DraftVOLUME 2_COMPILED SET_update 5-16-2022 3 of 4.pdf

PDF 30 MB Posted

Attached to
Ramey Unit School Replacement Federal contract opportunity
Solicitation number
Not on record
Issued by
Department of the Army Corps of Engineers Engineering District Savannah

View the file

Other files for this federal contract opportunity

Other files attached to Ramey Unit School Replacement, newest first.
File Type Posted
DraftVOLUME 2_COMPILED SET_update 5-16-2022 2 of 4.pdf PDF
DraftVOLUME 2_COMPILED SET_update 5-16-2022 1 of 4.pdf PDF
DraftVOLUME 2_COMPILED SET_update 5-16-2022 4 of 4.pdf PDF
DraftVOLUME 1_COMPILED SET 1.pdf PDF
DraftVOLUME 3_COMPILED SET_updated 4-12-2022.pdf PDF
RAMEY Specs V1 01-08.pdf PDF
RAMEY Specs V3 25-32.pdf PDF
RAMEY Specs V4 33-35.pdf PDF
RAMEY Specs V5 Attachments.pdf PDF
RAMEY Specs V2 09-23.pdf PDF
W912HN22R3001 Draft Ramey School Final 19 May.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST FLOOR

100' - 0"

WALL BASE AS SCHEDULEDHYDRAULIC TRACTION MACHINE-

LESS PASSENGER ELEVATORS

7'

2"

HIGH IMPACT WALLCOVERING

ACCORDION FOLDING FIRE DOORS –

FLAT LEADPOST

WATER FOUNTAIN W/ BOTTLE FILLER

FIRST FLOOR

100' - 0"

6'

4"

WALL BASE AS SCHEDULED

TACK BOARD WALL COVERING

PIN MOUNTED LETTERS

7'

2"

ACCORDION FOLDING FIRE DOORS –

FLAT LEADPOST

ROOM SIGNAGE, REFER TO

SCHEDULE

FIRST FLOOR

100' - 0"

C.I.P. ARCHITECTURAL CONCRETE W/

INTEGRAL COLOR AND CLEAR

SEALER, TYPE # 2, REFER TO A200

WALL BASE AS SCHEDULED GYPSUM WALLBOARD - SEE

SCHEDULE

HIGH IMPACT WALLCOVERING

7'

2" 2'

FIRST FLOOR

100' - 0"C.I.P. ARCHITECTURAL CONCRETE W/

INTEGRAL COLOR AND CLEAR

SEALER, TYPE # 2, REFER TO A200

WALL BASE AS SCHEDULED C.I.P. ARCHITECTURAL CONCRETE W/

INTEGRAL COLOR AND CLEAR

SEALER, TYPE # 2, REFER TO A200

HIGH IMPACT WALLCOVERING

WATER FOUNTAIN W/ BOTTLE FILLER

CERAMIC WALL TILE

7'

2"

A-562

E1

TYP.

C.I.P. ARCHITECTURAL CONCRETE W/

INTEGRAL COLOR AND CLEAR

SEALER, TYPE # 2, REFER TO A200

HUB IDENTITY SIGN, REFER TO A192

HUB IDENTITY SIGN, REFER TO A192

OPEN

TO

BEYOND

FIRST FLOOR

100' - 0"C.I.P. ARCHITECTURAL CONCRETE W/

INTEGRAL COLOR AND CLEAR

SEALER, TYPE # 2, REFER TO A200

WALL BASE AS SCHEDULED

HUB IDENTITY SIGN, REFER TO A192HUB IDENTITY SIGN, REFER TO A192

OPEN

TO

BEYOND

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S a v a n n a h D is tr ic t w

O g le th o rp e A v e

S a v a n n a h G e o rg ia

C H

E C

K E

D B

Y

U.S. ARMY CORPS OF

ENGINEERS

SAVANNAH DISTRICT

100 W. OGLETHORPE AVE.

SAVANNAH, GA 31401

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

-4

-0

E

R

O B

IN

S

O N

S T

R E

E T

S

U

IT

E

O R

L A

N D

O F

L

F Y

P

N A

M

C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt

3/30/2022 11:17:28 AM

M A

R C

H

B S

H E

R A

R D

B S

H E

R A

R D

D T

O R

B E

R T

A-260

IN

T

E R

IO

R

E L E

V A

T

IO

N S

A

R C

H R

D A

G U

A D

IL

L A

P

U E

R T

O R

IC

O

R E

P L A

C E

M E

N T

R A

M E

Y U

N

IT

S C

H O

O L

D T

O R

B E

R T

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

R A

A

-2 .d w g

W H

N R

1/4" = 1'-0"A-260

INTERIOR ELEVATION - VESTIBULE 1D01 - WESTF1

1/4" = 1'-0"A-260

INTERIOR ELEVATION - VESTIBULE 1D01 - EASTF5

1/4" = 1'-0"A-260

INTERIOR ELEVATION - CIRCULATION 1D03 - EASTD1

1/4" = 1'-0"A-260

INTERIOR ELEVATION - CIRCULATION 1D03 - WESTC1

1/4" = 1'-0"A-260

INTERIOR ELEVATION - CIRCULATION 1D03 - NORTHA1

1/4" = 1'-0"A-260

INTERIOR ELEVATION - CIRCULATION 1D03 - SOUTHA6 0 4ft. 8ft.4 ft.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

TACK BOARD WALL COVERING

CONTROL JOINT (CJ) TYP.

3'

0" 9'

0"

ELEVATIONS

SEE CASEWORK

OPEN

SMART BOARD ON MOBILE STATION,

AS SCHEDULED

4 C.I.P. ARCHITECTURAL CONCRETE W/

CLEAR SEALER, TYPE # 4, REFER TO

A200

CJ CJ CJ

CJ CJ CJ CJ CJ

HVAC DUCT, PAINT

PIN MOUNTED LETTERS

STOREFRONT AS SCHEDULED

C1.3

9'

0"11

A5

FIRST FLOOR

100' - 0"

A1.1 A1.1

REFER TO TEACH WALL TYPE

TW-1.1

ELEVATIONS

SEE CASEWORK

LAVATORY W/ INTEGRAL

COUNTER - DOUBLE BOWL, 1

JUVENILE, 1 ADA HEIGHT

1" ACOUSTICAL WALL

ABSORBING PANEL

2' - 0" 4" 2' - 0" 4" 4' - 0" 1' - 0" 4' - 0" 1' - 0" 4' - 0" 4" 2' - 0" 4" 2' - 0"EQ. 4' - 0" EQ.

CL

2'

0" 7'

8"

C1.1

FIRST FLOOR

100' - 0"

ROLLER WINDOW SHADES

WALL BASE AS SCHEDULED

FIRST FLOOR

100' - 0"

ELEVATIONS

SEE CASEWORK WATER FOUNTAIN W/

BOTTLE FILLER

FIRST FLOOR

100' - 0"

1" ACOUSTICAL WALL ABSORBING

PANEL

8'

6" 3'

0"

15' - 0"30' - 0"

C8.3

BOOK BAG WALL HOOK

1" ACOUSTICAL WALL ABSORBING

PANEL

OPERABLE GLAZED PARTITION WALL BASE AS SCHEDULEDINTERIOR SIGNAGE

ROOM SIGNAGE, REFER TO

SCHEDULE

LOC PANEL, COORDINATE

OPENING W/ WALL FINISH

AND DEVICE

FIRST FLOOR

100' - 0"

OPERABLE SOLID PARTITION

WALL BASE AS SCHEDULED

FIRST FLOOR

100' - 0"

2'

0" 7'

6"

2' - 0" 4" 2' - 0" 4" 2' - 0" 4" 2' - 0" 4" 4' - 0" 1' - 0" 4' - 0" 1' - 0" 4' - 0" 1' - 0" 4' - 0" 1' - 0" 4' - 0" 4" 2' - 0" 4" 2' - 0" 4" 2' - 0" 4" 2' - 0"

REFER TO TEACHING WALL TYPE .TW-1.2

A1.1 A1.1

WALL BASE AS SCHEDULED

1" ACOUSTICAL WALL

ABSORBING PANEL

C1.1

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S a v a n n a h D is tr ic t w

O g le th o rp e A v e

S a v a n n a h G e o rg ia

C H

E C

K E

D B

Y

U.S. ARMY CORPS OF

ENGINEERS

SAVANNAH DISTRICT

100 W. OGLETHORPE AVE.

SAVANNAH, GA 31401

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

-4

-0

E

R

O B

IN

S

O N

S T

R E

E T

S

U

IT

E

O R

L A

N D

O F

L

F Y

P

N A

M

C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt

3/30/2022 11:17:34 AM

M A

R C

H

B S

H E

R A

R D

B S

H E

R A

R D

D T

O R

B E

R T

A-261

IN

T

E R

IO

R

E L E

V A

T

IO

N S

A

R C

H R

D A

G U

A D

IL

L A

P

U E

R T

O R

IC

O

R E

P L A

C E

M E

N T

R A

M E

Y U

N

IT

S C

H O

O L

D T

O R

B E

R T

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

R A

A

-2 .d w g

W H

N R

1/4" = 1'-0"A-261

INTERIOR ELEVATION - HUB D1 - NORTHF1

1/4" = 1'-0"A-261

INTERIOR ELEVATION - LS03 - WEST4

1/4" = 1'-0"A-261

INTERIOR ELEVATION - LS03 - SOUTH5(TYPICAL TEACHING WALL FOR PRE-K,K,SP GRADES, LS 01-02) (TYPICAL TEACHING SIDE FOR PRE-K,K,SP GRADES, LS 01-02)

1/4" = 1'-0"A-261

INTERIOR ELEVATION - HUB D1 - EASTB1

0 4ft. 8ft.4 ft.

1/4" = 1'-0"A-261

INTERIOR ELEVATION - HUB D1 - SOUTHD1

1/4" = 1'-0"A-261

INTERIOR ELEVATION - LS03 - EASTA1

1/4" = 1'-0"A-261

INTERIOR ELEVATION - LIMNS - EASTA6

M A

R K

D E

S C

R

IP

T

IO

N D

A

SECOND FLOOR

115' - 4"

3'

0"

ELEVATIONS

SEE CASEWORK

EQ EQ

OPEN

5' - 0"

10"

13' - 0"

6"

2' - 0" 2' - 8" 3' - 0" 1' - 0" 4' - 6"

8"

1' - 0"

8"

7' - 0"

8"

1' - 0"

8"

4' - 6"

SMART BOARD ON MOBILE STATION,

AS SCHEDULED

C1.3

C2

1" ACOUSTICAL WALL ABSORBING

PANEL

HVAC DUCT, PAINT

VJ

3'

0" 5'

0"

C.I.P. ARCHITECTURAL CONCRETE W/

CLEAR SEALER, TYPE # 4, REFER TO

A200

VJ VJ

VJ

PIN MOUNTED LETTERS

WATER FOUNTAIN W/

BOTTLE FILLER

FIRST FLOOR

100' - 0"

PIN MOUNTED LETTERS

BOOK BAG WALL HOOK

FIRST FLOOR

100' - 0"

GYPSUM WALLBOARD - SEE

SCHEDULE

METAL STUD FRAMING

A1.1 A1.1

TW-1.2

REFER TO TEACHING WALL TYPE

ELEVATIONS

SEE CASEWORK

CERAMIC WALL TILE

2' - 0" 4" 2' - 0" 4" 4' - 0" 1' - 0" 4' - 0" 1' - 0" 4' - 0" 4" 2' - 0" 4" 2' - 0"

1" ACOUSTICAL WALL

ABSORBING PANEL

1' - 4" 4' - 0"

A

LI

G N

CL

2'

0" 7'

8"

C1.1

1" ACOUSTICAL WALL ABSORBING

PANEL

FIRST FLOOR

100' - 0"

GLAZED CURTAIN WALL

SYSTEM

ROLLER WINDOW SHADES

WALL BASE AS SCHEDULED

E.Q. 4' - 0" E.Q.

2'

0" 7'

8"

1" ACOUSTICAL WALL

ABSORBING PANEL

FIRST FLOOR

100' - 0"

C8.3

OPERABLE GLAZED PARTITION 1" ACOUSTICAL WALL ABSORBING

PANEL

1" ACOUSTICAL WALL ABSORBING

PANEL

ROOM SIGNAGE, REFER TO

SCHEDULE

3'

0" 8'

6"

2' - 0" 12' - 0" 2' - 0"

1' - 0" 33' - 0" 1' - 0"

HVAC DUCT, PAINT

E1

A-563CJ

E1

A-563 CJ CJ CJCJ

E1

A-563

E1

A-563

FIRST FLOOR

100' - 0"

GLAZED CURTAIN WALL

SYSTEM

WALL BASE AS SCHEDULED

OPERABLE SOLID PARTITION

FIRST FLOOR

100' - 0"

OPERABLE GLAZED PARTITION

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S a v a n n a h D is tr ic t w

O g le th o rp e A v e

S a v a n n a h G e o rg ia

C H

E C

K E

D B

Y

U.S. ARMY CORPS OF

ENGINEERS

SAVANNAH DISTRICT

100 W. OGLETHORPE AVE.

SAVANNAH, GA 31401

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

-4

-0

E

R

O B

IN

S

O N

S T

R E

E T

S

U

IT

E

O R

L A

N D

O F

L

F Y

P

N A

M

C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt

3/30/2022 11:17:40 AM

M A

R C

H

B S

H E

R A

R D

B S

H E

R A

R D

D T

O R

B E

R T

A-262

IN

T

E R

IO

R

E L E

V A

T

IO

N S

A

R C

H R

D A

G U

A D

IL

L A

P

U E

R T

O R

IC

O

R E

P L A

C E

M E

N T

R A

M E

Y U

N

IT

S C

H O

O L

D T

O R

B E

R T

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

R A

A

-2 .d w g

W H

N R

(TYPICAL TEACHING WALL LS04 - LS09) (TYPICAL WINDOW WALL FOR LS04 - LS09)

(TYPICAL OF HUBS 1D30, 1D40)

1/4" = 1'-0"A-262

INTERIOR ELEVATION - HUB D2 - SOUTHF1

1/4" = 1'-0"A-262

INTERIOR ELEVATION - HUB D2 - EASTC1

1/4" = 1'-0"A-262

INTERIOR ELEVATION - LS04 - WESTC3

1/4" = 1'-0"A-262

INTERIOR ELEVATION - LS04 - NORTHC8

1/4" = 1'-0"A-262

INTERIOR ELEVATION - HUB D2 - NORTHD1

1/4" = 1'-0"A-262

INTERIOR ELEVATION - LS04 - EASTA1

1/4" = 1'-0"A-262

INTERIOR ELEVATION - LS 04 - SOUTHa6 0 4ft. 8ft.4 ft.

M A

R K

D E

S C

R

IP

T

IO

N D

A

SECOND FLOOR

115' - 4"

WATER FOUNTAIN W/ BOTTLE FILLER C.I.P. ARCHITECTURAL CONCRETE W/

INTEGRAL COLOR AND CLEAR

SEALER, TYPE # 2, REFER TO A200

WALL BASE AS SCHEDULED

2'

7'

2"

HIGH IMPACT WALLCOVERING

SECOND FLOOR

115' - 4"

LOCKER: 2 TIER, 12" W X 15" D X 72"

HIGH

7'

2"

WALL BASE AS SCHEDULED

HIGH IMPACT WALLCOVERING

2'

7'

2"

HIGH IMPACT

WALLCOVERING

SECOND FLOOR

115' - 4"

C.I.P. ARCHITECTURAL CONCRETE W/

INTEGRAL COLOR AND CLEAR

SEALER, TYPE # 2, REFER TO A200

A-562

E1 Sim

HUB IDENTITY SIGN, REFER TO A192HUB IDENTITY SIGN, REFER TO A192

OPEN

TO

BEYOND

WALL BASE AS SCHEDULED

TACK BOARD WALL COVERING

3'

0" 7'

0"

SECOND FLOOR

115' - 4"

HUB IDENTITY SIGN, REFER TO A192HUB IDENTITY SIGN, REFER TO A192

OPEN

TO

BEYOND

WALL BASE AS SCHEDULED

TACK BOARD WALL COVERING

C.I.P. ARCHITECTURAL CONCRETE W/

INTEGRAL COLOR AND CLEAR

SEALER, TYPE # 2, REFER TO A200

FIRST FLOOR

100' - 0"

TACK BOARD WALL COVERING WALL BASE AS SCHEDULED FREE STANDING S.S. WASH

FOUNTAIN

MULTI-STATION S.S. WALL

SINK

7'

2"

SEE CASEWORK ELEVATION

SECOND FLOOR

115' - 4"

TACK BOARD WALL COVERING

WALL BASE AS SCHEDULED

VESTIBULE

2D01

PIN MOUNTED LETTERS

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S a v a n n a h D is tr ic t w

O g le th o rp e A v e

S a v a n n a h G e o rg ia

C H

E C

K E

D B

Y

U.S. ARMY CORPS OF

ENGINEERS

SAVANNAH DISTRICT

100 W. OGLETHORPE AVE.

SAVANNAH, GA 31401

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

-4

-0

E

R

O B

IN

S

O N

S T

R E

E T

S

U

IT

E

O R

L A

N D

O F

L

F Y

P

N A

M

C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt

3/30/2022 11:17:47 AM

M A

R C

H

B S

H E

R A

R D

B S

H E

R A

R D

D T

O R

B E

R T

A-263

IN

T

E R

IO

R

E L E

V A

T

IO

N S

A

R C

H R

D A

G U

A D

IL

L A

P

U E

R T

O R

IC

O

R E

P L A

C E

M E

N T

R A

M E

Y U

N

IT

S C

H O

O L

D T

O R

B E

R T

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

R A

A

-2 .d w g

W H

N R

1/4" = 1'-0"A-263

INTERIOR ELEVATION - CIRCULATION 2D02 - WESTD1

1/4" = 1'-0"A-263

INTERIOR ELEVATION - CIRUCLATION 2D02 - EASTC1

1/4" = 1'-0"A-263

INTERIOR ELEVATION - CIRCULATION 2D02 - NORTHA1

1/4" = 1'-0"A-263

INTERIOR ELEVATION - CIRCULATION 2D03 - SOUTHA6 0 4ft. 8ft.4 ft.

1/4" = 1'-0"A-263

INTERIOR ELEVATION - ART - NORTHF1

1/4" = 1'-0"A-263

INTERIOR ELEVATION - VESTIBULE 2D01- EASTF6

M A

R K

D E

S C

R

IP

T

IO

N D

A

128'-9"

127'-4"

128'-9" 128'-9"

127'-4" 127'-8"

6'

0"

C8.3

AUDIO-VISUAL EQUIPMENT

8'

0"

3'

0" 8'

CEILING AS SCHEDULED

OPERABLE GLAZED PARTITION

ROOM SIGNAGE, REFER TO

SCHEDULE

CJ CJ

CJ

E1

A-563

E1

A-563

CJ

3' - 0"6"3' - 0"6"3' - 0"6"3' - 0"

13' - 6"

3' - 0"6"3' - 0"6"3' - 0"

10' - 0"

2'

6" 8'

1" ACOUSTICAL WALL ABSORBING

PANEL

3' - 0"6"3' - 0"6"3' - 0"6"3' - 0"6"3' - 0"6"3' - 0"6"3' - 0"6"3' - 0"6"3' - 0"

31' - 0"

SECOND FLOOR

115' - 4"

STOREFRONT AS SCHEDULED

MECH DUCTWORK, PAINT

OPEN

TO

BEYOND

127'-8"

128'-9" 128'-9"

127'-4" 127'-4"

128'-9"

SMART BOARD ON MOBILE STATION,

AS SCHEDULED

C1.3

CONTROL JOINT TYP.

8'

3'

0"

1" ACOUSTICAL WALL ABSORBING

PANEL18' - 0" 11' - 6" 2' - 6"3' - 0"2' - 6" 4' - 6" 1' - 0" 6' - 6" 4' - 6"1' - 0"

SECOND FLOOR

115' - 4"

CEILING AS SCHEDULED

HVAC DUCT, PAINT

WATER FOUNTAIN W/

BOTTLE FILLER

MANUAL ROLLER SHADE

OVER DOOR GLAZING

SECOND FLOOR

115' - 4"

C8.1

WALL BASE AS SCHEDULED SOLID PHENOLIC CABINET

CEILING AS SCHEDULED

SOLID PHENOLIC WALL SHELVING W/

SUPPORTS

SOLID PHENOLIC CABINET

6'

0"

SHELF SUPPORT

8'

3'

0"

3' - 0" 6" 3' - 0" 6" 3' - 0" 6" 3' - 0" 6" 3' - 0" 6" 3' - 0"

20' - 6"

3' - 0"6"3' - 0"6"3' - 0"6"3' - 0"6"3' - 0"6"3' - 0"6"3' - 0"

24' - 0"

3' - 0" 6" 3' - 0" 6" 3' - 0" 6" 3' - 0" 6" 3' - 0"

17' - 0"

1" ACOUSTICAL WALL ABSORBING

PANEL

A6

SECOND FLOOR

115' - 4"

CEILING AS SCHEDULED

ROLLER WINDOW SHADES

GLAZED CURTAIN WALL SYSTEM

C8

A-523

WALL BASE AS SCHEDULED

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S a v a n n a h D is tr ic t w

O g le th o rp e A v e

S a v a n n a h G e o rg ia

C H

E C

K E

D B

Y

U.S. ARMY CORPS OF

ENGINEERS

SAVANNAH DISTRICT

100 W. OGLETHORPE AVE.

SAVANNAH, GA 31401

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

-4

-0

E

R

O B

IN

S

O N

S T

R E

E T

S

U

IT

E

O R

L A

N D

O F

L

F Y

P

N A

M

C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt

3/30/2022 11:17:54 AM

M A

R C

H

B S

H E

R A

R D

B S

H E

R A

R D

D T

O R

B E

R T

A-264

IN

T

E R

IO

R

E L E

V A

T

IO

N S

A

R C

H R

D A

G U

A D

IL

L A

P

U E

R T

O R

IC

O

R E

P L A

C E

M E

N T

R A

M E

Y U

N

IT

S C

H O

O L

D T

O R

B E

R T

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

R A

A

-2 .d w g

W H

N R

1/4" = 1'-0"A-264

INTERIOR ELEVATION - HUB 2D20 - NORTHF1

1/4" = 1'-0"A-264

INTERIOR ELEVATION - HUB 2D20 - SOUTHD1

1/4" = 1'-0"A-264

INTERIOR ELEVATION - HUB 2D20 - EASTB1

(TYPICAL FOR HUBS 2D10, 2D30)

0 4ft. 8ft.4 ft.

(TYPICAL FOR HUBS 2D10, 2D30, 2D40)

1/4" = 1'-0"A-264

INTERIOR ELEVATION - HUB 2D40 - SOUTHA1

(TYPICAL FOR HUBS 2D10, 2D30)

1/4" = 1'-0"A-264

INTERIOR ELEVATION - HUB 2D20 - WESTB4

M A

R K

D E

S C

R

IP

T

IO

N D

A

T ectonic Cop yright 2007

115' - 4"

EMERGENCY EYE WASH/SHOWER W/

FLOOR DRAIN

DEMONSTRATION TABLE

1" ACOUSTICAL WALL ABSORBING

PANEL

REFER TO TEACHING WALL TYPE .TW-2.2

A1.2 C1.1 A1.2

CL

2' - 4"2' - 0"4"2' - 0"4"4' - 0"1' - 0"4' - 0"1' - 0"4' - 0"4"2' - 0"4' - 0"4' - 0"

SECOND FLOOR

115' - 4"

7'

0"

A2.1

C8.3 C8.3 C8.3

A17 A17 A17

FE

EYE GOGGLE SANITATION CABINET

2'

6" 1'

4"

4" 2'

36"/ 312 42"/ 312 42"/ 312

36"/ 100 42"/ 152 42"/ 100 36"/ 152 42"/ 100 36"/ 152

A18

19' - 6"

2'

6"

SECOND FLOOR

115' - 4"48"/ 40248"/ 402

CASEWORK ALONG WALL - F.V.

42"/ 102 42"/ 102 42"/ 102 42"/ 102 27"/ 10227"/ 10227"/ 102

SECOND FLOOR

115' - 4"

2'

4" 1'

4"

2'

6"

7'

0"

C8.3 C8.3 C8.3

A17A17A17 A2.1

36"/ 152 42"/ 100 36"/ 152 42"/ 100 42"/ 150 36"/ 100

42"/ 312 42"/ 312 36"/ 312

19' - 6"

2'

6"

SECOND FLOOR

115' - 4"

A1.1 A1.1C1.1

2' - 0" 4" 2' - 0" 4" 2' - 0" 4" 4' - 0" 1' - 0" 4' - 0" 1' - 0" 4' - 0" 4" 2' - 0" 4" 2' - 0" 4" 2' - 0" 4" 2' - 0" 4" 2' - 0"

2'

0" 7'

9"

1" ACOUSTICAL WALL ABSORBING

PANEL

WALL BASE AS SCHEDULED

CL

REFER TO TEACHING WALL

A1.2

TW-4.2

SECOND FLOOR

115' - 4"

A2.1

WALL BASE AS SCHEDULED

GLAZED CURTAIN WALL SYSTEM

ROLLER WINDOW SHADES

2'

6"

SECOND FLOOR

115' - 4"

1" ACOUSTICAL WALL ABSORBING

PANEL

OPERABLE SOLID PARTITION

8'

0" 2"

1'

8" 2"

2' - 0" 4" 2' - 0" 4" 2' - 0" 4" 2' - 0" 4" 4' - 0" 6" 4' - 0" 6" 4' - 0" 4" 2' - 0" 4" 2' - 0" 4" 2' - 0" 4"1' - 0"

SECOND FLOOR

115' - 4"

WALL BASE AS SCHEDULED

OPERABLE GLAZED PARTITION

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S a v a n n a h D is tr ic t w

O g le th o rp e A v e

S a v a n n a h G e o rg ia

C H

E C

K E

D B

Y

U.S. ARMY CORPS OF

ENGINEERS

SAVANNAH DISTRICT

100 W. OGLETHORPE AVE.

SAVANNAH, GA 31401

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

-4

-0

E

R

O B

IN

S

O N

S T

R E

E T

S

U

IT

E

O R

L A

N D

O F

L

F Y

P

N A

M

C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt

3/30/2022 11:17:59 AM

M A

R C

H

B S

H E

R A

R D

B S

H E

R A

R D

D T

O R

B E

R T

A-265

IN

T

E R

IO

R

E L E

V A

T

IO

N S

A

R C

H R

D A

G U

A D

IL

L A

P

U E

R T

O R

IC

O

R E

P L A

C E

M E

N T

R A

M E

Y U

N

IT

S C

H O

O L

D T

O R

B E

R T

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

R A

A

-2 .d w g

W H

N R

(SCIENCE LAB II SIMILAR)

(SCIENCE LAB II SIMILAR)

(SCIENCE LAB II SIMILAR)

(SCIENCE LAB II SIMILAR)

0 4ft. 8ft.4 ft.

1/4" = 1'-0"A-265

INTERIOR ELEVATION - SCIENCE II - NORTHB1

1/4" = 1'-0"A-265

INTERIOR ELEVATION - SCIENCE LAB II - EASTB6

1/4" = 1'-0"A-265

INTERIOR ELEVATION - SCIENCE LAB II - SOUTHA1

1/4" = 1'-0"A-265

INTERIOR ELEVATION - SCIENCE LAB II - WESTA6

1/4" = 1'-0"A-265

INTERIOR ELEVATION - TYP. MS/HS L.S. - TEACHING WALLF1

1/4" = 1'-0"A-265

INTERIOR ELEVATION - TYP. MS/HS L.S. - WINDOW WALLF6

1/4" = 1'-0"A-265

INTERIOR ELEVATION - TYP. MS/HS L.S. - SOLID PARTITION WALLD1

1/4" = 1'-0"A-265

INTERIOR ELEVATION - TYP. MS/HS L.S. - HUB WALLD6

M A

R K

D E

S C

R

IP

T

IO

N D

A

A10.6 X 7

12" X 15" X 72" VENTED PE

LOCKER

LOCKER BENCH: 12 X 48

WALL BASE AS SCHEDULED

FIRST FLOOR

100' - 0"

A10.6 A10.6X 6 X 6

SHOWER CURTAIN, ROD & HOOKS

12" X 15" X 72" VENTED PE LOCKERLOCKER BENCH: 12 X 48

FIRST FLOOR

100' - 0"

A10.6 X7

ADA LOCKER BENCH: 22 X 42

WALL BASE AS SCHEDULED

FIRST FLOOR

100' - 0"

A10.6

A11.1A11.3 A1.2

SHOWER CURTAIN, ROD & HOOKS WALL BASE AS SCHEDULED

FIRST FLOOR

100' - 0"

12" X 15" X 72" VENTED PE LOCKER

WALL BASE AS SCHEDULED

LOCKER BENCH: 12 X 48

FIRST FLOOR

100' - 0"

LOCKER BENCH: 12 X 48

12" X 15" X 72" VENTED PE LOCKER

FIRST FLOOR

100' - 0"

LOCKER BENCH: 12 X 48

WALL BASE AS SCHEDULED

A11.1

HM CASED OPENING FRAME

OPEN

BEYOND

FIRST FLOOR

100' - 0" x 5

A11.3

A10.6

12" X 15" X 72" VENTED PE LOCKER

WALL BASE AS SCHEDULEDLOCKER BENCH: 12 X 48

A11.1

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S a v a n n a h D is tr ic t w

O g le th o rp e A v e

S a v a n n a h G e o rg ia

C H

E C

K E

D B

Y

U.S. ARMY CORPS OF

ENGINEERS

SAVANNAH DISTRICT

100 W. OGLETHORPE AVE.

SAVANNAH, GA 31401

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

-4

-0

E

R

O B

IN

S

O N

S T

R E

E T

S

U

IT

E

O R

L A

N D

O F

L

F Y

P

N A

M

C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt

3/30/2022 11:18:06 AM

M A

R C

H

B S

H E

R A

R D

B S

H E

R A

R D

D T

O R

B E

R T

A-273

L O

C K

E R

R O

O M

E L E

V A

T

IO

N S

A

R C

H R

D A

G U

A D

IL

L A

P

U E

R T

O R

IC

O

R E

P L A

C E

M E

N T

R A

M E

Y U

N

IT

S C

H O

O L

D T

O R

B E

R T

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

R A

A

-2 .d w g

W H

N R

1/4" = 1'-0"A-273

INTERIOR ELEVATION - GIRLS PE LOCKER - NORTHF1

1/4" = 1'-0"A-273

INTERIOR ELEVATION - GIRLS PE LOCKER - EASTF4

1/4" = 1'-0"A-273

INTERIOR ELEVATION - GIRLS PE LOCKER - SOUTHF8

1/4" = 1'-0"A-273

INTERIOR ELEVATION - GIRLS PE LOCKER - WESTC1

1/4" = 1'-0"A-273

INTERIOR ELVATION - G. ATH LOCKER - NC4

1/4" = 1'-0"A-273

INTERIOR ELEVATION - G. ATH LOCKER - E1C8

1/4" = 1'-0"A-273

INTERIOR ELEVATION - G. ATH LOCKER - SA1

1/4" = 1'-0"A-273

INTERIOR ELEVATION - G. ATH LOCKER - W1AB

0 4ft. 8ft.4 ft.

M A

R K

D E

S C

R

IP

T

IO

N D

A

A1 A-302

A1 A-302

F1 A-303

F1 A-303

A1 A-303

A1 A-303

B1 A-301

B1 A-301

B1 A-304

B1 A-304

D1 A-301

D1 A-301

D1 A-302

D1 A-302

F1 A-301

F1 A-301

F1 A-302

F1 A-302

D8 A-304

D8 A-304

B1 A-302

B1 A-302

D1 A-303

D1 A-303

D6 A-302

D6 A-302

B1 A-303

B1 A-303

F1 A-304

F1 A-304

D1 A-304

D1 A-304

A1 A-304

A1 A-304

F8 A-304

F8 A-304

C8 A-302

C8 A-302

B5 A-303

B5 A-303

A3 A-364

A4 A-356

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S a v a n n a h D is tr ic t w

O g le th o rp e A v e

S a v a n n a h G e o rg ia

C H

E C

K E

D B

Y

U.S. ARMY CORPS OF

ENGINEERS

SAVANNAH DISTRICT

100 W. OGLETHORPE AVE.

SAVANNAH, GA 31401

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

-4

-0

E

R

O B

IN

S

O N

S T

R E

E T

S

U

IT

E

O R

L A

N D

O F

L

F Y

P

N A

M

C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt

3/30/2022 11:18:13 AM

M A

R C

H

B S

H E

R A

R D

B S

H E

R A

R D

D T

O R

B E

R T

A-300

B U

IL

D

IN

G

S E

C T

IO

N

S R

E F

E R

E N

C E

F L O

O R

P L A

N

A

R C

H R

D A

G U

A D

IL

L A

P

U E

R T

O R

IC

O

R E

P L A

C E

M E

N T

R A

M E

Y U

N

IT

S C

H O

O L

D T

O R

B E

R T

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

R A

A

-3 .d w g

W H

N R

1" = 20'-0"A-300

BUILDING SECTION REFERENCE PLAN1

M A

R K

D E

S C

R

IP

T

IO

N D

A

T ectonic Cop yright 2007

100' - 0"

SECOND FLOOR

115' - 4"

H.5 G.4

M

ABCDEFG

J

H.3

KLNN.1PQR A-353

A1

LS 22

2D21

LS 07

1D21

LIMM

2D61

LS 15

2D11

GUID -

CAREERS

1D54

AS

2D55

BOYS

2D57

GIRLS

2D59

GIRLS

1D69

BOYS

1D67

COMMONS

1C10

CIRCULATION

1C00b

A-354

A1

F.1G.7H.1

A-353

A5

D.9F.3

A-365

A3

A-351

A1

A-351

A4

LA/SS HUB

2D20

1-3 HUB

1D20

OT/PT (O)

1D71a

SHARED

CONFERENCE

1D65

PK-K HUB

1D10

LA/SS HUB

2D10

SES -

ASSESMENT

1D57

GUID -

COUNSELOR

1D53

CIRCULATION

1C00a

ENTRY VEST

1V01

FIRST FLOOR

100' - 0"

SECOND FLOOR

115' - 4"

H.5 G.4

M

A-351

A4 A-351

A7

ABCDEFGH

J

H.3

KLNN.1PQR

A-353

A8

LS 05

LS 20

SC

SC SC

SC

LS 17

LS 02 PERFORMANCE

SPACE

INFO CENTERCOMPUTING

CENTER

F.1G.7H.1 D.9F.3

MUSIC /BAND1-3 HUB

LA/SS HUB

PK-K HUB

LA/SS HUB

FIRST FLOOR

100' - 0"

SECOND FLOOR

115' - 4"

H.5 G.4

M

ABCDEFGH

J

H.3

KLN N.1PQR CIRCULATION

2D02

CIRCULATION

1D03

VESTIBULE

1D01

VESTIBULE

2D01

COMMONS

1C10

SERVING /

PREP

1C12

TREATMENT /

NURSE

1A09

A. PRINCIPAL

1A16

F.1G.7H.1 D.9F.3A-361

A4

A-359

A8

A-362

A7

A-363

A1

WORK / COPY

RM

1A13

WORK

SPACE

1C18

ALUM. CANOPY

FIRST FLOOR

100' - 0"

SECOND FLOOR

115' - 4"

H.5 G.4

M

ABCDEFG

J

H.3

LNN.1PQR

F.1G.7H.1 D.9F.3

A-359

A5

LS 08

1D31

1-3 HUB

1D30

LIMS -

KITCHEN

1D62a

LIMS -

INSTRUCTION

1D62

CTE LAB I

2D42

AS

2D32

MATH HUB

2D30

LS23

2D31

STEM HUB

2D40

CTE LAB II

2D41

ART

1D60

4-5 HUB

1D40

MECH

2B01

PE LOCKER

RR - WOMEN

1B10

PE LOCKER -

GIRLS

1B10a

ATH LOCKER

1B10b

MAINT

SUPPORT

1A22

CORR

1A20

CENTRAL

STORAGE

1A26

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S a v a n n a h D is tr ic t w

O g le th o rp e A v e

S a v a n n a h G e o rg ia

C H

E C

K E

D B

Y

U.S. ARMY CORPS OF

ENGINEERS

SAVANNAH DISTRICT

100 W. OGLETHORPE AVE.

SAVANNAH, GA 31401

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

-4

-0

E

R

O B

IN

S

O N

S T

R E

E T

S

U

IT

E

O R

L A

N D

O F

L

F Y

P

N A

M

C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt

3/30/2022 11:18:32 AM

M A

R C

H

B S

H E

R A

R D

B S

H E

R A

R D

D T

O R

B E

R T

A-301

B U

IL

D

IN

G

S E

C T

IO

N

S

A

R C

H R

D A

G U

A D

IL

L A

P

U E

R T

O R

IC

O

R E

P L A

C E

M E

N T

R A

M E

Y U

N

IT

S C

H O

O L

D T

O R

B E

R T

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

R A

A

-3 .d w g

W H

N R

1/16" = 1'-0"A-301

N/S BUILDING SECTION 2D1

1/16" = 1'-0"A-301

N/S BUILDING SECTION 1F1

1/16" = 1'-0"A-301

N/S BUILDING SECTION 3B1

0 16ft. 32ft.16ft.

A

B2

C1

D1

KEYPLAN

B1

C2

D2

D4

D3

1/16" = 1'-0"A-301

N/S BUILDING SECTION 4A1

M A

R K

D E

S C

R

IP

T

IO

N D

A

SECOND FLOOR

115' - 4"

H.5

M

DEF

J

H.3

KLNN.1PQR

F.1G.7H.1 D.9F.3

MATH HUB

2D30

STEM HUB

2D40 SCIENCE II

2D47

LS26

2D37

LS 11

1D37

1-3 HUB

1D30

4-5 HUB

1D40

LS 12

1D45

PE STORAGE

1B24a

GYM

1B20

ELEC

1A29

FIRST FLOOR

100' - 0"

C

LE

A R

H E

IG

H

C

O U

R T

A R

E A

D E F

GYM

1B20 PE STORAGE

1B24a

ELEC

1A29

F.1 G.7 H.1D.9 F.3 A-358

A1 A-358

A5

FIRST FLOOR

100' - 0"

SECOND FLOOR

115' - 4"

3 4 5 1110984.8 9.22 2.3 6 76.3 6.8 9.5 10.6 1211.75.3 6.2 8.1

LS 19

2D27

LS 20

2D25

LS 21

2D23

LS 22

2D21

LS 07

1D21

LS 06

1D23

LS 05

1D25

LS 04

1D27

MECH

2D60

MECH

1D74

LS23

2D31

LS24

2D33

LS25

2D35

LS26

2D37

LS 08

1D31

LS 09

1D33

LS 10

1D35

LS 11

1D37

FIRST FLOOR

100' - 0"

SECOND FLOOR

115' - 4"

3 4 5 1110981 4.8 9.22 2.3 6 76.3 6.8 9.5 10.6 1211.7 13 13.6

5.3

A-352

A5

1-3 HUB

1D20

LA/SS HUB

2D20

CIRCULATION

2D02

CIRCULATION

1D03

MATH HUB

2D30

1-3 HUB

1D30

FIRST FLOOR

100' - 0"

SECOND FLOOR

115' - 4"

5.5

84.8 6.9

6 76.3 6.85.3 6.2 8.1

A-362

A1

COMMONS

1C10

5'

8"

FIRST FLOOR

100' - 0"

G.4

STAGE

STOR

1C11b

114'-0"

124'-0"

127'-8"

3.1

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S a v a n n a h D is tr ic t w

O g le th o rp e A v e

S a v a n n a h G e o rg ia

C H

E C

K E

D B

Y

U.S. ARMY CORPS OF

ENGINEERS

SAVANNAH DISTRICT

100 W. OGLETHORPE AVE.

SAVANNAH, GA 31401

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

-4

-0

E

R

O B

IN

S

O N

S T

R E

E T

S

U

IT

E

O R

L A

N D

O F

L

F Y

P

N A

M

C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt

3/30/2022 11:18:41 AM

M A

R C

H

B S

H E

R A

R D

B S

H E

R A

R D

D T

O R

B E

R T

A-302

B U

IL

D

IN

G

S E

C T

IO

N

S

A

R C

H R

D A

G U

A D

IL

L A

P

U E

R T

O R

IC

O

R E

P L A

C E

M E

N T

R A

M E

Y U

N

IT

S C

H O

O L

D T

O R

B E

R T

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

R A

A

-3 .d w g

W H

N R

1/16" = 1'-0"A-302

N/S BUILDING SECTION 5F1

1/16" = 1'-0"A-302

N/S BUILDING SECTION 6D1

1/16" = 1'-0"A-302

E/W BUILDING SECTION AB1

1/16" = 1'-0"A-302

E/W BUILDING SECTION BA1

1/16" = 1'-0"A-302

E/W BUILDING SECTION ED6

A

B2

C1

D1

KEYPLAN

B1

C2

D2

D4

D3

0 16ft. 32ft.16ft.

1/8" = 1'-0"A-302

N/S ENLARGED BUILDING SECTION 9C8

0 8ft. 16ft.8ft.

M A

R K

D E

S C

R

IP

T

IO

N D

A

T ectonic Cop yright 2007 T ectonic Cop yright 2007

100' - 0"

FIRST FLOOR

100' - 0"

34510

5.5

8 14.89.2

6.9

22.366.39.510.6 14 13.6

5.3

COMMONS

PERFORMANCE

SPACEGYM

A-356

A7

A-354

A7 A-365

A7

6.28.1

A-355

A1

A-360

A6

FIRST FLOOR

100' - 0"

SECOND FLOOR

115' - 4"

3 4 5 111091 4.8 9.2

A-352

A1

2 2.3 6 6.3 6.8 9.5 10.6 1211.7 135.3 8.1

LA/SS HUB

2D10

PK-K HUB

1D10

CIRCULATION

1D03

CIRCULATION

2D02

STEM HUB

2D40

4-5 HUB

1D40

FIRST FLOOR

100' - 0"

SECOND FLOOR

115' - 4"

3 4 5 111091 4.8 9.22 2.3 6 6.3 6.8 9.5 10.6 1211.7 135.3 8.1

A-361

A7

LS 18

2D17 LS 17

2D15

LS 16

2D13

LS 15

2D11

LS 03

1D15

LS 02

1D13

LS 01

1D11

SES -

ASSESMENT

1D57

SES -

ASSESSOR

WKSPC

1D58

ELEV

1D02 VESTIBULE

2D01

CTE LAB II

2D41

SCIENCE I

2D43 PREP

2D45

SCIENCE II

2D47

VESTIBULE

1D01

ART

1D60

LS 14

1D41

LS 13

1D43

LS 12

1D45

FIRST FLOOR

100' - 0"

10.6 13.6

TRAINING

ROOM

1B22

ATH STOR

1B24

PE STORAGE

1B24a

FIRST FLOOR

100' - 0"

ABCDEFF.1 D.9F.3

STORAGE

1B14

ATH

WORKSPACE

1B25a

WEIGHT

ROOM

1B27

TEAM ROOM

1B29

MECH

2B01

CORR

1B28

MAIN TELCOM

TR1

1A27

CORR

1A20

CENTRAL

STORAGE

1A26

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S a v a n n a h D is tr ic t w

O g le th o rp e A v e

S a v a n n a h G e o rg ia

C H

E C

K E

D B

Y

U.S. ARMY CORPS OF

ENGINEERS

SAVANNAH DISTRICT

100 W. OGLETHORPE AVE.

SAVANNAH, GA 31401

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

-4

-0

E

R

O B

IN

S

O N

S T

R E

E T

S

U

IT

E

O R

L A

N D

O F

L

F Y

P

N A

M

C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt

3/30/2022 11:18:59 AM

M A

R C

H

B S

H E

R A

R D

B S

H E

R A

R D

D T

O R

B E

R T

A-303

B U

IL

D

IN

G

S E

C T

IO

N

S

A

R C

H R

D A

G U

A D

IL

L A

P

U E

R T

O R

IC

O

R E

P L A

C E

M E

N T

R A

M E

Y U

N

IT

S C

H O

O L

D T

O R

B E

R T

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

R A

A

-3 .d w g

W H

N R

1/16" = 1'-0"A-303

E/W BUILDING SECTION GA1

1/16" = 1'-0"A-303

E/W BUILDING SECTION CF1

0 16ft. 32ft.16ft.

1/16" = 1'-0"A-303

E/W BUILDING SECTION DD1

1/16" = 1'-0"A-303

E/W BUILDING SECTION FB1

A

B2

C1

D1

KEYPLAN

B1

C2

D2

D4

D3

1/16" = 1'-0"A-303

N-S BUILDING SECTION AT PENTHOUSEB5

M A

R K

D E

S C

R

IP

T

IO

N D

A

3 4 5 105.5 81 4.8 9.26.92 2.3 6 6.3 9.5 10.6 1413.6

5.3 6.2

A-360

A1 MUSIC /BAND

1C09

CIRCULATION

1C00b

SERVING /

PREP

1C12

DISHWASHING

1C13

CORR

1A20

STORAGE

1B14

LAUNDRY

1B16 ACCESS

1B21

MECH

2B01

GYM

1B20

A-357

A3

A-355

A4

FIRST FLOOR

100' - 0"

3 4 5 111095.5 81 4.8 9.22 2.3 6 76.8 9.5 10.6 1211.7 13 1413.6

5.3 6.2

A-360

A1

MUSIC /BAND

1C09

CIRCULATION

1C00b

SERVING /

PREP

1C12

SERVING /

PREP

1C12

DISHWASHING

1C13

CORR

1A20

PE LOCKER -

GIRLS

1B10a

PE LOCKER -

BOYS

1B12a

ATH

WORKSPACE

1B25a

PE STAFF

1B25

GYM

1B20

MECH

2B01

FIRST FLOOR

100' - 0"

3 4 5 105.5 81 4.8 9.26.92 2.3 6 9.5 10.6 1413.65.3

CENTRAL

STORAGE

1A26

RECEIVING

1A28

CORR

1A20

CONFERENCE

1A12

6.2

ADMIN - CIRC

1A10

MEDIA -

STAFF

1C01a

INFO CENTER

1C01

A-356

A1 A-359

A1

ENTRY VEST

1V01

2.6 3.3

FIRST FLOOR

100' - 0"

DEFG.7 F.3A-358

A8

A-358

A8

SIM. / O.H.

PE GYM

SEATING

1B10

FIRST FLOOR

100' - 0"

3 4 5 5.5

1 4.82 2.3 5.3

A-365

A1

COMPUTING

CENTER

1C01c

BOYS

1C05

CIRCULATION

1C00a

FIRST FLOOR

100' - 0"

SECOND FLOOR

115' - 4"

3 4 5 1110981 4.8 9.22 2.3 6 76.8 9.5 10.6 1211.7 135.3 6.2

A-362

A4

STAIR B

1D80

PK-K HUB

1D10

RR

1D18

SC

1D12

BOYS

1D67

CIRCULATION

1D03

LIMM

1D66

LIMS -

INSTRUCTION

1D62

SC

1D42

RR

1D47

4-5 HUB

1D40

STAIR C

1D90

STEM HUB

2D40

RR

2D49

SC - STEM

2D44

CTE LAB I

2D42

VIDEO

STUDIO

2D52b

CIRCULATION

2D02

BOYS

2D57

SC

2D12

RR

2D18

LA/SS HUB

2D10

A-364

A6

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S a v a n n a h D is tr ic t w

O g le th o rp e A v e

S a v a n n a h G e o rg ia

C H

E C

K E

D B

Y

U.S. ARMY CORPS OF

ENGINEERS

SAVANNAH DISTRICT

100 W. OGLETHORPE AVE.

SAVANNAH, GA 31401

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

-4

-0

E

R

O B

IN

S

O N

S T

R E

E T

S

U

IT

E

O R

L A

N D

O F

L

F Y

P

N A

M

C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt

3/30/2022 11:19:15 AM

M A

R C

H

B S

H E

R A

R D

B S

H E

R A

R D

D T

O R

B E

R T

A-304

B U

IL

D

IN

G

S E

C T

IO

N

S

A

R C

H R

D A

G U

A D

IL

L A

P

U E

R T

O R

IC

O

R E

P L A

C E

M E

N T

R A

M E

Y U

N

IT

S C

H O

O L

D T

O R

B E

R T

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

R A

A

-3 d w g

W H

N R

1/16" = 1'-0"A-304

E/W BUILDING SECTION HF1

1/16" = 1'-0"A-304

E/W BUILDING SECTION JD1

1/16" = 1'-0"A-304

E/W BUILDING SECTION LB1

A

B2

C1

D1

KEYPLAN

B1

C2

D2

D4

D3

0 16ft. 32ft.16ft.

1/16" = 1'-0"A-304

N/S BUILDING SECTION 7D8

1/16" = 1'-0"A-304

E/W BUILDING SECTION KF8

1/16" = 1'-0"A-304

E/W BUILDING SECTION B.1A1

1/8" = 1'-0"A-304

E/W ENLARGED BUILDING SECTION - FIELD HOUSEB8

M A

R K

D E

S C

R

IP

T

IO

N D

A

A4 A-351

A7 A-351

A1 A-351

A1 A-353

A5 A-353

A1 A-354

A8 A-353

A1 A-356

A1 A-352

A7 A-354

A1 A-355

A4 A-355

A9 A-357

A5 A-358

A1 A-358

A8 A-358

A8 A-358

SIM./O.H.

A1

A-359

A5 A-359

A8 A-359

A1 A-360

A6 A-360

A1 A-361

A1 A-351

A1 A-352

SIM / OH

A1 A-351

A1 A-362

A1 A-362

SIM / OH

A1 A-351

SIM/OH

A1

A-351

SIM/OH

A7 A-361

A7 A-361

A7 A-361

A5 A-352

A1 A-351

SIM SIM SIM

A5 A-352

SIM/OH

SIM / OH

A4 A-362

A4 A-362

SIM / OH

A7 A-361

SIM/OH

A4 A-361

A7 A-362

A1 A-363

A1 A-364

A8 A-363

A5 A-363

REFER TO AREA D2 FOR

SIMILAR SECTIONS (OPP HAND)

A3 A-364

A7 A-356

A4 A-356

A3 A-357

A7 A-365

A1 A-357

A1 A-365

A6 A-357

WALL SECTION GENERAL NOTES

1. WALL SECTIONS ARE PROVIDED FOR INFORMATION ON THE ARCHITECTURAL

ELEMENTS OF THE CONSTRUCTION. CAST-IN-PLACE CONCRETE STRUCTURE

SHOWN WITHOUT SPECIFIC STRUCTURAL DETAILING / REINFORCING / JOINTS THAT

ARE REQUIRED.

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S a v a n n a h D is tr ic t w

O g le th o rp e A v e

S a v a n n a h G e o rg ia

C H

E C

K E

D B

Y

U.S. ARMY CORPS OF

ENGINEERS

SAVANNAH DISTRICT

100 W. OGLETHORPE AVE.

SAVANNAH, GA 31401

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

-4

-0

E

R

O B

IN

S

O N

S T

R E

E T

S

U

IT

E

O R

L A

N D

O F

L

F Y

P

N A

M

C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt

3/30/2022 11:19:23 AM

M A

R C

H

B S

H E

R A

R D

B S

H E

R A

R D

D T

O R

B E

R T

A-350

W A

L L S

E C

T

IO

N R

E F

E R

E N

C E

P L A

N

A

R C

H R

D A

G U

A D

IL

L A

P

U E

R T

O R

IC

O

R E

P L A

C E

M E

N T

R A

M E

Y U

N

IT

S C

H O

O L

D T

O R

B E

R T

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

R A

A

-3 .d w g

W H

N R

1" = 20'-0"A-350

WALL SECTION REFERENCE PLANA1

0 20ft. 40ft.20ft.

M A

R K

D E

S C

R

IP

T

IO

N D

A

SECOND FLOOR

115' - 4"

T/FOOTING (N)

97' - 0"

CONCRETE BEAM

R

CEILING AS SCHEDULED

CEILING AS SCHEDULED

A-551

A8

2'

LS 05

1D25

LS 20

2D25

A-523

A1

FIN. GRADE

SEE CIVIL

DOWNSPOUT

CONNECT TO STORM, SEE CIVIL

MANUAL ROLLER SHADE

E2

E2

MANUAL ROLLER SHADE

A-521

A6

A-521

C1

E2

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB

WALL CONSTRUCTION

GLAZED CURTAINWALL (AIR BARRIER)

WALL CONSTRUCTION

C.I.P. ARCH CONC WALL (AIR BARRIER)

3" SPRAY APPLIED INSULATION

2-1/2" METAL STUD U.N.O.

GYPSUM BOARD

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB ON GRADE (AIR BARRIER)

UNDERSLAB VAPOR BARRIER

GRAVEL (CAPILLARY WATER BARRIER)

COMPACTED FILL

133'-8"

130'-0"

3'

8"

8" 1' - 4" 8"

FIRST FLOOR

100' - 0"

SECOND FLOOR

115' - 4"

Q

STEEL SUPPORTS & BRACINGS FOR

OPERABLE WALL - SEE STRUCTURAL

CEILING AS SCHEDULED

SEE RCP

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT INSULATING CONC. SYSTEM (R-20 MIN.)

CONCRETE ROOF DECK - SEE STRUCTURAL

LS 05

1D25

LS 20

2D25

CEILING AS SCHEDULED

SEE RCP

STEEL SUPPORTS AND BRACING FOR OPERABLE

WALL - SEE STRUCTRAL

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB ON GRADE (AIR BARRIER)

UNDERSLAB VAPOR BARRIER

GRAVEL (CAPILLARY WATER BARRIER)

COMPACTED FILL

A-542

A7 Sim

OPERABLE GLAZED PARTITION

OPERABLE GLAZED PARTITION

A-542

A7 Sim

1' - 6"

CEILING AS SCHEDULED

C.I.P. CONCRETE BEAM

1" ACOUSTICAL WALL ABSORBING

PANEL

98'-0"

FIRST FLOOR

100' - 0"

SECOND FLOOR

115' - 4"

P

CEILING AS SCHEDULED

CONCRETE BEAM

CEILING AS SCHEDULED

CONCRETE COLUMN

GYPSUM WALLBOARD COLUMN

WRAP - SEE PLANS FOR TYPE

GYPSUM WALLBOARD COLUMN

WRAP - SEE PLANS FOR TYPE

SC

1D22

SC

2D22

HVAC DUCT, PAINT

LA/SS HUB

2D20

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB

STOREFRONT AS SCHEDULED

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB ON GRADE (AIR BARRIER)

UNDERSLAB VAPOR BARRIER

GRAVEL (CAPILLARY WATER BARRIER)

COMPACTED FILL

CEILING AS SCHEDULED

C.I.P. CONCRETE COLUMN

STOREFRONT AS SCHEDULED

CEILING AS SCHEDULED

1-3 HUB

1D20

98'-0"

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S a v a n n a h D is tr ic t w

O g le th o rp e A v e

S a v a n n a h G e o rg ia

C H

E C

K E

D B

Y

U.S. ARMY CORPS OF

ENGINEERS

SAVANNAH DISTRICT

100 W. OGLETHORPE AVE.

SAVANNAH, GA 31401

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

-4

-0

E

R

O B

IN

S

O N

S T

R E

E T

S

U

IT

E

O R

L A

N D

O F

L

F Y

P

N A

M

C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt

3/30/2022 11:19:26 AM

M A

R C

H

B S

H E

R A

R D

B S

H E

R A

R D

D T

O R

B E

R T

A-351

W A

L L S

E C

T

IO

N S

A

R C

H R

D A

G U

A D

IL

L A

P

U E

R T

O R

IC

O

R E

P L A

C E

M E

N T

R A

M E

Y U

N

IT

S C

H O

O L

D T

O R

B E

R T

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

R A

A

-3 .d w g

W H

N R

1/2" = 1'-0"A-351

WALL SECTION D2.1 - NORTH WALLA1

1/2" = 1'-0"A-351

WALL SECTION D2.2 - GRID QA4

1/2" = 1'-0"A-351

WALL SECTION D2.3 - GRID PA7

0 2ft. 4ft.2 ft.

M A

R K

D E

S C

R

IP

T

IO

N D

A

SECOND FLOOR

115' - 4"

T/FOOTING (N)

97' - 0"

C.I.P. CONCRETE BEAM

& ROOF SYSTEM , PAINT

EXTERIOR FINISH SYSTEM ON

GLASS MAT FIBER REINFORCED

SHEATHING ON 3-5/8" GALV METAL

STUDS @ 16" O.C. (BY FRAMING

ENGINEER)

SEE RCP

CEILING AS SCHEDULED

CEILING AS SCHEDULED

SEE RCP

C.I.P. CONCRETE BEAM

& ROOF SYSTEM , PAINTA-531

A1 Sim

A-551

A1 Sim

C1 Sim

A-531

GLAZED CURTAIN WALL SYSTEM

O

PA

Q U

E

SP

AN

D

R

EL

GLAZED CURTAIN WALL SYSTEM

8" 1'

8"

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

ALUMINUM ENTRANCE DOOR

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB ON GRADE (AIR BARRIER)

UNDERSLAB VAPOR BARRIER

GRAVEL (CAPILLARY WATER BARRIER)

COMPACTED FILL

A-521

E6

A-552

D1 Sim

3' - 4"8"

A-551

A1 Sim

FIRST FLOOR

100' - 0"

SECOND FLOOR

115' - 4"

T/FOOTING (N)

97' - 0"

12 13

ALUMINUM ENTRANCE DOOR

CONCRETE FOUNDATION

UNDERSLAB VAPOR BARRIER

8" GRAVEL CAPILLARY WATER BARRIER

COMPACTED FILL

A-551

A1 Sim

A-531

A1 Sim

C.I.P. ARCH CONC WALL (AIR BARRIER)

SEE STRUCTURAL

REFER TO ELEVATIONS FOR FINISH

EXTERIOR SOFFIT SYSTEM - DIRECT

APPLIED EXTERIOR FINISH SYSTEM ON

GLASS MAT FIBER REINFORCED GYP

SHEATHING ON 3-5/8" GALV METAL STUDS

BY FRAMING ENGINEER, BRACE FOR WIND

UPLIFT AS REQUIRED

C1

A-531

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB ON GRADE (AIR BARRIER)

UNDERSLAB VAPOR BARRIER

GRAVEL (CAPILLARY WATER BARRIER)

COMPACTED FILL

MATH HUB

2D30

1-3 HUB

1D30

A-523

C8 Sim

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

135'-8"

C.I.P. CONCRETE COLUMN

WALL CONSTRUCTION

GLAZED CURTAINWALL (AIR BARRIER)

A-523

A1 Sim

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S a v a n n a h D is tr ic t w

O g le th o rp e A v e

S a v a n n a h G e o rg ia

C H

E C

K E

D B

Y

U.S. ARMY CORPS OF

ENGINEERS

SAVANNAH DISTRICT

100 W. OGLETHORPE AVE.

SAVANNAH, GA 31401

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

-4

-0

E

R

O B

IN

S

O N

S T

R E

E T

S

U

IT

E

O R

L A

N D

O F

L

F Y

P

N A

M

C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt

3/30/2022 11:19:29 AM

M A

R C

H

B S

H E

R A

R D

B S

H E

R A

R D

D T

O R

B E

R T

A-352

W A

L L S

E C

T

IO

N S

A

R C

H R

D A

G U

A D

IL

L A

P

U E

R T

O R

IC

O

R E

P L A

C E

M E

N T

R A

M E

Y U

N

IT

S C

H O

O L

D T

O R

B E

R T

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

R A

A

-3 .d w g

W H

N R

1/2" = 1'-0"A-352

WALL SECTION D2.4 - HUB ENDA1

1/2" = 1'-0"A-352

WALL SECTION D1.1 - HUB ENDA5

0 2ft. 4ft.2 ft.

M A

R K

D E

S C

R

IP

T

IO

N D

A

SECOND FLOOR

115' - 4"

T/FOOTING (N)

97' - 0"

JK

CEILING AS SCHEDULED

LS 15

2D11

COMMONS

1C10

SES -

ASSESMENT

1D57

SEE STRUCTURAL

3" EXPANSION JOINT

A-552

A4

A-561

A1

STAIR CONSTUCTION

C.I.P. CONCRETE STAIR -SEE STRUCT

GEOFOAM

CONCRETE SLAB ON GRADE

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

PAINTED ALUMINUM RAILINGS

PAINTED ALUMINUM RAILINGS

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB ON GRADE (AIR BARRIER)

UNDERSLAB VAPOR BARRIER

GRAVEL (CAPILLARY WATER BARRIER)

COMPACTED FILL

C.I.P. ARCHITECTURAL CONCRETE

WALL

CEILING AS SCHEDULED

CAST-IN-PLACE CONCRETE

CEILING AS SCHEDULED

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB

133'-8"

FIRST FLOOR

100' - 0"

T/FOOTING (N)

97' - 0"

G

110'-0"

CEILING AS SCHEDULED

C.I.P. ARCH CONC WALL

W/ FORMLINER TO

10'-0" A.F.F.

CI.P. CONCRETE WALL

CI.P. CONCRETE BEAM

CIRCULATION

1C00b

COMMONS

1C10

C.I.P. CONCRETE COLUMN

SEE FINISH PLANS / ELEVATIONS

FOR FINISH

TYPE E3(S) INTERIOR PARTITION

ON FACE OF CONCRETE WALL

SEE INTERIOR ELEVATIONS

DIRECT APPLIED ACRYLIC EXTERIOR FINISH

SYSTEM

DIRECT APPLIED ACRYLIC EXTERIOR FINISH

SYSTEM

A-551

A4 Sim

135'-8"

130'-0"

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

E2SB

A-551

A1 Sim

WALL CONSTRUCTION

C.I.P. ARCH CONC WALL (AIR BARRIER)

3" SPRAY APPLIED INSULATION

2-1/2" METAL STUD U.N.O.

GYPSUM BOARD

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB ON GRADE (AIR BARRIER)

UNDERSLAB VAPOR BARRIER

GRAVEL (CAPILLARY WATER BARRIER)

COMPACTED FILL

E2SB

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

2' - 0"

3' - 0" 8"

5'

8"

FIRST FLOOR

100' - 0"

B

C.I.P. CONCRETE COLUMN

7'

0"

T/FOOTING (S)

96' - 0"

A-521

E1

C.I.P. CONCRETE WALL FOUNDATION

SEE STRUCTURAL

FINISHED GRADE - SEE CIVIL

124'-1"

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

WALL CONSTRUCTION

GLAZED CURTAINWALL (AIR BARRIER)

WALL CONSTRUCTION

C.I.P. ARCH CONC WALL (AIR BARRIER)

3" SPRAY APPLIED INSULATION

2-1/2" METAL STUD U.N.O.

GYPSUM BOARD

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB ON GRADE (AIR BARRIER)

UNDERSLAB VAPOR BARRIER

GRAVEL (CAPILLARY WATER BARRIER)

COMPACTED FILL

SOFFIT CONSTRUCTION

DIRECT APPLIED EXT FINISH SYSTEM

5/8" GMFR SHEATHING

3-5/8" GALV METAL STUDS

A-551

A1 Sim

A-531

A1 Sim

3'

128'-0"

A-522

E1

123'-6"

A-531

A1 Sim

TYP

STEEL TUBE W/ BREAK METAL WRAP

TO MATCH CURTAINWALL FRAMING

A-525

A5

C7 Sim

A-531

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S a v a n n a h D is tr ic t w

O g le th o rp e A v e

S a v a n n a h G e o rg ia

C H

E C

K E

D B

Y

U.S. ARMY CORPS OF

ENGINEERS

SAVANNAH DISTRICT

100 W. OGLETHORPE AVE.

SAVANNAH, GA 31401

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

-4

-0

E

R

O B

IN

S

O N

S T

R E

E T

S

U

IT

E

O R

L A

N D

O F

L

F Y

P

N A

M

C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt

3/30/2022 11:19:32 AM

M A

R C

H

B S

H E

R A

R D

B S

H E

R A

R D

D T

O R

B E

R T

A-353

W A

L L S

E C

T

IO

N S

A

R C

H R

D A

G U

A D

IL

L A

P

U E

R T

O R

IC

O

R E

P L A

C E

M E

N T

R A

M E

Y U

N

IT

S C

H O

O L

D T

O R

B E

R T

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

R A

A

-3 .d w g

W H

N R

1/2" = 1'-0"A-353

WALL SECTION D1.2 - SOUTH @ COMMONSA1

1/2" = 1'-0"A-353

WALL SECTION C2.1 - COMMONS SOUTHA5

1/2" = 1'-0"A-353

WALL SECTION C1.1 - SOUTH @ INFO CENTERA8

0 2ft. 4ft.2 ft.

M A

R K

D E

S C

R

IP

T

IO

N D

A

A

B

GLAZED CURTAIN WALL SYSTEM

GLAZED CURTAIN WALL SYSTEM

T/FOOTING (S)

96' - 0"

C1 Sim

A-531

A4

A-524

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

SOFFIT CONSTRUCTION

DIRECT APPLIED EXT FINISH SYSTEM

5/8" GMFR SHEATHING

3-5/8" GALV METAL STUDS

WALL CONSTRUCTION

GLAZED CURTAINWALL (AIR BARRIER)

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB ON GRADE (AIR BARRIER)

UNDERSLAB VAPOR BARRIER

GRAVEL (CAPILLARY WATER BARRIER)

COMPACTED FILL

GLAZED CURTAIN WALL SYSTEM

GLAZED CURTAIN WALL SYSTEM

ALUMINUM ENTRANCE DOOR

C.I.P. CONCRETE COLUMN

C.I.P. ARCHITECTURAL CONCRETE

WALL

ALUMINUM CANOPY

DIRECT APPLIED ACRYLIC EXTERIOR

FINISH SYSTEM

A-551

A1 Sim

128'-0"

124'-1"

122'-4"

A-551

A1 Sim

A-531

A1 Sim

A-531

A1 Sim

TYP

A-523

B8

1' - 4" 8"

118'-8"

115'-0"

3'

8"

A-522

E1 Sim

A-552

D1 Sim

A-523

B8

A-510

BUILDING PLAQUE

3.1

3.1

3.2

C4

A-533

A4

A-533

ROOM SIGNAGE, REFER TO

SCHEDULE

AUTOMATIC DOOR OPERATOR PUSH

BUTTON

CARD READER

2'

CL

FIRST FLOOR

100' - 0"

*TOP Area B, C2, D 133' - 8"

*BOR - Area C2 130' - 0"

10.6

T/FOOTING (S)

96' - 0"

GYM

1B20

3'

8"

A-551

D1 Sim

C.I.P. CONCRETE SIDEWALK

SEE CIVIL

C.I.P. CONCRETE WALL FOUNDATION

SEE STRUCTURAL

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB ON GRADE (AIR BARRIER)

UNDERSLAB VAPOR BARRIER

GRAVEL (CAPILLARY WATER BARRIER)

COMPACTED FILL

WALL CONSTRUCTION

C.I.P. ARCH CONC WALL (AIR BARRIER)

3" SPRAY APPLIED INSULATION

2-1/2" METAL STUD U.N.O.

GYPSUM BOARD

PERFORATED METAL PANEL

HVAC DUCT, PAINT

1' - 0"1' - 4"8"

6" ALUMINUM DOWNSPOUT W/

COLLECTOR HEAD & CONNECTED TO

STORM

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S a v a n n a h D is tr ic t w

O g le th o rp e A v e

S a v a n n a h G e o rg ia

C H

E C

K E

D B

Y

U.S. ARMY CORPS OF

ENGINEERS

SAVANNAH DISTRICT

100 W. OGLETHORPE AVE.

SAVANNAH, GA 31401

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

-4

-0

E

R

O B

IN

S

O N

S T

R E

E T

S

U

IT

E

O R

L A

N D

O F

L

F Y

P

N A

M

C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt

3/30/2022 11:19:35 AM

M A

R C

H

B S

H E

R A

R D

B S

H E

R A

R D

D T

O R

B E

R T

A-354

W A

L L S

E C

T

IO

N S

A

R C

H R

D A

G U

A D

IL

L A

P

U E

R T

O R

IC

O

R E

P L A

C E

M E

N T

R A

M E

Y U

N

IT

S C

H O

O L

D T

O R

B E

R T

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

R A

A

-3 .d w g

W H

N R

1/2" = 1'-0"A-354

WALL SECTION C1.2 - SOUTH @ ENTRYA1

1/2" = 1'-0"A-354

WALL SECTION B2.1 - GYM WESTA7

0 2ft. 4ft.2 ft.

M A

R K

D E

S C

R

IP

T

IO

N D

A

T/FOOTING (S)

96' - 0"

A-551

D1 Sim

C7

A-531

C.I.P. CONCRETE BEAM

BEYOND, PAINT

SEE STRUCTURAL

3'

8"

PRE-FAB PVC DOWNSPOUT ADAPTER

- CONNECT TO STORM, SEE DETAIL &

CIVIL

COLLAPSIBLE BLEACHERS

HVAC DUCT, PAINT

133'-8" ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

WALL CONSTRUCTION

C.I.P. ARCH CONC WALL (AIR BARRIER)

3" SPRAY APPLIED INSULATION

2-1/2" METAL STUD U.N.O.

GYPSUM BOARD

6" ALUMINUM DOWNSPOUT,

CONNECTED TO STORM

WALL CONSTRUCTION

C.I.P. ARCH CONC WALL (AIR BARRIER)

3" SPRAY APPLIED INSULATION

2-1/2" METAL STUD U.N.O.

GYPSUM BOARD

8"1' - 4"8"

FIRST FLOOR

100' - 0"

T/FOOTING (N)

97' - 0"

*TOS - MECH MEZZ

114' - 8"

10.6

ACCESS

1B21

MECH

2B01

GYM

1B20

3'

6"

PERFORATED METAL PANEL

INCLINED METAL LADDERS W/ HAND

RAIL

HVAC DUCT, PAINT

133'-8"

C.I.P. CONCRETE BEAM

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB ON GRADE (AIR BARRIER)

UNDERSLAB VAPOR BARRIER

GRAVEL (CAPILLARY WATER BARRIER)

COMPACTED FILL

GYM WALL PADS

A-510

SIM

A-551

D1 Sim

A-551

A4 Sim

WRAP PMMA FLASHING

OVER PARAPET

1' - 0" 1' - 4" 8"

FIRST FLOOR

100' - 0"

10.6

T/FOOTING (S)

96' - 0"

WEIGHT

ROOM

1B27

GYM

1B20

DOOR AND FRAME AS SCHEDULED

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

WALL CONSTRUCTION

C.I.P. ARCH CONC WALL (AIR BARRIER)

3" SPRAY APPLIED INSULATION

2-1/2" METAL STUD U.N.O.

GYPSUM BOARD

6" ALUMINUM DOWNSPOUT W/

COLLECTOR HEAD & CONNECTED TO

STORM

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB ON GRADE (AIR BARRIER)

UNDERSLAB VAPOR BARRIER

GRAVEL (CAPILLARY WATER BARRIER)

COMPACTED FILL

PERFORATED METAL PANEL

CEILING AS SCHEDULED

A-551

D1 Sim

A-551

A4 Sim

A-510

SIM

1' - 0" 1' - 4" 8"

133'-8"

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S a v a n n a h D is tr ic t w

O g le th o rp e A v e

S a v a n n a h G e o rg ia

C H

E C

K E

D B

Y

U.S. ARMY CORPS OF

ENGINEERS

SAVANNAH DISTRICT

100 W. OGLETHORPE AVE.

SAVANNAH, GA 31401

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

-4

-0

E

R

O B

IN

S

O N

S T

R E

E T

S

U

IT

E

O R

L A

N D

O F

L

F Y

P

N A

M

C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt

3/30/2022 11:19:38 AM

M A

R C

H

B S

H E

R A

R D

B S

H E

R A

R D

D T

O R

B E

R T

A-355

W A

L L S

E C

T

IO

N S

A

R C

H R

D A

G U

A D

IL

L A

P

U E

R T

O R

IC

O

R E

P L A

C E

M E

N T

R A

M E

Y U

N

IT

S C

H O

O L

D T

O R

B E

R T

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

R A

A

-3 .d w g

W H

N R

1/2" = 1'-0"A-355

WALL SECTION B1.2 - GYM EASTA1

1/2" = 1'-0"A-355

WALL SECTION B1.3 - GYM WEST WALLA4

1/2" = 1'-0"A-355

WALL SECTION B1.4 - GYM WEST WALL AT WEIGHT RMA8

0 2ft. 4ft.2 ft.

M A

R K

D E

S C

R

IP

T

IO

N D

A

T/FOOTING (S)

96' - 0"

C7 Sim

A-531

3'

8" R

AC

KE

D F

AS

C

IA

B

EA

M

H

EI

G

H T

VA

R

IE

S

MEDIA -

STAFF

1C01a

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

127'-2"

SOFFIT CONSTRUCTION

DIRECT APPLIED EXT FINISH SYSTEM

5/8" GMFR SHEATHING

3-5/8" GALV METAL STUDS

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

WALL CONSTRUCTION

C.I.P. ARCH CONC WALL (AIR BARRIER)

3" SPRAY APPLIED INSULATION

2-1/2" METAL STUD U.N.O.

GYPSUM BOARD

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB ON GRADE (AIR BARRIER)

UNDERSLAB VAPOR BARRIER

GRAVEL (CAPILLARY WATER BARRIER)

COMPACTED FILL

CEILING AS SCHEDULED

A-551

A1 Sim

A-551

A1 Sim

FIRST FLOOR

100' - 0"

4.8

T/FOOTING (S)

96' - 0"

COMMONS

1C10

PERFORMANCE

SPACE

1C11

A-551

D1 Sim

A-551

A4 Sim

112'-0"

BTM/WALL

4' - 4" 1' - 0" 8"

5/8" GYPSUM BOARD SOFFIT ON

3-5/8" METAL STUD FRAMING BY

FRAMING ENGINEER, PAINT - SEE RCP

SEE PLANS FOR WALL TYPE

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

WALL CONSTRUCTION

C.I.P. ARCH CONC WALL (AIR BARRIER)

3" SPRAY APPLIED INSULATION

2-1/2" METAL STUD U.N.O.

GYPSUM BOARD

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB ON GRADE (AIR BARRIER)

UNDERSLAB VAPOR BARRIER

GRAVEL (CAPILLARY WATER BARRIER)

COMPACTED FILL

1" ACOUSTICAL WALL ABSORBING

PANEL

CEILING AS SCHEDULED DIRECT APPLIED ACRYLIC EXTERIOR

FINISH SYSTEM

DIRECT APPLIED ACRYLIC EXTERIOR

FINISH SYSTEM

133'-8"

130'-0"

3'

8"

1' - 4" 8"

HIGH IMPACT WALLCOVERING

A-541

C9

HVAC DUCT

P6

110'-0"

2" ACOUSTICAL WALL ABSORBING

PANEL

FIRST FLOOR

100' - 0"

T/FOOTING (N)

97' - 0"

F

CIRCULATION

1C00b

CIRCULATION

1C00a

112'-6"

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB ON GRADE (AIR BARRIER)

UNDERSLAB VAPOR BARRIER

GRAVEL (CAPILLARY WATER BARRIER)

COMPACTED FILL

CEILING AS SCHEDULED

A3-S

CEILING AS SCHEDULED

DOOR AND FRAME AS SCHEDULED

C.I.P. ARCHITECTURAL CONCRETE

FINISHING

A-551

D1 Sim

A-551

A4 Sim

CONTINUE PMMA FLASHING

OVER PARAPET

BTM WALL

A8

A-541

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S a v a n n a h D is tr ic t w

O g le th o rp e A v e

S a v a n n a h G e o rg ia

C H

E C

K E

D B

Y

U.S. ARMY CORPS OF

ENGINEERS

SAVANNAH DISTRICT

100 W. OGLETHORPE AVE.

SAVANNAH, GA 31401

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

-4

-0

E

R

O B

IN

S

O N

S T

R E

E T

S

U

IT

E

O R

L A

N D

O F

L

F Y

P

N A

M

C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt

3/30/2022 11:19:41 AM

M A

R C

H

B S

H E

R A

R D

B S

H E

R A

R D

D T

O R

B E

R T

A-356

W A

L L S

E C

T

IO

N S

A

R C

H R

D A

G U

A D

IL

L A

P

U E

R T

O R

IC

O

R E

P L A

C E

M E

N T

R A

M E

Y U

N

IT

S C

H O

O L

D T

O R

B E

R T

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

R A

A

-3 .d w g

W H

N R

1/2" = 1'-0"A-356

WALL SECTION A.2 - INFORMATION CENTER WESTA1

1/2" = 1'-0"A-356

WALL SECTION C2.2 - COMMONS @ PERFORMANCEA7

1/2" = 1'-0"A-356

WALL SECTION AT CIRCULATION 1C00aA4

0 2ft. 4ft.2 ft.

M A

R K

D E

S C

R

IP

T

IO

N D

A

T/FOOTING (N)

97' - 0"

*BOR - Area A 115' - 0"

5.3

CIRCULATION

1C00b

SERVING /

PREP

1C12

CEILING AS SCHEDULEDCEILING AS SCHEDULED

A-561

A6

WALL CONSTRUCTION

C.I.P. ARCH CONC WALL (AIR BARRIER)

3" SPRAY APPLIED INSULATION

2-1/2" METAL STUD U.N.O.

GYPSUM BOARD

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

A-551

A4 Sim

A-551

A1 Sim

121'-8"

DIRECT APPLIED ACRYLIC EXTERIOR

FINISH SYSTEM

2'

0"

FIRST FLOOR

100' - 0"

T/FOOTING (N)

97' - 0"

*TOS - MECH MEZZ

114' - 8"

8.1

CORR

1A20

PE LOCKER

RR - WOMEN

1B10

A-554

C5

MECH

2B01

C.I.P. ARCH CONC WALL (AIR BARRIER)

CEILING AS SCHEDULEDCEILING AS SCHEDULED

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

A-551

A1 Sim

135'-8"

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB

HOLLOW METAL DOOR AND FRAME

ALUMINUM CANOPY

WALL CONSTRUCTION

C.I.P. ARCH CONC WALL (AIR BARRIER)

3" SPRAY APPLIED INSULATION

2-1/2" METAL STUD U.N.O.

GYPSUM BOARD

A-510

Sim

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB ON GRADE (AIR BARRIER)

UNDERSLAB VAPOR BARRIER

GRAVEL (CAPILLARY WATER BARRIER)

COMPACTED FILL

METAL SERVICE STAIRS W/

PLATFORM

FIRST FLOOR

100' - 0"

10.6

T/FOOTING (S)

96' - 0"

ELEC

1A29a

ELEC

1A29

A-510

A-510

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

A-551

A1 Sim

A-551

A4 Sim

DIRECT APPLIED ACRYLIC EXTERIOR

FINISH SYSTEM

C1 Sim

A-531

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB ON GRADE (AIR BARRIER)

UNDERSLAB VAPOR BARRIER

GRAVEL (CAPILLARY WATER BARRIER)

COMPACTED FILL

118'-8"

FIRST FLOOR

100' - 0"

T/FOOTING (N)

97' - 0"

*BOR - Area C2 130' - 0"

*BOR - Area A 115' - 0"

G

CONDUIT REFER TO ELECRICAL & TECHNOLOGY

JUNCTION BOX

PROVIDE ACCESS PANEL

JUNCITION BOX

CONDUIT

PROVIDE WALL ACCESS PANEL

BEHIND AACOUSTICAL PANEL

C.I.P. CONCRETE WALL

MODIFIED BITUMINOUS MEMBRANE

ROOFING

ALUMINUM CANOPY

ALUMINUM CANOPY BRACKET

HOLLOW METAL DOOR AND FRAME

DOOR AND FRAME AS SCHEDULED

7'

4"

9'

0"

7'

6"

A-551

A4 Sim

C5

A-554

A-551

A1 Sim

A-532

C1 Sim

C4

A-553

DETAIL @ GUTTER BEYOND

A-541

E4 1"

A-563

E3

A-563

E3

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S a v a n n a h D is tr ic t w

O g le th o rp e A v e

S a v a n n a h G e o rg ia

C H

E C

K E

D B

Y

U.S. ARMY CORPS OF

ENGINEERS

SAVANNAH DISTRICT

100 W. OGLETHORPE AVE.

SAVANNAH, GA 31401

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

-4

-0

E

R

O B

IN

S

O N

S T

R E

E T

S

U

IT

E

O R

L A

N D

O F

L

F Y

P

N A

M

C:\Users\maldonado\Documents\1720109-RUS-A_2021_jmaldonado@schenkelshultz.com.rvt

3/30/2022 11:19:45 AM

M A

R C

H

B S

H E

R A

R D

B S

H E

R A

R D

D T

O R

B E

R T

A-357

W A

L L S

E C

T

IO

N S

A

R C

H R

D A

G U

A D

IL

L A

P

U E

R T

O R

IC

O

R E

P L A

C E

M E

N T

R A

M E

Y U

N

IT

S C

H O

O L

D T

O R

B E

R T

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

R A

A

-3 .d w g

W H

N R

1/2" = 1'-0"A-357

WALL SECTION A.1 - CIRCULATION / SERVINGA1

1/2" = 1'-0"A-357

WALL SECTION B1.1 - PENTHOUSE WESTA3

1/2" = 1'-0"A-357

WALL SECTION B1.5 - ELECTRICAL ROOMSA9

0 2ft. 4ft.2 ft.

1/2" = 1'-0"A-357

WALL SECTION @ SERVICE CORRIDOR & COMMONSA6

M A

R K

D E

S C

R

IP

T

IO

N D

A

*TOP Area B, C2, D 133' - 8"

*BOR - Area C2 130' - 0"

D

T/FOOTING (S)

96' - 0"

ELEC

1A29

GYM

1B20

A-521

E1

C3

A-521

A-552

A1

A-551

A1 Sim

BOLLARD

ASPHALT PAVING

SEE CIVIL

GYM WALL PADS

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

WALL CONSTRUCTION

GLAZED CURTAINWALL (AIR BARRIER)

WALL CONSTRUCTION

C.I.P. ARCH CONC WALL (AIR BARRIER)

3" SPRAY APPLIED INSULATION

2-1/2" METAL STUD U.N.O.

GYPSUM BOARD

FLOOR CONSTRUCTION

FLOOR FINISH - SEE FINISH PLANS

CONC SLAB ON GRADE (AIR BARRIER)

UNDERSLAB VAPOR BARRIER

GRAVEL (CAPILLARY WATER BARRIER)

COMPACTED FILL

WALL CONSTRUCTION

C.I.P. ARCH CONC WALL (AIR BARRIER)

3" SPRAY APPLIED INSULATION

2-1/2" METAL STUD U.N.O.

GYPSUM BOARD

A-551

A4 Sim

C7 Sim

A-531

PERFORATED METAL PANEL

*TOP Area B, C2, D 133' - 8"

*BOR - Area C2 130' - 0"

G.7

H.1

T/FOOTING (S)

96' - 0"

PE STORAGE

1B24a

GYM

1B20

A-551

A1 Sim

A-551

A4 Sim

A-521

E1

C3

A-521

C7 Sim

A-531

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEIGHT CONCRETE ROOF INSULATION (R-20 MIN)

C.I.P. CONC ROOF DECK

WALL CONSTRUCTION

GLAZED CURTAINWALL (AIR BARRIER)

WALL CONSTRUCTION

C.I.P. ARCH CONC WALL (AIR BARRIER)

3" SPRAY APPLIED INSULATION

2-1/2" METAL STUD U.N.O.

GYPSUM BOARD

ROOF CONSTRUCTION

MODIFIED BITUMEN ROOF SYSTEM (AIR BARRIER)

LIGHTWEI…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .