Attachment_03_(GD16).doc

DOC document 27 KB Posted

Attached to
Infrastructure, Design, Engineering, Architecture, and Integration, (IDEAI-2) Federal contract opportunity
Solicitation number
DOC52PAPT1300014
Issued by
Department of Commerce US Patent and Trademark Office

About this file

Attachment 3

View the file

Other files for this federal contract opportunity

Other files attached to Infrastructure, Design, Engineering, Architecture, and Integration, (IDEAI-2), newest first.
File Type Posted
Amendment_003_DOC52PAPT1300014.pdf PDF
Attachment_15_(Experience_Reference_Worksheet)_Rev_1.doc DOC document
Amendment_002_DOC52PAPT1300014.pdf PDF
Amendment_001_DOC52PAPT1300014.pdf PDF
Attachment_01_(FN01).doc DOC document
Attachment_14_(Termination_Worksheet).doc DOC document
Attachment_06_(TM02).doc DOC document
Attachment_08_(Weekly_Funding_Analysis).doc DOC document
Attachment_10_EVM_Format_Template.pdf PDF
Attachment_13_(Labor_Rate_Price_Proposal)_set_aside.xls XLS spreadsheet
Attachment_02_(FN07).doc DOC document
DOC52PAPT1300014_IDEAI2_SetAside.pdf PDF
Attachment_11_Contract_Actuals_Templates.xls XLS spreadsheet
Attachment_12_(Labor_Categories)_set_aside.xls XLS spreadsheet
Attachment_09_(Invoices).xls XLS spreadsheet
Attachment_15_(Experience_Reference_Worksheet).doc DOC document
Attachment_07_(Document_Receipt).doc DOC document
Attachment_05_(GD17).doc DOC document
Attachment_04_(PN01).doc DOC document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DOC52PAPT1300014

Attachment 3

GD16

CONTRACT DELIVERABLE DESCRIPTION

Deliverable Number:

GD16

Title/Description:

Letter of Completion (LOC)

Frequency of Submission:

As Required Number of Copies:

First Submission Due:

After completion of appropriate activities

Subsequent Submissions Due:

N/A

Government Acceptance Required:

No

Government Response Due:

N/A

Remarks:

This is an official letter from the contractor to the PTO advising of the completion of tasks or non-CDRL deliverables Format/Content Requirements and Instructions:

At a minimum, the Letter of Completion should include the following information regarding specific tasks/deliverables:

1.

Task Order number, task number, and activity number.

2.

Specifically state that the task has been completed or that the deliverable has been submitted, with the appropriate date.

If only partial completion of any of the deliverables has occurred and the expected thirty (30) day warning was not sent to the PTO, state in the letter which items were not completed and their new completion date.

File details come from the government source that posted it. Updated .