About this file
District Services Complex Relocation - Bid Package Summary
This is a Notice to Contractors and bid package issued by the Grossmont-Cuyamaca Community College District for the District Services Complex Relocation project. The project involves renovating existing buildings at Cuyamaca College to relocate district staff from Grossmont College, including renovation of Cuyamaca Building A (three buildings) and two existing B Annex trailers to accommodate District Facilities, Risk Management, and Personnel Commissioning functions. The scope of work includes new finishes, furniture, power connections, light fixtures, HVAC units, access controls, IT/AV upgrades, landscaping, exterior painting, and site work. This is non-DSA work. Bids are due by July 28, 2026 at 2:00 p.m. at the Grossmont College Purchasing and Contracts Office in El Cajon, California. A non-mandatory pre-bid meeting and job walk is scheduled for July 13, 2026 at 10:00 a.m. at Cuyamaca College Building A. Written questions from bidders must be submitted by July 16, 2026 at 4:00 p.m., with addenda and responses to bidders due by July 23, 2026 at 4:00 p.m. The District will issue a Letter of Intent to Award on August 3, 2026, with the contract award occurring on August 2, 2026. The estimated contract start date is August 17, 2026, with a contract duration of 155 consecutive calendar days. Bidders must hold a valid California Class B General Building Contractor license and must be prequalified to bid on the project.
The estimated contract value is $7,300,000.00. Successful bidders must provide a Performance Bond and Payment Bond each equal to 100% of the total bid amount, issued by a California-admitted surety. Bid security in the form of cash, certified check, cashier's check, or bid bond equal to 10% of the maximum bid amount is required. Liquidated damages are set at $2,500.00 per calendar day for each day of delay beyond the contract completion date. The District encourages bidders to pursue Disabled Veteran Business Enterprise (DVBE) participation, with a goal of at least 3% of the total contract dollar amount, though this is not a requirement. Bidders must comply with California Labor Code provisions including prevailing wage requirements, weekly certified payroll submission, and apprenticeship hiring as appropriate. All contractors and subcontractors must register with the Department of Industrial Relations and maintain compliance with the District's Labor Compliance Program. Insurance requirements include workers' compensation coverage and general liability protection. Bidders must submit proof of site visit, workers' compensation certification, subcontractor designations, asbestos-free materials certification, non-collusion affidavit, prevailing wage certification, lead-based paint certification, recycled content certification, and drug-free workplace certification as part of their bid package.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B26.011
DISTRICT SERVICES COMPLEX RELOCATION
Bid Submittal/ Opening Date: Tuesday, July 28, 2026 at 2:00 p.m.
Grossmont–Cuyamaca Community College District Purchasing and Contracts Office Bldg 80 Lot 4 8800 Grossmont College Drive, El Cajon CA 92020
Event Date
Advertisement Date(s) 06/30/2026 and 07/07/2026
Questions from Bidders Due (in writing) 07/16/2026 by 4:00 PM
Addendum(s) and Responses to Bidders 07/23/2026 by 4:00 PM
Bid Opening 07/28/2026 at 2:00 PM
Letter of Intent to Award 08/03/2026
Protest Deadline 8/02/2026
Award of Bid 08/02/2026
Estimated Contract Start Date 08/17/2026
Contract Duration 155 Days
Non-Mandatory Pre-Bid Meeting & Job Walk
DATE: Monday, July 13, 2026 at 10:00 a.m.
LOCATION: Cuyamaca College Bldg. A ADDRESS: 900 Rancho San Diego Pkwy, San Diego, CA 92019
GROSSMONT–CUYAMACA COMMUNITY COLLEGE DISTRICT
B26.011 – DISTRICT SERVICES COMPLEX RELOCATION TABLE OF CONTENTS
CONTENTS
DOCUMENT DESCRIPTION PAGE
00020 Notice to Contractors Calling for Bids
00100 Information for Bidders
00200 Bid Form
00300 Bid Bond
00400 Contractor’s Certification Regarding Workers Compensation
00410 Designation of Subcontractors
00420 Designation of DVBE Subcontractors
00430 Information Required of Bidders
00440 Asbestos-Free Materials Certification
00450 Non-collusion Affidavit
00455 Site Visit Certification
00500 Contract
00600 Performance Bond
00610 Payment Bond for Public Works
00620 Recycled Content Certification
00630 Drug-Free Workplace Certification
00700 General Conditions
00800 Special Conditions
00810 Supplemental General Conditions / Information Required of Bidders . 78
00930 Lead Based Paint Certification
00980 Prevailing Wage Certification
B26.011 – DISTRICT SERVICES COMPLEX RELOCATION TABLE OF CONTENTS
EXHIBITS:
Exhibit A: DVBE Program Requirements…………………………101
Exhibit B: Website for Prevailing Wage Scales…………….……..110
Exhibit C: Request for Taxpayer Identification Number…………111
Exhibit D: Pre-Bid Request for Information (RFI) Form………...112
Exhibit E: Master Schedule………………………………………..114
Exhibit F: Drawings Table of Contents…………………………...115
Exhibit G: Specifications Table of Contents………………………119
Exhibit H: Small and Underutilized Business Certification Information Form………………………..…………….122
Exhibit I:
Exhibit J:
Exhibit K:
Exhibit L:
Wage Rate Worksheet………………………………….127 GCCCD Campus Maps..………………………………129 GCCCD Academic Calendars…………………………132 DCS Cuyamaca Phasing and Site Logistics......………135
Exhibit M: Cuyamaca College Bldg. A As-Builts………………….136
Exhibit N: MTGL Lead Removal Specifications………………….137
Exhibit O: Cuyamaca College Black Book – Site Utilities………..138
Exhibit P: Cuyamaca College Limited Asbestos Survey…………139
Exhibit Q: Cuyamaca College Geotech Report…………………...140
Exhibit R: Irrigation Control Wires………………………………..141
Exhibit S: Warranty Form…………………………………………142
Exhibit T: PMCS – Oracle Unifier…………………………………143
Exhibit U: GCCCD Construction Handbook……………………..144
Exhibit V: Geotech Evaluation…………………………………….145
Exhibit W: Summary of Work……………………………………...146
[END OF DOCUMENT]
B26.011 – DISTRICT SERVICES COMPLEX RELOCATION NOTICE TO CONTRACTORS
DOCUMENT 00020
NOTICE TO CONTRACTORS CALLING FOR BIDS
NOTICE IS HEREBY GIVEN that Grossmont–Cuyamaca Community College District of San Diego
County, California, acting by and through its Governing Board, hereinafter referred to as the District, will receive up to, but not later than 2:00 p.m., on Tuesday, July 28, 2026 for the award of a contract;
B26.011—
DISTRICT SERVICES COMPLEX RELOCATION
Bids shall be received in the Purchasing and Contracts office of the Grossmont–Cuyamaca Community
College District, Grossmont College, Parking Lot 4, 8800 Grossmont College Drive, El Cajon, CA 92020 and shall be opened and publicly read aloud at the above-stated time and place.
Each bid must conform and be responsive to this invitation, the Contract Documents, all plans, specifications and any other documents comprising the pertinent documents, copies of which are now on file and may be obtained beginning Tuesday, June 30, 2026 via the District Vendor Portal https://vendors.planetbids.com/portal/52798/portal-home. To be considered for the Bidding Contractors
List, please register as a vendor on PlanetBids Vendor Portal and include CUPCCAA when completing
Category/Description. Potential bidders can register as a bidder online, search for bid requests, and download documents. Prequalification is required to bid; the necessary documents and instructions are available under the Bid Documents section. All questions and requests for clarification will only be accepted through PlanetBids and must be received no later than 4:00 p.m. Thursday, July 16, 2026.
Bids must be submitted on the Bid form provided by the District and included in the bid documents. Each bid must strictly conform with and be responsive to this Notice Inviting Bids, the Information for Bidders, and other Contract Documents. District reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding. Except as provided in Public Contract Code
Section 5100 et seq. no bidder may withdraw a bid for a period of sixty (60) calendar days after the opening of the bids.
In contracts involving expenditure in excess of $25,000.00, Civil Code section 3247(a), the successful bidder shall file a payment bond issued by an admitted Surety approved to conduct business in the State of
California approved by the District in the form set forth in the contract documents.
The successful bidder will be required to provide a Performance Bond and a separate Payment Bond, each in an amount equal to 100% of the total successful bid prior to execution of the Contract. The forms on the bonds are set forth in the Contract Documents and all bonds must be issued by a California-admitted surety as defined in California Code of Civil Procedures Section 995.120.
The class of California contractor’s license(s) required in order to bid on and perform the contract for this
Project is:
B General Building Contractor
Estimated contract value - $7,300,000.00 The District may have made a finding that certain brand or trade names are necessary in order to maintain conformity among its campuses, compatibility with existing systems and to streamline maintenance and parts storage. A copy of the resolution is incorporated in the bid documents under Specifications.
NON-MANDATORY PRE-BID MEETING AND JOB WALK
DATE: Monday, July 13, 2026 at 10:00 a.m.
LOCATION: Cuyamaca College Bldg. A ADDRESS: 900 Rancho San Diego Pkwy, San Diego, CA 92019
Publication Dates: Tuesday, June 30, 2026& Tuesday, July 07, 2026
B26.011 – DISTRICT SERVICES COMPLEX RELOCATION INFORMATION FOR BIDDERS
DOCUMENT 00100
INFORMATION FOR BIDDERS
1. Preparation of Bid Form
The District invites bids on the attached form to be submitted at such time and place as is stated in the
Notice to Contractors Calling for Bids. All blanks in the bid form must be appropriately filled in. All bids must be submitted in sealed envelopes bearing on the outside the name of the bidder, his address, and the name of the
Project for which the bid is submitted. All prices must be stated in both words and figures where so indicated, and where there is a conflict in the words and figures, the words shall govern. Prices quoted shall be in whole dollars only. Prices, wording and notations must be in ink or typewritten. Erasures or other changes shall be noted over by signature of the bidder. It is the sole responsibility of the bidder to see that his bid is received in proper time. All bids received after the scheduled closing time for receipt of bids will be returned to the bidder unopened.
2. Combined Bid Packages
This paragraph applies when there is more than one bid package for a project. Bidders shall have the option to bid combined bid packages. The bidder MUST still bid each package separately, in addition to the combined bid. The District will compare the combined bid with the individual bids. If the combined bid is lower than the sum of the apparent low individual bids the District shall elect to award to the combined bidder. If the sum total of the individual bids is lower than the combined bid, the individual packages will be awarded. If the bidder is submitting a combined bid for multiple packages, the bidder must write the words “MULTIPLE BID
PACKAGES” and the number of each package on the outside of the sealed envelope.
3. Bid Security
Each bid shall be accompanied by one of the following:
(a) cash; (b) a certified check made payable to the
District; (c) a cashier’s check made payable to the
District; or (d) an original executed hard copy bid bond payable to the District executed by the bidder as principal and an admitted surety approved to conduct business in the State of California as surety, in an amount not less than 10% of the maximum amount of the bid. A, B, C, or D must be received by the District’s
Purchasing and Contracts Department before the latest date/time for submitting bid proposals. Personal sureties and unregistered surety companies are unacceptable.
The California admitted surety insurer, as defined in
California Code of Civil Procedure Section 995.120, shall be a satisfactory corporate surety. The cash, check or bid bond shall be given as a guarantee that the bidder shall execute the Contract if it be awarded to the bidder in conformity with the Contract Documents and shall provide the surety bond or bonds as specified therein within ten (10) consecutive calendar days after notification of the Notice of Award of the Contract to the bidder.
In the event the bidder to whom the Notice of Award of
Contract is given fails or refuses to post the required bonds, as provided in Section 10 below, and return executed copies of the Contract within ten (10) consecutive calendar days from the date of the Notice of
Award of Contract, the District may declare the bidder’s bid deposit or bond forfeited as damages caused by the failure of the bidder to post the required bonds and execute such copies of the Contract, and may award the
Contract to the next lowest responsible bidder, or may call for new bids.
4. Faxed and Electronic Mail Bids
All bids must be under sealed cover. The District will not accept any bids or bid modifications submitted by facsimile or electronic mail transmission.
5. Signature
The bid must be signed in the name of the bidder and must bear the signature in longhand of the person or persons duly authorized to sign the bid on behalf of the bidder. All signatures are to be in ink. In the event that the bidder is a joint venture or partnership, there shall be submitted with the bid certifications signed by authorized officers of each of the parties to the joint venture or partnership, naming the individual who shall be the agent of the joint venture or partnership, who shall sign all necessary documents for the joint venture or partnership and who, should the joint venture or partnership be the successful bidder, shall act in all matters relative to the Contract resulting therefore for the joint venture or partnership.
6. Modifications
Changes in or additions to the bid form, recapitulations of the work bid upon, alternative proposals, or any other modification of the bid form which is not specifically called for in the Contract Documents may result in the
District’s rejection of the bid as not being responsive to the invitation to bid. No oral or telephonic modification of any bid submitted will be considered and a telegraphic modification may be considered only if the postmark evidences that a confirmation of the telegram duly signed by the bidder was placed in the mail prior to the opening of bids. Bids may be rejected if they show any alteration in form, are incomplete, or contain irregularities of any kind.
7. Erasures/Mutilation of Bid Documents
The bid submitted must not contain any erasures, interlineations, or other corrections unless each such correction is suitably authenticated by affixing in the margin immediately opposite the correction the surname or surnames of the person or persons signing the bid.
Bidders should not deface or mutilate the bid documents to the extent that they may not be usable for construction purposes.
8. Examination of Site and Contract Documents
At its own expense and prior to submitting its bid, each bidder shall visit the site of the proposed work and fully acquaint himself with the conditions relating to the construction and labor so that the bidder may fully understand the facilities, which include but are not limited to difficulties, and restrictions attending the execution of the work under the Contract. Bidders shall thoroughly examine and be familiar with the drawings and specifications. Each bidder shall also determine the local conditions which may, in any way affect the performance of the work, including the prevailing wages and other relevant cost factors; familiarize itself with all federal, state and local laws, ordinances, rules, regulations and codes affecting the performance of the work, including the cost of permits and licenses required for the work; make such surveys and investigations, including investigations of subsurface or latent physical conditions at the site or where work is to be performed.
The failure or omission of any bidder to receive or examine any Contract Documents, form, instrument, addendum, or other document or to visit the site and acquaint himself with conditions there existing shall in no way relieve any bidder from any obligation with respect to their bid or to the Contract. The submission of a bid shall be taken as incontrovertible evidence of compliance with this section.
9. Withdrawal of Bids
Any bidder may withdraw his bid either personally, by written request, or by telegraphic request confirmed in the manner specified above at any time prior to the scheduled closing time for receipt of bids. Any request to withdraw a bid shall be so worded so as not to reveal the amount of the original bid. Withdrawn bids may be resubmitted until the scheduled time for receipt of bids, so long as the resubmitted bids are in full conformance with the Contract Documents. After the scheduled closing time for receipt of bids, a bidder may not withdraw its bid until the expiration of sixty (60) calendar days, after which time a bid may be withdrawn only in writing and in advance of actual award of the
Contract.
10. Contracts and Bonds
The Contract form which the successful bidder, as
Contractor, will be required to execute, and the form of the Performance Bond equal to 100% of the successful bid, and Payment Bond equal to 100% of the successful bid which the bidder will be required to furnish at the time of execution of the Contract, are included in the
Contract Documents and should be carefully examined by the bidder. The required number of executed copies of the Contract, the Performance Bond, and the
Payment Bond for Public Works is as specified in the
Special Conditions. The Performance and Payment
Bonds must be executed by an admitted Surety approved to conduct business in the State of California, pursuant to California Code of Civil Procedure Section 995.120.
In addition, to the extent required by law, the Payment and Performance Bonds must be accompanied by a certified copy of the certificate of authority of the insurer issued by the Insurance Commissioner of the State of
California, a certificate from the Clerk of the County of
San Diego that the certificate of authority of the insurer has not been surrendered, revoked, cancelled, annulled, or suspended, or if it has that it has been renewed, and four copies of the insurer’s most recent annual statement and quarterly statement filed with the Department of
Insurance of the State of California.
11. Interpretation of Plans and Documents
If any person contemplating submitting a bid for the proposed Contract is in doubt as to the true meaning of any part of the drawings, specifications, or other
Contract Documents, or finds discrepancies in, or omissions from the drawings and specifications, that person may submit to both the Program Manager and the Architect a written request for an interpretation or correction thereof. The person submitting the request will be responsible for its prompt delivery. Any interpretation or correction of the Contract Documents will be made only by addendum duly issued. Any addenda or bulletins issued by the Program Manager and/or the Architect during the time of bidding or forming a part of the documents furnished to bidders for bid preparation, shall be covered in the bid and made part of the Contract Documents. In the event that an addendum or bulletin, setting forth material changes, additions or deletions is issued when there is 72 hours or less to the bid deadline, the District will extend the bidding deadline by at least 72 hours. No person is authorized to make any oral interpretation of any provision in the Contract Documents to any bidder, and no bidder is authorized to rely on any such unauthorized oral interpretation.
12. Bidders Interested in More Than One Bid
No person, firm, or corporation shall be allowed to make, or file, or be interested in more than one bid for the same work unless alternate bids are specifically called for. A person, firm, or corporation that has submitted a sub-proposal to a bidder, or that has quoted prices of materials to a bidder, is not thereby disqualified from submitting a sub-proposal or quoting prices to other bidders or making a prime proposal.
13. Noncollusion Affidavit
Bidders on all public works contracts are required to submit an affidavit of Noncollusion with their bid. This form is included with the bid package and must be signed under the penalty of perjury and dated.
14. Reservation
The District reserves the right to reject any or all bids, or to waive any irregularities or informalities in any bids or in the bidding.
15. Award of Contract
The award of the Contract, if made by the District, will be to the lowest responsible bidder therefore whose bid complies with all of the prescribed requirements. If alternate bids are called for, the Contract may be awarded at the election of the governing board to the lowest responsible bidder on the base bid, or on the base bid and any alternate or combination of alternates, as specifically established in the Notice to Contractors
Calling for Bids.
16. Evidence of Responsibility
If bidders were not required to pre-qualify prior to being allowed to bid on the Project, the following information will be required to accompany bids submitted to the
District:
Each bid shall be supported by a statement of the bidder’s experience as of recent date on the form entitled
“INFORMATION REQUIRED OF BIDDER,” bound herein. District may also consider the qualifications and experience of subcontractors and other persons and organizations (including those who are to furnish the principal items of material and equipment) proposed for those portions of the work. Operating costs, maintenance considerations, performance data and guarantees of materials and equipment may also be considered by the District. In this regard, the District may conduct such investigations as the District deems necessary to assist in the evaluation of any bid and to establish the responsibility, qualifications and financial ability of the bidder, proposed subcontractors, and other persons and organizations to do the work in accordance with the Contract Documents to the District’s satisfaction within the prescribed time; the District reserves the right to reject the bid of any bidder who does not pass any such evaluation to the satisfaction of the
District.
17. Listing Subcontractors
Each bidder shall set forth on the form provided herein, and submit with its sealed bid at the time bids are due the name and address of the place of business of each subcontractor who will perform work, labor, furnish materials, or render service to the bidder on said
Contract in excess of one-half (1/2) of one percent (1%) of the total bid. Bidders are required to submit the phone number, license number, license expiration date, and DIR registration number of each subcontractor listed in its bid at the time of bid opening. No time extension will be allowed for submission of additional information required by this
Section.
18. Workers’ Compensation
In accordance with the provisions of Section 3700 of the
Labor Code, Contractor shall secure the payment of compensation to his employees. Contractor shall sign and file with the District the following certificate prior to performing the work under this Contract:
I am aware of the provisions of Section 3700 of the
Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Contract.
The form of such certificate, Contractors Certificate
Regarding Workers Compensation, is included as part of the Contract Documents.
19. Substitution of Security
The Contract Documents call for monthly progress payments based upon the percentage of the work completed. The District will retain five percent (5%) of each progress payment as security for completion of the work. At the request and expense of the successful bidder, the District will substitute securities for the amount so retained in accordance with Public Contract
Code section 22300 and the Contract Documents.
20. Labor Compliance
Pursuant to Labor Code section 1771.7, the District has implemented and shall enforce a Labor Compliance
Program (LCP) for this Project. The successful bidder shall be required to comply with all the requirements of the District's LCP and applicable provisions of the
California Labor Code. In bidding on this Project, it shall be the bidder’s responsibility to evaluate the cost of complying with the District's LCP. The bidders shall include all costs of compliance with specified requirements in the contract amount.
The successful bidders shall be responsible for complying with the provisions of the District's LCP, including the standard provisions requiring payment of prevailing wages, maintenance and submission of weekly certified payrolls, and hiring of apprenticeship as appropriate.
The successful bidders shall be required to attend, and invite subcontractors to attend, a pre-construction meeting at which a representative of the District shall discuss labor law requirements. The successful bidders shall work with the District's staff and consultants to ensure the full compliance with the District's LCP and applicable labor law.
The District has obtained from the Director of the
Department of Industrial Relations the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed to execute the Contract. These rates are on file at the District Office located at District, 8800
Grossmont College Drive, El Cajon, CA 92020-1799
Copies may be obtained on request. Bidders are advised that a copy of these rates must be posted at each job site.
The project is also subject to the requirements of all applicable provisions of the California Labor Code and the California Code of Regulations, including but not limited to, Chapter 1 of Part 7 of Division 2 of the Labor
Code (Section 1720 et seq.); California Code of
Regulations, Title 8, Chapter 8, Subchapters 3 & 4
(Section 16000 et seq.); and California Code of
Regulations, Title 8, Chapter 8, Subchapter 4.5 (Section
16450 et seq.).
The successful bidder and each subcontractor of any tier shall be required to pay not less than the general prevailing rates of per-diem wages in the locality in which the work is to be performed for each craft or type of worker needed to execute the contract.
Successful bidder and each subcontractor shall keep accurate payroll records in accordance with Labor Code
Section 1776. Payroll records shall be furnished in a format prescribed by Section 16401 of Title 8 of the
California Code of Regulations, with use of the current version of “Public Works Payroll Reporting Form (A-1-
131)” and “Statement of Employer Payments (DLSE
Form PW26)” constituting presumptive compliance with this requirement, provided the forms are filled out accurately and completely.
The successful bidder will be required to retain copies of certified payroll records for a minimum of five (5) years from the date of completion and submit them upon request of the District or its authorized agent.
A copy of the per-diem rates of Prevailing Wages shall be posted at the site of the Project by the District. Rates are available at http://www.dir.ca.gov/dlsr/pwd/index.htm.
21. Debarment of Contractors and Subcontractors
In accordance with the provisions of the California
Labor Code, Contractors or subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Section 1777.1 or Section
1777.7 of the California Labor Code. Any contract on a public works project entered into between a contractor and a debarred subcontractor is void as a matter of law.
A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid, or may have been paid to a debarred subcontractor by a contract on the Project shall be returned to the District.
The successful bidder, as Contractor, shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the
Project.
22. Contractor's License
To perform the work required for this Project, bidders must possess the appropriate Contractor's License for the portion of the work bid upon, and bidders must maintain the license throughout the duration of the Contract. If, at the time the bids are opened, bidder is not licensed to perform the Project in accordance with division 3, chapter 9 of the Business and Professions Code of the
State of California and the Notice to Contractors Calling for Bids, the bid will not be considered.
Provided, however, that in all contracts where federal funds are involved, no bid submitted shall be invalidated by the failure of the bidder to be licensed in accordance with the laws of California. The first payment for work or material under any contract shall not be made unless and until the Registrar of Contractors verifies to the
District that the records of the Contractor’s State License
Board indicate that the Contractor was properly licensed at the time the contract was awarded. Any bidder or contractor not so licensed shall be subject to all legal penalties imposed by law, including, but not limited to, any appropriate disciplinary action by the Contractor’s
State License Board. Failure of the bidder to obtain proper and adequate licensing for an award of a contract shall constitute a failure to execute the contract and shall result in the forfeiture of the security by the bidder.
23. Storm Water Permit for Construction Activity
It shall be the responsibility of the successful bidder to file a Notice of Intent and procure a State Water
Resources Control Board (State Water Board) National
Pollutant Discharge Elimination System General Permit for Waste Discharge Requirements for Discharges of
Storm Water Runoff Associated with Construction
Activity (Permit). The successful bidder shall be solely responsible for preparing and implementing a Storm
Water Pollution Prevention Plan (SWPPP) prior to initiating work. The successful bidder shall be responsible for procuring, implementing and complying with the provisions of the Permit and the SWPPP, including the standard provisions, monitoring and reporting requirements as required by Permit. It shall be the responsibility of all bidders to evaluate and include in the bid the cost of procuring the Permit and preparing the SWPPP as well as complying with the SWPPP and any necessary revisions to the SWPPP. The successful bidder shall also include in his bid the cost of monitoring as required by the Permit.
24. Bid Deposit Return
The District will return the security accompanying the bids of all unsuccessful bidders no later than sixty (60) calendar days after award of the Contract.
25. Insurance
Prior to commencement of the work the successful bidder shall purchase and maintain insurance as set forth in the General Conditions, in the amounts specified in the Special Conditions to these Contract Documents, and in a form acceptable to the District, from a company or companies lawfully authorized to do business in
California as admitted carriers having an “A” policy holders rating and a financial size rating of at least Class
VII in accordance with the most current Best’s Key
Rating Guide, Property-Casualty. Such insurance shall be adequate to protect themselves from claims under
Workers’ Compensation Acts, and from claims from damages for personal injury, including death, and damage to property, which may arise from operations under the Contract and from the ownership, maintenance or uses of motor vehicles, or claims involving blanket contractual liability applicable to the successful bidder’s obligations under the Contract
Documents, and completed operations, independent contractors, and Broad Form Property damage, without exclusion for collapse, explosion, demolition, underground coverage, and excavating. The successful bidder shall be required to file with the District certificates of such insurance, and shall name, by way of endorsement on any policy of insurance, the District, Program Manager and Architect as additional insureds.
Failure to furnish such evidence of insurance may be considered default by the successful bidder.
District reserves the right pursuant to Government Code
Section 4420.5 to use an owner controlled insurance program.
26. Request For Substitutions
a. For purposes of this provision the term
"substitution" shall mean the substitution of any material, process or article that is substantially equal or better in every respect to that so indicated or specified in the specifications.
b. Whenever in specifications any material, process, or article is indicated or specified by grade, patent, or proprietary name or by name of manufacturer, such specifications shall be deemed to be used for the purpose of facilitating the description of the material, process or article desired and shall be deemed to be followed by words "or equal."
Bidders may, unless otherwise stated, offer for substitution any material, process or article which shall be substantially equal or better in every respect to that so indicated or specified. However, the
District has adopted certain uniform standards for certain materials, processes and articles. If any material, process or article offered for substitution by bidders is not, in the opinion of the Architect and the District, substantially equal or better in every respect to that specified, bidders shall furnish the material, process or article specified. The burden of proof as to the equality of any material, process or article shall rest with the bidders.
c. Bidders shall submit requests together with substantiating data for substitution of any "or equal" material, process or article no later than nine (9) business days prior to the bid opening. Provisions authorizing submission of "or equal" substitution justification data shall not in any way authorize an extension of time for performance of this Contract.
Furthermore, if a proposed "or equal" substitution request is rejected, a bidder shall be responsible for including the specified material, process or article in its bid. The District shall not be responsible for any costs of bidders associated with "or equal" substitution requests. The District has the complete and sole discretion to determine if a material, process or article is an "or equal" material, process or article that may be substituted.
d. For purposes of subdivision (c) above, data required to substantiate requests for substitutions of an "or equal" material, process or article data shall include a signed affidavit from the bidder stating that the substituted "or equal" material, process or article is equivalent to that specified in the specification in every way except as listed on the affidavit.
Substantiating data shall also include any and all illustrations, specifications, and other relevant data including catalogue information which describes the requested substituted "or equal" material, process or article and substantiates that it is an “or equal” to the material process or article specified.
In addition, the submittal documentation must also include a statement of the cost implications of the substitution being requested stating whether and why the substitution of the "or equal" material, process or article will reduce or increase the
Contract Price. The substantiating data must also include information regarding the durability and lifecycle cost of the requested substituted "or equal" material, process or article. Failure to submit all the needed substantiating data, including the signed affidavit, to the Program Manager in a timely fashion so that the substitution can be adequately reviewed may result in the rejection of the proposed substitution. The Program Manager and Architect are not obligated to review multiple substitution submittals for the same product or item due to the bidder’s failure to submit a complete package initially.
e. Time limitations in this Article must be complied with strictly and in no case will an extension of time for completion be granted because of bidder’s failure to request the substitution of an alternative item at the times and manner set forth herein in subdivision (c). Further, the bidder shall bear the costs of all engineering work associated with the review of submittals for substitution of equals.
f. In event Contractor furnishes material, process, or article more expensive than that specified, the difference in cost of such material, process, or article so furnished shall be borne by Contractor.
27. Anti-Discrimination
It is the policy of the District that in connection with all work performed under contracts, there be no discrimination against any prospective or active employees engaged in the work because of race, color, ancestry, national origin, religious creed, sex, age or marital status. The successful bidder agrees to comply with applicable Federal and California laws including, but not limited to, the California Fair Employment
Practice Act, beginning with Government Code 12900, and Labor Code 1735. In addition, the successful bidder agrees to require like compliance by any subcontractors employed on the work by him.
28. Disabled Veteran Business Enterprises
In accordance with Education Code Section 71028, the
District has a participation goal for Disabled Veteran
Business Enterprises (“DVBE”) of at least three percent
(3%) of the total dollar amount of contracts awarded.
Although Bidders are not specifically required to meet the 3%, they are encouraged to attempt through “good faith effort”. Bidders are encouraged to seek and include
DVBE subcontractor and supplier participation in your bids. In addition, you are encouraged to note in the
Expanded List of Proposed Subcontractors those who qualify as DVBE’s. Prior to, and as a condition precedent for, final payment under this Contract, the successful bidder will be required to provide documentation to the District identifying the amounts paid to DVBE’s in conjunction with this Contract so that the District can assess its success at meeting its DVBE participation goal.
29. Pre-Bid Meeting & Job Walk
A Non-Mandatory Pre-Bid Meeting and Job Walk has been scheduled for Monday, July 13, 2026 at 10:00 a.m. This Non-Mandatory Pre-Bid Meeting and Job-
Walk will take place at, 900 Rancho San Diego Pkwy, San Diego, CA 92019, Cuyamaca College Bldg. A.
Representatives of the District, Program Manager, and the campus will be present to answer questions bidders have regarding this Project. Bidders are encouraged to attend the Non-Mandatory Pre-Bid Meeting and Job
Walk; however, attendance is not required in order to submit a bid, and bids will be accepted from registered bidders whether or not they attended. All registered bidders will receive the pre-bid attendee list and any addenda issued after the meeting through PlanetBids.
No Telephone Availability
Bidders are advised that on bid date telephones WILL
NOT be available at the District Administrative Offices for use by bidders or their representatives.
30. Required Certifications
Bidders, for all projects involving state funds, are required to submit the “Asbestos-Free Materials
Certification.” This form is included with the bid package and must be signed under the penalty of perjury and dated. The successful bidder shall also execute, under the penalty of perjury and dated, the "Recycled
Content Certification" and the “Drug-Free Workplace
Certification” included in this package.
31. Ethics in Bidding.
The District expects the bidders to maintain high ethical standards in engaging in the competitive bidding process. The bid amount of one bidder should not be divulged to another before the award of the subcontract or order, nor should it be used by bidders to secure a lower proposal from another bidder on that project (bid shopping). Subcontractors or Suppliers should not request information for the bidder regarding any sub-bid in order to submit a lower proposal on that project (bid peddling). The District will consider any bidder found to be engaging in such practices to be a non-responsible bidder and may reject its bid on that ground.
B26.011 – DISTRICT SERVICES COMPLEX RELOCATION BID FORM
DOCUMENT 00200
BID FORM
Company
TO: Grossmont-Cuyamaca Community College District, acting by and through its Board of
Education, herein called the “District”:
1. Pursuant to and in compliance with your Notice to Contractors Calling for Bids and the other documents relating thereto, the undersigned bidder, having thoroughly examined and familiarized himself with the terms of the Contract, the local conditions affecting the performance of the Contract and the cost of the work at the place where the work is to be done, and with the drawings and specifications and other Contract Documents, hereby proposes and agrees to perform, within the time stipulated, the Contract, including all of its component parts, and everything required to be performed, including its acceptance by the
District and to provide and furnish any and all of the labor, materials, tools, expendable equipment, and all utility and transportation services necessary to perform the Contract and complete in a workmanlike manner all of the work required in connection with the Project described below:
B26.011 — DISTRICT SERVICES COMPLEX RELOCATION
All in strict conformity with the drawings and specifications and other Contract Documents, including addenda nos. _____, _____, _____,and _____, on file at the office of said District.
Award of Contract: The District shall award the Contract for the Project to the bidder submitting the lowest bid, as determined from the total base bid alone and is deemed responsible by the
District.
BASE BID:
$___________________for the District Services Complex Relocation.
+ $____900,000_______ District Services Complex Relocation allowance for potential project modifications and unforeseen conditions above and beyond those noted in the Construction Documents and Specifications.
= $___________________TOTAL BASE BID (includes all applicable taxes and cost; or for the sum of (in words)
NOTE: The District will still award based on the total base bid, not based on these additive alternates.
Said sum indicated above includes all applicable taxes, costs and a $900,000 allowance described in Section W, Document 00800, SPECIAL CONDITIONS, which is to be credited back to the District if not used.
2. It is understood that the District reserves the right to reject this bid and that this bid shall remain open and not be withdrawn for the period specified in the Notice to Contractors
Calling for Bids.
3. Attached is the required bid security in the amount of not less than 10% of the Bid:
$ . Bid bond, certified check, cashier’s check or cash (circle one).
4. Non-collusion affidavit is attached hereto.
5. The required list of proposed subcontractors is attached hereto.
6. It is understood and agreed that if written notice of the acceptance of this bid is mailed, telegraphed, or delivered to the undersigned after the opening of the bid, and within the time this bid is required to remain open, or at any time thereafter before this bid is withdrawn, the undersigned will execute and deliver to the District a contract in the form attached hereto in accordance with the bid as accepted. The undersigned will submit the executed Contract, Performance Bond and Payment Bond for Public Works, and Insurance Certificates as specified, all within ten (10) consecutive calendar days after Award of Contract (which date shall be the day following the Board of Education approval of the award). The work under the Contract shall be commenced by the undersigned bidder, if awarded the contract, on the date to be stated in the District’s Notice to the Contractor to Proceed, and shall be completed by the Contractor in the time specified in the Contract Documents. The Contractor shall not start work on the Project until all paper work required herein is timely and correctly submitted to the District. No time extensions shall be granted to Contractor for Contractor's failure to comply with these provisions.
7. Notice of acceptance or requests for additional information should be addressed to the undersigned at the address stated below:
8. The names of all persons interested in the foregoing proposal as principals are as follows:
(IMPORTANT NOTICE: If bidder or other interested person is a corporation, state legal name of corporation, also names of the president, secretary, treasurer, and manager thereof; if a co-partnership, state true name of firm, also names of all individual copartners comprising the firm; if bidder or other interested person is an individual, state first and last names in full.)
9. Bidder certifies that he is licensed in accordance with the law providing for the registration of
Contractors, License No. ___________________, Expiration Date
__________________, classification of license__________________________________.
If the bidder is a joint venture, each member of the joint venture must include the above information.
10. Bidder certifies that his is/is not (circle one) DVBE certified. DVBE reference number assigned by the Office of Small Business Certification and Resources is ____________. If bidder is DVBE certified, please attach a copy of the DVBE certification letter.
11. Pursuant to Section 7103.5 of the Public Contract Code submitting a bid to the District, the bidder offers and agrees that if the bid is accepted, it will assign to District all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15
U.S.C. Section 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, materials, or services by the bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and become effective at the time the purchasing body tenders final payment to the bidder.
Corporation Name or Partnership Name or if Individual
Address
Signature of Bidder Date
Note: If bidder is a corporation or partners authorized to sign contracts on behalf of the partnership; and if bidder is an individual, the bidder’s signature shall be placed above. If bidder is a corporation, affix corporation seal.
I,_______________________________________, the ____________________________________ of the bidder, hereby certify under penalty of perjury under the laws of the State of California, that all of the information submitted by the bidder in connection with this bid and all of the representations made herein are true and correct. Executed on this _________ day of _____________________________
20__, at County, California.
Proper Name of Bidder ____________________________
By
Signature of Bidder
NOTE: If bidder is a corporation, the legal name of the corporation shall be set forth above together with the signatures of authorized officers or agents and the document shall bear the corporate seal; if bidder is a partnership, the true name of the firm shall be set forth above together with the signature of the partner or partners authorized to sign contracts on behalf of the partnership; and if bidder is an individual, his or her signature shall be placed above.
Business Address:
Place of Residence:
Telephone: ( )
Bidder must submit the following documents with this Bid Form in order to be considered responsive:
00300 Bid Bond
00400 Contractor's Certification Regarding Workers' Compensation
00410 Designation of Subcontractors
00420 Designation of DVBE Subcontractors/Suppliers
00430 Information Required of Bidders
00440 Asbestos-Free Materials Certification
00450 Non-Collusion Affidavit
00455 Site Visit Certification
00620 Recycled Content Certification
00630 Drug-Free Workplace Certification
00930 Lead Based Paint Certification
00980 Prevailing Wage Certification
B26.011 – DISTRICT SERVICES COMPLEX RELOCATION BID BOND
DOCUMENT 00300
BID BOND
KNOW ALL MEN BY THESE PRESENTS: THAT we, , as Principal, and
, as Surety, are held and firmly bound unto the Grossmont-Cuyamaca Community College District, hereinafter called the District, in the penal sum of TEN PERCENT (10%) OF THE MAXIMUM AMOUNT OF THE BID of the Principal submitted to the said DISTRICT for the work described below for the payment of which sum in lawful money of the United States, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that whereas the Principal has submitted the accompanying bid dated _________________ 20__, for B26.011 DISTRICT SERVICES COMPLEX RELOCATION. NOW, THEREFORE. If the Principal shall not withdraw said bid within the period specified therein after the opening of the same, or, if no period be specified, within sixty (60) days after said opening; and, if the Principal be awarded the contract, and shall within the period specified therefore, or if no period be specified, within ten (10) consecutive calendar days after the Award of Contract (which date shall be the day following the Board of Education approval of the award) complete the prescribed forms are presented to him for signature enter into a written contract with the District in accordance with the bid as accepted and give bond with good and sufficient surety or sureties, as may be required, for the faithful performance and proper fulfillment of such contract and for the payment for labor and materials used for the performance of the contract, or in the event of the withdrawal of said bid within the period specified or the failure to enter into such contract and give such bonds within the time specified. If the Principal shall pay the District the difference between the amount specified in said bid and the amount for which the District may procure the required work and/or supplies, if the latter amount be in excess of the former, together with all costs incurred by the District in again calling for bids, then the above obligation shall be void and of no effect, otherwise to remain In full force and virtue.
Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract on the call for bids, or to the work to be performed thereunder, or the specifications accompanying the same, shall in anywise affect its obligation under this bond, and It does hereby waive notice of any such change, extension of time, alteration or addition to the terms of said contract or the call for bids, or to the work, or to the specifications.
In the event a lawsuit is brought upon this bond by the District and judgment is recovered, the surety shall pay all litigation expenses incurred by the District in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation expenses.
IN WITNESS WHEREOF, the above-bound parties have executed this instrument under their several seals this day of ____________________ 20__, the name and corporate seal of each corporate party being hereto affixed and these presents duly assigned by its undersigned representative, pursuant to authority of Its governing body.
Principal
By
Title
(Corporate Seal) Surety
By Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title
B26.011 – DISTRICT SERVICES COMPLEX RELOCATION CONTRACTOR’S CERTIFICATION
REGARDING WORKERS COMPENSATION
DOCUMENT 00400
CONTRACTOR’S CERTIFICATE REGARDING
WORKERS’ COMPENSATION
Labor Code section 3700 in relevant part provides:
Every employer except the State shall secure the payment of compensation in one or more of the following ways:
(a) By being insured against liability to pay compensation in one or more insurers duly authorized to write compensation insurance in this State.
(b) By securing from the Director of Industrial Relations a certificate of consent to self-insure, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self-insure and to pay any compensation that may become due to his employees
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Contract.
Contractor
By Signature
Title
(In accordance with Article 5 (commencing at section 1860), chapter 1, part 7, division 2 of the Labor Code, the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .