DPW063113P-PLANS_DRAWINGS-14 APRIL 2023-B272 REPAIR FLOOR TILE BY REPLACEMENT.pdf
PDF 1 MB Posted
- Attached to
- Flooring Contract
- Solicitation number
- W911SG23B0002
About this file
This set of engineering drawings and specifications is for a flooring replacement project at Building 272 on White Sands Missile Range in New Mexico. The project involves demolishing existing porcelain tile and porcelain cove base flooring in designated areas, preparing surfaces, and installing new porcelain tile and cove base using DalTile and Marazzi materials. The drawings depict the project location, demolition plan, and new flooring plan. The specifications require tile, cove base, door thresholds, transition strips, and edging to match the provided product data. The contractor must submit samples for approval, dispose of hazardous materials, and follow abatement procedures. This project is in support of Solicitation Number W911SG23B0002 for flooring services issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Sign In Roster.pdf | ||
| Solicitation Amendment P0002.pdf | ||
| Solicitation Amendment.pdf | ||
| Wage Determination1.pdf | ||
| Solicitation Updated_W911SG23B0003_8.25.2023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGNED
CHIEF, ENGINEERING DIVISION
DATE
APPROVED
RECOMMENDED
BRANCH CHIEF
SUBMITTED
PROJECT MANAGER
CHECKED
DRAWN BY
NO. DATE
DRAWING NUMBER
SCALE
SHEET OF
SHEET
DESCRIPTION
REVISIONS
APPROVEDBY
SHEET SIZE
X/X"=1'-0"
WHITE SANDS MISSILE RANGE, NEW MEXICO
DIRECTORATE OF PUBLIC WORKS
ENGINEERING SERVICES DIVISION
DRAWING TITLE
WS-272-2023-G-000-01
B272 REPAIR FLOOR TILE
BY REPLACEMENT
COVER/INDEX SHEET
10/14/23
TS
DAVID GARCIA
JAMES NUNEZ
JOHN MORGAN
B272 REPAIR FLOOR TILE BY REPLACEMENT
0%
DESIG
N
DRAWING # TITLE
WS-272-2023-G-000-01 COVER SHEET/INDEX
WS-272-2023-G-100-02 PROJECT LOCATION
WS-272-2023-D-100-03 BLDG. 272 DEMOLITION FLOORING PLAN
WS-272-2023-A-100-04 BLDG. 272 NEW FLOORING PLAN
IS
SUED F
OR
CONSTRUCTIO
N
BUILDING 272
CANTONMENT AREA
PICATINNY
LAS CRUCES GATE ENTRANCE
H
EAD
Q U
AR
TER
S AVEN
U
E O
W
EN
S R O
AD
(R
O U
TE 1)
BUILDING 272
CANTONMENT AREA
ROCK ISLAND
PICATINNY
AE
R
O
BE
E
TH
O
R
H
EAD
Q U
AR
TER
S AVE.
BUILDING 272 PROJECT LOCATION
NTS
DESIGNED
CHIEF, ENGINEERING DIVISION
DATE
APPROVED
RECOMMENDED
BRANCH CHIEF
SUBMITTED
PROJECT MANAGER
CHECKED
DRAWN BY
NO. DATE
DRAWING NUMBER
SCALE
SHEET OF
SHEET
DESCRIPTION
REVISIONS
APPROVEDBY
SHEET SIZE
X/X"=1'-0"
WHITE SANDS MISSILE RANGE, NEW MEXICO
DIRECTORATE OF PUBLIC WORKS
ENGINEERING SERVICES DIVISION
DRAWING TITLE
WS-272-2023-G-100-02
B272 REPAIR FLOOR TILE
BY REPLACEMENT
PROJECT LOCATION
10/14/23
TS
DAVID GARCIA
JAMES NUNEZ
JOHN MORGAN
Ù
Ø
Ú
0%
DESIG
N
PROJECT LOCATION IS
APPROXIMATELY 1/2 MILE
FROM WSMR
CANTONMENT AREA
STAGING
AREA
BLDG. 272
CUTTING AREAS SHALL BE
APPROVED BY COR BEFORE
CONSTRUCTION STARTS.
CONTRACTOR SHALL WORK
ONLY ON THE WEEK DAYS
FROM 1900 TO 0600 HOURS,
AND AT WEEKENDS DURING
REGULAR HOURS (SEE SOW).
IS
SUED F
OR
BLDG. 272 DEMOLITION FLOORING PLAN
SCALE: 3/32" = 1'-0"
DESIGNED
CHIEF, ENGINEERING DIVISION
DATE
APPROVED
RECOMMENDED
BRANCH CHIEF
SUBMITTED
PROJECT MANAGER
CHECKED
DRAWN BY
NO. DATE
DRAWING NUMBER
SCALE
SHEET OF
SHEET
DESCRIPTION
REVISIONS
APPROVEDBY
SHEET SIZE
X/X"=1'-0"
WHITE SANDS MISSILE RANGE, NEW MEXICO
DIRECTORATE OF PUBLIC WORKS
ENGINEERING SERVICES DIVISION
DRAWING TITLE
10/14/23
TS
DAVID GARCIA
JAMES NUNEZ
JOHN MORGAN WS-272-2023-D-100-03
DESIG
N B272 REPAIR FLOOR TILE
BY REPLACEMENT
DEMOLITION FLOORING
PLAN
GENERAL DEMOLITION NOTES
1. CONTRACTOR SHALL TEST ALL MATERIALS TO BE DEMOLISHED AND ALL VISIBLE MATERIALS THAT WILL BE SEEN ONCE EXISTING PORCELAIN COVE BASE AND PORCELAIN FLOOR TILE ARE DEMOLISHED. TESTING SHALL BE PER SOW PART
10-HAZARDOUS BUILDING MATERIALS ABATEMENT, CONTRACTOR SHALL FOLLOW GUIDELINES.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ABATING ALL HAZARDOUS BUILDING MATERIALS FOUND IN THE WORK AREA. ABATEMENT OF HAZARDOUS MATERIALS (INCLUDING ASBESTOS CONTAINING MATERIAL (ACM), LEAD BASED PAINT (LBP), OR MOLD SHALL TAKE PLACE PRIOR TO PERFORMING OTHER WORK OF THIS PROJECT.
3. THE CONTRACTOR SHALL BE RESPONSIBLE TO PERFORM ABATEMENT AND DISPOSAL OF ALL HAZARDOUS BUILDING MATERIALS IN ACCORDANCE WITH ALL APPLICABLE LAWS, RULES AND REGULATIONS. THE CONTRACTOR SHALL COORDINATE WITH MR. RAY DURAN, RAYMOUND.B.DURAN.CIV@ARMY.MIL, (575) 678-4641, AT THE HAZARDOUS WASTE
MANAGEMENT CENTER FOR DISPOSAL OF ALL HAZARDOUS WASTE
4. THE CONTRACTOR SHALL NOT DAMAGE ANY FIXED PROPERTY AND PROVIDE TEMPORARY PROTECTIVE COVERS IN A MANNER ACCEPTABLE TO THE GOVERNMENT. THE CONTRACTOR PRIOR TO STARTING REMOVAL OF EXISTING PORCELAIN COVE BASE AND PORCELAIN FLOOR TILE, SHALL MOVE AND COVER ANY FIXED FURNITURE OR FIXED EQUIPMENT WITH FULL COVERS. THE CONTRACTOR SHALL COORDINATE WITH THE COR TO TAKE PICTURES OF THE
EXISTING CONDITIONS BEFORE WORK STARTS.
5. CONTRACTOR SHALL DEMOLISH EXISTING PORCELAIN COVE BASE, AND PORCELAIN FLOOR TILE IN THE DESIGNATED AREAS SHOWN IN THE DRAWINGS, WHICH INCLUDES: ADHESIVES, TRANSITION STRIPS, DOOR THRESHOLDS, EDGING TRIMS, AND ANY OTHER COMPONENTS ASSOCIATED WITH THE EXISTING TILING SYSTEMS. THE CONTRACTOR SHALL FIELD VERIFY EXISTING MATERIAL TYPES, QUANTITIES, SQUARE FOOTAGE AREAS AND ALL DIMENSIONS.
6. THE EXISTING PORCELAIN TILE COVE BASE, PORCELAIN FLOOR TILE, ETC. SHALL BE REMOVED, AND PROPERLY DISPOSED OF OFF-BASE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CLEANUP AND DISPOSAL OF WASTE AND DEBRIS GENERATED DURING AND AT THE COMPLETION OF THIS PROJECT. IN GENERAL, THE WASTE AND DEBRIS SHALL BE DISPOSED OF IAW ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND REGULATIONS. SPECIFICALLY, THE WASTE AND DEBRIS SHALL BE DISPOSED OF IAW THE JURISDICTION HAVING AUTHORITY, INCLUDING, ANY DISPOSAL SITE OUTSIDE THE STATE OF NEW MEXICO. THE CONTRACTOR SHALL ENSURE THAT ALL WASTE AND DEBRIS IS CONTAINERIZED IAW THE U.S. DEPARTMENT OF TRANSPORTATION AND THE JURISDICTION HAVING AUTHORITY LAWS AND REGULATIONS. THE CONTRACTOR SHALL ENSURE THAT ALL WASTE IS CONTAINERIZED IN A MANNER TO PREVENT
UNCONTROLLED AND IMPROPER SPILLS, LEAKS, AND RELEASES
7. CONTRACTOR SHALL CLEAN, PREPARE, REPAIR, RESURFACE THE EXISTING CONCRETE SLAB AREAS & EXISTING WALLS SURFACE AREAS WHERE NEW MATERIALS WILL BE INSTALLED AFTER DEMOLISHING EXISTING PORCELAIN COVE BASE, AND PORCELAIN FLOOR TILE.
8. EXISTING FURNITURE WILL BE REMOVED AND RETURNED TO THE ORIGINAL POSITION BY USER. AFTER THE INSTALLATION OF THE NEW PORCELAIN TILE SYSTEM AND PORCELAIN COVE BASE. COORDINATE WITH COR AT THE
PRE-CONSTRUCTION MEETING
9. EXISTING BUILT-IN FURNITURE WILL REMAIN IN PLACE AND SHALL BE PROTECTED DURING ENTIRE CONSTRUCTION.
CONTRACTOR SHALL BE RESPONSIBLE OF ANY DAMAGES.
DEMOLITION KEYED NOTES
1. CONTRACTOR SHALL FIELD VERIFY QUANTITIES OF PORCELAIN TILE, AND PORCELAIN COVE BASE THAT ARE TO BE
DEMOLISHED.
2. NO WORK IN THIS AREA. GRAY SHADED AREA IS NOT PART OF THE SCOPE OF WORK
3. FIXED FURNITURE OR FIXED EQUIPMENT TO REMAIN IN PLACE AND TO BE PROTECTED DURING ENTIRE CONSTRUCTION
4. CONTRACTOR SHALL PROTECT ALL THE EXISTING RECESSED FLOOR BOXES (CLEAN OUTS) WHICH WILL REMAIN IN
PLACE.
5. CONTRACTOR SHALL ADJUST ALL THE HEIGHTS FOR THE EXISTING WALL VINYL CORNER GUARDS WHICH ARE LOCATED IN THE WORK AREAS TO ACCOMMODATE THE NEW PORCELAIN COVE BASE. ALSO, CONTRACTOR SHALL ADJUST ALL THE EXISTING DOORS AS REQUIRED IN ORDER TO AVOID DIRECT CONTACT WITH THE NEW PORCELAIN TILE.
IS
SUED F
OR
DESIGNED
CHIEF, ENGINEERING DIVISION
DATE
APPROVED
RECOMMENDED
BRANCH CHIEF
SUBMITTED
PROJECT MANAGER
CHECKED
DRAWN BY
NO. DATE
DRAWING NUMBER
SCALE
SHEET OF
SHEET
DESCRIPTION
REVISIONS
APPROVEDBY
SHEET SIZE
X/X"=1'-0"
WHITE SANDS MISSILE RANGE, NEW MEXICO
DIRECTORATE OF PUBLIC WORKS
ENGINEERING SERVICES DIVISION
DRAWING TITLE
10/14/23
TS
DAVID GARCIA
JAMES NUNEZ
JOHN MORGAN WS-272-2023-A-100-04
0%
DESIG
N
B272 REPAIR FLOOR TILE
BY REPLACEMENT
NEW FLOORING PLAN
BLDG. 272 NEW FLOORING PLAN
SCALE: 3/32" = 1'-0"
GENERAL NOTES
1. CONTRACTOR SHALL CLEAN AND PREPARE ALL THE CONCRETE FLOOR SURFACE AREAS TO RECEIVE THE
INSTALLATION OF THE NEW PORCELAIN TILE.
2. THE AREAS SHADED GRAY WILL REMAIN UNDISTURBED. CONTRACTOR SHALL PROTECT THESE AREAS DURING THE
ENTIRE CONSTRUCTION
3. CONTRACTOR SHALL INSTALL NEW PORCELAIN TILE SYSTEM. CONTRACTOR SHALL USE THE BASIS-OF-DESIGN FROM "DALTILE" MANUFACTURER, MODELS: "GRAVEL ROAD - SD86 & GRAVEL ROAD (XT) - SD86" IN ORDER TO COMPLY WITH
ALL THE REQUIREMENTS, (SEE SPECIFICATIONS ATTACHED TO SOW).
4. CONTRACTOR SHALL INSTALL NEW 6" HIGH X 12" WIDE PORCELAIN COVE BASE SYSTEM. CONTRACTOR SHALL USE THE BASIS-OF-DESIGN FROM "MARAZZI" MANUFACTURER, COVE BASE NUMBER P-36C9TB, & COVE BASE OUTCORNER: PC-36C9TB. COLOR: "MC51 TAUPE" IN ORDER TO COMPLY WITH ALL THE REQUIREMENTS, (SEE
SPECIFICATIONS ATTACHED TO SOW).
5. THE CONTRACTOR SHALL INSTALL NEW PORCELAIN COVE BASE AT THE SPACES WHERE THERE IS EXISTING PORCELAIN BASE TILE; PREPARE EXISTING WALL SURFACE AND INSTALL NEW PORCELAIN COVE BASE.
CONTRACTOR SHALL COORDINATE WITH DPW-COR AND SUBMIT THE NEW PORCELAIN COVE BASE FOR APPROVAL BEFORE INSTALLATION. COLORS SHALL BE SELECTED BY DPW-COR. TOP AND BOTTOM GAPS OF THE NEW COVE
BASE SHALL BE ENTIRELY SEALED INCLUDING TOP AND BOTTOM.
6. THE FINAL COLORS SELECTION FOR THE NEW PORCELAIN TILE, AND ALL ITS COMPONENTS SUCH AS GROUT, TRANSITION STRIPS, DOOR THRESHOLDS, EDGING TRIMS, BASE BOARDS, ETC. SHALL BE SELECTED AND APPROVED BY DPW AND THE FACILITY USER (COORDINATE WITH COR). THE CONTRACTOR SHALL PROVIDE A MINIMUM OF SIX (6) PHYSICAL STANDARD SIZE PORCELAIN TILE SAMPLES, BEFORE THE INSTALLATION FOR FINAL APPROVAL. (SEE
SPECIFICATIONS FOR THE SELECTED COLORS).
7. INSTALL NEW ADA COMPLIANT DOOR THRESHOLDS, TRANSITION STRIPS, EDGING TRIMS AS REQUIRED AROUND EXISTING FIXED FURNITURE AND OTHER PLACES REQUIRED TO COVER GAPS, AND ANY OTHER REQUIRED COMPONENTS ASSOCIATED WITH THE NEW PORCELAIN TILE (MATCH ALL COMPONENT ITEMS TO EXISTING). THE CONTRACTOR SHALL FIELD VERIFY THE EXISTING MATERIAL TYPES, FORMS, QUANTITIES, SQUARE FOOTAGE AREAS, AND ALL DIMENSIONS AS PER SCALED DRAWINGS.
8. PORCELAIN TILE SHALL BE FREE OF ANY DENTS OR CRACKS, AND OTHER PHYSICAL AND MANUFACTURING DEFECTS.
9. NEW VINYL/RUBBER TRANSITION STRIPS SHALL BE HEAVY-DUTY AND DESIGNED TO FIT WITH THE TYPE OF EXISTING
CARPET OR TILE ADJACENT TO THE NEW TILING.
10. PORCELAIN TILE SHALL NOT BE INSTALLED ON SURFACES THAT ARE UNSUITABLE AND WILL PREVENT A PROPER INSTALLATION. HOLES, CRACKS, DEPRESSIONS, OR ROUGH AREAS SHALL BE REPAIRED USING MATERIAL
RECOMMENDED BY THE PORCELAIN TILE THIN-SET MANUFACTURER.
11. CONTRACTOR SHALL CUT AND FIT PORCELAIN TILE, TO BUTT TIGHTLY TO VERTICAL SURFACES, PERMANENT FIXTURES, AND BUILT-IN FURNITURE INCLUDING CABINETS, PIPES, OUTLETS, EDGINGS, TRANSITION STRIPS, DOOR THRESHOLDS, WALL BASE BOARDS. BIND OR SEAL CUT EDGES AS RECOMMENDED BY THE PORCELAIN TILE
MANUFACTURERS.
12. IF THE CONTRACTOR SPILLS ANY ADHESIVE, THIN-SET, OR IN ANY WAY SOILS THE WALLS OR OTHER FURNISHINGS, OR DAMAGES ANY FURNISHINGS, THE CONTRACTOR SHALL CLEAN UP AND MAKE REPAIRS USING A SPECIALIST AT
THE CONTRACTOR'S EXPENSE.
13. FOLLOWING COMPLETION OF PORCELAIN TILE REPLACEMENT, THE CONTRACTOR SHALL REMOVE COVERS, CLEAN
THE FIXTURES WITH APPROVED METHOD.
14. THE CONTRACTOR SHALL PROVIDE TO THE GOVERNMENT COR EXTRA PORCELAIN TILE AND PORCELAIN COVE BASE COMPONENTS IN ORDER TO BE STORED BY THE USER. THE QUANTITIES FOR EACH MATERIAL SHALL BE BASED ON
10 PERCENT OF THE TOTAL SQUARE FOOTAGE OF EACH MATERIAL FOR THIS PROJECT.
15. THE CONTRACTOR SHALL INSTALL THE THRESHOLDS AT DOOR OPENINGS ACCORDING TO THE INSTRUCTIONS IN
THE SPECIFICATIONS FOR THIS PROJECT. (SEE THE SPECIFICATIONS ATTACHED TO SOW)
16. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION PHASING PLAN FOR THE DWP COR AND THE USER APPROVAL.
KEYED NOTES
1. AREAS WHERE NEW PORCELAIN FLOOR TILE & PORCELAIN COVE BASE SYSTEM WILL BE INSTALLED (SEE
SPECIFICATIONS)
2. GRAY SHADED AREA IS NOT PART OF THE SCOPE OF WORK, PROTECT DURING CONSTRUCTION
3. EXISTING CLEAN OUT RECESSED BOX. PROTECT DURING CONSTRUCTION AND ADJUST AS NEEDED TO
ACCOMMODATE NEW FLOORING SYSTEM.
4. THE NORTH SIDE OF THE FACILITY IS THE ONLY AREA ALLOWED FOR TILE CUTTING, BEFORE ANY TILE CUTTING OCCURS OUTSIDE THE FACILITY, COORDINATE WITH DPW - COR FOR THE EXACT SELECTED CUTTING AREA LOCATION. PROTECT EXISTING EXTERIOR GROUND SURFACE, BENCHES, LANDSCAPING AND ANY EXTERIOR WALLS
AT THE SELECTED CUTTING AREA DURING THE ENTIRE CONSTRUCTION .
IS
SUED F
OR
| BLDG.272 14 APRIL 2023-COVER PAGE |
| Sheets and Views |
| COVER PAGE |
| BLDG.272 14 APRIL 2023-B1330 PROJECT LOCATION |
| Sheets and Views |
| B1330 PROJECT LOCATION |
| BLDG.272 14 APRIL 2023-BLDG 1330 DEMO FLOORING PLAN |
| Sheets and Views |
| BLDG 1330 DEMO FLOORING PLAN |
| BLDG.272 14 APRIL 2023-B1330 NEW FLOORING PLAN & ROOMS SCHEDULE |
| Sheets and Views |
| B1330 NEW FLOORING PLAN & ROOMS SCHEDULE |
File details come from the government source that posted it. Updated .