Drawing for B502.pdf

PDF 542 KB Posted

Attached to
Replace the Water Pipes at B502, Camp Carroll
Solicitation number
W90VN924R0083
Issued by

About this file

This document appears to be a drawing and description for a federal contract opportunity to replace the water pipes at Building 502 in Camp Carroll. The scope of work includes replacing the hot/cold water pipes, plumbing fixtures, unit heaters, fan coil units, radiators, and related components in the restrooms, offices, and storage areas. Electrical work such as replacing lighting fixtures, exit signs, and fire alarm detectors is also required. The project location is Camp Carroll, and the solicitation number is W90VN924R0083. This appears to be a contract opportunity issued by the Department of the Army Materiel Command Army Contracting Command. The document provides detailed drawings and specifications for the required work.

View the file

Other files

File Type Posted
W90VN924R0083 Amend 1.pdf PDF
W90VN924R0083.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEWR No. : H18-00002-3J PROJECT : Replace the water pipes at B502 LOCATION : Camp Carroll

SITE MAP, CAMP CARROLL

THIS PROJECT

1/7

GENERAL NOTE

The contractor should coordinate any salvageable and recyclable materials within project limit with COR carefully to determine proper material handing methods.

The contractor should use ‘lead free’ paint all painting area

Drinking water:

Disinfect new water piping and existing water piping lines affected by Contractor’s operations in accordance with AWWA C651.

Bacteriological samples shall be taken after disinfection is completed to provide a record DPW Environmental division thru COR.

Sediment control measures must be implemented at construction sites and engineering controls shall be put in place to prevent runoff into the storm drains.

All construction which involves soil excavation shall have a sediment control plan which is pre-approved in advance from the Garrison DPW’s Environmental Office (DSN 763-2195).

Waste:

All Construction & Demolition waste must be disposed properly by the contractor.

In accordance with USFK Reg 201-1, Chapter 7, Construction wastes must be segregated for recycling whenever possible.

Please provide the Waste Disposal & Recycling data to the project COR and DPW, Environmental at seojin.hong.ln@army.mil (763-5387) to track the amount of waste generation and achieve the DoD mandated goal of 60% diversion rate for C&D debris.

All bulk recyclable material/equipment must be reviewed by DLS-DS prior to disposal.

POC: Area IV Disposal Service Representative (DSR) (DSN) 743-1361 (Cell) 010-8779-3598 (Email) DispServKoreaDSR@dla.mil

Storm water:

EGS Wastewater 4-3(n), Sediment control at construction sites.

Sediment control measures must be implemented at construction sites and engineering controls shall be put in place to prevent runoff into the storm drains.

All construction which involves soil excavation shall have a sediment control plan which is pre-approved in advance from the Garrison DPW’s Environmental Office

FEWR No. : H18-00002-3J PROJECT : Replace the water pipes at B502 LOCATION : Camp Carroll

2/7

GENERAL NOTE

mailto:DispServKoreaDSR@dla.mil

B502, CAMP CARROLL

3”

HWR

3” 3”

HWR

3”

HWR

1”

2-1/2”

1-1/2”

2-1/2”

1-1/4”

2”

3”

3’

¾”

6’

6’ 3’

1-1/4”

1”

2” 2-1/2” 2-1/2” 2-1/2”2-1/2”

2” 1-1/2” 1-1/4”

2-1/2”

HWS

HWR

HWS

HWR

HWR

HWS

HWR

HWS

HWR

HWS

HWR

HWS

2”2” 2”2” 1-1/2” 1-1/4”

1-1/2” 2”

1”

2”

2-1/2”

1-1/4”

1/2”

3/4”

2ND FL 2ND FL

1”

1/2” 3’

6’

½”, ½”, 3”,3”

¾”

NEW UNIT HEAT, FAN COIL UNIT AND RADIATOR PLAN

Fan coil unit TYP FOR 51. *Replace 13ea unit heaters, copper tube hot water supply pipe, hot water return pipe, cold water pipe, valves, 40mm thick pipe insulation and pipe gangers. See this mark

2. *Replace 5ea fan coil units, copper tube supply/return pipe, valves, pipe insulation, pipe insulation protective jacketing, pipe hangers, #24 sheet metal cover for water pipes. See this mark

3. *Replace 2ea finned tube radiators (2 row-3 m LG), copper tube supply/return water pipe, valves, pipe insulation, pipe insulation protective jacketing, pipe hangers and #24 sheet metal cover for water pipes. See this mark

4. *Replace 4ea finned tube radiators (2 row-2 m LG), copper tube supply/return water pipe, valves, pipe insulation, pipe hangers and pipe insulation protective jacketing. See this mark

Radiator

TYP FOR 6

See unit heat installation detail plan Men’s room Ladie’s room

2ND FLOOR

(Storage)

FEWR No. : H18-00002-3J PROJECT : Replace the water pipes at B502 LOCATION : Camp Carroll

Scope of work

3/7

1 1

UNIT HEAT INSTALLATION DETAIL

FEWR No. : H18-00002-3J PROJECT : Replace the water pipes at B502 LOCATION : Camp Carroll

4/7

1. Replace the hot/cold water pipes and return water pipes, valves, pipe insulations, pipe insulation protective jacketing, pipe hangers incl. connect to lavatories, urinals and water closets in women’s/men’s restrooms.

