Amend_002_Project_Specifications.pdf

PDF 585 KB Posted

Attached to
Construct VT Hanlon Substation, Stage 01, in South Dakota Federal contract opportunity
Solicitation number
DE-SOL-0007930
Issued by
Department of Energy Western Area Power Administration

About this file

Revised Project Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Construct VT Hanlon Substation, Stage 01, in South Dakota, newest first.
File Type Posted
Amendment_003.pdf PDF
VH_Contractor_and_internal_questions_and_answers.docx DOCX document
Amend_002_Project_Drawings.pdf PDF
Amend_002_Bidding_Schedule.pdf PDF
Amend_002_SF30.pdf PDF
21._Amendment_0001.pdf PDF
21._Prospective_Bidders_Letter.pdf PDF
Project_Drawings.pdf PDF
Contract_Clauses_and_Bid_Schedule.pdf PDF
Project_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 002 Solicitation No. DE-SOL-0007930

VT HANLON SUBSTATION

STAGE 01

Spec. No. 15WC112847-834

SECTION C

DESCRIPTION/SPECIFICATIONS

SOUTH DAKOTA

SECTION C

DESCRIPTIONS/SPECIFICATIONS

VT HANLON SUBSTATION STAGE 01

DIVISION 1 – GENERAL REQUIREMENTS

A. CONTRACT REQUIREMENT:

B. DESCRIPTION OF WORK:

C. DESCRIPTION OF BIDDING SCHEDULE ITEM:

1. Bidding Schedule item “Mobilization and preparatory work”

D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:

1. COMMENCEMENT AND COMPLETION:

2. SUBMITTAL APPROVAL TIME:

3. COMMENCEMENT OF CONTROL WORK:

4. OUTAGE RESTRICTIONS:

5. CONSTRUCTION SCHEDULE RESTRICTIONS:

6. MAXIMUM AVAILABLE FAULT CURRENT:

7. TYPICAL FOUNDATIONS FOR GOVERNMENT-FURNISHED ELECTRICAL EQUIPMENT

AND OIL DETENTION STRUCTURES:

8. TYPICAL FOUNDATIONS FOR CONTRACTOR-FURNISHED ELECTRICAL EQUIPMENT:

E. CONSTRUCTION SCHEDULE:

1. SUBMITTAL TIME:

2. FORMAT AND DETAIL:

F. MATERIAL:

1. POINTS-OF-DELIVERY:

2. PROTECTION OF MATERIAL:

G. RIGHTS-OF-WAY:

1. GENERAL:

2. ACCESS EASEMENTS:

3. WORK ON THE RIGHT-OF-WAY:

H. GEOLOGIC INVESTIGATIONS:

I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:

J. WATER CONSTRUCTION PURPOSES:

K. EXPLOSIVES AND BLASTING:

L. SUBMITTALS:

1. GENERAL:

2. APPROVAL TIME:

3. TRANSMITTAL:

DIVISION 2 – SITEWORK

A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule item “Miscellaneous sitework”

2. Bidding Schedule item “Removing transmission line structures”

3. Bidding Schedule item “Stripping”

4. Bidding Schedule item “Excavation for substation site and access road”

5. Bidding Schedule item “Embankments”

6. Bidding Schedule item “Standard chain link fence”

7. Bidding Schedule item “Gravel-surfacing”

8. Bidding Schedule item “Seeding”

9. Bidding Schedule does not contain separate items for the following

DIVISION 3 – CONCRETE

A. GENERAL:

1. MATERIAL:

2. TEST FOR POTENTIAL REACTIVITY OF SAND AND COARSE AGGREGATE:

3. CURING:

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule item “Substation concrete foundations”

2. Bidding Schedule item “Type “C” cable trench”

3. Bidding Schedule item “Oil detention structure”

DIVISION 4 – METALWORK

A. GENERAL:

1. MEASUREMENT:

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule item “Steel structures, welded (galvanized)”

2. Bidding Schedule item “Aluminum structures, welded”

DIVISION 9 – SUBSTATION – ELECTRICAL

A. GENERAL:

1. Bidding Schedule for Government-furnished items

2. Bidding Schedule for items (not furnished by the Government)

3. Unless otherwise specified, associated support structures provided

4. Installation and painting of electrical equipment and material

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule items “Power circuit breaker, 245-kV, 3,000 amps (Government-furnished)”, “Power circuit breaker, 123-kV, 3,000 amps (Government-furnished)”, “Power circuit breaker, 72-kV, 2,000 amps (Government-furnished)”, and “Power circuit breaker, 15-kV, 2,000 amps (Government-furnished)”:

2. Bidding Schedule items “Disconnecting switch, 245-kV, 2,000 amps” and “Disconnecting switch with ground blades, 245-kV, 2,000 amps” includes providing the following disconnecting switches and disconnecting switch with ground blades as shown on the drawings and in accordance with WAPA ES 8.1 equipment standard:

3. Bidding Schedule items “Disconnecting switch, 123-kV, 2,000 amps” and “Disconnecting switch with ground blades, 123-kV, 2,000 amps”, includes providing the following disconnecting switches and disconnecting switch with ground blades as shown on the drawings and in accordance with WAPA ES 8.1 Equipment Standard:

4. Bidding Schedule items “Disconnecting switch, 72-kV, 600 amps” and “Disconnecting switch, 15-kV, 1,600 amps” includes providing the following disconnecting switches as shown on the drawings and in accordance with WAPA ES 8.1 equipment standard:

5. Bidding Schedule item “Load break switch, 25-kV, 600 amps” includes providing the load break switches in accordance with WAPA ES 8.2 equipment standard:

6. Bidding Schedule item “Fuse disconnecting switch, 69-kV, single-phase” includes providing single-pole fuse disconnecting switches as shown on the drawings and in accordance with WAPA ES 8.3 equipment specifications:

7. Bidding Schedule item “Fuse disconnecting switch, 14.4-kV, single-phase” includes providing single-pole fuse disconnecting switches as shown on the Drawings and in accordance with WAPA ES 8.3 equipment specifications:

8. Bidding Schedule item “Voltage transformer, 115-kV, single-phase” and “Voltage transformer, 69-kV, single-phase”:

9. Bidding Schedule items “Current transformer, 115-kV, single-phase” and “Current transformer, 69-kV, single-phase”:

10. Bidding Schedule items “Coupling capacitor voltage transformer, 230-kV, single-phase”, “Coupling capacitor voltage transformer, 115-kV, single-phase”, and “Coupling capacitor voltage transformer, 69-kV, single-phase”:

11. Bidding Schedule item, “Shunt reactor bank, 15-kV, 8.33 MVA, air core, single-phase (Government-furnished)” includes associated isolating insulators and support:

12. Bidding Schedule item “Resistor, 12.47-kV, 55 ohms, single-phase” includes providing 12.47-kV resistors in accordance with WAPA ES 4.5 equipment specifications. The ratings and features of the resistors shall be as follows:

