Draft P-1097 - CONSTRUCTION DESIGN.pdf

PDF 30 MB Posted

Attached to
P-1097 RELOCATE UNDERWTR ELECTROMAGNETIC MEASUREMENT SYS
Solicitation number
N40085-23-R-2516
Issued by

About this file

This draft request for proposals outlines requirements for the construction of an underwater electromagnetic measurement system platform and related infrastructure. The selected contractor will be responsible for designing and building a steel-framed three-level platform supported by four steel piles in the Thames River at Groton, Connecticut. This includes constructing a weather-resistant shed on the third deck to house electromagnetic measurement equipment provided by others. The contractor must also install two composite submarine cables connecting the platform to a range house using a jet-plow method and covering them with concrete matting. There is an option to demolish and remove the existing infrastructure in a future year. The Navy's Naval Facilities Engineering Command is the issuing agency.

View the file

Other files

File Type Posted
Draft P-1097 - DEMO DESIGN.pdf PDF
Draft SPECS_P-1097 RELOCATE UEMMS FINAL DESIGN.pdf PDF
Draft Factor 1 11-29-22.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P -1

R

E L O

C A

T E

U E

M M

S

G-001

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

PROJECT

LOCATION

AREA MAP

A3

AREA MAP

A2

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND ~ MID-ATLANTIC

FINAL DESIGN SUBMITTAL

OCTOBER 11, 2022

EXISTING DCS

REPLACEMENT

DCS LOCATION

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

1640322

R

E L O

C A

T E

U E

M M

S

G-002

SHEET ON WHICH BUILDING SECTION IS DRAWN

PAGE

No.

SHEET

No.

NAVFAC

DWG. No.

SHEET TITLE

G-001 TITLE SHEET

G-002 DRAWING INDEX AND GENERAL NOTES

S-101 DCS TOWER ELEVATIONS

SHEET ON WHICH DETAIL IS TAKEN

DCS TOWER FOUNDATION

A#

SHEET ON WHICH DETAIL IS DRAWN

DETAIL LABEL IDENTIFICATION NUMBER

DETAIL IDENTIFICATION NUMBER

CALL OUT DETAIL IDENTIFICATION NUMBER

S-103

C-301 CABLE SECTION DETAILS

C-101 SITE PLAN

DCS TOWER ISOMETRICS-102

DCS PLATFORM 1S-105

FLOAT FRAMING DETAILS

S-110

B-101 SOIL BORING PLAN AND LOGS3

DCS PLATFORM 2S-106

FLOATING DOCK

S-108

DCS PLATFORM 3S-107

DCS TOWER FOUNDATION DETAILSS-104

S-109

DCS BUILDING

PAGE

No.

SHEET

No.

NAVFAC

DWG. No.

SHEET TITLE

DCS TOWER PLAN HVACM-401

DCS TOWER PLANSE-403

DCS TOWER LIGHTING PROTECTION AND GROUNDING PLANSE-404

DETAILSE-501

DETAILSE-502

POWER RISER DIAGRAME-601

ELECTRICAL SCHEDULES AND PLATESE-602

FIRE PROTECTION NOTES AND LEGENDF-001

FIRE PROTECTION FLOOR PLANF-101

FIRE PROTECTION DETAILSF-501

PILE GUIDE DETAILS

S-111

DETAILSS-501

LADDER DETAILS

S-504

SECURITY ENCLOSURE DETAILS

S-50220

S-503 SECURITY ENCLOSURE

S-50523

DCS TOWER PLANSE-402

RANGE HOUSE PLANS & ELEVATIONSE-401

ELECTRICAL ABBREVIATIONS, LEGENDS & NOTESE-001

10009530

10009531

10009532

10009533

10009534

10009535

10009536

10009537

10009538

10009539

10009540

10009541

10009542

10009543

10009544

10009545

10009546

10009547

10009548

10009549

10009550

10009551

10009552

10009553

10009554

10009555

10009556

10009557

10009558

10009559

10009560

10009561

10009562

10009563

10009564

10009565

37 10009566

38 10009567

SHIP LADDER DETAILS

S-506

MISC. DETAILS

S-507

DCS BUILDING

S-112

DCS BUILDING DETAILS

S-113

39 10009568

S-508

MISC. DETAILS

DETAILS

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

R

E L O

C A

T E

U E

M M

S

B-101

BORING LOCATIONS

NEW DCS TOWER

LOCATION

B1

B2

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

GROTON, CT.

NEW LONDON, CT.

T H A M E S R I V E R

N E W L O N D O N H A R B O R

POWDER ISLAND

WHITE ROCK

MELTON

LEDGE

COVER COMPOSITE CABLES

WITH CONCRETE MATTRESS

(±1750 LF) SEE DETAIL

EXISTING DCS

LOCATION

P -1

R

E L O

C A

T E

U E

M M

S

C-101

SITE PLAN

NEW DCS TOWER

LOCATION

NEW COMPOSITE

CABLES (2 CABLES)

EXISTING COMPOSITE CABLES

(TO REMAIN ACTIVE)

ORIGINAL COMPOSITE CABLES

(ABANDONED IN-PLACE)

PLAN

ASSUMED LOCATION

OF NEW RANGE (N.I.C.)

NEW DCS TOWER

(SEE SHEET S-101)

-20-25-30-35 -40

PFIZER PIER

FUELING PIER

EXISTING RANGE

LOCATION

SOUTH YARD EXPANSION

DREDGE LOCATION

EDGE OF DREDGE SLOPE

EXISTING SEWER OUTFALL

(EXACT LOCATION UNKNOWN)

RANGE HOUSE/SHORE LANDING

(SEE SHEET C-301)

EXISTING ANCHORAGE

LOCATION

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

R

E L O

C A

T E

U E

M M

S

C-301

DCS TOWER PLAN

EXISTING RANGE HOUSE

EXISTING DUCT BANK

EXISTING RETAINING WALL

EXISTING RIP-RAP

SHORE LANDING (RANGE HOUSE) DETAIL

RANGE HOUSE/SHORE LANDING SECTION

A2

CONDUIT DUCT BANK SECTION

B3

-20

OLD AND NEW JET PLOW DETAIL

B4

CONCRETE MATTRESS DETAIL

B5

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

R

E L O

C A

T E

U E

M M

S

S-101

SOUTH ELEVATION WEST ELEVATION

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

R

E L O

C A

T E

U E

M M

S

S-102

ISOMETRIC VIEW LOOKING NORTH EASTISOMETRIC VIEW LOOKING SOUTH WEST

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

R

E L O

C A

T E

U E

M M

S

S-103

TOWER BASE - PLAN

SOUTH ELEVATION WEST ELEVATION

ISOMETRIC VIEW TYPICAL 22"Ø PIPETYPICAL 20"Ø PIPE SENSOR CABLE RISER

AA

BB

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

R

E L O

C A

T E

U E

M M

S

S-104

PLAN AT EL. -20.0' PLAN AT EL. -16.0' PLAN AT EL. +4.5'

BASE LIFTING PAD EYE

A1

CORRUGATED DECKING CONN.

D5

PILE TOP CONNECTION DETAILS

A4

A

A

B B

TYPICAL PLATFORM FRAME CONNECTIONS

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

R

E L O

C A

T E

U E

M M

S

S-105

SOUTH ELEVATION

PLATFORM 1 - SECTION

A2

PLATFORM 1 - DECK PLAN

C3

PILE DRIVING SHOE DETAIL

A4

PILE SPLICE DETAIL

A5

PLATFORM 1 - FRAMING PLAN

C5

SOUTH ELEVATION - DETAIL

B3

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

S-106

PLATFORM 2 - SECTION

A2

PLATFORM 2 - DECK PLAN

C4

SOUTH ELEVATION - DETAIL

A1 B1

A2 B2

AA

SENSOR CABLE SUPPORT HOUSING

C5

PLATFORM 2 - FRAMING PLAN

B4

SOUTH ELEVATION

C2

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

R

E L O

C A

T E

U E

M M

S

S-107

SOUTH ELEVATION

PLATFORM 3 - DECK PLAN

C3

PLATFORM 3 - SECTION

A2

GUIDE PILE TOP CONNECTION

C5

PLATFORM 3 - FRAMING PLAN

A5

SOUTH ELEVATION - DETAIL

B2

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

R

E L O

C A

T E

U E

M M

S

S-108

DCS BUILDING - WEST ELEVATION

C2

DCS BUILDING - NORTH ELEVATION

B3

DCS BUILDING - EAST ELEVATION

B2

DCS BUILDING - SOUTH ELEVATION

C3

SAMPLE BUILDING

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

R

E L O

C A

T E

U E

M M

S

S-109

DCS BUILDING - PLAN

C2

DCS BUILDING - SECTION

C3

DCS BUILDING - RAISED FLOOR

C4

DCS BUILDING - ROOF PLAN

A3

DCS BUILDING - BASE/LIFTING FRAME

A2

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

R

E L O

C A

T E

U E

M M

S

S-110

BUILDING STEP PLAN

C2

A

A

BUILDING STEP DETAIL

C3

ELEVATED FLOORING DETAIL

C5

LIFTING LUG DETAIL

B2

CORNER POST DETAIL

B3

WALL BASE CONNECTION

B5

EAVE/FASCIA CONNECTION

A3

WALL AND ROOF JOINTS

A5

DOOR OPENING DETAIL

A1

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

R

E L O

C A

T E

U E

M M

S

S-111

SOUTH ELEVATION

FLOAT SECTION

C5

FLOATING DOCK PLAN

C3

WATERTIGHT HATCH DETAIL

B3

A

A

"D" FENDER CONNECTION DETAIL

A4

A

A

SECTION A-A

PLAN

FLOAT PLATFORM DETAIL

A2

A

A

SECTION A-A

PLAN

FLOAT CLEAT DETAIL

A5

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

R

E L O

C A

T E

U E

M M

S

S-112

FLOAT FRAMING PLAN

C2

END HULL SECTION

D4

FRAME SECTION

D5

SIDE HULL LONGITUDINAL SECTION

A2

FRAME LONGITUDINAL SECTION

B2

SECTION B-B

SECTION A-A

B

B

A A

PLAN

DETAIL

C5

DETAIL

C3

DETAIL

C4

DETAIL

B3

DETAIL

A3

WATERTIGHT HATCH FRAMING DETAILS

A4

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

R

E L O

C A

T E

U E

M M

S

S-113

A

A

SECTION A-APLAN

PILE GUIDE BRACKET

C2

RUB ASSEMBLY DETAIL

B2

UHMW WEAR BLOCK

B3

PLATE FABRICATION DETAILS

C4

SECTION

B4

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

R

E L O

C A

T E

U E

M M

S

S-501

ELEVATION LOOKING NORTHEAST

B1

ELEVATION LOOKING EAST

B3

COMPOSITE CABLE CONDUIT 8"Ø SENSOR DROP PIPE

DETAIL

D4

DETAIL

D5

DETAIL

C4

DETAIL

C5

CABLE SUPPORT DETAIL

A4DETAIL

A2

N

DETAIL

A5

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

R

E L O

C A

T E

U E

M M

S

S-502

NAVIGATIONAL LANTERN SUPPORT DETAIL

SOLAR NAVIGATIONAL LANTERN CONNECTION DETAIL

A3

TIDE GUAGE CONNECTION DETAIL

C4

SOLAR LANTERN BOTTOM VIEW

CAMERA/LIGHT MOUNT DETAIL

A5

DETAIL

C1

DETAIL

D1

CLEANING APPARATUS

C2

SENSOR PIPE

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

R

E L O

C A

T E

U E

M M

S

S-503

SECURITY ENCLOSURE - PLAN

C2

ELEVATION

A1

ELEVATION

A3

ELEVATION

A5

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

R

E L O

C A

T E

U E

M M

S

S-504

HINGE DETAIL

C2

AA

HASP DETAIL

C4

B

B

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

R

E L O

C A

T E

U E

M M

S

S-505

LADDER DETAIL

C3

UPPER LADDER CONNECTION

D5

LOWER LADDER CONNECTION

C5

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

R

E L O

C A

T E

U E

M M

S

S-506

HANDRAIL DETAIL

C2

DAVIT DETAIL

C3

DAVIT PIN DETAIL

B1

DAVIT PIN BRACKET DETAIL

B2

FALL PROTECTION ANCHOR DETAIL

B3

DECK GRATING CONNECTION DETAILS

A2

CONDUIT PENETRATION DETAILS

A4

A

A

DAVIT RESTRAINT DETAIL

C5

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

R

E L O

C A

T E

U E

M M

S

S-507

SHIP LADDER PLAN

C2

SHIP LADDER SECTION

A1

SHIP LADDER SECTION

A2

SHIP LADDER SECTION

A4

SHIP LADDER SECTION

A5

DETAIL

D3

DETAIL

D4

DETAIL

D5

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

R

E L O

C A

T E

U E

M M

S

S-508

CABLE SUPPORT PLATES DETAIL

A2

HANDRAIL GATE DETAIL

C4

A

A

HANDRAIL GATE STOP DETAIL

A3

HANDRAIL GATE LATCH DETAIL

A5

32482

P R

O F E

SS IONAL ENG

I N

E E

R

S T A

TE

CONNECT

IC

U

T

OF

L

I CENSED

MARSHALL

C H A

R L E S

W

R O

B E R

T S

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M

ID

LA

N

T D

C B

L N

A V

A L

S

TA

TI

O

N

N O

R

FO

LK

, V

A

N A

V A

L S

U B

M A

R

IN

E B

A S

E N

E W

L O

N D

O N

N E

W L

O N

D O

N , C

T

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

MI

DL

AN

T

DC

BL

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

SU

BM

AR

IN

E

BA

SE

N

EW

L O

ND

O

N

NE

W L

O

ND

O W

, C T

P-

R

EL

O

CA

TE

D

UE

M S

SAM/JDL

EJA

DSN

1640322

Lic. No. 037705

ALISON WAKELINCO

M M

ON

WE

ALTH-OF-VIRGIN

IA

PROFESSIONAL-ENG

IN

EE

R

FIRE SUPPRESSION GENERAL NOTES:

1. PROVIDE CLEAN AGENT EXTINGUISHING SYSTEM FOR THE DATA CONCENTRATOR SHED (DCS).

2. APPLICABLE CRITERIA:

UFC 3-600-01 FIRE PROTECTION ENGINEERING FOR FACILITIES (CHANGE 6), 6 MAY 2021

NFPA 70 NATIONAL ELECTRICAL CODE (NEC), 2023

NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE, 2022

NFPA 2001 STANDARD ON CLEAN AGENT FIRE EXTINGUISHING SYSTEMS, 2022

3. THE SYSTEM SHALL BE DESIGNED BY ENGINEERING TECHNOLOGIST QUALIFIED AT NICET LEVEL IV IN SPECIAL HAZARDS

SYSTEMS.

4. ONLY LISTED AND APPROVED DEVICES AND MATERIALS AS SPECIFIED IN NFPA 72 AND NFPA 2001 SHALL BE USED.

5. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND ARE NOT INTENDED TO SHOW THE EXACT LOCATIONS OF COMPONENTS, NOR SHOW ALL SYSTEM COMPONENTS. CONTRACTOR SHALL PROVIDE ADDITIONAL OFFSETS OR FITTINGS REQUIRED FOR PROPER INSTALLATION, COORDINATION WITH OTHER TRADES, AND/OR TO MAINTAIN PROPER CLEARANCES. CONTRACTOR SHALL ALSO VERIFY STRUCTURAL, MECHANICAL, AND ELECTRICAL INSTALLATIONS AND DRAWINGS TO AVOID OBSTRUCTIONS OR INTERFERENCE WITH FIRE PROTECTION PIPING AND NOZZLES.

6. THE FK-5-1-12 (NOVEC 1230) SYSTEM SHALL BE DESIGNED TO PROVIDE A MINIMUM DESIGN CONCENTRATION OF 5.6%.

7. SUPERVISE AND CONTROL THE GASEOUS AGENT SUPPRESSION SYSTEM AT THE FIRE SUPPRESSION RELEASING

PANEL.

8. ALL WIRE MUST BE INSTALLED IN MINIMUM 3/4 INCH CONDUIT UNLESS NOTED OTHERWISE.

9. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING FINAL DEVICE LOCATIONS. CONTRACTOR TO RESOLVE CONFLICTS

WITH LIGHTING, CEILING OBSTRUCTIONS, AND SUPPLY/RETURN REGISTERS.

10. REFER TO MANUFACTURERS INSTALLATION MANUAL FOR ADDITIONAL INSTALLATION INSTRUCTIONS AND WHEN PLACING SYSTEMS IN OPERATION. BE SURE DIP SWITCHES CONTROLLING PANEL OPERATION ARE IN THEIR PROPER POSITION. ALL POWER LIMITED AND NON-POWER LIMITED CIRCUIT WIRING MUST ENTER AND EXIT THE CABINET THROUGH DIFFERENT KNOCKOUTS AND/OR CONDUITS, BE SEPARATED IN THE CABINET AND BE SPACED A MINIMUM OF 1/4 INCH APART. POWER LIMITED FIELD WIRING RUNS MUST USE LISTED POWER LIMITED CABLE PER NATIONAL

ELECTRICAL CODE.

11. PIPE SIZES SHALL BE DETERMINED VIA CALCULATIONS BY CONTRACTOR.

12. THE COMPONENTS OF HANGER ASSEMBLIES THAT DIRECTLY ATTACH TO THE PIPE OR TO THE BUILDING SHALL BE

LISTED.

FIRE SUPRESSION LEGEND

CLEAN AGENT CONTAINER

CYLINDER DISCHARGE PRESSURE SWITCH

FIRE SUPPRESSION RELEASING PANEL

AREA SMOKE DETECTOR, AT CEILING/DECK

AREA SMOKE DETECTOR, BELOW RAISED FLOOR

CLEAN AGENT SYSTEM MANUAL ACTUATION STATION

CLEAN AGENT SYSTEM INHIBIT SWITCH

CLEAN AGENT SYSTEM PRE-DISCHARGE ALARM

(SUPERSCRIPT INDICATES CANDELA RATING)

CLEAN AGENT SYSTEM DISCHARGE ALARM

(SUPERSCRIPT INDICATES CANDELA RATING)

WEATHERPROOF

END OF LINE RESISTOR

FP

2.

1-

F P5

ELECTRIC

CONTROL

HEAD

CYLINDER

STRAP

MAIN

AGENT

CYLINDER

TO FIRE SUPPRESSION

RELEASING PANEL

(FSRP)

TO NOZZLES

DP

1 CLEAN AGENT CYLINDER DETAIL

NOT TO SCALE

AREA

(FT )

ENCLOSURE

DESCRIPTION

DCS (ABOVE FLOOR)

DCS (BELOW FLOOR)

VOLUME

(FT )

2,380

MINIMUM DESIGN

CONCENTRATION (%)

5.6

AGENT WEIGHT

(LB)

NUMBER OF

CYLINDERS

2 340 5.6 18 1

NOVEC (1230) CLEAN AGENT EXTINGUISHING SYSTEM SUMMARY

2 3 *

NOTE: CLEAN AGENT SYSTEM WILL BE PROVIDED WITHIN THE DCS. SYSTEM WILL PROTECT ABOVE AND BELOW RAISED FLOOR.

* NUMBER OF CYLINDERS BASED ON 375 LB CYLINDER SIZE. OTHER SIZES/CONFIGURATIONS ACCEPTABLE.

HEIGHT (FT)

2 CLEAN AGENT EXTINGUISHING SYSTEM SUMMARY

NOT TO SCALE

FIRE ALARM SYSTEM GENERAL NOTES:

1. PROVIDE GAMEWELL FIRE ALARM CONTROL PANEL AT DATA CONCENTRATOR SHED (DCS) TO SUPERVISE CLEAN

AGENT FIRE SUPPRESSION SYSTEM. NEW DCS GAMEWELL FACP TO EXISTING GAMEWELL FACP AT RANGE BUILDING

VIA FIBER OPTIC NETWORK.

2. APPLICABLE CODES:

NFPA 70 NATIONAL ELECTRICAL CODE (NEC), 2023.

NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE, 2022.

UFC 3-600-01 FIRE PROTECTION ENGINEERING FOR FACILITIES (CHANGE 6), 6 MAY 2021

3. THE SYSTEM SHALL BE DESIGNED BY ENGINEERING TECHNOLOGIST QUALIFIED AT NICET LEVEL III OR IV IN FIRE ALARM

SYSTEMS.

4. NEW DEVICES SHALL BE UL LISTED.

5. INITIATING DEVICE CIRCUITS AND SIGNALING LINE CIRCUITS SHALL BE CLASS B.

6. ALL CONDUIT, JUNCTION/BACK BOXES, COVERS AND COUPLINGS, WHEN PROVIDED, MUST BE FACTORY PAINTED RED IN UNFINISHED AREAS (E.G., ABOVE CEILINGS, MECHANICAL ROOMS, ETC.). ALL CONDUIT, JUNCTION/BACK BOXES, COVERS AND COUPLINGS, WHEN PROVIDED, ARE PERMITTED TO BE PAINTED TO MATCH THE ROOM FINISHING IN FINISHED AREAS. THE INSIDE COVER OF THE JUNCTION BOX MUST BE IDENTIFIED AS "FIRE ALARM" AND THE CONDUIT MUST HAVE PAINTED RED BANDS 3/4-IN. WIDE AT 20 FT. INTERVALS AND ON BOTH SIDES OF ALL FLOOR, WALL, AND

CEILING PENETRATIONS.

7. ALL SYSTEM POWER AND GROUND CIRCUITS SHALL BE TYPE "THHN" SOLID COPPER SIZED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS AND THE APPLICABLE CODES AND BE INSTALLED IN CONDUIT.

8. ALL WIRING, CABLES, BOXES, TROUGHS AND OTHER RELATED EQUIPMENT SHALL BE INSTALLED IN STRICT

COMPLIANCE WITH THE NATIONAL ELECTRICAL CODE (NEC).

9. ALL PENETRATIONS OF FIRE RESISTANCE RATED BARRIERS, WALLS, AND, SHAFT/ASSEMBLIES SHALL BE DRILLED AND

THEN SEALED WITH AN APPROVED UL FIRE-RATED THROUGH-PENETRATION ASSEMBLY.

10. UL CLASSIFICATIONS AND MATERIAL PRODUCT DATA SHEETS FOR ALL FIRE STOPPING SYSTEMS SHALL BE SUBMITTED

AND APPROVED BEFORE ANY FIRE STOPPING IS INSTALLED.

11. SECONDARY POWER SUPPLY SHALL BE VIA BATTERIES CAPABLE OF OPERATING THE FIRE ALARM SYSTEM ON STANDBY FOR 48 HOURS FOLLOWED BY 15 MINUTES IN ALARM. CHARGING AND METERING SHALL BE PROVIDED IN

ACCORDANCE WITH NFPA 72.

12. DEDICATED BATTERY CABINETS SHALL BE MOUNTED NO MORE THAN 3-FT FROM THE FINISHED FLOOR.

13. PROVIDE SYSTEM RECORD DOCUMENT CABINET ADJACENT TO FIRE ALARM CONTROL PANEL. PROVIDE A COPY OF THE

FIRE PROTECTION AS-BUILT DRAWINGS AND POINTS LIST IN THE CABINET.

14. PROVIDE LABELS FOR ALL ADDRESSABLE DEVICES AND NOTIFICATION APPLIANCES.

15. ALL DRAWINGS ARE CONCEPTUAL IN NATURE. THEY DO NOT SHOW THE EXACT LOCATIONS OF COMPONENTS NOR SHOW ALL SYSTEM COMPONENTS. CONTRACTOR SHALL PROVIDE ADDITIONAL COMPONENTS FOR A PROPERLY

INSTALLED AND FUNCTIONAL SYSTEM IN ACCORDANCE WITH ALL APPLICABLE CODES.

FIRE ALARM LEGEND

FIRE ALARM CONTROL PANEL (GAMEWELL)

SUPPLEMENTARY FIRE ALARM CONTROL PANEL (GAMEWELL)

SINGLE-MODE FIBER OPTIC ADAPTER

ADDRESSABLE MONITOR MODULE

1. PROVIDE CLEAN AGENT CYLINDER WITH LIQUID LEVEL INDICATOR.

2. PROVIDE PRESSURE SWITCH AT CYLINDER VALVE FOR SYSTEM DISCHARGE.

FI

RE

P

RO

TE

CT

IO

N

NO

TE

S

AN

D

LE

GE

ND

OP AE AW

AS NOTED

F-001

DSN

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

MI

DL

AN

T

DC

BL

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

SU

BM

AR

IN

E

BA

SE

N

EW

L O

ND

O

N

NE

W L

O

ND

O W

, C T

P-

R

EL

O

CA

TE

D

UE

M S

SAM/JDL

EJA

DSN

1640322

Lic. No. 037705

ALISON WAKELINCO

M M

ON

WE

ALTH-OF-VIRGIN

IA

PROFESSIONAL-ENG

IN

EE

R

FIRE PROTECTION FLOOR PLAN

PROVIDE MONITOR MODULES FOR FIRE ALARM

SYSTEM SUPERVISION OF FSRP ALARM,

PRE-DISCHARGE, RELEASE, SUPERVISORY, AND

TROUBLE CONDITIONS.

PRIMARY CLEAN AGENT SUPPLY.

RESERVE CLEAN AGENT SUPPLY.

KEY NOTES:

FI

RE

P

RO

TE

CT

IO

N

FL

OO

R

PL

AN

OP AE AW

AS NOTED

F-101

DSN

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

MI

DL

AN

T

DC

BL

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

SU

BM

AR

IN

E

BA

SE

N

EW

L O

ND

O

N

NE

W L

O

ND

O W

, C T

P-

R

EL

O

CA

TE

D

UE

M S

SAM/JDL

EJA

DSN

1640322

Lic. No. 037705

ALISON WAKELINCO

M M

ON

WE

ALTH-OF-VIRGIN

IA

PROFESSIONAL-ENG

IN

EE

R

120 VOLT AC

EOLR

120 VOLT AC

D1 FIRE ALARM/RELEASING SYSTEMS RISER DIAGRAM

NOT TO SCALE

ALA

RM C

ONDITIO

N

INPUT

OPERATIO

N

OTHER TROUBLE CONDITION

FSRP CIRCUIT FAULT (OPEN, GROUND, SHORT)

ANY TWO SMOKE DETECTORS

CLEAN AGENT TIME DELAY CYCLE COMPLETE

CLEAN AGENT INHIBIT

CLEAN AGENT MANUAL ACTUATION (REMOTE STATION)

CLEAN AGENT CYLINDER LOW PRESSURE SWITCH

CLEAN AGENT CYLINDER MAINTENANCE SWITCH

ANY SMOKE DETECTOR

TROUBLE

C

ONDITIO

N

LO

CAL N

OTIFIC

ATIO

N - P

RE-D

ISCHARGE ALA

RM

START 60

SECOND D

ISCHARGE TIM

E D

ELA

Y

ACTIVATE C

LE

AN AGENT D

ISCHARGE

SEE N

OTE 2

CLO

SE D

AMPERS

DISCONNECT C

LE

AN AGENT R

ELE

ASE C

IR

CUIT

DISCONNECT POWER TO ELE

CTRONIC

EQUIPMENT

1. THE RELEASE OF THE CLEAN AGENT SYSTEM SHALL OCCUR UPON ACTUATION OF MANUAL STATION OR ANY TWO SMOKE DETECTORS, AND 60 SECOND COUNTDOWN. RELEASING OF THE CLEAN AGENT SOLENOID VALVE SHALL BE PERFORMED BY THE FSRP.

2. WHEN INHIBIT SWITCH IS PRESSED AFTER THE DISCHARGE COUNTDOWN HAS BEGUN, THE COUNTDOWN SHALL STOP. WHEN SWITCH IS RELEASED THE COUNTDOWN RESETS AND BEGINS AGAIN. IF THE RELEASING PANEL IS SUCCESSFULLY RESET WHILE THE INHIBIT SWITCH IS

ACTIVATED, THEN THE DISCHARGE SEQUENCE IS HALTED.

3. REFER TO MECHANICAL MATRIX OF OPERATION FOR ADDITIONAL INFORMATION.

SUPERVISORY C

ONDITIO

N

LO

CAL N

OTIFIC

ATIO

N - D

ISCHARGE ALA

RM

B1 FIRE SUPPRESSION RELEASING PANEL SEQUENCE OF OPERATIONS

NOT TO SCALE

DEACTIVATE PRE-D

ISCHARGE ALA

RM

EOLR

EOLR

EOLR

EOLR

EOLR 120 VOLT AC

TO EXISTING BASE-WIDE FIRE ALARM REPORTING SYSTEM

TO EXISTING BUILDING FIRE ALARM SYSTEM

RANGE HOUSE (EXISTING)DCS (NEW)

PRE-D

ISCHARGE C

ONDITIO

N

TRANSMIT D

CS ALA

RM SIG

NAL T

O FIR

E D

EPT.

INPUT

OPERATIO

N

FSRP TROUBLE CONDITION

FSRP RELEASE CONDITION

FSRP PRE-DISCHARGE CONDITION

FSRP SUPERVISORY CONDITION

FSRP ALARM CONDITION

TRANSMIT D

CS R

ELE

ASE SIG

NAL T

O FIR

E D

EPT.

TRANSMIT D

CS SUPERVISORY SIG

NAL T

O FIR

E D

EPT.

1. EXISTING SEQUENCE OF OPERATIONS FOR RANGE HOUSE SYSTEM TO OTHERWISE REMAIN IN USE.

TRANSMIT D

CS TROUBLE

SIG

NAL T

O FIR

E D

EPT.

B3 FIRE ALARM CONTROL PANEL SEQUENCE OF OPERATIONS

NOT TO SCALE

TRANSMIT D

CS PRE-D

ISCHARGE SIG

NAL T

O FIR

E D

EPT.

GAS

CARTRIDGE

ACTUATOR

EOLR

CLEAN AGENT MANUAL ACTUATION (CYLINDER PRESSURE SWITCH)

RELE

ASE C

ONDITIO

N

FI

RE

P

RO

TE

CT

IO

N

DE

TA

ILS

OP AE AW

AS NOTED

F-501

DSN

EOLR

TO

HVAC

TO

DAMPER

TO

ELECTRONIC

EQUIPMENT

CONTROLLER

FIBER OPTIC CABLE PROVIDED BY

OTHERS. SEE ELECTRICAL DRAWINGS.

SHUT D

OWN H

VAC

Insert from: "36_38-P-1097 Prefinal Fire.pdf"
FIRE PROTECTION
F-001 FIRE PROTECTION NOTES AND LEGEND
F-101 FIRE PROTECTION FLOOR PLAN
F-501 FIRE PROTECTION DETAILS

File details come from the government source that posted it. Updated .