2. Replace the glazed ceramic wall/floor tiles incl. metal lath and cement plaster in women’s/men’s restrooms.

3. Replace the ceiling board incl. suspended ceiling system, 4ea ceiling access doors and paint in women’s/men’s restrooms.

4. Replace 2SM CMU wall for water line in women’s restroom.

5. Replace 6ea lavatory bowls incl. faucets, pop-up drain, traps, vanity cabinets and marble tops in women’s/men’s restrooms.

6. Replace 6ea water closets and metal toilet partitions with doors in women’s/men’s restrooms.

7. Replace 3ea urinals and metal urinal partitions incl. all accessories in men’s restroom.

8. Replace 6ea SST framed glass mirror, 6ea SST soap dishes, 6ea SST toilet tissue dispensers and 2ea SST paper towel dispensers in women’s/men’s restrooms.

9. Replace 1LM clogged urinal drain pipe in men’s restroom.

10. Install the caulking in women’s/men’s restrooms.

11. Remove and reinstall 2ea fire alarm detectors in women’s /men’s restrooms.

20 (DHWR)

40 (DHW)

40 (DCW)

40, 20, 32

40, 16, 16 40, 16, 16

Men’s room

Women’s room

9. Existing clogged urinal drain pipe

4. Replace 2 SM CMU wall for water line.

FEWR No. : H18-00002-3J PROJECT : Replace the water pipes at B502 LOCATION : Camp Carroll Scope of work

5/7

RESTROOM FLOOR PLAN

E X

IT

E X

IT

EXIT

E X

IT

E X

IT

D

D

LIGHTING PLAN, B502

2ND FLOOR

EXIT

DD

(Storage)

Men’s room

D

Ladie’s room

Main office

EXIT

1st Floor (Storage-1)

Reception desk

EXIT

E X

IT

E X

IT

E X

T

Scope of work

1. Replace 23ea 2'x4' LED lighting fixtures, recessed type and power lines in main office (2nd FL), break room(2nd FL), storage(1st FL & 2nd FL), reception desk(1st FL) and women’s/men’s restrooms(1st FL).

2. Replace 14ea LED 2'x4', recessed type w/EM battery pack and power lines in main office, break room, storage-1(1st FL), storage-2(1st FL), storage (2nd FL), reception desk and women’s/men’s restrooms.

3. Replace/Install 11ea LED Exit lights, single type and power lines.

4. Replace 12ea surfaced type fluorescent lighting fixtures with new lighting fixtures included EM battery pack in distribution area. (Same lighting fixture as currently installed).

5. Remove and reinstall ceiling lighting fixtures to replace the water line in distribution area. See this mark

6. Remove and reinstall 7ea fire detectors on 2nd floor (Storage), women’s/men’s restrooms and distribution area.

Break room

FEWR No. : H18-00002-3J PROJECT : Replace the water pipes at B502 LOCATION : Camp Carroll

6/7

2ND Floor 2ND Floor

1st Floor (Storage-2)

Distribution Area

D D

: 2'x4' LED lighting fixtures, recessed type : 2'x4’ LED lighting fixture, recessed type w/EM battery pack

LEGEND

D : Remove and reinstall fire alarm detector : Remove and reinstall ceiling lighting fixtures

CEILING PLAN, B502

1. Replace the ceiling board

2. Replace the ceiling board

3. Replace the ceiling board

5. Paint 56SM on CMU wall

2ND Floor (Storage)

Men’s roomDistribution Area

Reception desk

2ND Floor Break RM

Scope of work

1. Replace the gypsum ceiling board, *suspended ceiling system, insulation and paint on 1st floor distribution area to replace the unit heats and water pipes.

2. Replace the gypsum ceiling board, *suspended ceiling system, insulation, ceiling access door and painting on 2nd floor storage to replace the water pipes.

3. Replace 40SM gypsum ceiling board, *suspended ceiling system, insulation and paint on 1st floor reception desk, main office and break room.

4. Replace 20SM gypsum wall board, metal stud/renner and paint on 1st floor reception desk, main office and break room to replace the water pipes.

5. Paint 56SM on CMU wall beside entrance door.

FEWR No. : H18-00002-3J PROJECT : Replace the water pipes at B502 LOCATION : Camp Carroll

Height of the ceiling : 5.7 M Height of the ceiling : 5.7 M

Ceiling : 2.44 H

Ceiling : 2.44 H

Ceiling : 2.44 H

Ceiling : 2.44 H

2ND Floor Main Office

:Replace the ceiling board

LEGEND

Ladie’s room

7/7