13. Bidding Schedule item “Capacitor, 12.47-kV, 50-kVAR, single-phase” includes providing capacitors in accordance with WAPA ES 4.5 equipment specifications. The ratings and features of the capacitors shall be as follows:

14. Bidding Schedule item “Distribution transformer, 69-12.47-kV, 750-kVA, 3-phase” includes providing distribution transformer as shown on the drawings and in accordance with WAPA ES 2.1 equipment standard:

15. Bidding Schedule item “Station service transformer, 12.47-kV, 500-kVA, 3-phase” includes providing station service transformers in accordance with WAPA ES 2.1 equipment standard: . 30

16. Bidding Schedule item “Voltage transformer, 25-kV, single-phase” includes providing voltage transformers in accordance with WAPA ES 6.1 equipment standard:

17. Bidding Schedule item “Reactor potential device, 23-kV, single-phase”

18. Bidding Schedule item “Resistor, 208 V, 30 ohms”

19. Bidding Schedule item “Outdoor switchgear assembly”

20. Bidding Schedule item “Fusible safety switch, 600V, 1200A, 3-phase”

21. Bidding Schedule item “Outdoor AC distribution boards”

22. Bidding Schedule item “1 AWG, 25-kV, insulated copper cable”

23. Bidding Schedule item “Grounding system”

24. Bidding Schedule item “Outdoor bus systems”

25. Bidding Schedule item “Associated electrical equipment and material”

26. Bidding Schedule items “Furnishing 5/c No. 10 AWG control cable” and “Furnishing 12/c No. 10

AWG control cable”

27. Bidding Schedule items “Installing 5/c No. 10 AWG control cable” and “Installing 12/c No. 10

AWG control cable”

28. Bidding Schedule item “Vertical switchboard sections (Government-furnished)”

29. Bidding Schedule item “DC distribution boards”

30. Bidding Schedule item “Station battery system (Government-furnished)”

31. Bidding Schedule item “Battery chargers (Government-furnished)”

DIVISION 11 – SERVICE BUILDING

A. GENERAL:

SECTION 00 24 00 – GENERAL

00 24 13 DESCRIPTION OF BIDDING SCHEDULE ITEM:

1. Bidding Schedule item “Service building”

01 33 00 SUBMITTAL PROCEDURES:

1. GENERAL:

04 21 00 MASONRY VENEER:

1. GENERAL:

05 00 00 METALS:

1. GENERAL:

06 10 00 ROUGH CARPENTRY:

1. GENERAL:

06 17 53 WOOD TRUSSES:

1. GENERAL:

08 11 00 STEEL DOORS AND FRAMES:

1. GENERAL:

2. LOCKSET L1:

09 69 00 ACCESS FLOORING:

1. GENERAL:

2. SYSTEM DESCRIPTION:

3. STRUCTURAL SYSTEM PERFORMANCE REQUIREMENTS:

4. ELECTRICAL AND MECHANICAL SYSTEM PERFORMANCE REQUIREMENTS:

5. SUBMITTALS:

6. MATERIAL:

7. INSTALLATION:

SECTION 23 00 00 – HEATING, VENTILATING, AND AIR CONDITIONING

23 03 00 BASIC MECHANICAL MATERIALS AND METHODS:

1. GENERAL:

23 05 93 TESTING, ADJUSTING, AND BALANCING:

1. GENERAL:

2. PRODUCTS:

3. EXECUTION:

23 30 00 DUCTWORK:

1. GENERAL:

2. PRODUCTS:

3. EXECUTION:

23 33 00 DAMPERS:

1. GENERAL:

2. PRODUCTS:

3. EXECUTION:

23 81 16 HAZARDOUS DUTY AIR CONDITIONING:

1. GENERAL:

2. PRODUCTS:

3. EXECUTION:

23 81 26 PACKAGED CONDENSING UNITS:

1. GENERAL:

2. PRODUCTS:

23 73 13 PACKAGED AIR-HANDLING UNIT:

1. GENERAL:

23 82 23 VENTILATION AND EXHAUST:

1. GENERAL:

2. PRODUCTS:

3. EXECUTION:

23 82 33 CONVECTION HEATING:

1. GENERAL:

26 00 00 ELECTRICAL:

1. GENERAL:

26 05 00 COMMON WORK RESULTS FOR ELECTRICAL:

1. GENERAL:

2. DRAWINGS:

3. CUTTING AND PATCHING:

4. PAINTING:

5. ACCEPTANCE DEMONSTRATION:

6. CLEANUP:

26 05 19 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES:

1. GENERAL:

26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS:

1. GENERAL:

26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS:

1. GENERAL:

26 05 83 WIRING CONNECTIONS:

1. GENERAL:

2. MOUNTED HEIGHT:

26 05 83.03 DOOR ALARMS:

1. GENERAL:

2. MATERIAL:

3. INSTALLATION:

26 06 20.16 ELECTRICAL EQUIPMENT AND CIRCUITS SCHEDULES:

1. GENERAL:

26 09 23 LIGHTING CONTROL DEVICES:

1. GENERAL:

26 24 00.16 PANELBOARDS:

1. GENERAL:

26 27 26 WIRING DEVICES:

1. RECEPTACLES:

2. COVER PLATES:

3. CIRCUIT BREAKERS:

26 51 13 INTERIOR LUMINAIRES, LAMPS, AND BALLASTS:

1. MATERIAL:

2. ILLUMINANCE:

3. INSTALLATION:

26 51 14 EXTERIOR LUMINAIRES, LAMPS, AND BALLASTS:

1. MATERIAL:

2. ILLUMINANCE:

3. INSTALLATION:

26 53 00 EXIT SIGNS:

1. MATERIAL:

2. INSTALLATION:

26 54 00 CLASSIFIED LOCATION LIGHTING AND EQUIPMENT:

1. GENERAL:

26 54 00.01 BATTERY ROOM LIGHTING:

1. MATERIAL:

2. INSTALLATION:

26 54 00.02 BATTERY ROOM EXIT SIGN AND EMERGENCY LIGHTS:

1. MATERIAL:

2. INSTALLATION:

26 54 00.03 BATTERY ROOM EQUIPMENT:

1. MATERIAL:

2. INSTALLATION:

DIVISION 1 – GENERAL REQUIREMENTS

A. CONTRACT REQUIREMENT:

Construct and complete VT Hanlon Substation, in accordance with the Construction Contract (Standard Form 1442); the Contract Clauses; Western’s Construction Standards, including Standard 1 – General Requirements (September 2013), Standard 2 – Sitework (September 2013), Standard 3 – Concrete (September 2013), Standard 4 – Substation Metalwork and Transmission Line Lattice Structures (September 2013), Standard 9 – Substation – Electrical (September 2013), Standard 11 – Service Building (September 2013), Standard 12 – Painting (September 2013), Standard 13 – Environmental Quality Protection (September 2013), Standard 15 – Drawings (September 2013); Standard Drawings; and these Project Specifications and Drawings.

If a conflict occurs between the Project Specifications and the Construction Standards, the Project Specifications shall govern. The Project Specifications and the drawings are used to take exceptions or provide additions to the Construction Standards. Some paragraphs in the Construction Standards will not apply to this job.

Western’s Construction Standards, Standard Drawings, and Electrical Equipment Standards are available at:

https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspxm

Western Project Specifications and Construction Standards are explained in Standard 1 – General Requirements, Section 1.1.1, “Standards and Project Specifications”.

B. DESCRIPTION OF WORK:

This is a new substation. The principal components of work include removing two transmission line structures, constructing a new six (6) breaker 230-kV ring bus, 115-kV two (2) breaker ring bus, five (5) 69-kV breaker–and-a-half bays (load management equipment furnished and installed by others, Contractor is responsible for foundations, conduit, and grounding), three (3) autotransformers (provided by others, the Contractor is responsible for all electrical and control connections) with oil containment, 12.47-kV reactor, a service building, vertical switchboard sections, battery chargers and battery system, DC and AC distribution boards and associated electrical equipment, site development, ground grid, and fence for VT Hanlon Substation.

Paragraphs “Description of Bidding Schedule Items” in Divisions – 1, 2, 3, 4, 9, and 11 describe the work to be performed.

The work is located at 45361 253rd Street, Montrose, South Dakota, 57048 as shown on Drawing

VH 0015.

C. DESCRIPTION OF BIDDING SCHEDULE ITEM:

1. Bidding Schedule item “Mobilization and preparatory work” includes the following:

a. Performing mobilization and preparatory work in accordance with Section H & M of the contract clauses.

b. Prepare and submit a Construction Schedule and furnish a Safety and Health Program.

c. Providing jobsite office trailer and the items listed below. Prior to any jobsite work, the

Contractor shall provide the office trailer for the exclusive use of Western.

(1) Relocation: If the Contractor changes the location of his office during the term of the contract, then the Contractor shall also move the mobile office trailer provided for Western, simultaneously with the transportation of his own unit.

https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspxm

(a) Installation: Install anchors and tie-downs for the trailer complying with local, State, and Federal regulations. The office trailer shall be grounded. Entry points to the trailer shall be provided with stairways complying with Occupational Health and Safety Administration (OSHA) (29 Code of Federal Regulations (C.F.R.) 1926.1052).

(b) Office Space Requirements:

1) Size and Arrangement: At least 250-square-feet (minimum) consisting of two (2) separate rooms (one (1) office and one (1) larger room).

2) Heating and Cooling: Heating and cooling unit sized to provide adequate heating and cooling.

3) Lighting and Electrical: Adequate lighting and 110 V electrical outlets.

4) Utilities: Make all arrangements and pay all costs for providing utilities, including potable drinking water, electrical power, and heating and cooling energy.

5) Toilet Facilities: Toilet facilities shall be provided in the immediate vicinity of the office and shall be maintained.

(2) Emergency Equipment: Provide and maintain the following emergency equipment:

(a) First aid kit by Affirmed Medical, Inc., Model No. 3503, or equal. Mount to the wall inside the workroom.

(b) Dry chemical fire extinguishers, Classified 4-A:60-B:C, one (1) to be located inside each entrance to the trailer.

(3) Window Coverings: Provide adjustable mini-blinds.

(4) Office Furniture: Provide good quality, fully functional, office furniture as follows:

QUANTITY DESCRIPTION

5 Folding Office Chairs

1 Office Desk (30” x 60” minimum)

2 Office Tables (30” x 60” minimum)

1 Five-Drawer File Cabinet

1 Bookcase (30” x 13” x 48”)

12 “Plan Hold” binders No. 1CB-24 (including one (1) rack)

D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:

1. COMMENCEMENT AND COMPLETION: See FAR 52.211-10 in Section F of the solicitation/contract.

2. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, Western will require 40-calendar days for review of drawings or data submitted for approval.

3. COMMENCEMENT OF CONTROL WORK: Do not perform any control board or outdoor equipment wiring until receipt of Government-furnished wiring diagrams. Western will furnish outdoor wiring diagrams, outdoor schematic diagrams, control board wiring diagrams, and control board schematic diagrams no sooner than 20-calendar days after the delivery of the control boards. Include these restrictions in the construction program.

4. OUTAGE RESTRICTIONS: In addition to the restrictions listed in Construction Standard 1, the following outage restrictions shall apply:

a. The electrical operation of the transmission lines are under the jurisdiction of Western’s

Watertown Operations Office. All outage requests by the Contractor shall be subject to the approval of the Contracting Officer’s Representative (COR). Approval or denial of an individual outage request will be based on transmission system electrical loads, system operating configurations, and weather conditions at the time the outage is scheduled to begin. At any time because of transmission system electrical loads, transmission system operation or reliability, Western may deny an outage request or direct the Contractor to return facilities to operating conditions and release the applicable Special Work Permit.

b. Make all outage requests in writing to the COR a minimum of 3-weeks in advance.

c. Meeting the minimum advance notice requirement of 3-weeks does not guarantee an outage will be approved. To improve the chances of an outage being approved, all outages should be submitted with as much advance notice as practicable. Weather conditions and other system conditions such as other scheduled and nonscheduled (forced) outage must be evaluated against an outage request before approval can be granted.

5. CONSTRUCTION SCHEDULE RESTRICTIONS: The following Construction Schedule restrictions shall apply:

a. The Contractor shall not work more than 12 hours per day nor more than 60-hours in one continuous period without approval from the COR.

6. MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized as defined below and shall meet the requirements of Standard 1 – General Requirements, Section 1.4 “Safety and Health” and the following:

a. The maximum available fault current in the 230-kV, 115-kV, 69-kV, 12.47-kV areas are

5,830, 7,100, 7,400, and 29,250 amps and the X/R ratio is 9.4, 14, 19.4, and 15.7 respectively after completing construction.

b. A minimum of 1, 1/0 ground shall be used in the 115-kV, 69-kV, 12.47-kV areas.

c. A minimum of 1, 3/0 ground or 2, 1/0 grounds shall be used in the 230-kV area.

d. No protective ground lead shall be longer than 36 feet in length, unless approved by the

Contracting Office Representative (COR). Resistance values given in Personal Protective Grounds Test Report shall be less than or equal to those allowed in ASTM F 2249.

e. Protective Ground Leads: Each protective ground lead shall have a permanent identification tag with unique identification number, certified wire size, and test date. Each protective ground lead shall be tested complete with connectors, in accordance with ASTM F 2249. Protective ground leads shall be retested and recertified annually. A protective ground lead without an identification tag to relate it to the annual certification of that protective ground lead shall not be used. No protective ground lead shall be longer than 36-feet, unless approved by Contracting Officer’s Representative (COR). Test results shall be submitted to the COR for approval prior to use of the grounds. When using the DC test method, the Contractor shall submit testing information in the format shown below in the Personal Protective Grounds Test Report. When using the AC test method, the Contractor shall submit testing information in accordance with the test set manufacturers recommendations.

CABLE

ID

CABL

E SIZE

CABLE

CONDITION

CABLE

LENGTH

ASTM

RESISTANCE

(MΩ)

MEASURED

RESISTANCE

(MΩ)

PASS/FAIL

FT IN

Tester’s Signature

Test Temperature ______

Test Date ___________________

7. TYPICAL FOUNDATIONS FOR GOVERNMENT-FURNISHED ELECTRICAL EQUIPMENT

AND OIL DETENTION STRUCTURES: Typical foundations are shown on Drawings VH 2300- 1 and VH 2300-2 through VH 2316. Western will design these foundations after receipt of informational drawings and data. Western will forward the revised construction drawings for these foundations no later than 45-days prior to the “NLT” delivery date listed in the, “Material” section. If the “NLT” delivery date is adjusted by Western, forwarding of revised foundation construction drawings will be automatically adjusted in a like manner.

8. TYPICAL FOUNDATIONS FOR CONTRACTOR-FURNISHED ELECTRICAL EQUIPMENT:

Typical foundations are shown on Drawings VH 2306 through 2310. Regarding foundations noted as “design not firm”: Western will design these foundations after receipt and final approval of seismic qualification documents and informational drawings and data from the Contractor.

E. CONSTRUCTION SCHEDULE:

1. SUBMITTAL TIME: Prepare and submit a Construction Schedule to the COR within 45-calendar days after date of Notice to Proceed.

2. FORMAT AND DETAIL: Dates for each item of Government-furnished material shall be provided. Do not program dates earlier than the estimated delivery dates shown in the “Material” paragraph.

F. MATERIAL: Furnish all material for completing the work, except material furnished by Western as listed below:

ITEM

ESTIMATED

WEIGHT

(LBS)

ESTIMATED

DELIVERY

DATE

ESTIMATED

COST

1. Power circuit breakers:

a. Six (6) 245-kV, 3,000 amps 10,500 ea NST 7-01-15

NLT 7-31-15

$115,000 ea

b. Six (6) 123-kV, 3,000 amps 6,500 ea NST 2-01-16

NLT 3-17-16

$85,000 ea

c. Nine (9) 72-kV, 2,000 amps 5,000 ea NST 2-01-16

NLT 3-17-16

$70,000 ea

d. One (1) 15-kV, 2,000 amps 3,300 ea NST 2-15-16

NLT 3-17-16

$40,000

2. Three (3) Shunt reactor, 15-kV,

8.33 MVA, air core, single-phase 7,300 ea NST 9-01-15

NLT 10-12-15 $ 150,000 total

3. One (58 cells) 125-VDC Station battery BHB1 and accessories 200 per cell NST 7-01-16

NLT 7-31-16 $65,000

ITEM

ESTIMATED

WEIGHT

(LBS)

ESTIMATED

DELIVERY

DATE

ESTIMATED

COST

4. Two (2) Battery chargers BHC1 and BHC2 500 ea NST 7-01-16

NLT 7-31-16 $8,000 ea

5. Twenty-one (21) Vertical switchboard sections CHA2 through CHA8, CHB1, CHB2, CHB6 through CHB9, CHC1, CHC2 and CHC5 through CHC10

650 ea NST 7-01-16 NLT 7-31-16 $1,000,000 total

NST – No sooner than.

NLT – No later than.

1. POINTS-OF-DELIVERY:

a. Material furnished by Western will be delivered to VT Hanlon Substation. The Contractor is responsible for unloading of Western-furnished material. The Contractor shall inspect the equipment and report any damages to the COR.

b. The six (6) 245-kV, 3,000 amp breakers furnished by Western will be delivered to the East

River Cooperative substation 100 yards directly north east of the VT Hanlon substation.

The Contractor shall load, transport, and unload the material to the jobsite. The Contractor shall inspect the equipment and report any damages to the COR.

2. PROTECTION OF MATERIAL: Provide suitable indoor or warehouse storage for the following items: station batteries, battery chargers, and vertical switchboards. Provide protection against the elements after being removed from indoor storage and before installation, as directed by the manufacturer.

G. RIGHTS-OF-WAY:

1. GENERAL: Transmission line right-of-way is 125-feet-wide. Western does not represent that the Contractor can gain access to every structure site or travel continuously along the transmission line.

Orient construction methods and equipment to utilize Government-furnished rights-of-way, or obtain additional temporary access without additional cost to Western. Any additional temporary access acquired by the Contractor shall have prior COR approval, since several areas of the transmission line have travel restricted areas. During the contract period, Western reserves the right to use Contractor-obtained access.

2. ACCESS EASEMENTS: Western has acquired access easements from existing public roads to the transmission line, and some off right-of-way access along the transmission line. This off right-of-way access route is to provide access to the transmission line structure sites not accessible by traveling the transmission line.

3. WORK ON THE RIGHT-OF-WAY:

a. General: Perform work on the rights-of-way necessary for access to or along the transmission line. Only that excavation, dozing, or blading absolutely necessary will be allowed. Excavation, dozing, and blading for ease of travel may only be performed after field review and approval by the COR. Unauthorized excavation, dozing, blading shall immediately be repaired, or Western will have the damage repaired and back charge the Contractor for all costs involved.

b. Ease of Travel and Crane Landings: Excavation, dozing, or blading done for ease of travel on any easement or for crane landings shall be restored to the original contour of the land, and shall be compacted to a dry density not less than the natural in-place dry density of the surrounding earth. The use of water may be required to obtain the required density. Topsoil shall be stockpiled and spread on cuts prior to completion of work.

H. GEOLOGIC INVESTIGATIONS:

Geologic logs of subsurface explorations included in the “Drawings” Division constitute the information and records of geologic investigations for the work. Locations of subsurface investigations are shown on the Drawings.

Western does not guarantee that the geologic information and records show the conditions that will be encountered in performing the work, but only that the geologic information and records show conditions encountered at the particular point and time the information and records were obtained.

The geologic information may not indicate variations, such as those caused by seasonal fluctuations in rainfall and other factors, which may affect the water level. The Contractor shall determine the nature of material to be excavated, the difficulties of making and maintaining required excavations, and doing other work affected by geology and ground water elevations at the worksite.

I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:

Make arrangements and provide all electric power for construction purposes. Provide necessary transmission lines, distribution circuits, transformers, and other electrical equipment for distributing the power to the places of use. At contract completion, remove temporary electrical equipment and distribution lines.

Until permanent power is available, provide 24-hours a day temporary power to the service building to serve all building loads including HVAC, lighting, and station battery system. Provide temporary heating prior to beginning finish work, sufficient to keep the interior of the building at a minimum of 70 degrees Fahrenheit for 24-hours a day, until permanent heating is available.

J. WATER CONSTRUCTION PURPOSES:

Furnish water for construction purposes. Make arrangements for obtaining the water, and provide for conveying the water to the points of use.

K. EXPLOSIVES AND BLASTING:

Explosives shall not be used.

L. SUBMITTALS:

1. GENERAL: The Contractor shall furnish submittals via email as specified in the Construction Standards and this Project Specification. Submittals via email shall be in standard PDF or Electronic CAD “*.dwg” (AutoCAD 2014) formats. All submittals shall include the Western specification number, Western project title, and Bidding Schedule Contract Line Item Number (CLIN) and applicable division number. Multiple CLIN’s on a single submittal are not permitted.

A cover transmittal letter in Microsoft Word or PDF format shall be included with each email.

2. APPROVAL TIME: Approval time for submittals shall be in accordance with the

“Commencement, Prosecution, and Completion of Work” paragraph.

3. TRANSMITTAL: The Contractor shall transmit submittals to the Construction Field Engineer.

a. Construction Field Engineer:

Western Area Power Administration Western Construction Field Engineer ATTN: B5610.HU, Trevor Howard 200 4th Street SW Huron, South Dakota 57350-2474 Email: THoward@wapa.gov mailto:THoward@wapa.gov

DIVISION 2 – SITEWORK

A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule item “Miscellaneous sitework” includes the following:

a. Clearing and grubbing.

b. Providing HDPE pipe culverts, with a flared-end section at each pipe end, as shown on the Drawings.

c. Providing reinforced concrete pipe culverts with flared end sections at each pipe end as shown on the Drawings.

d. Providing riprap and sand and gravel bedding for protecting earth slopes at inlets and outlets of HDPE reinforced concrete pipe culverts, in drainage ditches, and elsewhere as shown on Drawing VH 2050.

e. Remove existing barbed wire fence as shown on Drawing VH 2050.

f. Providing a soil-applied herbicide where gravel surfacing is placed.

g. Providing miscellaneous metalwork, and other accessories as shown on Drawing

VH 2052.

2. Bidding Schedule item “Removing transmission line structures” includes the following:

a. Remove latticed steel structure 118/4 and cut off the footings 5-feet below existing grade.

Remove latticed steel structure 118/5 and completely remove foundations. Information on the exact foundations installed is not available. However, Drawings for several possible foundation designs are included. See dwgs. FT-SF D 2005, FT-SF D 2006, FT-SF D

2007, FT-SF D 2008, FT-SF D 2009

b. Structures to be removed are shown on Existing Installation Drawing FT-SF D 4082, at station 1454+70, and on Existing Installation Drawing FT-SF D 4083, at station 1444+20. Drawings 43-26S 2200, 43-26S 2201, and 43-212 2200 include dimensions and weights. Items removed become property of the Contractor and shall be promptly removed from the right-of-way.

c. Conductors, overhead ground wires and assemblies attached to these structures will be removed by others.

3. Bidding Schedule item “Stripping” includes stripping topsoil from the following areas on which compacted embankments are required to be placed and in which excavation is required:

a. Substation site.

b. Access roads.

4. Bidding Schedule item “Excavation for substation site and access road” includes required excavation for the following:

a. Substation yard to attain subgrade elevations under gravel surfacing and finished grade elevations where gravel surfacing is not required.

b. Access road to attain subgrade elevations under gravel surfacing and finished grade elevations where gravel surfacing is not required.

c. Drainage ditches around substation yard, for access road, and elsewhere as shown on the Drawings.

d. Riprap and gravel bedding at outlets and inlets of culverts.

e. There is an abandoned fiber optic cable in the area of the excavation running North to

South which may be found during excavation. The Contractor does not need to take any precautions to avoid the cable.

5. Bidding Schedule item “Embankments” includes constructing and compacting embankments for the substation site, access roads, and elsewhere as shown on the Drawings.

6. Bidding Schedule item “Standard chain link fence” includes providing standard chain link fence with Type III gates and guard of three strands of barbed wire as shown on Drawings 31 2000, 31 2001, and 31 2038. Fence shall be erected as shown on Drawing VH 2050.

7. Bidding Schedule item “Gravel-surfacing” includes providing 6-inch-thick gravel surfacing as shown on Drawings VH 2050, VH 2051, VH 2052, and VH 2053. See also Construction Standard 2.11.1.

8. Bidding Schedule item “Seeding” includes providing material, preparing areas to be seeded, spreading commercial fertilizer, sowing and maintain grass seed, and protecting seeded areas.

Areas to be seeded include:

a. Excavation and embankment slopes outside the gravel-surfaced area of the substation site.

b. Disturbed areas, except those to receive gravel surfacing.

c. Disposal areas.

d. Borrow areas.

e. Seed: Use regionally native plant seed. Perform seeding during the period March 1 to June 1 or August 1 to October 1, except during unfavorable weather conditions or when soil conditions are not suitable as determined by the COR.

f. Fertilizer: Applying uniformly at a rate required per the Western Construction Standards

g. Mulching: Applying mulch to seeded areas and crimp into top soil within 24-hours after seeding. Applying uniformly at a rate required per the Western Construction Standards

9. Bidding Schedule does not contain separate items for the following. Include these items in applicable Bidding Schedule items.

a. Excavations for foundations, structures, and trenches.

b. Placing and compacting earth material and backfill.

c. Providing gravelfills for the Service Building and under concrete foundations as shown on the Drawings.

d. Providing sand backfill around buried insulated electrical cables and 2-inch by 8-inch lumber over the sand as shown on Drawing 31 1006.

e. Disposing of Excavated Material: The Contractor shall make arrangements required for disposal of waste material in an approved landfill.

f. Expansion anchors and adhesive anchors.

g. The site for the new substation has existing subsurface drain tile lines. The tile extends through the property to the northeast but precise location data is not available. The drain tile lines shall be capped in both directions where the tile exits the property to the south.

Damage to the tile resulting from construction of the substation on Western property does not need to be repaired. See Drawing VH T017.

DIVISION 3 – CONCRETE

A. GENERAL:

1. MATERIAL:

a. Cement: Type IIA cement.

b. Compressive Strength: 4000 psi at 28-days for substation concrete and foundations for transmission line steel pole structures.

c. Water-Cement Ratio: Net water-cement ratio, exclusive of water absorbed by the aggregates, shall not exceed 0.45 by weight.

d. Type A and D water-reducing and retarding admixtures may be used if approved by the

COR.

e. Use of fly ash is required in concrete.

2. TEST FOR POTENTIAL REACTIVITY OF SAND AND COARSE AGGREGATE: Western may perform test for each source used by the Contractor. If the tests determine the aggregate(s) to be unsuitable as a concrete aggregate, a suitable source shall be obtained by the Contractor.

3. CURING: Exposed, formed surfaces of concrete foundations shall be cured with water, resin-base curing compound without fugitive dye, or by covering with polyethylene film.

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule item “Substation concrete foundations” includes the following:

a. Earthwork, formwork, reinforcement, material used in concrete, anchor bolts, curing, finishing, joints, and other related work and material needed to complete the concrete construction.

b. Concrete foundations for steel structures.

c. Concrete foundations for electrical equipment.

d. Unwatering foundation excavations, if required.

e. Casing excavations, if required

f. Measurement for quantities for substation concrete foundations will be made on the basis of concrete quantities shown on Drawing VH 2000. Regardless of the concrete quantities actually placed, payment will be based on the quantities of concrete shown on the Drawing.

2. Bidding Schedule item “Type “C” cable trench” includes providing precast concrete Type C cable Trenches, vehicular crossings, complete with sandfill, precast polymer concrete covers, and other accessories.

3. Bidding Schedule item “Oil detention structure” includes providing oil containment structure as shown on VH 2300-1, VH 2301-1 and VH 2302-1, complete with C.I. Agent Hydrocarbon flow filter or equal, concrete, piping, hardware and aluminum cover. Hydrocarbon filter system shall be installed in accordance with manufacturer’s instructions. Furnish three spare C.I.

Agent Hydrocarbon flow filters or equal and deliver to the COR on site.

Measurement for quantities for the oil detention structure will be made on the basis of the concrete quantity shown on Drawing VH 2000. Regardless of the concrete quantities actually placed, payment will be based on the quantity of concrete shown on the drawing.

DIVISION 4 – METALWORK

A. GENERAL:

1. MEASUREMENT: Measurement for quantities for Bidding Schedule item “Steel structures, welded (galvanized)” will be made on the basis of black weights calculated in accordance with LRFD, “AISC Code of Standard Practice for Steel Buildings and Bridges”, except that weights for nonrectangular shapes and plates are to be based on actual detailed dimensions.

a. Steel structure weights, calculated as noted above, are shown on the Government-furnished shop drawings and shall be shown on the Contractor-furnished final shop drawings, and payment will be based thereon. Steel and aluminum estimated weights are shown on the specifications drawings for the structures requiring approval drawings as noted in the Bidding Schedule items “Steel structures, welded (galvanized)” and “Aluminum Structures, welded”.

1. Bidding Schedule item “Steel structures, welded (galvanized)” includes providing the following:

a. Five (5) – 115-kV Take-Off Structure – Type I.

b. Three (3) – 115-kV Take-Off Structure – Type II.

c. Three (3) – 115-kV Take-Off Structure – Type III.

d. Four (4) – 230-kV Take-Off Structure – Type IV.

e. Two (2) – 230-kV Take-Off Structure – Type V.

f. Four (4) – 230-kV Bus Tower – Type I.

g. Two (2) – 45-foot Ground Mast – Type I.

h. Three (3) – 65-foot Ground Mast – Type II.

i. Three (3) – 12.47-kV Bus Pole – Type II.

j. Two (2) – 12.47-kV Bus Pole – Type III.

k. Twenty-seven (27) – 69-kV Bus Pole – Type IV.

l. Eight (8) – 115-kV Bus Poles – Type V.

m. Thirty-eight (38) – 230-kV Bus Pole – Type VI.

n. Two (2) – 230-kV Bus Pole – Type VII.

o. Eleven (11) – 230-kV Bus Tee Pole (2-Phase) – Type II.

p. One (1) – 230-kV Bus Tee Pole (2-Phase) – Type III.

q. Five (5) – 12.47-kV Bus Tee Pole (3-Phase) – Type IV.

r. Three (3) – 12.47-kV Bus Tee Pole (3-Phase) – Type V.

s. Nineteen (19) – 69-kV Bus Frame – Type I.

t. Twenty-four (24) – 69-kV Bus Frame – Type II.

u. Ten (10) – 115-kV Bus Frame – Type III.

v. Five (5) – 115-kV Bus Frame – Type IV.

w. Fifty-four (54) – 230-kV Bus Frame – Type V.

x. Twenty-one (21) – 230-kV Bus Frame – Type VI.

y. Two (2) – 12.47-kV Disconnect Switch Support – Type I.

z. One (1) – 69-kV Disconnect Switch Support – Type II.

aa. Thirty-one (31) – 115-kV Disconnect Switch Support – Type III.

bb. Twelve (12) – 230-kV Disconnect Switch Support – Type IV.

cc. Five (5) – 230-kV Disconnect Switch Support – Type V.

dd. One (1) – 12.47-kV Equipment Support (VT) – Type I.

ee. Six (6) – 69-kV Equipment Support (VT) – Type II.

ff. Fourteen (14) – 69-kV Equipment Support (CCVT) – Type III.

gg. Six (6) – 69-kV Equipment Support (CT) – Type IV.

hh. Three (3) – 115-kV Equipment Support (VT) – Type V.

ii. Ten (10) – 115-kV Equipment Support (CCVT) – Type VI.

jj. Three (3) – 115-kV Equipment Support (CT) – Type VII.

kk. Eighteen (18) – 230-kV Equipment Support (CCVT) – Type VIII.

ll. One (1) – 12.47-kV Reactor Dampening Support – Type I.

mm. Two (2) – 12.47-kV Station Service Feed Support – Type I.

nn. One (1) –69-kV Fuse Disconnect Switch Support – Type I.

oo. Forty-six (46) – Single-switch operating platforms including grating, Type I, MK FR1 as shown on VH 2926.

pp. Nine (9) – Double-switch operating platforms including grating, Type II, MK FR2 as shown on VH 2926.

qq. One (1) – Equipment cabinet platform for the 12.47-kV circuit breaker including grating, Type IV, MK FR4 as shown on VH 2925.

rr. Nine (9) – Equipment cabinet platforms for the 69-kV circuit breakers including grating, Type V, MK FR5 as shown on VH 2925.

ss. Six (6) – Equipment cabinet platforms for the 115-kV circuit breakers including grating,

tt. Six (6) – Equipment cabinet platforms for the 230-kV circuit breakers including grating, Type VI, MK FR6 as shown on VH 2925.

uu. Three (3) – Equipment cabinet platforms for the power transformers including grating, All above structures require approval drawings.

The above material including connection bolts, nuts, washers, and lock nuts shall be galvanized.

2. Bidding Schedule item “Aluminum structures, welded” includes providing the following:

a. Five (5) – 12.47-kV Bus Pole – Type I.

b. One (1) – 12.47-kV Bus Tee Pole (2-Phase) – Type I.

All above structures require approval drawings.

DIVISION 9 – SUBSTATION – ELECTRICAL

A. GENERAL: Electrical equipment and material shall be as specified in Western’s “WAPA ES”

Standard Equipment Specifications, as shown on project drawings, and in accordance with NEMA, ANSI, IEEE, ICEA, ASTM, NEC, NESC, UL, and Federal specifications and standards as applicable.

Applicable requirements shall be met under the following service conditions:

Ambient Temperatures:

Maximum ........................................................................................... +40°C Maximum 24-Hour Average .............................................................. +30°C Minimum ............................................................................................. -50°C

Elevation:

Above Mean Sea Level .............................................................. 1,400-Feet

*ASCE-7 Wind Load:

Minimum Basic Wind Speed .......................................................... 90 MPH Importance Factor ................................................................................ 1.15

*IEEE Seismic Qualification ............................................................................ Low

*Wind and seismic loads are nonsimultaneous.

1. Bidding Schedule for Government-furnished items (including associated supporting structures when furnished) require the Contractor to provide:

a. Unless otherwise indicated, unloading and inspecting Government-furnished items.

b. Installing Government-furnished items as shown on drawings.

c. Furnishing equipment and material not furnished by Western.

2. Bidding Schedule for items (not furnished by the Government) shall be furnished by the

Contractor and shall include the following:

a. Providing (furnishing and installing) bidding schedule items.

b. Providing equipment and material not furnished by Western.

c. Installing bidding schedule items as shown on drawings.

3. Unless otherwise specified, associated support structures provided for each electrical equipment rated above 7-kV shall be 102-inches in height and hot-dip galvanized, if made of steel. Instrument transformers that are seismically qualified shall be 96 inches in height. If tubular steel supports are furnished, they shall be galvanized internally and externally.

4. Installation and painting of electrical equipment and material shall be provided in accordance with Standards 9 and 12 respectively.

1. Bidding Schedule items “Power circuit breaker, 245-kV, 3,000 amps (Government-furnished)”, “Power circuit breaker, 123-kV, 3,000 amps (Government-furnished)”, “Power circuit breaker, 72-kV, 2,000 amps (Government-furnished)”, and “Power circuit breaker, 15-kV, 2,000 amps (Government-furnished)”:

DESIGNATION

JV3A, JV4A,

JV4B, JV5A,

JV6A, JV6B

JY1B, JY2A,

JZ5B, JZ6A,

JZ7B, JZ8A,

JZ9A, JZ9B,

JZ10A JZ13A,

JZ13B, JZ14A,

JZ15A, JZ15B,

JZ16A

JW70A

Manufacturer Mitsubishi Mitsubishi Mitsubishi ABB

Type SF6 gas SF6 gas SF6 gas Vacuum Nominal Voltage Rating (kV) 230 115 69 12.47

Maximum Voltage Rating (kV) 245 123 72 38

Continuous Current (Amps) 3,000 3,000 2,000 2,000

Estimated Weight of 3-pole Breaker 10,500 6,500 5,000 3,300

Approximate SF6 Gas Weight (LBS) 132 61.2 40 N/A

a. The equipment supplier will unload the power circuit breakers from the truck, and

Contractor personnel shall inspect the power circuit breakers for possible damage during shipment or transportation and report any damage to Western’s COR.

b. Special tools and spare parts will be furnished with the power circuit breakers (a complete list will be included with the breaker instruction books). The Contractor shall deliver the spare parts furnished with the breakers to Western’s on-site representative.

2. Bidding Schedule items “Disconnecting switch, 245-kV, 2,000 amps” and

“Disconnecting switch with ground blades, 245-kV, 2,000 amps” includes providing the following disconnecting switches and disconnecting switch with ground blades as shown on the drawings and in accordance with WAPA ES 8.1 equipment standard:

YV3A, YV4A,

YV4B, YV5A,

YV6A, YV6B,

WV3A, WV4A,

WV4B, WV5A,

WV6A, WV6B

YV2C, YV6C,

YV7C

YV4C-ZV4A,

YV5A-ZV5A

Type

3-pole, single throw, outdoor, group operated, vertical break, rotating insulator

3-pole, single throw, outdoor, group operated, vertical break, rotating insulator

3-pole, single throw, outdoor, group operated, vertical break, rotating insulator

System Nominal Voltage Rating (kV) 230 230 230

Rated Maximum Voltage (kV) 245 245 245

Basic Impulse Insulation Level (kV) 900 900 900

Continuous Current Rating (Amps) 2,000 2,000 2,000

Momentary Current Rating (kA) 100 100 100

YV3A, YV4A,

YV4B, YV5A,

YV6A, YV6B,

WV3A, WV4A,

WV4B, WV5A,

WV6A, WV6B

YV2C, YV6C,

YV7C

YV4C-ZV4A,

YV5A-ZV5A

Grounding Blades None None Clip-end

Switch Operator Type Manual Worm- Gear Operator

Manual Worm- Gear Operator

Manual Worm- Gear Operator

Phase Spacing (FT) 12’-0” 12’-0” 12’-0”

Height of Support Structure (FT)* 10’-6” 15’-6” 15’-6”

Mounting Position Horizontal Horizontal Horizontal Key Interlock None None None

*Approximate mounting height.

3. Bidding Schedule items “Disconnecting switch, 123-kV, 2,000 amps” and

“Disconnecting switch with ground blades, 123-kV, 2,000 amps”, includes providing the following disconnecting switches and disconnecting switch with ground blades as shown on the drawings and in accordance with WAPA ES 8.1 Equipment Standard:

YY1A, YY1B, YY1C,

WY2A, YZ5B, YZ5C,

YZ7B, YZ7C, WZ6A,

WZ8A, YZ9A,YZ9B,

YZ9C, YZ13A,

YZ13B, YZ13C,

WZ9A, WZ10A,

WZ13A, WZ14A,

YZ15B, YZ15C,

WZ15A, WZ16A

YY2A-ZY2A, YZ6A-

ZZ6A, YZ8A-ZZ8A,

YZ10A-ZZ10A,

YZ14A-ZZ14A,

YZ15A-ZZ15A,

YZ16A-ZZ16A

Type

3-pole, single throw, outdoor, group operated, vertical break, rotating insulator

3-pole, single throw, outdoor, group operated, vertical break, rotating insulator

System Nominal Voltage Rating (kV) 115 115

Rated Maximum Voltage (kV) 123 123

Basic Impulse Insulation Level (kV) 550 550

Continuous Current Rating (Amps) 2,000 2,000

Momentary Current Rating (kA) 70 70

Grounding Blades None Clip-end

Switch Operator Type Manual Worm-Gear Operator

Manual Worm-Gear Operator

YY1A, YY1B, YY1C,

WY2A, YZ5B, YZ5C,

YZ7B, YZ7C, WZ6A,

WZ8A, YZ9A,YZ9B,

YZ9C, YZ13A,

YZ13B, YZ13C,

WZ9A, WZ10A,

WZ13A, WZ14A,

YZ15B, YZ15C,

WZ15A, WZ16A

YY2A-ZY2A, YZ6A-

ZZ6A, YZ8A-ZZ8A,

YZ10A-ZZ10A,

YZ14A-ZZ14A,

YZ15A-ZZ15A,

YZ16A-ZZ16A

Phase Spacing (FT) 7’-0” 7’-0”

Height of Support Structure (FT)* 10’-6” 10’-6”

Mounting Position Horizontal Horizontal Key Interlock YY1C interlocked with ZY2A, YZ5C interlocked with ZZ6A, YZ7C interlocked with ZZ8A, YZ9C interlocked with ZZ10A, YZ13C interlocked with ZZ14A, YZ15C interlocked with ZZ16A

4. Bidding Schedule items “Disconnecting switch, 72-kV, 600 amps” and “Disconnecting switch, 15-kV, 1,600 amps” includes providing the following disconnecting switches as shown on the drawings and in accordance with WAPA ES 8.1 equipment standard:

DESIGNATION WZ19A WW70A,

WW72A

Type

3-pole, single throw, outdoor, group operated, vertical break, rotating insulator

3-pole, single throw, outdoor, group operated, rotating insulator

System Nominal Voltage Rating (kV) 69 12.47

Rated Maximum Voltage (kV) 72 15

Basic Impulse Insulation Level (kV) 350 150

Continuous Current Rating (Amps) 600 1,600

Momentary Current Rating (kA) 40 40

Grounding Blades None None

Arcing Horns Whip Standard

Switch Operator Type Manual Worm- Gear Operator

Manual Worm- Gear Operator

DESIGNATION WZ19A WW70A,

WW72A

Phase Spacing (FT) 7’-0” 5’-0”

Height of Support Structure (FT) 10’-6” 12’-6”

Mounting Position Horizontal Horizontal

Key Interlock None None

5. Bidding Schedule item “Load break switch, 25-kV, 600 amps” includes providing the load break switches in accordance with WAPA ES 8.2 equipment standard:

DESIGNATION WW19A, WW74A

Type

3-pole, single-throw, outdoor, manually group-operated, vertical break, rotating insulator type interrupter S&C Alduti-Rupter

Electric Company type or equivalent

System Nominal Voltage (kV) 25

Rated Maximum Voltage (kV) 27

Basic Impulse Insulation Level (kV) 150* Switch Continuous Current Rating (Amps) 600

Momentary Current Rating (kA) 40

Phase Spacing (FT) 5’-0” Approximate Mounting Height Above Ground (FT) 16’-0”

Mounting position Vertical

*Cypoxy station post insulators are acceptable.

6. Bidding Schedule item “Fuse disconnecting switch, 69-kV, single-phase” includes providing single-pole fuse disconnecting switches as shown on the drawings and in accordance with WAPA ES 8.3 equipment specifications:

DESIGNATION (SINGLE-PHASE) FZ19A1, FZ19A2, FZ19A3

Nominal Voltage Rating (kV) 69

Maximum Rated Voltage (kV) 72

Basic Impulse Level (kV) 350 Mounting Position Vertical Approximate Mounting Height (FT) 22’-0” Phase Spacing (FT) 5’-0”

Fuse Symmetrical Interrupting Rating (RMS amps) 8,000

*Approximate Fuse E Rating 3E to 200E

*Exact E rating will be furnished after the Contractor has submitted the time current curves of proposed fuse units.

a. Equipment Type: Outdoor, single-pole, hook-operated, fuses, S&C Electric Company

SMD drop out indicating type or equivalent.

b. Fuse disconnecting switches shall be qualified to operate under service conditions specified in paragraph A. General.

7. Bidding Schedule item “Fuse disconnecting switch, 14.4-kV, single-phase” includes providing single-pole fuse disconnecting switches as shown on the Drawings and in accordance with WAPA ES 8.3 equipment specifications:

DESIGNATION (SINGLE-PHASE)

FW19A1, FW19A 2,

FW19A3, FW74A1, FW74A

2, FW74A 3

Nominal Voltage Rating (kV) 14.4 Maximum Rated Voltage (kV) 17

Basic Impulse Level (kV) 150 Mounting Position Vertical Approximate Mounting Height (FT) 12’-0” Phase Spacing (FT) 5’-0” Fuse Symmetrical Interrupting Rating (RMS amps) 25,000

*Approximate Fuse E Rating 3 to 300E

*Exact E rating will be furnished after the Contractor has submitted the time current curves of proposed fuse units.

a. Equipment Type: Outdoor, single-pole, hook-operated, fuses, S&C Electric Company

SMD-40 drop out indicating type or equivalent.

b. Fuse disconnecting switches shall be qualified to operate under service conditions specified in paragraph A. General.

8. Bidding Schedule item “Voltage transformer, 115-kV, single-phase” and “Voltage transformer, 69-kV, single-phase”:

(SINGLE-PHASE) VY1A1, VY1A2, VY1A3

VZ9A1, VZ9A2, VZ9A3,

VZ13A1, VZ13A2,

VZ13A3

Type Single-phase, outdoor, 60 Hz

Single-phase, outdoor, 60 Hz

Rated Primary Voltage (kV) 115 69

Basic Impulse Level 550 350

Ratio Primary to Secondary*

600/1000:1 600/1000:1

350/600:1 350/600:1

(SINGLE-PHASE) VY1A1, VY1A2, VY1A3

VZ9A1, VZ9A2, VZ9A3,

VZ13A1, VZ13A2,

VZ13A3

ANSI Accuracy Class 0.3 W, X, M, Y, Z, ZZ Metering Accuracy

0.3 W, X, M, Y, Z, ZZ

Metering Accuracy

Type Oil-filled Oil-filled

Thermal burden rating

(VA) 400 400

Mounting Base Base

*The non-polarity terminal of the secondary winding shall be the common terminal connection required for the 69 and 115 secondary voltages.

9. Bidding Schedule items “Current transformer, 115-kV, single-phase” and “Current transformer, 69-kV, single-phase”:

(SINGLE-PHASE)

QY1A1, QY1A2,

QY1A3

QZ9A1, QZ9A2,

QZ9A3, QZ13A1,

QZ13A2, QZ13A3

Type Single-phase, outdoor, 60 Hz, Extended Range

Single-phase, outdoor, 60 Hz, Extended Range Nominal System Voltage (kV) 115 69

Basic Impulse Level (kV) 550 350 Rated Primary and Secondary Currents (Amps)

1000:5 1000:5

ANSI Accuracy Class 0.15% for all Burdens

0.15% for all Burdens

Continuous Thermal Current Rating Factor at 30°C Ambient Temperature

1.5 1.5

Type Oil Filled Oil Filled

Short time Thermal Rating 54 45

Mounting Base Base

10. Bidding Schedule items “Coupling capacitor voltage…