DraftVOLUME 2_COMPILED SET_update 5-16-2022 3 of 4.pdf
PDF 30 MB Posted
- Attached to
- Ramey Unit School Replacement Federal contract opportunity
- Solicitation number
- Not on record
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DraftVOLUME 2_COMPILED SET_update 5-16-2022 2 of 4.pdf | ||
| DraftVOLUME 2_COMPILED SET_update 5-16-2022 1 of 4.pdf | ||
| DraftVOLUME 2_COMPILED SET_update 5-16-2022 4 of 4.pdf | ||
| DraftVOLUME 1_COMPILED SET 1.pdf | ||
| DraftVOLUME 3_COMPILED SET_updated 4-12-2022.pdf | ||
| RAMEY Specs V1 01-08.pdf | ||
| RAMEY Specs V3 25-32.pdf | ||
| RAMEY Specs V4 33-35.pdf | ||
| RAMEY Specs V5 Attachments.pdf | ||
| RAMEY Specs V2 09-23.pdf | ||
| W912HN22R3001 Draft Ramey School Final 19 May.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST FLOOR
100' - 0"
WALL BASE AS SCHEDULEDHYDRAULIC TRACTION MACHINE-
LESS PASSENGER ELEVATORS
7'
2"
HIGH IMPACT WALLCOVERING
ACCORDION FOLDING FIRE DOORS –
FLAT LEADPOST
WATER FOUNTAIN W/ BOTTLE FILLER
FIRST FLOOR
100' - 0"
6'
4"
WALL BASE AS SCHEDULED
TACK BOARD WALL COVERING
PIN MOUNTED LETTERS
7'
2"
ACCORDION FOLDING FIRE DOORS –
FLAT LEADPOST
ROOM SIGNAGE, REFER TO
SCHEDULE
FIRST FLOOR
100' - 0"
C.I.P. ARCHITECTURAL CONCRETE W/
INTEGRAL COLOR AND CLEAR
SEALER, TYPE # 2, REFER TO A200
WALL BASE AS SCHEDULED GYPSUM WALLBOARD - SEE
SCHEDULE
HIGH IMPACT WALLCOVERING
7'
2" 2'
FIRST FLOOR
100' - 0"C.I.P. ARCHITECTURAL CONCRETE W/
INTEGRAL COLOR AND CLEAR
SEALER, TYPE # 2, REFER TO A200
WALL BASE AS SCHEDULED C.I.P. ARCHITECTURAL CONCRETE W/
INTEGRAL COLOR AND CLEAR
SEALER, TYPE # 2, REFER TO A200
HIGH IMPACT WALLCOVERING
WATER FOUNTAIN W/ BOTTLE FILLER
CERAMIC WALL TILE
7'
2"
A-562
E1
TYP.
C.I.P. ARCHITECTURAL CONCRETE W/
INTEGRAL COLOR AND CLEAR
SEALER, TYPE # 2, REFER TO A200
HUB IDENTITY SIGN, REFER TO A192
HUB IDENTITY SIGN, REFER TO A192
OPEN
TO
BEYOND
FIRST FLOOR
100' - 0"C.I.P. ARCHITECTURAL CONCRETE W/
INTEGRAL COLOR AND CLEAR
SEALER, TYPE # 2, REFER TO A200
WALL BASE AS SCHEDULED
HUB IDENTITY SIGN, REFER TO A192HUB IDENTITY SIGN, REFER TO A192
OPEN
TO
BEYOND
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S a v a n n a h D is tr ic t w
O g le th o rp e A v e
S a v a n n a h G e o rg ia
C H
E C
K E
D B
Y
U.S. ARMY CORPS OF
ENGINEERS
SAVANNAH DISTRICT
100 W. OGLETHORPE AVE.
SAVANNAH, GA 31401
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
-4
-0
E
R
O B
IN
S
O N
S T
R E
E T
S
U
IT
E
O R
L A
N D
O F
L
F Y
P
N A
M
C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt
3/30/2022 11:17:28 AM
M A
R C
H
B S
H E
R A
R D
B S
H E
R A
R D
D T
O R
B E
R T
A-260
IN
T
E R
IO
R
E L E
V A
T
IO
N S
A
R C
H R
D A
G U
A D
IL
L A
P
U E
R T
O R
IC
O
R E
P L A
C E
M E
N T
R A
M E
Y U
N
IT
S C
H O
O L
D T
O R
B E
R T
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
R A
A
-2 .d w g
W H
N R
1/4" = 1'-0"A-260
INTERIOR ELEVATION - VESTIBULE 1D01 - WESTF1
1/4" = 1'-0"A-260
INTERIOR ELEVATION - VESTIBULE 1D01 - EASTF5
1/4" = 1'-0"A-260
INTERIOR ELEVATION - CIRCULATION 1D03 - EASTD1
1/4" = 1'-0"A-260
INTERIOR ELEVATION - CIRCULATION 1D03 - WESTC1
1/4" = 1'-0"A-260
INTERIOR ELEVATION - CIRCULATION 1D03 - NORTHA1
1/4" = 1'-0"A-260
INTERIOR ELEVATION - CIRCULATION 1D03 - SOUTHA6 0 4ft. 8ft.4 ft.
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
TACK BOARD WALL COVERING
CONTROL JOINT (CJ) TYP.
3'
0" 9'
0"
ELEVATIONS
SEE CASEWORK
OPEN
SMART BOARD ON MOBILE STATION,
AS SCHEDULED
4 C.I.P. ARCHITECTURAL CONCRETE W/
CLEAR SEALER, TYPE # 4, REFER TO
A200
CJ CJ CJ
CJ CJ CJ CJ CJ
HVAC DUCT, PAINT
PIN MOUNTED LETTERS
STOREFRONT AS SCHEDULED
C1.3
9'
0"11
A5
FIRST FLOOR
100' - 0"
A1.1 A1.1
REFER TO TEACH WALL TYPE
TW-1.1
ELEVATIONS
SEE CASEWORK
LAVATORY W/ INTEGRAL
COUNTER - DOUBLE BOWL, 1
JUVENILE, 1 ADA HEIGHT
1" ACOUSTICAL WALL
ABSORBING PANEL
2' - 0" 4" 2' - 0" 4" 4' - 0" 1' - 0" 4' - 0" 1' - 0" 4' - 0" 4" 2' - 0" 4" 2' - 0"EQ. 4' - 0" EQ.
CL
2'
0" 7'
8"
C1.1
FIRST FLOOR
100' - 0"
ROLLER WINDOW SHADES
WALL BASE AS SCHEDULED
FIRST FLOOR
100' - 0"
ELEVATIONS
SEE CASEWORK WATER FOUNTAIN W/
BOTTLE FILLER
FIRST FLOOR
100' - 0"
1" ACOUSTICAL WALL ABSORBING
PANEL
8'
6" 3'
0"
15' - 0"30' - 0"
C8.3
BOOK BAG WALL HOOK
1" ACOUSTICAL WALL ABSORBING
PANEL
OPERABLE GLAZED PARTITION WALL BASE AS SCHEDULEDINTERIOR SIGNAGE
ROOM SIGNAGE, REFER TO
SCHEDULE
LOC PANEL, COORDINATE
OPENING W/ WALL FINISH
AND DEVICE
FIRST FLOOR
100' - 0"
OPERABLE SOLID PARTITION
WALL BASE AS SCHEDULED
FIRST FLOOR
100' - 0"
2'
0" 7'
6"
2' - 0" 4" 2' - 0" 4" 2' - 0" 4" 2' - 0" 4" 4' - 0" 1' - 0" 4' - 0" 1' - 0" 4' - 0" 1' - 0" 4' - 0" 1' - 0" 4' - 0" 4" 2' - 0" 4" 2' - 0" 4" 2' - 0" 4" 2' - 0"
REFER TO TEACHING WALL TYPE .TW-1.2
A1.1 A1.1
WALL BASE AS SCHEDULED
1" ACOUSTICAL WALL
ABSORBING PANEL
C1.1
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S a v a n n a h D is tr ic t w
O g le th o rp e A v e
S a v a n n a h G e o rg ia
C H
E C
K E
D B
Y
U.S. ARMY CORPS OF
ENGINEERS
SAVANNAH DISTRICT
100 W. OGLETHORPE AVE.
SAVANNAH, GA 31401
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
-4
-0
E
R
O B
IN
S
O N
S T
R E
E T
S
U
IT
E
O R
L A
N D
O F
L
F Y
P
N A
M
C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt
3/30/2022 11:17:34 AM
M A
R C
H
B S
H E
R A
R D
B S
H E
R A
R D
D T
O R
B E
R T
A-261
IN
T
E R
IO
R
E L E
V A
T
IO
N S
A
R C
H R
D A
G U
A D
IL
L A
P
U E
R T
O R
IC
O
R E
P L A
C E
M E
N T
R A
M E
Y U
N
IT
S C
H O
O L
D T
O R
B E
R T
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
R A
A
-2 .d w g
W H
N R
1/4" = 1'-0"A-261
INTERIOR ELEVATION - HUB D1 - NORTHF1
1/4" = 1'-0"A-261
INTERIOR ELEVATION - LS03 - WEST4
1/4" = 1'-0"A-261
INTERIOR ELEVATION - LS03 - SOUTH5(TYPICAL TEACHING WALL FOR PRE-K,K,SP GRADES, LS 01-02) (TYPICAL TEACHING SIDE FOR PRE-K,K,SP GRADES, LS 01-02)
1/4" = 1'-0"A-261
INTERIOR ELEVATION - HUB D1 - EASTB1
0 4ft. 8ft.4 ft.
