Section L Attachments 1Mar11.docx
DOCX document 47 KB Posted
- Attached to
- Infrastructure, Development, and Engineering (IDE) Federal contract opportunity
- Solicitation number
- Not on record
About this file
Section L Attachments (MSWord)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA 30Mar11.doc | DOC document | |
| RFP FBO QA 1.docx | DOCX document | |
| Section L Attachments 25Mar11.docx | DOCX document | |
| FA9422-11-R-0001 Amend 1 25Mar11.pdf | ||
| More Q A 1Feb11.docx | DOCX document | |
| FA9422-11-R-0001 1Mar11.pdf | ||
| RFPLtr 1Mar11.pdf | ||
| IndustryDayQA 24Jan11.docx | DOCX document | |
| DMOC Brief - IDE Industry Day_V2 101213.pptx | PPTX presentation | |
| Contracting Industry_day_IDE_8 Dec 10 101213.ppt | PPT presentation | |
| Draft RFP 101202.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1: CROSS REFERENCE MATRIX
For Prospective Offerors: See paragraph 2.2.3 regarding instructions for completion of the solicitation Cross-Reference Matrix. If this matrix conflicts with any other requirement, direction, or provision of this solicitation, the other reference shall take precedence over this matrix. Additionally, to the extent this matrix discloses details as to the extent or manner by which the Government intends to evaluate offeror’s proposals for award, Section M references in the matrix are for information purposes only, and the Government shall be obligated to evaluate proposals solely in conformance with the provisions of the Section M of the solicitation.
An example of the format is shown below:
Section L
| Section M |
| Proposal Reference |
| SOW |
Reference
Mission Capability
Subfactor 1.1
Subfactor 1.2
Subfactor 1.3
Past Performance
Cost/Price
ATTACHMENT 2: PAST PERFORMANCE INFORMATION
Provide the information requested in this form for each contract/program (citation) being described. Provide frank, concise comments regarding your performance on the contracts you identify. Provide a separate completed form for each contract/program submitted. Limit the number of citations submitted and the length of each submission to the limitations set forth at paragraphs 5.3 and 2.2, respectively, of Section L-III of this solicitation.
| A. | Offeror Name (Company/Division): | _____________________________________ | |
| CAGE Code: | _____________________________________ | ||
| DUNS Number: | _____________________________________ |
(NOTE: If the company or division performing this effort is different than the offeror or the relevance of this effort to the instant acquisition is impacted by any company/corporate organizational change, note those changes. Refer to the "Organizational Structure Change History" you provided as part of your Past Performance Volume.)
B. Program Title: _____________________________________________________
C. Contract Specifics:
1. Contracting Agency or Customer __________________
| 2. Contract Number | __________________________ | |
| 3. Contract Type | __________________________ | |
| 4. Period of Performance | __________________________ | |
| 5. Initial Contract Cost/Price | _____________________ |
6. Current/final Contract Cost/Price ___________________
7. Annual Contract $ Value ______________________
8. If Amounts for 5 and 6 above are different, provide a brief description of the reason ________________________________________________________________________________________________________________________________________________________________________________________________________________________
D. Brief Description of Effort as __Prime or __Subcontractor (Please indicate whether it was development and/or production, or other acquisition phase and highlight portions considered most relevant to current acquisition)
E. Completion Date:
| 1. Original date: | ____________________ | ||
| 2. Current Schedule: | ____________________ | ||
| 3. Estimate at Completion: | ____________________ | ||
| 4. How Many Times Changed: | ____________________ | ||
| 5. Primary Causes of Change: | ________________________________________________________ |
F. Primary Customer Points of Contact: (For Government contracts, provide current information on all three individuals. For commercial contracts, provide points of contact fulfilling these same roles.)
| 1. Program Manager: | Name | ___________________________ | |||
| Office | ___________________________ | ||||
| Address | ___________________________ | ||||
| ___________________________ | |||||
| Telephone | ___________________________ |
| 2. Contracting Officer: | Name | ___________________________ | |||
| Office | ___________________________ | ||||
| Address | ___________________________ | ||||
| ___________________________ | |||||
| Telephone | ___________________________ |
| 3. Administrative | Name | ___________________________ | ||||
| Contracting Officer | Office | ___________________________ | ||||
| Address | ___________________________ | |||||
| ___________________________ | ||||||
| Telephone | ___________________________ |
G. Address any technical (or other) area about this contract/program considered unique.
H. For each of the applicable subfactors under the Mission Capability factor in Section M, illustrate how your experience on this program applies to that subfactor.
I. Specify, by name, any key individual(s) who participated in this program and are proposed to support the instant acquisition. Also, indicate their contractual roles for both acquisitions.
J. Describe the nature or portion of the work on the proposed effort to be performed by the business entity being reported here. Also, estimate the percentage of the total proposed effort to be performed by this entity and whether this entity will be performing as the prime, subcontractor, or a corporate division related to the prime (define relationship)
K. Identify any Earned Value Management (EVM) or similar metrics required to track contract performance. If such metrics were required for this contract, provide the summary level data.
ATTACHMENT 3: PAST PERFORMANCE QUESTIONNAIRE
WHEN FILLED IN THIS DOCUMENT IS SOURCE SELECTION SENSITIVE INFORMATION IAW FAR 3.104
SECTION 1: CONTRACT IDENTIFICATION
A. Contractor: ________________________________________________________________________
B. Cage Code of contractor contract was awarded to: ________________________________________________________________________
C. Contract number: _____________________________
D. Contract type: ________________________________
E. Was this a competitive contract? Yes _____ No _____
F. Period of performance: __________________________
G. Initial contract cost: $____________________________
H. Current/final contract cost: $______________________
I. Reasons for differences between initial contract cost and final contract costs:
J. Description of service provided:_______________________________________________
SECTION 2. CUSTOMER OR AGENCY IDENTIFICATION
A. Customer or agency name: ________________________________________________________________________
B. Customer or agency description (if applicable): ________________________________________________________________________
C. Geographic description of services under this contract, i.e. local, nationwide, worldwide, other Commands:
SECTION 3. EVALUATOR IDENTIFICATION
A. Evaluator's name:__________________________________________________________
B. Evaluator's title: ___________________________________________________________
C. Evaluator's phone/fax number:________________________________________________
D. Number of years evaluator worked on subject contract: ___________________________
SECTION 4: EVALUATION
Please indicate your satisfaction with the contractor’s performance by placing an “X” in the appropriate block using the scale provided to the right of each question. This scale is defined as follows:
CODE PERFORMANCE LEVEL
B BLUE/EXCEPTIONAL - The contractor’s performance meets contractual requirements and exceeds many (requirements) to the Government’s benefit. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
P PURPLE/VERY GOOD- The contractor’s performance meets contractual requirements and exceeds some (requirements) to the Government’s benefit. The contractual performance was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
G GREEN/SATISFACTORY – The contractor’s performance meets contractual requirements. The contractual performance contained some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Y YELLOW/MARGINAL – Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.
R RED/UNSATISFACTORY – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
N NOT APPLICABLE - Unable to provide a score.
B
P
G
Y
R
N
Technical Performance T1. Quality & repeatability of operations & maintenance
T2. Quality of technical system testing and certification efforts
T3. Quality/integrity of technical data/report preparation efforts
T4. Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements
T5. Ability to implement current standard practices for computer hardware design, development, operation, maintenance, upgrades and configuration control
T6. Ability to implement current standard practices for computer software design, development, operation, maintenance, upgrades and configuration control
T7. Adequacy/effectiveness of environmental safety procedures
T8. Compliance with export control laws
Program Management P1. Effectiveness of overall contract management (including ability to effectively lead, manage and control the program)
P2. Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes)
P3. Timeliness/effectiveness of contract problem resolution without extensive customer guidance
P4. Understand/complied with customer objectives and technical requirements
P5. Successfully responded to emergency and/or surge situations
P6. Quality/effectiveness of sub-contracted efforts
P7. Effectiveness of material management (including Government Furnished Property or Material)
P8. Effectiveness of acquisition management
P9. Contractor proposed alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the customer
P10. Contractor implemented responsive/flexible processes to improve quality and timeliness of support.
B
P
G
Y
R
N
Transition/phase-in T/PI1. Contractor ability to smoothly transition resources and personnel.
T/PI2. Contractor effectiveness on maintaining continuity of mission support while transitioning/phasing in resources and personnel to support other efforts.
Employee Retention/Attraction E1. Ability to hire/apply a qualified workforce to this effort.
E2. Ability to retain a qualified workforce on this effort.
E3. Effectiveness of employee compensation towards quality of work.
Small and Small Disadvantaged Business Participation S1. Ability to meet or exceed small business and small disadvantaged business goals set forth in the approved subcontracting plan
S2. Ability to effectively manage small business participation to meet technical performance.
Cost Performance C1 Accuracy in forecasting contract costs
C2 Ability to meet forecasted costs and perform within contract costs
C3 Ability to alert Government of unforeseen costs before they occur
C4 Sufficiency and timeliness of cost reporting
2. Please discuss each and every response for which you indicated B/E (Blue/Exceptional), P/VG (Purple/Very Good), Y/M (Yellow/Marginal) or R/U (Red/Unsatisfactory) in response to the questions above (use additional sheets, if necessary).
3. Government Contracts Only: Has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations?
| Yes___ | Default___ | Convenience___ | Pending Terminations___ |
| No ___ |
If yes, please explain (e.g., inability to meet cost, performance, or delivery schedules, etc).
SECTION 5: NARRATIVE SUMMARY
What were the contractor’s most positive aspects in the performance of the contract?
What were the contractor’s most negative aspect in the performance of the contract? __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Would you have any reservations about soliciting this contractor in the future or having them perform one of your critical and demanding programs?
Please provide any additional comments concerning this contractor’s performance, as desired.
Evaluator’s Signature Date
Thank you for your prompt response and assistance!
Please return this completed questionnaire to:
Mailing Address: Donna C. Heinz
| AFNWC/PKE (Contracting Officer) |
| 8150 F. Ave SE, Building 20226, Rm 9 |
Kirtland AFB, NM 87117 Email Address: donna.heinz@kirtland.af.mil
SECTION L - ATTACHMENT 4
1. Offerors shall:
a. Provide these Cost Proposal Instructions to all subcontractors. Proprietary subcontractor data may be submitted directly to the Government in accordance with Proposal Preparation Instructions in this announcement.
b. Furnish Tables 1 and 2 for the entire performance period (supported by rationale required by paragraph 2) in hard copy and on CD as IBM PC compatible, Microsoft Excel, to include all cell formulas. Include a separate Cost Element Summary by Offeror Fiscal Year (OFY) for each CLIN outlined in Section L and M. Identify when the offeror’s fiscal year (OFY) begins and ends.
c. Offerors are required to provide individual pricing sheets for each of the initial task orders. In addition, offerors are required to provide a pricing sheet for Development efforts using the workload analysis provided within the Basic Contract SOW. To develop overall contract prices and ceilings for the basic contract, it is advised that sheets be provided for each OFY over the life of the contract.
d. Ensure that all rate data and estimating factors used in the proposal have been submitted for review to the cognizant Defense Contract Audit Agency (DCAA) prior to cost proposal submission.
e. Provide the following information as the first page of the proposal for the Prime and Each Subcontractor.
| i. | Name, title, telephone and fax numbers and e-mail address of offeror’s | |
| contact point | ||
| ii. | Amount proposed for the basic effort and each option | |
| iii. | Name, address and telephone number of the cognizant DCMA and | |
| DCAA offices | ||
| iv. | Name, title, signature of authorized representative | |
| v. | Date offer is submitted and expiration date of offer | |
| vi. DUNS Number | ||
| vii. CAGE Code |
2. Using the Table 1 format, Submit a cost element summary by major cost element by OFY for each CLIN. The detail required for each major cost element is described below. Address all cost elements applicable to the proposed effort and provide a narrative to support the basis of estimate of proposed costs included in Table 1.
a. Direct Labor. Show each direct labor category proposed on a separate row. When job classifications or position titles (e.g. "Senior Scientist", "Technician", or "Lead Engineer") are used, provide narrative descriptions of related qualifications, duties, and responsibilities as an attachment to the cost proposal. In supporting rationale, identify the source and explain the derivation of the labor rate proposed for the first year in each labor category, and explain the methodology used to project each rate for subsequent years. Note: If temporary or part-time labor is proposed, explain the differences between the pay rates for full-time and temporary or part-time workers, and the impact of those differences on the direct rates proposed. Identify all uncompensated labor (straight time and/or overtime) included in this cost element, and explain the impact of uncompensated time on direct rates proposed.
As applicable, identify the proposed escalation factors applied to future estimates and rationale for the proposed factors.
Per Section H, Clause H103 LABOR RATE SCHEDULE FOR THE INFRASTRUCTURE, DEVELOPMENT, AND ENGINEERING CONTRACT (MAY 2010); fully burdened hourly rates for each labor category necessary to complete the work specified within the Statement of Work for each year of the contract shall be proposed using the Labor Rate Schedule required for Table 3. The Labor Rate Schedule shall become a Section J attachment to the basic contract upon award.
b. Indirect Cost Rates and/or Factors. Identify all indirect cost rates (such as fringe benefits, labor overhead, material overhead, G&A, Cost of Money (COM), etc.) and applicable allocation bases by OFY. If separate indirect rates are proposed (i.e. several G&A rates) identify each base and provide calculation as to how calculated amounts were derived. If composite rates are used, provide the calculations used in deriving the composite rates. Identify the basis of proposed rates (e.g., Forward Pricing Rate Agreement and date of agreement, bidding rates and submission date, actual rates and effective date, billing rates and approval date, etc.).
c. Subcontracts/Interorganizational Transfers (IOTs). Obtain cost proposals from each subcontractor and IOT (those actually performing labor hours) using the same cost element breakout required for Table 1 for each CLIN (if applicable). Provide a list of anticipated subcontractors/IOTs using Table 2. Perform and provide evaluation results of cost/price analysis of subcontract/IOT proposals. If decrement factors are used, explain their development and application. If the proposed subcontractor’s/IOT’s fee rate is higher than the Prime’s fee, provide rationale as to why the subcontractor’s risk is greater than the Prime’s. NOTE: Subcontractor/IOT proposals are due by the closing date identified in this solicitation.
In accordance with FAR 52.215-23 Limitations On Pass-Through Charges--Identification Of Subcontract Effort, the offeror’s proposal shall exclude excessive pass-through charges. To comply with this provision, the contractor shall provide the following information:
(1) The offeror shall identify in its proposal the percent of effort it intends to perform, and the percent expected to be performed by each subcontractor, under the contract.
(2) If the offeror intends to subcontract more than 70 percent of the total cost of work to be performed under the contract, task order (TO), or delivery order, the offeror shall identify in its proposal—
(i) The amount of the offeror’s indirect costs and profit applicable to the work to be performed by the subcontractor(s); and
(ii) A description of the value added by the offeror as related to the work to be performed by the subcontractor(s).
(3) If any subcontractor proposed under the contract, TO, or delivery order intends to subcontract to a lower-tier subcontractor more than 70 percent of the total cost of work to be performed under its subcontract, the offeror shall identify in its proposal—
(i) The amount of the subcontractor’s indirect costs and profit applicable to the work to be performed by the lower-tier subcontractor(s); and
(ii) A description of the value added by the subcontractor as related to the work to be performed by the lower-tier subcontractor(s).
d. Other Direct Costs: Travel and other direct costs may be necessary for this effort, as directed by TO SOWs but proposed costs will not be required upon proposal submission. Total costs will be determined by the program office upon award.
e. Cost of Money (COM). Refer to FAR 52.215-16, Facilities Capital Cost of Money. Provide a schedule which contains proposed cost of money (COM) factors, if applicable, to include a display of all individual bases for the COM amounts. A DD Form 1861 for each OFY must be submitted if proposing COM.
f. Fee. Identify proposed fee base and rate.
| g. New Mexico Gross Receipts Tax (NMGRT). NMGRT may be applicable to the proposed effort. For assistance in determining the extent to which NMGRT may apply and applicable rates, contact the New Mexico Taxation and Revenue Department, 5301 Central Ave., NE, PO Box 8485, Albuquerque, NM 87198, (505) 841-6200, http://www.state.nm.us/tax/. Identify the cost elements and amounts included in the NMGRT base, if applicable. Demonstrate the method of calculating total tax dollars included in the proposal. | |
| TABLE 1 |
COST ELEMENT SUMMARY
NOTE: THIS IS A SAMPLE TABLE - ALL OFFERORS SHOULD PROPOSE IN ACCORDANCE WITH THEIR APPROVED ACCOUNTING PRACTICES.
Beginning OFY* Ending OFY*
COST ELEMENT
BASE
RATE
AMT
BASE
RATE
AMT
TOTAL
PROPOSEDAMOUNT
DIRECT LABOR
(List each direct labor category separately.)
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| TOTAL DIRECT LABOR |
| XXXX |
XXXX
XXXX
| XXXX |
| XXXX |
| TOTAL LABOR OVERHEAD |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
SUBCONTRACTS, IOTS, CONSULTANTS (List Separately)
XXXX
| XXXX |
| XXXX |
MATERIAL
XXXX
| XXXX |
| XXXX |
| MATERIAL OVERHEAD |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
TRAVEL
XXXX
| XXXX |
| XXXX |
ODCs
XXXX
| XXXX |
| XXXX |
| G&A |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
SUBTOTAL COSTS
XXXX
| XXXX |
| XXXX |
| COST OF MONEY (See DD Form 1861) |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| FEE |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
TOTAL COST & FEE
XXXX
| XXXX |
| XXXX |
| NMGRT (IF APPLICABLE) |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
| XXXX |
TOTAL PRICE
XXXX
| XXXX |
| XXXX |
*Submit a cost element summary by OFY for the basic and options (if applicable) as appropriate for each year of performance.
TABLE 2
SUBCONTRACT/INTERORGANIZATIONAL TRANSFERS & CONSULTANTS
PRICE SUMMARY
| SUBCONTRACTOR NAME |
| SUBCONTRACT TASKS** |
| SUBCONTRACT TYPE |
| SUBCONTRACT QUOTED PRICE |
| SUBCONTRACTOR COST PROPOSED BY PRIME |
| DIFFERENCE |
TOTALS
**Identify Performance Work Statement section or paragraph or provide a narrative explanation as an addendum.
TABLE 3
SAMPLE LABOR RATE SCHEDULE
(Information below is to be filled in by IDE offerors. Offerors are encouraged to follow the general format shown below but may tailor as necessary. The labor categories, labor rates and dates shown below are provided as a sample only. Contractor shall specify if dates used are Offeror’s fiscal year, a period of performance in the contract, etc.)
Labor Rates shown blow are fully burdened, but exclude fixed fee.
Write Prime Contractor’s Company Name Here
| Labor Category |
| Labor Rate for |
OFY1
Labor Rate for
OFY2
Labor Rate for
OFY3
Labor Rate for
OFY4
Labor Rate for
OFY5
| Program Manager 1 |
| $70.00 |
| $72.00 |
| $74.00 |
| $75.00 |
| $77.00 |
| Engineer 1 |
| $60.00 |
| $63.00 |
| $66.00 |
| $69.00 |
| $72.00 |
| Analyst 3 |
| $55.00 |
| $57.00 |
| $59.00 |
| $61.00 |
| $63.00 |
| Technician 2 |
| $30.00 |
| $31.00 |
| $32.00 |
| $33.00 |
| $34.00 |
Write Subcontractor’s Company Name Here
| Labor Category |
| Labor Rate for |
OFY1
Labor Rate for
OFY2
Labor Rate for
OFY3
Labor Rate for
OFY4
Labor Rate for
OFY5
| Technician 1 |
| $50.00 |
| $52.00 |
| $54.00 |
| $56.00 |
| $58.00 |
| Technician 2 |
| $55.00 |
| $57.00 |
| $59.00 |
| $61.00 |
| $63.00 |
| Engineer 1 |
| $60.00 |
| $63.00 |
| $66.00 |
| $69.00 |
| $72.00 |
Write Subcontractor’s Company Name Here
| Labor Category |
| Labor Rate for |
OFY1
Labor Rate for
OFY2
Labor Rate for
OFY3
Labor Rate for
OFY4
Labor Rate for
OFY5
| Technician 1 |
| $50.00 |
| $52.00 |
| $54.00 |
| $56.00 |
| $58.00 |
| Technician 2 |
| $55.00 |
| $57.00 |
| $59.00 |
| $61.00 |
| $63.00 |
| Engineer 1 |
| $60.00 |
| $63.00 |
| $66.00 |
| $69.00 |
| $72.00 |
ATTACH THIS PAGE TO THE FIRST PAGE OF YOUR PROPOSAL
COST PROPOSAL CHECKLIST
Place a check by the appropriate items. Write “n/a” next to the item if not applicable.
In accordance with the Cost Proposal Instructions, the following is provided with our proposal:
__ EXCEL spreadsheets of all applicable tables, on CD ROM WITH FORMULAS.
Spreadsheets merely representing hard number inputs are not acceptable.
__ Cost/price analyses of all subcontract and IOT proposals
__ Fully-disclosed subcontracts and IOT proposals which includes Table 1 for each subcontracts and IOT
__ Subcontract information in accordance with FAR 52.215-22 Limitations On Pass-Through Charges--Identification Of Subcontract Effort
__ Fully completed Table 1(s), by CLIN (as applicable) by OFY
__ Fully completed Table 2(s), listing all proposed subcontractors and IOTs by CLIN (as applicable)
_ Support for any proposed ODCs to include consultant agreements on all proposed consultants
__ Computations of any composite indirect rates or team labor rates
__ Fully Completed DD1861’s (if proposing COM) by basic and each option (as applicable) by OFY image1.gif
File details come from the government source that posted it. Updated .