DRAFT AFDM N00024-21-R-2243 082021.docx
DOCX document 262 KB Posted
- Attached to
- Auxiliary Floating Dry Dock Medium (AFDM) Draft RFP Federal contract opportunity
- Solicitation number
- N00024_21_R_2243
About this file
This draft solicitation is for the design and construction of one Auxiliary Floating Dry Dock Medium (AFDM) under a firm fixed price contract with associated supplies and services. The Naval Sea Systems Command intends to issue a full and open competition solicitation in September 2021. Associated supplies and services include technical data, a production level data package, crew familiarization, wing wall cranes, vehicle bridge design, and vehicle bridge construction. Feedback on the draft solicitation and attachments will be accepted until August 30, 2020. Inquiries may be directed to the specified Navy contacts. This pre-solicitation notice provides information on the forthcoming procurement but does not constitute a commitment to solicit offers or award contracts.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Addendum L-9 Certifications Regarding Responsibility Matters.doc | DOC document | |
| Addendum L-8 Pricing Summary.xlsx | XLSX spreadsheet | |
| Addendum L-6 Proposed Delivery Schedule Form.xls | XLS spreadsheet | |
| J-8 AFDM Cybersecurity 18Jun2021.docx | DOCX document | |
| Attachment J-1 AFDM PSPEC 05 AUG 2021.docx | DOCX document | |
| Addendum L-7 Past Performance Form.doc | DOC document | |
| Addendum L-4 ID of Non Commercial Data.doc | DOC document | |
| Addendum L-5 ID of Commercial Data.doc | DOC document | |
| Addendum L-3 Commercial Warranty Terms.docx | DOCX document | |
| Attachment J-7 AFDM IDE.docx | DOCX document | |
| J-4 Item Unique Identification.docx | DOCX document | |
| Attachment J-2 AFDM DRL 06 AUG 2021.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002421R2243
Section B - Supplies or Services and Prices
NOTE A
Option Items (CLINs 1003, 1004, 1005, 1006, 1007, 1008, 1009 and 1010) to which the option clause 52.217-7 under Section I is applicable, are to be supplied only if and to the extent said options are exercised. The Government is not obligated to order any or all of these items. Exercise of one option will not obligate the Government to the exercise of other options.
NOTE B
Provisional amounts (CLIN 1003) is subject to adjustment under the clause of this contract entitled “PROVISIONED ITEMS ORDER– ALTERNATE II,” for supplies or other requirements ordered pursuant to said clause. Amount in actual orders, if any orders are issued, will be individually priced. All orders hereunder are to be firm-fixed price. PIOs will be placed, if any, prior to the expiration of the warranty period in accordance with Attachment J-3, Commercial Warranty Terms.
NOTE C
Provisional amounts for CLIN 1007 is subject to adjustment under Section C Clause entitled “PROVISIONED ITEM ORDER – ALTERNATE II,” for supplies or other requirements ordered pursuant to said clause. The amounts shown are for planning purposes only. Amount in actual orders, if any orders are issued, will be individually priced. All orders hereunder are to be firm-fixed price.
NOTE D
Approximately 1,000 man-hours and $5,000 material may be needed under CLIN 1007. These are estimates and do not indicate that the Government will necessarily order this amount or any at all. The actual amount of labor hours and material dollars will be determined in accordance Section H Clause entitled “SPECIAL STUDIES & DOCUMENTATION”. In the table below, enter the applicable hourly labor rate for each Government fiscal year, which will apply to any work ordered under this item.
CLINS 1007
Special Studies & Documentation Government Fiscal Year Fully Burdened Rate Supervisory ($ per Hour) Fully Burdened Rate Sr. Engineer ($ per Hour) Fully Burdened Rate Engineer ($ per Hour)
| 2022 |
| $TBD |
| $TBD |
| $TBD |
| 2023 |
| $TBD |
| $TBD |
| $TBD |
| 2024 |
| $TBD |
| $TBD |
| $TBD |
| 2025 |
| $TBD |
| $TBD |
| $TBD |
| 2026 |
| $TBD |
| $TBD |
| $TBD |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1001
| 1 |
| Each |
AFDM Dry Dock
FFP
Auxiliary Floating Dry Dock Medium.
FY 22
FOB: Origin (Shipping Point)
PURCHASE REQUEST NUMBER: N0002421NR68123
PSC CD: 1950
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1002
| 1 |
| Each |
Technical Data Package for 1001 (NSP)
FFP
Technical Data Package (TDP) for CLIN 1001. The data to be furnished hereunder shall be in accordance with Attachment J-2, Data Requirements List, attached hereto.
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1003
| 1 |
| Each |
| OPTION |
| PIO – Vendor Recommended Spares for 1001 |
FFP
Provisioned Items Order (PIO) – Vendor Recommended Spares for CLIN 1001. See Notes A and B.
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1004
| 1 |
| Each |
| OPTION |
| Crew Familiarization for CLIN 1001 |
FFP
See Note A.
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1005
| 1 |
| Each |
| OPTION |
| Packaging and Delivery to San Diego, CA |
FFP
Packaging and Delivery to San Diego, CA for CLIN 1001. See Note A.
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1006
| 1 |
| Each |
| OPTION |
| Production-Level Data Package and Rights |
FFP
Production Level Data Package and Rights for CLIN 1001. The data to be furnished hereunder shall be prepared in accordance with Attachment J-2, Data Requirements List, attached hereto. See Note A.
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1007
| 1 |
| Each |
| OPTION |
| Special Studies & Documentation |
FFP
Special Studies & Documentation Analyses in support of AFDM Program. See Notes A, C and D.
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1008
| 1 |
| Each |
| OPTION |
| Vehicle Bridge Design |
FFP
See Note A.
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1009
| 1 |
| Each |
| OPTION |
| Vehicle Bridge Construction and Delivery |
FFP
See Note A FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1010
| 1 |
| Each |
| OPTION |
| Wingwall Portal Cranes |
FFP
See Note A FOB: Destination
NET AMT
CLAUSES INCORPORATED BY FULL TEXT
B-215-H002 REFUNDS (SPARES AND SUPPORT EQUIPMENT) (NAVSEA) (OCT 2018)
(a) In the event that the price of a spare part or item of support equipment delivered under this contract significantly exceeds its intrinsic value, the Contractor agrees to refund the difference. Refunds will not be made to recoup the amount of cost decreases that occur over time due to productivity gains (excluding economic purchase quantity considerations) or changes in market conditions.
(b) For purposes of this requirement, the intrinsic value of an item is defined as follows:
(1) If the item is one which is sold or is substantially similar or functionally equivalent to one that is sold in substantial quantities to the general public, intrinsic value is the established catalog or market price, plus the value of any unique requirements, including delivery terms, inspection, packaging, or labeling.
(2) If there is no comparable item sold in substantial quantities to the general public, intrinsic value is defined as the price an individual would expect to pay for the item based upon an economic purchase quantity as defined in FAR 52.207-4, plus the value of any unique requirements, including delivery terms, inspection, packaging or labeling.
(c) At any time up to two years after delivery of a spare part or item of support equipment, the Contracting Officer may notify the Contractor that based on all information available at the time of the notice, the price of the part or item apparently exceeds its intrinsic value.
(d) If notified in accordance with paragraph (c) above, the Contractor agrees to enter into good faith negotiations with the Government to determine if, and in what amount, the Government is entitled to a refund.
(e) If agreement pursuant to paragraph (d) above cannot be reached, and the Navy's return of the new or unused item to the Contractor is practical, the Navy, subject to the Contractor's agreement, may elect to return the item to the Contractor. Upon return of the item to its original point of Government acceptance, the Contractor shall refund in full the price paid. If no agreement pursuant to paragraph (d) above is reached, and return of the item by the Navy is impractical, the Contracting Officer may, with the approval of the Head of the Contracting Activity, issue a Contracting Officer's final decision on the matter, subject to Contractor appeal as provided in the "Disputes" clause (FAR 52.233-1).
(f) The Contractor shall make refunds, as required under this requirement, in accordance with instructions from the Contracting Officer.
(g) The Contractor shall not be liable for a refund if the Contractor advised the Contracting Officer in a timely manner that the price it would propose for a spare part or item of support equipment exceeded its intrinsic value, and with such advice, specified the estimated proposed price, the estimated intrinsic value and known alternative sources or item, if any, that can meet the requirement.
(h) This requirement does not apply to any spare parts or items of support equipment whose price is determined through adequate price competition. This requirement also does not apply to any spare part or item of support equipment if the Contractor submitted, and certified the currency, accuracy and completeness of, cost or pricing data applicable to the item.
(End of text)
Section C - Descriptions and Specifications
SECTION C - DESCRIPTION AND SPECIFICATIONS
PART 1 – GENERAL STATEMENT OF WORK
PART 2 – CONTRACT LINE ITEM NUMBER (CLIN) DESCRIPTIONS
PART 3 – AFDM STATEMENT OF WORK, DETAIL DESIGN AND CONSTRUCTION
PART 4 – STANDARD CLAUSES
PART 1 – GENERAL STATEMENT OF WORK
This statement of work defines the effort required for the design, construction, testing, outfitting, configuration management, and program management for the Auxiliary Floating Dry Dock Medium (AFDM). The Contractor shall perform the technical design, construction, testing, delivery, and management for the AFDM in accordance with the provisions of this contract including attachments, revisions, and modifications thereto. All departures from the requirements of this contract shall be fully justified in writing and submitted to the Government for written approval.
In order to support follow-on competitive contract awards of additional floating dry docks of the same configuration, the Government desires Government Purpose rights to all drawings, designs, specifications, production engineering data and work packages per DFARS clause 252.227-7013 (Rights in Technical Data –Non-Commercial Items) that would permit another qualified contractor to produce the same configuration.
PART 2 – CONTRACT LINE ITEM NUMBER (CLIN) DESCRIPTIONS
CLIN 1001 – Auxiliary Floating Dry Dock Medium – AFDM The Contractor shall furnish all resources necessary to perform the Design and Construction of the AFDM at the Contractor’s facilities in accordance with:
a) The provisions of this Contract;
b) AFDM PSPEC, Attachment J-1;
c) Other documents, exhibits, and attachments listed in Section J of this Contract; and
d) All revisions and modifications thereto.
CLIN 1002 – Technical Data Package for CLIN 1001 Data shall be prepared in accordance with this Contract, and as instructed in the Data Requirements List (DRL) Attachment J-2. The Contractor shall prepare production, logistic support, and test and trial documentation, which meet the requirements of this Contract and its attachments. The Contractor shall verify that the final technical data deliverables, in accordance with the DRL, accurately reflect the craft as delivered and as modified under this Contract at the conclusion of the warranty period in accordance with Attachment J-3, Commercial Warranty Terms.
CLIN 1003 – Vendor-Recommended Spares (VRS) for CLIN 1001 (IF OPTION IS EXERCISED) The Contractor shall provide spare parts, special tools, and test equipment in accordance with the requirements herein and the “PROVISIONED ITEM ORDER – ALTERNATE II” requirement in this contract.
CLIN 1004 - Crew Familiarization for CLIN 1001 (IF OPTION IS EXERCISED) The Contractor shall provide Crew Familiarization for user representatives as specified in this Section C and the Data Requirements List (Attachment J-2).
CLIN 1005– Packaging and Delivery to Naval Base San Diego for Item 1001 (IF OPTION IS EXERCISED) The Contractor shall prepare the AFDM craft for shipment as specified in Section D. The floating dry dock including all outfitting and accessory items shall be delivered with transportation charges prepaid by the Contractor to Naval Base San Diego, CA as specified in Section F.
CLIN 1006 - Production Level Data Package and Rights (IF OPTION IS EXERCISED) The Contractor shall provide all production data necessary for a competent builder to manufacture the craft from the provided Data Package in accordance with the AFDM SOW Section C-3.085c and the DRL, Attachment J-2 without any further assistance/information. To permit future competitive procurement, the Government desires Government Purpose Rights, as a minimum, in all technical data.
CLIN 1007 - Special Studies and Documentation (IF OPTION IS EXERCISED) In accordance with the clause entitled "SPECIAL STUDIES & DOCUMENTATION" under Section H of this contract, the Contractor shall provide approximately 1000 man-hours of engineering labor and $5,000 of material to perform Special Studies & Documentation in support of AFDM. Special Studies & Documentation are defined as any work authorized by the Procuring Contracting Officer that is required to support AFDM. Orders for this effort will be placed in accordance with the general requirements in Section H of this Contract entitled “SPECIAL STUDIES & DOCUMENTATION”. The Contractor shall complete the table for fully loaded engineering rates under Section B.
CLIN 1008– Vehicle Bridge Design (IF OPTION IS EXERCISED) The contractor shall provide design information for the vehicle bridge identified in the Performance Specification, Attachment J-1. Data shall be prepared in accordance with applicable sections of the Data Requirements List (DRL) Attachment J-2.
CLIN 1009– Vehicle Bridge Construction (IF OPTION IS EXERCISED) Contractor shall construct and deliver the vehicle bridge identified in CLIN 1008.
CLIN 1010– Wingwall Portal Cranes (IF OPTION IS EXERCISED) Contractor shall design and construct portal cranes for the AFDM (CLIN 1001) port & starboard wingwalls identified in the Performance Specifications, Attachment J-1. Data shall be prepared in accordance with applicable sections of the Data Requirements List (DRL) Attachment J-2. Contractor shall transport the cranes to the delivery destination, install the cranes onto the dry dock wingwalls, test and commission the cranes prior to delivering the AFDM to the Navy.
PART 3 – AFDM STATEMENT OF WORK, DESIGN AND CONSTRUCTION
C-3.042a CONFERENCES, REVIEWS, AND GENERAL MEETINGS A Post Award Conference (PAC), Design Reviews (DR), Logistics Guidance Conference (LGC), Interim Progress Reviews (IPR), and a Production Readiness Review (PRR) shall be held during Design and Construction (D&C) of the AFDM.
The Contractor shall attend and host a PAC conducted with the Government within thirty (30) days of award of the D&C Contract at the Contractor’s facility. The Contractor shall prepare the PAC Agenda and Minutes (DI-001). The purpose of the PAC is to review the Contract and technical documents, the technical and schedule requirements including the schedule of design reviews and discuss the roles and working relationships between the Contractor and the Government. Representatives from each major subcontractor on the Contractor’s team shall attend the PAC.
The Contractor shall conduct a DR at the Contractor’s facility beginning three (3) months after award of the D&C contract. The Contractor shall prepare Design Review Agendas and Minutes (DI-002). DRs shall be held every three (3) months continuing through Start of Construction (SOC). The Contractor’s Design Agent (if subcontracted), and an ABS Engineering representative shall attend all DRs in person.
The Government will convene an LGC at the Contractor’s facility approximately three (3) months after award of the D&C contract. The purpose of the LGC is to review and discuss the Government’s logistics data requirements and logistics schedules. The Contractor shall review and discuss its overall planned logistics approach including the Integrated Logistics Support Management Plan (ILSMP). The Contractor shall prepare Logistics Guidance Conference Agendas and Minutes (DI-003).
The Contractor shall conduct the initial IPR at the Contractor’s facility twelve (12) months after award of the D&C contract and continuing every three (3) months through delivery of the AFDM. The Contractor shall prepare Interim Progress Review Agendas and Minutes (DI-004).
In addition, a Production Readiness Review (PRR) shall be convened.
C-3.042b PRODUCTION READINESS REVIEW The Contractor shall successfully complete a PRR prior to the authorization by the Contracting Officer for the Start of Construction. Start of Construction is defined as the commencement of steel-cutting for the AFDM. The purpose of the PRR is to demonstrate to the Government that proper management, engineering, and production requirements are adequately defined and implemented, and that design maturity supports initiation of the construction phase.
The Contractor shall notify the Government of the planned PRR date thirty (30) days prior to PRR. The PRR shall be held not less than fifteen (15) days prior to Start of Construction. The PRR shall be held at the Contractor’s facility. The Government will notify the shipyard within ten (10) days after the PRR whether Start of Construction is authorized.
At the PRR, the Contractor shall demonstrate sufficient design maturity has been achieved to start construction, the flow of production information will sustain production, and the status of material ordering and delivery will support the proposed build schedule. The Contractor shall identify any potential risk areas and shall explain the mitigation for each risk.
The Contractor shall prepare the Production Readiness Review Agenda, Presentation, and Minutes (DI-005).
The following represents the minimum exit criteria for the PRR, and forms the basis for the Government’s determination for Start of Construction authorization:
1) Regulatory Body requirements: In accordance with the ABS rules for vessels built under survey, the Contractor shall present the status of having satisfied the requirement for submittal and approval of Plans showing the arrangements, scantlings, details of principal parts of the hull structure and welding details prior to commencement of construction. The status of the Plans and all ABS comments shall be addressed by an ABS representative.
2) Status Contract Requirements: The following data items shall be submitted in accordance with the Contract and will be evaluated by the Government at the PRR:
i. DI–006: Integrated Master Schedule
ii. DI-007: Drawing Schedule and Documentation Schedule
iii. DI-008: Material Ordering Schedule
iv. DI–014: Classification Society or Regulatory Body Communications
v. DI–047: Preliminary Facility Certification Request (FCR)
3) Functional Design Completion: The craft’s Functional Design shall be one hundred (100) percent complete. The products that comprise the Functional Design that shall be one hundred (100) percent complete are listed in the table below. These products and documents that comprise the Functional Design shall have a documented resolution to all comments related to contract compliance concerns. The associated DRLs shall be delivered no later than thirty (30) days prior to the commencement of PRR.
Functional Design Products
| DRL |
| TITLE |
| DI-010 |
| MASTER EQUIPMENT LIST |
| DI-021-01 |
| TRIM AND STABILITY BOOKLET |
| DI-021-03 |
| STABILITY REPORT |
| DI-021-04 |
| BUCKLING AND ULTIMATE STRENGTH ASSESSMENT |
| DI-021-05 |
| PONTOON DECK LOAD CALCULATIONS |
| DI-021-06 |
| SEAKEEPING ANALYSIS |
| DI-021-07 |
| CRAFT DRAWING INDEX |
| DI-021-10 |
| FIRE STRUCTURAL PROTECTION DRAWING |
| DI-021-11 |
| HULL LINES DRAWING |
| DI-021-12 |
| MIDSHIP SECTION DRAWING |
| DI-021-13 |
| TYPICAL SECTION DRAWING |
| DI-21-14 |
| COMPARTMENT ARRANGEMENT AND OUTFITTING DRAWING |
| DI-021-15 |
| GENERAL ARRANGEMENT DRAWING |
| DI-021-16 |
| MACHINERY ARRANGEMENT DRAWING |
| DI-021-17 |
| TOPSIDE ARRANGEMENT DRAWING |
| DI-021-18 |
| DECK AND PLATFORM DRAWING |
| DI-021-19 |
| CONTROL HOUSE STRUCTURAL DRAWING |
| DI-021-21 |
| ELECTRICAL DISTRIBUTION SYSTEM ONE-LINE DIAGRAM |
| DI-021-22 |
| ELECTRICAL POWER LOAD ANALYSIS |
| DI-021-24 |
| ELECTRICAL SYSTEM FAULT CURRENT ANALYSIS |
| DI-021-25 |
| LIGHTING SYSTEM ONE-LINE DIAGRAM |
| DI-021-26 |
| PROTECTIVE DEVICE COORDINATION STUDY |
| DI-021-36 |
| HVAC DIAGRAMS |
| DI-021-38 |
| FIRE CONTROL AND SAFETY PLANS |
| DI-021-40 |
| MOORING, SHIP HANDLING AND TOWING DESIGN AND DIAGRAMS |
| DI-021-48 |
| CATHODIC PROTECTION DRAWING |
| DI-021-49 |
| PAINT SCHEDULE |
| DI-046-03 |
| BALLAST SYSTEM REPORT AND DIAGRAM |
| DI-046-12 |
| FILL, VENT, AND SOUNDING SYSTEM REPORT AND DIAGRAM |
4) There shall be no open Requests for Variance at PRR.
5) The Contractor shall provide evidence of readiness of the construction facilities.
6) The Contractor shall provide evidence that manning resources are available to support planned production.
7) A comprehensive schedule for the Detail Design effort that demonstrates that Production Work Packages and the flow of production information will support and sustain start of construction, as a measure of production unit/module readiness. 85% of the Detail Design shall be complete based on contractors IMS, and at least three (3) months of production work, verified by 3D product model, in the form of Production Work Packages shall be complete and provided for review.
8) The contractor shall submit a Preliminary Facilities Certification Request (FCR).
C-3.042c SCHEDULES The Contractor shall prepare an Integrated Master Schedule (DI-006) demonstrating all efforts required to meet the requirements of DD&C have been integrated. The Integrated Master Schedule (IMS) shall demonstrate the overarching technical architecture being proposed, meet the stated schedule requirements for contract milestones and delivery, demonstrate logistical flow, provide reasonable critical path for the Program, and provide minimum-maximum task duration with supporting rationale for those tasks identified as moderate or high risk.
The Contractor shall maintain consistent dates and terminology amongst schedules. The event based IMS shall define the critical path and provide a total integrated overview depicting all activities required for the performance of the Contract. The following detailed schedules shall be provided as extractions from the IMS:
| 1) | Detail Design Schedule |
| 2) | Erection Sequence Schedule |
| 3) | Schedule of Major Milestones and Key Events |
| 4) | Test and Trials Schedule |
For each submission of detailed schedules in the Schedule, the Contractor shall include the Actual Start and Actual Completion dates for all tasks and events completed to date of that submission.
The Contractor shall prepare a Drawing Schedule and Documentation Schedule (DI-007) of all drawings, modeling and simulation reports, analyses, and associated lists.
The Contractor shall prepare a Material Ordering Schedule (DI-008) of all materials, equipment, components and systems ordered.
C-3.042d PURCHASE ORDERS The Contractor shall prepare a Purchase Order Index (DI-009) of all Purchase Orders (PO) issued. POs with all attachments and/or purchase specifications including terms and conditions shall be made available upon Government request.
C-3.042e MASTER EQUIPMENT LIST The Contractor shall prepare, update and maintain a Master Equipment List (DI-010) for the following items:
| 1) | Equipment with procurement costs greater than $5,000 |
| 2) | Pumps (motor greater than 10 hp) |
| 3) | All equipment subject to domestic source restrictions in DFARS 225.70 and 225.71, if applicable |
C-3.042f LAUNCHING AND DOCKING INFORMATION The Contractor shall prepare Launching and Docking Information (DI-011) describing the facilities and procedures and containing supporting calculations. The Contractor shall include all relevant information needed to demonstrate readiness for launch of the AFDM in production using Launching and Docking Information (DI-011).
C-3.042g CRAFT DAMAGE REPORT In the event the craft is damaged (including damage from launching, docking/undocking, collision, allision, mooring, or grounding), the Government shall be notified in writing. The Contractor shall perform an assessment of possible damage. If requested by the Government, the craft shall be drydocked and examined at no expense to the Government. The Contractor shall prepare a Craft Damage Report (DI-012) for each incident.
C-3.045a CARE OF THE CRAFT The Contractor shall maintain the craft, including all Contractor Furnished Material (CFM) in a satisfactory condition during the entire period the craft is in the Contractor's possession. The Contractor shall take shelf life or service life limitations of CFM into account when procuring, handling, storing and installing to maximize useful life to the Government after delivery of the craft.
The Contractor shall provide protection of equipment from the time of procurement until craft delivery. The Contractor shall ensure that all equipment is properly maintained during periods of inactivity. The Contractor shall appropriately warehouse equipment prior to installation on the craft. The following additional requirements apply:
| Protective Level |
| Type of Equipment |
| Protection Required |
| I |
| Equipment and panels which have components with glass surfaces (Plan Position Indicators (PPI's), gauges, dials etc.). |
| Fitted, multi-layered cover on front, consisting of two layers of Herculite one layer Refrasile and one layer of 5/8" Scotch Foam Sewn-in guards of fire retardant plywood or sheet metal peel-a-strip on exposed surfaces. |
| II |
| Equipment and panels which have fragile, protruding appendages (louvers, knobs, actuators, etc.) |
| Fitted front cover, padding taped to equipment where necessary. Peel-a-Strip on exposed surfaces. |
| III |
| Cabinets which have selfventilating intake and exhaust openings, but no exposed glass surfaces or fragile protrusions. |
| Taped on cover, Peelastrip on exposed surfaces. |
| IV |
| Fluid system accessories (thermometers, sight glasses, sensing devices, flow indicators, pressure gauges etc.). |
| Sheet metal covers, pads as necessary, taped on Herculite covers. |
| V |
| Mechanical Equipment |
| Sheet metal covers |
During construction, the Contractor shall keep the craft free of chips, shavings, refuse, dirt, cigarette butts, water, and other extraneous matter. The Contractor shall keep piping and ducting openings sealed prior to and after installation into the craft. The Contractor shall clean tanks and voids. Tanks and voids shall pass Government inspection before being closed. The Contractor shall remove rubbish from places which are to be permanently closed or which may become inaccessible. Appropriate measures shall be taken to minimize wear and damage incident to construction, and to prevent corrosion or other deterioration. The Contractor shall activate electric motor strip heaters as soon as power can be made available. Otherwise, the Contractor shall provide heat lamps or other heating devices for all electric motors and other equipment subject to damage from condensation.
The Contractor shall protect machine parts, both interior and exterior, against corrosion and deterioration during the interval between manufacturing and craft delivery. Preservative on working parts shall be removed prior to operation of the machinery or equipment. If removal of storage preservative is necessary for testing the machinery or equipment before installation on the craft, the Contractor shall return machinery or equipment to a preserved state and protect the machinery or equipment in accordance with the manufacturer’s instructions. The Contractor shall protect piping, machinery, and equipment from damage such as freezing or other adverse environmental conditions. Equipment, prefabricated parts, furniture, outfit and outfitting material which is stowed in warehouses or on piers during construction of the craft, shall be free of vermin before being placed onboard. The Contractor shall keep clean and protect parts and equipment, including those having working surfaces or passages, or piping for lubricating and hydraulic oil, during manufacture, storage, assembly, and installation.
The Contractor shall protect equipment from the elements. After manufacture and prior to installation on the craft the Contractor shall protect equipment by stowing inside a building/container or sealed by a vacuum pack wrapping as appropriate and approved by the manufacturer. Equipment installed and bolted to respective foundations on the craft in the weather or stowed on deck in the weather shall have weatherproof covers installed and have all non-CRES parts preserved against corrosion. The Contractor shall coat installed wire rope in accordance with manufacturer's recommendation practices. The Contractor shall coat hydraulic rams exposed to the weather with marine grade grease and covered. Within ten working days after installation on the craft, the Contractor shall energize heater circuits. If craft's power is not available at the time of heater circuit installation, the Contractor shall provide temporary power. Furthermore, the Contractor shall maintain proper hydraulic fluid levels, replace filters, lubricate moving parts and protect wire rope as required by the technical manuals and manufacturers’ recommendations for the equipment. In addition to the general requirements defined above, the Contractor shall protect and maintain clean craft machinery and equipment at all times against dust, moisture, metal chips, sandblasting grit, and other foreign matter.
The Contractor shall thoroughly clean, flush, and verify all vents, ducts, and tanks free of contaminants and industrial and foreign material prior to use.
During the fabrication, installation, and testing of all piping systems, the Contractor shall keep openings tightly sealed to prevent intrusion of dirt and moisture. The Contractor shall thoroughly clean all piping, fittings, and applicable equipment after fabrication and prior to installation. After installation, the Contractor shall thoroughly clean and flush each applicable system (e.g. chilled water) of all foreign matter in accordance with manufacturer’s requirements with the applicable system’s medium, or an approved substitute. The Contractor shall conduct system flushing at or near the system design operating pressure at a line velocity to achieve a Reynolds Number of not less than 4000 in the piping under flush. The Contractor shall use temporary strainers and may use line vibrators. The contractor shall line temporary strainers with 125 to 200 micron filter bags (five micron for fuel and hydraulic systems). The Contractor shall stop the flushing and inspect the filter bags at no longer than 2-hour intervals, discarding the contents on completion of each inspection.
The contractor shall continue to flush and inspect until completion of two consecutive satisfactory inspections, whereupon the contractor shall approach the Customer to present a final 2-hour flush for validation. Criterion for satisfactory final flush shall be free of visible contaminants that cannot be crushed by finger.
Prior to and during use, craft ventilation systems shall have uptake filters installed and maintained. The Contractor shall provide continuous cathodic protection as soon as the craft is waterborne, using the craft's cathodic protection system or a temporary cathodic protection system.
Prior to trials, all filters shall be as new or replaced with new and the interior and exterior of the craft shall be swept, washed down, and otherwise cleaned, and the vessel put in a habitable condition.
C-3.045b FIRE AND FLOODING PREVENTION
The Contractor shall prepare a Fire and Flooding Protection Plan (DI-013). The Contractor shall maintain a plan of fire prevention, fire detection, and firefighting to protect each craft module assembly and the assembled craft prior to delivery. The Contractor shall maintain a plan of flooding prevention, flooding detection, flooding repair and dewatering capability to protect the craft while it is waterborne and prior to delivery. The Contractor shall conduct training drills for the shipyard’s employees at the beginning of construction, and at intervals of not more than each six (6) months thereafter. Fire and flooding protection organization charts and instructions shall be prepared and posted.
C-3.070 CLASSIFICATION SOCIETY AND REGULATORY BODIES, STANDARDS, CERTIFICATIONS
The craft and its systems as delivered shall comply with all the applicable laws of the United States and the requirements of the Regulatory Bodies and ABS, in issue at the time of the proposal due date, and as identified in the Contract. The Contractor shall obtain and provide all necessary certifications or documents that cover the Regulatory Body approvals and indicate additional compliance.
Additionally, the Contractor shall accomplish all work necessary to comply with those applicable laws of the United States and the requirements of the Regulatory Bodies that are imposed as a requirement subsequent to the award and shall be accomplished in order to obtain certification prior to delivery.
The Contractor shall prepare Classification Society or Regulatory Body Communications (DI-014) that will include correspondence with enclosures between the Contractor and Regulatory Bodies. The Contractor shall prepare copies of Classification Society and Regulatory Body Certificates, Statements, and Letters (DI-015).
The Government shall be invited to attend the Contractor/ABS kick-off meeting.
If the Contractor and its subcontractors and vendors intend to use the ABS website, Eagle Construct 02E, (Eagle Construct) for the submittal of all drawings and plans that require ABS review and approval, three (3) Government representatives shall be granted project accounts. PMS 325 shall be designated as the owner and granted the highest level of oversight access in the ABS website for the AFDM Program including all Contractor and subcontractor submittals and transmissions to ABS, ABS responses, and other outstanding technical comments. The highest level of oversight access is the level which corresponds to the most visibility of data, including email notification for transmittals and approvals as well as drawing download capability. The plan submittal schedule shall be submitted to the ABS website to allow ABS to track progress on all planned submittals and to determine the required ABS resource loading needed to support plan reviews. The Contractor shall simultaneously provide copies of all Regulatory Body submittals to the Government. Should a new Regulatory Body website be set up during this Contract, the Government shall be granted the same level of access.
C-3.077 INTEGRATED ENVIRONMENTAL, SAFETY, AND HEALTH
The Contractor shall comply with Federal, State, and Local Integrated Environmental, Safety, and Health (IESH) requirements and the IESH requirements of this contract. System safety engineering and management controls shall be integrated into the design and construction process with emphasis on minimizing mishap risk and avoiding hazardous operations. System safety and risk items shall be addressed at the Design Review and each IPR.
The Contractor shall provide sufficient information in the Builders Trials and Acceptance Trials Agendas to support the Government’s compliance with the National Environmental Protection Act (NEPA) including test locations, time of year, duration and identification of test elements that may impact the human environment.
Asbestos and lead paint shall not be used in the construction of the craft. The use of and dependence on hazardous material, as defined in 40 CFR 116.4, throughout the craft life cycle shall be avoided. Pollution prevention measures, including source reduction and material substitution shall be incorporated in the craft design. Alternatives to hazardous material shall be used where applicable. Class I and Class II ozone depleting substances, as defined by the Clean Air Act, 42 United States Code (U.S.C) section 7671, are prohibited in all craft systems and equipment. If the Contractor is unable to satisfy a requirement without the use of a Prohibited or Restricted substance, the Contractor shall prepare a NAVSEA Hazardous Material Waiver Request (DI-016). The Contractor shall prepare Safety Data Sheets (DI-017) for all applicable substances.
The Contractor shall prepare a Lithium Battery Report (DI-045) identifying the location of all lithium batteries.
C-3.080a INTEGRATED LOGISTICS SUPPORT
The Contractor shall prepare an Integrated Logistics Support Management Plan (DI -018).
C-3.080b UNIQUE IDENTIFICATION
The Contractor shall provide IUID marking and associated data in accordance with DFARS Clause 252.211-7003 and the requirements provided in the following description.
IUID is a set of data marked on items that is globally unique, unambiguous, and robust enough to ensure data information quality throughout the life of the unit until disposal and to support multi-faceted applications and users. The unique item identifier and the component data elements of the unique item identifier shall not change over the life of the item. The IUID component data elements, at a minimum, shall be contained in a Data Matrix ECC200 symbol, as required by MIL-STD-130 latest revision.
The enterprise (i.e., a manufacturer or vendor) shall be responsible for implementation of the Unique Identification marking/Automatic Identification Technology (UID/AIT) program in accordance with the Department of Defense Guide to Uniquely Identifying Tangible Items Rev 2.0 dated 01 October 2008, and with the Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.211-7003 Item Identification and Valuation and the updated final rule for UID DFARS Clause 252.211-7003, dated March 2016 (hereafter referred to as “UID DFARS Clause”) These documents can be found at http://www.acq.osd.mil/dpap/uid.
The physical marks that contain the IUID-required elements shall remain legible until the item is destroyed. Where space is available, human readable information for IUID data elements shall be marked on the item. MIL STD 130 latest revision provides information on various marking methods, surface requirements, and verification criteria. The preferred placement of the mark on the part is in the installed position whenever possible. This will allow personnel to read the mark without necessitating its removal. For parts already marked with a label or data plate, the contractor shall remove and add additional IUID information if space is available on the current label or replace with a label or data plate containing IUID information in addition to existing information. The verification grade for the IUID marking on all items marked will be in accordance with MIL-STD 130 latest revision.
Notwithstanding DFARS Clause 252.211.7003, the Contractor shall prepare Item Unique Item Identification Information (DI-019) for the items to be marked, as specified in Contract Attachment J-4.
Data submission – The Contractor shall submit information required by the IUID DFARS Clause in accordance with the procedures at http://www.acq.osd.mil/dpap/uid.
During Acceptance Trials (AT) and/or receipt inspection, the Government will verify the UID markings on the equipment listed.
C-3.083 SUPPLY SUPPORT
The Contractor shall prepare a Vendor Recommended Spares (VRS) Listing and Statistics (DI-020) to sustain operation and maintenance of each piece of equipment, component, or system onboard for 90 days.
The Contractor shall procure all spare parts identified and approved by the Government, in accordance with the general requirements in Section C of the contract entitled “PROVISIONED ITEMS ORDER ALT II”. The Contractor shall package each 90-day supply of spares to be delivered with each craft. Any additional quantities of spare parts during the production period shall be procured by the Contractor as requested by the Government.
The Contractor shall ensure that any required portable and electronic test equipment to be used for testing and measurements shall be in calibration during tests and trials and recalibrated prior to craft delivery.
The Contractor shall accomplish the receipt, inspection, identification, segregation, marking, packaging, packing and storage of any Government approved VRS received at the Contractor’s facility. The Contractor shall ensure that 100% of any Government-approved VRS is procured, validated and loaded onboard prior to craft delivery. The Contractor will be responsible for identifying any spares necessary or required to be onboard to support craft Trials. Any Government-purchased spares utilized as a replacement part during Contractor-sponsored trials will be required to be re-procured at the Contractor’s expense and provided to the Government. The Contractor shall ensure any shelf-life material has a minimum of six months of shelf life remaining at craft acceptance. Spares ordering and receipt status shall be presented at all scheduled ILS meetings and as requested by the Government.
C-3.084 PREPARATION FOR DELIVERY OF THE CRAFT
The craft shall be delivered with all items such as, but not limited to, equipment, accessories, appliances, plumbing fixtures, bulkheads (interior and exterior), floors and decks, ceilings and overheads, windows, machinery spaces, etc., displaying an obvious appearance of being new and unused. The craft shall be free of dirt and debris associated with construction and adequately prepared for transportation to destination. The craft shall, in addition to the above, also display the highest level of cleanliness such that all areas of the craft can be immediately put to its intended use.
The craft systems shall be in operating condition at delivery of the vessel. Equipment having periodic certification and/or calibration requirements shall have a minimum of eleven (11) months remaining of the certification and/or calibration period at delivery of the vessel. Inter-compartment cables not connected to equipment shall have ends sealed and taped off and shall be individually coiled and secured. Non-consumable items with shelf life or service life limitations shall have a minimum of 75% of their useful life remaining at delivery.
The Contractor shall deliver the craft fully outfitted, ready to receive cargo and crew, and with approvals and certifications in place. The Contractor shall deliver the craft at a draft and trim condition that is within the limiting requirements for full load condition. The Contractor shall ensure that the delivery condition is restored in accordance with the above criteria where it becomes necessary to obtain a differing temporary condition to clear an obstruction (low bridge, shallow draft, narrow beam clearance, etc.) on the way to open ocean.
The contractor shall ensure the transportation to delivery destination is in accordance with the U.S. Navy Tow Manual (SL740-AA-MAN-010) and verified by the Government prior to embarkment.
C-3.085a DRAWINGS AND DOCUMENTATION The Contractor shall develop all craft drawings, equipment drawings and design calculations for construction of the craft. The requirements of the Contractor Craft Specification shall be incorporated into the drawings to the extent that the drawings are self-sufficient and fully describe construction of the craft without reference to the Contractor Craft Specification. The Contractor Craft Specification shall be updated by the Contractor as necessary during contract performance to incorporate changes resulting from J-1 Specification updates.
The Contractor shall prepare Construction Drawings and Documentation (DI-021), Auxiliary System Design Report and Diagrammatics (DI-046) and Cybersecurity Information for Control systems (DI-049). The Contractor shall conduct a survey prior to delivery and update all drawings and documentation to reflect the as-built condition of the craft, including all drawings and documentation required by Classification Society and Regulatory Bodies. The latest revision of drawings shall reflect the current status of changes and variations.
If defects develop in machinery, systems, or equipment during the Warranty Period in accordance with Attachment J-3: Commercial Warranty Terms, and if corrections of such defects are determined to be the responsibility of the Contractor, and if the correction requires an engineering change, the Contractor shall revise and provide new drawings, including all drawings and documentation required by Regulatory Bodies, to the Government that show modifications made to correct such defects.
The Contractor shall prepare the following drawings and documentation:
1) TRIM AND STABILITY BOOKLET (DI-021-01)
2) ACOUSTIC TREATMENT AND INSULATION SCHEDULE (DI-021-02)
3) STABILITY REPORT (DI-021-03)
4) BUCKLING AND ULTIMATE STRENGTH ASSESSMENT (DI-021-04)
5) PONTOON DECK LOAD CALCULATIONS (DI-021-05)
6) SEAKEEPING ANALYSIS (DI-021-06)
7) CRAFT DRAWING INDEX (DI-021-07)
8) OEM COMMERCIAL WARRANTY SHEETS AND REGISTRATION FORMS (DI-021-08)
9) APPENDAGE DRAWING (DI-021-09)
10) FIRE STRUCTURAL PROTECTION DRAWING (DI-021-10)
11) HULL LINES DRAWING (DI-021-11)
12) MIDSHIP SECTION DRAWING (DI-021-12)
13) TYPICAL SECTION DRAWING (DI-021-13)
14) COMPARTMENT ARRANGEMENT AND OUTFITTING DRAWING (DI-021-14)
15) GENERAL ARRANGEMENT DRAWING (DI-021-15)
16) MACHINERY ARRANGEMENT DRAWING (DI-021-16)
17) TOPSIDE ARRANGEMENT DRAWING (DI-021-17)
18) DECK AND PLATFORM DRAWING (DI-021-18)
19) CONTROL HOUSE STRUCTURAL DRAWING (DI-021-19)
20) BALLAST CONTROL CONSOLE ARRANGEMENT (DI-021-20)
21) ELECTRICAL DISTRIBUTION SYSTEM ONE-LINE DIAGRAM (DI-021-21)
22) ELECTRICAL POWER LOAD ANALYSIS (DI-021-22)
23) ELECTRICAL POWER SYSTEM DIAGRAM (DI-021-23)
24) ELECTRICAL SYSTEM FAULT CURRENT ANALYSIS (DI-021-24)
25) LIGHTING SYSTEM ONE-LINE DIAGRAM (DI-021-25)
26) PROTECTIVE DEVICE COORDINATION STUDY (DI-021-26)
27) SWITCHBOARD DETAILS (DI-021-27)
28) SHORE SERVICE CONNECTIONS DRAWING (DI-021-28)
29) COMPUTER NETWORK DIAGRAMMATIC DRAWING (DI-021-29)
30) GENERAL ANNOUNCING SYSTEM DRAWING (DI-021-30)
31) INTERIOR COMMUNICATION SYSTEM BLOCK WIRING DIAGRAM (DI-021-31)
32) TELEPHONE DIRECTORY (DI-021-32)
33) VIDEO SURVEILLANCE SYSTEM DRAWING (DI-021-33)
34) ALARM SYSTEM DRAWING (DI-021-34)
35) LIST OF CLOSURES (DI-021-35)
36) HVAC DIAGRAMS (DI-021-36)
37) STORES HANDLING DRAWING (DI-021-37)
38) FIRE CONTROL AND SAFETY PLANS (DI-021-38)
39) EQUIPMENT REMOVAL DRAWING (DI-021-39)
40) MOORING, SHIP HANDLING AND TOWING DESIGN AND DIAGRAMS (DI-021-40)
41) DRY DOCK CRANE REPORT AND DRAWINGS (DI-021-41)
42) SHIP ACCESS BROWS (DI-021-42)
43) SHIP SERVICE BOOMS AND PLATFORMS (DI-021-43)
44) SHORE SERVICE PLATFORMS (DI-021-44)
45) FURNITURE AND EQUIPMENT OUTFITTING LIST (DI-021-45)
46) LIST OF LABELS AND MARKINGS (DI-021-46)
47) KEY TAG INDEX (DI-021-47)
48) CATHODIC PROTECTION DRAWING (DI-021-48)
49) PAINT SCHEDULE (DI-021-49)
50) DECK COVERING SCHEDULE (DI-021-50)
51) DOCKING PLAN (DI-021-51)
52) LADDERS AND HANDRAILS SCHEDULE (DI-021-52)
53) LIST OF GAUGES (DI-021-53)
54) PEDESTRIAN ACCESS RAMP ARRANGEMENT,
LOAD CALCULATIONS, AND DETAILS (DI-021-54)
55) VEHICLE BRIDGE DESIGN REPORT (DI-021-55)
56) VEHICLE BRIDGE ARRANGEMENT AND PRODUCTION LEVEL DETAILS (DI-021-56)
57) AUXILIARY SYSTEM DESIGN REPORT AND DIAGRAMMATICS (DI-046)
58) GRIT AND BLAST SYSTEM REPORT AND DIAGRAM (DI-046-01)
59) MACHINERY COOLING SYSTEM REPORT AND DIAGRAM (DI-046-02)
60) BALLAST SYSTEM REPORT AND DIAGRAM (DI-046-03)
61) COMPRESSED AIR SYSTEMREPORT AND DIAGRAM (DI-046-04)
62) TANK LEVEL INDICATION SYSTEM REPORT AND DIAGRAM (DI-046-05)
63) POTABLE WATER SYSTEM REPORT AND DIAGRAMS (DI-046-06)
64) GRAY WATER SYSTEM REPORT AND DIAGRAM (DI-046-07)
65) BLACK WATER SYSTEM REPORT AND DIAGRAM (DI-046-08)
66) FUEL OIL SYSTEM REPORT AND DIAGRAM (DI-046-09)
67) CHT SYSTEM REPORT AND DIAGRAM (DI-046-10)
68) DECK AND SPACE DRAIN SYSTEM REPORT AND DIAGRAM (DI-046-11)
69) FILL, VENT, AND SOUNDING SYSTEM REPORT AND DIAGRAM (DI-046-12)
70) FIXED FIRE EXTINGUISHING SYSTEM REPORT AND DIAGRAM (DI-046-13)
71) FIRE MAIN SYSTEM REPORT AND DIAGRAM (DI-046-14)
72) CYBERSECURITY INFORMATION FOR CONTROL SYSTEMS (DI-049)
73) CONTRACTOR FURNISHED EQUIPMENT INFORMATION SYSTEMS USING DOD INFORMATION (DI-049-01)
74) CONTROL AND COMMUNICATION SYSTEMS MAPPING (DI-049-02)
75) UNNECESSARY SERVICES AND PROGRAMS (DI-049-02)
76) HOST INTRUSION DETECTION SYSTEM (DI-049-03)
77) CONTROL SYSTEM CONFIGURATION (DI-049-04)
78) PATCH MANAGEMENT AND UPDATE PROCESS (DI-049-05)
79) FIREWALL RULE SETS (DI-049-06)
80) RESTORATION PROCEDURES (DI-049-07)
C-3.085b TECHNICAL DATA
Rights in Technical data and technical data marking requirements are in accordance with DFARS 252.227-7013 Rights in Technical Data—Non-commercial Items and DFARS 252.227-7015 Rights in Technical Data—Commercial Items as applicable, as invoked in Section I of this RFP. The Government desires at least Government Purpose Rights (GPR), as that term is defined in DFARS 252.227-7013, in all technical data and computer software relating to the Auxiliary Floating Dry Dock - Medium, including all of its components and subsystems, and the TDP in order to support its goal and ability to support and sustain the Auxiliary Floating Dry Dock - Medium over its lifetime and to provide for competitive solicitation of a follow on contract. Data rights shall be unlimited for non-commercial technical data (drawings, manuals, etc. developed by the builder) provided to support acceptance, operation/training, maintenance, repair, modification and supply support for the delivered craft. Hull lines drawings and other proprietary details of the craft/system design shall be marked for limited release per DFARS 252.227-7013; such drawings will only be used within the Government for acceptance, operation/training, maintenance, repair, modification and supply support for the delivered craft. The contractor is not to deliver any technical data with restrictions on reproduction or release unless valid rationale is provided as required by DFARS 252.227-7037, Validation of Restrictive Markings on Technical Data, as invoked in Section I of this solicitation.
C-3.085c PRODUCTION LEVEL DATA PACKAGE
In order to support follow-on competitive contract awards of additional craft of the same configuration, the Government may exercise option CLIN 1006 to acquire Government Purpose rights to technical data per DFARS clause 252.227-7013 (Rights in Technical Data –Non-Commercial Items) that would permit another qualified contractor to produce the same configuration. If exercised, the Contractor shall provide all data developed in the execution of this contract necessary for a competent craft builder to manufacture the craft without any help beyond the provided Data Package in a Production Level Data Package (DI-022).
The Production Level Data Package only consists of production data the builder would normally develop in the execution of this contract. Listing of specific data elements in the Data Item is intended to be descriptive, not prescriptive. There is no expectation that additional data will be developed for the Production Level Data package than what the builder would typically develop for their own use. The data shall be developed in the Contractor's format for in house use. Final Production data shall be delivered under CLIN 1006 and be reflective of all modifications and ECP's adjudicated at the time of the order.
C-3.086a COMMERCIAL TECHNICAL MANUALS AND SUPPLEMENTAL DATA
The Contractor shall provide Commercial Technical Manuals and Supplemental Data (DI-023) that support operation and maintenance for all equipment and components installed onboard the craft.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .