 IN
ACCORDANCE WITH WWR-500 MANUAL OF STANDARD
PRACTICE AND SHALL BE PLACED 3" MIN. FROM TOP OF
SLAB.
UNKNOWN LINES BELOW GRADE DETECTED BY
GPR. CONTRACTOR TO PERFORM TEST PIT
PRIOR TO EXCAVATING
UNKNOWN LINES BELOW GRADE DETECTED BY
GPR. CONTRACTOR TO PERFORM TEST PIT
PRIOR TO EXCAVATING
25'± TYP.
LIMIT OF WORK: 25'±
COMPACTED SUBGRADE
AND FILL
'-8
12'-6"
HELICAL PILES
TEMPORARY
NOT TO SCALE
EROSION CONTROL - SILT FENCE
CONCRETE CURB
SCALE: NTS
DEEP FOUNDATION DETAIL
SCALE: NTS
BRIDGE FOOTPRINT PLAN
NOT TO SCALE
PROPOSED UTILITY BRIDGE REPLACEMENT PLAN
LIMIT OF WORK: 25'±
SILT FENCE (TYP.)
25'± TYP.
EXISTING CONCRETE FOOTINGS TO
REMAIN (DEPTH V.I.F)
PROPOSED USE OF LARGE BOULDERS FOR SCOUR PROTECTION
6'-6"
FL
O
W
6" EMBEDMENT
#3 STIRRUPS @ 18"
(4) - #5 REBAR
#3 STIRRUPS @ 18" O.C
(4) - # 5 REBAR
6"
EM
BE
D
M
EN
T (T
YP
9'-8" 11'-8"
SCALE: NTS
REINFORCED CONCRETE PILE CAP
PAPER JOINT, TYP.
3 4 6
9' -8
HELICAL PILE LOCATION
POUR IN PLACE CONCRETE SLAB BRIDGE
24"
#7 @ 6"
2'-0"
CONCRETE CURB (SEE DETAIL 5)
NOT TO SCALE
CURB BEAM REINFORCEMENT DETAIL5
#7 @ 6"
9'-8"
11'-8"
6"
TO BE DETERMINED
BY PILE INSTALLER
TO BE DETERMINED
BY PILE INSTALLER
(2) - #7 REBAR
#3 STIRRUPS @ 18"
12"
(4) - # 5 REBAR
(4) - #5 REBAR
(2) - #5 REBAR
WIRE MESH
REINFORCEMENT
@ 3" MIN. FROM
TOP OF SLAB
WIRE MESH
REINFORCEMENT
@ 3" MIN. FROM
TOP OF SLAB
WIRE MESH
REINFORCEMENT
@ 3" MIN. FROM
TOP OF SLAB
WIRE MESH
REINFORCEMENT
@ 3" MIN. FROM
TOP OF SLAB
2" COVER
2" COVER
Description Date
SUBMISSIONS/ REVISIONS
No
Drawn By:
Design By:
Checked By:
Submission Date:
06/9/2026
Approved By:
Sheet:Project ID:
Sheet Title:
Drawing Number:
Project Title:
Project Location:
KATHY HOCHUL
Governor
KATHY MOSER
Commissioner
123456789
89 123467 5
A
B
D
E
F
G
H
C
JC
DR
VH
DR
OFLI-CR-2026-001(A) 14
LONG ISLAND DISTRICT
625 BELMONT AVE
WEST BABYLON, NY 11702
TOM ALWORTH
EXECUTIVE DEPUTY COMMISSIONER
BEVIN COLLINS, RA, LEED AP
DEPUTY COMMISSIONER, CAPITAL PROJECTS
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON,
UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER
TO ALTER THIS DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE THE
SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS,
DATE AND ARCHITECT'S/ENGINEER'S SIGNATURE. COPYRIGHT © 2022
RED TRAIL SLAB BRIDGE REPLACEMENT
CONNETQUOT RIVER STATE PARK PRESERVE
4090 SUNRISE HIGHWAY
OAKDALE, NY, 11769
CONSULTANTS: N/A
KEY PLAN:
CONTRACT #: N/A
GEORGE GORMAN, JR.
LONG ISLAND REGIONAL DIRECTOR
VESNA HADZIBABIC, PE, LEED AP BD+C
LONG ISLAND CAPITAL DISTRICT MANAGER
PROPOSED SHORT SPAN
BRIDGE DETAILS
ENVIRONMENTAL REVIEW 8.22.25
90% DD 3.6.26
CODE COMPLIANCE REVIEW 3.13.26
CONSTRUCTION CONTRACT 6.9.26
S-1
RECOMMENDED:
MacLean D684S81012 LEAD SHAFT
OR EQUAL
(SEE SHEET SPEC-5 SECTION 2.1)
RECOMMENDED:
MacLean D684S81012 LEAD SHAFT
OR EQUAL
(SEE SHEET SPEC-5 SECTION 2.1)
RECOMMENDED:
MacLean D684S81012 LEAD SHAFT OR EQUAL
(SEE SHEET SPEC-5 SECTION 2.1)
ANTICIPATED ± 30 FT MIN.
INCLUDING MULTIPLE ± 7 FT
EXTENSIONS
Land, Air, Water Environmental Services, Inc.
DRILLER'S LOGS
BORING#: B-1
April 5, 2024
Great River, NY
Page# 1 of 1
DATE:
SITE: Connetquot State Park
DEPTH DRILLED:
CORING DEVICE:
DRILL RIG / GEOPROBE TYPE:
DRILLER:
DEPTH
FROM TO
ft ft ft ft ft ft ft ft ft ft ft ft ft ft ft ft ft ft ft ft ft ft ft ft ft ft
RECOVERY
14 inches
14 inches
12 inches
Direct Push
9 inches
Direct Push
10 inches
Direct Push
10 inches
Direct Push
12 inches
Direct Push
12 inches 7-7-10-9
2-1-2-6
3-3-4-7
4-5-3-3
5-4-2-2 feet 2" x 24"
AUTOMATIC SPT DROP HAMMER
Geoprobe 78DT
C. Pedersen
BLOWS / 6
INCHES
3-6-5-5
6-8-6-8
17-12-13-9
CONSULTANT: Lockwood, Kessler & Bartlett, Inc.
Syosset, NY
DEPTH TO WATER:
TIME WATER WAS TAKEN:
WELL/BORING GROUTED : Backfill
DRILLING METHOD:
HELPER: J. Neuhaus
SAMPLE DESCRIPTION
Dark brown sand, fine to medium, trace of gravel, (SP)
Dark brown sand, medium to fine, trace of gravel, (SP), wet
Dark brown gravel sand, coarse to medium to fine, 15% gravel (SP), wet
Rod Advancement Brown sand/gravel, coarse to medium to fine, 10% gravel, (SP), wet
Rod Advancement Tan sand/gravel, coarse to medium to fine, 40% gravel, (SP), wet
Rod Advancement
White sand, fine, trace of gravel, (SW), wet
Rod Advancement
White sand, fine, trace of gravel, (SW), wet
Rod Advancement
White sand, fine, trace of gravel, (SW), wet feet
8:03 AM
3.5" Geoprobe rods
The boring / well has been finished at grade as contracted. It is the responsibility of the client and / or property owner to maintain the boring / well and have it legally abandoned when decommissioning is required.
Description Date
SUBMISSIONS/ REVISIONS
No
Drawn By:
Design By:
Checked By:
Submission Date:
06/9/2026
Approved By:
Sheet:Project ID:
Sheet Title:
Drawing Number:
Project Title:
Project Location:
KATHY HOCHUL
Governor
KATHY MOSER
Commissioner
123456789
89 123467 5
A
B
D
E
F
G
H
C
JC
DR
VH
DR
OFLI-CR-2026-001(A) 14
LONG ISLAND DISTRICT
625 BELMONT AVE
WEST BABYLON, NY 11702
TOM ALWORTH
EXECUTIVE DEPUTY COMMISSIONER
BEVIN COLLINS, RA, LEED AP
DEPUTY COMMISSIONER, CAPITAL PROJECTS
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON,
UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER
TO ALTER THIS DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE THE
SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS,
DATE AND ARCHITECT'S/ENGINEER'S SIGNATURE. COPYRIGHT © 2022
RED TRAIL SLAB BRIDGE REPLACEMENT
CONNETQUOT RIVER STATE PARK PRESERVE
4090 SUNRISE HIGHWAY
OAKDALE, NY, 11769
CONSULTANTS: N/A
KEY PLAN:
CONTRACT #: N/A
GEORGE GORMAN, JR.
LONG ISLAND REGIONAL DIRECTOR
VESNA HADZIBABIC, PE, LEED AP BD+C
LONG ISLAND CAPITAL DISTRICT MANAGER
GEOTECHNICAL SOIL BORING LOGS
ENVIRONMENTAL REVIEW 8.22.25
90% DD 3.6.26
CODE COMPLIANCE REVIEW 3.13.26
S-2
NOTES:
1. TABULATED VALUES ARE BASED ON GRADE 60
REINFORCING BARS AND NORMAL-WEIGHT CONCRETE.
2. TENSION DEVELOPMENT LENGTHS AND TENSION LAP SPLICE
LENGTHS ARE BASED ON ACI 318-19, SECTIONS 25.4.2 AND
25.5, RESPECTIVELY. TABULATED VALUES FOR BEAMS OR
COLUMNS ARE BASED ON TRANSVERSE REINFORCEMENT
AND CONCRETE COVER MEETING MINIMUM CODE
REQUIREMENTS. LENGTHS ARE IN INCHES.
3. CASES 1 AND 2, WHICH DEPEND ON THE TYPE OF
STRUCTURAL ELEMENT, CONCRETE COVER, AND THE
CENTER-TO-CENTER (C.-C.) SPACING OF THE BARS, ARE
DEFINED AS:
4. LAP CLASS A VALUE ARE THE REQUIRED TENSION DEVELOPMENT
LENGTHS, Ld; LAP SPLICE LENGTHS ARE MULTIPLES OF TENSION
DEVELOPMENT LENGTHS;
CLASS A = 1.0 Ld AND CLASS B = 1.3 Ld (ACI 318-19, SECTION 25.5).
5. LAP SPLICES OF #14 OR #18 BARS ARE NOT PERMITTED. THE
TABULATED VALUES FOR THOSE BAR SIZES ARE THE TENSION
DEVELOPMENT LENGTHS.
6. TOP BARS ARE HORIZONTAL BARS WITH MORE THAN 12" OF
CONCRETE CAST BELOW THE BARS.
7. FOR LIGHTWEIGHT AGGREGATE CONCRETE, MULTIPLY THE
TABULATED VALUES BY 1.3; OR WHEN f IS SPECIFIED, THE FACTOR
IS 6.7
8. FOR EPOXY COATED BARS, MULTIPLY THE TABULATED
VALUES BY ONE OF THE FOLLOWING FACTORS:
NOTES:
1. TABULATED VALUES ARE BASED ON GRADE 60 REINFORCING BARS
AND NORMAL WEIGHT CONCRETE.
2. COMPRESSION DEVELOPMENT LENGTHS AND COMPRESSION LAP SPLICE LENGTHS
ARE BASED ON ACI 318-19 SECTIONS 25.4 AND 25.5. LENGTHS ARE IN INCHES.
3. FOR COMPRESSION LAP SPLICE LENGTHS:
3.1. THE TABULATED LENGTHS ARE APPLICABLE FOR ALL CONCRETE STRENGTHS OF
AT LEAST 3,000 PSI.
4. ACI 318-19 DOES NOT ALLOW LAP SPLICES OF #14 AND #18 BARS, EXCEPT TO #11 AND
SMALLER BARS.
ALL GRADES OF STEEL:
D = FINISH INSIDE BEND DIAMETER
d = NOMINAL BAR DIAMETER
MIN. D = 6d FOR #3 THROUGH #8 = 8d FOR #9 AND #11 = 10d FOR #14 AND #18
Description Date
SUBMISSIONS/ REVISIONS
No
Drawn By:
Design By:
Checked By:
Submission Date:
06/9/2026
Approved By:
Sheet:Project ID:
Sheet Title:
Drawing Number:
Project Title:
Project Location:
KATHY HOCHUL
Governor
KATHY MOSER
Commissioner
123456789
89 123467 5
A
B
D
E
F
G
H
C
JC
DR
VH
DR
OFLI-CR-2026-001(A) 14
LONG ISLAND DISTRICT
625 BELMONT AVE
WEST BABYLON, NY 11702
TOM ALWORTH
EXECUTIVE DEPUTY COMMISSIONER
BEVIN COLLINS, RA, LEED AP
DEPUTY COMMISSIONER, CAPITAL PROJECTS
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON,
UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER
TO ALTER THIS DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE THE
SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS,
DATE AND ARCHITECT'S/ENGINEER'S SIGNATURE. COPYRIGHT © 2022
RED TRAIL SLAB BRIDGE REPLACEMENT
CONNETQUOT RIVER STATE PARK PRESERVE
4090 SUNRISE HIGHWAY
OAKDALE, NY, 11769
CONSULTANTS: N/A
KEY PLAN:
CONTRACT #: N/A
GEORGE GORMAN, JR.
LONG ISLAND REGIONAL DIRECTOR
VESNA HADZIBABIC, PE, LEED AP BD+C
LONG ISLAND CAPITAL DISTRICT MANAGER
CONCRETE REINFORCEMENT DETAILS
ENVIRONMENTAL REVIEW 8.22.25
90% DD 3.6.26
CODE COMPLIANCE REVIEW 3.13.26
S-3
SECTION 011100 - SAFETY
PART 1 - GENERAL
1.1 SUMMARY
A. This section requires compliance with applicable Safety codes, standards, and regulations, including but not limited to OSHA, Building Code of New York State, Fire Code of New York State, and Facility Regulations.
1.2 RELATED WORK SPECIFIED ELSEWHERE
A. Summary of the Work: Section 011000.
1.3 DEFINITIONS, ABBREVIATIONS
A. OSHA: Occupational Safety and Health Administration.
B. BCNYS: Building Code of New York State.
C. EBCNYS: Existing Building Code of New York State.
D. FCNYS: Fire Code of New York State.
E. NFPA: National Fire Protection Association.
F. NEC: NFPA 70E.
1.4 SUBMITTALS
A. Provide a SITE SPECIFIC SAFETY PLAN no later than 15 days after approval of the Contract by the Comptroller. The plan must include at a minimum:
1. Cover page including Project Name/Location/Project Number/Contractor Name/Potential Start/Finish Dates.
2. Complete Scope of work.
3. Roles and Responsibilities page identifying Supervision, list of the names of all competent and/or qualified persons, including their qualifications, for each activity requiring a competent person i.e. excavations, scaffolding, rigging, fall protection, etc.
4. A program for implementing appropriate PPE as specified in the High 5.
Hazard Assessment detailed in Subparagraph 1.04 A.11 below.
5. A program for assuring employees have proper work attire, i.e.
substantial sole safety-toed footwear, long pants, shirts with minimum 4-inch sleeves, etc.
a. Exception:
1) When the employer can demonstrate that it is infeasible or creates a greater hazard to utilize these systems, the employer shall develop and implement a Fall Protection Plan, which meets the requirements of paragraph (k) 1926.502. This plan must be approved before implementation by the applicable OGS Regional Safety Manager.
6. A program for raising employee awareness through the use of weekly Safety Talks (i.e. “Toolbox Talks” or “Tailgate Meetings”) on topics related to upcoming/relevant work on the project. Contractor shall be required to verify that all employees on site participated in meeting, with documentation submitted to the OPRHP Representative.
7. A written Respirable Silica Protection Plan, including tasks for which employees could reasonably be expected to be exposed to harmful silica dust, and control methods that will be used to limit or eliminate exposure, as well as any PPE necessary to ensure protection.
8. Identify specific hazards related to this Project, and how employees will be protected from those hazards.
9. High Hazard Assessment's detailing procedures for all high hazard work activities including, but not limited to:
a. All lifts involving cranes or material handling equipment.
b. Demolition.
c. Excavations where anticipated depth is 5' or more.
1) High Hazard Assessments shall include a step-by-step breakdown of a given task, the hazards associated with each step, the controls that will be utilized to eliminate or minimize the hazards, and the PPE that will be used to protect from remaining hazards.
2) All required certifications shall be provided for all applicable types of work with required training/certifications (i.e., Powder Actuated Tools, Aerial Lifts, Forklifts, Crane Operators License, etc.).
10. A project safety inspection program, with a minimum of one documented safety inspection per week, during the course of construction. Submit copies of all resultant inspection reports to the OPRHP Representative on a weekly basis.
11. A program for providing proper care for injured employees, including the name of the employee with First Aid/CPR certification who will be on site at all times during the course of construction, to include local hospital/medical facility locations and contact information.
12. Provide an Emergency Action and Evacuation Plan, including Fire Protection and Emergency Response, when applicable.
a. Plan to include:
1) Procedures for reporting a fire or other emergency.
2) Procedures for emergency evacuation, including type of evacuation and exit route assignments.
3) Emergency Contact information.
4) Procedures on how to alert workers of an emergency.
5) Procedures to account for all employees after evacuation and muster/evacuation points.
6) A list of all major fire hazards, to include type of fire protection equipment necessary to control hazard.
B. Accident Reporting: The OPRHP Representative shall be immediately notified of any and all accidents. A copy of a written accident report shall be furnished to the OPRHP Representative within 24 hours of an incident.
1. After any incident on site resulting in an employee being injured or damage to property, a Post- Accident Review Investigation shall be held as soon as possible after any incident. As a minimum, this investigation will involve the injured person, his/her supervisor, the responsible project superintendent and/ or supervisor and the onsite safety supervisor. The contractor shall be responsible to provide a written Post-Accident Corrective Action Plan, which will detail immediate steps taken to correct any unsafe condition that led to injury/property damage, long-term actions to prevent repeat incidents from happening on the site, and roles and responsibilities of individuals who will be implementing the corrective measures, which will be reviewed for effectiveness and continually monitored for implementation.
1.5 STOP WORK ACTIVITY AUTHORITY
A. All NYS OPRHP Representatives have the authority to stop a work activity that exposes any Contractor employees to potentially serious injury and/or illness. The responsible Contractor shall immediately cease work, perform an assessment of the activity that is exposing employees to any Immediately Dangerous to Life or Health (IDLH) conditions, and take action necessary to satisfactorily address the unsafe condition(s), at no cost to the State. The activity may only resume when a NYSOGS Representative and respective Contractor's Safety Representative verify corrective measures have been satisfactorily completed. Any related impact to time of completion shall be considered within the Contractor's control.
B. No site work, other than mobilization, shall commence until the Site-Specific Safety Plan is approved.
1.6 ADDITIONAL SAFETY POLICIES THAT WILL BE ADHERED TO
THROUGHOUT THE CONSTRUCTION PHASE
A. All contractors are required to utilize head (hardhat) and eye protection (safety glasses) at all times well within the project limits.
B. Any employee exposed to equipment/vehicles shall be required to utilize an ANSI Level 2 Safety Work Vest.
C. Contractors are strictly prohibited from utilizing any state-owned equipment or materials during construction.
D. All tools/equipment on multi-trade projects shall bear identifiable markings as to which contractor the tool/equipment belongs to. If any tool/equipment on the project does not have contractor's markings, the tool shall be immediately removed from the site until owner claims the tool/equipment.
E. Seatbelts shall be utilized when operating all heavy equipment designed to be operated in a seated position. When traveling in a vehicle, all employees shall be seated in a secured seat with a seatbelt in place.
F. All heavy equipment being utilized on site shall have a fire extinguisher of suitable size/rating within reach of operator.
G. Any fuel-powered equipment shall have a fire extinguisher of suitable size/rating no closer than 10 feet and no further than 25 feet from the equipment.
H. An applicable sized Spill Kit shall be available on all jobsites where heavy equipment is being utilized.
END OF SECTION 011100
Description Date
SUBMISSIONS/ REVISIONS
No
Drawn By:
Design By:
Checked By:
Submission Date:
06/9/2026
Approved By:
Sheet:Project ID:
Sheet Title:
Drawing Number:
Project Title:
Project Location:
KATHY HOCHUL
Governor
KATHY MOSER
Commissioner
123456789
89 123467 5
A
B
D
E
F
G
H
C
JC
DR
VH
DR
OFLI-CR-2026-001(A) 14
LONG ISLAND DISTRICT
625 BELMONT AVE
WEST BABYLON, NY 11702
TOM ALWORTH
EXECUTIVE DEPUTY COMMISSIONER
BEVIN COLLINS, RA, LEED AP
DEPUTY COMMISSIONER, CAPITAL PROJECTS
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON,
UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER
TO ALTER THIS DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE THE
SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS,
DATE AND ARCHITECT'S/ENGINEER'S SIGNATURE. COPYRIGHT © 2022
RED TRAIL SLAB BRIDGE REPLACEMENT
CONNETQUOT RIVER STATE PARK PRESERVE
4090 SUNRISE HIGHWAY
OAKDALE, NY, 11769
CONSULTANTS: N/A
KEY PLAN:
CONTRACT #: N/A
GEORGE GORMAN, JR.
LONG ISLAND REGIONAL DIRECTOR
VESNA HADZIBABIC, PE, LEED AP BD+C
LONG ISLAND CAPITAL DISTRICT MANAGER
PROJECT SPECIFICATIONS
ENVIRONMENTAL REVIEW 8.22.25
90% DD 3.6.26
CODE COMPLIANCE REVIEW 3.13.26
SPEC-1
SECTION 310000 - EARTHWORK
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Site Clearing:
a. Protecting existing vegetation to remain.
2. Excavation:
a. Excavating for structures.
3. Fill and Backfill:
a. Backfilling for site structures to subgrade elevations.
4. Preparation of subgrades.
5. Compaction.
1.3 REFERENCE STANDARDS
A. ASTM International:
6. ASTM C88 - Standard Test Method for Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate
7. ASTM C136 - Standard Test Method for Sieve Analysis of Fine and
Coarse Aggregates.
8. ASTM D698 - Standard Test Methods for Laboratory Compaction
Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3).
9. ASTM D1557 - Standard Test Methods for Laboratory Compaction
Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3).
10. ASTM D2419 - Standard Test Method for Sand Equivalent Value of Soils and Fine Aggregate.
11. ASTM D2434 - Standard Test Method for Permeability of Granular Soils
(Constant Head).
12. ASTM D2487 - Standard Practice for Classification of Soils for
Engineering Purposes (Unified Soil Classification System).
13. ASTM D2974 - Standard Test Methods for Determining the Water
(moisture) Content, Ash Content, and Organic Material of Peat and Other Organic Soils.
14. ASTM D4318 - Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils.
15. ASTM D4373 - Standard Test Method for Rapid Determination of Carbonate Content of Soils
16. ASTM D4873 - Standard Guide for Identification, Storage, and Handling of Geosynthetic Rolls and Samples.
17. ASTM D6938 - Standard Test Methods for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth).
B. Related Requirements:
1. Local utility standards when working in close proximity to utility lines.
2. Occupational Safety and Health Administration: Comply with the applicable requirements of the Code of Federal Regulations Title 29 - Labor, Part 1926 Safety and Health Regulations for Construction
(OSHA).
C. New York State Department of Transportation (NYS DOT)
1. NYS DOT 620 - Bank and Channel Protection
2. NYS DOT 703 - Aggregates
3. NYS DOT 733 - Earthwork Materials
1.4 DEFINITIONS
A. Surface Soil: Soil that is present at the top layer of the existing soil profile.
B. Subsurface: Soil beneath the level of subgrade; soil beneath the topsoil layers of a naturally occurring soil profile.
C. Topsoil: Top layer of the soil profile consisting of existing native surface topsoil or existing in-place surface soil; the zone where plant roots grow. Its appearance is generally friable, pervious, and black or a darker shade of brown, gray, or red than underlying subsurface; reasonably free of subsurface soils, clay lumps, gravel, weeds, roots, toxic materials, or other non-soil materials.
D. Borrow Soil: Approved soil imported from off-site for use as fill or backfill.
E. Backfill: Soil material or controlled low-strength material used to fill an excavation.
1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe.
2. Final Backfill: Backfill placed over initial backfill to fill a trench.
F. Fill: Soil materials used to raise existing grades.
G. Suitable Material (Fill and Backfill for Landscaped Areas): Material generally consisting of mineral soil (inorganic), blasted or broken rock and similar materials of natural or man-made origin, including mixtures thereof.
Maximum particle size will not exceed 2/3 of the specified layer thickness prior to compaction. Topsoil and organic silt may be used as suitable material in landscaped areas provided it is placed as the surface soil.
H. Unsuitable Material: Material containing cinders, industrial waste, sludge, building/construction rubble, land fill, muck, and peat.
I. Subgrade: Uppermost surface of an excavation or the top surface of a fill or backfill immediately below subbase, drainage material, or topsoil materials.
J. Subbase Course: Aggregate layer placed between the subgrade and asphaltic or concrete pavement section or concrete structure.
K. Drainage Material: Aggregate layer with minimal material passing the #200 sieve to promote downward water flow and minimizes upward capillary flow of pore water.
L. Classified Earth Excavation: Removal of all surface and subsurface material not classified as rock, to the lines and dimensions indicated.
M. Unclassified Earth Excavation: Removal of all surface and subsurface material, of any description, necessary to perform the work of this contract.
This will include:
1. All soil deposits of any description both above and below groundwater levels. These may be naturally deposited or placed by previous construction operations.
2. Ledge rock of all quality. (Limestone, Sandstone, Shale, Granite and similar materials in solid beds or masses in its original or stratified position which can only be removed by drilling, wedging, use of pneumatic tools or heavy ripping equipment). Blasting operations will not be permitted to loosen any ledge rock necessary to be removed in this contract.
3. Boulders of any size.
4. Any materials of man-made origin.
N. Authorized Additional Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions as directed by OPRHP Representative. Authorized additional excavation and replacement material will be paid for according to Contract provisions.
O. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions without direction by OPRHP Representative.
Unauthorized excavation, as well as remedial work directed by OPRHP Representative, shall be without additional compensation.
P. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below the ground surface.
Q. Utilities: On-site underground pipes, conduits, ducts, and cables as well as underground services within buildings.
R. Plant-Protection Zone: Area surrounding individual trees, groups of trees, shrubs, or other vegetation to be protected during construction.
S. Vegetation: Trees, shrubs, groundcovers, grass, and other plants.
T. Landscaped Areas: Areas not covered by structures, walks, roads, paving, or parking.
U. Grading Limit Line (Shown on Drawings): Limits of grading, excavations and filling required for the Work. Unless specifically noted otherwise, the Grading Limit Line and Contract Limit Line shall be considered the same.
1.5 MATERIAL OWNERSHIP
A. Except for materials indicated to be stockpiled or otherwise remain State's property, cleared materials shall become Contractor's property and shall be removed from Project site.
1.6 SUBMITTALS
A. Submittals for this Section are subject to the re-evaluation fee identified in Article 4 of the General Conditions.
B. Manufacturer's installation instructions shall be provided along with product data.
C. Submittals shall be provided in the order in which they are specified and tabbed (for combined submittals).
D. Existing Conditions: Submit documentation before earthwork activities begin of existing trees and plantings, adjoining construction, and site improvements that establishes preconstruction conditions that might be misconstrued as damage caused by the Work of this Section.
1. Use sufficiently detailed photographs or video recordings.
2. Include plans and notations to indicate specific wounds and damage conditions of each tree or other plant designated to remain.
E. Qualification Data: For qualified testing agency.
1.7 QUALITY ASSURANCE
F. Geotechnical Testing Agency Qualifications: Qualified according to ASTM E329 and ASTM D3740 for testing indicated.
1.8 FIELD CONDITIONS
A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during earth-moving operations.
1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from OPRHP Representative and authorities having jurisdiction.
2. Provide alternate routes around closed or obstructed traffic ways if required by OPRHP Representative or authorities having jurisdiction.
B. Improvements on Adjoining Property: Authority for performing earth moving indicated on property adjoining State's property will be obtained by OPRHP Representative before award of Contract.
1. Do not proceed with work on adjoining property until directed by OPRHP
Representative.
C. Salvageable Improvements: Carefully remove items indicated to be salvaged.
D. Utility Locator Service: Locate underground utilities before beginning site clearing or earth-moving operations.
Description Date
SUBMISSIONS/ REVISIONS
No
Drawn By:
Design By:
Checked By:
Submission Date:
06/9/2026
Approved By:
Sheet:Project ID:
Sheet Title:
Drawing Number:
Project Title:
Project Location:
KATHY HOCHUL
Governor
KATHY MOSER
Commissioner
123456789
89 123467 5
A
B
D
E
F
G
H
C
JC
DR
VH
DR
OFLI-CR-2026-001(A) 14
LONG ISLAND DISTRICT
625 BELMONT AVE
WEST BABYLON, NY 11702
TOM ALWORTH
EXECUTIVE DEPUTY COMMISSIONER
BEVIN COLLINS, RA, LEED AP
DEPUTY COMMISSIONER, CAPITAL PROJECTS
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON,
UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER
TO ALTER THIS DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE THE
SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS,
DATE AND ARCHITECT'S/ENGINEER'S SIGNATURE. COPYRIGHT © 2022
RED TRAIL SLAB BRIDGE REPLACEMENT
CONNETQUOT RIVER STATE PARK PRESERVE
4090 SUNRISE HIGHWAY
OAKDALE, NY, 11769
CONSULTANTS: N/A
KEY PLAN:
CONTRACT #: N/A
GEORGE GORMAN, JR.
LONG ISLAND REGIONAL DIRECTOR
VESNA HADZIBABIC, PE, LEED AP BD+C
LONG ISLAND CAPITAL DISTRICT MANAGER
PROJECT SPECIFICATION
ENVIRONMENTAL REVIEW 8.22.25
90% DD 3.6.26
CODE COMPLIANCE REVIEW 3.13.26
SPEC-2
E. Do not commence operations until temporary site fencing and erosion and sedimentation control measures are in place.
F. Do not commence earthwork operations until plant-protection measures specified herein are in place.
G. The following practices are prohibited within protection zones:
2. Storage of construction materials, debris, or excavated material.
3. Parking vehicles or…