DJJU-08-RFP-0554 Amendment 3 Questions and Answers.doc
DOC document 52 KB Posted
- Attached to
- Exterior Security Upgrades
- Solicitation number
- DJJU-08-RFP-0554
About this file
The due date for receipt of proposals is changed to 11AM December 3 2008. Answers to questions on RFP attached.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DJJU-08-RFP-0554 Amendment 002.doc | DOC document | |
| DJJU-08-RFP-0554 Amendment 1.doc | DOC document | |
| Cover letterdoc.doc | DOC document | |
| DJJU-08-RFQ-0554 SF-1442.pdf | ||
| DJJU-08-RFP-0554.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The Proposal response date is changed to 11AM December 3, 2008
1. Under Section 04400 Stonework, specs out pre-qualified subcontractor Lorton Contracting, can other Co. be used for stonework?
Answer: Additional stone contractors may be utilized, however, they must demonstrate their technical capabilities as well as adequately demonstrate that they have worked on historical buildings.
2. Specification Section 01230, under 3.1 Schedule of Alternated indicates 3 alternates, however under Section B in bid documents only gives lump sum , please provide revised bid form or indicate were to show alternates?
Answer: There is one Alternate with three line items. To be more specific this section is restated as “Spare Parts.” Offerors shall add an attachment 1 to the Schedule B-1. Include the prices for the requested spare parts. The Government reserves the right to order these items and makes no guarantee that the items will be purchased. These items will not be considered in the award evaluation process.
3. Specifications call out for an office trailer, however drawings do not indicate staging area, please provide detail for staging area?
Answer: The contractor may utilize the driveway entrance areas directly under the building at the respective gate that they will be working on. The employee entrances will remain open during the construction period, thus the contractor MUST provide a protected path for Government employees to move from one entrance to another. A temporary fence shall be provided by the contractor to control pedestrian traffic.
The maximum trailer that can installed under the building will be limited by the building curb width and column width. The present curb to curb width is 9 feet, whereas, the column to column width is 11 feet. The construction trailer may also be installed outside the building if allowed by the DC Government.
4. After reviewing Section 01500 – 6, E. Temporary enclosures I have the following question; Will chain-link fencing be required for complete duration of project for security and protection? If so, please provide detail?
Answer: Chain link fence is required as well as outside the building where concrete excavation and bollard installation work is required. The contractor shall interface with the DC Government on the side walk closure permits and their requirements for excavation protection.
5. Guard booth transaction tray – Is the tray to be build into the window or granite guard booth wall?
Due to the very limited space in the driveway areas and within the guard booths, the granite walls must be modified so that the transaction trays are built into the wall.
6. Will DOJ ensure or verify that the area for the bollard installation(s) is free of utilities?
Answer: No. The government has researched the building utilities and has indicated those utilities that are presently known. Reference notes 3 and 4 on contract drawings C.0.1 and C.0.2 and note that the contractor is responsible to determine if any other hidden are present.
7. Relocation of existing water main
a. What size is the existing water main?
b. Approximately what year was the water main installed?
c. What is the elevation of the installed water main?
Answer: At the Tenth Street entrance, there are three existing buried pipes. One 18 inch sewer, one 15 inch drain, and one 6 inch water. The elevations range from a depth of 7 feet to 8 1/2 feet.
At the Ninth Street entrance, there are two existing buried pipes. One 12 inch drain, and one 6 inch water. The intent is that the contractor will work around these existing utilities. Reference contract drawing C.0.4, detail 5 for work around design. They are buried at approximately 8 1/2 feet. These utilities were installed in 1933. The exact elevation of these lines MUST be verified by the contractor.
The contractor is not required to relocate any of these lines but shall protect the piping during the installation of the new bollard system.
8. Underground Duct Bank – Division 02585, part 3.1 installation, paragraph B, line 6 states that the duck bank shall be reinforced under the road way. What size should the reinforcing be? Can you provide a sketch showing how much and the horizontal and vertical spacing of the re-bar?
Answer: The ductbank reinforcing shall be in accordance with specification section 02584. All rebar shall be 1/2 inch. No sketches will be provided.
9. Underground Duck Bank – Drawing E.3.2 shows elevation details of both the 9th and 10th streets duck banks. What size is the schedule 80 PVC conduit for the vehicle detector loop?
Answer: The wiring associated with the bollard loop detectors shall be installed in 1 inch schedule 80 PVC conduit.
10. Specification Section 10450, Turnstiles. Will the Turnstiles be subjected to outside weather conditions? If so, will an optional inner channel cover to protect the electronics from wet conditions be required?
Answer: The new turnstiles are to be installed under the edge of the building but subject to exterior weather conditions. An inner channel cover shall be provided to protect the electronics.
11. Ref: Solicitation, Offer and Award, Standard Form 1442, Item 10 – “Performance of Work,” and Section B, Suppliers, Services and Price/Cost, Paragraph B-1 Services to be Provided and Section C, Description/Specification/Work Statement, Paragraph C-1, Administrative Information, reads
a. Provide “additional CCTV cameras” Should this read “additional CCTV camera poles?”
b. Should “Card reader” be “Card reader stanchion”
Answer: The government concurs that only CCTV poles, stanchions. associated conduits and pull strings are to be provided by the contractor.
12. Specification Section 05120 – Structural Steel, Paragraph 1.5 Quality Assurance.
a. Line A. Installer Qualifications, Designates the installer to be a AISC Certified Erector. Since the framing installed in this project is considered to be decorative and ornate and not of a structurally supportive application can this requirement be waived?
b. Line B, Fabricator’s Qualification, designates the fabricator to be a AISC-Certified Plant. Since the framing installed in this project is considered to be decorative and ornate and not of a structural supportive application, can this requirement be waived?
c. The structural tube steel used for the turnstile framing, the pedestrian door entrance framing and the camera poles are noted on the structural drawings to be hot dipped galvanized and coated. Are there any requirements for stainless steel cladding on the aforementioned items?
Answer: AISC certifications will not be waived. The steel framing specified by circle note 5 on contract drawing A.1.3 is structurally supportive of the windowed structure above the turnstile, thus the installer shall be AISC certified. No Stainless steel cladding is specified.
13. Division 16. Note under #2 on drawing E.1.4B, install 2 #12, 1 #12 GND in ¾” conduit for 24V power supply to CCTV camera. This wiring is to be installed by the Security Contractor. Should the note read like note #11 & note #19 on drawing E.1.4A, install ¾” empty conduit with nylon pull string for security cameras? . Note number #2 on drawing E.1.38 is the same as above.
Answer: No. The contractor shall install the indicated power wiring and transformers as specified in the drawings. It is the intent that the government security contractor will only install the CCTV fiber and cameras. All power associated with the CCTV cameras are part of this contract.
14. Division 13, Bollard Hydraulic Barricade System
a. Part 2 – Products, Paragraph 2.1 line F. What size wiring should be installed from the new electric panel to the pop up bollard in the 1” rigid galvanized steel conduit?
b. Part 2- Products, Paragraph 2.3, Line A.1 Control Circuit. What size wire shall be installed from the hydraulic pump unit to the pop up bollards and the main and slave control panels in the 2” rigid galvanized steel conduit and the 20 sch. 80 PVC conduit.
c. Part 2- Products, Paragraph – 2.4 Accessories. Are stop and go signal lights required?
Answer: The size of the wire to be installed in the conduit is specific to the bollards being provided. It is up to the contractor’s bollard supplier to determine the exact wire size they require for their application.
No stop and go signal lights are required.
15. Sections 10450 Turnstiles, Section 2.3 Paragraph C, line 1.A, Interface turnstiles with building fire alarm system to be free-wheeling in either direction in the event of building fire alarm activation. Who will perform this interlock function?
Answer: The actual interlock of the turnstiles with the building fire alarm system and the associated programming shall be performed by the contractor awarded this contract. The proper operation will be witnessed by the Government.
16. Is it required to be a U.S. citizen to work on the project?
Trade workers do not have to be a US citizens , however, they must pass the Government NCIC background check and be escorted at all times.
17. Will penetrations through the exterior wall, the moat wall or through interior walls require x-ray or infra ray scanning prior to core drilling?
Answer: Penetrations to the exterior moat wall does not require x-raying. Penetrations to the building exterior wall “does” require x-raying to insure that the building steel beams are not compromised. Penetrations to building interior drywalls and masonry walls do not require x-raying
18. Were there any previous security protection structures such as fix bollard, anti ram fences or hydraulic bollards installed at the 9th & 10th Street portals? If the answer is yes, are there any remaining foundations or obstructions that may be encountered when excavating for the new hydraulic bollard footing?
Answer: Pop up bollards were once installed at both the North and Tenth Street vehicular entrances. The tops of the bollards were removed HOWEVER the foundations and associated conduits are still present. It may be necessary to remove a portion of these subsurface structures during the installation of the new bollards.
19. The following general information is provided:
Reference contract drawing A.8 details 6 and 7. At the Ninth Street Vehicular entrance, the concrete portion of the duct bank shall be extend to the interior of the moat wall and individual rigid conduits will be extended to the interior of the building. EMT conduits shall extend to the final designation.
At the Tenth Street vehicular entrance, the concrete portion of the duct bank shall extend to the interior of the building (no moat present) wall and EMT conduits shall extend to the final designation.
The contractor is required per contract drawings E-1.3A and E-1.4A to install new power panels to power the HPU's. The electrical feeds for these new panels will be extended from the closets electrical room.
A concrete encased duct bank is required from each of the pop up bollards to the interior of the building (Reference contract drawing A.8). Once the duct bank enters the building, individual EMT conduits will extend to the respective final locations. (reference contract drawings E-1.1A and E-1.2A).
In the contract drawings and specifications the name "Portico" is another name for the "vehicular entrance". The duct bank begins at the pop up bollards and extends under the portico (vehicular entrance) as concrete encased and then the individual conduits extend to their final location once they enter the building.
Once you drive down the vehicular ramp, their are two loading docks and numerous personnel doors to enter the basement. All loading dock doors should be of sufficient size to move the HPU units in to their final locations. The contractor may wish to measure the double door widths to ensure easy passage of the HPU's.
The fixed granite bollards are specified under contract drawings C-O.3 and A.4.1. The existing granite bollards were installed in 1933 and as such the new granite bollards will NOT have to exactly match the existing bollards. During the submittal process, granite sample shall be submitted in order that we can match the new granite as closely as possible to the existing bollards.
The new granite bollards are to be installed to meet the same K-12 force rating as the new pop up bollards. Thus the foundation for the new granite bollards is detailed in contract drawing C.0.3, detail 2.
All Noisy work such as jack hammering shall be untaken during non business hours. Work such as the use of back hoes can normally be undertaken during normal business hours.
20. With reference to Item L. 13.1 Technical Proposal Item C. Firm’s Experience Past Performance requirement for the above noted RFP. To meet specific requirement, if a small business teams up with a large business and/or a subcontractor for this RFP, would DOJ consider the basis of technical evaluation the team’s combined experience and past performance, or limit evaluation to the experience and performance of prime small business member submitting the RFP ?
Answer: The Government intends to take into account the experience of the prime and proposed subcontractors.
21. The Proposal response date is changed to 11AM December 3, 2008