1/4" = 1'-0"A-261
INTERIOR ELEVATION - HUB D1 - SOUTHD1
1/4" = 1'-0"A-261
INTERIOR ELEVATION - LS03 - EASTA1
1/4" = 1'-0"A-261
INTERIOR ELEVATION - LIMNS - EASTA6
M A
R K
D E
S C
R
IP
T
IO
N D
A
SECOND FLOOR
115' - 4"
3'
0"
ELEVATIONS
SEE CASEWORK
EQ EQ
OPEN
5' - 0"
10"
13' - 0"
6"
2' - 0" 2' - 8" 3' - 0" 1' - 0" 4' - 6"
8"
1' - 0"
8"
7' - 0"
8"
1' - 0"
8"
4' - 6"
SMART BOARD ON MOBILE STATION,
AS SCHEDULED
C1.3
C2
1" ACOUSTICAL WALL ABSORBING
PANEL
HVAC DUCT, PAINT
VJ
3'
0" 5'
0"
C.I.P. ARCHITECTURAL CONCRETE W/
CLEAR SEALER, TYPE # 4, REFER TO
A200
VJ VJ
VJ
PIN MOUNTED LETTERS
WATER FOUNTAIN W/
BOTTLE FILLER
FIRST FLOOR
100' - 0"
PIN MOUNTED LETTERS
BOOK BAG WALL HOOK
FIRST FLOOR
100' - 0"
GYPSUM WALLBOARD - SEE
SCHEDULE
METAL STUD FRAMING
A1.1 A1.1
TW-1.2
REFER TO TEACHING WALL TYPE
ELEVATIONS
SEE CASEWORK
CERAMIC WALL TILE
2' - 0" 4" 2' - 0" 4" 4' - 0" 1' - 0" 4' - 0" 1' - 0" 4' - 0" 4" 2' - 0" 4" 2' - 0"
1" ACOUSTICAL WALL
ABSORBING PANEL
1' - 4" 4' - 0"
A
LI
G N
CL
2'
0" 7'
8"
C1.1
1" ACOUSTICAL WALL ABSORBING
PANEL
FIRST FLOOR
100' - 0"
GLAZED CURTAIN WALL
SYSTEM
ROLLER WINDOW SHADES
WALL BASE AS SCHEDULED
E.Q. 4' - 0" E.Q.
2'
0" 7'
8"
1" ACOUSTICAL WALL
ABSORBING PANEL
FIRST FLOOR
100' - 0"
C8.3
OPERABLE GLAZED PARTITION 1" ACOUSTICAL WALL ABSORBING
PANEL
1" ACOUSTICAL WALL ABSORBING
PANEL
ROOM SIGNAGE, REFER TO
SCHEDULE
3'
0" 8'
6"
2' - 0" 12' - 0" 2' - 0"
1' - 0" 33' - 0" 1' - 0"
HVAC DUCT, PAINT
E1
A-563CJ
E1
A-563 CJ CJ CJCJ
E1
A-563
E1
A-563
FIRST FLOOR
100' - 0"
GLAZED CURTAIN WALL
SYSTEM
WALL BASE AS SCHEDULED
OPERABLE SOLID PARTITION
FIRST FLOOR
100' - 0"
OPERABLE GLAZED PARTITION
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S a v a n n a h D is tr ic t w
O g le th o rp e A v e
S a v a n n a h G e o rg ia
C H
E C
K E
D B
Y
U.S. ARMY CORPS OF
ENGINEERS
SAVANNAH DISTRICT
100 W. OGLETHORPE AVE.
SAVANNAH, GA 31401
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
-4
-0
E
R
O B
IN
S
O N
S T
R E
E T
S
U
IT
E
O R
L A
N D
O F
L
F Y
P
N A
M
C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt
3/30/2022 11:17:40 AM
M A
R C
H
B S
H E
R A
R D
B S
H E
R A
R D
D T
O R
B E
R T
A-262
IN
T
E R
IO
R
E L E
V A
T
IO
N S
A
R C
H R
D A
G U
A D
IL
L A
P
U E
R T
O R
IC
O
R E
P L A
C E
M E
N T
R A
M E
Y U
N
IT
S C
H O
O L
D T
O R
B E
R T
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
R A
A
-2 .d w g
W H
N R
(TYPICAL TEACHING WALL LS04 - LS09) (TYPICAL WINDOW WALL FOR LS04 - LS09)
(TYPICAL OF HUBS 1D30, 1D40)
1/4" = 1'-0"A-262
INTERIOR ELEVATION - HUB D2 - SOUTHF1
1/4" = 1'-0"A-262
INTERIOR ELEVATION - HUB D2 - EASTC1
1/4" = 1'-0"A-262
INTERIOR ELEVATION - LS04 - WESTC3
1/4" = 1'-0"A-262
INTERIOR ELEVATION - LS04 - NORTHC8
1/4" = 1'-0"A-262
INTERIOR ELEVATION - HUB D2 - NORTHD1
1/4" = 1'-0"A-262
INTERIOR ELEVATION - LS04 - EASTA1
1/4" = 1'-0"A-262
INTERIOR ELEVATION - LS 04 - SOUTHa6 0 4ft. 8ft.4 ft.
M A
R K
D E
S C
R
IP
T
IO
N D
A
SECOND FLOOR
115' - 4"
WATER FOUNTAIN W/ BOTTLE FILLER C.I.P. ARCHITECTURAL CONCRETE W/
INTEGRAL COLOR AND CLEAR
SEALER, TYPE # 2, REFER TO A200
WALL BASE AS SCHEDULED
2'
7'
2"
HIGH IMPACT WALLCOVERING
SECOND FLOOR
115' - 4"
LOCKER: 2 TIER, 12" W X 15" D X 72"
HIGH
7'
2"
WALL BASE AS SCHEDULED
HIGH IMPACT WALLCOVERING
2'
7'
2"
HIGH IMPACT
WALLCOVERING
SECOND FLOOR
115' - 4"
C.I.P. ARCHITECTURAL CONCRETE W/
INTEGRAL COLOR AND CLEAR
SEALER, TYPE # 2, REFER TO A200
A-562
E1 Sim
HUB IDENTITY SIGN, REFER TO A192HUB IDENTITY SIGN, REFER TO A192
OPEN
TO
BEYOND
WALL BASE AS SCHEDULED
TACK BOARD WALL COVERING
3'
0" 7'
0"
SECOND FLOOR
115' - 4"
HUB IDENTITY SIGN, REFER TO A192HUB IDENTITY SIGN, REFER TO A192
OPEN
TO
BEYOND
WALL BASE AS SCHEDULED
TACK BOARD WALL COVERING
C.I.P. ARCHITECTURAL CONCRETE W/
INTEGRAL COLOR AND CLEAR
SEALER, TYPE # 2, REFER TO A200
FIRST FLOOR
100' - 0"
TACK BOARD WALL COVERING WALL BASE AS SCHEDULED FREE STANDING S.S. WASH
FOUNTAIN
MULTI-STATION S.S. WALL
SINK
7'
2"
SEE CASEWORK ELEVATION
SECOND FLOOR
115' - 4"
TACK BOARD WALL COVERING
WALL BASE AS SCHEDULED
VESTIBULE
2D01
PIN MOUNTED LETTERS
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S a v a n n a h D is tr ic t w
O g le th o rp e A v e
S a v a n n a h G e o rg ia
C H
E C
K E
D B
Y
U.S. ARMY CORPS OF
ENGINEERS
SAVANNAH DISTRICT
100 W. OGLETHORPE AVE.
SAVANNAH, GA 31401
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
-4
-0
E
R
O B
IN
S
O N
S T
R E
E T
S
U
IT
E
O R
L A
N D
O F
L
F Y
P
N A
M
C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt
3/30/2022 11:17:47 AM
M A
R C
H
B S
H E
R A
R D
B S
H E
R A
R D
D T
O R
B E
R T
A-263
IN
T
E R
IO
R
E L E
V A
T
IO
N S
A
R C
H R
D A
G U
A D
IL
L A
P
U E
R T
O R
IC
O
R E
P L A
C E
M E
N T
R A
M E
Y U
N
IT
S C
H O
O L
D T
O R
B E
R T
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
R A
A
-2 .d w g
W H
N R
1/4" = 1'-0"A-263
INTERIOR ELEVATION - CIRCULATION 2D02 - WESTD1
1/4" = 1'-0"A-263
INTERIOR ELEVATION - CIRUCLATION 2D02 - EASTC1
1/4" = 1'-0"A-263
INTERIOR ELEVATION - CIRCULATION 2D02 - NORTHA1
1/4" = 1'-0"A-263
INTERIOR ELEVATION - CIRCULATION 2D03 - SOUTHA6 0 4ft. 8ft.4 ft.
1/4" = 1'-0"A-263
INTERIOR ELEVATION - ART - NORTHF1
1/4" = 1'-0"A-263
INTERIOR ELEVATION - VESTIBULE 2D01- EASTF6
M A
R K
D E
S C
R
IP
T
IO
N D
A
128'-9"
127'-4"
128'-9" 128'-9"
127'-4" 127'-8"
6'
0"
C8.3
AUDIO-VISUAL EQUIPMENT
8'
0"
3'
0" 8'
CEILING AS SCHEDULED
OPERABLE GLAZED PARTITION
ROOM SIGNAGE, REFER TO
SCHEDULE
CJ CJ
CJ
E1
A-563
E1
A-563
CJ
3' - 0"6"3' - 0"6"3' - 0"6"3' - 0"
13' - 6"
3' - 0"6"3' - 0"6"3' - 0"
10' - 0"
2'
6" 8'
1" ACOUSTICAL WALL ABSORBING
PANEL
3' - 0"6"3' - 0"6"3' - 0"6"3' - 0"6"3' - 0"6"3' - 0"6"3' - 0"6"3' - 0"6"3' - 0"
31' - 0"
SECOND FLOOR
115' - 4"
STOREFRONT AS SCHEDULED
MECH DUCTWORK, PAINT
OPEN
TO
BEYOND
127'-8"
128'-9" 128'-9"
127'-4" 127'-4"
128'-9"
SMART BOARD ON MOBILE STATION,
AS SCHEDULED
C1.3
CONTROL JOINT TYP.
8'
3'
0"
1" ACOUSTICAL WALL ABSORBING
PANEL18' - 0" 11' - 6" 2' - 6"3' - 0"2' - 6" 4' - 6" 1' - 0" 6' - 6" 4' - 6"1' - 0"
SECOND FLOOR
115' - 4"
CEILING AS SCHEDULED
HVAC DUCT, PAINT
WATER FOUNTAIN W/
BOTTLE FILLER
MANUAL ROLLER SHADE
OVER DOOR GLAZING
SECOND FLOOR
115' - 4"
C8.1
WALL BASE AS SCHEDULED SOLID PHENOLIC CABINET
CEILING AS SCHEDULED
SOLID PHENOLIC WALL SHELVING W/
SUPPORTS
SOLID PHENOLIC CABINET
6'
0"
SHELF SUPPORT
8'
3'
0"
3' - 0" 6" 3' - 0" 6" 3' - 0" 6" 3' - 0" 6" 3' - 0" 6" 3' - 0"
20' - 6"
3' - 0"6"3' - 0"6"3' - 0"6"3' - 0"6"3' - 0"6"3' - 0"6"3' - 0"
24' - 0"
3' - 0" 6" 3' - 0" 6" 3' - 0" 6" 3' - 0" 6" 3' - 0"
17' - 0"
1" ACOUSTICAL WALL ABSORBING
PANEL
A6
SECOND FLOOR
115' - 4"
CEILING AS SCHEDULED
ROLLER WINDOW SHADES
GLAZED CURTAIN WALL SYSTEM
C8
A-523
WALL BASE AS SCHEDULED
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S a v a n n a h D is tr ic t w
O g le th o rp e A v e
S a v a n n a h G e o rg ia
C H
E C
K E
D B
Y
U.S. ARMY CORPS OF
ENGINEERS
SAVANNAH DISTRICT
100 W. OGLETHORPE AVE.
SAVANNAH, GA 31401
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
-4
-0
E
R
O B
IN
S
O N
S T
R E
E T
S
U
IT
E
O R
L A
N D
O F
L
F Y
P
N A
M
C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt
3/30/2022 11:17:54 AM
M A
R C
H
B S
H E
R A
R D
B S
H E
R A
R D
D T
O R
B E
R T
A-264
IN
T
E R
IO
R
E L E
V A
T
IO
N S
A
R C
H R
D A
G U
A D
IL
L A
P
U E
R T
O R
IC
O
R E
P L A
C E
M E
N T
R A
M E
Y U
N
IT
S C
H O
O L
D T
O R
B E
R T
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
R A
A
-2 .d w g
W H
N R
1/4" = 1'-0"A-264
INTERIOR ELEVATION - HUB 2D20 - NORTHF1
1/4" = 1'-0"A-264
INTERIOR ELEVATION - HUB 2D20 - SOUTHD1
1/4" = 1'-0"A-264
INTERIOR ELEVATION - HUB 2D20 - EASTB1
(TYPICAL FOR HUBS 2D10, 2D30)
0 4ft. 8ft.4 ft.
