DRAFT SOW.doc

DOC document 139 KB Posted

Attached to
AIRCRAFT LEASING Federal contract opportunity
Solicitation number
DJMS-11-JPT-R-0023
Issued by
Department of Justice US Marshals Service Justice Prisoner and Alien Transportation System Contracts Division

About this file

Draft Statement of Work (SOW)

View the file

Other files for this federal contract opportunity

Other files attached to AIRCRAFT LEASING, newest first.
File Type Posted
Attachment 3 - Leased-Charter Flight Personnel Data Sheet.pdf PDF
Attachment 1 - JPATS GMM-Rev2.pdf PDF
Attachment 4 - Performance Measurement and Reporting.doc DOC document
Attachment 2 - GSE.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUSTICE PRISONER AND ALIEN TRANSPORTATION SYSTEM (JPATS)

OKLAHOMA CITY, OKLAHOMA

AIRCRAFT LEASING

Section II- Statement of Work A. Background

A.1.

The Justice Prisoner and Alien Transportation System (JPATS) supports the Federal judiciary through its scheduling and transportation responsibilities. JPATS transports sentenced prisoners who are in the custody of the Federal Bureau of Prisons (BOP) to hearings, court appearances and detention facilities. Military and civilian law enforcement agencies use JPATS to shuttle their prisoners between different jurisdictions at a fraction of what commercial sources would charge.

A.2.

JPATS operates a fleet of aircraft that move prisoners over long distances more economically and with higher security than commercial airlines. Most air movements are done aboard large transport category aircraft that JPATS either owns or leases.

A.3.

JPATS is the only government-operated, regularly scheduled passenger airline in the nation. JPATS routinely serves approximately 20 domestic cities, plus other major cities in the United States on an as-required basis.

A.4.

To continue to fulfill this critically important mission, JPATS requires the lease of United States of America (U. S.) registered, narrow-bodied, large transport category turbine-powered aircraft.

B. Overview of the JPATS Operating Environment

B.1.

JPATS is headquartered in Kansas City, Missouri with air fleet operations in Oklahoma City, Oklahoma. Currently at this site, JPATS utilizes a fleet of leased aircraft comprised of two (2) MD-83 aircraft.

Table No.1 . JPATS Current Fleet of Aircraft

Location
Jetliner Type
Number of Jetliners
Oklahoma City
MD-83
2

B.2.

The Government desires to replace these aircraft with mid-life, narrow-bodied, large, transport category, turbine-powered aircraft.

C. Purpose And Objectives

C.1.

The purpose of this procurement is for JPATS to lease two (2) mid-life, narrow-bodied, large, transport category, turbine-powered aircraft for its aircraft operations at the Oklahoma City operating site.

C.2 The objective of this procurement is to obtain aircraft that meet the needs of the JPATS program in the most cost effective manner possible.

D. Scope

D.1.

The Contractor shall provide to JPATS the aircraft, insurance and all associated maintenance and logistics support described herein.

E. Contractor Responsibilities

In addition to providing aircraft described herein:

E.1.

The Contractor is responsible to provide insurance, full maintenance and logistics support, aircraft positioning/de-positioning, and all maintenance ferry flights to include fuel and associated expenses.

E.2.

The Contractor is responsible to maintain the leased aircraft in accordance with Title 14 CFR Part 91 and the policies and procedures as detailed in the JPATS General Maintenance Manual (GMM) for performance of said maintenance. See Attachment No. 1.

E.3.

The Contractor is responsible for providing aircraft push backs, lavatory servicing, potable water servicing, interior and exterior cleaning, positioning and operation of Ground Power Units (GPUs), external engine starting air carts (“huffers”), air conditioning carts, and mobile air stairs at the JPATS Oklahoma City main operating site.

E.3a.

The Contractor is responsible for providing, positioning and operation of Ground Power Units (GPU), external engine starting air carts (“huffers”), and air conditioning carts at each enroute stop when the aircraft are dispatched from the JPATS Oklahoma City operational site with an inoperative APU under an appropriately executed deferred maintenance action (MEL).

E.3b.

The Contractor is responsible for providing, positioning and operation of mobile air stairs at each enroute stop when the aircraft are dispatched from the JPATS Oklahoma City operational site with an inoperative self contained air stairs under an appropriately executed deferred maintenance action (MEL). If the aircraft are equipped with both forward and aft air stairs, this provision applies only if both forward and aft stairs are not operational.

E.4 Ground Support Equipment (GSE) will be made available to the Contractor at the Oklahoma City main operational site at the discretion of the Contracting Officer Technical Representative (COTR). See Attachment No. 2

E.5.

The Contractor shall consider the JPATS Oklahoma City main operational site as a main operating base (MOB), as opposed to an “out station” and staff accordingly with appropriate levels of mechanics, support staff, and logistics support, and schedule and perform maintenance accordingly. See Item Q., “Key Personnel.”

E.6.

The Contractor shall be responsible for performing thorough routine and non-routine housekeeping, cleaning, and general maintenance activities within the JPATS provided facilities at the Oklahoma City main operational site to include logistics storage rooms and maintenance offices.

E.7 The Contractor shall be responsible to clear ice and snow from the JPATS aircraft parking ramps at the Oklahoma City main operational site during periods of inclement weather to include the aircraft parking ramp and adjacent taxi way at the Federal Transfer Center (FTC). JPATS’ snow removal equipment may be made available to the Contractor.

F.

Government Responsibilities

F.1.

JPATS will be responsible for aircraft push backs, lavatory servicing, potable water servicing, interior cleaning, providing, positioning and operation of GPUs, “huffers”, air conditioning carts, and mobile air stairs at enroute stops.

F.2.

JPATS will be responsible for mission related fees to include: ground handling fees such as landing fees and parking fees, as applicable, aircraft and GSE fuel, and aircraft de-icing fees.

F.3.

JPATS will be responsible to operate the leased aircraft as Public Use Aircraft. All aircraft shall be operated in compliance with mandatory requirements contained within Title 14 CFR Part 91, FAA Advisory Circular 00-1.1, Government Aircraft Operations, and the policies and procedures as detailed in the JPATS General Operations Manual (GOM).

F.4.

JPATS will be responsible to facilitate conflict resolution. The referenced JPATS manuals shall have precedence over the Contractor’s manuals while the aircraft is in the possession of, and being operated by, JPATS.

F.5.

JPATS Chief of Flight Operations, or designee, will be responsible for daily decisions on the aircraft airworthiness and “dispatchability” despite relief that may be offered under the provisions of the applicable Minimum Equipment List (MEL).

G.

Aircraft Utilization

G.1.

Based on current mission flying schedules, JPATS’ estimated utilization rate for the proposed fleet of two aircraft will be approximately 1,250 flight (Hobbs) hours and approximately 900 takeoffs and landings (cycles) per aircraft per year. “Hobbs Hours” by definition is “wheels off” during takeoff to “wheels on” during landing. The estimated hours and cycles identified above are representative of the expected usage, and as such, actual hours may vary due to scheduling demands.

H.

Aircraft Requirements/Configuration

H.1.

The Contractor shall provide aircraft that are mid-life, narrow-bodied, large, turbine-powered, transport category aircraft of United States of America registry with a valid FAA issued standard Certificate of Airworthiness at time of delivery to JPATS.

H.2.

Specific minimum requirements for the types of airframes to be supplied are as follows:

1. As detailed in Section II, B.1., both aircraft offered to the government shall be of the same category, class, type and series/model, thereby constituting a standardized fleet.

2. Aircraft offered that are not of the same category, class, type and series/model as the current leased aircraft identified in Section II, B.1., must be “equal” as defined below.

H.3.

Brand Name or Equal. The Contractor must provide a standardized fleet of Boeing 737-400s, MD-83s, or equal aircraft. If a Contractor proposes aircraft “equal” to the aircraft identified above, the Contractor must submit documentation that the proposed aircraft meets the Salient Features. In accordance with FAR 11.104(b), the following are the required Salient Features of the aircraft at the time of delivery:

1. Aircraft must meet all specifications of its original Type Certificate in accordance with Title 14 CFR Part 25.

2. Aircraft must be certified for day, night, Visual Flight Rules (VFR), Instrument Flight Rules (IFR) operations and flight into known icing conditions.

3. All cockpit and cabin instrumentation, avionics, placards, gauges and any additional required documentation, must be labeled and readable in the English language and United States measuring system. Metric system is not acceptable.

4. Documentation from contractor that aircraft must not have sustained any substantial damage as defined by National Transportation Safety Board 49 CFR Subpart A, General 830.2.

5. Aircraft must be equipped with an APU suitable for providing ground power, self contained engine starts, and ground heating and cooling of the aircraft. The unit must be capable of supplying electrical power to the aircraft’s electrical system while airborne.

6. Aircraft must be equipped with a minimum of three lavatories configured for external servicing.

7. Aircraft must be of a narrow body (single aisle) configuration.

8. Aircraft must have a standard 2 and 3 cabin seating configuration, or 3 and 3 cabin seating configuration.

9.

Aircraft must have a manufacture date no earlier than 1991. Aircraft must meet the aircraft cycle requirements as stipulated below:

A.

It is anticipated that under this contract each aircraft may accrue 900 cycles per year for a potential total of 4,500 cycles during the life of the contract. 14 CFR Section 121.1107 states that aircraft may not be operated beyond its applicable flight cycle implementation time without special, certified maintenance. Accordingly, during the life of the contract no aircraft shall exceed its flight cycle limitation time as noted below. The flight cycle limitation time “name brand” aircraft as determined by cycles are as follows:

1) 737-400: 60,000 cycles

2) MD-83: 60,000 cycles

B.

During the life of the contract, any proposed “Or equal” aircraft shall also not exceed its applicable flight cycle limitation time as described in 14 CFR, Section 121.1107. For purposes of this Salient Characteristic, the maximum aircraft cycles allowed for any aircraft proposed under this contract shall be calculated by subtracting the appropriate FAA-stipulated flight cycle limitation time for the aircraft from the estimated flight cycles that Government expects to accrue on the aircraft at the time of aircraft delivery to the end of the contract, the difference of which is the maximum number of cycles allowed upon delivery of the aircraft. For example, if it is estimated that JPATS will put 4,500 cycles on a Boeing 737-400 aircraft during the life of the contract, the maximum cycles that the proposed aircraft can already have on it at the time of delivery is 55,500 (i.e., 60,000 minus 4,500).

H.4.

In addition to the requirements of Section II, H.3, all leased aircraft shall have, as a minimum, the following at the time of delivery to JPATS:

1. General A. All documentation and manuals for the operation of the aircraft flight systems.

B. Aircraft must be equipped with emergency equipment and equipment for over water passenger operations in accordance with Federal Aviation Regulations: 121.309 and 121.339.

C. An electronic system for calculating ,determining and displaying the aircraft’s center of gravity (CG) envelope, the actual CG for the flight, takeoff and landing weights, zero fuel weight, stabilizer trim settings (if applicable) and associated data prior to flight. The system must be readily useable by cockpit flight crew members prior to each flight segment. The system must be compatible with Microsoft Windows Operating System as installed on a Motion Computing Tablet or equivalent.

D. Compliance with all published FAA Airworthiness Directives and manufacturer Mandatory/Alert Service Bulletins.

E. Compliance with all calendar, flight hour, flight cycle maintenance inspections/events from either a manufacturer or FAA approved maintenance program.

F. Aircraft must have takeoff, climb and cruise performance capabilities equal to or greater than the MD-83 aircraft equipped with Pratt & Whitney JT8D-219 engines.

G.

Aircraft must have operational range capability equal to or greater than the MD-83 aircraft equipped with a standard three fuel tank configuration.

2. Avionic/Navigation/Auto Flight System A. Single or dual Flight Management System (FMS) with a data base containing worldwide navigation data. Additionally, the airport data base will incorporate all airports with an instrument approach procedure and a runway greater than 5,000 feet in length in the geographic area defined as the Continental United States, Alaska, Hawaii, Canada, Latin America and South America.

B. The FMS software version must be the same for each aircraft. Contractor will be responsible for maintaining current data.

C. The FMS must be fully integrated/interfaced with and receive navigational data/inputs from a minimum of two Inertial Reference Systems (IRS) or two Attitude and Heading Reference Systems (AHRS), as applicable, a minimum of one Global Positioning System (GPS) or a minimum of two radio navigation systems. The system must be FAA certified and capable of conducting RNAV (GPS) Arrivals (RNAV STAR), RNAV (GPS) Instrument Approaches, and RNAV (GPS) Standard Instrument Departures (RNAV SID). An equivalent system is acceptable.

D. A Flight Guidance/Autopilot System.

E. Three (3) digital VHF transceivers communication systems with a minimum of 760 channels with 8.33 KHZ spacing.

F. Two (2) digital VHF, VOR/LOC navigation receivers.

G. Two (2) glide slope receivers with a minimum of 40 receive channels.

H. One (1) marker beacon receiver systems.

I. Two (2) digital ADF navigation systems.

J. Enhanced Ground Proximity Warning System (EGPWS) with low level wind shear detection and TAWS capability.

K. Traffic Collision Avoidance System (TCAS) II system incorporating revision 7 or a later version.

L. Two (2) Air Data Computers.

M. Two (2) Radio Altimeter systems.

N. One (1) Digital Flight Data Recorder.

O. One (1) Digital Cockpit Voice Recorder.

P. One (1) Digital High Frequency (HF) communication system.

Q. One (1) VHF and HF SELCAL system.

R. Two (2) Mode S Transponders.

S. Two (2) Distance Measuring Equipment Systems (DME), with Nav-1 and Nav-2 channeling.

T. One (1) Altitude Pre-select/Alerter system.

U. All aircraft equipment and components necessary for certification for flight operations in RVSM airspace.

V. Wiring for two (2) AirCell ST 3100 Iridium Telecommunication Systems (satellite communication system). Supplied system to include coax and antenna capable of supporting a cockpit mounted handset and a cabin mounted handset provided by the U.S. Marshals Service.

W. An Electronic Flight Instrument System (EFIS) consisting of both pilot and copilot:

1. Electronic Attitude Director Indicator (EADI) with integrated airspeed format display.

2. Electronic Horizontal Situation Indicator (EHSI) utilizing a heading up and not track up display format.

3. Note: Engine instrument/hydraulic displays may be either EFIS or analog displays.

X. Digital auto throttle system.

Y. Standardized cockpit presentations and associated navigational equipment and instruments.

3. Equipment A. Operational forward self-contained and powered air stairs. If the aircraft are equipped with aft powered air stairs, those stairs will be rendered operational.

B. An operational Class C fire detection and suppression system in all cargo compartments.

C. Operational thrust reversers.

D. Compliant with noise level requirements established in Title 14 CFR Part 36, Stage Three.

E. Have single point refueling capability.

4.

Cabin Configuration/Furnishing/Equipment/Storage. Each plane shall:

A. Have a minimum of 148 forward facing coach seats installed with the maximum pitch possible. Passenger seats shall be “Tourist Class” Triple or Triple and Double configuration and meet Title 14 CFR Part 121 standards for the carriage of passengers.

B. Have all cabin class partitions removed.

C. Be compliant with Title 14 CFR Part 121.215 burn criteria.

D. Have a reinforced Flight Deck Door meeting the standards for a Title 14 CFR Part 121.313 commercial air carrier.

E. Have all seat-back trays removed.

F. Have all ashtrays removed with appropriate blanking plates installed in their place.

G. Have all seat backs locked in the full upright position, with the exception of the first two forward seat rows and the emergency exit seat rows. All seat belt cotter keys and retaining pins shall be removed.

H. Have provisions for storage of JPATS ice chest and bottled water in galley(s) with appropriate tie downs or reinforced web strapping.

5.

Exterior

A. A logo, trademark or any similar marking characteristic of a commercial air carrier shall NOT be displayed on any JPATS aircraft.

B. Each aircraft shall have an appropriately assigned U.S. registration number applied to the aircraft in accordance with Title 14 CFR 45.25 requirements.

H. 5.

The following digital photographs will be submitted for each aircraft proposed by the Offeror:

A. An exterior photograph taken from the front of the aircraft that depicts all of the aircraft from that viewpoint.

B. An exterior photograph taken from the rear of the aircraft that depicts all of the aircraft from that viewpoint.

C. An exterior photograph taken from the area of the left wing tip that depicts all of the aircraft from that viewpoint.

D. An exterior photograph taken from the area of the right wing tip that depicts all of the aircraft from that viewpoint.

E. An interior photograph taken from the front of the cabin area (just aft of the cockpit door) looking aft.

F. An interior photograph taken from the rear of the cabin area (just forward of the rear door/bulkhead) looking forward.

G. An interior photograph taken from the over wing exit area looking forward.

H. An interior photograph taken from the over wing exit area looking aft.

I. A cockpit photograph that depicts the overhead instrument panel.

J. A cockpit photograph that depicts the Captain’s instrument panel.

K. A cockpit photograph that depicts the Center forward instrument panel.

L. A cockpit photograph that depicts the First Officer’s instrument panel.

M. A cockpit photograph that depicts the Lower Center instrument console.

I. Aircraft Departure and Return Locations

I.1.

The leased aircraft will generally be required to depart from and return to the JPATS Oklahoma City main operational site, with an occasional Remain Over Night (RON) at an enroute stop.

J. Training J.1.

If a Contractor proposes an “equal” aircraft, the Contractor must include in its price proposal the following:

1. Type rating training, recurrent training or transition training as appropriate for USMS pilots not already typed, current and transitioned in offered “equal” aircraft prior to aircraft delivery. Training will be conducted at a domestic FAA approved training facility. The Contractor will provide a training plan for accomplishing the pilot training. Training expenses are to include all travel and per diem costs.

2. The cost of contract pilots to fly the “equal” aircraft while the USMS pilots are being trained to fly the “equal” aircraft. These pilots must past an employment background check prior to providing these services.

K.

Maintenance and Logistics Support

K.1.

The Contractor is responsible for aircraft maintenance and logistics support in providing full Line Servicing, Line Maintenance at the JPATS’ Oklahoma City main operational site and Heavy Maintenance by approved vendors using approved processes identified in their maintenance and inspection program.

K.2 Aircraft must be maintained, inspected, repaired, and altered in accordance with approved data in accordance with Title 14 CFR Part 91.

K.3.

The Contractor shall be reimbursed for maintenance events as an Other Direct Cost (ODC) for labor and materials related to accomplishment of customer requested alterations, repairs or replacement of cabin equipment and furnishings damaged due to abuse, industrial cleaning of the aircraft’s interior or exterior on a more frequent interval than detailed in K.14 and K.15, when directed to do so by the JPATS Contracting Officer, and non-local travel expenses of the Contractor’s in-flight mechanics.

K.4.

Contractors must perform maintenance and inspections in accordance with the policies and procedures contained within the JPATS General Maintenance Manual (GMM).

K.5.

A JPATS-provided aircraft flight log book, with daily flight log sheets, will be utilized by the JPATS flight crews to record daily flight data and maintenance discrepancies. These daily flight log sheets will be managed and retained in accordance with policies and procedures contained in the JPATS GMM, Section IV, as they are considered to be part of the aircraft’s permanent historical record. A white copy of each complete daily flight log sheet will be released to the Contractor upon completion of each flying day. The Contracting Officer and COTR shall have free and unrestricted access to these log books at all times.

K.6.

The Contractor shall furnish a replacement aircraft when a leased aircraft is removed from service for the performance of either scheduled or unscheduled Heavy Maintenance during the life of the lease. This replacement aircraft shall conform to all requirements of the contract and the approval of the Contracting Officer shall be obtained in writing prior to positioning the replacement aircraft. Wet leased aircraft may be considered in lieu of dry leased aircraft only at discretion of the Contracting Officer for a time frame not to exceed fourteen (14) days.

K.7.

The Contractor is responsible for ensuring that each leased aircraft flown on an Out of Continental United States (OCONUS) mission or on a mission that involves a Remain Over Night (RON) shall have a properly trained and certificated in-flight Airframe & Power plant (A&P) mechanic on board the aircraft. The Contractor may also be required to provide an in-flight mechanic for domestic missions as directed by the Primary COTR. Travel expenses for the in-flight mechanics will be reimbursable under the contract’s cost reimbursable (ODC) CLIN.

K.8.

The Contractor is responsible for providing Aircraft Maintenance and Logistics Support that offers JPATS “dispatchable” aircraft based on the following typical Monday through Friday flying schedule:

Table No. 2. Typical Weekly Flying Schedule

Local Time

Oklahoma City
0600-1830

The Contractor shall be responsible to provide appropriate levels of maintenance and logistic support at lease one (1) hour prior to the scheduled departure time of each aircraft.

K.9.

If an aircraft cannot be dispatched due to maintenance, or a decision by JPATS that the aircraft is not mission capable, or takeoff is delayed more than two hours due to a maintenance delay, or a mission is aborted during any leg of the mission due to a maintenance problem, this shall be considered a lost mission. The Contractor’s failure to provide an aircraft for a scheduled mission that follows a lost mission will result in the assessment of liquidated damages as defined in Section IV – Contract Terms and Conditions.

If an aircraft completes a mission and arrives back at the main operational site with a “grounding” discrepancy documented in the log book, the contractor shall have the aircraft repaired and ready for the next scheduled mission or provide a replacement aircraft for the next scheduled mission. The Contractor must formally notify the on-site ACOTR no later than 2200 (Central Time) when any leased aircraft is unable to fly its next scheduled mission.

K.10.

It is JPATS’ preference that replacement aircraft are “dry” lease aircraft. Should the Contractor elect to provide a dry lease replacement aircraft, such replacement aircraft will not remain in use beyond 60 calendar days. Beyond the 60 calendar day limit, if the original aircraft is deemed unsuitable for return to service, the “replacement” aircraft will then be placed into service as a “substitute” aircraft.

K.11. Should the Contractor elect to provide a Wet Lease Aircraft as a replacement aircraft, (at no additional cost to the government), for any of the above lost mission situations, the crews of the Wet Lease Aircraft shall be subject to NCIC background checks, and the requirements established in Section IV, paragraph H. Wet lease aircraft shall come from appropriately certificated Title 14 CFR Part 121 commercial operators and will be operated in accordance with established policies and procedures contained in FAA approved operational specifications for that particular air carrier. If it becomes absolutely necessary to use a Wet Lease Aircraft as a replacement aircraft, such use will not exceed fourteen (14) calendar days. Additionally, the flight crews must become familiar with the unique JPATS mission requirements and they must coordinate mission activities closely with the on board JPATS Security Officer in Charge (SOIC) to ensure these requirements are met. The flight crew of the Wet Lease Aircraft will be required to fill out and submit to JPATS Flight Following the “Leased/Charter Flight Personnel Data Sheet” which will be provided to them by the SOIC. See Attachment 3.

K.12.

JPATS reserves the right to test-fly a dry leased aircraft after correction of a maintenance discrepancy that caused the aircraft to be non-airworthy to determine if the aircraft is in fact airworthy prior to boarding passengers. When these test flights are performed at the request of the Contracting Officer, the cost of fuel will be the responsibility of the Government.

K.13.

The Contractor is responsible for dual push backs at the JPATS Oklahoma City main operational site, one from the main hangar and one from the Federal Transfer Center (FTC).

K.14.

The Contractor shall be responsible to perform a complete exterior aircraft wash on each of the leased aircraft, as a minimum, once per calendar quarter. More frequent cleaning of the aircraft’s exterior may be directed at the discretion of the JPATS COTR and will be reimbursed under the contract’s (ODC) CLIN.

K.15.

The Contractor shall be responsible to perform an extensive (heavy) cleaning of each leased aircraft interior, to include cleaning the carpets and seats, seatback pockets, windows, window shades, etc as a minimum, once per calendar quarter. More frequent cleaning of the aircraft’s interior may be directed at the discretion of the JPATS COTR and will be reimbursed under the contract’s ODC CLIN.

When JPATS aircraft fly more than one mission per day (e.g., two day missions with the same tail number or a day and night mission with the same tail number), the Contractor shall be responsible to clean the interior of the aircraft between missions. This “turn” cleaning will include cleaning the lavatories, cabin, and galleys to include emptying all the trash cans, replacing all trash can liners, picking up trash around the passenger seats, wiping down the mirrors, sink, toilet seat and shroud, wet mopping the floor, wiping down the galley and counter tops, sweeping the entry way and aisle, and restocking supplies.

K.16.

The Contractor shall be responsible to hangar the leased aircraft at the discretion of the JPATS COTR.

K.17.

The Contractor shall ensure all leased aircraft are parked and secured each night to include the installation of wheel chocks, engine intake and exhaust covers, pitot covers, and other covers and plugs as recommended by the manufacturer for the type, model, and series of aircraft being offered under this lease.

K.18.

The Contractor shall notify the JPATS Contracting Officer and COTR immediately when any assigned lease aircraft becomes non-airworthy.

K.19.

The Contractor shall notify the COTR immediately when there is an intention to MEL an inoperative piece of equipment, or when the MEL has been appropriately cleared. JPATS will be the final approval authority for MEL actions.

K.20.

The Contractor shall notify the COTR when aircraft parts have been ordered, the estimated time of arrival (ETA) of the parts on order, and immediately when the parts are received.

K.21.

The Contractor’s Director of Maintenance or Maintenance Leads at the JPATS’ Oklahoma City main operational site will communicate directly with the JPATS COTR concerning all maintenance and logistics matters.

K.22.

The Contractor must employ mechanics who have been actively engaged in aircraft maintenance as a certified mechanic for at least 12 months out of the last 24 month period immediately preceding the start of the operation on aircraft of the same type, model and series of the leased aircraft.

K.23.

The Contractor must employ mechanics who have completed a manufacturer’s, or equivalent, maintenance training course and have a minimum of six (6) months experience for the type, model, and series of aircraft being offered under this lease.

K.24.

The Contractor shall ensure a daily inspection is performed on each leased aircraft. The Contractor shall provide a proposed daily inspection checklist to the JPATS COTR for review and approval.

K.25.

The Contractor shall dump and replace potable water at least once a week and will sterilize the system per the aircraft maintenance manual or at least once each quarter.

K.26.

The Contractor shall be required to compute and report each month, Aircraft Availability Rates (AAR), See Attachment 4.

K.27.

The Contractor shall be responsible for the accomplishment of, or make arrangements for the accomplishment of, all off-site emergency repairs (repairs made away from the JPATS Oklahoma City main operating site).

K.28.

The Contractor will assemble, store and maintain a spare parts/“Fly Away Kit” for use on those aircraft flying Out of Continental United States (OCONUS) missions. The Kit will consist of items mutually agreed upon by the Contractor and COTR. The Kit will be placed in a JPATS designated aircraft cargo compartment during the OCONUS mission and will be removed from the aircraft and re-stored at the completion of the mission. On missions within the Continental United States, each aircraft may carry a Fly Away Kit of reduced size at the discretion of COTR.

L.

Flight Scheduling

L.1.

Flight schedules shall be performed as directed by JPATS Flight Following. Flight schedules shall be provided to the Contractor on a weekly basis or other frequencies as determined by JPATS Flight Following. Under certain conditions there may be requirements to make schedule changes/additions with a very short lead time.

M.

Deliverables

Table No. 3. Deliverables

Item No.
Item
Due Date
1.
Jet Aircraft (Oklahoma City, Oklahoma)
Refer to Section II.N. Table 1
2.
Jet Aircraft (Oklahoma City, Oklahoma)
Refer to Section II.N. Table 1
3.
Manufacturer’s Airplane Flight Manual (AFM)(with Performance Specifications and Systems Description and Operation) for each aircraft
Delivered with each aircraft
4.
Minimum Equipment List (MEL) for each aircraft
Delivered with each aircraft
5.
Aircraft Operating Manuals (AOM) for each aircraft- Quantity of Three (3)
Delivered with each aircraft
6.
Quick Reference Handbooks or equivalent (QRH) for each aircraft – Quantity of Three (3)
Delivered with each aircraft
7.
Weight and Balance Manual for each aircraft
Delivered with each aircraft
8.
Latest Weighing Data for each aircraft-must be within the twelve (12) months prior to delivery
Delivered with each aircraft
9.
Weight and Balance System – to be utilized by the JPATS flight crew prior to flight to calculate Center of Gravity (CG) for each aircraft – Electronic (See Section II.H.4.1.C)
Delivered with each aircraft
10.
Refueling Manual for each leased aircraft
Delivered with each aircraft
11.
De-Icing Manual for each leased aircraft
Delivered with each aircraft
12.
Hazardous Materials Manual – one (1) manual, or access to an electronic manual.
Delivered with each aircraft
13.
Aircraft Maintenance Manual (AMM) for each type leased aircraft – one (1) set hardcopy, or access to an electronic manual.
Delivered with each aircraft
14.
Illustrated Parts Catalogs (IPC) for each type of leased aircraft – one (1) set hardcopy, or access to an electronic manual.
Delivered with each aircraft
15.
Automated Maintenance Tracking Program (CAMPS) Daniels, Flight Docs, or equivalent – one (1) set hardcopy, or access to an electronic manual.
Delivered with each aircraft
16.
Aircraft List of Passenger Accommodations (LOPA) for each leased aircraft
Delivered with each aircraft
17.
Aircraft Equipment List for each leased aircraft
Delivered with each aircraft
18.
Logistics (Spares) Inventory
Delivered with each aircraft
19.
Inventory for OCONUS / CONUS Fly Away Kit for each leased aircraft
Delivered with each aircraft
20.
All documentation and manuals for the operation of the aircraft flight systems (e.g. FMS, TCAS, etc.)
Delivered with each aircraft
21.
Monthly Aircraft Availability Report (See Section II.K.25)
Deliver in electronic format (via e-mail) to the Contracting Officer by the 10th day of the month following the reported month

N.

Delivery, Inspection, and Acceptance of the Aircraft

N.1.

Aircraft

1.

The Government will inspect the Contractor’s proposed aircraft utilizing the Delivery Inspection Checklist to verify that both aircraft comply with all of the requirements of the Contract and to ensure all of the Government’s findings from the pre-award inspection have been corrected to the full satisfaction of the Government. See Attachment 6.

2.

Deliverables --In addition to the aircraft themselves, during the final delivery, inspection, and acceptance process, the Contractor must provide all contract deliverables as identified in this Statement of Work, Paragraph M., Deliverables, Items 3 through 20. All documentation, manuals, placards, etc., must be in the English language and U.S. standard measurement system.

3.

Configuration Schedule -- The Contractor shall configure each aircraft for final delivery, inspection and acceptance in accordance with the schedule below.

Table 4 – Initial Aircraft Final Delivery Inspection and Acceptance

Aircraft
Time of Delivery for Final Inspection from Date of Award¹
Location of Aircraft Delivery²
Aircraft No. 1
9 Weeks
Oklahoma City, OK
Aircraft No. 2
9 Weeks
Oklahoma City, OK

¹ No later than the time frame indicated (refer to Paragraph 4 below).

² Aircraft will be delivered by the Contractor to the JPATS Oklahoma City operational site on the scheduled final delivery date as specified.

4.

Final Delivery and Inspection -- The Government will inspect the delivered aircraft to verify that it complies with the contract’s requirements. The Government will have four (4) calendar days to conduct its inspection of each configured aircraft and associated deliverables. During the inspection, the Government will document any findings where the aircraft /deliverables do not meet the contract’s requirements, and the Contractor shall correct these deficiencies within ten (10) calendar days from the date it receives the Government’s notice to correct deficiencies, or in a time frame agreed to by the Contracting Officer, prior to a final determination of acceptance by the Government.

5.

Acceptance Flight -- The final delivery inspection and acceptance process will also include an aircraft acceptance flight that is to be provided by the Contractor. This acceptance flight is meant to demonstrate the takeoff and landing capabilities and the en route characteristics of the proposed aircraft. The flight should normally take no longer than 1.5 hours. It shall be performed by pilots provided by the Contractor. However, a JPATS pilot shall sit in the center cockpit “jump” seat on the flight deck during this acceptance flight as the official Government observer. An acceptance flight will be deemed successful if all aircraft systems are fully operational and function properly during the test flight, and the aircraft exhibits an acceptable level of trim, stability, manoeuvrability, and controllability as determined by the JPATS pilot. Any inoperative or improperly functioning components or systems discovered during the acceptance flight shall be documented by the JPATS pilot in the applicable flight log book and must be corrected by the Contractor within the aforementioned ten (10) calendar days, or a time frame agreed to by the Contracting Officer, prior to a final determination of acceptance by the Government.

6.

Termination for Cause --If, after this inspection process, it is determined by the Government that any proposed aircraft is not acceptable or is unavailable for delivery on the required delivery date, the Government may terminate for cause this contract in whole or in part at no cost to the Government.

O.

Substitution of Aircraft O.1.

At the discretion of the Government, the Contractor may substitute aircraft/engines during the performance of the contract with aircraft/engines of the same category, class, type, series, model and age provided each substitution complies with the requirements of this contract and is inspected and accepted by the Government. Inspection costs shall be incurred by the Contractor, and substitute aircraft shall be provided at no additional cost to the Government.

P.

Personnel Requirements

P.1.

Personnel Requirements – The Contractor shall provide properly qualified and cleared personnel to successfully perform the maintenance and logistical services described herein.

P.2.

General Personnel - The Contractor’s employees shall be proficient in reading, writing, communicating, and understanding the English language. The Contractor’s employees shall comply with rules, regulations, laws, directives, and requirements that are in place or issued during the period of performance that relate to proper conduct, time and attendance, safety, and security.

P.3.

Program Management – The Contractor shall provide the following program management positions for this contract. Individuals filling these positions shall have the ability to read, speak, and write English fluently.

1. Program Manager – The Program Manager, who has the ability and authority to make performance and technical decisions on behalf of the Contractor, shall provide on-site management and supervision to all Contractor employees working under the contract to ensure that all technical requirements of the contract are satisfactorily met. This individual shall be available to the Government on a 24-hour basis, by way of a land line telephone, or cellular phone, to ensure appropriate Contractor response in the event of an emergency or other exigent circumstance. The Program Manager shall have the ability to carry out all performance and technical functions efficiently, effectively, and in a timely fashion.

2. Director of Maintenance – The Director of Maintenance shall be responsible for on-site management and supervision of the Contractor’s on-site Maintenance Leads and the Logistics Representative in accordance with policies and procedures set forth in the applicable GMM. The Director of Maintenance shall receive and execute, on behalf of the Contractor, such technical direction as the COTR and/or the Contracting Officer may issue in accordance with the terms and conditions of the Contract. The Director of Maintenance shall be available to the Government 24 hours per day by land line telephone or by cellular phone. Qualifications for the position of Director of Maintenance will include: (1 A current mechanics certificate with Airframe and Power plant ratings, each of which is currently effective and has been in effect for at least fifteen (15) years; (2 At least ten (10) years of diversified maintenance experience on the same category and class aircraft offered under the terms of the contract; (3 At least ten (10) years in the capacity of approving aircraft for return to service; and (4 At least five (5) years as an aircraft maintenance inspector.

3. Designated QC Inspector- The Quality Control (QC) Inspector is responsible for managing the continuing airworthiness program for referenced leased aircraft operated by JPATS. The QC Inspector, on behalf of the Contractor, ensures all maintenance programs and procedures meet the minimum requirement of applicable parts of Title 14 CFR Part 91, policies and procedures detailed in the JPATS GMM, and policies and procedures applicable under the terms of the contract. In this regard, the QC Inspector shall: 1) develop, maintain, and administer a quality control system; 2) establish procedures for all inspection functions, including buy-back of routine, non-routine, and RII discrepancies; and 3) maintain a complete, current, and valid technical data library applicable to the leased aircraft. The QC Inspector shall be available to the Government 24 hours per day by cellular phone. Qualifications for the position of QC Inspector will include (1 A current mechanics certificate with Airframe and Powerplant ratings, each of which is currently effective and has been in effect for at least fifteen (15) years; (2 At least ten (10) years of diversified maintenance experience on the same category and class aircraft offered under the terms of the contract; (3 At least seven (7) years in the capacity of approving aircraft for return to service; (4 At least ten (10) years as an aircraft maintenance inspector; and 5) At least five (5) years experience in the development of aircraft maintenance programs and inspection procedures.

4. Maintenance Lead: (Minimum of 2) - Maintenance Leads shall be assigned to each work shift at the JPATS Oklahoma City operational site. The Maintenance Leads shall report to the Director of Maintenance and shall be responsible for the performance of all maintenance services at the Oklahoma City operational site as well as coordinating emergency repairs at enroute stops. Each Maintenance Lead shall have decision making authority with respect to all matters of a technical nature. The Maintenance Leads shall receive and execute, on behalf of the Contractor, such technical direction as the COTR and/or the Contracting Officer may issue in accordance with the terms and conditions of the Contract. Qualifications for the position of Maintenance Lead will include (1 A current mechanics certificate with Airframe and Power plant ratings, each of which is currently effective and has been in effect for at least ten (10) years; (2 At least seven (7) years of diversified maintenance experience on the same category and class aircraft offered under the terms of the contract; (3 At least five (5) years in the capacity of approving aircraft for return to service.

5. Mechanic (Minimum of 6) – Mechanics shall be assigned to each work shift as required at the JPATS Oklahoma City operational site. The Mechanics shall report to the Maintenance Leads and shall be responsible for the performance of all maintenance services at the Oklahoma City operational site. Qualifications for the position of Mechanic will include (1 A current mechanics certificate with Airframe and Power plant ratings, each of which is currently effective and has been in effect for at least seven (7) years; (2 At least five (5) years of diversified maintenance experience on the same category and class aircraft offered under the terms of the contract; (3 At least three (3) years in the capacity of approving aircraft for return to service.

6. Mechanic (R&E Qualified) - Mechanic shall be assigned to a work shift offering the greatest benefit to the maintenance program at the JPATS Oklahoma City operational site. The Mechanic shall report to the Maintenance Lead and shall be responsible for the performance of all maintenance services at the Oklahoma City operational site. Qualifications for the position of Mechanic will include (1 A current mechanics certificate with Airframe and Power plant ratings, each of which is currently effective and has been in effect for at least seven (7) years; (2 At least five (5) years of diversified avionics maintenance experience on the same category and class aircraft offered under the terms of the contract; (3 At least three (3) years in the capacity of approving aircraft for return to service .

7. Logistics Representative- The Logistics Representative shall be responsible for all logistics functions associated with the maintenance support of all leased aircraft and Ground Support Equipment (as applicable) referenced under the terms of this contract to include: material requisitioning in appropriate quantities, receiving inspection, material handling and storage, inventory control, shipping and receiving, calibration and certification, warrantee program, equipment rental/lease, and shelf life control. These logistics functions shall be performed in accordance with policies and procedures set forth in Title 14 CFR Part 91, the JPATS General Maintenance Manual and terms and conditions of this contract. The Logistics Representative shall be available to the Government 24 hours per day by cellular phone.

Q.

Key Personnel Q.1.

The Contractor shall designate the following positions as “Key Personnel.” The Government considers these positions to be full-time. With the exception of the Program Manager, individuals filling these positions shall be posted at their assigned duty sites 100 percent of the time. The Government deems these positions as critical to the performance of work under this contract. Any proposed substitutes for individuals occupying these positions shall possess qualifications equal to or superior to those of the key personnel being replaced. The inability of the Contractor to provide personnel with equal to or superior qualifications of the key personnel may result in termination of the contract. At a minimum, the individuals occupying the positions listed below are considered key personnel for the duration of this contract. The Contracting Officer may at his/her discretion add to this list.

1.

Program Manager 2.

Director of Maintenance (Located on-site in Oklahoma City)

3.

Designated QC Inspector (Located on-site in Oklahoma City)

4.

Maintenance Lead: (Minimum of 2) (Located on-site in Oklahoma City) 5.

A&P Mechanic (Minimum of 6) (Located on-site in Oklahoma City) 6.

A&P Mechanic (R&E Qualified) (Located on-site in Oklahoma City) 7.

Logistics Representative (Located on-site in Oklahoma City)

Q.2.

All key personnel are subject to the following requirements:

1.

Replacement is subject to the prior written approval of the Contracting Officer.

2.

Requests for replacement shall include a detailed resume describing the qualifications of the individual(s) proposed and any security clearance(s) held. Proposed individuals shall meet all of the qualifications requirements cited in this contract.

3.

Contractor proposals to replace any key personnel shall be submitted in writing to the Contracting Officer at least thirty (30) days in advance of proposed replacement , and are subject to the approval of the Contracting Officer or his/her designee, including approval of proposed replacement.

LIST OF ATTACHMENTS

ATTACHMENT

TITLE

NO. OF PAGES

JPATS General Maintenance Manual (GMM)

Ground Support Equipment (GSE)

Leased/Charter Flight Personnel Data Sheet

Performance Measurement and Reporting

(Aircraft Availability Rate)

PAGE