DLTWTF_Laboratory_Exhaust_System_Replacement.docx

DOCX document 36 KB Posted

Attached to
David L. Tippin Water Treatment Facility Lab Strobic Air Exhaust System Replacement with Double Wall Plenum (Bid Discount)
Solicitation number
26-P-00430
Issued by
Hillsborough County, Florida

About this file

This is a Scope of Work document from the City of Tampa Water Department for the removal and replacement of laboratory exhaust equipment at the David L. Tippin Water Treatment Facility. The project involves removing the existing Strobic Air dual fan fume exhaust system and installing a new Strobic Air Tri-Stack two fan fume exhaust system with Phenicon HS coating 316 stainless steel double wall plenum and NEMA-4X disconnect switch. The scope includes providing crane and rigging services, reusing existing starters, connecting to the curb and existing controls and electrical systems, and performing startup and testing operations. Work is to be completed during normal business hours, with the City of Tampa Water Department responsible for cleaning and neutralization of existing chemicals in the fan and hood prior to replacement.

The awardee shall provide a one-year warranty on parts and labor, with the manufacturer providing a two to seven year warranty on the fan and motor. Contractors must submit pricing for total labor, total materials, total rental and subcontractor costs, and a total not-to-exceed price. No specific response dates, due dates, award dates, or contract term information is provided in this scope of work document. Funding sources and budget parameters are not identified in the available documentation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

David L. Tippin Water Treatment Facility Lab Strobic Air Exhaust System Replacement with Double Wall Plenum Scope of Work: Remove and Replace Laboratory, Strobic Air Fan Exhaust System and Plenum

· Provide crane, rigging, and any necessary equipment

· Remove existing Strobic Air dual fan fume exhaust system

· Furnish and install new Strobic Air Tri-Stack two fan fume exhaust system with Phenicon HS coating 316 stainless Steel double wall plenum and NEMA-4X disconnect switch

· Reuse existing starters

· Connect to curb

· Connect to existing controls and electrical

· Start and test operation

· Awardee shall provide 1 year warranty on parts and labor. Manufacturer shall provide 2-7 year warranty on fan and motor

· Work to be performed during normal business hours

City of Tampa Water Department shall provide cleaning/neutralization of existing chemicals in fan and hood prior to replacement.

Total Labor: _____________________ Total Materials: _____________________ Total Rental/Subcontractor: _____________________

TOTAL NOT TO EXCEED: ______________________