(TYPICAL FOR HUBS 2D10, 2D30, 2D40)
1/4" = 1'-0"A-264
INTERIOR ELEVATION - HUB 2D40 - SOUTHA1
(TYPICAL FOR HUBS 2D10, 2D30)
1/4" = 1'-0"A-264
INTERIOR ELEVATION - HUB 2D20 - WESTB4
M A
R K
D E
S C
R
IP
T
IO
N D
A
T ectonic Cop yright 2007
115' - 4"
EMERGENCY EYE WASH/SHOWER W/
FLOOR DRAIN
DEMONSTRATION TABLE
1" ACOUSTICAL WALL ABSORBING
PANEL
REFER TO TEACHING WALL TYPE .TW-2.2
A1.2 C1.1 A1.2
CL
2' - 4"2' - 0"4"2' - 0"4"4' - 0"1' - 0"4' - 0"1' - 0"4' - 0"4"2' - 0"4' - 0"4' - 0"
SECOND FLOOR
115' - 4"
7'
0"
A2.1
C8.3 C8.3 C8.3
A17 A17 A17
FE
EYE GOGGLE SANITATION CABINET
2'
6" 1'
4"
4" 2'
36"/ 312 42"/ 312 42"/ 312
36"/ 100 42"/ 152 42"/ 100 36"/ 152 42"/ 100 36"/ 152
A18
19' - 6"
2'
6"
SECOND FLOOR
115' - 4"48"/ 40248"/ 402
CASEWORK ALONG WALL - F.V.
42"/ 102 42"/ 102 42"/ 102 42"/ 102 27"/ 10227"/ 10227"/ 102
SECOND FLOOR
115' - 4"
2'
4" 1'
4"
2'
6"
7'
0"
C8.3 C8.3 C8.3
A17A17A17 A2.1
36"/ 152 42"/ 100 36"/ 152 42"/ 100 42"/ 150 36"/ 100
42"/ 312 42"/ 312 36"/ 312
19' - 6"
2'
6"
SECOND FLOOR
115' - 4"
A1.1 A1.1C1.1
2' - 0" 4" 2' - 0" 4" 2' - 0" 4" 4' - 0" 1' - 0" 4' - 0" 1' - 0" 4' - 0" 4" 2' - 0" 4" 2' - 0" 4" 2' - 0" 4" 2' - 0" 4" 2' - 0"
2'
0" 7'
9"
1" ACOUSTICAL WALL ABSORBING
PANEL
WALL BASE AS SCHEDULED
CL
REFER TO TEACHING WALL
A1.2
TW-4.2
SECOND FLOOR
115' - 4"
A2.1
WALL BASE AS SCHEDULED
GLAZED CURTAIN WALL SYSTEM
ROLLER WINDOW SHADES
2'
6"
SECOND FLOOR
115' - 4"
1" ACOUSTICAL WALL ABSORBING
PANEL
OPERABLE SOLID PARTITION
8'
0" 2"
1'
8" 2"
2' - 0" 4" 2' - 0" 4" 2' - 0" 4" 2' - 0" 4" 4' - 0" 6" 4' - 0" 6" 4' - 0" 4" 2' - 0" 4" 2' - 0" 4" 2' - 0" 4"1' - 0"
SECOND FLOOR
115' - 4"
WALL BASE AS SCHEDULED
OPERABLE GLAZED PARTITION
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S a v a n n a h D is tr ic t w
O g le th o rp e A v e
S a v a n n a h G e o rg ia
C H
E C
K E
D B
Y
U.S. ARMY CORPS OF
ENGINEERS
SAVANNAH DISTRICT
100 W. OGLETHORPE AVE.
SAVANNAH, GA 31401
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
-4
-0
E
R
O B
IN
S
O N
S T
R E
E T
S
U
IT
E
O R
L A
N D
O F
L
F Y
P
N A
M
C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt
3/30/2022 11:17:59 AM
M A
R C
H
B S
H E
R A
R D
B S
H E
R A
R D
D T
O R
B E
R T
A-265
IN
T
E R
IO
R
E L E
V A
T
IO
N S
A
R C
H R
D A
G U
A D
IL
L A
P
U E
R T
O R
IC
O
R E
P L A
C E
M E
N T
R A
M E
Y U
N
IT
S C
H O
O L
D T
O R
B E
R T
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
R A
A
-2 .d w g
W H
N R
(SCIENCE LAB II SIMILAR)
(SCIENCE LAB II SIMILAR)
(SCIENCE LAB II SIMILAR)
(SCIENCE LAB II SIMILAR)
0 4ft. 8ft.4 ft.
1/4" = 1'-0"A-265
INTERIOR ELEVATION - SCIENCE II - NORTHB1
1/4" = 1'-0"A-265
INTERIOR ELEVATION - SCIENCE LAB II - EASTB6
1/4" = 1'-0"A-265
INTERIOR ELEVATION - SCIENCE LAB II - SOUTHA1
1/4" = 1'-0"A-265
INTERIOR ELEVATION - SCIENCE LAB II - WESTA6
1/4" = 1'-0"A-265
INTERIOR ELEVATION - TYP. MS/HS L.S. - TEACHING WALLF1
1/4" = 1'-0"A-265
INTERIOR ELEVATION - TYP. MS/HS L.S. - WINDOW WALLF6
1/4" = 1'-0"A-265
INTERIOR ELEVATION - TYP. MS/HS L.S. - SOLID PARTITION WALLD1
1/4" = 1'-0"A-265
INTERIOR ELEVATION - TYP. MS/HS L.S. - HUB WALLD6
M A
R K
D E
S C
R
IP
T
IO
N D
A
A10.6 X 7
12" X 15" X 72" VENTED PE
LOCKER
LOCKER BENCH: 12 X 48
WALL BASE AS SCHEDULED
FIRST FLOOR
100' - 0"
A10.6 A10.6X 6 X 6
SHOWER CURTAIN, ROD & HOOKS
12" X 15" X 72" VENTED PE LOCKERLOCKER BENCH: 12 X 48
FIRST FLOOR
100' - 0"
A10.6 X7
ADA LOCKER BENCH: 22 X 42
WALL BASE AS SCHEDULED
FIRST FLOOR
100' - 0"
A10.6
A11.1A11.3 A1.2
SHOWER CURTAIN, ROD & HOOKS WALL BASE AS SCHEDULED
FIRST FLOOR
100' - 0"
12" X 15" X 72" VENTED PE LOCKER
WALL BASE AS SCHEDULED
LOCKER BENCH: 12 X 48
FIRST FLOOR
100' - 0"
LOCKER BENCH: 12 X 48
12" X 15" X 72" VENTED PE LOCKER
FIRST FLOOR
100' - 0"
LOCKER BENCH: 12 X 48
WALL BASE AS SCHEDULED
A11.1
HM CASED OPENING FRAME
OPEN
BEYOND
FIRST FLOOR
100' - 0" x 5
A11.3
A10.6
12" X 15" X 72" VENTED PE LOCKER
WALL BASE AS SCHEDULEDLOCKER BENCH: 12 X 48
A11.1
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S a v a n n a h D is tr ic t w
O g le th o rp e A v e
S a v a n n a h G e o rg ia
C H
E C
K E
D B
Y
U.S. ARMY CORPS OF
ENGINEERS
SAVANNAH DISTRICT
100 W. OGLETHORPE AVE.
SAVANNAH, GA 31401
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
-4
-0
E
R
O B
IN
S
O N
S T
R E
E T
S
U
IT
E
O R
L A
N D
O F
L
F Y
P
N A
M
C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt
3/30/2022 11:18:06 AM
M A
R C
H
B S
H E
R A
R D
B S
H E
R A
R D
D T
O R
B E
R T
A-273
L O
C K
E R
R O
O M
E L E
V A
T
IO
N S
A
R C
H R
D A
G U
A D
IL
L A
P
U E
R T
O R
IC
O
R E
P L A
C E
M E
N T
R A
M E
Y U
N
IT
S C
H O
O L
D T
O R
B E
R T
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
R A
A
-2 .d w g
W H
N R
1/4" = 1'-0"A-273
INTERIOR ELEVATION - GIRLS PE LOCKER - NORTHF1
1/4" = 1'-0"A-273
INTERIOR ELEVATION - GIRLS PE LOCKER - EASTF4
1/4" = 1'-0"A-273
INTERIOR ELEVATION - GIRLS PE LOCKER - SOUTHF8
1/4" = 1'-0"A-273
INTERIOR ELEVATION - GIRLS PE LOCKER - WESTC1
1/4" = 1'-0"A-273
INTERIOR ELVATION - G. ATH LOCKER - NC4
1/4" = 1'-0"A-273
INTERIOR ELEVATION - G. ATH LOCKER - E1C8
1/4" = 1'-0"A-273
INTERIOR ELEVATION - G. ATH LOCKER - SA1
1/4" = 1'-0"A-273
INTERIOR ELEVATION - G. ATH LOCKER - W1AB
0 4ft. 8ft.4 ft.
M A
R K
D E
S C
R
IP
T
IO
N D
A
A1 A-302
A1 A-302
F1 A-303
F1 A-303
A1 A-303
A1 A-303
B1 A-301
B1 A-301
B1 A-304
B1 A-304
D1 A-301
D1 A-301
D1 A-302
D1 A-302
F1 A-301
F1 A-301
F1 A-302
F1 A-302
D8 A-304
D8 A-304
B1 A-302
B1 A-302
D1 A-303
D1 A-303
D6 A-302
D6 A-302
B1 A-303
B1 A-303
F1 A-304
F1 A-304
D1 A-304
D1 A-304
A1 A-304
A1 A-304
F8 A-304
F8 A-304
C8 A-302
C8 A-302
B5 A-303
B5 A-303
A3 A-364
A4 A-356
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S a v a n n a h D is tr ic t w
O g le th o rp e A v e
S a v a n n a h G e o rg ia
C H
E C
K E
D B
Y
U.S. ARMY CORPS OF
ENGINEERS
SAVANNAH DISTRICT
100 W. OGLETHORPE AVE.
SAVANNAH, GA 31401
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
-4
-0
E
R
O B
IN
S
O N
S T
R E
E T
S
U
IT
E
O R
L A
N D
O F
L
F Y
P
N A
M
C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt
3/30/2022 11:18:13 AM
M A
R C
H
B S
H E
R A
R D
B S
H E
R A
R D
D T
O R
B E
R T
A-300
B U
IL
D
IN
G
S E
C T
IO
N
S R
E F
E R
E N
C E
F L O
O R
P L A
N
A
R C
H R
D A
G U
A D
IL
L A
P
U E
R T
O R
IC
O
R E
P L A
C E
M E
N T
R A
M E
Y U
N
IT
S C
H O
O L
D T
O R
B E
R T
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
R A
A
-3 .d w g
W H
N R
1" = 20'-0"A-300
BUILDING SECTION REFERENCE PLAN1
M A
R K
D E
S C
R
IP
T
IO
N D
A
T ectonic Cop yright 2007
100' - 0"
SECOND FLOOR
115' - 4"
H.5 G.4
M
ABCDEFG
J
H.3
KLNN.1PQR A-353
A1
LS 22
2D21
LS 07
1D21
LIMM
2D61
LS 15
2D11
GUID -
CAREERS
1D54
AS
2D55
BOYS
2D57
GIRLS
2D59
GIRLS
1D69
BOYS
1D67
COMMONS
1C10
CIRCULATION
1C00b
A-354
A1
F.1G.7H.1
A-353
A5
D.9F.3
A-365
A3
A-351
A1
A-351
A4
LA/SS HUB
2D20
1-3 HUB
1D20
OT/PT (O)
1D71a
SHARED
CONFERENCE
1D65
PK-K HUB
1D10
LA/SS HUB
2D10
SES -
ASSESMENT
1D57
GUID -
COUNSELOR
1D53
CIRCULATION
1C00a
ENTRY VEST
1V01
FIRST FLOOR
100' - 0"
SECOND FLOOR
115' - 4"
H.5 G.4
M
A-351
A4 A-351
A7
ABCDEFGH
J
H.3
KLNN.1PQR
A-353
A8
LS 05
LS 20
SC
SC SC
SC
LS 17
LS 02 PERFORMANCE
SPACE
INFO CENTERCOMPUTING
CENTER
F.1G.7H.1 D.9F.3
MUSIC /BAND1-3 HUB
LA/SS HUB
PK-K HUB
LA/SS HUB
FIRST FLOOR
100' - 0"
SECOND FLOOR
115' - 4"
H.5 G.4
M
ABCDEFGH
J
H.3
KLN N.1PQR CIRCULATION
2D02
CIRCULATION
1D03
VESTIBULE
1D01
VESTIBULE
2D01
COMMONS
1C10
SERVING /
PREP
1C12
TREATMENT /
NURSE
1A09
A. PRINCIPAL
1A16
F.1G.7H.1 D.9F.3A-361
A4
A-359
A8
A-362
A7
A-363
A1
WORK / COPY
RM
1A13
WORK
SPACE
1C18
ALUM. CANOPY
FIRST FLOOR
100' - 0"
SECOND FLOOR
115' - 4"
H.5 G.4
M
ABCDEFG
J
H.3
LNN.1PQR
F.1G.7H.1 D.9F.3
A-359
A5
LS 08
1D31
1-3 HUB
1D30
LIMS -
KITCHEN
1D62a
LIMS -
INSTRUCTION
1D62
CTE LAB I
2D42
AS
2D32
MATH HUB
2D30
LS23
2D31
STEM HUB
2D40
CTE LAB II
2D41
ART
1D60
4-5 HUB
1D40
MECH
2B01
PE LOCKER
RR - WOMEN
1B10
PE LOCKER -
GIRLS
1B10a
ATH LOCKER
1B10b
MAINT
SUPPORT
1A22
CORR
1A20
CENTRAL
STORAGE
1A26
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S a v a n n a h D is tr ic t w
O g le th o rp e A v e
S a v a n n a h G e o rg ia
C H
E C
K E
D B
Y
U.S. ARMY CORPS OF
ENGINEERS
SAVANNAH DISTRICT
100 W. OGLETHORPE AVE.
SAVANNAH, GA 31401
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
-4
-0
E
R
O B
IN
S
O N
S T
R E
E T
S
U
IT
E
O R
L A
N D
O F
L
F Y
P
N A
M
C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt
3/30/2022 11:18:32 AM
M A
R C
H
B S
H E
R A
R D
B S
H E
R A
R D
D T
O R
B E
R T
A-301
B U
IL
D
IN
G
S E
C T
IO
N
S
A
R C
H R
D A
G U
A D
IL
L A
P
U E
R T
O R
IC
O
R E
P L A
C E
M E
N T
R A
M E
Y U
N
IT
S C
H O
O L
D T
O R
B E
R T
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
R A
A
-3 .d w g
W H
N R
1/16" = 1'-0"A-301
N/S BUILDING SECTION 2D1
1/16" = 1'-0"A-301
N/S BUILDING SECTION 1F1
1/16" = 1'-0"A-301
N/S BUILDING SECTION 3B1
0 16ft. 32ft.16ft.
A
B2
C1
D1
KEYPLAN
B1
C2
D2
D4
D3
1/16" = 1'-0"A-301
N/S BUILDING SECTION 4A1
M A
R K
D E
S C
R
IP
T
IO
N D
A
SECOND FLOOR
115' - 4"
H.5
M
DEF
J
H.3
KLNN.1PQR
F.1G.7H.1 D.9F.3
MATH HUB
2D30
STEM HUB
2D40 SCIENCE II
2D47
LS26
2D37
LS 11
1D37
1-3 HUB
1D30
4-5 HUB
1D40
LS 12
1D45
PE STORAGE
1B24a
GYM
1B20
ELEC
1A29
FIRST FLOOR
100' - 0"
C
LE
A R
H E
IG
H
C
O U
R T
A R
E A
D E F
GYM
1B20 PE STORAGE
1B24a
ELEC
1A29
F.1 G.7 H.1D.9 F.3 A-358
A1 A-358
A5
FIRST FLOOR
100' - 0"
SECOND FLOOR
115' - 4"
3 4 5 1110984.8 9.22 2.3 6 76.3 6.8 9.5 10.6 1211.75.3 6.2 8.1
LS 19
2D27
LS 20
2D25
LS 21
2D23
LS 22
2D21
LS 07
1D21
LS 06
1D23
LS 05
1D25
LS 04
1D27
MECH
2D60
MECH
1D74
LS23
2D31
LS24
2D33
LS25
2D35
LS26
2D37
LS 08
1D31
LS 09
1D33
LS 10
1D35
LS 11
1D37
FIRST FLOOR
100' - 0"
SECOND FLOOR
115' - 4"
3 4 5 1110981 4.8 9.22 2.3 6 76.3 6.8 9.5 10.6 1211.7 13 13.6
5.3
A-352
A5
1-3 HUB
1D20
LA/SS HUB
2D20
CIRCULATION
2D02
CIRCULATION
1D03
MATH HUB
2D30
1-3 HUB
1D30
FIRST FLOOR
100' - 0"
SECOND FLOOR
115' - 4"
5.5
84.8 6.9
6 76.3 6.85.3 6.2 8.1
A-362
A1
COMMONS
1C10
5'
8"
FIRST FLOOR
100' - 0"
G.4
STAGE
STOR
1C11b
114'-0"
124'-0"
127'-8"
3.1
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S a v a n n a h D is tr ic t w
O g le th o rp e A v e
S a v a n n a h G e o rg ia
C H
E C
K E
D B
Y
U.S. ARMY CORPS OF
ENGINEERS
SAVANNAH DISTRICT
100 W. OGLETHORPE AVE.
SAVANNAH, GA 31401
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
-4
-0
E
R
O B
IN
S
O N
S T
R E
E T
S
U
IT
E
O R
L A
N D
O F
L
F Y
P
N A
M
C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt
3/30/2022 11:18:41 AM
M A
R C
H
B S
H E
R A
R D
B S
H E
R A
R D
D T
O R
B E
R T
A-302
B U
IL
D
IN
G
S E
C T
IO
N
S
A
R C
H R
D A
G U
A D
IL
L A
P
U E
R T
O R
IC
O
R E
P L A
C E
M E
N T
R A
M E
Y U
N
IT
S C
H O
O L
D T
O R
B E
R T
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
R A
A
-3 .d w g
W H
N R
1/16" = 1'-0"A-302
N/S BUILDING SECTION 5F1
1/16" = 1'-0"A-302
N/S BUILDING SECTION 6D1
1/16" = 1'-0"A-302
E/W BUILDING SECTION AB1
1/16" = 1'-0"A-302
E/W BUILDING SECTION BA1
1/16" = 1'-0"A-302
E/W BUILDING SECTION ED6
A
B2
C1
D1
KEYPLAN
B1
C2
D2
D4
D3
0 16ft. 32ft.16ft.
1/8" = 1'-0"A-302
N/S ENLARGED BUILDING SECTION 9C8
0 8ft. 16ft.8ft.
M A
R K
D E
S C
R
IP
T
IO
N D
A
T ectonic Cop yright 2007 T ectonic Cop yright 2007
100' - 0"
FIRST FLOOR
100' - 0"
34510
5.5
8 14.89.2
6.9
22.366.39.510.6 14 13.6
5.3
COMMONS
PERFORMANCE
SPACEGYM
A-356
A7
A-354
A7 A-365
A7
6.28.1
A-355
A1
A-360
A6
FIRST FLOOR
100' - 0"
SECOND FLOOR
115' - 4"
3 4 5 111091 4.8 9.2
A-352
A1
2 2.3 6 6.3 6.8 9.5 10.6 1211.7 135.3 8.1
LA/SS HUB
2D10
PK-K HUB
1D10
CIRCULATION
1D03
CIRCULATION
2D02
STEM HUB
2D40
4-5 HUB
1D40
FIRST FLOOR
100' - 0"
SECOND FLOOR
115' - 4"
3 4 5 111091 4.8 9.22 2.3 6 6.3 6.8 9.5 10.6 1211.7 135.3 8.1
A-361
A7
LS 18
2D17 LS 17
2D15
LS 16
2D13
LS 15
2D11
LS 03
1D15
LS 02
1D13
LS 01
1D11
SES -
ASSESMENT
1D57
SES -
ASSESSOR
WKSPC
1D58
ELEV
1D02 VESTIBULE
2D01
CTE LAB II
2D41
SCIENCE I
2D43 PREP
2D45
SCIENCE II
2D47
VESTIBULE
1D01
ART
1D60
LS 14
1D41
LS 13
1D43
LS 12
1D45
FIRST FLOOR
100' - 0"
10.6 13.6
TRAINING
ROOM
1B22
ATH STOR
1B24
PE STORAGE
1B24a
FIRST FLOOR
100' - 0"
ABCDEFF.1 D.9F.3
STORAGE
1B14
ATH
WORKSPACE
1B25a
WEIGHT
ROOM
1B27
TEAM ROOM
1B29
MECH
2B01
CORR
1B28
MAIN TELCOM
TR1
1A27
CORR
1A20
CENTRAL
STORAGE
1A26
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S a v a n n a h D is tr ic t w
O g le th o rp e A v e
S a v a n n a h G e o rg ia
C H
E C
K E
D B
Y
U.S. ARMY CORPS OF
ENGINEERS
SAVANNAH DISTRICT
100 W. OGLETHORPE AVE.
SAVANNAH, GA 31401
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
-4
-0
E
R
O B
IN
S
O N
S T
R E
E T
S
U
IT
E
O R
L A
N D
O F
L
F Y
P
N A
M
C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt
3/30/2022 11:18:59 AM
M A
R C
H
B S
H E
R A
R D
B S
H E
R A
R D
D T
O R
B E
R T
A-303
B U
IL
D
IN
G
S E
C T
IO
N
S
A
R C
H R
D A
G U
A D
IL
L A
P
U E
R T
O R
IC
O
R E
P L A
C E
M E
N T
R A
M E
Y U
N
IT
S C
H O
O L
D T
O R
B E
R T
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
R A
A
-3 .d w g
W H
N R
1/16" = 1'-0"A-303
E/W BUILDING SECTION GA1
1/16" = 1'-0"A-303
E/W BUILDING SECTION CF1
0 16ft. 32ft.16ft.
1/16" = 1'-0"A-303
E/W BUILDING SECTION DD1
1/16" = 1'-0"A-303
E/W BUILDING SECTION FB1
A
B2
C1
D1
KEYPLAN
B1
C2
D2
D4
D3
1/16" = 1'-0"A-303
N-S BUILDING SECTION AT PENTHOUSEB5
M A
R K
D E
S C
R
IP
T
IO
N D
A
3 4 5 105.5 81 4.8 9.26.92 2.3 6 6.3 9.5 10.6 1413.6
5.3 6.2
A-360
A1 MUSIC /BAND
1C09
CIRCULATION
1C00b
SERVING /
PREP
1C12
DISHWASHING
1C13
CORR
1A20
STORAGE
1B14
LAUNDRY
1B16 ACCESS
1B21
MECH
2B01
GYM
1B20
A-357
A3
A-355
A4
FIRST FLOOR
100' - 0"
3 4 5 111095.5 81 4.8 9.22 2.3 6 76.8 9.5 10.6 1211.7 13 1413.6
5.3 6.2
A-360
A1
MUSIC /BAND
1C09
CIRCULATION
1C00b
SERVING /
PREP
1C12
SERVING /
PREP
1C12
DISHWASHING
1C13
CORR
1A20
PE LOCKER -
GIRLS
1B10a
PE LOCKER -
BOYS
1B12a
ATH
WORKSPACE
1B25a
PE STAFF
1B25
GYM
1B20
MECH
2B01
FIRST FLOOR
100' - 0"
3 4 5 105.5 81 4.8 9.26.92 2.3 6 9.5 10.6 1413.65.3
CENTRAL
STORAGE
1A26
RECEIVING
1A28
CORR
1A20
CONFERENCE
1A12
6.2
ADMIN - CIRC
1A10
MEDIA -
STAFF
1C01a
INFO CENTER
1C01
A-356
A1 A-359
A1
ENTRY VEST
1V01
2.6 3.3
FIRST FLOOR
100' - 0"
DEFG.7 F.3A-358
A8
A-358
A8
SIM. / O.H.
PE GYM
SEATING
1B10
FIRST FLOOR
100' - 0"
3 4 5 5.5
1 4.82 2.3 5.3
A-365
A1
COMPUTING
CENTER
1C01c
BOYS
1C05
CIRCULATION
1C00a
FIRST FLOOR
100' - 0"
SECOND FLOOR
115' - 4"
3 4 5 1110981 4.8 9.22 2.3 6 76.8 9.5 10.6 1211.7 135.3 6.2
A-362
A4
STAIR B
1D80
PK-K HUB
1D10
RR
1D18
SC
1D12
BOYS
1D67
CIRCULATION
1D03
LIMM
1D66
LIMS -
INSTRUCTION
1D62
SC
1D42
RR
1D47
4-5 HUB
1D40
STAIR C
1D90
STEM HUB
2D40
RR
2D49
SC - STEM
2D44
CTE LAB I
2D42
VIDEO
STUDIO
2D52b
CIRCULATION
2D02
BOYS
2D57
SC
2D12
RR
2D18
LA/SS HUB
2D10
A-364
A6
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S a v a n n a h D is tr ic t w
O g le th o rp e A v e
S a v a n n a h G e o rg ia
C H
E C
K E
D B
Y
U.S. ARMY CORPS OF
ENGINEERS
SAVANNAH DISTRICT
100 W. OGLETHORPE AVE.
SAVANNAH, GA 31401
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
-4
-0
E
R
O B
IN
S
O N
S T
R E
E T
S
U
IT
E
O R
L A
N D
O F
L
F Y
P
N A
M
C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt
3/30/2022 11:19:15 AM
M A
R C
H
B S
H E
R A
R D
B S
H E
R A
R D
D T
O R
B E
R T
A-304
B U
IL
D
IN
G
S E
C T
IO
N
S
A
R C
H R
D A
G U
A D
IL
L A
P
U E
R T
O R
IC
O
R E
P L A
C E
M E
N T
R A
M E
Y U
N
IT
S C
H O
O L
D T
O R
B E
R T
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
R A
A
-3 d w g
W H
N R
1/16" = 1'-0"A-304
E/W BUILDING SECTION HF1
1/16" = 1'-0"A-304
E/W BUILDING SECTION JD1
1/16" = 1'-0"A-304
E/W BUILDING SECTION LB1
A
B2
C1
D1
KEYPLAN
B1
C2
D2
D4
D3
0 16ft. 32ft.16ft.
1/16" = 1'-0"A-304
N/S BUILDING SECTION 7D8
1/16" = 1'-0"A-304
E/W BUILDING SECTION KF8
1/16" = 1'-0"A-304
E/W BUILDING SECTION B.1A1
1/8" = 1'-0"A-304
E/W ENLARGED BUILDING SECTION - FIELD HOUSEB8
M A
R K
D E
S C
R
IP
T
IO
N D
A
A4 A-351
A7 A-351
A1 A-351
A1 A-353
A5 A-353
A1 A-354
A8 A-353
A1 A-356
A1 A-352
A7 A-354
A1 A-355
A4 A-355
A9 A-357
A5 A-358
A1 A-358
A8 A-358
A8 A-358
SIM./O.H.
A1
A-359
A5 A-359
A8 A-359
A1 A-360
A6 A-360
A1 A-361
A1 A-351
A1 A-352
SIM / OH
A1 A-351
A1 A-362
A1 A-362
SIM / OH
A1 A-351
SIM/OH
A1
A-351
SIM/OH
A7 A-361
A7 A-361
A7 A-361
A5 A-352
A1 A-351
SIM SIM SIM
A5 A-352
SIM/OH
SIM / OH
A4 A-362
A4 A-362
SIM / OH
A7 A-361
SIM/OH
A4 A-361
A7 A-362
A1 A-363
A1 A-364
A8 A-363
A5 A-363
REFER TO AREA D2 FOR
SIMILAR SECTIONS (OPP HAND)
A3 A-364
A7 A-356
A4 A-356
A3 A-357
A7 A-365
A1 A-357
A1 A-365
A6 A-357
WALL SECTION GENERAL NOTES
1. WALL SECTIONS ARE PROVIDED FOR INFORMATION ON THE ARCHITECTURAL
ELEMENTS OF THE CONSTRUCTION. CAST-IN-PLACE CONCRETE STRUCTURE
SHOWN WITHOUT SPECIFIC STRUCTURAL DETAILING / REINFORCING / JOINTS THAT
ARE REQUIRED.
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S a v a n n a h D is tr ic t w
O g le th o rp e A v e
S a v a n n a h G e o rg ia
C H
E C
K E
D B
Y
U.S. ARMY CORPS OF
ENGINEERS
SAVANNAH DISTRICT
100 W. OGLETHORPE AVE.
SAVANNAH, GA 31401
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
-4
-0
E
R
O B
IN
S
O N
S T
R E
E T
S
U
IT
E
O R
L A
N D
O F
L
F Y
P
N A
M
C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt
3/30/2022 11:19:23 AM
M A
R C
H
B S
H E
R A
R D
B S
H E
R A
R D
D T
O R
B E
R T
A-350
W A
L L S
E C
T
IO
N R
E F
E R
E N
C E
P L A
N
A
R C
H R
D A
G U
A D
IL
L A
P
U E
R T
O R
IC
O
R E
P L A
C E
M E
N T
R A
M E
Y U
N
IT
S C
H O
O L
D T
O R
B E
R T
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
R A
A
-3 .d w g
W H
N R
1" = 20'-0"A-350
WALL SECTION REFERENCE PLANA1
0 20ft. 40ft.20ft.
M A
R K
D E
S C
R
IP
T
IO
N D
A
SECOND FLOOR
115' - 4"
T/FOOTING (N)
97' - 0"
CONCRETE BEAM
R
CEILING AS SCHEDULED
CEILING AS SCHEDULED
A-551
A8
2'
LS 05
1D25
LS 20
2D25
A-523
A1
FIN. GRADE
SEE CIVIL
DOWNSPOUT
CONNECT TO STORM, SEE CIVIL
MANUAL ROLLER SHADE
E2
E2
MANUAL ROLLER SHADE
A-521
A6
A-521
C1
E2
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB
WALL CONSTRUCTION
GLAZED CURTAINWALL (AIR BARRIER)
WALL CONSTRUCTION
C.I.P. ARCH CONC WALL (AIR BARRIER)
3" SPRAY APPLIED INSULATION
2-1/2" METAL STUD U.N.O.
