Downtown_Irrigation_Repair.pdf
PDF 950 KB Posted
- Attached to
- Downtown Irrigation Repair
- Solicitation number
- RFP 25-108
- Issued by
- Lee County, Fort Lauderdale City, Florida
About this file
This document is a Request for Proposal (RFP) 25-108 issued by the Fort Myers Community Redevelopment Agency (CRA) in Lee County, Florida, seeking qualified contractors for the Downtown Irrigation Repair project. The project involves restoring, mapping, and commissioning an existing irrigation system through comprehensive equipment installation, repairs, electrical grounding, and complete as-built mapping of system functional components. The solicitation was released on October 24, 2025, with a pre-submittal meeting scheduled for October 30, 2025, and proposals due on November 25, 2025, at 2:00 pm. The work includes installing a new Hunter ACC2 75-station controller, 30 Hunter ICD decoders, rebuilding 30 Rain Bird scrubber valves, replacing 75 valve boxes, and addressing wire splices and electrical grounding. The contract term anticipates substantial completion within 150 consecutive calendar days and final completion within 180 consecutive calendar days from the Notice to Proceed.
The project is funded through the Fort Myers Community Redevelopment Agency, which manages redevelopment trusts to revitalize urban areas. The solicitation includes provisions for local and minority business enterprise preferences, with potential evaluation points for businesses located in Fort Myers or Lee County. Contractors must meet minimum qualifications, including holding necessary Florida licenses, being in business for at least three consecutive years, and having no outstanding defaults with the CRA. The estimated project involves detailed technical specifications and requires comprehensive documentation, including zone mapping, CAD files, and final PDF documentation. Liquidated damages provisions are included, with penalties calculated based on the contract value if completion timelines are not met. Contractors must provide comprehensive insurance coverage and comply with various state and local regulations, including E-Verify requirements and public records law provisions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SRF_SupplementaryConditions_Construction_Contract_(August_2022).pdf | ||
| SRF_SupplementaryConditions_EM_Contract_(August_2022).pdf | ||
| Streetscape_irrigation_color_diagram.pdf | ||
| FHWA-1273_(10_23)_.pdf | ||
| Solicitation-Checklists.xlsx | XLSX spreadsheet | |
| Notice_of_Award.docx | DOCX document | |
| 2_CFR_Part_200_app_II_(up_to_date_as_of_4-28-2025).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 25-108
Downtown Irrigation Repair
The City of Fort Myers Procurement Services utilizes an electronic bidding system to streamline the solicitation process.
City of Fort Myers Procurement Services Website https://procurement.opengov.com/portal/cityftmyers
Downtown Irrigation Repair, RFP 25-108
TABLE OF CONTENTS
1. INTRODUCTION
2. PROJECT DETAILS / SCOPE OF WORK
3. EVALUATION PHASES
4. INSTRUCTIONS
5. CONSTRUCTION SUPPLEMENTAL CONDITIONS
6. SOLICITATION TERMS AND CONDITIONS
7. CONTRACT TERMS AND CONDITIONS
8. INSURANCE
9. DEFINITIONS
10. SUBMISSION QUESTIONNAIRE
11. DRAFT CONTRACT
1. INTRODUCTION
1.1. Summary
Summary
The Fort Myers Community Redevelopment Agency (CRA) requests submittals from interested and qualified Respondents to provide:
Project Overview
This project involves the restoration, mapping, and commissioning of the existing irrigation system identified in the color-coded map provided by the City of Fort Myers. Work will include equipment installation, repairs, electrical grounding, and complete as-built mapping of the system’s functional components.
Background
The City of Fort Myers (the “City”), established in 1886, is located on the southern west coast of
Florida. It is the cultural and trade center for Lee County and the surrounding area. The City was built on the site of Fort Harvie and was named for Colonel Abraham Charles Myers, then
Chief Quartermaster of Florida. The City has 1,027 employees serving a population of 102,060 per the 2025 population estimate full time permanent residents with a population growth of
12% between 2020 and 2022. According to the Lee County Visitor & Convention Bureau, nearly 4.5 million people visit Fort Myers each year and spend over $4 billion dollars while in the area. Fort Myers has experienced unprecedented growth in its tax base, as the past (3), year over year percentage increases, were double digit. The City added a total of $5.0 billion to its tax base over the past five years, or 75.6%.
The City is situated between Tampa and Miami along scenic U.S. Highway 41, also known as
Tamiami Trail. Recent accolades for the City of Fort Myers include top ranking for best places to live, to retire, and to start a new business, safest cities in America, #4 college town in
Florida, and most recently the fastest growing place by U.S News and World Report (2024).
The City of Fort Myers is committed to providing exceptional municipal services to residents, businesses and visitors in a fiscally responsible manner while preserving the City’s rich history, diverse culture, and charming lifestyle.
Project Specific Background
ABOUT THE FORT MYERS COMMUNITY REDEVELOPMENT AGENCY (CRA)
Since 1984, the CRA has managed redevelopment trusts to revitalize blighted areas in the City of
Fort Myers. This reinvestment can take the form of public infrastructure, residential and commercial grant programs, public arts, affordable housing development, safety initiatives and historic preservation.
If left under-resourced, parts of our city risk remaining overlooked, affecting community spirit, and slowing economic growth. This lack of redevelopment doesn't just impact current residents—it also discourages potential new businesses and families from making our city their home. Imagine a city where every neighborhood is a beacon of growth and community spirit— a place where residents enjoy sustainable, thriving spaces and businesses benefit from a vibrant economic environment. This is the future we're creating. The Fort Myers Community
Redevelopment Agency was created in 1984 by the City of Fort Myers, Florida, under Florida
Statute Chapter 163. The Fort Myers City Council members, sitting as the Community
Redevelopment Agency Board of Commissioners, oversee the Agency’s programs and policies.
The Fort Myers CRA office is located at 1400 Jackson Street in the historical downtown River
District.
1.2. Advertisement
RFP 25-108 Downtown Irrigation Repair
The City of Fort Myers is seeking submittals for RFP 25-108 Downtown Irrigation
Repair. Submissions must be received electronically on or before Tuesday, November 25, 2025 at
2:00 pm. Interested participants are encouraged to download the solicitation documents. For more details visit https://procurement.opengov.com/portal/cityftmyers
CITY OF FORT MYERS
Marty K. Lawing, City Manager Legal Ad: News-Press/OpenGov
Mary Hagemann, City Clerk RUN DATES: Friday, October 24, 2025
1.3. Contact Information
Direct inquiries to the following:
Procurement Representative Name
Cathy Scott, Procurement Specialist
2200 Second Street
Fort Myers, FL 33901
Email: cscott@fortmyers.gov
Phone: (239) 321-7235
Requesting Department:
Community Redevelopment Agency
1.4. OpenGov Portal
The CRA uses OpenGov (https://procurement.opengov.com/portal/cityftmyers) to administer the competitive solicitation process, including but not limited to soliciting responses, issuing addenda, posting results and issuing notification of an intended decision. There is no charge to register and download the solicitation from OpenGov. Contractor is strongly encouraged to read the various Guides and Tutorials available in OpenGov well in advance of their intention of submitting a response to ensure familiarity with the use of OpenGov. The CRA shall not be responsible for a Contractor’s inability to submit a response by the end date and time for any reason, including issues arising from the use of OpenGov.
1.5. Timeline
The Proposed timeline for this solicitation (which is subject to change) is:
Solicitation Release Date(Non-Mandatory): October 24, 2025
Pre-Submittal Meeting(Non-Mandatory): October 30, 2025, 10:00am
Meet in front of Oxbow Restaurant
1300 Hendry St.
Fort Myers, FL 33901
Question Submission Deadline(Non-
Mandatory):
November 13, 2025, 2:00pm
Submission Deadline(Non-Mandatory): November 25, 2025, 2:00pm
Selection Committee Meeting(Non-
Mandatory):
December 1, 2025, 10:00am
City Hall - Finance West Conference Room
2200 Second Street
Fort Myers, FL
Join the meeting now
Meeting ID: 296 352 723 667 8
Passcode: DV9PB9Xz
Dial in by phone
+1 239-205-3327,,661560269# United
States, Cape Coral
Find a local number
Phone conference ID: 661 560 269# https://teams.microsoft.com/meet/2963527
236678?p=3MQIVfXxR0hdokey5F
Proposed City Council Approval Date(Non-
Mandatory):
December 3, 2025
1.6. Pre-Submittal Meeting
The purpose of a Pre-Submittal Meeting is to review and discuss the solicitation and any addenda as published. A representative from Procurement Services and a representative from https://teams.microsoft.com/meet/2963527236678?p=3MQIVfXxR0hdokey5F https://teams.microsoft.com/meet/2963527236678?p=3MQIVfXxR0hdokey5F the requesting department will be present to discuss the solicitation. The date, time, and location as stated in the 'timeline'.
2. PROJECT DETAILS / SCOPE OF WORK
2.1. Mandatory Minimum Qualifications
1. The Contractor shall hold any necessary license(s) authorizing them to do business in the
State of Florida.
2. Contractor shall have been in business under the current company/firm name for a minimum of three (3) consecutive years.
3. Neither Contractor nor any principal, officer, or stockholder shall be in arrears or in default of any debt or contract involving the CRA, (as a party to a contract, or otherwise); nor have failed to perform faithfully on any previous contract with the CRA.
4. Contractor is required to inform the CRA of any relevant legal or ethical issues. Specifically, they need to disclose:
4.1. Judgments: Any court decisions against them.
4.2. Pending Lawsuits: Any legal actions that are currently underway.
4.3. Criminal Activities: Any criminal conduct, especially if it involves moral turpitude
(actions that are morally reprehensible).
Contractor will be given a chance to explain or provide additional information regarding these issues if applicable. This allows them to clarify any concerns and provide context.
To demonstrate qualifications to perform the Work, each Contractor must be prepared to submit within five (5) days of CRA’s request written evidence, such as financial data, previous experience, present commitments, and other such data as may be called for. Each Solicitation must contain evidence of the Respondent’s qualifications to do business in the State of Florida, or covenant to obtain such qualification, prior to award of the contract.
The Contractor will be required to maintain the Minimum Qualifications Requirements, as presented during selection, if selected and awarded the contract, during the term of the
Contract and any contract renewals.
2.2. Scope of Services
Contractor, hereby agrees to provide and perform the Scope of Services required and necessary to complete the work as set forth below:
Project Overview
This project involves the restoration, mapping, and commissioning of the existing irrigation system identified in the color-coded map provided by the City of Fort Myers. Work will include equipment installation, repairs, electrical grounding, and complete as-built mapping of the system’s functional components.
Repairing Downtown Water Irrigation System
1. Data Collection and Mapping
All existing irrigation system components within the designated area will be located, identified, and documented. These components include:
• Controllers
• Rain sensors
• Backflow prevention devices
• Quick coupling valves
• Electric zone control valves
• Wire splices
• Wire path routes
Zone Mapping:
Zones will be mapped by activating each electric valve to verify zone boundaries.
Deliverables:
• Overall site map in PDF format (field book format)
• Zone description sheet
• CAD files or shapefiles (if requested)
2. System Upgrades and Installation
The following equipment and system upgrades will be included:
• (1) Hunter ACC2 75-station plastic controller with surge protection, rain sensor, and cellular communication module, mounted on a concrete post (electrical service provided by others)
• (30) Hunter ICD decoders with surge protection
• Rebuild (30) Rain Bird scrubber valves, including diaphragm and solenoid replacement.
If a rebuild is not feasible, install new Rain Bird scrubber valves
• Replace (75) valve boxes for splices and electric zone valves
• Replace all faulty wire splices using 3M DBY waterproof connectors
• Locate, troubleshoot, and document the entire 2-wire path
• 4G Wireless Cellular Cartridge with a 1-year subscription
Grounding Requirements:
• Ground 2-wire path at the controller
• Ground at each path terminus and every 1,000 feet using 8-ft, 5/8" ground rods
3. As-Built Documentation & Closeout
Upon project completion, the following documents and services will be provided:
• As-built drawings including:
o 2-wire path map o Zone control valve locations o Splice points o Backflow and quick coupling valve locations o Controller locations o Zone descriptions and coverage areas o Highlighted backflow water supply to match the City's color-coded map
• Final PDF package
• Final walk-through and inspection with City representatives
• Testing and programming of all installations and repairs
4. Exclusions (Not Included in This Proposal)
The following are not included in this scope but may be addressed through a Change Order if needed:
• Replacement of damaged or non-functioning wire
• Directional boring, pavement/sidewalk cutting, or brick removal/replacement due to conduit or sleeve issues
• Repairs to lateral or main irrigation lines, if discovered
• Repair or replacement of sprinkler heads (rotors, sprayers, bubblers)
• Ongoing monthly cellular service subscription for the controller
5. Assumptions and Limitations
• The primary objective is to restore system functionality, map all components, and install modern controls.
• Due to prolonged inactivity and hurricane-related damage, additional unforeseen repairs may be required. These will not be included in the base scope until the system is functional and assessed.
3. EVALUATION PHASES
1. Qualifications of the Contractor
To demonstrate qualifications to perform the Work, each Contractor must be prepared to submit information pertaining to each criterion. Each Submittal must contain evidence of the
Contractor's qualifications to do business in the State of Florida, or covenant to obtain such qualification, prior to award of the contract.
2. Responsiveness
The CRA will determine whether the Contractor complies with the instructions for submissions including completeness which encompasses the inclusion of all required attachments. Late submissions will not be accepted. Failure to meet other requirements may result in rejection.
3. Responsibility
The CRA will determine whether the Contractor is one with whom it can or should do business.
Factors that the CRA may evaluate to determine “responsibility” include, but are not limited to: past performance, references (including those found outside the submittals), compliance with applicable laws, Contractor's record of performance and integrity – e.g. has the Contractor been delinquent or unfaithful to any contract with the CRA, whether the Contractor is qualified legally to contract with the CRA, financial stability and the perceived ability to perform completely as specified. Contractor must always have financial resources sufficient, in the opinion of the CRA, to ensure performance of the contract and must provide proof upon request. The City reserves the right to inspect and review the Contractor's facilities, equipment, and personnel and those of any identified Subcontractor/Subconsultants. The CRA will determine whether any failure to supply information, or the quality of the information, will result in rejection.
4. Technical/Qualification Submittal
Each proposer must be organized with section tabs for ease of review in the same order as described in the criteria.
The CRA will determine how well submissions meet the requirements in terms of the response to the specifications and how well the offer addresses the needs of the project.
5. Selection Committee and Evaluation Process
5.1. Procurement Services
Procurement Services will perform the initial review of all submittals for preliminary qualification and documentation compliance. This review process may include, but is not limited to, forms verification, professional licensing, references, past performance, and other relevant criteria and review of the MBE and Local preference if applicable. This will confirm the Contractor's submissions are responsive to the solicitation request.
Procurement staff will review of all responsive submissions and forward it with the responsive submissions to the Selection Committee for further analysis. This analysis may include evaluation of scope requirements and price, if applicable as stated in this solicitation.
5.2. Selection Committee
A Selection Committee (hereinafter referred to as “the Committee”) consisting of at least three (3) members will be established to review, discuss, and evaluate all responsive submissions. The Committee may utilize additional CRA staff, consultants and experts as either voting or non-voting members to advise and assist the Committee in review of the submissions.
A Selection Committee, appointed in accordance with the City’s policies and procedures, will individually review and evaluate all eligible submissions based on the factors set forth in the Evaluation Criteria of the Solicitation and assign a score for each criterion ranging from zero (0) points to the maximum points allowed for each rating criteria. This will be completed before the selection committee meeting. The Committee will rank the short-listed Contractor based on the Evaluation Criteria outlined in the section titled Evaluation
Criteria for Short-Listing.
5.3. Selection Committee Meeting
The Procurement representative will schedule a public meeting for the Committee to discuss their initial evaluation and rank the responsive Contractor's deemed acceptable to be selected; committee members may change or update their scores any time before the scores are read aloud. The evaluation scores will be submitted via OpenGov to the
Procurement representative. The Committee will then determine if they would like
Presentations/Interviews with any of the Contractors and how many they would like to invite.
5.4. Presentations/Interviews
The Committee reserves the right to request Presentations/Interviews with any or all responsive and responsible Contractors whose submissions are deemed to be acceptable for award. Presentations/Interviews may be limited at the discretion of the Committee to short-listed Contractors. Presentations may be conducted for the purpose of clarification and to assure full understanding of, and responsiveness to, the solicitation requirements.
The CRA will not be liable for any costs incurred by the Contractor in connection with such Presentations (i.e., travel, accommodations, etc.).
Presentations will be conducted in a public meeting. Each Contractor will be asked to excuse themselves during other presentations. During the presentation, Contractors must clearly demonstrate their understanding of the project scope, discuss their approach to successfully completing the project, and respond to questions from the Committee.
Upon completion of the presentations/interviews, the Committee shall an open discussion, and the public will have an opportunity to speak (3 minute maximum) before the
Committee submits presentation scoring through OpenGov. The Procurement Manager or designee will read the ranking of the Contractors from the Committee scoring.
If the Committee elects to conduct Presentations/Interviews, the Criteria for Phase 2 will be developed by the selection committee at the end of Phase 1. All scores from Phase 1 will be cleared and only scores in Phase 2 will be considered for award.
5.5. Final Ranking
After the presentation/interviews, the Committee will rank the short-listed Contractors using the criteria outlined in the Evaluation Criteria for Final Ranking section. The rankings will then be submitted to the CRA Council for approval.
5.5.1. Upon CRA Council approval, the Department Director or designee, in conjunction with the Procurement representative, will initiate negotiations with the top-ranked Contractor with the intention of entering into a contract.
5.5.2. If negotiations with the top-ranked Contractor fail, they will be terminated, and negotiations will begin with the next-ranked Contractor.
5.5.3. This process will continue until a successful contract is negotiated or the solicitation is terminated.
5.5.4. Once a contract is finalized, it will be executed by the Mayor and CRA
Manager.
5.6. Flexible Award Options
The Committee may evaluate and award a Contract based on responses to this
Solicitation without presentations. Therefore, each submission should contain the
Contractors best terms and conditions for consideration.
The CRA may also make awards based on individual items, groups of items, all-or-non, or a combination thereof, potentially involving one or more Contractors.
5.7. Tiebreaker
In the event of a tie, two or more Contractors that have the same ranking, the following steps will be taken to determine the highest ranked Contractor. This method shall be used for all RFP’s and RSQ’s ties.
5.7.1. Step 1: Contractors with an established drug-free workplace program, as defined by Florida Statute Section 287.087, shall be ranked higher. Documentation verifying the drug-free workplace program must be provided to receive this preference.
5.7.2. Step 2: Contractors qualifying as local, in accordance with the definition set forth in CRA of Fort Myers Ordinances Section 38-71 or its most recent revision, shall be ranked higher than non-local Contractors. Proof of local status must be submitted with the proposal to receive this preference.
5.7.3. Step 3: The Contractor with the highest number of 1st place rankings among evaluators shall be deemed the top-ranked Contractor. If a tie persists, the
Contractor with the highest number of 2nd place rankings will be ranked higher.
This method will continue progressively through 3rd, 4th, and subsequent rankings until the tie is resolved. If a tie remains after all rankings are considered, additional tie-breaking criteria will apply.
5.7.4. Step 4: In the event a tie persists after Steps 1 through 3, preference shall be given to the Contractor demonstrating the highest commitment to sustainability and environmental stewardship. Evaluation factors may include green certifications, use of eco-friendly materials, waste reduction strategies, carbon footprint minimization efforts, and participation in local sustainability initiatives. The
Contractor with the most significant and verifiable sustainability contributions shall be deemed the first-ranked Contractor.
5.7.5. Step 5: For FDOT Solicitations, steps 1 - 4 are replaced with; the
Procurement Director/Manager or designee may appoint an additional Selection
Committee member to evaluate the proposals based upon the factors in the solicitation and scoring for each criterion. This may continue until one Contractor is deemed the highest ranked.
For Federally funded solicitations remove local preference.
For non-CRA funded procurements, the steps not permitted by law or process are hereby removed.
The highest ranked Contractor upon completion of the steps needed shall receive the first opportunity to negotiate.
5.8. Reserved Right to Reject Solicitations
The CRA, at its sole and absolute discretion, reserves the right to reject any and all, or parts of any and all submittals, to readvertise this solicitation, to postpone or cancel this solicitation process at any time, or to waive irregularities and informalities in this solicitation or in the submittals received as a result of this solicitation. The City does not guarantee the award of any Contract as a result of this solicitation process.
The CRA reserves the right to evaluate the financial capability, reputation, integrity, skill, business experience, and quality of performance under similar operations for each
Contractor prior to making an award.
The CRA reserves the right to request that the Contractor provide additional information as it deems necessary to evaluate, clarify, or substantiate any area contained in each submittal and to best meet the needs of the CRA. This includes information which indicates financial resources as well as the ability to provide and maintain the system and/or services. Failure to promptly supply requested information, such as records of past performance, financial stability, or the ability to meet project schedules, may result in a determination of non-responsiveness.
5.9. Authority to Award
Contracts shall be awarded in accordance with the provisions of the City’s Procurement
Ordinance and Policy upon approval of CRA Council.
6. Contract Negotiations and Acceptance
Upon CRA Council approval, the Department Director or designee will initiate negotiations with the top-ranked Contractor with the intention of entering a contract. Contractor must be prepared for the CRA to accept the Submittal as presented. If Contractor fails to sign all documents necessary to successfully execute the final contract within a reasonable time, or negotiations do not result in an acceptable agreement, the CRA may reject the Submittal or revoke the award and may begin negotiations with the next highestContractor. Final contract terms must be approved or signed by the appropriately authorized CRA Official. No binding contract will exist between the Contractor and the CRA until the CRA executes a written contract and purchase order.
No. Evaluation Criteria Scoring Method Weight (Points)
1. Approach to the Project/Design
• The approach the scope of services, including a comprehensive representation, demonstrating an understanding and a commitment of how you intend to implement and fulfill the requirements of the scope of services.
• How your firm will balance staffing needs for this project.
• How your firm will facilitate timely completion of the project.
• Describe unique abilities, innovative approaches, and/or special considerations.
Points Based 45 (38.1% of Total)
2. Experience of the Firm and
Qualifications of Assigned Personnel
• Experience and capabilities to perform the scope of work.
• Academic, training, and licensed credentials of employees assigned to the project.
• Existing workload and ability to meet the timeline outlined in the project.
• Provide 2 examples of completed projects with similar scope and budget within the last 5 years. Preference will be given to government agency work.
• Provide 2 examples of projects completed by the project manager with similar scope and budget in the last 5 years.
Points Based 55 (46.6% of Total)
3. Compliance with Minority Business
Enterprise Policy (City funded only, procurement will score)
• Certified Minority Business by the
State of Florida Office of Supplier
Diversity, located within Lee
County and registered with the
City. (13) or
• Shows Proof Consultants applied for status and are awaiting confirmation (8) and
• Partnering with a minimum of two Minority Businesses that are certified by the State, located within Lee County and registered with the City (3)
Points Based 13 (11% of Total)
4. Local Vendor Preference (City funded only, scored by Procurement)
• See completed Local Preference
Company Affidavit
• Qualified business located in City of Fort Myers (5)
• Qualified business located in Lee
County (3)
Points Based 5 (4.2% of Total)
4. INSTRUCTIONS
Procurement Information
Procurement Services is the official source for obtaining information regarding CRA of Fort Myers solicitations. It is the responsibility of Contractor to monitor and obtain solicitation updates and current award information both prior to and after the scheduled opening date. Information is updated as it becomes available. The CRA reserves the right to issue an award or a recommendation of award at any time following the scheduled solicitation opening date.
Applicable Laws and Appeals
This solicitation is issued in accordance with, and governed by, the provisions and procedures outlined in Chapter 38, Articles III and IV of the City of Fort Myers Code of Ordinances. These provisions can be accessed online at:
City of Fort Myers Code of Ordinances - Procurement
Alternatively, contact Procurement Services for further assistance.
Any appeals related to this solicitation must comply with the requirements specified in the City’s
Code of Ordinances and procurement policies.
Americans With Disabilities Act
Persons with disabilities requiring special accommodations to participate in this solicitation process should contact Procurement Services at least seven (7) days before the required accommodation.
Contact Information:
Procurement Services
2200 Second Street, Fort Myers, FL 33901
Email: ProcurementServices@fortmyers.gov
Phone: (239) 321-7240
Solicitation Submission Guidelines
1. Official Submission Portal
All submissions must be made electronically through the CRA’s Bid Portal in OpenGov.
The portal will keep all files locked until the solicitation officially closes.
2. Official Time
The time clock in OpenGov will serve as the “Official Time” for determining the actual closing time of the solicitation. Submissions received after the specified date and time will not be accepted.
3. Responsibilities
3.1. Contractor is solely responsible for ensuring timely electronic submissions.
3.2. The CRA is not responsible for the distribution of addenda or other solicitation-related information to Contractor who fail to register in OpenGov.
https://library.municode.com/fl/fort_myers/codes/code_of_ordinances?nodeId=SPAADCO_CH38FI_ARTIIIPU
4. Addenda Distribution
All addenda and updates will be made available exclusively via OpenGov. Contractor is advised to regularly check the portal for any updates related to this solicitation.
4.1. Introduction
To be considered, electronic submissions must be completed in accordance with the instructions outlined in this solicitation and submitted within the specified timeframe. The portal will keep all files locked until the solicitation officially closes.
The City reserves the right to accept or reject any or all submissions and to waive irregularities or technicalities, as deemed in the best interest of the City. All decisions made by the City regarding these matters shall be final and binding.
4.2. Solicitation Documents
Visit the City of Fort Myers Procurement Services Website and follow the link to Active
Solicitations to access solicitation information. It is the responsibility of the Contractor to ensure correct registration information is provided. The CRA is not liable for any issues arising from incorrect or incomplete contact information.
1. Use of Official Solicitation Documents
All submittals must be prepared using the solicitation documents provided by the CRA. The CRA assumes no responsibility for errors or misinterpretations resulting from the use of incomplete or unofficial solicitation documents.
2. Purpose of Solicitation Documents
Solicitation documents are provided solely to facilitate the preparation and submission of responses.
3. Right to Cancel
The CRA reserves the right to cancel any solicitation at any time without obligation.
4.3. Responsibilities of the Contractor
Each Contractor is responsible for the following actions before submitting an offer:
1. Download Official Solicitation Documents
Obtain solicitation documents exclusively from OpenGov. Documents sourced from other platforms or sources are not guaranteed to be accurate.
2. Thoroughly Review Documents
Examine all solicitation documents to fully understand the requirements. If additional clarification is needed, submit questions through the OpenGov Q&A module.
3. Consider Applicable Laws and Regulations
Evaluate all Federal, State, and Local laws, ordinances, codes, and regulations that could impact the cost, progress, performance, or execution of the work.
4. Correlate Observations with the Solicitation Documents https://www.cityftmyers.com/1171/Procurement-Services
Study and carefully align observations with the solicitation documents to ensure consistency.
5. Report Conflicts or Discrepancies
Notify the Procurement Services Department by email to procurementservices@fortmyers.gov and submit a question through the E-Procurement Q&A tab of any conflicts, errors, or discrepancies in the solicitation documents.
5.1. Response Timeline Questions related to document format or processes will be addressed within two (2) business days or the solicitation may be placed on hold. This timeline does not apply to project-specific questions that require input from project managers or subject matter experts.
6. Review the Draft Contract
The draft contract intended for award is included with this solicitation for reference.
6.1. This draft contains standard legal language and may be modified.
6.2. Any exceptions to the standard contract should be submitted as a question in the
Q&A module before the question deadline. If the question deadline has passed, exceptions should be clearly noted in the Submission Questionnaire.
• Note: Exceptions to the draft contract may impact the evaluation of the submittal.
7. CRA's Right to Modify Contract
The CRA reserves the right to make modifications to the draft contract for specific solicitations before execution.
4.4. Questions and Addenda Guidelines
1. Submission of Questions
All questions regarding the meaning or intent of the solicitation documents must be submitted through the OpenGov Portal. Only questions received before the deadline specified in the solicitation timeline will be considered. Responses to questions will only be binding if provided in writing via addenda or the "Questions & Answers" feature in OpenGov. Oral or other informal interpretations or clarifications will have no legal effect. Any addenda issued electronically during the solicitation period shall become part of the solicitation and will be incorporated into the resulting contract.
2. Authority of Addenda and Revisions
Revisions to the solicitation and responses provided via the "Questions & Answers" feature are authoritative and shall be considered addenda to the solicitation. All information provided in this solicitation, including addenda and answers to questions, will be incorporated into the solicitation and any resulting contract. It is the responsibility of the Contractor to review all addenda, revisions, and published answers to questions. Requests for interpretations must be submitted through the OpenGov Portal. Failure to review and comply with the latest addenda or interpretations will not relieve the Contractor of their obligations under the solicitation or the mailto:procurementservices@fortmyers.gov resulting contract. No oral interpretations will be provided. All official interpretations will be issued as written addenda and made available via OpenGov.
3. Modification of Solicitation Documents
The CRA reserves the right to issue addenda to modify the solicitation documents as necessary. Contractor(s) are strongly encouraged to attend any pre-submittal meetings to gain clarity on the solicitation requirements.
4.5. Interpretation of Solicitation and Addenda
The absence of details or the omission of specific descriptions within the Solicitation or any addenda shall be interpreted as requiring adherence to the highest standards of best commercial practices. All interpretations and clarifications of this Solicitation shall be governed by the terms and conditions set forth in this Contract.
4.6. Incorporation of Procurement Policy and Ordinance
The City’s Procurement Policy and Ordinance (38-61 thru 68) are hereby incorporated by reference into this solicitation and any contract awarded as a result of this solicitation. By participating in this solicitation, Contractor agrees to be bound by the City’s Procurement
Ordinance and Policy in all matters related to this solicitation and any subsequent contract.
4.7. Local Preference
The City of Fort Myers has a local vendor preference policy (Ordinance 38-71 thru 76). Please click on the ordinance number to review the policy.
4.8. Minority Business Enterprise Program
All forms MUST accompany each set of Solicitation forms. Minority Business Enterprise (MBE)
(Ordinance No 38-122 thru 128): The City has established an MBE Ordinance for expenditures of construction, services, goods, and other services. Minority Business Enterprise’s (MBE’s) are businesses who are certified by the State of Florida Office of Supplier Diversity and whose principal place of business is located within the boundaries of Lee County.
The City's Minority Business Enterprise Policy can be found at:
https://www.fortmyers.gov/1511/Minority-Business-Enterprise-Program
4.9. Submittal Preparation
1. Preparation of Response
Contractor must prepare their responses in a clear and concise manner, ensuring that all required content is complete. Special attention should be given to the specific information, instructions, and requirements outlined in the solicitation document to ensure responsiveness.
Incomplete responses or those lacking key information may be rejected. To facilitate the review process, each section or tab of the response should be properly labeled to correspond with the solicitation requirements.
2. Incurred Expenses https://fortmyers.gov/DocumentCenter/View/14396/City-of-Fort-Myers-Procurement-Policy-PDF https://fortmyers.gov/DocumentCenter/View/14396/City-of-Fort-Myers-Procurement-Policy-PDF https://library.municode.com/fl/fort_myers/codes/code_of_ordinances?nodeId=SPAADCO_CH38FI_ARTIIIPU_DIV2LOVEPR https://library.municode.com/fl/fort_myers/codes/code_of_ordinances?nodeId=SPAADCO_CH38FI_ARTVMIBUENPR https://www.cityftmyers.com/1511/Minority-Business-Enterprise-Program
The CRA is not responsible for any expenses incurred by Contractor in the preparation and submission of their proposals, including costs associated with presentations or other activities related to the solicitation process.
3. Proprietary Information
3.1. CRA's Judgment on Disclosure The CRA reserves the right to exercise its own judgment regarding the disclosure of records. The CRA may take any actions it deems necessary, including filing a declaratory action, to comply with Federal or Florida public records laws.
3.2. Ownership of Submittals All submittals received in response to this solicitation will become the property of the CRA and will not be returned to the Contractor.
4.10. Submission Guidelines for RFP/RSQ's
Contractor is responsible for uploading their submittals directly into the OpenGov Submission
Portal. The authorized representative who binds the Contractor to the submittal must sign the qualification statement. A submittal is considered timely only if received through the OpenGov portal by the precise date and time specified in the solicitation timeline. The official time will be determined by the OpenGov portal's time clock. The portal will not accept submittals after the deadline.
Except as provided under the Americans with Disabilities Act for individuals requiring special accommodations, all proposals for this solicitation must be submitted electronically. Paper responses will be deemed non-responsive.
1. Instructions for Uploading Submissions
1.1. Submission Process Log into your OpenGov account and navigate to the solicitation for which you wish to submit a response. Click on “Draft Response”, complete the required information, upload your submission along with all required attachments, and submit your response.
1.2. Responsibility for Timely Submission The Contractor is solely responsible for ensuring their submittals are complete, uploaded, and submitted via the e-Procurement
Portal before the specified due date and time. The CRA is not responsible for any delays or failures in submission caused by any occurrence.
2. Submission Requirements
2.1. Document Format A single PDF document, signed by an authorized representative, must be submitted via the OpenGov portal.
2.2. Title Page – Introduction Include the following: Name of the individual or firm, Address, Email address, Telephone number, Name of contact person, Date, Solicitation number and title.
2.3. Table of Contents Include page numbers and bookmark each section for easy navigation.
2.4. Letter of Transmittal Two (2) page limit. Content: Briefly state the Contractor's understanding of the services to be provided. Make a positive commitment to perform the work. Provide the names, titles, addresses, and telephone numbers of authorized representatives.
2.5. Mandatory Minimum Qualification Documentation Provide documentation to verify compliance with the "Minimum Qualifications" section. Ensure all documentation is clear and specific.
2.6. Place responses to the evaluation criteria in the order it is stated under the
"Evaluation Phase" section.
2.7. Required Documents
2.7.1. Corporate Submissions Must be signed in the corporate name by the
President or Vice-President (or other authorized officer with evidence of signing authority). The corporate seal must be affixed and attested by the Secretary or
Assistant Secretary. Include the corporate address and state of incorporation.
2.7.2. Partnership Submissions Must be signed in the partnership name by a partner, with the title noted under the signature. Include the partnership's official address.
2.8. Litigation History Provide details of any current litigation or outstanding judgments involving the Contractor in the respective question under the Submission Questionnaire.
3. Binding Submissions
All submissions shall remain binding for a period of one hundred eighty (180) calendar days following the opening date.
4. Late Submissions
Late submissions will not be accepted under any circumstances. Contractor assumes full responsibility for the timely upload of their responses.
4.11. Conformance to Solicitation
1. Compliance with Mandatory Requirements
All submissions must conform to the material and mandatory requirements outlined in this
Solicitation. However, the CRA reserves the right to waive irregularities at its discretion without prior notice or the issuance of a written addendum.
If a Contractor wishes to submit an Offer that would require the CRA to waive, alter, or omit a material or mandatory requirement, the Contractor must first submit a written request to the
CRA to amend the Solicitation. Such requests must follow the process outlined in the
“Interpretations of Solicitation and Addenda” section of this Solicitation.
If the CRA agrees, at its sole discretion, to amend, alter, or waive the requirement, the CRA will issue a written addendum to notify all prospective participants of the change.
2. Submitting Requests for Waivers or Amendments
Requests to waive, alter, or amend a mandatory requirement must be submitted as a written question that can be addressed in an addendum issued to all participants.
Important Note:
This process does not require participants to submit their complete Proposal prior to the due date. Instead, it is a mechanism for requesting a waiver or amendment to a mandatory requirement that is necessary to enable submission of the intended Proposal.
4.12. Modification and Withdrawal of Submissions
1. Modifying or Withdrawing Submissions
Submissions may be modified or withdrawn by the Contractor through the OpenGov portal at any time before the opening of the Solicitations.
2. Withdrawal Due to Material Mistake
If, within twenty-four (24) hours after Submissions are opened, a Contractor files a duly signed written notice with the CRA and promptly demonstrates to the CRA's reasonable satisfaction that a material and substantial mistake occurred in the preparation of its Submission, the Contractor may withdraw its Submission. In such cases:
2.1. The Submission security, if applicable, will be returned.
2.2. The Contractor will thereafter be disqualified from further participation in the Work to be provided under the Contract.
4.13. Opening Submissions for Construction
Construction-related submittals will be publicly opened and announced by Procurement Services on the due date and time specified in the Solicitation. During the opening, the Contractor’s name and verification of bond submittal, if applicable, will be announced aloud.
1. Instructions to Join the Solicitation Opening Virtual Meeting
1.1. Select a Method to Join Choose the preferred method provided in the Solicitation document.
1.2. Join the Virtual Meeting Use the link or access details provided in the "Introduction" section to join the virtual Proposal Opening session.
1.3. Note Sessions will be recorded. To ensure a smooth process, participants are asked to turn off their cameras and mute their microphones before joining the meeting.
2. Opportunity to Speak
Attendees will be given an opportunity to speak during the meeting. When called by the name, email, or phone number listed in the attendance log, unmute your device and state your name and address for the record.
4.14. Irrevocable Offer
By submitting a response to this Solicitation, the Contractor agrees that their submission constitutes an irrevocable offer to the CRA after the opening date. This offer shall remain valid for a period of one hundred eighty (180) calendar days from the date of the opening. The
Contractor agrees to provide the goods and services described in this Solicitation under the terms, conditions, and pricing outlined in their submission.
The CRA, at its sole discretion, reserves the right to release any submission from this commitment during the validity period.
4.15. Reserved Rights
1. Request for Additional Information
The CRA reserves the right to request additional information from the Contractor after the closing date. This may include but is not limited to
1.1. Information necessary to evaluate, clarify, or substantiate any aspect of the submittal.
1.2. Evidence of financial resources and the ability to provide and maintain the required system and/or services. Additionally, the CRA may conduct investigations into the qualifications of any Contractor, which may include background checks performed by the
Fort Myers Police Department.
2. Flexible Award Options
The CRA reserves the right to
2.1. Make awards based on individual items, groups of items, all-or-none, or a combination thereof, potentially involving one or more suppliers.
2.2. Reject any or all submittals or waive informalities or technicalities in the submittals received.
3. Rejection of Submittals
The CRA reserves the right to
3.1. Reject any and all Submissions;
3.2. Waive any and all informalities;
3.3. Negotiate contract terms with the Successful Contractor;
3.4. Disregard nonconforming, non-responsive, unbalanced, or conditional submittals;
3.5. Reject any submittal if it is determined that awarding to the Contractor is not in the
CRA’s best interest, including cases where a) The Solicitation is not responsive; b)
The Contractor is unqualified or has questionable financial ability; c) The Contractor fails to meet any other relevant standards or criteria established by the CRA.
4.16. Protest Procedure
The CRA’s protest policy and procedure are outlined in the City of Fort Myers Procurement
Policy, which can be accessed at the following link:
City of Fort Myers Procurement Policy (PDF)
For details, refer to Page 20, Item F of the policy document.
4.17. Award of Contract for RFP/RSQ's
1. Formal Award
Contracts will be awarded in accordance with the City’s Procurement Code, Chapter 38, Article 3 of the City of Fort Myers Code of Ordinances. The contract will be awarded to the highest-ranked Contractor based on evaluation criteria and presentation results. The award is contingent upon successful contract negotiation and final approval by the CRA Council.
2. Purchase Order
The Purchase Order (PO) issued by the CRA to the selected Contractor within the time specified for acceptance, in conjunction with the contract, establishes a binding contract without further action by either party.
The contract will include this Solicitation, any addenda, the Contractor’s submittal, and the established Purchase Order. This Contract shall be governed by and construed in accordance with the laws of the State of Florida. Venue for any legal action arising out of or relating to this contract shall be in a court of competent jurisdiction located in Lee County, Florida.
3. Multiple Awards
The CRA reserves the right, at its sole discretion, to award the work described herein to more than one responsive and responsible Contractor. In cases of multiple awards, the CRA will apportion work among the selected Contractor as it deems appropriate. No minimum amount or proportion of work is guaranteed to any single Contractor or class of Contractor.
4.18. Form of Contract
The CRA’s intended format for the awarded Contract is incorporated into this solicitation. However, any exceptions to the terms of this standard Contract must be clearly indicated in the Contractor’s submittal. The Contractor acknowledges that exceptions may affect the evaluation of their submittal.
1. Formatting Adjustments
The final executed Contract may differ in pagination or numbering from the draft provided.
2. CRA’s Right to Modify Contract Language
The CRA reserves the right to revise or alter the language of the Draft Contract after responses are received and prior to execution. Revisions may be made to address the specific requirements or circumstances of the solicitation.
https://www.cityftmyers.com/DocumentCenter/View/14396/City-of-Fort-Myers-Procurement-Policy-PDF
4.19. Execution of Contract from a Formal Award
The successful Contractor shall, within fifteen (15) calendar days after the issuance of a Notice of Award and receipt of the Contract from the City of Fort Myers Procurement Services, sign and enter into a Contract with the City. Simultaneously, the Contractor must provide:
1) Any required bonds;
2) Indemnities; and
3) Updated insurance certificates as specified in the Solicitation.
Failure to meet the established deadline for submitting the required documents may result in cancellation of the award at the CRA’s discretion.
4.20. Debriefing of Proposers
Not later than thirty (30) days after CRA Board of Commissioners approval of a selection or shortlist, a proposer may submit a written request to the applicable contracting agent for a debriefing on the evaluation of their proposal. The contracting agent will schedule a meeting with the Proposer for the debriefing. However, at the Proposer’s request, the debriefing may be conducted via telephone conference. The debriefing shall include the following minimum information:
1. Key requirements of the solicitation.
2. The overall ranking of all proposals.
3. The significant weaknesses or deficiencies in the proposal in response to the requirements of the solicitation.
4. If requested, an explanation of the score received for each evaluation criteria will be provided, including costs, if applicable.
5. If applicable, a summary of the rationale for award.
6. Responses to any relevant questions of the Proposer.
Untimely debriefing requests will also be considered.
4.21. Prohibition Against Considering Social, Political, or Ideological Interests
In accordance with Florida Statute Section 287.05701, an awarding body is prohibited from:
1. Requesting documentation of or considering a Contractor’s social, political, or ideological interests when determining whether the Contractor is responsible.
2. Giving preference to a Contractor based on their social, political, or ideological interests.
This ensures that all evaluations and awards are conducted solely on the basis of objective criteria and the best interests of the CRA.
4.22. Identification of Variances
The Contractor must clearly identify any variances from the Solicitation requirements, no matter how minor. Any exceptions to the scope of work must be specifically noted and thoroughly explained in the Contractor’s questionnaire. If no variances are identified in the submittal, the
CRA will assume that:
1. The materials, equipment, or services offered fully comply with the Solicitation specifications.
2. The Contractor agrees to all terms and conditions outlined in the attached Draft Contract.
Failure to disclose variances may result in the Contractor being held to full compliance of the
Solicitation requirements.
4.23. Cone of…