GYPSUM BOARD
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB ON GRADE (AIR BARRIER)
UNDERSLAB VAPOR BARRIER
GRAVEL (CAPILLARY WATER BARRIER)
COMPACTED FILL
133'-8"
130'-0"
3'
8"
8" 1' - 4" 8"
FIRST FLOOR
100' - 0"
SECOND FLOOR
115' - 4"
Q
STEEL SUPPORTS & BRACINGS FOR
OPERABLE WALL - SEE STRUCTURAL
CEILING AS SCHEDULED
SEE RCP
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT INSULATING CONC. SYSTEM (R-20 MIN.)
CONCRETE ROOF DECK - SEE STRUCTURAL
LS 05
1D25
LS 20
2D25
CEILING AS SCHEDULED
SEE RCP
STEEL SUPPORTS AND BRACING FOR OPERABLE
WALL - SEE STRUCTRAL
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB ON GRADE (AIR BARRIER)
UNDERSLAB VAPOR BARRIER
GRAVEL (CAPILLARY WATER BARRIER)
COMPACTED FILL
A-542
A7 Sim
OPERABLE GLAZED PARTITION
OPERABLE GLAZED PARTITION
A-542
A7 Sim
1' - 6"
CEILING AS SCHEDULED
C.I.P. CONCRETE BEAM
1" ACOUSTICAL WALL ABSORBING
PANEL
98'-0"
FIRST FLOOR
100' - 0"
SECOND FLOOR
115' - 4"
P
CEILING AS SCHEDULED
CONCRETE BEAM
CEILING AS SCHEDULED
CONCRETE COLUMN
GYPSUM WALLBOARD COLUMN
WRAP - SEE PLANS FOR TYPE
GYPSUM WALLBOARD COLUMN
WRAP - SEE PLANS FOR TYPE
SC
1D22
SC
2D22
HVAC DUCT, PAINT
LA/SS HUB
2D20
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB
STOREFRONT AS SCHEDULED
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB ON GRADE (AIR BARRIER)
UNDERSLAB VAPOR BARRIER
GRAVEL (CAPILLARY WATER BARRIER)
COMPACTED FILL
CEILING AS SCHEDULED
C.I.P. CONCRETE COLUMN
STOREFRONT AS SCHEDULED
CEILING AS SCHEDULED
1-3 HUB
1D20
98'-0"
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S a v a n n a h D is tr ic t w
O g le th o rp e A v e
S a v a n n a h G e o rg ia
C H
E C
K E
D B
Y
U.S. ARMY CORPS OF
ENGINEERS
SAVANNAH DISTRICT
100 W. OGLETHORPE AVE.
SAVANNAH, GA 31401
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
-4
-0
E
R
O B
IN
S
O N
S T
R E
E T
S
U
IT
E
O R
L A
N D
O F
L
F Y
P
N A
M
C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt
3/30/2022 11:19:26 AM
M A
R C
H
B S
H E
R A
R D
B S
H E
R A
R D
D T
O R
B E
R T
A-351
W A
L L S
E C
T
IO
N S
A
R C
H R
D A
G U
A D
IL
L A
P
U E
R T
O R
IC
O
R E
P L A
C E
M E
N T
R A
M E
Y U
N
IT
S C
H O
O L
D T
O R
B E
R T
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
R A
A
-3 .d w g
W H
N R
1/2" = 1'-0"A-351
WALL SECTION D2.1 - NORTH WALLA1
1/2" = 1'-0"A-351
WALL SECTION D2.2 - GRID QA4
1/2" = 1'-0"A-351
WALL SECTION D2.3 - GRID PA7
0 2ft. 4ft.2 ft.
M A
R K
D E
S C
R
IP
T
IO
N D
A
SECOND FLOOR
115' - 4"
T/FOOTING (N)
97' - 0"
C.I.P. CONCRETE BEAM
& ROOF SYSTEM , PAINT
EXTERIOR FINISH SYSTEM ON
GLASS MAT FIBER REINFORCED
SHEATHING ON 3-5/8" GALV METAL
STUDS @ 16" O.C. (BY FRAMING
ENGINEER)
SEE RCP
CEILING AS SCHEDULED
CEILING AS SCHEDULED
SEE RCP
C.I.P. CONCRETE BEAM
& ROOF SYSTEM , PAINTA-531
A1 Sim
A-551
A1 Sim
C1 Sim
A-531
GLAZED CURTAIN WALL SYSTEM
O
PA
Q U
E
SP
AN
D
R
EL
GLAZED CURTAIN WALL SYSTEM
8" 1'
8"
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
ALUMINUM ENTRANCE DOOR
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB ON GRADE (AIR BARRIER)
UNDERSLAB VAPOR BARRIER
GRAVEL (CAPILLARY WATER BARRIER)
COMPACTED FILL
A-521
E6
A-552
D1 Sim
3' - 4"8"
A-551
A1 Sim
FIRST FLOOR
100' - 0"
SECOND FLOOR
115' - 4"
T/FOOTING (N)
97' - 0"
12 13
ALUMINUM ENTRANCE DOOR
CONCRETE FOUNDATION
UNDERSLAB VAPOR BARRIER
8" GRAVEL CAPILLARY WATER BARRIER
COMPACTED FILL
A-551
A1 Sim
A-531
A1 Sim
C.I.P. ARCH CONC WALL (AIR BARRIER)
SEE STRUCTURAL
REFER TO ELEVATIONS FOR FINISH
EXTERIOR SOFFIT SYSTEM - DIRECT
APPLIED EXTERIOR FINISH SYSTEM ON
GLASS MAT FIBER REINFORCED GYP
SHEATHING ON 3-5/8" GALV METAL STUDS
BY FRAMING ENGINEER, BRACE FOR WIND
UPLIFT AS REQUIRED
C1
A-531
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB ON GRADE (AIR BARRIER)
UNDERSLAB VAPOR BARRIER
GRAVEL (CAPILLARY WATER BARRIER)
COMPACTED FILL
MATH HUB
2D30
1-3 HUB
1D30
A-523
C8 Sim
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
135'-8"
C.I.P. CONCRETE COLUMN
WALL CONSTRUCTION
GLAZED CURTAINWALL (AIR BARRIER)
A-523
A1 Sim
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S a v a n n a h D is tr ic t w
O g le th o rp e A v e
S a v a n n a h G e o rg ia
C H
E C
K E
D B
Y
U.S. ARMY CORPS OF
ENGINEERS
SAVANNAH DISTRICT
100 W. OGLETHORPE AVE.
SAVANNAH, GA 31401
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
-4
-0
E
R
O B
IN
S
O N
S T
R E
E T
S
U
IT
E
O R
L A
N D
O F
L
F Y
P
N A
M
C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt
3/30/2022 11:19:29 AM
M A
R C
H
B S
H E
R A
R D
B S
H E
R A
R D
D T
O R
B E
R T
A-352
W A
L L S
E C
T
IO
N S
A
R C
H R
D A
G U
A D
IL
L A
P
U E
R T
O R
IC
O
R E
P L A
C E
M E
N T
R A
M E
Y U
N
IT
S C
H O
O L
D T
O R
B E
R T
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
R A
A
-3 .d w g
W H
N R
1/2" = 1'-0"A-352
WALL SECTION D2.4 - HUB ENDA1
1/2" = 1'-0"A-352
WALL SECTION D1.1 - HUB ENDA5
0 2ft. 4ft.2 ft.
M A
R K
D E
S C
R
IP
T
IO
N D
A
SECOND FLOOR
115' - 4"
T/FOOTING (N)
97' - 0"
JK
CEILING AS SCHEDULED
LS 15
2D11
COMMONS
1C10
SES -
ASSESMENT
1D57
SEE STRUCTURAL
3" EXPANSION JOINT
A-552
A4
A-561
A1
STAIR CONSTUCTION
C.I.P. CONCRETE STAIR -SEE STRUCT
GEOFOAM
CONCRETE SLAB ON GRADE
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
PAINTED ALUMINUM RAILINGS
PAINTED ALUMINUM RAILINGS
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB ON GRADE (AIR BARRIER)
UNDERSLAB VAPOR BARRIER
GRAVEL (CAPILLARY WATER BARRIER)
COMPACTED FILL
C.I.P. ARCHITECTURAL CONCRETE
WALL
CEILING AS SCHEDULED
CAST-IN-PLACE CONCRETE
CEILING AS SCHEDULED
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB
133'-8"
FIRST FLOOR
100' - 0"
T/FOOTING (N)
97' - 0"
G
110'-0"
CEILING AS SCHEDULED
C.I.P. ARCH CONC WALL
W/ FORMLINER TO
10'-0" A.F.F.
CI.P. CONCRETE WALL
CI.P. CONCRETE BEAM
CIRCULATION
1C00b
COMMONS
1C10
C.I.P. CONCRETE COLUMN
SEE FINISH PLANS / ELEVATIONS
FOR FINISH
TYPE E3(S) INTERIOR PARTITION
ON FACE OF CONCRETE WALL
SEE INTERIOR ELEVATIONS
DIRECT APPLIED ACRYLIC EXTERIOR FINISH
SYSTEM
DIRECT APPLIED ACRYLIC EXTERIOR FINISH
SYSTEM
A-551
A4 Sim
135'-8"
130'-0"
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
E2SB
A-551
A1 Sim
WALL CONSTRUCTION
C.I.P. ARCH CONC WALL (AIR BARRIER)
3" SPRAY APPLIED INSULATION
2-1/2" METAL STUD U.N.O.
GYPSUM BOARD
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB ON GRADE (AIR BARRIER)
UNDERSLAB VAPOR BARRIER
GRAVEL (CAPILLARY WATER BARRIER)
COMPACTED FILL
E2SB
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
2' - 0"
3' - 0" 8"
5'
8"
FIRST FLOOR
100' - 0"
B
C.I.P. CONCRETE COLUMN
7'
0"
T/FOOTING (S)
96' - 0"
A-521
E1
C.I.P. CONCRETE WALL FOUNDATION
SEE STRUCTURAL
FINISHED GRADE - SEE CIVIL
124'-1"
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
WALL CONSTRUCTION
GLAZED CURTAINWALL (AIR BARRIER)
WALL CONSTRUCTION
C.I.P. ARCH CONC WALL (AIR BARRIER)
3" SPRAY APPLIED INSULATION
2-1/2" METAL STUD U.N.O.
GYPSUM BOARD
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB ON GRADE (AIR BARRIER)
UNDERSLAB VAPOR BARRIER
GRAVEL (CAPILLARY WATER BARRIER)
COMPACTED FILL
SOFFIT CONSTRUCTION
DIRECT APPLIED EXT FINISH SYSTEM
5/8" GMFR SHEATHING
3-5/8" GALV METAL STUDS
A-551
A1 Sim
A-531
A1 Sim
3'
128'-0"
A-522
E1
123'-6"
A-531
A1 Sim
TYP
STEEL TUBE W/ BREAK METAL WRAP
TO MATCH CURTAINWALL FRAMING
A-525
A5
C7 Sim
A-531
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S a v a n n a h D is tr ic t w
O g le th o rp e A v e
S a v a n n a h G e o rg ia
C H
E C
K E
D B
Y
U.S. ARMY CORPS OF
ENGINEERS
SAVANNAH DISTRICT
100 W. OGLETHORPE AVE.
SAVANNAH, GA 31401
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
-4
-0
E
R
O B
IN
S
O N
S T
R E
E T
S
U
IT
E
O R
L A
N D
O F
L
F Y
P
N A
M
C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt
3/30/2022 11:19:32 AM
M A
R C
H
B S
H E
R A
R D
B S
H E
R A
R D
D T
O R
B E
R T
A-353
W A
L L S
E C
T
IO
N S
A
R C
H R
D A
G U
A D
IL
L A
P
U E
R T
O R
IC
O
R E
P L A
C E
M E
N T
R A
M E
Y U
N
IT
S C
H O
O L
D T
O R
B E
R T
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
R A
A
-3 .d w g
W H
N R
1/2" = 1'-0"A-353
WALL SECTION D1.2 - SOUTH @ COMMONSA1
1/2" = 1'-0"A-353
WALL SECTION C2.1 - COMMONS SOUTHA5
1/2" = 1'-0"A-353
WALL SECTION C1.1 - SOUTH @ INFO CENTERA8
0 2ft. 4ft.2 ft.
M A
R K
D E
S C
R
IP
T
IO
N D
A
A
B
GLAZED CURTAIN WALL SYSTEM
GLAZED CURTAIN WALL SYSTEM
T/FOOTING (S)
96' - 0"
C1 Sim
A-531
A4
A-524
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
SOFFIT CONSTRUCTION
DIRECT APPLIED EXT FINISH SYSTEM
5/8" GMFR SHEATHING
3-5/8" GALV METAL STUDS
WALL CONSTRUCTION
GLAZED CURTAINWALL (AIR BARRIER)
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB ON GRADE (AIR BARRIER)
UNDERSLAB VAPOR BARRIER
GRAVEL (CAPILLARY WATER BARRIER)
COMPACTED FILL
GLAZED CURTAIN WALL SYSTEM
GLAZED CURTAIN WALL SYSTEM
ALUMINUM ENTRANCE DOOR
C.I.P. CONCRETE COLUMN
C.I.P. ARCHITECTURAL CONCRETE
WALL
ALUMINUM CANOPY
DIRECT APPLIED ACRYLIC EXTERIOR
FINISH SYSTEM
A-551
A1 Sim
128'-0"
124'-1"
122'-4"
A-551
A1 Sim
A-531
A1 Sim
A-531
A1 Sim
TYP
A-523
B8
1' - 4" 8"
118'-8"
115'-0"
3'
8"
A-522
E1 Sim
A-552
D1 Sim
A-523
B8
A-510
BUILDING PLAQUE
3.1
3.1
3.2
C4
A-533
A4
A-533
ROOM SIGNAGE, REFER TO
SCHEDULE
AUTOMATIC DOOR OPERATOR PUSH
BUTTON
CARD READER
2'
CL
FIRST FLOOR
100' - 0"
*TOP Area B, C2, D 133' - 8"
*BOR - Area C2 130' - 0"
10.6
T/FOOTING (S)
96' - 0"
GYM
1B20
3'
8"
A-551
D1 Sim
C.I.P. CONCRETE SIDEWALK
SEE CIVIL
C.I.P. CONCRETE WALL FOUNDATION
SEE STRUCTURAL
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB ON GRADE (AIR BARRIER)
UNDERSLAB VAPOR BARRIER
GRAVEL (CAPILLARY WATER BARRIER)
COMPACTED FILL
WALL CONSTRUCTION
C.I.P. ARCH CONC WALL (AIR BARRIER)
3" SPRAY APPLIED INSULATION
2-1/2" METAL STUD U.N.O.
GYPSUM BOARD
PERFORATED METAL PANEL
HVAC DUCT, PAINT
1' - 0"1' - 4"8"
6" ALUMINUM DOWNSPOUT W/
COLLECTOR HEAD & CONNECTED TO
STORM
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S a v a n n a h D is tr ic t w
O g le th o rp e A v e
S a v a n n a h G e o rg ia
C H
E C
K E
D B
Y
U.S. ARMY CORPS OF
ENGINEERS
SAVANNAH DISTRICT
100 W. OGLETHORPE AVE.
SAVANNAH, GA 31401
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
-4
-0
E
R
O B
IN
S
O N
S T
R E
E T
S
U
IT
E
O R
L A
N D
O F
L
F Y
P
N A
M
C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt
3/30/2022 11:19:35 AM
M A
R C
H
B S
H E
R A
R D
B S
H E
R A
R D
D T
O R
B E
R T
A-354
W A
L L S
E C
T
IO
N S
A
R C
H R
D A
G U
A D
IL
L A
P
U E
R T
O R
IC
O
R E
P L A
C E
M E
N T
R A
M E
Y U
N
IT
S C
H O
O L
D T
O R
B E
R T
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
R A
A
-3 .d w g
W H
N R
1/2" = 1'-0"A-354
WALL SECTION C1.2 - SOUTH @ ENTRYA1
1/2" = 1'-0"A-354
WALL SECTION B2.1 - GYM WESTA7
0 2ft. 4ft.2 ft.
M A
R K
D E
S C
R
IP
T
IO
N D
A
T/FOOTING (S)
96' - 0"
A-551
D1 Sim
C7
A-531
C.I.P. CONCRETE BEAM
BEYOND, PAINT
SEE STRUCTURAL
3'
8"
PRE-FAB PVC DOWNSPOUT ADAPTER
- CONNECT TO STORM, SEE DETAIL &
CIVIL
COLLAPSIBLE BLEACHERS
HVAC DUCT, PAINT
133'-8" ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
WALL CONSTRUCTION
C.I.P. ARCH CONC WALL (AIR BARRIER)
3" SPRAY APPLIED INSULATION
2-1/2" METAL STUD U.N.O.
GYPSUM BOARD
6" ALUMINUM DOWNSPOUT,
CONNECTED TO STORM
WALL CONSTRUCTION
C.I.P. ARCH CONC WALL (AIR BARRIER)
3" SPRAY APPLIED INSULATION
2-1/2" METAL STUD U.N.O.
GYPSUM BOARD
8"1' - 4"8"
FIRST FLOOR
100' - 0"
T/FOOTING (N)
97' - 0"
*TOS - MECH MEZZ
114' - 8"
10.6
ACCESS
1B21
MECH
2B01
GYM
1B20
3'
6"
PERFORATED METAL PANEL
INCLINED METAL LADDERS W/ HAND
RAIL
HVAC DUCT, PAINT
133'-8"
C.I.P. CONCRETE BEAM
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB ON GRADE (AIR BARRIER)
UNDERSLAB VAPOR BARRIER
GRAVEL (CAPILLARY WATER BARRIER)
COMPACTED FILL
GYM WALL PADS
A-510
SIM
A-551
D1 Sim
A-551
A4 Sim
WRAP PMMA FLASHING
OVER PARAPET
1' - 0" 1' - 4" 8"
FIRST FLOOR
100' - 0"
10.6
T/FOOTING (S)
96' - 0"
WEIGHT
ROOM
1B27
GYM
1B20
DOOR AND FRAME AS SCHEDULED
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
WALL CONSTRUCTION
C.I.P. ARCH CONC WALL (AIR BARRIER)
3" SPRAY APPLIED INSULATION
2-1/2" METAL STUD U.N.O.
GYPSUM BOARD
6" ALUMINUM DOWNSPOUT W/
COLLECTOR HEAD & CONNECTED TO
STORM
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB ON GRADE (AIR BARRIER)
UNDERSLAB VAPOR BARRIER
GRAVEL (CAPILLARY WATER BARRIER)
COMPACTED FILL
PERFORATED METAL PANEL
CEILING AS SCHEDULED
A-551
D1 Sim
A-551
A4 Sim
A-510
SIM
1' - 0" 1' - 4" 8"
133'-8"
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S a v a n n a h D is tr ic t w
O g le th o rp e A v e
S a v a n n a h G e o rg ia
C H
E C
K E
D B
Y
U.S. ARMY CORPS OF
ENGINEERS
SAVANNAH DISTRICT
100 W. OGLETHORPE AVE.
SAVANNAH, GA 31401
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
-4
-0
E
R
O B
IN
S
O N
S T
R E
E T
S
U
IT
E
O R
L A
N D
O F
L
F Y
P
N A
M
C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt
3/30/2022 11:19:38 AM
M A
R C
H
B S
H E
R A
R D
B S
H E
R A
R D
D T
O R
B E
R T
A-355
W A
L L S
E C
T
IO
N S
A
R C
H R
D A
G U
A D
IL
L A
P
U E
R T
O R
IC
O
R E
P L A
C E
M E
N T
R A
M E
Y U
N
IT
S C
H O
O L
D T
O R
B E
R T
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
R A
A
-3 .d w g
W H
N R
1/2" = 1'-0"A-355
WALL SECTION B1.2 - GYM EASTA1
1/2" = 1'-0"A-355
WALL SECTION B1.3 - GYM WEST WALLA4
1/2" = 1'-0"A-355
WALL SECTION B1.4 - GYM WEST WALL AT WEIGHT RMA8
0 2ft. 4ft.2 ft.
M A
R K
D E
S C
R
IP
T
IO
N D
A
T/FOOTING (S)
96' - 0"
C7 Sim
A-531
3'
8" R
AC
KE
D F
AS
C
IA
B
EA
M
H
EI
G
H T
VA
R
IE
S
MEDIA -
STAFF
1C01a
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
127'-2"
SOFFIT CONSTRUCTION
DIRECT APPLIED EXT FINISH SYSTEM
5/8" GMFR SHEATHING
3-5/8" GALV METAL STUDS
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
WALL CONSTRUCTION
C.I.P. ARCH CONC WALL (AIR BARRIER)
3" SPRAY APPLIED INSULATION
2-1/2" METAL STUD U.N.O.
GYPSUM BOARD
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB ON GRADE (AIR BARRIER)
UNDERSLAB VAPOR BARRIER
GRAVEL (CAPILLARY WATER BARRIER)
COMPACTED FILL
CEILING AS SCHEDULED
A-551
A1 Sim
A-551
A1 Sim
FIRST FLOOR
100' - 0"
4.8
T/FOOTING (S)
96' - 0"
COMMONS
1C10
PERFORMANCE
SPACE
1C11
A-551
D1 Sim
A-551
A4 Sim
112'-0"
BTM/WALL
4' - 4" 1' - 0" 8"
5/8" GYPSUM BOARD SOFFIT ON
3-5/8" METAL STUD FRAMING BY
FRAMING ENGINEER, PAINT - SEE RCP
SEE PLANS FOR WALL TYPE
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
WALL CONSTRUCTION
C.I.P. ARCH CONC WALL (AIR BARRIER)
3" SPRAY APPLIED INSULATION
2-1/2" METAL STUD U.N.O.
GYPSUM BOARD
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB ON GRADE (AIR BARRIER)
UNDERSLAB VAPOR BARRIER
GRAVEL (CAPILLARY WATER BARRIER)
COMPACTED FILL
1" ACOUSTICAL WALL ABSORBING
PANEL
CEILING AS SCHEDULED DIRECT APPLIED ACRYLIC EXTERIOR
FINISH SYSTEM
DIRECT APPLIED ACRYLIC EXTERIOR
FINISH SYSTEM
133'-8"
130'-0"
3'
8"
1' - 4" 8"
HIGH IMPACT WALLCOVERING
A-541
C9
HVAC DUCT
P6
110'-0"
2" ACOUSTICAL WALL ABSORBING
PANEL
FIRST FLOOR
100' - 0"
T/FOOTING (N)
97' - 0"
F
CIRCULATION
1C00b
CIRCULATION
1C00a
112'-6"
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB ON GRADE (AIR BARRIER)
UNDERSLAB VAPOR BARRIER
GRAVEL (CAPILLARY WATER BARRIER)
COMPACTED FILL
CEILING AS SCHEDULED
A3-S
CEILING AS SCHEDULED
DOOR AND FRAME AS SCHEDULED
C.I.P. ARCHITECTURAL CONCRETE
FINISHING
A-551
D1 Sim
A-551
A4 Sim
CONTINUE PMMA FLASHING
OVER PARAPET
BTM WALL
A8
A-541
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S a v a n n a h D is tr ic t w
O g le th o rp e A v e
S a v a n n a h G e o rg ia
C H
E C
K E
D B
Y
U.S. ARMY CORPS OF
ENGINEERS
SAVANNAH DISTRICT
100 W. OGLETHORPE AVE.
SAVANNAH, GA 31401
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
-4
-0
E
R
O B
IN
S
O N
S T
R E
E T
S
U
IT
E
O R
L A
N D
O F
L
F Y
P
N A
M
C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt
3/30/2022 11:19:41 AM
M A
R C
H
B S
H E
R A
R D
B S
H E
R A
R D
D T
O R
B E
R T
A-356
W A
L L S
E C
T
IO
N S
A
R C
H R
D A
G U
A D
IL
L A
P
U E
R T
O R
IC
O
R E
P L A
C E
M E
N T
R A
M E
Y U
N
IT
S C
H O
O L
D T
O R
B E
R T
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
R A
A
-3 .d w g
W H
N R
1/2" = 1'-0"A-356
WALL SECTION A.2 - INFORMATION CENTER WESTA1
1/2" = 1'-0"A-356
WALL SECTION C2.2 - COMMONS @ PERFORMANCEA7
1/2" = 1'-0"A-356
WALL SECTION AT CIRCULATION 1C00aA4
0 2ft. 4ft.2 ft.
M A
R K
D E
S C
R
IP
T
IO
N D
A
T/FOOTING (N)
97' - 0"
*BOR - Area A 115' - 0"
5.3
CIRCULATION
1C00b
SERVING /
PREP
1C12
CEILING AS SCHEDULEDCEILING AS SCHEDULED
A-561
A6
WALL CONSTRUCTION
C.I.P. ARCH CONC WALL (AIR BARRIER)
3" SPRAY APPLIED INSULATION
2-1/2" METAL STUD U.N.O.
GYPSUM BOARD
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
A-551
A4 Sim
A-551
A1 Sim
121'-8"
DIRECT APPLIED ACRYLIC EXTERIOR
FINISH SYSTEM
2'
0"
FIRST FLOOR
100' - 0"
T/FOOTING (N)
97' - 0"
*TOS - MECH MEZZ
114' - 8"
8.1
CORR
1A20
PE LOCKER
RR - WOMEN
1B10
A-554
C5
MECH
2B01
C.I.P. ARCH CONC WALL (AIR BARRIER)
CEILING AS SCHEDULEDCEILING AS SCHEDULED
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
A-551
A1 Sim
135'-8"
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB
HOLLOW METAL DOOR AND FRAME
ALUMINUM CANOPY
WALL CONSTRUCTION
C.I.P. ARCH CONC WALL (AIR BARRIER)
3" SPRAY APPLIED INSULATION
2-1/2" METAL STUD U.N.O.
GYPSUM BOARD
A-510
Sim
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB ON GRADE (AIR BARRIER)
UNDERSLAB VAPOR BARRIER
GRAVEL (CAPILLARY WATER BARRIER)
COMPACTED FILL
METAL SERVICE STAIRS W/
PLATFORM
FIRST FLOOR
100' - 0"
10.6
T/FOOTING (S)
96' - 0"
ELEC
1A29a
ELEC
1A29
A-510
A-510
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
A-551
A1 Sim
A-551
A4 Sim
DIRECT APPLIED ACRYLIC EXTERIOR
FINISH SYSTEM
C1 Sim
A-531
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB ON GRADE (AIR BARRIER)
UNDERSLAB VAPOR BARRIER
GRAVEL (CAPILLARY WATER BARRIER)
COMPACTED FILL
118'-8"
FIRST FLOOR
100' - 0"
T/FOOTING (N)
97' - 0"
*BOR - Area C2 130' - 0"
*BOR - Area A 115' - 0"
G
CONDUIT REFER TO ELECRICAL & TECHNOLOGY
JUNCTION BOX
PROVIDE ACCESS PANEL
JUNCITION BOX
CONDUIT
PROVIDE WALL ACCESS PANEL
BEHIND AACOUSTICAL PANEL
C.I.P. CONCRETE WALL
MODIFIED BITUMINOUS MEMBRANE
ROOFING
ALUMINUM CANOPY
ALUMINUM CANOPY BRACKET
HOLLOW METAL DOOR AND FRAME
DOOR AND FRAME AS SCHEDULED
7'
4"
9'
0"
7'
6"
A-551
A4 Sim
C5
A-554
A-551
A1 Sim
A-532
C1 Sim
C4
A-553
DETAIL @ GUTTER BEYOND
A-541
E4 1"
A-563
E3
A-563
E3
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S a v a n n a h D is tr ic t w
O g le th o rp e A v e
S a v a n n a h G e o rg ia
C H
E C
K E
D B
Y
U.S. ARMY CORPS OF
ENGINEERS
SAVANNAH DISTRICT
100 W. OGLETHORPE AVE.
SAVANNAH, GA 31401
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
-4
-0
E
R
O B
IN
S
O N
S T
R E
E T
S
U
IT
E
O R
L A
N D
O F
L
F Y
P
N A
M
C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt
3/30/2022 11:19:45 AM
M A
R C
H
B S
H E
R A
R D
B S
H E
R A
R D
D T
O R
B E
R T
A-357
W A
L L S
E C
T
IO
N S
A
R C
H R
D A
G U
A D
IL
L A
P
U E
R T
O R
IC
O
R E
P L A
C E
M E
N T
R A
M E
Y U
N
IT
S C
H O
O L
D T
O R
B E
R T
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
R A
A
-3 .d w g
W H
N R
1/2" = 1'-0"A-357
WALL SECTION A.1 - CIRCULATION / SERVINGA1
1/2" = 1'-0"A-357
WALL SECTION B1.1 - PENTHOUSE WESTA3
1/2" = 1'-0"A-357
WALL SECTION B1.5 - ELECTRICAL ROOMSA9
0 2ft. 4ft.2 ft.
1/2" = 1'-0"A-357
WALL SECTION @ SERVICE CORRIDOR & COMMONSA6
M A
R K
D E
S C
R
IP
T
IO
N D
A
*TOP Area B, C2, D 133' - 8"
*BOR - Area C2 130' - 0"
D
T/FOOTING (S)
96' - 0"
ELEC
1A29
GYM
1B20
A-521
E1
C3
A-521
A-552
A1
A-551
A1 Sim
BOLLARD
ASPHALT PAVING
SEE CIVIL
GYM WALL PADS
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
WALL CONSTRUCTION
GLAZED CURTAINWALL (AIR BARRIER)
WALL CONSTRUCTION
C.I.P. ARCH CONC WALL (AIR BARRIER)
3" SPRAY APPLIED INSULATION
2-1/2" METAL STUD U.N.O.
GYPSUM BOARD
FLOOR CONSTRUCTION
FLOOR FINISH - SEE FINISH PLANS
CONC SLAB ON GRADE (AIR BARRIER)
UNDERSLAB VAPOR BARRIER
GRAVEL (CAPILLARY WATER BARRIER)
COMPACTED FILL
WALL CONSTRUCTION
C.I.P. ARCH CONC WALL (AIR BARRIER)
3" SPRAY APPLIED INSULATION
2-1/2" METAL STUD U.N.O.
GYPSUM BOARD
A-551
A4 Sim
C7 Sim
A-531
PERFORATED METAL PANEL
*TOP Area B, C2, D 133' - 8"
*BOR - Area C2 130' - 0"
G.7
H.1
T/FOOTING (S)
96' - 0"
PE STORAGE
1B24a
GYM
1B20
A-551
A1 Sim
A-551
A4 Sim
A-521
E1
C3
A-521
C7 Sim
A-531
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)
C.I.P. CONC ROOF DECK
WALL CONSTRUCTION
GLAZED CURTAINWALL (AIR BARRIER)
WALL CONSTRUCTION
C.I.P. ARCH CONC WALL (AIR BARRIER)
3" SPRAY APPLIED INSULATION
2-1/2" METAL STUD U.N.O.
GYPSUM BOARD
ROOF CONSTRUCTION
MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)
LIGHTWEI…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .